13 October 2008
Environmental Audit & Due Diligence Assessment Report
Contents
EXECUTIVE SUMMARY 3 - 11
ANNEXURES
DISCLAIMER
Government of India has launched a programme for Ø During the compliance assessment it was observed that
Renovation and Modernization (R&M) of old coal fired KTPS has complied to most of the conditions specified
power plants in the country. Under this programme, 210 in the consent order issued by pollution control board
MW Unit – 6 of Koradi Thermal Power Station (KTPS), an and as per Maharashtra Factories Rules except for the
existing thermal power station of MAHAGENCO, was few which have been listed below:
considered for R&M.
è flow meters for measurement of fresh water and
In this regard, Ernst & Young Private Limited (E&Y) has effluent in the power plant
been invited to carry out an environmental audit and due è discharge / reuse of storm water with out mixing
diligence assessment (EA-DDA) to review and asses the with trade effluent (The same was not
environmental performance of the plant being proposed for implemented due to practical constraints)
rehabilitation. The overall scope of work for the EA-DDA è no pre-employment medical check up for
also covers Occupational Health and Safety (OH&S) contract workers as well as during the
Assessment and Institutional Capacity Assessment of the employment
plant. è Corporate health and safety policy does not have
the commitment to integrate health and safety in
The final report presented here provides observations and all decisions including those dealing with
recommendations for Compliance Assessment, Pollution purchase of plant, equipment, machinery and
Prevention & Control Assessment, Resource Efficiency material as well as selection and placement of
Assessment, Potential Risk and Liability Assessment, personnel. However, KTPS has framed its policy
Occupational Health & Safety Assessment and Institutional statement at the plant level with the
Capacity Assessment. The report also provides details of aforementioned commitment.
the investment plans, if any, based on the è Corporate health and safety policy is yet to be
recommendation. revised / updated since the formation of
MAHAGENCO from erstwhile MSEB
A summary of key observations and recommendations are
listed below for ready reference.
Pollution Prevention and Control Assessment: Ø Primary data was collected to authenticate the existing
environmental data. Monitoring was carried out for
Ø During the audit period, historical data of the ambient various environmental parameters including AAQ, stack
air quality was analyzed and it was found that there is emissions, water and waste water. Mercury (Hg) was
no degradation of the air shed in the region. The also analyzed in all the parameters to gauge the impact
present particulate matter, NOx and SOx levels are less of pollution due to Hg.
than 50% of the prescribed limit and has the potential to
take additional burden. Ø Air pollution control systems presently available with
KTPS are ESPs and Bag Filters (BF).
Ø Considering the same, KTPS may meet the limit of 100
mg/Nm3 for PM as against 50 mg/Nm3 targeted by Ø Unit 6 has a duel control system of both ESP and BF.
Pollution Prevention Abatement Handbook (PPAH). In Normally BF is in service, with ESP path 15 % open due
rare cases, an emissions level of up to 150 mg/Nm3 may to high dp across the bag Filters. However when the oil
be acceptable. (FO) is fired in the Boiler, only ESP is in service
bypassing the Bag Filters.
Ø The stack emission levels were also analyzed based on
the historic data for 4 years. It was observed that the Ø Based on the data available for stack emission for Unit –
stack emissions were higher than the prescribed limit of 6, it was observed that sometimes the stack emissions
150 mg/Nm3 for all the unit- 7. The PM emission level are exceeding the prescribed limit of 150 mg/Nm3
for Unit 5 was higher than the statute in the year 2003- specified by MPCB.
04 and 2004-05. The same was within the limit for the
year 2005-06 and 2006-07. The decrease in the PM Ø Considering that Unit – 6 has to meet the emission
emission is attributed to the installation of the bag standards of 100 mg/Nm3 as specified by PPAH as well
filter. The PM emission level for Unit 6 was found to be as the proposed revision by the Central Pollution
within the limit for the year 2003-04 and 2006-07. The Control Board (CPCB) the following recommendations
same was exceeding the limit for the years 2004 – 06. are being presented to improve the pollution control
The higher levels during the said period was due to the system of Unit – 6:
inefficiency of the bag filters which was later changed
during the shut down period in the year 2005-06. This è Replacement of BF by upgraded ESP having
contributed to the decrease in the PM emission. higher capacity with more number of fields. The
cost estimate for such an activity would be
approximately INR 250 million. Alternately, preparation which is pumped to the ash bund at
KTPS may also consider replacement of existing Koradi and Khasara. The supernatant is
bags in the BF with more efficient ones. recovered from the ash bund and pumped back
However, the O&M cost for the same is higher into the AHU. Fresh water is used as make up
than that of ESP due to requirement of regular water for ash slurry preparation.
change of bags (i.e. ~every 3 years for cost of è Unit – 6 is equipped with a cooling tower from
INR ~120 million). Therefore, it is not where it is circulated back to condenser. The
recommended. makeup water to the system is received from
è Introducing ammonia to improve the efficiency Pond No. 3 and the over flow of the system is
of the ESP. The same is a plausible alternative circulated to Pond no. 2 which is connected to
and the cost for the same is expected to be INR the main raw water storage pond i.e. no. 3.
0.1 million per MW. The details of the ammonia è One of the ash water supernatant from Khasara
system are given in section – 4.3.8 of the report. ash bund is not being recovered by KTPS. The
quantity of water is estimated to be 33,566
Ø Water is one of the scarce commodities and should be m3/day. However, part of the water is utilized
utilized judiciously. Currently KTPS draws water from back into the system.
the Pench dam which is about 25 km from the plant. è Overflow water from Coal Handling Plant (CHP)
Most of the fresh water used in the plant is being and Booster Pump House (BPH) is being let out
recycled to reduce the quantity of fresh water intake. of the plant boundary with out treatment. The
quantity of water being let out of the plant
Ø During the audit, water flow measurements were taken boundary is estimated to be 16,643 m3/day.
using tracer method and non-contact flow meters. KTPS has initiated work for installation of
Based on the current hydrological scheme of KTPS, the recovery system and tender has been floated.
following were observed: è Boiler blow down and cooling water discharge is
being sent to the ETP for further treatment and
è Raw water is used as makeup water in cooling used for the AHP.
tower as well as for ash slurry preparation.
è DM water is used in the boiler. Ø Based on the observations during the audit, the
è Trade effluent is sent to the ETP, which is following recommendations are being made:
basically a settling tank, from where it is sent to
the ash handling unit (AHU) for ash slurry
è The ash water supernatant from Khasara ash Ø Considering the above scenario, the following
bund should be recovered and recycled back into recommendations are being made:
the system.
è Over flow water from CHP and BPH should be è The raw water pond no. 3 should be cleaned
treated and recycled back into plant. A settling immediately which help in reducing the organic
tank should be constructed near the outlet for load in the pond as well as increase the holding
treatment and recycling. Steps have been capacity.
initiated by KTPS in this regard and tenders have è MAHAGENCO should also see the feasibility of
been floated for the same. constructing a separate pipeline for tapping the
intake water directly from Pench pipeline which
Ø Chemicals are used in the water treatment plant for would help reduce the chemical consumption for
making DM water which is fed into the boiler. Based on water treatment as well as avoid wastage of
the historical data available with KTPS it was observed water such as tapping of water by local
that the chemical usage has been increasing over the population for domestic use.
period. è An estimated 3.0 million could be saved alone
on reduction in the caustic lye used for
Ø Chemicals such as caustic lye have shown increase in treatment of water.
consumption due to increased chloride levels in the raw
water near the raw water pump houses. Also, the Ø KTPS has provided automatic water sprinkler system at
holding capacity of the raw water pond no. 3 has the wagon tipplers and advance fog system at
decreased over the years due to increased conveyers to minimize dust emissions. However no dust
anthropogenic activity around the pond. This has also collection system with dust suppressants is made
resulted in increased organic load and vegetation along available at CHP.
the banks of the pond.
Ø Based on the chemical analysis carried out on the raw Ø Based on the physical observation made during the
water at the source i.e. Pench and near the pumping audit, the following are the recommendations:
house at KTPS it was observed that the chloride levels
are 3-4 times more near the pumping house. The è Dust collection system should be installed at all
treatment using caustic lye to reduce the chloride levels transfer points in the conveyor system to avoid
has increased the financial burden on the KTPS. fugitive dust.
è Dust suppressants should be used during was observed that temperature indicators were not in
sprinkling to retain the moisture level for longer operation in other locations apart from the heaters.
period of time. They are 1.) The outlet feed water temperature, 2.) air
inlet 3.) exit temperature of the air pre-heater etc have
Resource Efficiency Assessment: not been monitored due to the non-availability of
equipments. Therefore it is recommended to identify
The following recommendations are being proposed based the places and install pressure or temperature
on the observations made during the audit period: indicators as per the requirement and monitor the
parameters at regular intervals. However, MAHGENCO
Ø Online power measurement of BFP pumps, ID and FD has installed a central system for monitoring live
fans, CEPs and Coal mills. At present, total auxiliary parameters of all the Power Stations and availability of
consumption is being monitored but by measuring above parameters are addressed in this project.
individual power consumption, the exact loading of the
equipments can be found out. Therefore measurement Ø Measurement of Boiler surface temperature on regular
of power can be included in the log book as a part of intervals. It is recommended to measure the
regular practice temperature of the boiler on regular intervals to check
if the surface temperature is well within the limits. In
Ø Arresting of steam leakages. The steam leakage check case of abnormalities the quality of insulation in the
up can be carried out at regular intervals and arrest the area can be improvised.
same to the extent possible to save energy.
Ø Measurement of coal consumption. Though it is well
Ø Pressure gauges and temperature indicators across known that very few power plants in India have the
the inlet and outlet of the heaters. It was observed facility to measure the coal, but online monitoring of
that some of the pressure guages were not working and the bunkered quantity of coal shall be carried out by
in some places there is no pressure guage. It is also installation of belt weigher to the conveyer belts going
recommended to install temperature indicators at the to the bunker.
inlet and outlet of heaters to measure the steam
temperature and drip temperature. Since the Ø Installation of Smart Wall Blowing System For
performance of heaters would play a major role in Optimizing Wall Blowing And Improving Heat Rate:
efficiency of the plant it is advisable to install the same Installation of SWBS results in following benefits:
and these data can also be included in the log book. It
è Reduced variation in SH/RH spray, hence steady Occupational Health & Safety Assessment:
SH / RH steam temperature. This results in
improved efficiency of boiler and heat rate of Ø It was observed that the number of accidents have
overall cycle. increased during 2002-04. During 2004-05, a declining
è Reduced superheated steam consumption due to trend has been observed in the number of accidents
reduced number of wall blowing. including minor injuries such as pin prick, sprained back
è The soot blower operation is reduces by about or foot, slip on plain road. However, in the year 2006,
55 - 60% compared to conventional wall blowing the plant, on an average, witnessed one accident every
system. second week.
è Reduction in tube erosion due to selective and
reduced steam blowing Ø It was observed that unsafe acts have contributed to
è Annual energy saving of INR 5.25 million was more than half of the accidents that have occurred in
achieved. the plant since 2004. However, the number of accidents
and unsafe acts has shown a decline in the numbers
Ø Introduction Of Super Cleaning Of Turbine Oil: The over a period.
introduction of super cleaning of turbine oil will result in
following benefits: Ø A detailed root cause analysis for each of the
observations has been provided in section – 6.2 of the
è Average Oil consumption has been reduced to 76 report
barrels from 145 per year.
è Reduction in sludge formation at the bottom of Ø Some of the major observations and recommendations
Main Oil Tank. at KTPS with respect to OHS are given below for ready
è No Governing problems are faced due to reference.
chocking of governing components.
è Installation of super cleaning system has è EHS Policy: EHS policy is yet to be revised since
resulted in many tangible and intangible the restructuring of MSEB in 2004. However, it
benefits. Total cost saving of INR 7.196 million was informed by MAHAGENCO that the same
has been achieved. was being revised and will be circulated among
all the plants once approved by the board.
è Risk Analysis Study: KTPS has conducted a Risk
Analysis study at the plant and detailed action
plan is prepared and implemented through è Training for contract workers: Contract worker
OHSAS. participation is very limited in safety specific
è Near Miss Reporting: KTPS has put in place a training and awareness programmes.
near miss incident reporting system. The same è Rotation of Work: Comprehensive
has been communicated to various departments. documentation with regard to classification of
KTPS is also taking steps to increase the diseases based on occupational exposure was
workers participation in the system. not found in place.
è OHS Audit: As per the existing corporate policy, è Comprehensive procedures for administrative
OHS audit is to be conducted every year. Though controls such as rotating employees and
the OHS audit was not conducted every year, imparting trainings on performing tasks in ways
MAHAGENCO has carried out OHS audit during that reduce exposure to work place hazards
2004 & 2007. Subsequently KTPS has also taken were not found in place. It was informed that
initiative to implement OHSAS 18001:2007 despite having medical problems, which may be
management system. aggravated due to occupational exposure,
è Fire Fighting Department: No deviations from workers have not been keen on rotation of work.
scheduled standard test and examination of fire è Reportedly, the workers have resisted attempts
service equipment and fire protection system by the top management to transfer workers from
were observed during the site visit. However, one department to the other. Workers
some deviations were noticed with reference to interviewed during the site visits have also
the recommendations by The Fire Advisor & indicated their preference to continue working in
Chief Fire Officer. The same are already been the same department.
informed to and accepted / approved by the FA è Safety / mock drills: Safety and mock drills with
& CFO. regard to acid leak, chlorine leak, fire and
è House Keeping: During the site visit, Disaster Management Plan (DMP) are
housekeeping, lighting and ventilation were conducted periodically to check the
observed to be poor in the plant for safe working preparedness of the emergency response
of occupant, specifically in the CHP area. At the system, records of which are being maintained
time of site visit, the dust suppression system by the safety department. Observations and
and fresh air system in CHP were found not in recommendations made during mock drill that
operation. Several gas cylinders were found required corrective measures have not been
without seal in the storage yard. addressed promptly.
è Further, it was observed the responsibility of è Observations made during mock drill, which
implementing these observations was not clearly require corrective measures, should be given
assigned to any individual. Also, no priority and addressed immediately for
comprehensive documentation was found in improving the efficiency of the emergency
place with regard to action points / measures preparedness and response. Specific individuals
taken to address observations made during mock should be assigned the responsibility of ensuring
drills these action points are addressed, as and when
è At present, OHSAS 18001 system is being identified. Action points taken and status of the
implemented at KTPS and it was informed by observations requiring corrective measures
KTPS that the above observations are being should be documented to keep track of the
improved upon as part of the management performance of the system.
system. è A comprehensive Root Cause Analysis (RCA) by
è Accident Investigation: Accidents are the Safety Department would help in identifying
investigated and recorded. However, a the root cause for the accident and placing
comprehensive Root Cause Analysis (RCA) of systemic controls and for ensuring avoidance of
all the accidents is not carried out. similar mishaps in future. During the audit, a
sample accident case was taken and a RCA was
Ø Some of the recommendations for OHS are as follows: carried out and provided to the safety
department.
