Você está na página 1de 16
‘SPECIFICATION DIALOG EAC SDN, BHD. DOCUMENT TITLE: SPECIFICATION FOR FLOWMETER PROJECT TITLE INDEPENDENT DEEPWATER PETROLEUM TERMINAL AT PENGERANG, JOHOR, DARUL TAZIM PROJECT OWNER : PENGERANG INDEPENDENT TERMINALS SDN. BHO. | | | | Famfieron | 7 | ssbaa0r@ | APPROVED FOR CONSTRUGTION 7 ut o | ona ISSUED FOR APPROVAL 7 Ta Rev | Date Description Pregid ‘Document No: DHOOOS-ENG-+SP-0010 iananor2 Rote PE ReSR | SPECIFICATION DIALOG EBC SDN, BHO. # TABLE OF CONTENTS 1.0. GENERAL. 2.0 APPLICABLE CODES AND STANDARDS. 3.0 ENVIRONMENTAL CONDITION 40. TRCHNICAL SPECIFICATION crcrnnennnenn 7 TESTING AND INSPECTION WARRANTY . BMI srccricanon [= DIALOG E86 SON, BHD. | Page 10 20 GENERAL, Ths document provides suppy and dalivery of Fewmeters and acces Independent DeepnaterPetoloum Temina at Pengereng shal supnly the Flowmeter o be used or te compound fenvieonment. The desertion and the quanlly of the te on rere as the DECSE) representative, Fale to dently deviaton wit be inlerpreted by the DECSE at conmaton that the VENDOR / MANUFACTURER compl 1 specication and any subsequent cost that may aise trom nor complane shall be bore by the VENDOR J MANUFACTURER. [APPLICABLE CODES AND STANDARDS elvery ofthe Flowmeter and accessories shall confer Except whore spectied elsowhare, all the equipments and maleate shall conform tothe requirements of IEC as wel as Local Codes and roglaions. qupmenis marufactued to ‘er spectestions and standards shaud be statedin the vender’ qotaen, conta issued by Engnea’s decision. incase of eer

Você também pode gostar