Office of the Chief Executive Officer

Mizoram Rural Roads Development Agency.


NOTICE INVITING TENDERS (NIT)
NIT No. 2/MiRRDA/PMGSY/2016-17

1. The Chief Executive Officer, Mizoram Rural Roads Development Agency (MiRRDA) &
Engineer-in-Chief, PWD on behalf of the Governor of Mizoram invites item-rate bids, in
electronic tendering system, for construction of roads under Pradhan Mantri Gram Sadak
Yojana for each of the following works from eligible contractors.

Estimated Bid
Sl. Package Period of
District Name of the work Cost Security
No. no. completion
(Rs. Lakh) (Rs. Lakh)
1 2 3 4 5 6 7
Construction of Sialsuk to Sailam Road.
1 Aizawl MZ 01 911 (0.0 to 10.5) kmp 24 Rs. 732.60 Rs. 14.65
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Hmuifang to Chawilung Road.
2 Aizawl MZ 01 912 (0.0 to 10.38) kmp 24 Rs. 740.33 Rs. 14.81
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Darlawn to N. Serzawl Road.
3 Aizawl MZ 01 913 (0.0 to 8.32) kmp 18 Rs. 651.68 Rs. 13.03
(SH: Construction of road using Flexible Pavement)
Construction of Sakawrdai to Vaitin Road.
Aizawl
4 MZ 01 914 (0.0 to 4.89) kmp 18 Rs. 375.53 Rs. 7.51
(SH: Construction of road using Flexible Pavement)
Construction of Zohmun to Palsang Road.
Aizawl
5 MZ 01 915 (0.0 to 12.37) kmp 24 Rs. 845.84 Rs. 16.92
(SH: Construction of road using Flexible Pavement)
Construction of Khawlian to N. Tlangnuam Road.
Aizawl
6 MZ 01 916 (0.0 to 4.00) kmp 18 Rs. 278.33 Rs. 5.57
(SH: Construction of road using Flexible Pavement)
Construction of N. Tlangnuam to Daido Road.
Aizawl
7 MZ 01 917 (0.0 to 5.39) kmp 18 Rs. 362.84 Rs. 7.26
(SH: Construction of road using Flexible Pavement)
Construction of Phullen to Zawngin Road.
Aizawl
8 MZ 01 918 (0.0 to 12.36) kmp 24 Rs. 836.41 Rs. 16.73
(SH: Construction of road using Flexible Pavement)
Construction of Dilkhan to N. Lungpher Road.
Aizawl
9 MZ 01 919 (0.0 to 12.68) kmp 24 Rs. 866.02 Rs. 17.32
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Dilkhan to Tualbung Road.
Aizawl
10 MZ 01 920 (0.0 to 7.64) kmp 18 Rs. 523.18 Rs. 10.46
(SH: Construction of road using Flexible Pavement)