è Safety specific training and awareness programs
should be made mandatory for contract labors. Institutional Capacity Assessment:
è Classification of diseases based on occupational
exposure should be documented. In order assess the institutional capacity at KTPS to handle
è The workers and worker unions should be the R&M of Unit -6, an assessment was carried out on the
sensitized towards the need and benefits of same. Based on the assessment, the following were the
rotation of work. A rotation of work policy could major observations and recommendations.
be framed and workers at the time of
recruitment should be informed about the policy Ø Institutional Setup: The environmental monitoring
and the probability of inter departmental cell (EMC) is headed by section head of Water
transfers. Treatment Plant (WTP) of stage – II.
Ø The safety department and EMC report to different would enable to integrate environmental issues with
Section Engineers (SEs) of two different stages i.e. safety and health issues at the plant level leading a
Stage I and II. comprehensive EHS system.
Ø Training: KTPS has an in-house training facility and Ø Feedback on the training sessions should be taken
trainings at various levels are provided with in- from the people attending the training at the end of
house experts from various departments. the training session. The feedback should be
Ø Feedback is given by the sectional heads to the concealed and the same should be directly
trainers based on the information provided by the submitted to the HR department for further action.
participants from their section. Ø KTPS should also inform the village panchayat office
Ø Addressing stakeholder Concerns: During the the procedure for lodging written complaints with
stakeholder consultation process, the gram KTPS or the concerned authorities responsible for
sarpanch (village head) of Koradi village informed environmental management.
that their office does not have the proper guidance/ Ø KTPS may also provide a drop box at the entrance
information as to whom to approach within the KTPS (near security cabin), which is easily accessible by
to communicate the view or concerns of the the local residents. It shall be used to submit
villagers. It was also informed that the lack of concerns in writing. The drop box would be under
knowledge leads them to raise their issues with the the jurisdiction of PRO of KTPS.
local elected member of the Legislature who in turn
communicates the same with the plant
Ø It was informed by KTPS that a Public Relations
Officer (PRO) has been appointed and same was
communicated to the villagers so that they can meet
the PRO to put forth their grievances. A board has
also been displayed at the entrance of the plant
regarding the same.
PART 1.0: INTRODUCTION having multiple units) for rehabilitation in particular has
been proposed. In order to carry out the EA-DDA of KTPS,
1.1. PURPOSE MAHAGENCO has retained the services of Ernst & Young
Pvt. Ltd.
Government of India has launched a programme for
Renovation and Modernization (R&M) of old coal fired 1.2. KORADI THERMAL POWER STATION (KTPS)
power plants in the country. This programme, the
Partnership for Excellence, includes a financing window, In 2005, as per requirement of the Electricity Act of 2003,
funded by the World Bank and GEF, for rehabilitation the Maharashtra State Electricity Board (MSEB) was split
projects that prioritize energy-efficient outcomes. into three companies: Mahanirmiti or Mahagenco
(Maharashtra State Power Generation Co. Ltd.);
Under this programme, 210 MW Unit – 6 of Koradi Thermal Mahavahan or Mahatransco (Maharashtra State Electricity
Power Station (KTPS), an existing thermal power station Transmission Co. Ltd.); and Mahavitaran or Mahadiscom
of Maharashtra State Power Generation Co. Ltd. (Maharastra State Electricity Distribution Co. Ltd).
(MAHAGENCO), was considered for R&M.
1.3. INSTALLED CAPACITY OF KTPS
The following aspects have been covered as part of the
overall EA-DDA KTPS has 7 units adding to a total generation capacity of
(a) Understanding the existing performance of the 1100 MW. The ground breaking ceremony for KTPS was
plant in terms of energy efficiency and held on 25th December 1968 and the first unit (Unit -1) of
environment 120 MW was commissioned in the year 1974. The following
(b) Techno-economic aspects with respect too which are the details of the installed capacities of KTPS, Nagpur:
the benefits would be achieved through R&M
Stage I – Units 1 to 4: 120 MW each (Boiler: ABL Kolkata;
In order to assess the energy efficiency and environmental TG: ZAMECH, ELBLAG, Poland)
performance of the plant being proposed for rehabilitation, Stage II – Unit 5: 200 MW (Boiler and TG: BHEL India);
an Environmental Audit, that would provide information Unit 6 and 7: 210 MW (Boiler and TG: BHEL India)
about key environmental issues related to overall
performance, as well as the state of compliance (with Unit 1 to 4 have been de-rated to 105 MW each from its
applicable regulations and industry best practices) in the original capacity of 120 MW each by Central Electricity
plant in general and in the unit proposed (in case of plants Authority (CEA).
The plant is certified with ISO 14001:2004 and 9001 Ø Mr. R P Gokul
management systems. The plant is also implementing Ø Mr. Raja Raghavan
OHSAS 18001:2007 management system. Ø Mr. Jayanth Chetlur
Ø Ms. Shilpi Singh
1.4. ENVIRONMENTAL SETTINGS OF KTPS
During the site visit, the following officials of KTPS were
Koradi Thermal Power Station (KTPS), one of the power contacted to discuss and understand the operations of
generation units of MAHAGENCO, is located in Koradi KTPS with regard to Environmental Health and Safety
approximately 11 kms from Nagpur (The Orange City) on performance as well as resource efficiency assessment.
the Nagpur - Chindwara highway. Table – 1 provides the The key persons among them were:
details of the environmental setting of KTPS.
Ø Dr. V. V. Wanjari (Medical Superintendent)
1.5. SITE VISITS, DATA COLLECTION & REPORT Ø Mr. P. K. Khurana (Ex. Chemist, Stage II)
DISCUSSIONS Ø Mr. D. S. Dhakate (Exe. Engineer - POG)
Ø Mr. A. K. Kapoor (Safety Officer)
An initial site visit was carried out during 18th July 2007 Ø Mr. Ajay G. Telang (Dy. Executive Engineer –
and 21st July 2007 by Ernst & Young Pvt. Ltd. (E&Y) R&M)
team to collect all the necessary basic information to Ø Mr. M. N. Naisal (Dy. EE-CHP)
understand the EHS performance of KTPS. Ø Mr. Milind Dharmadhikari (Chemist, Stage II)
Ø Mr. S. S. Bagchi (Chemist, Stage II)
The site visit included data collection and reconnaissance Ø Mr. Mongse (Chemist, Stage II)
survey of the plant and its associated facilities. Prior to the
initial site visit, E&Y had communicated to KTPS, the
preliminary list of documents / information which would be
required to carry out the Environmental Audit and Due
Diligence Assessment (EA-DDA).
Koradi Village -
Plant Site
Based on the data collected, baseline pollution parameters Ø Potential Liabilities / Risks: This includes
for the following to be established: particulate matter consultation with the following stakeholders to
(kg/kWh), SO2 emissions (kg/kWh), NOx (kg/kWh), identify potential environmental liabilities to the
mercury emissions (g/MWh) and ash generation (kg/kWh) power plant:
their design parameters. The parameters • Ensuring compliance with the applicable
include national and state level regulatory
requirements and any specific stipulation on
q Primary fuel use the plant
q Auxiliary fuel use • Meeting the requirements of applicable PPAH
q Unit heat rate guidelines and an assessment of their
q Specific water consumption feasibility
q Auxiliary power consumption • Improving the various resource efficiency
parameters of Unit – 6 towards their
w A detailed material and energy balance respective design parameters as well as
assessment will be carried out for different towards the industry best practices,
stages of power production to identify the applicable to similar plant and technologies
losses which could be minimized. • Preparing a matrix comparing the proposed
interventions against their environmental
Ø Institutional Capacity Assessment: This will review benefits related to reduction in pollution,
the institutional setup and resources available improvement in energy efficiency, reduction
within the plant for ensuring sound environmental in greenhouse gas emissions and risk
performance and assess their adequacy and mitigation.
effectiveness. The review would include the
following: Ø Preparation of investment plan: Based on the
measures identified to mitigate the potential
w Institutional setup for environmental risks and liabilities, a cost benefit analysis for
management different interventions to be made by developing
w Systems and procedures a matrix. Any additional investments required to
w Training achieve the industry best practices to be
w Mechanisms for addressing public concerns specified and provided separately in the report.
PART 3: COMPLIANCE ASSESSMENT 3.2. OCCUPATIONAL HEALTH & SAFETY (Laws &
Regulations)
The applicable environmental laws and regulations for
Koradi Thermal Power Station (KTPS) are presented Ø The Factories Act & Maharashtra Factories Rules
below for reference. The compliance assessment of plant Ø The Electricity Rules
has been carried out taking into consideration the below Ø Gas Cylinder Rules
mentioned laws and regulations. Ø The Petroleum Act & Rules
Ø SMPV Rules
3.1. ENVIRONMENTAL (Laws & Regulations) Ø Boiler Act & Regulations
Ø Dangerous Machines (Regulations) Act.
Ø Air (Prevention & Control of Pollution) Act & Rules Ø The Maharashtra Factories (Control of Industrial
Ø Water (Prevention & Control of Pollution) Act & Major Accident Hazards) Rules
Rules Ø The Maharashtra Safety Officers (Duties,
Ø Water (Prevention & Control of Pollution) Cess Act Qualifications and Conditions of Service) Rules
& Rules
Ø Public Liability Insurance Act & Rules
Ø National Environment Tribunal Act
Ø CPCB Charter on CREP
Ø Environment Protection Act
o Environment Protection Rules
o Hazardous waste (Management & Handling)
Rules
o MSIHC Rules
o Noise (Regulation & Control) Rules
o Batteries (Management & Handling) Rules
o Bio-Medical waste (Management & Handling)
Rules
o Fly Ash Notifications
o EIA Notification
3.3 ENVIRONMENTAL COMPLIANCE Ø Show Cause Notice under Clause (b) of Sub-Section
(4) of Section 25 of the Water (P&CP) Act, 1974
The first unit of KTPS was installed in the year 1968 and vide letter no MPCB/PCI-II/TB/SCN/B-3660 dated
the last unit (Unit -7) was commissioned in the year 1984. 06/11/2006
Since all the units of KTPS were installed prior to the
formulation of the Environmental Protection Act, 1986, 3.3.1. Summary of Findings
KTPS did not require a Environmental Clearance for
establishment as well as operation from Ministry of During the audit it was observed that most of the
Environment and Forest (MoEF), New Delhi. The first conditions specified in the consent order are being followed
Consent to Operate was issued to the plant in the year by KTPS except a few. The detailed checklist of compliance
1989 by Maharashtra Pollution Control Board (MPCB). The assessment is provided below.
latest Consent to Operate, was issued by MPCB, under the
Air Act, Water Act and Hazardous Waste (M&H) Rules, on
28th December 2006 and is valid till 30th September 2011.
The same document has been considered for assessing the
compliance against the conditions specified in the consent
order.
6 Daily water As per the consent order, the daily water The quantities of water used for the
consumption consumption should not exceed as given aforementioned purposes were
under found to be with in the limits
prescribed in the consent based on
Consumption the data made available by KTPS
(Cess records). However, due to
S. Description Quantity non-availability of flow meters, Partial Compliance
NO. (m3/day) actual measurements were not
1 Domestic 12000 possible.
2 Industrial 15000
Process
3 Industrial 90000
cooling/boiler
8 Hooding and As per the consent order, the coal KTPS has initiated the work for
Ventilation handling system shall be covered with provision of hoods and ventilation
arrangements for proper hooding and ventilation system at CHP.
In-Progress
CHP arrangements connected to dust
suppression agent so as not to allow any
fugitive emissions
9 Installation of As per the consent orders dated Daily monitoring of AAQ with
continuous ambient 22/11/2001 and 28/12/2006, KTPS CAAQMS, as suggested in the
air quality and should install three continuous ambient consent order, is not being carried
micrometeorological air quality and micro-meteorological out and the same is not being
monitoring station monitoring station at location indicated reported to State Board. However,
by SPCB. Also, as per consent order the AAQ is being monitored twice a
dated 22/11/2001, KTPS shall install week as per NAAQ standards. In-Progress
continuous ambient air quality
monitoring station and in the event the The continuous AAQ monitoring
same cannot be provided, the AAQ will system is being installed.
be monitoring every day and the daily
report be submitted to the Regional
Office.
10 Disposal of As per the consent order, KTPS should The hazardous waste including ETP
hazardous waste sell the used/spent oil to the SPCB sludge containing chemical waste is
authorized third party and waste being disposed as required by the Yes
containing oil and chemical sludge from MPCB norms.
ETP should be disposed off in the TSDF.
14 Medical Check up U/r 73-V (1) (b) of the Maharashtra The health register made available
Factories Rules, 1963, Workers indicated that the workers are being
employed in a ‘hazardous process’ shall examined once in a year.
be medically examined by the Factory No
Medical Officer once in a period of 6
months to ascertain the health status of
all the workers in respect of occupational
PART 4: POLLTUION PREVENTION AND CONTROL Ø Assessing plant’s overall performance vis-à-vis
ASSESSMENT applicable national and state level laws and
regulations.
Koradi Thermal Power Station (KTPS) and MAHAGENCO
are committed towards maintaining a sound environmental The areas covered during the study included assessing the
management of the plant and are aiming towards achieving efficiency of ESPs / Bag Filters of all the units, NOx control
the same by recognizing the sources of pollution and taking systems, Noise Control Systems, Water Recycling Systems,
preventive and control measures to keep the same within Effluent Treatment Systems, Dust Supression Systems and
the standards / stipulated limits. As part of the initiative, Ash Pond (ash water decanting as well as containment of
KTPS has also taken up Environmental Management ash slurry in the pond).
System as per ISO 14001.
Our approach for pollution prevention and control
As part of the overall EA-DDA, the pollution prevention and assessment has been provided in subsequent page of the
control assessment was carried out to review and assess report
the adequacy and effectiveness of the existing pollution
control systems at KTPS and to suggest necessary
measures to improve the environmental performance of the
plant in terms of prevention and control of pollution.
Assess the plants overall performance against the applicable laws and
regulations in terms of pollution prevention and control
4.1 SOURCES OF POLLUTION the locations identified by the State Pollution Control
Board.
