Cultura Documentos
PROJECT
UPGRADING AND RENOVATION OF CROWNE PLAZA COMPLEX
CONSULTANT
ACE INTERNATIONAL CONSULTING ENGINEERS
MAIN CONTRACTOR
ROBERTS CONSTRUCTIONS
MEP CONTRACTOR
ZENER STEWARD LLC
SUPPLIER
(AVADH METAL LLC)
MANUFACTURER
(AVADH METAL)
INDEX
1 - Product Catalogue
6 - Location of application
7 - Required certification
8 - Method Statement
11 - Description of supplier
12 - Description of manufacturer
15 - Time Affects
& Building Materials Trading LLC
& Building Materials Trading LLC
Tel.: +971 2666 4021 Fax: +971 2666 4061 Al Hamed Tower, Near Al Falah
Plaza, 8th Floor, Muroor Rd, P.O Box: 114246 Abu Dhabi, UAE
Email: avadh.metal@gmail.com
TECHNICAL DATA OF
PRODUCT/DESCRIPTION OF MATERIAL
FRAMING SYSTEM ACCESSORIES
FULLY THREADED RODS DIN 975 | GRADE 4.8 / 8.8
STAINLESS
ZINC PLATED HOT DIP GALVANIZED D d s
STEEL FOR BOLT
WASHERS (BSEN 14713-1: 2009)
(SS 304/SS 306)
(mm) (mm) (mm)
M6 M6 M6 12 6.4 1.6
M8 M8 M8 16 8.4 1.6
M10 M10 M10 21 10.5 2
M12 M12 M12 24 13 2.5
STAINLESS STEEL
ZINC PLATED HOT DIP GALVANIZED D d s
DIN FOR WASHER
WASHERS (BSEN 14713-1: 2009)
(SS 304/SS 306)
(mm) (mm) (mm)
440 M6 M6 - 22 6.6 2
9021 M8 M8 M8 24 8.4 2
9021 M10 M10 M10 30 10.5 2.5
440 M12 M12 - 45 13.5 4
9021 M12 M12 M16 37 13 3
9021 M16 M16 M12 50 17 3
WASHERS (SRW) DIN 440, DIN 9021
STAINLESS STEEL
HOT DIP GALVANIZED AxBxD
FOR BOLT
(BSEN 14713-1: 2009)
(SS 304/SS 306)
(mm)
M10 M10 40 x 40 x 5
M12 M12 40 x 40 x 5
M16 M16 40 x 40 x 5
M6 M6 40 x 40 x 6
M10 M10 40 x 40 x 6
M12 M12 40 x 40 x 6
FRAMING SYSTEM ACCESSORIES
HEXAGON NUTS DIN 934 | GRADE 4.8 / 8.8
MACHINE HEX HEAD BOLTS DIN 933/ DIN 24017 | GRADE 4.8 / 8.8
HOT DIP S S
ZINC PLATED HOT DIP GALVANIZED
GALVANIZED DIN EN
DIMENSION (BSEN 14713-1: 2009)
(BSEN 14713-1: 2009) (mm) (mm)
M6 x 12 - M6 x 12
10/5 10/5
M6 x 25 - M6 x 25
M8 x 25 M8 x 25 M8 x 25
17/8 17/8
M8 x 40 - M8 x 40
M10 x 20 - M10 x 20
M10 x 30 M10 x 30 M10 x 30
M10 x 45 M10 x 45 M10 x 45 24/13 24/13
M10 x 60 - M10 x 60
HEX HEAD BOLT (SHB) DIN 933/EN 24017
M10 x 70 - M10 x 70
(without nut) M12 x 22 - M12 x 22
M12 x 25 M12 x 25 M12 x 25
M12 x 30 M12 x 30 M12 x 30
M12 x 40 M12 x 40 M12 x 40
24/13 24/13
M12 x 50 - M12 x 50
M12 x 60 M12 x 60 M12 x 60
M12 x 80 - M12 x 80
M12 x 90 M12 x 90 M12 x 90
M16 x 40 M16 x 40 M16 x 40
M16 x 60 M16 x 60 M16 x 60 17/8 17/8
M16 x 90 M16 x 90 M16 x 90
*OTHER SIZES AVAILABLE UPON REQUEST
NUT WITHOUT SPRING NUT WITH SHORT SPRING NUT WITH LONG SPRING
PULL OUT
LONGITUDINAL TIGHTENING
THICKNESS (t) FORCE
THREAD SIZE FORCE (FL) TORQUE
(Fv)
mm Kn Kn Nm
M6 5.0 1.0 5.0 12.0
M8 6.0 2.4 6.0 28.0
M10 8.0 3.5 7.0 55.0
M12 10.0 5.0 9.0 75.0
PULL OUT
LONGITUDINAL TIGHTENING
FORCE
THREAD SIZE FORCE (FL) TORQUE
(Fv)
Kn Kn Nm
M6 5.0 0.3 6.5
M8 6.0 0.6 16.0
M10 7.0 1.2 31.5
M12 7.0 1.7 50.0
FINAL CONTRACTOR’S STATEMENT
(COMPLIANCE SHEET & STATEMENT)
COMPLIANCE STATEMENT
PROJECT NAME: UPGRADING AND RENOVATION OF CROWNE PLAZA COMPLEX MEP CONTRACTOR: ZENER STEWARD LLC
The metal thickness of perforated channel shall not be less than PRE-GALVANIZED UNISTRUT CHANNEL
Q
1.5 mm before galvanizing.
COMPLY COMPLY TO BS EN 10142 (FORMERLY BS 2989)
8th Floor, Al Hamed Tower (near Al Fala Plaza), Muroor Rd الطابق الثامن، قرب الفالح بالزا،أحمد-برج ال
Abu Dhabi UAE, PO Box 114246 ، اإلمارات العربية المتحدة، أبوظبي، شارع المرور، 144246 :صندوق البريد
Tel.: +971 26664021 | Fax: +971 026664061 رقم الهاتف: 97126664021 +
رقم الفاكس: 97126664061 +
avadh.metal@gmail.com | ambt.auh@avadhmetal.com
البريد االلكتروني:avadh.metal@gmail.com
8th Floor Makateb Building Deira City الدور الثامن بناية مكاتيب ديرة
Dubai UAE، PO Box 88735
Dubai UAE, PO Box 88735
42965384 971+ :الهاتف
Tel.: +971 42965384 avadh.metal@gmail.com | ambt.auh@avadhmetal.com
avadh.metal@gmail.com | ambt.auh@avadhmetal.com
COPY OF THE SPECIFICATIONS
UPGRADING AND RENOVATION
OF CROWNE PLAZA COMPLEX – DUBAI (Package -1A)
r. Cable trays arranged one above the other shall have spacing in
relation to their width not exceeding a ratio of 1.2 with a
minimum distance of 150 mm.
t. The Contractor will be responsible for ensuring that the cable tray
and ladder rack routes do not prevent access to machine
components, control positions, walkways, access points and
working areas.
The Contractor will meet the costs of changing tray or ladder rack
routes to comply with this condition of the contract.