Page 1 of 12
Sl. Period of Estimated Bid
Package
No District Name of the work completio Cost Security
no.
. n (Rs. Lakh) (Rs.
1 2 3 4 5 6 Lakh)
7
Construction of Mualpheng to Maite Road.
11 Aizawl MZ 01 921 (0.0 to 24.50) kmp 24 Rs. 1687.30 Rs. 33.75
(SH: Construction of road using Flexible Pavement)
Construction of N. Lungpher to Buhban Road.
12 Aizawl MZ 01 922 (0.0 to 6.77) kmp 18 Rs. 484.71 Rs. 9.69
(SH: Construction of road using Flexible Pavement)
Construction of Zuangtui to Muthi Road.
13 Aizawl MZ 01 923 (0.0 to 2.26) kmp 18 Rs. 188.72 Rs. 3.77
(SH: Construction of road using Flexible Pavement)
Construction of Chalrang to Riangtlei Road.
14 Champhai MZ 02 91A (0.0 to 2.00) kmp 12 Rs. 235.75 Rs. 4.72
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Chalrang to Riangtlei Road.
15 Champhai MZ 02 91B (2.00 to 5.00) kmp 12 Rs. 222.40 Rs. 4.45
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Chalrang to Riangtlei Road.
16 Champhai MZ 02 91C (5.00 to 8.00) kmp 12 Rs. 269.25 Rs. 5.39
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Chalrang to Riangtlei Road.
17 Champhai MZ 02 91D (8.00 to 11.34) kmp 12 Rs. 259.71 Rs. 5.19
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of NE Bualpui to Changzawl Road.
18 Champhai MZ 02 92 A (0.0 to 2.00) kmp 12 Rs. 269.24 Rs. 5.38
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of NE Bualpui to Changzawl Road.
19 Champhai MZ 02 92 B (2.00 to 4.44) kmp 12 Rs. 178.77 Rs. 3.58
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Melbuk to Hruaikawn Road.
20 Champhai MZ 02 93 A (0.0 to 3.00) kmp 12 Rs. 175.65 Rs. 3.51
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Melbuk to Hruaikawn Road.
21 Champhai MZ 02 93 B (3.00 to 5.00) kmp 12 Rs. 157.78 Rs. 3.16
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Melbuk to Hruaikawn Road.
22 Champhai MZ 02 93 C (5.00 to 9.30) kmp 12 Rs. 164.58 Rs. 3.29
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Vapar to Murlen Road.
23 Champhai MZ 02 94 A (0.0 to 3.00) kmp 12 Rs. 231.92 Rs. 4.64
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Vapar to Murlen Road.
24 Champhai MZ 02 94 B (3.00 to 5.00) kmp 12 Rs. 209.25 Rs. 4.19
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Vapar to Murlen Road.
25 Champhai MZ 02 94 C (5.00 to 7.00) kmp 12 Rs. 242.18 Rs. 4.84
(SH: Formation cutting, Culverts & Retaining Walls)

Page 2 of 12
Sl. Period of Estimated Bid
Package
No District Name of the work completio Cost Security
no.
. n (Rs. Lakh) (Rs.
1 2 3 4 5 6 Lakh)
7
Construction of Vapar to Murlen Road.
26 Champhai MZ 02 94 D (7.00 to 9.00) kmp 12 Rs. 259.95 Rs. 5.20
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Vapar to Murlen Road.
27 Champhai MZ 02 94 E (9.00 to 11.44) kmp 12 Rs. 184.49 Rs. 3.69
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
28 Champhai MZ 02 95 A (0.0 to 3.00) kmp 12 Rs. 242.48 Rs. 4.85
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
29 Champhai MZ 02 95 B (3.00 to 6.00) kmp 12 Rs. 256.09 Rs. 5.12
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
30 Champhai MZ 02 95 C (6.00 to 9.00) kmp 12 Rs. 254.52 Rs. 5.09
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
31 Champhai MZ 02 95 D (9.00 to 11.00) kmp 12 Rs. 254.21 Rs. 5.08
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
32 Champhai MZ 02 95 E (11.00 to 14.00) kmp 12 Rs. 267.74 Rs. 5.35
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
33 Champhai MZ 02 95 F (14.00 to 17.00) kmp 12 Rs. 330.54 Rs. 6.61
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
34 Champhai MZ 02 95 G (17.00 to 18.00) kmp 12 Rs. 224.71 Rs. 4.49
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
35 Champhai MZ 02 95 H (18.00 to 21.00) kmp 12 Rs. 227.07 Rs. 4.54
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
36 Champhai MZ 02 95 I (21.00 to 24.00) kmp 12 Rs. 198.15 Rs. 3.96
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
37 Champhai MZ 02 95 J (24.00 to 26.00) kmp 12 Rs. 275.35 Rs. 5.51
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Khuangthing to Thekte Road.
38 Champhai MZ 02 95 K (26.00 to 29.91) kmp 12 Rs. 164.23 Rs. 3.28
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Chalrang to Vangtlang Road.
39 Champhai MZ 02 911 (0.0 to 13.50) kmp 24 Rs. 905.00 Rs. 18.10
(SH: Construction of road using Flexible Pavement)
Construction of Khawhai to Tlangpuilian Road.
40 Champhai MZ 02 912 (0.0 to 16.00) kmp 24 Rs. 1089.99 Rs. 21.80
(SH: Construction of road using Flexible Pavement)