KTPS is a coal based electricity generation plant. The major
sources of pollution from a coal based thermal power Historic data of 4 years on stack emissions and AAQ was
station are air emissions, waste water discharge and solid collated, during the audit period, in order to understand the
waste discharge. existing environmental scenario in and around the plant
based on the data and also to gauge the authenticity of the
4.1.1. AIR POLLUTION data based on the independent monitoring at the site
during the audit period.
The major sources of air emissions are from the stacks
attached to the ESP/Bag filter and fugitive emissions at The data included monitoring reports from the third party
CHP. The details of the stacks are tabulated below as Table laboratory carrying out monitoring on behalf of
- 2. MAHAGENCO. The analysis of the data provided is
presented below.
4.2 POLLUTION CONTROL EQUIPMENT
Stack Details (Unit) Stack Duct Dia(m) Flue gas Flue gas velocity(m/s) Pollution Control
Height(m) Temp(oC) Equipment
Stack 1 (Unit 1 & 2) 76 2.98 x 6.50 Unit 2: 122 Unit 2: 10.5 ESP
Stack 2 (Unit 3 & 4) 76 2.98 x 6.50 Unit 3: 129 Unit 3: 11.2 ESP
Stack 3 (Unit 5) 90 2.80 x 4.00 A: 140 A: 16.70 ESP / Bag Filter
B: 141 B: 24.53
Stack 4 (Unit 6) 90 2.80 x 4.20 A: 145 A: 23.14 ESP / Bag Filter
B: 143 B; 22.21
Stack 5 (Unit 7) 90 3.15 x 3.15 A: 142 A: 14.4 ESP
B: 145 B: 17.4
4.3.1 Ambient Air Quality from the aforementioned reason, PM emissions from the
stack especially Units of Stage II i.e. Units 5, 6 & 7 are
Ambient Air Quality (AAQ) is being monitored at three contributing to the increase in SPM levels.
locations specified by the SPCB. The monitoring is being
carried out twice a week at all locations by KTPS. In order to authenticate the existing data, ambient air
quality monitoring was carried out during the audit period
In order to analyze the air shed quality in the area, AAQ at 5 locations. The location where the AAQ monitoring was
data of four years i.e. from 2004-05 to 2007-08 has been carried out has been presented below. The locations were
considered. The data was compared with the applicable selected based on the norms prescribed by the Central
standards to check the compliance with the limits Pollution Control Board (CPCB) and the predominant wind
prescribed i.e. 500 µg/m3 for particulate matter (24 direction in the area during the monitoring period.
hourly) as the area is categorized as industrial zone.
It was observed that the parameters such as SPM, NOx and
The review of the data showed that the SPM, SOx and NOx SO2 were found to be within the prescribed limits for AAQ.
values were well within the prescribed limits at each RSPM (PM10) levels in one of the location i.e. time office
location. The graphical representation of the individual of stage – II was found to be higher than the prescribed
parameters has been given as Figures – 3 to 4. limit during the monitoring period. This may be attributed
to the dust laden wind in the area as most of the roads in
As can be seen from the Figure - 2, there has been a are not completely paved outside the plant area.
steady increase in the SPM levels at all the locations over
the period of 3 years. Based on the review and analysis of the data for 3 years
and primary data collected during the audit period, it can
Two of the locations, i.e. Railway Siding and Raw Water be seen that the area still has a buffer of more than 50% in
Pump House (RWPH), are within the plant boundary and in terms of air emission compared with the limits. This shows
the upwind and downwind directions respectively. The that the air is not degraded and can with stand increase in
increase in the SPM levels can be attributed to the heavy the emission levels.
vehicle movement on the highway and increased activities
in the surrounding villages. The activities include brick
manufacturing and also the use of wood and charcoal
during cooking by villagers leading to uncontrolled burning
and contributing to the particulate matter levels. Apart
FIGURE – 2: AAQ (SPM) – AVERAGE ALL LOCATIONS FIGURE – 4: AAQ (NOx) – AVERAGE ALL LOCATIONS
Average SPM Level (All Locations) Average NOx Level (All Locations)
600 140
SPM Level (micro gms/Cu.m)
FIGURE – 3: AAQ (SO2) – AVERAGE ALL LOCATIONS FIGURE – 5: AAQ (SPM) – AVERAGE ALL LOCATIONS
(SEPTEMBER 2007)
Average SO2 Level (All Locations)
Average SPM Levels (All Locations)
SO2 Level (micro gms/Cu.m)
140
120 600
SPM (micro.gms/cu.m)
100 Railway Siding 500
80 Club No.1 400
60 RWPH 300
40 Standard 200
20 16 18
20 11 11 11 11 10 10 11 10 10 100
0 0
2004-05 2005-06 2006-07 2007-08 Time Office Club - 2 Railway Siding KTC Koradi STP colony
Stage - 2
Years
SPM
Locations
Standard
FIGURE – 6: AAQ (PM10) – AVERAGE ALL LOCATIONS FIGURE – 8: AAQ (SO2) – AVERAGE ALL LOCATIONS
(SEPTEMBER 2007) (SEPTEMBER 2007)
Average PM10 Levels (All Locations) Average SO2 Levels (All Locations)
180 140
PM10 (micro.gms/cu.m)
SO2 (micro.gms/cu.m)
160 120
140
100
120
100 80
80 60
60
40
40
20 20
0 0
Time Office Club - 2 Railway Siding KTC Koradi STP colony Time Office Club - 2 Railway KTC Koradi STP colony
Stage - 2 Stage - 2 Siding
PM10 SO2
Locations Locations
Standard Standard
140
Nox (micro.gms/cu.m)
120
100
80
60
40
20
0
Time Office Club - 2 Railway Siding KTC Koradi STP colony
Stage - 2
Nox
Locations
Standard
again less than the prescribed limit. As per the PPAH, there FIGURE – 10: STACK EMISSION (NOx) – ALL UNITS
is no SO2 emission norms prescribed and the plant/unit
should follow the local regulations.
Average NOx Emission (All Units)
NOx emission levels for all the units were found to be within
160
the prescribed limit. No deviations were observed in the 140
NOx emission levels during the period for which the data
500
400
50.00
0.00
2004-05 2005-06 2006-07 (Stg I) 2006-07 (Stg II)
Years
4.3.3 Environmental Monitoring as part of Audit Particulate Matter: The stack emission monitoring showed
that the particulate matter emissions of Units 5, 6 & 7 were
Environmental monitoring is carried out by KTPS on a much higher than the standard limit of 150 mg/Nm3. The
regular basis at the locations specified by the state emission levels of unit 2 & 3 were recorded below the
pollution control board and the same is report to the Board standard limit.
regularly. As part of the environmental audit 5 days
monitoring was carried out for various environmental As per PPAH, the maximum permission emission level for
aspects. This data provided an independent perspective on Particulate matter is 100 mg/Nm3 however the target
the existing status of environmental conditions in and should be 50 mg/Nm3. In rare cases, an emissions level of
around KTPS. The monitoring was carried out by an up to 150 mg/Nm3 may be acceptable. Based on the data
independent environmental lab M/s Vimta Labs, Hyderabad analysis it was observed that the particulate matter
during 25th and 29th September 2007. Later the emission of all the units are higher than the prescribed limit
monitoring was repeated twice during September-2007 and of 150 mg/Nm3. Figure - 12 shows the emission levels of
January 2008 by M/s Mahabal Enviro engineers, Nagpur. particulate matter.
The details of the monitoring location are provided in the
Annexure - II. The locations are identified on the map given Sulphur di-oxide (SO2): SO2 emissions were analyzed for
as Plate – 1. the stack emissions. It was observed that the standard
limitfor SO2 emissions is 203 MT/Day. As per PPAH, it is
4.3.3.1 Stack Emissions recommended that the SO2 emission levels meet regional
load targets.
Vimta Labs carried out the stack emission monitoring
between 26th and 28th September 2007. The stack Based on the analysis of the stack emissions, the SO2
emission of Units 2, 3, 5, 6 and 7 were monitored during emission were observed to be with in the prescribed limit.
the period. Unit 1 and 4 were not monitored as Unit 4 was The Figure - 13 shows the emission levels of SO2.
under shut down and oil firing was underway in Unit 1 and it
was suggested by KTPS not to monitor the emissions Oxides of Nitrogen (NOx): In order to determine the
during oil firing. concentration of NOx emissions from stacks, flue gas
analyzers were used and monitoring was carried out. The
The stack emissions were monitored at the existing port NOx emissions were higher than the prescribed limit of 150
holes provided on the duct of the outlet from ESP /Bag PPM for Unit 6 (LHS) based on the readings based on one
Filter. The results of the stack monitoring are as follows: grab sample. However during other sets of readings NOx
level found well within the prescribed limits. The NOx FIGURE – 13: STACK EMISSION (SO2)
levels for remaining units were also found well within the
prescribed limits. The NOx levels for the remaining units Stack Emission (SO2)
were found to be within the prescribed limit. Figure - 14
shows the emission levels of NOx.
200.0
Note: NOx conversion: mg/Nm3 to PPM (multiply by 150.0
0.487) [Source: PPAH]
100.0
50.0
FIGURE – 12: STACK EMISSION (PM)
0.0
2 3 5a 5b 6a 6b 7a 7b
Stack Emission (Particulate Matter) SO2 (MT/Day)
Unit (Duct)
Standard
2500
PM Level (m g/Nm 3)
2000
1500 FIGURE – 14: STACK EMISSION (NOx)
1000
500
0
Stack Emission (NOx)
2 3 5a 5b 6a 6b 7a 7b
180.00
Unit (Duct) SPM (mg/Nm3)
160.00
Standard (mg/Nm3)
Unit Rated Load Average Average Efficiency The retrofitting work for ESP of Unit – 7 was delayed and
Capacity during SPM inlet SPM oulet (%) an extension in the date was requested. The same was
(MW) stack (mg/Nm3) (mg/Nm3) E=(A- accepted by MPCB and time was extended till 31st March
monitoring B)/A*100 2008.
(MW) A B
4 105 92 21342 140 99.34 Limitations
5 200 189 43302 137 99.68 The efficiency of the pollution control equipments could not
6 210 168 49990 120 99.76 be carried out based on the monitoring as it was observed
that the portholes provided for the monitoring of stack
7 210 175 45112 910 97.98
emissions was not as per the prescribed norms of CPCB. As
Note: Subsequently, KTPS had carried out stack monitoring during per CPCB guidelines, to ensure laminar flow, sampling ports
September 2007 and January 2008, during which, the average SPM
levels at Unit -7 were recorded as 475 and 461 mg/Nm3 respectively.
shall be located at least 8 times chimney diameter down
stream and 2 times up stream from any flow disturbance.
Maharashtra Pollution Control Board (MPCB) had served a
notice to KTPS for high PM emission from Unit 5, 6 & 7 This was not observed at the site where all the portholes
during the year 2005. KTPS sent a detailed action plan were either placed close to the gate valve or close to the
against the notice on 2nd August 2005, where in it was bends which leads to disturbance in the laminar flow and
informed that the retrofitting works for Unit – 5 were inaccurate results.
already completed and bag filter commissioned.
The CPCB norms as referred are applicable to the Power
Partial replacement of bags for Unit – 6 was carried out Stations after 1997 and these are not applicable to the
during March 2008. New order was placed for 8022 bags Units erected prior to 1997. Also, for the existing stack, it
(PTFE membrane type) on 27/08/08 with temperature is practically not possible to make such arrangement.
limit of 2600C. The guaranteed service hours for the
proposed bags was indicated as 32000 Hrs and the cost per 4.3.6 Recommendations
bag is INR 12182.24. An additional cost of INR 2243.16 is
required for providing suitable cage for above new design. The following recommendations are being proposed for
Installation, testing & commissioning charges would be increasing the efficiency of the pollution control system for
additional and costs INR 24 Lakhs. The bags will be Unit - 6:
replaced in O/H of Unit 6 scheduled in Oct-08.
Plausible.
1
Chemithon Engineers Ltd., (CEL)
Others Recommendations:
4.4 ASH GENERATION & UTILIZATION TABLE – 6: ASH GENERATION (Source – KTPS)
Coal, the raw material for power generation at KTPS, was Year Coal Ash Fly Ash Bottom Ash
analyzed to determine the ash content. Both proximate and Consumption Generation (80% of ash (20% of ash
ultimate analysis was carried out on the bunkered coal for (MT) (MT) generation) generation)
Stage I and II of KTPS. Based on the analysis it was found (MT) (MT)
that the ash content in the coal is 35%. By considering the 04-05 4969783 1739424 1391539 347884
average ash content of 35% in the coal, the quantity of fly 05-06 4914121 1474236 1179389 294847
ash generated during the years 2004-05, 05-06 and 06-07 06-07 5479652 1643896 1315116 328779
is given in the Table - 6.
KTPS has entered into an agreement with M/s Manikgad
As the quantity of the fly ash and bottom ash cannot be
Cements (MC) for collection and utilization of fly ash. As
quantified, a theoretical norm of 80:20 for fly ash and
per the agreement, the cement manufacturer would collect
bottom ash has been taken to arrive at the quantities.
the entire quantity of fly ash from Unit -5 and half quantity
from Unit-6. The same is on a Built-Own-Operate basis.
As on date, KTPS has not installed any system where the
KTPS has also entered into an agreement with M/s Murli
captured fly ash can be utilized. All the fly ash is
Agro for the collection and utilization of dry ash from Unit-
transported to the ash handling plant where the ash is
6 and Unit-7.
mixed with treated effluent and raw water to prepare ash
slurry and is sent to ash pond. The ash slurry supernatant
4.4.1 Ash Utilization Plan
is partly recovered and recycled back into the AHU for
preparation of ash slurry.
Based on the aforementioned arrangement for fly ash
utilization, the following ash utilization plan is provided
As per the Fly Ash Notification issued by Ministry of
below.
Environment and Forest (MoEF), New Delhi in 1999 (Draft
Notification 2007 yet to be finalized), all thermal power
The ash generation for Unit 5 & 6 has been considered
plants based on coal / lignite shall provide fly ash to
based on the average coal consumption in the respective
cement / brick manufacturers free of cost to for
units and the ash content of coal.
manufacturing concrete, bricks and use in other
construction activity.
2
This is considering that the R&M activity will be completed by the year
2010 which would improve the efficiency of Unit – 6 by 1%.
3
This is considering that 3 KL of water is required per MT of ash for slurry
preparation.
4.5 WATER SOURCE AND RECYCLING SYSTEM towers. For Stage I, all the units have cooling towers. For
Stage II, only Unit 6 and 7 have cooling towers. Unit 5 has a
The source of water for KTPS is from the reservoir of natural cooling system i.e. pond – 2.
Pench Dam located approximately 25 km from the plant.
The water is supplied to the Pond No.3 through gravitation FIGURE - 16: DM & COOLING WATER SYSTEM
flow. From pond no.3 the water is pumped into the plant.
After in-house consumption, most of the water is circulated Lift Unit 5, 6 & 7
back into the pond – 3 for reuse. The schematic diagram of Pump
the water flow system at KTPS has been provided as Plate SW Units 1,2, 3 & 4
- IIa for ready reference.
WTP - I
DM
4.5.1 Water Scheme SW
Sq.
Tank
There are 2 Raw Water Pump Houses (RWPH) at Pond No. WTP-II Raw water tank
3 for pumping of water to various units. RWPH I supplies RWP - II RWP - I
Domestic (Colony &Plant)
water to Stage 1 units and RWPH II supplies water to Stage
II units. Dalmia Pump House (DPH), which supplies water Dalmia pump
house
Inflow
to both Khaperkheda power plant and KTPS, also draws from Pond No. 3
water from pond – 3. Pench
Dam
The water thus pumped is sent to the raw water tank at
KTPS which is later sent to Water Treatment Plant (WTP) The return water from the cooling tower flows back to
of stage II where the water is treated and the DM water is condenser. Water in this close cycle is circulated with CW
used for power plant and chlorinated water is used for Pumps located at condenser inlet and Cooling Tower Lift
domestic purpose. Water from the raw water tank is also Pumps (CTLP) located near Cooling towers. On return
supplied to the Ash Handling Plant (AHP) for slurry path of the water from the cooling towers to the condenser
preparation. is a tank i.e. junction box (JB). Overflow of this JB goes to
Pond No. 3. Unit 5 has a natural cooling system where the
DM and Cooling water system: After DM water is used at hot water from condenser is let out to pond no. 2 for
individual units for steam generation, the condensate cooling which later joins pond. -3.
extracted from the LP exhaust is sent to the cooling
The water from pond – 2 joins the raw water source pond – (settling tanks) and no secondary treatment using
3 via two different channels. One channel from pond – 2 is chemicals is carried out. The treated water from the
divided into 2 streams with a ratio of 60:40. The 60% settlers is sent to the effluent outlet sump from where it is
stream joins pond – 3 after traveling a distance of about pumped to the new raw water pump of Unit 7, clear water
6.5 km through the villages surround the plant and the 40% pump of unit 5 and slurry tank of unit 6.
stream after traveling a distance of approximately 1 km.
The solid waste from ETP mainly contains ash which is
FIGURE - 17: COOLING WATER CIRCULATION SYSTEM recovered and supplied to local brick manufacturers.
The treated water is used for gardening. Overflow from the Additional raw water required for make up and preparation
STP is discharged out of the colony area. Sludge from the of the slurry is in AHU in pumped from pond – 3. The un-
STP is used as manure for the gardens and plants in colony recovered water from ETP joins a stream from pond – 2
and plant. which later joins pond – 3.
The detailed schematic of the STP is provided in Plate 5 of FIGURE - 18: ASH WATER RECYCLING SYSTEM
the report. The inlet and outlet characteristics of the
Un-
sewage have been given in Annexure - III. recovered
Ash Bund
It is observed that the treated sewage meets the AWR Khasara
requirements of the on-land disposal standards set by CHP + BPH FFPH
CPCB. The pH was recorded as 7.4 and COD was recorded Overflow
as 23.5 mg/l and BOD of <5 mg/l. The treated water is
being used for gardening in plant and colony. AWR Koradi Ash Bund Booster PH
(Koradi) AHP - I
Ash water recycling system: The streams from the both the
stages are sent to ETP where the solids are settled using
clarifiers. The treated water is pumped into the Ash
Stage I and II surface
Handling Unit (AHU). The ash collected from the ESP/bag AHP - II ETP runoffs, Pre-treatment
filter is mixed with the treated water to prepare slurry. The effluents and boiler blow
slurry is then pumped into the Booster Pump House (BPH) downs
from where it is pumped to the ash pond.
Water flow measurements were carried out to determine
Part of the supernatant from the ash pond is collected into the quantity of water intake from Pond No. 3 and outlets
the Ash Water Recovery (AWR) scheme and pumped back from the plant.
into AHU. The remaining part of the supernatant is let out
into open stream which joins a river. Another water stream Flow measurements were carried out using Non-Contact
from the ash pond is let out as open channel which is not Flow Meters (NCFM) and Tracer Method. During the
recovered into AWR. measurement, the pump rated capacities and the running
capacity was also noted to co-relate the flow
measurements.
RWPH I supplies water to stage I units and RWPH II supplies The ash slurry from the Booster Pump House (BPH) is
water to stage II. DPH supply water to the WTP II. sent to the ash pond at Khasara. The supernatant from the
ash pond is collected in the pond and pumped back into the
Using NCFM, water flows were measured from RWPH I and plant for ash slurry preparation. The AWR scheme is
DPH. At the time of the measurement, 3 pumps were in provided in Plate - II. At the time of monitoring, the pumps
operation at RWPH I and 1 pump was operational at DPH. at Khasara AWR were not in operation (as cleaning of ash
Of the three pumps, water from 2 pumps at RWPH were from the collection pond was underway). Only one pump
being pumped to one header. From the header, water is was in operation at the Koradi AWR which was pumping
pumped to the units. From the third pump, water is pumped water back to the plant.
directly to units. The pumps at RWPH were running at full
capacity where as the pump at DPH was at 75% capacity. Tracer method was used to measure the flow of ash water
discharge from the ash bund at khasara ash pond. The ash
The flow measurements were as follows: water supernatant flows as two different streams. The flow
rates of both the streams has been measured and
RWPH I : Pipe I – 1314.25 (31542 cu.m/day) presented below:
: Pipe II – 0
Dalmia : 567 cu.m/hr (13604.8 cu.m/day) Ø Stream 1 (Left) – 10,703.8 cu.m/day
Ø Stream 2 (right) – 33566.4 cu.m/day
Tracer method was used for measuring the flow from RWPH
II as the channels were underground. In order to avoid The stream – 1 is partly recovered. The quantity of water
inconsistency, 12 reading were taken at each channel to which is not being recovered could not be quantified as the
arrive at a agreeable average flow rate. The average flow pumps at AWR Khasara were not in operation during the
rate at each channel which supplies water to individual monitoring period. Stream – 2 does not join the AWR and is
units is as follows: let out without recovering as an open channel which later
joins the river.
Ø Unit 5: 287719 cu.m/day
Ø Unit 6: 326021 cu.m/day Waste water from the Coal Handling Plant (CHP) and
Ø Unit 7: 294645 cu.m/day overflow from BPH, is not treated is let out of the plant
premises.
In order to estimate the quantity of waste water being During the time of measurement, only one pump was in
discharged out of the plant without treatment, flow operation running at 75% load. The flow measurement
measurements were taken using the tracer method and the recorded at the ETP pump house was 461 cu.m/hr (i.e.
same was recorded as 693.5 cu.m/hr (16,643 cu.m/day). 11,076 cu.m./day).
In order to estimate the recovery of the waste water which
is being recovered at the AWR Koradi, NCFM was used to 4.5.2 Water Consumption
measure the flow of the water. At the time of measurement
only one pump was operational. Based on the requirement The water consumption details of KTPS, for the year 2007-
2/3 pumps are operated at a time. The flow measured at 084, has been presented below to understand the quantity
Koradi AWR was 704 cu.m/hr (i.e. 16,917 cu.m/day). of water recycled / un-recovered.
4.5.1.3 Cooling Water System Based on the details, the water balance has been prepared.
The following are the details of the same:
As mentioned in the report earlier, all units under Stage I
have cooling tower and the water recovered in circulated WATER BALANCE (All quantities in cu.m / year)
back into the system. For stage II, only Units 6 & 7 has A TOTAL WATER INTAKE (RWP) 309735592
cooling towers. B TOTAL Boiler Feed, CW, 43666591
WATER IN Domestic and Ash
As mentioned in the earlier section, during the monitoring, THE Disposal
the 60% stream was closed due to expansion work on the SYSTEM + Effluents 14054496
recovered/recirculated to
highway. All the water was diverted into the 40% channel.
Pond No. 3
Tracer method was used to estimate the flow rate. The flow
+ Effluents generated 21196682
of the stream was recorded as 9,63,965 cu.m/day.
TOTAL (B) 78917769
4.5.1.4. Effluent Treatment Plant C WATER DISCHARGED BACK TO POND No. 3 (A-B-D) 205349206
D WATER LOSS (Delta) 25468617
Treated water from the ETP is pumped to the AHU for ash BALANCE TOTAL OF B + C + D 309735592
slurry preparation. In order to estimate the amount of
water being pumped, flow measurements were taken at the The details of the water consumption and reuse are given in
pump house of ETP. the Annexure-IX for ready reference.
4
Source : KTPS, Water Cess Records for 2007-08
Limitations of flow measurements Ø Water flow meters are to be installed at major inlet
and outlet points such as Raw Water Pump house,
The following flow measurements were not recorded during WTP I & II Inlets, DM water and Softener Water
the study period: outlets, inlet to cooling tower, inlet and outlet of
ETP and STP, inlet to AWR, outlet of AWR, inlet and
Ø Un-recovered water from ETP joining pond – 2 outlet of AHP. The points where the flow meters are
stream which later joins pond – 3 due to to be installed are shown on the schematic diagram
inaccessibility. in Plate – II B.
Ø 2nd stream from pond – 3 joining pond – 3 due to
inaccessibility Ø Runoff water from CHP and overflow water BPH is
Ø Cooling water joining pond – 2 from cooling tower of presently being discharged without treatment which
unit 6 & 7 as there was no straight open channel for is approximately 16,643 m3/day. The construction
measurement of a primary treatment facility i.e. a settling plant be
Ø Over flow from JB as there was no straight open constructed at the outlet point to remove suspended
channel for measurement solids in the overflow water and the entire quantity
Ø AWR Khasara as the pumps were shutdown for be recycled back into the system.
maintenance of the water recovery pond
Ø Ash water supernatant from Khasara ash bund
Considering the aforementioned limitations, the water which does not join the AWR scheme should be
balance of KTPS could not be arrived upon. However, based recovered. Based on the measurements carried out
on the data provided by KTPS for the year 2007-08, the during the audit period using tracer method,
water balance has been provided. approximately 33,566 cu.m/day of water is being let
out without recovery which can be recycled back
4.5.3 Recommendations into the system.
4.6 CHEMICAL USE FOR WATER TREATMENT (DM TABLE – 9: CHEMICAL USE (Source – KTPS)
WATER)
Chemicals UOM 2005-06 2006-07
Raw water from pond no. 3 is pumped to Water Treatment HCL MT 1014 1224
Plant (WTP) of stage I and II for treatment using chemicals Caustic Lye MT 234 248
for preparation of DM water used for steam generation at
the power plant and domestic water for colony and plant. Hydrazine Kg 6800 13000
Lime MT 324 426
The chemicals used for treatment are HCL, Caustic Lye, Alum MT 335 187
Hydrazine (used to eliminate the residual oxygen in the Salt MT 3671 3862
feed water), Lime, Alum, Salt and Poly Aluminium Chloride PAC MT 45 126
(PAC).
TABLE – 10: SPECIFIC CHEMICAL CONSUMPTION
Historical data for the use of chemicals was collected from (Source – KTPS)
KTPS for the years 2005-06 and 2006-07. The quantity of
chemicals used for the treatment of water is given below in
Chemicals UOM 2005-06 2006-07
Table - 9. In order to estimate the specific chemical
consumption interms of total DM water used during the HCL Kg/m3 1.2671 1.3258
particular year, the historical data of DM water Caustic Lye Kg/m3 0.2924 0.2843
consumption at the plant level was collected from KTPS. Hydrazine Kg/m3 0.0085 0.0072
The quantity of DM water used during the year 2005-06 Lime Kg/m3 0.4049 0.4259
was 8,00,234 cu.m and during the year 2006-07 was
Alum Kg/m3 0.4186 0.3503
833,427 cu.m.
Salt Kg/m3 4.5874 3.7807
Based on the data made available regarding the total PAC Kg/m3 0.0562 0.0707
chemical consumption and the quantity of DM water used,
the quantity of chemical used for treatment of 1 cu.m of Excess usage of chemicals in the WTP is due to the high
water was determined and presented in the Table - 9 for turbidity and organic load of the raw water from Pond No.3.
reference. This is due to the increased activity in the surrounding
areas of the pond by villages and agricultural activity. Also,
heavy siltation in the banks of the pond has increased the
vegetation in the banks and physically reduced the areas of S. Parameters Unit Dalmia Stg – II Pench
the pond and water holding capacity. No. Pumphouse RWP intake
for KTPS Water water
The PAC consumption during the year 2006-07 was more (Present)
during 2006-07 compared to 2005-06 by 0.0146 kgs. The 3 pH - 7.5 – 8.5 7.8 – 8.3 7.5 – 8.0
consumption of other chemicals was less than the previous
4 Total ppm as 120 – 150 130 – 160 100 –
year.
Hardness CaCO3 120
5 Total ppm as 70 – 100 75 – 110 10 – 20
4.6.1 Recommendations
Chlorides CaCO3
The following are the recommendations for improving the
water quality of Pond No. 3 which will also help reduce the Ø The cost benefit was calculated considering the
use of chemicals for treatment: above data.
Ø Chlorine levels in the Pench intake water and at the TABLE – 12 : Cost Analysis(Source – KTPS)
raw water pump house were analyzed. It was
observed that the total chlorides as ppm of CaCO3 Designed Dalmia Stg – II Pench
ranged between 10-20 in Pench intake water and Pumphouse RWP intake
70-100 near the raw water pump house (please for KTPS Water water
refer table – 11). (Present)
Anionic Load 102 104 104 44
TABLE – 11: Water Characteristics (Source – KTPS) Anion Exchange 1800 1765 1765 4170
Output (m3)
S. Parameters Unit Dalmia Stg – II Pench No. of - 46 46 20
No. Pumphouse RWP intake regenerations
for KTPS Water water Caustic Soda / - 0.5 0.5 0.5
(Present) Regen (MT)
1 M. Alkalinity ppm as 130 – 150 120 – 150 110 – Total Alkali - 23 23 10
CaCO3 130 required per
2 Conductivity Micro 300 – 450 300 – 400 200 – Month (MT)
mhos/cm 300 Savings in caustic soda 23-10 = 13 MT
The perusal of the ambient noise level shows that the Lday
ranged between 43.5 dB (A) to 58.6 dB (A). The highest
was recorded at the plant boundary and the lowest at the
hospital. The Lnight ranged between 41.1 dB (A) to 52.1
dB (A). The highest again was recorded at the plant
boundary.