Page 3 of 12
Sl. Period of Estimated Bid
Package Name
No District completio Cost Security
no. of the work
. n (Rs. Lakh) (Rs.
1 2 3 4 5 6 Lakh)
7
Construction of Khawzawl to Ngaizawl Road.
41 Champhai MZ 02 913 (0.0 to 12.49) kmp 24 Rs. 820.33 Rs. 16.41
(SH: Construction of road using Flexible Pavement)
Construction of Ngaizawl to Tualpui Road.
42 Champhai MZ 02 914 (0.0 to 14.78) kmp 24 Rs. 982.92 Rs. 19.66
(SH: Construction of road using Flexible Pavement)
Construction of Khawzawl to Neihdawn Road.
43 Champhai MZ 02 915 (0.0 to 18.32) kmp 24 Rs. 1179.83 Rs. 23.60
(SH: Construction of road using Flexible Pavement)
Construction of Khawhai to Lungtan Road.
44 Champhai MZ 02 916 (0.0 to 6.65) kmp 18 Rs. 478.67 Rs. 9.57
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Hnahlan to Tualcheng Road.
45 Champhai MZ 02 917 (0.0 to 13.78) kmp 24 Rs. 913.06 Rs. 18.26
(SH: Construction of road using Flexible Pavement)
Construction of Leithum to Vangchhia Road.
46 Champhai MZ 02 918 (0.0 to 17.00) kmp 24 Rs. 1398.59 Rs. 27.97
(SH: Construction of road using Flexible Pavement)
Construction of Khuangleng to Leisenzo Road.
47 Champhai MZ 02 919 (0.0 to 5.00) kmp 18 Rs. 373.32 Rs. 7.47
(SH: Construction of road using Flexible Pavement)
Construction of Khawkawn to Chiahpui Road.
48 Champhai MZ 02 920 (0.0 to 5.76) kmp 18 Rs. 429.29 Rs. 8.59
(SH: Construction of road using Flexible Pavement)
Construction of Nghalimlui to Balisora Road.
49 Lawngtlai MZ 04 91 A (0.0 to 3.00) kmp 12 Rs. 188.51 Rs. 3.77
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Nghalimlui to Balisora Road.
50 Lawngtlai MZ 04 91 B (3.00 to 5.00) kmp 12 Rs. 314.36 Rs. 6.29
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Nghalimlui to Balisora Road.
51 Lawngtlai MZ 04 91 C (5.00 to 8.00) kmp 12 Rs. 264.45 Rs. 5.29
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Nghalimlui to Balisora Road.
52 Lawngtlai MZ 04 91 D (8.00 to 12.65) kmp 12 Rs. 341.78 Rs. 6.84
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Karlui to Damlui Road.
53 Lawngtlai MZ 04 92 A (0.0 to 2.00) kmp 12 Rs. 207.68 Rs. 4.15
(1.0 (SH: Formation cutting, Culverts & Retaining Walls)
Construction of Karlui to Damlui Road.
54 Lawngtlai MZ 04 92 B (2.00 to 6.00) kmp 12 Rs. 252.54 Rs. 5.05
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Karlui to Damlui Road.
55 Lawngtlai MZ 04 92 C (6.00 to 8.20) kmp 12 Rs. 204.62 Rs. 4.09
(SH: Formation cutting, Culverts & Retaining Walls)