The noise levels at the station gate I & II are within the 4.7.1 Noise Control Measures
limits of the standards of 75 and 70 dB during day and
night respectively. The noise level at the hospital which is As mentioned in earlier section, the major sources of noise
in the KTPS colony is also within the limit of Silence Zone are the generators, boilers and turbines.
during the day time. However, the noise level is slightly
higher during night i.e. 41 dB against 40 dB. This can be KTPS has provided acoustic enclosures for turbine
attributed to the close proximity of the highway and also generators and boilers where possible to reduce the impact
activities in the colony. of the noise generated from generators. Preventive
maintenance is carried out regularly for auxiliary units like
TABLE – 16: AMBIENT NOISE LEVELS air compressors and ID Fans to maintain the noise levels
within the limits.
Location L10 L50 L90 Leq Lday Lnight Ldn
KTPS has provided acoustic enclosures to all the work
Station – 1 57.8 51.2 49.7 55.3 54.2 51.5 58.4
places in the turbine room to avoid noise levels to exceed
Gate
the work zone limit. Ear muffs and plugs have been
Station – 2 56.9 52.0 46.0 55.2 58.6 52.1 60.3 provided to all the workers who are exposed to high noise
Gate levels at places such as boiler and turbine area to avoid
Hospital 48.3 44.2 41.1 45.5 43.5 41.1 49.2 health hazards.
Commercial 50.4 46.3 42.8 47.5 48.9 42.4 50.6
Complex 4.8 DUST SUPRESSION SYSTEM
TABLE – 17: AMBIENT NOISE STANDARD The major source of fugitive dust is from the coal handling
plant (CHP). Coal is delivered to the CHP area through rail
Category of Area Day Night wagons and rope ways. The coal from the tippler is
transferred to the coal pile, crusher and to the bunkers by
Industrial Area 75 70
conveyors. Transfer points constitute the fugitive sources.
Commercial Area 65 55 Screens, sieves, crushers, dust on road are the typical
Residential Area 55 45 sources.
Silence Zone 50 40
KTPS has provided automatic water sprinkler system at the
wagon tipplers and advance fog system at conveyers to
All the roads in the plant and colony are tar roads. The
movement of vehicles in the plant is restricted and hence
there in no dust from the roads.
KTPS had also carried out a study of air quality in the CHP
premises during May 2007. The study was carried out by an
independent consultant. Certain recommendations were
provided based on the study which includes:
4.8.1 Recommendations
PART 5: RESOURCE EFFICIENCY ASSESSMENT In addition, the pattern pertaining to specific coal
consumption and specific water consumption were also
The key objectives of the resource efficiency assessment drawn and peak points were highlighted.
includes: The data related to the breakdown of the plant was
collected and analysis of the same was carried out.
Ø Historical performance of efficiency parameters
such as primary fuel use, auxiliary fuel use, specific The power generation, coal consumption, water
water consumption and auxiliary consumption; consumption and specific coal consumption data were
presented on year wise basis and the explanation of the
Ø Establishment of heat and energy balance of the graphs is presented in the following sections of the report.
major energy guzzlers in the plant; and
All the data collected from the plant is enclosed as
Ø Discuss and finalize the energy conservation annexure at the end of the report.
measures and best practices being followed by other
thermal power plants in India with the appointed
R&M consultant;
Data analysis
160
140
42 %
120
100
Million kWh
80 Planned overhaul
maintenance
60
40
20
0
Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06
Month
140000
120000
100000 39 %
Consumption (MT)
80000
Planned overhaul
60000
maintenance
40000
20000
0
Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06
-20000
Month
FIGURE – 21 : UNIT : 6 SPECIFIC COAL CONSUMPTION PATTERN FOR THE YEAR 2005-06
0.90
0.80
0.70
Kg of Coal / Kwh of Power
0.60
0.50
0.40
0.10
0.00
Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06
-0.10
Month
FIGURE – 22 : UNIT – 6 : AUXILIARY POWER GENERATION PATTERN FOR THE YEAR 2005-06
16.00
14.00
12.00
55 %
% Auxiliary consumption
10.00
8.00
6.00
4.00
2.00
0.00
Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06
-2.00
Month
Specific DM water consumption for the financial year 2005-2006 for Unit - 6
0.60
0.50
Kg of water / kWh of Electricity
0.40
0.20
0.10
0.00
Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06
Month
160
140
20 %
120
100
Million kWh
58 %
80
60
40
20 Planned overhaul
maintenance
0
Apr-0 6 May-0 6 J un-0 6 J ul-0 6 Aug -0 6 S ep-0 6 O ct-0 6 Nov-0 6 Dec-0 6 J an-0 7 Feb-0 7 Mar-0 7
M o nth
120000
16 %
100000
Consumption (MT)
80000
58 %
60000
40000
20000
0
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Month
FIGURE – 26 : UNIT 6 : AUXILIARY POWER CONSUMPTION PATTERN FOR THE YEAR 2006-07
12.00
14 %
10.00
9%
% Auxiliary consumption
8.00
6.00
4.00
2.00
0.00
May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Month
FIGURE – 27 : UNIT 6 : SPECIFIC COAL CONSUMPTION PATTERN FOR THE YEAR 2006-07
Specific Coal/Consumption
Coal Consumption pattern
Power Ge ne ration for for
the the Year Ye
financial 2006-07
ar 2006-2007
1.00
0.90
0.80
Kg of Coal / Kwh of Power
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Month
0.2
0.18
0.16
Kg of Water / kWh of Electricity
52 %
0.14
0.12
0.1
52 %
0.08
0.06
0.04
0.02
0
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Month
5.2 COAL HANDLING PLANT AND MONITORING Rakewise receipts are maintained by KTPS and S E Nagpur.
KTPS prepares the bills and submits the same to the HO.
KTPS is facilitated with a centralized Coal Handling plant to
supply coal to both Stage I and Stage II. H.O. will release the payment on receipt of coal. The cost of
coal at the time of receipt includes basic charges, royalty
A conveyor is being operated to supply coal from the coal charges and sizing charges. Transit losses are allowed upto
yard to another conveyor from where coal is being fed into 0.8% of the total.
the bunkers. At present there is no measurement to weigh
the coal before feeding into bunkers. After the receipt of coal, the entire wagon is weighed with
and without coal. The tare weight of the wagon is deducted
5.2.1 Coal receipt – A Brief Introduction from the total weight of the coal to get the actual receipt of
the coal. The weighed coal is stored in the coal yard for
KTPS receives coal in two modes: supply. At present, there is no online weighment of coal
Ø Rope supply to the individual units.
Ø Rail
The typical ultimate or elemental analysis of coal is given
The road transport is used only in case of emergency. below:
The following companies supply coal to KTPS. TABLE 18 : ELEMENTAL ANALYSIS OF COAL
The coal sample was taken at each mill and the proximate TABLE – 20 : SIEVE ANALYSIS OF COAL
analysis was carried out for the same on 10th November
2007. The results of the analysis are given below: Sieve Gradation Before Crusher % After Crusher %
+100 18 0
TABLE 19 : PROXIMATE ANALYSIS OF COAL +50 16 6
+20 20 32
Coal Moisture Ash VM FC GCV
Basis +2 38 46
Mill % % % % kcal/kg
-2 8 16
ADB 3.75 40.01 23.73 32.51 4244
A
AFB 10.51 37.2 22.06 30.23 3946
As per the analysis, 78% of the coal was crushed close to
ADB 3.04 39.29 23.25 34.42 4415 20 mm size before being fed into the coal mill and 16% of
B
AFB 12.36 35.51 21.02 31.11 3991 the coal size was less than 2 mm. Though 94% of the coal
ADB 3.1 39.6 23.87 33.43 4377 was of desired size, 6% of it was more than the required
D size. As the size of the coal is high, the power consumption
AFB 12.66 35.69 21.51 30.14 3945
in the coal mill will be high. Therefore, 6% of the coal will
ADB 3.14 38.97 22.65 35.24 4430
F have direct impact on the coal mill power consumption
AFB 12.02 35.4 20.57 32.01 4024 which requires immediate attention.
Belt ADB 3.04 36.1 26.6 34.26 4715
No. KTPS is equipped with six coal mills better known as Coal
AFB 12.94 32.41 23.88 30.77 4234
101 Mill A, B, C, D, E & F. Coal from the bunker is made to pass
Belt ADB 2.19 41.81 25.96 30.04 4301 through the feeders and is being fed into the coal mill. The
No. rate of coal fed into the mill is directly proportional to the
106 AFB 13.22 37.1 23.03 26.65 3816
speed of the feeders. The coal feeder is controlled with
Dynodrive by varying speed.
5.2.2 Sieve Analysis (Crusher)
Once the coal is crushed, primary air from the PA fan will
Sieve analysis of the coal is regularly carried out by KTPS carry the crushed coal to the boiler.
to find out the size of the coal. A sample of 1 kg or 2 kg
after crusher and after coal mill is taken out to carry out In order to carry out the sieve analysis, the coal sample
the sieve analysis. The sieve analysis results are given was taken after the crusher and before feeding to the
below:
boiler. The samples are taken from four sides and the Ø Higher flow rate of coal compared to the design
results are given in Table – 20. value
Ø Lower air flow rate
Two types of sieves are used by KTPS to conduct sieve Ø Improper design of boiler and furnace
analysis. Size of one sieve mesh is -200 mm and that of the
other is +50 mm. Based on the analysis, on an average 70% As per the analysis carried out by KTPS, the unburnts are
of the coal fed into the boiler is of required size as per the generated because of improper sizing of coal and higher
design. fuel input due to lower calorific value of coal.
But, specific to the coal mill A, 3.5% of the coal crushed On an average, 6.5% unburnts in the bottom ash and 1%
from the mill is more than 50 mm. This clearly envisages unburnts in the fly ash were measured which is significantly
not only the production of unburnt carbon during on the higher side. The general acceptable limits of
combustion in the boiler but also shows the poor unburnts are < 4% for bottom ash and < 1% for fly ash. This
performance of the mill. is one of main concern where immediate attention from
KTPS is required.
Even in other mills, 1.4 - 1.6% of the coal size was more
than 50 mm. As the size of the input coal is high, the
unburnt carbon generation during combustion will be high.
In order to analyze the same, unburnts testing are carried
out and the results are given below:
The tests for unburnt carbon in the fly ash and bottom ash
were carried out during the site visit and the results of the
same are given in Table-21.
CM - A CM - B CM - E CM - F
Corner ( + 50 ) ( - 200 ) ( + 50 ) ( - 200 ) ( + 50 ) ( - 200 ) ( + 50 ) ( - 200 )
1 4 62.9 1.6 67.8 0.9 75.8 1 76
2 4.4 64.5 0.9 72.8 3 69.6 1.1 76.8
3 0.8 73.1 1.7 69.8 1.6 64.8 1.6 65.8
4 4.8 65.4 1.4 71.8 0.8 76.4 1.8 76.1
Average 3.5 66.48 1.4 70.55 1.58 71.65 1.38 73.68
During the site visit, Mills C&D were not in operation
Auxiliary Current Voltage PF Power The total auxiliary power consumption is around 15 MW.
A kV kW The total auxiliary consumption of the Unit 6 works out to
ID FAN A 142 6.9 0.81 1374.6 10.1%. During the site visit, it was requested to perform an
ID FAN B 145 6.65 0.81 1352.8 exclusive study to measure coal consumption, power
FD FAN A 28 6.9 0.81 271.0 generation and auxiliary power consumption. The
FD FAN B Not in service measurements were carried out and based on the data,
heat rate, efficiency, % auxiliary consumption and plant
PA FAN A 110 6.9 0.81 1064.8
load factor are calculated. The results of the same are
PA FAN B 100 6.65 0.81 932.9 given below:
COAL MILL A Not in service
COAL MILL B 25.5 6.9 0.81 246.8
COAL MILL C 25 6.65 0.81 233.2
COAL MILL D Not in service
COAL MILL E 29 6.9 0.81 280.7
Maximum
Heat Plant
Aux. Coal Output power
Generation input in Overall Heat % auxiliary load
Date Consumption Consumption 106 generation
in mU 106 efficiency rate consumption factor
in mU in MT kCal/d possible in
kCal/d in %
MU
10/10/2007 3.894 0.4328 3310 3348.8 12846.1 26.07 3298.9 11.1 5.04 77
10/11/2007 4.05 0.4395 3442 3483.0 13358.4 26.07 3298.4 10.9 5.04 80
10/12/2007 4.282 0.4403 3635 3682.5 14107.4 26.10 3294.6 10.3 5.04 85
10/13/2007 3.628 0.4253 3084 3120.1 11969.0 26.07 3299.1 11.7 5.04 72
10/14/2007 3.888 0.4367 3305 3343.7 12826.7 26.07 3299.0 11.2 5.04 77
10/15/2007 3.862 0.431 3283 3321.3 12741.3 26.07 3299.2 11.2 5.04 77
10/16/2007 3.846 0.4303 3269 3307.6 12687.0 26.07 3298.7 11.2 5.04 76
10/17/2007 4.222 0.4373 3589 3630.9 13928.9 26.07 3299.1 10.4 5.04 84
5.3 STOCHIOMETRIC AIR REQUIREMENT AND FLUE KTPS feeds blended coal into the boiler for steam and
GAS ANALYSIS electricity generation. Therefore, the stochiometric
calculation using elemental analysis may not be
The stochiometric air requirement, total air requirement appropriate. Therefore, the entire stochiometric air and flue
and flue gas quantity of Unit – 6 Boiler is calculated using gas generation calculation is based on the flue gas analysis.
molar volume method.