Page 4 of 12
Sl. Period of Estimated Bid
Package Name
No District completio Cost Security
no. of the work
. n (Rs. Lakh) (Rs.
1 2 3 4 5 6 Lakh)
7
Construction of Tuithumhnar to Lunghauka Road.
56 Lawngtlai MZ 04 93 A (0.0 to 5.00) kmp 12 Rs. 229.13 Rs. 4.58
(1.0 (SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tuithumhnar to Lunghauka Road.
57 Lawngtlai MZ 04 93 B (5.00 to 7.00) kmp 12 Rs. 273.71 Rs. 5.47
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tuithumhnar to Lunghauka Road.
58 Lawngtlai MZ 04 93 C (7.00 to 10.00) kmp 12 Rs. 283.96 Rs. 5.68
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tuithumhnar to Lunghauka Road.
59 Lawngtlai MZ 04 93 D (10.00 to 13.00) kmp 12 Rs. 230.75 Rs. 4.61
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tuithumhnar to Lunghauka Road.
60 Lawngtlai MZ 04 93 E (13.00 to 15.48) kmp 12 Rs. 246.67 Rs. 4.93
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Balisora to Chamdurtlang Road.
61 Lawngtlai MZ 04 94 A (0.0 to 2.00) kmp 12 Rs. 204.75 Rs. 4.09
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Balisora to Chamdurtlang Road.
62 Lawngtlai MZ 04 94 B (2.00 to 5.00) kmp 12 Rs. 256.23 Rs. 5.12
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Balisora to Chamdurtlang Road.
63 Lawngtlai MZ 04 94 C (5.00 to 9.00) kmp 12 Rs. 312.78 Rs. 6.26
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Balisora to Chamdurtlang Road.
64 Lawngtlai MZ 04 94 D (9.00 to 11.65) kmp 12 Rs. 317.29 Rs. 6.35
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Ngengpuitlang to Darnamtlang Road.
Lawngtlai
65 MZ 04 95 A (0.0 to 4.00) kmp 12 Rs. 274.25 Rs. 5.48
(1.0 (SH: Formation cutting, Culverts & Retaining Walls)

Construction of Ngengpuitlang to Darnamtlang Road.


Lawngtlai
66 MZ 04 95 B (4.00 to 6.20) kmp 12 Rs. 202.55 Rs. 4.05
(SH: Formation cutting, Culverts & Retaining Walls)

Construction of Chawngte C to Bajeisora Road.


67 Lawngtlai MZ 04 911 (0.0 to 2.20) kmp 18 Rs. 187.82 Rs. 3.76
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Ugdasury to Kukurduleya Road.
68 Lawngtlai MZ 04 912 (0.0 to 6.18) kmp 18 Rs. 476.84 Rs. 9.54
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Tuithumhnar to Hmawngbu Road.
69 Lawngtlai MZ 04 913 (0.0 to 6.72) kmp 18 Rs. 452.93 Rs. 9.06
(SH: Construction of road using Flexible Pavement)

Page 5 of 12
Sl. Period of Estimated Bid
Package
No District Name of the work completio Cost Security
no.
. n (Rs. Lakh) (Rs.
1 2 3 4 5 6 Lakh)
7
Construction of Ajasora to Lawngpuighat Road.
70 Lawngtlai MZ 04 914 (0.0 to 10.90) kmp 24 Rs. 816.25 Rs. 16.33
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Tlabung to Chawilung Road.
71 Lunglei MZ 05 91 A (0.0 to 3.00) kmp 12 Rs. 212.52 Rs. 4.25
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tlabung to Chawilung Road.
72 Lunglei MZ 05 91 B (3.00 to 7.00) kmp 12 Rs. 213.54 Rs. 4.27
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tlabung to Chawilung Road.
73 Lunglei MZ 05 91 C (7.00 to 10.00) kmp 12 Rs. 229.00 Rs. 4.58
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tlabung to Chawilung Road.
74 Lunglei MZ 05 91 D (10.00 to 14.00) kmp 12 Rs. 195.77 Rs. 3.92
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tlabung to Chawilung Road.
75 Lunglei MZ 05 91 E (14.00 to 17.00) kmp 12 Rs. 197.82 Rs. 3.96
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tlabung to Chawilung Road.
76 Lunglei MZ 05 91 F (17.00 to 20.90) kmp 12 Rs. 185.48 Rs. 3.71
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Marpara to Laisawral Road.
77 Lunglei MZ 05 92 A (0.0 to 2.00) kmp 12 Rs. 216.82 Rs. 4.34
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Marpara to Laisawral Road.
78 Lunglei MZ 05 92 B (2.00 to 4.00) kmp 12 Rs. 284.42 Rs. 5.69
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Marpara to Laisawral Road.
79 Lunglei MZ 05 92 C (4.00 to 8.00) kmp 12 Rs. 348.21 Rs. 6.96
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Marpara to Laisawral Road.
80 Lunglei MZ 05 92 D (8.00 to 11.00) kmp 12 Rs. 274.94 Rs. 5.50
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Marpara to Laisawral Road.
81 Lunglei MZ 05 92 E (11.00 to 14.71) kmp 12 Rs. 303.45 Rs. 6.07
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mauzam to New Sachan Road.
82 Lunglei MZ 05 93 A (0.0 to 3.00) kmp 12 Rs. 310.87 Rs. 6.22
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mauzam to New Sachan Road.
83 Lunglei MZ 05 93 B (3.00 to 5.00) kmp 12 Rs. 272.80 Rs. 5.46
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mauzam to New Sachan Road.
84 Lunglei MZ 05 93 C (5.00 to 8.00) kmp 12 Rs. 331.14 Rs. 6.62
(SH: Formation cutting, Culverts & Retaining Walls)