KTPS monitors the flue gas analysis every shift / day. Flue
The primary data to calculate the air requirement is gas analysis at various loads and timings has been collated
collected from the plant and the same is used for and average data for similar load at different timings are
calculation. Ultimate analysis of the fuel collected from the used to calculate the flue gas flow rate from the plant.
plant given below is used for the calculation:
TABLE – 26 : FLUE GAS ANALYSIS
TABLE – 25 : ELEMENTAL (ULTIMATE) ANALYSIS OF Flue gas analysis
COAL O2 5.1 %
Ultimate analysis of the fuel CO2 13.9 %
C 38.86 % N2 81 %
H 3.655 %
N 1.235 % The flue gas flow rate of Unit – 6 is calculated as 6.77 kg of
S 0.49 % flue gas / kg of coal
O 8.715 %
Moisture 15 % The excess air (inclusive of air ingress from furnace
draught till the end of the chimney and excess being fed
Ash 32.05 %
through primary and secondary system) is calculated and
Total 100 % found to be 1.53 kg of air / kg of coal
Though the theoretical air and total air can be calculated The excess air percent is 26.5%
based on the elemental analysis, the same was not carried
out because the elemental analysis is carried out once in 6 Theoretical air requirement based on flue gas analysis is
months. 4.24 kg of air / kg of coal
In addition, the elemental analysis was given by the supplier
for specific quality of coal (homogenous composition). But, Total air requirement is 5.77 kg of air / kg of coal
The thermal efficiency of the boiler has been calculated Total heat supplied 100 %
using Indirect Method i.e., loss deduction method. Heat Lost due to flue gas 6.34 %
Heat loss due to hydrogen in
In this method, losses from the boiler are identified and the
fuel 5.26 %
same is deducted from 100% to calculate the efficiency. It
is one of the best methods recommended by Bureau of Loss due to moisture in fuel 2.40 %
Energy Efficiency to calculate the efficiency of the boiler. Loss due to moisture in air 0.2948 %
Loss due to radiation
The secondary and primary data required to calculate the assumed 1 %
efficiency were collected from the plant. The following Unburnt losses in bottom ash 1.22 %
losses are calculated using the data collected from the Unburnt losses in Fly ash 0.76 %
plant. Heat loss due to partial
conversion of C to CO 0.09 %
Ø Heat loss in flue gas
Heat losses in bottom ash 1.13 %
Ø Heat loss due to moisture in fuel
Ø Heat loss due to moisture in air Heat losses in Fly ash 0.47 %
Ø Heat loss due to H2 in fuel Efficiency 81.04 %
Ø Heat loss due to radiation
Ø Heat loss due to partial conversion of C to CO The efficiency of the boiler is calculated and found to be
Ø Heat loss due to bottom ash 81.04%
Ø Heat loss due to fly ash
Ø Heat loss due to unburnts in fly ash
Ø Heat loss due to unburnts in bottom ash
81.0%
6.3%
0.5% 0.1% 1.2% 1.0% 2.4% 5.3%
1.1% 0.8% 0.3%
Heat Lost due to flue gas Heat loss due to hydrogen in fuel
Loss due to moisture in fuel Loss due to moisture in air
Loss due to radiation assumed Unburnt losses in bottom ash
Unburnt losses in Fly ash Heat loss due to partial conversion of C to CO
Heat losses in bottom ash Heat losses in Fly ash
Useful heat
5.26, 28%
6.34, 34%
Heat Lost due to flue gas Heat loss due to hydrogen in fuel
Loss due to moisture in fuel Loss due to moisture in air
Loss due to radiation assumed Unburnt losses in bottom ash
Unburnt losses in Fly ash Heat loss due to partial conversion of C to CO
Heat losses in bottom ash Heat losses in Fly ash
5.5 HEAT ADDITION DUE TO SUPER HEATER, FIGURE - 31: HEAT ADDITION BY ACCESSORIES
ECONOMISER AND AIR PREHEATER
Superheaters, economiser and air preheater are used to Heat addition by accessories
increase the useful heat by recovering the waste heat from
the flue gas. The flue gas temperature at the boiler exit is
close to 900oC. The flue gas at 900oC is made to pass 13.4%
11.9%
Boiler / Reheater
S
Condenser
HP LP Extraction
Extraction
The energy balance across the LP heaters, HP heaters, and LP inlet are not functioning properly. It is
condensers and reheaters were evaluated with the help of recommended to replace the sensor immediately. LP
the following details: cylinder efficiency and the overall efficiency are not
established due to the non-availability of dryness fraction at
Ø Pressure across each heaters the LP exhaust.
Ø Temperature across each heaters
Ø Pressure and temperature across condensers 5.5.2 Heat addition due to reheater
Ø Pressure and temperature across reheaters KTPS is equipped with a single stage reheating system
which reheats the steam coming out from the HP turbine to
Currently, the steam flow rate across each heater is not 535˚C. The reheat pressure during the audit period was 22
measured or monitored by KTPS. Due to unavailability of kg/cm2. The steam flow in the reheater is calculated by
instruments at the site, the same was not included in the deducting the steam extracted in the HP heaters to the
report. total steam supplied to the HP cylinder inlet. Steam
extracted in each HP heater is calculated using the
Steam flow rate is used to evaluate the overall following formula :
performance of the boiler and turbine.
Heat gained by Feed water = Heat lost by the steam.
5.5.1 Turbine Efficiency The drip temperature measured physically at various
Based on the pressure and temperature across each points, steam pressure across the heater and feed water
cylinder, the efficiency of the individual cylinders and the flow is used to calculate the steam extracted in each
overall efficiency of the turbine are calculated. The heater.
efficiency details are given below:
TABLE - 30 : REHEATER EFFICIENCY
Heat addition due to reheater 81494 kW
TABLE - 29: TURBINE EFFICIENCY Heat addition in percent compared to
HP turbine efficiency 82.14 % 21.7 %
the useful heat output per kg of fuel
IP cylinder efficiency 96.9 %
5.5.3 Condenser
The efficiency of the IP cylinder is more than the design Condenser is one of the pertinent equipment in any power
value. This is due to the fact that the temperature sensors plant. The condenser will always be maintained in vacuum
displaying the temperature of the steam leaving the IP exit and the performance of the condenser is based on the
altitude of the plant and the temperature of the water 5.6 HEAT RATE AND EFFICIENCY OF PLANT
available in the near-by location.
Heat rate is one of the most important parameter which
The following parameters are monitored by the plant on a reflects the performance of the plant with the assistance of
regular basis. major equipments, auxiliaries and accessories.
Pressure in the condenser = 665 mm of Hg or Lower the heat rate, better will be the performance of the
Absolute pressure = 75 mm of Hg plant and vice versa. Heat rate can be calculated
Temperature of the condenser = 48.9 C exclusively for major individual equipments and also for
Cooling water inlet temperature = 33.4 C combination of equipments.
Cooling water exit temperature = 42.9 C
Heat rate is calculated based on the fuel flow rate, quality
Based on the above parameters, the heat rejected and of the steam generated in the boiler and power generated
effectiveness of the condenser are calculated and the by the turbine.
details of the same are furnished below:
In this report, three different heat rates are derived with
The heat rejected from the condenser are cross-checked the help of the instantaneous data and secondary data
with cooling water pump flow rate and the temperature collected from the plant. They are:
difference across cooling water system.
• Boiler heat rate
TABLE - 31 : CONDENSER EFFICIENCY • Gross turbine heat rate
Main steam flow 663 TPH • Gross unit heat rate
Range of the cooling water 8.5 ˚C
Temperature being maintained in As these three rates are very important to find out the
48.9 ˚C performance of the plant, the same are calculated and
the condenser
furnished below
Effectiveness of the condenser 58.6 %
Maximum possible effectiveness 70 % Boiler heat rate = (Heat supplied by the fuel)/(Heat
Rated flow rate of the pumps 28560 m3/h generated in the boiler + heat added in the reheater)
Heat rejected in the condenser
282343 kW
based on water flow rate
Turbine heat rate = (Heat generated in the boiler + heat Ø Power generated by the boiler = 175000 kW
added in the reheater) / Power generated by the turbine or 150 Million kCal/h
Ø Heat supplied by the fuel = 542 Million kCal/h
Unit heat rate = Heat supplied by the fuel / Power
generated by the turbine The overall efficiency calculation of the plant is given below
The heat rates are also used to calculate the efficiency of TABLE - 33 : OVERALL EFFICIENCY OF THE PLANT
the plant. Parameters Values Units
Main steam flow 663 TPH
TABLE - 32 : HEAT RATE Main steam flow 184.2 kg/s
Main steam pressure 130 kg/cm2
Heat supplied 2330 Million kJ/h
Main steam temperature 533 C
Heat generated 1579 Million kJ/h
Main steam enthalpy 3425.3 kJ/kg
Heat added in the reheater 279 Million kJ/h
Main steam entropy 6.5531 kJ/kg K
Boiler heat rate 1078 kCal/kWh
Heat inlet to the turbine 630826 kW
Power generated by the
175000 kW Power output 175000 kW
turbine
Instantaneous Gross Power output 150500000 kCal/h
2535 kCal/kWh Heat inlet to the turbine 542386888 kCal/h
turbine heat rate
Instantaneous Unit heat Instantaneous Overall
3180 kCal/kWh Efficiency 27.75 %
rate
In general, the efficiency of any equipment will be CEA along with CII carried out energy efficiency study in 19
calculated as output upon input. As per formula, the power thermal units. The comparison of best figures in each
generated by the turbine upon the heat supplied by the parameter achieved by Indian thermal power plant over last
boiler will give the efficiency of the plant. five years (2001-2005) have been collected and the same
are compared with KTPS.
TABLE - 34: BENCHMARKING KTPS WITH OTHER same can be improved. Some of the suggestions are given
POWER PLANTS below to improve the monitoring and recording system:
as mentioned by the plant personnel, reduction in air Sieve Gradation Before Crusher % After Crusher %
ingress will reduce the power consumption of ID fan. +100 18 0
Therefore necessary measures can be carried out to arrest +50 16 6
the air ingress.
+20 20 32
In addition, the flue gas temperature was also observed to +2 38 46
be higher than the desired value. On an average, the flue -2 8 16
gas temperature of the thermal power plant lies in between
145 - 150˚C. But the flue gas temperature was measured In practice, KTPS is monitoring and recording the analysis
as 169˚C. It is anticipated that the flue gas temperature of the coal before the crusher. During the visit, it was
will be much high compared to 169˚C as there is an air requested to carry out the sieve analysis before and after
ingress in the flue gas path and even in the air preheater. the crusher.
Because of the addtion of fresh air having low temperature, · As per the analysis after crusher, it is observed that
temperature of the flue gas was observed to be lower. nearly 80% of the size of the coal after crushing lies
Otherwise, the actual flue gas temperature will be close to between 2 mm to 50 mm and
200˚C which is very high compared to the normal standard · only 16% of the size of the coal lies between -2 mm
of any thermal power plant. to 2 mm.
But before crusher, it is observed that nearly
Therefore, it is highly recommended to take immediate · 58% of the size of the coal lies between 2 mm to 50
measures to reduce the flue gas temperature. mm,
· 8% of the size of the coal lies between -2 mm to 2
5.6.3.1.4 Sieve analysis mm and
The sieve analysis is carried out by the plant personnel · 34% of coal is having size higher than the 50 mm.
after crusher and before coal mill. During the site visit,
different types of sieves were observed and the plant 16% fines would be possible because of two main reasons:
personnel were requested to undergo sieve analysis for a 1. Coal would have been received with lot of fines or
maximum range before crusher, after crusher and after smaller size
coal mill. Based on the analysis for a specific sample, the 2. Improper functioning of Crusher
following results were observed.
Therefore, if the sieve analysis was conducted before
crushing, nearly 64% of the coal in that particular rake
would have been directly sent to the bunker without to ensure 100% size of the coal to be less than the desired
crushing. This not only saves the power consumption in the size for the boiler.
crusher but also increases coal crushing rate.
Therefore, it is recommended to carry out sieve analysis 5.6.3.2 Install Smart Wall Blowing System for
before crusher and to install a classifier to separate fines or Optimizing Wall Blowing and Improving Heat Rate
required size of the coal before feeding into the crusher.
The boiler performance including its ability to meet full
In addition to this, sieve analysis has been conducted after load, auxiliary power consumption, net plant heat rate,
coal mill. It is observed in the coal mill A that nearly 3.5% of availability of the unit, operation and maintenance cost etc.
the size of the coal lies above 50 mm and 67% of the size of are significantly affected by the fuel characteristics. Coal
the coal is less than -200mm and rest of the % size lies firing in the furnace forms different kinds of deposits on the
between -200mm and +50mm. Because of feeding higher boiler tubes.
size coal in the boiler, unburnts are coming out in the
bottom and fly ash. To improve the performance and thermal efficiency of the
boiler, it is important to remove these deposits periodically
The discharge of higher size from the coal mill is mainly due and maintain a clean heating surface.
to two reasons:
Boilers are designed such that the radiation and convective
1. Inefficiency of coal mill zone heat transfer surfaces absorb the released heat
2. Receipt of higher size coal from the crusher proportionately. Any deviation in heat transfer in radiation
and convection zone will affect the function of feed water
Both the issues are possible, therefore necessary measures preheating in the economiser, steam super heating in
needs to be carried out to maintain 100% size of the coal to LTSH, platen super heater and final super heater. This will
be less than -200 mm. result in reduction in boiler operating efficiency.
Because of the unburnts in the ash, nearly 2% loss in the Smart wall blowing system (SWBS) is a selective wall
efficiency is observed. In addition, there is a subsequent blowing system, operating on auto mode. The operation is
loss in the power consumption in the coal mill. Therefore, it controlled based on super heater spray flow and furnace
is highly recommended to install a classifier before crusher heat absorption at different zones. The system helps to
maintain the furnace heat absorption at optimum level
thereby maintaining the super heater and reheater sprays sensors in each wall and totally 32 sensors are mounted on
within limits. four sides of the water wall. The arrangement of heat flux
sensor is shown in Figure - .
5.6.3.2.1 Present Status
The two ends of the sensors are exposed to the flame
The conventional wall blowing systems are operated radiation and the stable cooling water side respectively.
sequentially once in 8 hrs. All soot blowers will be operated Sensors continuously give output proportional to the
3 times a day. absorbed heat flux.
In conventional blowing system, the furnace condition is The sensors are connected to the remote SWBS control
not taken into consideration. The changes in fuel panel positioned in the control room through transmitters.
characteristics and boiler load are also not taken into The SWBS control panel is connected to the conventional
account for controlling the soot blowing. soot blowing system. It is an add on facility to the existing
soot blowing system.
Periodical operation of the soot blowing system leads to
significant variation in super heater and reheater spray.
Soot blowing requires about 3.3 tons of steam per cycle.
FIGURE - 33: HEAT FLUX SENSOR the spray crosses the highest / lowest set points
respectively.