Page 6 of 12
Sl. Period of Estimated Bid
Package
No District Name of the work completio Cost Security
no.
. n (Rs. Lakh) (Rs.
1 3 4 5 6 Lakh)
7
2
Construction of Mauzam to New Sachan Road.
85 Lunglei MZ 05 93 D (8.00 to 11.00) kmp 12 Rs. 306.27 Rs. 6.13
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mauzam to New Sachan Road.
86 Lunglei MZ 05 93 E (11.00 to 13.00) kmp 12 Rs. 319.90 Rs. 6.40
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mauzam to New Sachan Road.
87 Lunglei MZ 05 93 F (13.00 to 15.46) kmp 12 Rs. 249.07 Rs. 4.98
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Bunghmun to Sesawm Road.
88 Lunglei MZ 05 94 A (0.0 to 3.00) kmp 12 Rs. 198.66 Rs. 3.97
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Bunghmun to Sesawm Road.
89 Lunglei MZ 05 94 B (3.00 to 6.00) kmp 12 Rs. 215.65 Rs. 4.31
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Bunghmun to Sesawm Road.
90 Lunglei MZ 05 94 C (6.00 to 9.00) kmp 12 Rs. 274.68 Rs. 5.49
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Bunghmun to Sesawm Road.
91 Lunglei MZ 05 94 D (9.00 to 10.57) kmp 12 Rs. 202.55 Rs. 4.05
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
92 Lunglei MZ 05 95 A (0.0 to 4.00) kmp 12 Rs. 372.92 Rs. 7.46
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
93 Lunglei MZ 05 95 B (4.00 to 7.00) kmp 12 Rs. 304.60 Rs. 6.09
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
94 Lunglei MZ 05 95 C (7.00 to 10.00) kmp 12 Rs. 349.56 Rs. 6.99
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
95 Lunglei MZ 05 95 D (10.00 to 14.00) kmp 12 Rs. 374.65 Rs. 7.49
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
96 Lunglei MZ 05 95 E (14.00 to 18.00) kmp 12 Rs. 475.13 Rs. 9.50
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
97 Lunglei MZ 05 95 F (18.00 to 21.00) kmp 12 Rs. 463.37 Rs. 9.27
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
98 Lunglei MZ 05 95 G (21.00 to 23.00) kmp 12 Rs. 431.91 Rs. 8.64
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
99 Lunglei MZ 05 95 H (23.00 to 27.00) kmp 12 Rs. 425.12 Rs. 8.50
(SH: Formation cutting, Culverts & Retaining Walls)