FIGURE - 34: SUPER HEATER SPRAY CONTROL WITH Reduction in tube erosion due to selective and reduced
CONVENTIONAL BLOWING SYSTEM AND SWBS steam blowing
5.6.3.4.1 Background
5.6.3.3.1 Benefits
Lubrication oils are being used in various equipments, out
Installation of SWBS results in following benefits. of which turbine lubrication system is very important and
critical application. Servo prime-46 of M/s. IOC make is
Reduced variation in SH/RH spray. Hence steady SH / RH used for turbine bearing lubrication and governing system.
steam temperature. This results in improved efficiency of The major parameters of the lube oil like viscosity,
boiler and heat rate of overall cycle. moisture, and mechanical impurities, TAN etc. Are being
Reduced superheated steam consumption due to reduced maintained within limits, by inbuilt centrifuging and top-up.
number of wall blowing.
However the oil in use picks up contamination from wearing
The soot blower operation is reduces by about 55 - 60% parts and the wear debris further pass through the system
compared to conventional wall blowing system. and in turn generate more contaminants, which can be
described as a self-escalating snow balling process.
Smaller contaminant particles are larger in number than 5.6.3.4.3 Project Recommended
larger contaminant particles. Only these smaller particles
can enter clearances and cause damage to mating parts. Electrostatic Liquid cleaner-ELC-100LP is been
recommended to each Main oil Tank (MOT) to super clean
The super-cleaning initiated to reduce wear tear of the Turbine oil. The oil supply is taken from MOT and outlet
equipment components and increase the life of lubricating is connected back to MOT.
oil by keeping check on contamination by dedicating two
units of electrostatic liquid cleaner –elc 100lp. 5.6.3.4.4 Principle of Operation Of Electrostatic
Liquid Cleaner
5.6.3.4.2 Present Status
ELC is an Electro static liquid cleaner and works similar to
The Filtration particle size of Duplex filter element & Main the principle of ESP (Electro Static Precipitator),
oil tank filter element is 37 μm and 250 μm respectively. Contaminants in oil such as magnetic / nonmagnetic,
This indicates that particles size up to 37 μm can onlybe organic/ inorganic, resinous matter or sludge etc are either
filtered on line. positively or negatively charged due to the contact
potential difference with oil.
Turbine oil is supposed to maintain ISO 11/9 to 13/10 level
of cleanliness, which is equivalent to ‘NAS 7’ and below. When oil is passed through an electric field, positively
However it was observed that NAS level of oil in use is 12+ charged particles are drawn to the negative pole and vice
with present on line cleaning system. versa. Neutral contaminants are drawn and deposited by
gradient force to the edge of the die electric media where
Ø The frequent chocking of Duplex Filter was noticed the intensity of the deformed electric field is highest.
with the existing on line filtration & centrifuging
system. When corrugated die electric media (collectors) are
Ø The thick sludge of observed at the bottom of Main inserted between electrodes, the electric field is deformed
Oil Tank during overhauls. and die electric polarisation occurs at the tips of the
Ø Governing problem faced resulting in two tripping of corrugation. The electric field is the strongest at the tips
the unit. and particles are drawn and deposited on opposite electric
Ø Scratching and scouring marks were observed on poles and removed from oil.
the turbine and generator bearings and journals
during overhauls.
7. Water consumption: It is assumed that in order to generated in the last financial year would be
dispose one tonne of ash three tonnes of water shall be generated in the future.
used.
For these above mentioned scenarios, coal consumption
Based on the calculations, the graphs were drawn to and other emissions pattern have been calculated. The
identify the pattern of the emissions in month wise. emissions pattern of the KTPS before R&M activity is given
below:
It is assumed as well as anticipated that because of the
R&M activity, there would increase or decrease in the FIGURE - 37: CO2 Emission Levels before R&M
emissions based on the type of activities which would have
carried out R&M. The following two scenarios have been
CO2 Emissions in MT
identified and emissions patterns have been forecasted for
the unit 6. 180000
160000
Scenario 1. 140000
120000
100000
The scenario one possess has adopted two conditions: 80000
60000
1. If the efficiency of the unit 6 is increases by 1% after 40000
R&M activity. 20000
2. If KTPS would operate the unit in such a manner so 0
that the monthly maximum electricity that had been Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Month
generated in the last financial year would be
generated in the future.
Scenario 2
FIGURE - 38: CO Emission Levels before R&M FIGURE - 40: SO2 Emission Levels before R&M
9 400
8 350
7 300
6
250
5
200
4
150
3
100
2
1 50
0 0
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Month Month
FIGURE - 39: SPM Emission Levels before R&M FIGURE - 41: NOx Emission Levels before R&M
80.00 50
45
70.00
40
60.00
35
50.00 30
40.00 25
20
30.00
15
20.00
10
10.00 5
0.00 0
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Month Month
FIGURE - 42: Water Consumption Levels before R&M FIGURE - 44: CO Emission Levels after R&M
10
30000
9
25000 8
7
20000 6
5
15000
4
3
10000
2
5000 1
0
0 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Month
Month Actual electricity generated Maximum electricity generated Average electricity generated
The following patterns show the emissions level after FIGURE - 45: SPM Emission Levels after R&M
carrying out the R&M activity.
SPM Emissions in MT
FIGURE - 43: CO2 Emission Levels after R&M 90.00
80.00
70.00
CO2 Emissions in MT
60.00
200000
50.00
180000
160000 40.00
140000
30.00
120000
100000
20.00
80000 10.00
60000
0.00
40000
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
20000
Month
0
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Actual electricity generated Maximum electricity generated Average electricity generated
Month
Actual electricity generated Maximum electricity generation Average e le ctricity generated
FIGURE - 46: SO2 Emission Levels after R&M FIGURE - 48: Water Consumption Levels after R&M
450 3 5000
400
3 0000
350
2 5000
300
250 2 0000
200
1 5000
150
1 0000
100
50 5000
0 0
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Se p-06 Oct-06 Nov-06 De c-06 Jan-07 Feb-07 Mar-07 Apr-06 M ay-06 Jun-06 Jul-06 Aug-06 Se p-06 Oct-06 Nov -06 De c-06 Jan-07 Fe b-07 Mar-07
Month Month
Actual e missions Maximum e le ctricity ge ne rate d Ave rage e le ctricity ge ne rate d Actual emissions Maximum electricity generated Average electricity generated
FIGURE - 47: NOx Emission Levels after R&M From the above emission pattern it is observed that if the
efficiency of the increased by 1% and average electricity
NOX Emissions in MT generated that had been generated in last financial year
60 would have been generated in the future the emissions are
50 lower than the present emissions.
40
30
If actual electricity generation in the future is equal to the
monthly maximum electricity that had been generated in
20
the last financial year than the emissions are slightly higher
10
than the actual emissions
0
Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07
Month The comparison table is given below:
Actual electricity generated Maximum electricity generated Average electricity generated
PART 6: OCCUPATIONAL HEALTH & SAFETY Ø Review of the protocols for safety of workers
ASSESSMENT working in hazardous work place
Ø Review of the accidents and emergency responses;
MAHAGENCO is committed to achieving its Environmental, and
Health and Safety Mission statement and has established a Ø Review of the monitoring and maintenance of health
Corporate Environmental, Health and Safety Unit (CEHSU) records.
to be responsible for the implementation of its EHS policy.
In this regard, MAHAGENCO has instituted a dedicated The areas covered during the study included fire fighting
Safety department at the KTPS, which is responsible for systems, personal protective equipment, safety drills,
addressing the policy, undertaking and implementing periodic health check up for workers, rotation of work and
measures for achieving the set targets with regard to minimisation of exposure and emergency management
safety and reporting its performance to the higher plans.
management.
Our approach for OH&S assessment has been provided in
The OH&S assessment was carried out to review and Figure.
assess the adequacy and effectiveness of the existing
Occupational Health and Safety (OH&S) and to suggest A list of documents that have been reviewed and personnel
necessary measures to improve the safety performance of interviewed during the audit has been provided in Table 1
the plant. and Table 2, respectively.
Review of compliance status with applicable national and state laws and
regulations
TABLE - 35: SAFETY PERFORMANCE OF KTPS PLANT TABLE – 36: SAFETY STATISTICS OF KTPS PLANT
(SOURCE: KTPS) (SOURCE: KTPS)
6.1.2 Predominant Cause-wise Accident workers are concentrated at one particular area and
monitoring for safety related issues is more effective.
Table 37 categorizes the cause of the accidents based on Also, detailed safety instruction are given to the
Unsafe Act and Unsafe Condition. Unsafe Acts may be contractors employed during the over haul along with the
defined as the actions of a worker in a manner which vary contract document. This makes it mandatory for all
from the accepted or legislated safe practice and create a contract workers to follow safety procedures during the
hazard to themselves, another person, or equipment. maintenance work. It was also informed that such kind of
Unsafe Condition is a condition in which something exists vigilance / monitoring is not possible during the regular
that varies from a normal accepted safe condition and, if work as the workers / employees are scattered and
not corrected, could cause injury, death, or property checking each individual would be a tedious task.
damage.
From the above, it may be concluded that the performance
On perusal of Table - 39, it may be observed that unsafe of the plant with regard to safety has been consistently
acts have contributed to more than half of the accidents improving since the past three years. However, unsafe
that have occurred in the plant since 2004. Although the acts, the cause for majority of such accidents in the plant
number of accidents has been declining, the number of premises have not shown a declining trend.
unsafe acts has not declined. The number of unsafe
conditions, leading to accidents has however constantly
decreased since 2004.
The following section details the observations made with The EHS policy should be updated and endorsed by the top
regard to the existing OH&S system of the plant and management of MAHAGENCO as it conveys the
recommendations suggested to improve the performance commitment and attitude of the management towards
for each of those aspects. ensuring safe and healthy work environment in the plant
premises.
6.2.1. Environment, Health and Safety (EHS) Policy
It was informed by KTPS that the EHS policy is being
Background amended as per the requirement and same shall be part of
the health and safety management once it is approved by
The EHS policy of the erstwhile MSEB has been displayed at the corporate EHS Unit.
multiple locations within the plant premises in English as
well as local language. 6.2.2. EHS Audit
of the plant, as committed in the policy, are not being Ø Assess the likelihood of each of the hazardous
carried out on an annual basis. OH & S audit by an external situations occurring (Risk Assessment);
agency has not been carried out since November / Ø Identify and effectively implement appropriate
December 2002. The latest EHS internal audit was carried control measures to prevent the occurrence of such
out in the September 2005 but the report is yet to be hazardous situations (Risk control); and finally
shared with KTPS personnel. Ø Review measures continually to ensure their
effectiveness
Recommendations
Observation
OH&S audit should be carried out at the frequency
committed in the policy. Regular audits would help in KTPS has conducted a Risk Analysis study at the plant and
tracking and improving the performance of the existing OH detailed action plan is prepared and implemented through
& S system. OHSAS.
Background
HAZARD
PPE are useful in eliminating and reducing injuries to
workers due to hazards, which cannot be controlled
ELIMINATE adequately through other control methods such as
elimination, substitution, and engineering.
Observations
SUBSTITUE
PPE such as shoes, helmets, goggles, belts and masks have
been provided to the workers in KTPS. The appropriateness
ENGINEERING and specification for the PPE to be used for performing
various work activities is decided in consultation with the
safety officer. The list of PPE to be used in the plant is
maintained with the safety department. The workers and
ADMINISTRATIVE
contractors have been communicated about the type of
PPE to be used based on the nature of the work activity.
The safety department and sectional heads are reportedly
PPE responsible for ensuring that workers are provided and use
appropriate PPE.
workers. Floor level safety meetings should also be Manager (Stage-I). GM (Stage-I) reports to Chief General
institutionalized. Manager.
Ø Initiatives such as institutionalizing of a near miss
incident reporting system, encouraging worker Observations
participation in safety management, accident
investigation and training need identification can be No deviations from scheduled standard test and
driven through the sub-safety committees examination of fire service equipment and fire protection
Ø These committees may be extended to include system were observed during the site visit. However, some
contract labor representation. This may help deviations were noticed with reference to the
communication of key safety decisions to contract recommendations by The Fire Advisor & Chief Fire Officer.
laborers also. The same are already been informed to and accepted /
Ø The formation of the sub-safety committees would approved by the FA & CFO.
also help in involvement of higher number of
workers in the safety initiative of the plant Root Cause
6.2.7 Safety & Fire Fighting Department Reportedly, these deviations have been due to the shortage
of manpower.
Background
Recommendations
The structure of the safety and fire-fighting department
has been provided as Figure – 4. The plant employs over Staff-strength of the safety and fire-fighting department
2000 workers in three shifts but has only one Safety may be increased for improving the efficiency and
Officer with two subordinates. Safety Management at the effectiveness of the safety department.
CHP is handled by an Executive Engineer who reports to
the Safety Officer. Additionally, there are twelve members 6.2.8. Housekeeping, Lighting and Ventilation
in the fire fighting department. Eight firemen are
outsourced through an external agency. Observation
Currently, the Safety Officer reports to the Superintendent During the site visit, housekeeping, lighting and ventilation
Engineer (Operations), who in turn reports to General were observed to be poor in the plant for safe working of
occupant, specifically in the CHP area. At the time of site
visit, the dust suppression system and fresh air system in 6.2.9. Training
CHP were found to be out of order. Several gas cylinders
were found to be stored without caps. Background
actually making use of extinguisher. This goes on 6.2.10. Periodic Health Checkup of Workers
throughout year. In the year April 2006 – March 2007
about 1204 persons were imparted this training Observations
Classification of diseases based on occupational exposure Further investigation revealed workers resist such
should be documented. programs due to the following reasons:
recommended by the safety officer in August 2005 mock spray system for cable galleries and boiler burners, high
drill for chlorine leak were not addressed and have been velocity water spray for main oil tanks, foam pouring
carried over to February 2007 mock drill. system for fuel oil tanks, and fire alarm and smoke
detection system.
Further, it was observed the responsibility of implementing
these observations was not clearly assigned to any Mobile facilities cover fire tender units and portable fire
individual. Also, no comprehensive documentation was extinguishers. On receipt of information, fire fighting staff
found in place with regard to action points / measures on duty responds to the situation. Fire report forms are
taken to address observations made during mock drills. documented by the fire officer.
Recommendations Fire drills are carried out periodically by fire fighting officer
under the guidance of safety officer. List of fire fighting
Observations made during mock drill, which require equipment is maintained by fire-fighting station in-charge.
corrective measures, should be given priority and Fire fighting station in-charge is also responsible for
addressed immediately for improving the efficiency of the inspection and testing of portable fire extinguisher.
emergency preparedness and response. Specific individuals
should be assigned the responsibility of ensuring these Pumps, size of mains, no. of hydrants, hose pipes and
action points are addressed as and when identified. Action medium velocity water spray system maintained with in the
points taken and status of the observations requiring plant premises meet or exceed the minimum regulatory
corrective measures should be documented to keep track requirements. For Stage-I oil handling plant, foam pouring
of the performance of the system. system has not been provided for storage tanks. Only fire
hydrants and water monitors have been provided.