Page 7 of 12
Sl. Period of Estimated Bid
Package
No District Name of the work completio Cost Security
no.
. n (Rs. Lakh) (Rs.
1 2 3 4 5 6 Lakh)
7
Construction of Thuampui to Lungchem Road.
100 Lunglei MZ 05 95 I (27.00 to 32.00) kmp 12 Rs. 432.76 Rs. 8.66
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
101 Lunglei MZ 05 95 J (32.00 to 37.00) kmp 12 Rs. 425.49 Rs. 8.51
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Thuampui to Lungchem Road.
102 Lunglei MZ 05 95 K (37.00 to 40.90) kmp 12 Rs. 318.61 Rs. 6.37
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Tuichawng to Matisora Road.
103 Lunglei MZ 05 912 (0.0 to 4.84) kmp 18 Rs. 336.98 Rs. 6.74
(SH: Construction of road using Flexible Pavement)
Construction of Serhuan to Lamthai Road.
104 Lunglei MZ 05 913 (0.0 to 12.00) kmp 24 Rs. 814.33 Rs. 16.29
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Mamit to Phaizau Road.
105 Mamit MZ 06 91 A (0.0 to 2.00) kmp 12 Rs. 220.47 Rs. 4.41
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mamit to Phaizau Road.
106 Mamit MZ 06 91 B (2.00 to 4.00) kmp 12 Rs. 410.70 Rs. 8.21
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mamit to Phaizau Road.
107 Mamit MZ 06 91 C (4.00 to 6.00) kmp 12 Rs. 261.49 Rs. 5.23
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mamit to Phaizau Road.
108 Mamit MZ 06 91 D (6.00 to 8.00) kmp 12 Rs. 201.98 Rs. 4.04
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Mamit to Phaizau Road.
109 Mamit MZ 06 91 E (8.00 to 10.48) kmp 12 Rs. 215.20 Rs. 4.30
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Bunghmun to W. Mualthuam Road.
110 Mamit MZ 06 912 (0.0 to 13.50) kmp 24 Rs. 910.75 Rs. 18.22
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Phura to Lungpuk Road.
111 Saiha MZ 07 91 A (0.0 to 4.00) kmp 12 Rs. 214.40 Rs. 4.29
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Phura to Lungpuk Road.
112 Saiha MZ 07 91 B (4.00 to 8.00) kmp 12 Rs. 256.50 Rs. 5.13
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Phura to Lungpuk Road.
113 Saiha MZ 07 91 C (8.00 to 11.00) kmp 12 Rs. 214.38 Rs. 4.29
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Phura to Lungpuk Road.
114 Saiha MZ 07 91 D (11.00 to 14.00) kmp 12 Rs. 276.13 Rs. 5.52
(SH: Formation cutting, Culverts & Retaining Walls)

Page 8 of 12
Sl. Period of Estimated Bid
Package
No District Name of the work completio Cost Security
no.
. n (Rs. Lakh) (Rs.
1 2 3 4 5 6 Lakh)
7
Construction of Phura to Lungpuk Road.
115 Saiha MZ 07 91 E (14.00 to 17.00) kmp 12 Rs. 265.35 Rs. 5.31
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Phura to Lungpuk Road.
116 Saiha MZ 07 91 F (17.00 to 20.00) kmp 12 Rs. 275.12 Rs. 5.50
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Phura to Lungpuk Road.
117 Saiha MZ 07 91 G (20.00 to 22.00) kmp 12 Rs. 361.01 Rs. 7.22
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Phura to Lungpuk Road.
118 Saiha MZ 07 91 H (22.00 to 25.00) kmp 12 Rs. 337.87 Rs. 6.76
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Phura to Lungpuk Road.
119 Saiha MZ 07 91 I (25.00 to 27.00) kmp 12 Rs. 350.48 Rs. 7.01
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Phura to Lungpuk Road.
120 Saiha MZ 07 91 J (27.00 to 29.95) kmp 12 Rs. 335.08 Rs. 6.70
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Sangau to Thaltlang Road.
121 Saiha MZ 07 92 A (0.0 to 4.00) kmp 12 Rs. 333.55 Rs. 6.67
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Sangau to Thaltlang Road.
122 Saiha MZ 07 92 B (4.00 to 7.28) kmp 12 Rs. 272.70 Rs. 5.45
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Vawmbuk to Archhuang Road.
123 Saiha MZ 07 93 A (0.0 to 3.00) kmp 12 Rs. 196.01 Rs. 3.92
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Vawmbuk to Archhuang Road.
124 Saiha MZ 07 93 B (3.00 to 6.36) kmp 12 Rs. 263.57 Rs. 5.27
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Saiha to Tuisumpui Road.
125 Saiha MZ 07 94 A (0.0 to 2.00) kmp 12 Rs. 246.47 Rs. 4.93
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Saiha to Tuisumpui Road.
126 Saiha MZ 07 94 B (2.00 to 5.00) kmp 12 Rs. 276.32 Rs. 5.53
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Saiha to Tuisumpui Road.
127 Saiha MZ 07 94 C (5.00 to 7.00) kmp 12 Rs. 241.74 Rs. 4.83
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Saiha to Tuisumpui Road.
128 Saiha MZ 07 94 D (7.00 to 10.00) kmp 12 Rs. 322.57 Rs. 6.45
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Saiha to Tuisumpui Road.
129 Saiha MZ 07 94 E (10.00 to 13.71) kmp 12 Rs. 249.85 Rs. 5.00
(SH: Formation cutting, Culverts & Retaining Walls)

Page 9 of 12
Sl. Period of Estimated Bid
Package
No District Name of the work completio Cost Security
no.
. n (Rs. Lakh) (Rs.
1 2 3 4 5 6 Lakh)
7
Construction of Vawmbuk to Tialdawngilui Road.
130 Saiha MZ 07 95 A (0.0 to 2.00) kmp 12 Rs. 295.12 Rs. 5.90
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Vawmbuk to Tialdawngilui Road.
131 Saiha MZ 07 95 B (2.00 to 4.57) kmp 12 Rs. 157.62 Rs. 3.15
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Chhuarlung to Ainak Road.
132 Saiha MZ 07 911 (0.0 to 10.90) kmp 24 Rs. 801.85 Rs. 16.04
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Phura to Vahai Road.
133 Saiha MZ 07 912 (0.0 to 17.00) kmp 24 Rs. 1340.64 Rs. 26.81
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Maisa to Lawngban Road.
134 Saiha MZ 07 913 (0.0 to 6.70) kmp 18 Rs. 532.78 Rs. 10.66
(SH: Construction of road using Cell Filled Concrete Technology)
Construction of Serchhip to Hriangtlang Road.
135 Serchhip MZ 08 91 A (0.0 to 4.00) kmp 12 Rs. 237.35 Rs. 4.75
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Serchhip to Hriangtlang Road.
136 Serchhip MZ 08 91 B (4.00 to 7.00) kmp 12 Rs. 287.32 Rs. 5.75
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Serchhip to Hriangtlang Road.
137 Serchhip MZ 08 91 C (7.00 to 9.00) kmp 12 Rs. 207.17 Rs. 4.14
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Serchhip to Hriangtlang Road.
138 Serchhip MZ 08 91 D (9.00 to 11.00) kmp 12 Rs. 343.11 Rs. 6.86
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Serchhip to Hriangtlang Road.
139 Serchhip MZ 08 91 E (11.00 to 13.00) kmp 12 Rs. 229.27 Rs. 4.59
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Serchhip to Hriangtlang Road.
140 Serchhip MZ 08 91 F (13.00 to 15.00) kmp 12 Rs. 227.44 Rs. 4.55
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Serchhip to Hriangtlang Road.
141 Serchhip MZ 08 91 G (15.00 to 18.00) kmp 12 Rs. 261.45 Rs. 5.23
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Serchhip to Hriangtlang Road.
142 Serchhip MZ 08 91 H (18.00 to 20.26) kmp 12 Rs. 182.65 Rs. 3.65
(SH: Formation cutting, Culverts & Retaining Walls)
Construction of Chekkawn to Lungchhuan Road.
143 Serchhip MZ 08 911 (0.0 to 4.00) kmp 18 Rs. 281.13 Rs. 5.62
(SH: Construction of road using Flexible Pavement)

2. Date of release of Invitation for Bids through e-procurement: 15th March 2017

Page 10 of 12
3. Cost of Bid Form:
Rs 5000/- per package (Rs 1500/- Cost of Tender Document + Rs 3500/- Processing Fee) (non-
refundable) only in the form of Demand Draft/Bankers Cheque in favour of CEO, MiRRDA.
4. Availability of Bid Document and mode of submission:
The bid document is available online and bid should be submitted online on website
www.pmgsytendersmiz.gov.in. The bidder would be required to register in the web-site
which is free of cost. For submission of bids, the bidder is required to have valid Digital
Signature Certificate (DSC) from one of the authorized Certifying Authorities (CA).
“Aspiring bidders who have not obtained the user ID and password for participating in e-
tendering in PMGSY may obtain the same from the website: www.pmgsytendersmiz.gov.in.
Digital signature is mandatory to participate in the e-tendering. Bidders already possessing a
valid digital signature issued from authorized CAs can use the same in this tender.
5. Submission of Original Documents:
The bidders are required to submit (a) original Demand Draft/Bankers Cheque towards the
cost of bid document and (b) original bid security in approved form and (c) original affidavit
regarding correctness of information furnished with bid document as per provisions of
Clause 4.4B(a) (ii) of ITB at the Office of the Chief Executive Officer, Mizoram Rural Roads
Development Agency, Tuikhuahtlang, Aizawl. (address and details of office where to be
submitted), no later than the deadline date for submission of the bid, failing which the bids shall
be declared non-responsive.
6. Last Date/Time for receipt of bids through e-tendering: 1st May 2017, 1500 hrs.
7. The site for the work is available.
8. Only online submission of bids is permitted, therefore; bids must be submitted online on
website www.pmgsytendersmiz.gov.in. The technical qualification part of the bid will be
opened online at 1300 hrs on 2nd May 2017 by the authorized officers. If the office happens to
be closed on the date of opening of the bids as specified, the bids will be opened online on the
next working day at the same time.
9. Pre-Bid Meeting will be held on 03.04.17 at 1100 hrs at the office Chamber of Engineer-in-
Chief, PWD, Tuikhuahtlang, Aizawl. Query should be submitted in writing in the office of the
undersigned latest by 5:00 pm on 28.03.17. Any query not submitted in writing shall not be
entertained.
10. The bidder is not required to quote his rate for routine maintenance. The rates to be paid for
routine maintenance are indicated in the Bill of Quantities. Further, the payment for
routine maintenance to the contractor shall be regulated based on his performance of
maintenance activities.

11. The bids for the work shall remain valid for acceptance for a period not less than ninety days
after the deadline date for bid submission.

12. Bidders may bid for any one or more of the works mentioned in the Table above. To qualify
for a package of contracts made up of this and other contracts for which bids are invited in
the same NIT, the bidder must demonstrate having experience and resources sufficient
to meet the aggregate of the qualifying criteria for the individual contracts.

Page 11 of 12
13. Other details can be seen in the bidding documents. The Employer shall not be held liable
for any delays due to system failure beyond its control. Even though the system will
attempt to notify the bidders of any bid updates, the Employer shall not be liable for any
information not received by the bidder. It is the bidders’ responsibility to verify the website
for the latest information related to the tender.
14. If a contractor participated in more than one package he/she must submit a list of package for
which he/she has participated. This list must be in order of his/her preference for award of
work.
15. Uploaded documents should be clear and readable. Unreadable documents will not be
entertained.

(R. VANLALTLUANGA)
Chief Executive officer,
Mizoram Rural Roads Development Agency,
Tuikhuahtlang,
Aizawl, Mizoram.
Memo No. B.15028/16/2016/PMGSY/EC/PWD/23 : Dated 15th March 2017
Copy to:
1. P.S. to the Hon’ble Chief Minister, Mizoram, Aizawl, for favour of information.
2. Director General & Joint Secretary (RC), NRRDA, for favour of information.
3. The Principal Secretary, PWD, Mizoram for favour of information.
4. The Chief Engineer, PWD, Building/Roads/Highways for favour of information.
5. All Superintending Engineer, PWD, Mizoram for favour of information with spare copy for
display in their respective notice board.
6. The Director, I&PR for favour of information. He is requested to publish the Notice Inviting
Tenders in two newspapers in Aizawl and Abbreviated Press Tender Notice (enclosed) in two
newspapers in the other seven districts in the State of Mizoram and two national newspaper
for two issues each.
7. The President/Secretary, Class I/II/III & IV contractors association for information.
8. Notice Board.
9. NIT Guard File.

Chief Executive officer,


Mizoram Rural Roads Development Agency,
Tuikhuahtlang,
Aizawl, Mizoram.

Signature Not Verified


Digitally signed by ZIRTHANMAWIA
HMAR Page 12 of 12
Date: 2017.03.19 21:48:55 IST
Location: PMGSY eTendering