6.2.13. Fire Fighting System
Observation
Background
Frequent incidents of minor fire occurrences on turbine
The firefighting system in the plant consists of fixed floor have been reported. Oil leakage and turbine heat were
installations and mobile facilities. Fixed installations informed to be the prime causes for these incidents.
consist of fire hydrant system, automatic high velocity However, the response times to such fire alarms were
water spray system (for oil storage tank and coal observed to be good and the fire was brought under control
conveyors), manually operated medium velocity water within reasonable time during all such alarms raised. Fire
extinguishers are being maintained as per the requirement. audit, a sample accident case was taken and suggestions
Fire blankets are also reportedly due for replacement. were provided on how a RCA should be carried out and
provided to the safety department. The same is provided
Recommendations below for reference.
As discussed earlier, the number of accidents in the plant An RCA should be carried out in these lines:
has shown a declining trend since 2004. However, the
number of accidents occurring the plant may still be Ø Was there a proper work permit for the work to be carried
out
considered high as the plant on an average witnessed one
Ø Was the worker aware of the hazardous condition and was
accident every second week in the year 2006. Accidents he trained for such maintenance work
are investigated and recorded. However, a comprehensive Ø Is a SOP available for the maintenance work and was the
Root Cause Analysis (RCA) of all the accidents is not worker aware of the procedures
carried out. Ø Was the supervisor available during the maintenance
work?
Recommendations Ø Was he provided with the appropriate PPE before
entering the work and was the same checked by a
A comprehensive Root Cause Analysis (RCA) by the supervisor
Safety Department would help in identifying the root cause Ø Was the worker using the PPE during the work?
Ø How often is such maintenance work carried out?
for the accident and placing systemic controls and for
ensuring avoidance of similar mishaps in future. During the
Observation Recommendations
It was observed during documentation review that an SOPs for working from heights should be developed
instance of non-adherence to the Permit System by one of
the workers had led to a fatal accident. A comprehensive
RCA was not carried for the accident and impatience on the
part of the worker was attributed as the reason for his non-
adherence to the set operating procedure.
KTPS has displayed the Material Safety Data Sheets at all While the top management is ultimately accountable for
the storage locations and has also prepared a Disaster health and safety issues the workers also play an important
Management Plan which identifies the potential risks due to role in ensuring successful implementation of the EHS
storage of hazardous materials and the action plan to be policy. It is important for all levels of employees to
taken during a disaster such as Chlorine Gas Leak, understand the dangers existing in the workplace, build the
Explosion of Oil Tankers, etc. The DMP also identifies the right attitude, always maintain a ‘safety first’ approach and
key individuals responsible for the smooth implementation obey the rules.
of DMP.
The EHS policy recognizes awareness building through
training and other means of communication as an important formation of safety sub committees or smaller
contribution towards the successful implementation of the safety groups.
safety policy.
Ø Efforts should be made to institute programs which
A review of the accident statistics between the years 2004 promote two way communications between the
and 2006 indicates that unsafe acts have been responsible management and the workers. Such efforts may
for majority of the accidents. Although the number of include organization of competition at unit level or
accidents at KTPS has been declining since 2004, the departmental level, encouraging and inviting
number of accidents due to unsafe acts have not suggestions for improving working conditions in
decreased. their individual workplaces.
Ø Multidisciplinary team of workers evincing interest
It has been understood through the interaction with the in safety initiatives may be formed and given
plant personnel and workers that the level of awareness intensive training inputs. These teams, post
and the degree of involvement of the workers in issues education and empowerment should be encouraged
pertaining to safety is low to drive safety initiatives in their respective
departments.
It was observed during the review of the areas pertaining to
use of PPE, effectiveness of Work Permit Systems, worker Ø The workers making a contribution towards safety
involvement in Safety Committees, participation in safety initiative should be given due recognition. Such
drills and the Emergency Management Plan that the recognition may be provided at an individual, group
workers’ involvement, co-operation and awareness with and/or sectional level.
regards to safety related issues has been low. The workers
have also shown resistance to health related programs
such as rotation of work and minimization of exposure and
have not participated in the plant’s medical check up
programs.
Recommendations
PART 7: INSTITUTIONAL CAPACITY ASSESSMENT Our approach for institutional capacity assessment has
been provided in subsequent slides.
MAHAGENCO is committed to sound environmental
management at all its power plants with KTPS as no
exception. In order to achieve its mission and vision,
MAHAGENCO has established a Corporate Environmental,
Health and Safety Unit (CEHSU) to be responsible for the
implementation of its EHS policy.
FIGURE - 52: EXISTING REPORTING STRUCTURE – WTP- II, KTPS (ENVIRONMENTAL MANAGEMENT CELL)
Executive
Chemist
(SH)
Chemist / SWAS Lab DM Plant Gravity Lift Pump ETP Lab Chemist
Lab Chemist Filter /
Chemist 4 LC/JLC 4 Art 4 Art 1 Jr. Lab
LC 4 Art to SSA 8 Chemist
Chief
General
Manager
SH
(WTP – I)
Chief
General
Manager
7.2.1. System and Procedure for Budget Allocation Ø There is no fixed percentage for fund allocation for
Environmental Management Cell and is done based
As per the legal procedure, all the budget allocations for on the need assessment.
individual plants, which are part of MAHAGENCO, are done
by Maharashtra Electricity Regulatory Commission 7.3 TRAINING
(MERC).
Training on the environmental management has been
Individual plant first assesses the requirements of funds identified as one of the key performance indicators as part
and prepares a budget for the financial year, which is sent of the Environmental Management System (ISO 14001) at
to the HO. HO submits the total budget for all the power KTPS. All the staff members including the section heads
stations to MERC for approval. The total budget is finalised and regular employees are trained on environmental
by MERC and the allotment of budget to the individual TPS management including aspects, legal requirements and
is communicated to the plant by HO. Based on the allotted management system implementation.
funds, the plant head, i.e. CGM, would again revisit the
budget prepared and on the priority basis the funds are Training calendar is prepared by the HR department for the
disbursed to each department / section (s). The final entire year. The training calendar is circulated to the
decision on the distribution of funds is taken by CGM. Superintendent Engineers (SE’s) and General Managers
(GM’s) for the approval and finalization.
For Eq: If the plant assesses the fund requirement as 100
crores and prepares a budget for the same. MERC may only Upon receiving the approval, the training calendar is
allocate 80 crores. Based on the priority of the department circulated to the respective Section Heads (SH’s) of each
/section (s) requirement, the budget is redrafted and department to nominate the participants as per the training
funds are accordingly distributed. needs and requirements.
7.2.1.1 Observations Training needs are identified by the SH’s for their
employees and a list is sent to the HR department for the
Ø The final allocation of funds at the plant level is the concerned training programme which has been prepared for
decision of the CGM. Corporate EHS Unit has no hold the year. Training on environmental management is part of
on the fund allocation at the plant level for the induction training programme. Trainings are mostly
environmental management. provided in-house. The faculty members are the SHs / SEs.
Feedback on the training sessions are taken from the 7.3.2. Recommendations
respective SH’s.
Ø KTPS should invite experts from other plants
KTPS as part of the management system has circulated (either belonging to MAHAGENCO or other state
booklets on environmental policy and awareness to the owned generation companies) for conducting
educational institutions, industries and local governing training programmes along with in-house faculty.
bodies in the surrounding villages. This would enhance the training module as well as
improve the knowledge sharing process. HRD should
7.3.1. Observations also take initiatives to send plant personnel to
external training programmes.
Ø MAHAGENCO has independent training department Ø Feedback on the training sessions is being taken
with two institutes situated at Nasik and Koradi to from the people attending the training at the end of
cater training needs of MAHAGENCO. The the training session. However, the feedback should
employees are also deputed for trainings outside the be concealed and the same should be directly
organization by MAHAGENCO HR Department. submitted to the HR department for further action.
Ø KTPS has started taking feed back on the training
sessions from the people attending the training at 7.4 MECHANISM FOR ADDRESSING PUBLIC
the end of the training session following the CONCERNS
comments made by E&Y in this regards during the
course of the initial reports. KTPS as part of their environmental management system
Ø The participants’ profiles for these programmes as has a written procedure to address the external
indicated in the calendar consist of Engineers, communication on concerns / issues with respect to
Chemist and Technicians (including unskilled environmental performance or management of KTPS.
labourers). No documentation was made available
to validate if such trainings are imparted to, As per the procedure, the stakeholder with his concern /
contract labors. However, documentation related to issue shall contact the SE (Co-ordination) at the CGM’s
safety trainings for Contract Laborers are available. office, who upon receiving the stakeholders comments
would direct the person to the concerned department /
section of the plant to get appropriate reply.
However, the resident of Mhasala village, which is located Ground water sample was analyzed and compared with the
adjacent to the Khasara ash bund, indicated that during IS : 10500 Limit. The ground water sample showed that the
summer, due to scarcity of potable water they are forced turbidity was 32 NTU as against the standard of 5 NTU with
to drink the river water which has ash supernatant. a relaxation up to 10 NTU. Sulphates was recorded as 449
mg/l which was found to be higher than the prescribed limit
It was also informed during the interview that diseases of 400 mg/l. Fluoride was recorded as 1.29 mg/l which was
such as Jaundice, Diahorrea and Dysentery were prevalent higher than 1 mg/l but less than the 1.5 mg/l which is the
in the area. This was due to non availability of potable permissible limit. Nitrate content in the water was recorded
water during summer season. The residents of Naanda and as 7.5 mg/l.
Mhasala interviewed during the visit indicated that there
were no dispensaries in their village and they either visited 8.1.3. Air Pollution
the neighboring villages or travelled to Nagpur for
accessing medical facilities. Residents of the other villages None of the other residents interviewed indicated any
also indicated that they visited Nagpur city for the problems on account of air pollution.
treatment of major ailments.
8.1.4. Community Engagement
In order to cross check the interviewees comments, the
water quality of ground water and surface water was In order to gauge the effectiveness of the interaction with
sampled and tested. Ground water sample was collected the community by KTPS, a sample number of villagers were
from Mashala village on the downstream of the ash pond at interviewed during the audit. During the interview, the
Khasara. Surface water samples were collected from water sarpanch (head of the village) was also interviewed.
bodies receiving ETP discharge and ash pond discharge
near railway station. The details of the analysis are During the interaction it was mentioned by the sarpanch
provided as Table – 38. that KTPS does not have in place a structured process to
engage with the community. It was also informed during
The surface water analyzed was compared with the the interview that the village panchayat is not aware of a
drinking water standard IS:2296 Class ‘C’ Limits for any concerned person whom they can approach for assistance
variations. It was observed that the surface water drains with issues related to the community and KTPS.
were meeting the prescribed standards and all the
parameters monitored were found to be well within the In order to substantiate the claim, officials from KTPS were
limits. interview, who informed that a Public Relations Officer
8.2 MERCURY (Hg) MASS BALANCE consecutive days i.e. 2nd January 2008 to 4th January
2008. The analysis report showed that the average Hg
As part of the overall risk and liability assessment, Hg mass content in coal was 0.81 mg/kg for stage – I and 0.83
balance was carried to gauge the risk to the community due mg/kg for stage – II.
to the presence of Hg in the environment.
Coal after burning is converted into ash. Bottom ash and fly
The main source of mercury at KTPS is the raw material ash samples were collected and analyzed for Hg content.
‘coal’. After the coal is fed into the boiler, Hg is released The average Hg content in bottom ash was 0.40 and 0.48
into the environment in the form of air emissions, trade mg/kg in stage – I and stage – II respectively. The average
effluent and bottom and fly ash. A schematic Diagram of Hg content in fly ash was 0.38 & 0.33 mg/kg in stage – I
the flow of Hg in the system is presented in Annexure – II. and stage – II respectively.
At KTPS, the bottom and fly ash are mixed with the treated The Table – 40 below provides the total Hg balance.
trade effluent prepare ash slurry. The ash slurry thus
formed in sent to the Booster Pump House (BPH) from TABLE -40 : Hg Balance
where it is sent to the ash pond. The supernatant from the
ash pond is collected in the Ash Water Recovery (AWR) Stage Input Output Unaccounted
unit which is then pumped back into the plant to use for ash
slurry preparation along with treated effluent.
Coal Fly Ash Bottom Ash Total
In order to carry out a mass balance of Hg at KTPS, and
considering the aforementioned cycle of Hg, samples were I 0.81 0.38 0.40 0.78 0.03
collected for analysis. II 0.83 0.33 0.48 0.80 0.03
Coal, being the source of Hg, was analyzed. Bunkered coal Ø KTPS to continue monitoring of Hg in air emissions
was collected and analysis was carried out which showed and ash (both bottom and fly ash) to estimate the
that there was presence of Hg in coal being used by KTPS. quantity of Hg not being accounted and take further
Bunkered coal was collected from both the stages of the action to reduce the impact of Hg on the
plant i.e. I & II separately and analyzed for three environment.
PART 9: ENVIRONMENTAL HEALTH & SAFETY options will be confirmed as part of the design
MANAGEMENT ACTION PLAN configuration of R&M activities (especially considering the
operational difficulties of current arrangement of
This part of the report consolidates the analysis of EHS combination of ESP and bag filters).
issues and recommendations of EADD in the form of EHS
Management Action Plan (EMAP). The EMAP includes brief The proposed measures for institutional strengthening and
on EHS issues, agreed mitigation measures with Koradi capacity building, and measures for overall station level
TPS/MAHAGENCO, estimated cost for implementation of improvements are focused to: (a) enhance overall
the mitigation measure, and the implementation schedule environmental performance and thereby minimize potential
of each measure. For ease of implementation, the EMAP is environmental risks and liabilities; (b) achieve 100%
segregated in to three levels of actions, including: (a) regulatory compliance; and (c) achieve better
mitigation measures to be implemented as part of R&M performance on Occupation Health and Safety aspects.
activities for the 6 th Unit (210 MW); (b) measures
proposed to be integrated as part of Institutional The Table below provides the EMAP details.
strengthening and capacity building for Koradi TPS; and
(c) measures to be taken up by Koradi TPS for the power
station as a whole. The EMAP has explicitly integrated the
action plans committed by Koradi TPS to Maharashtra
Pollution Control Board (MPCB) for complying with the
conditions of “Consent to Operate”. The EMAP also
specifies the environmental monitoring requirements
(including monitoring specified by MPCB) and the
reporting mechanism. The final EADD, including EMAP has
been disclosed for public by MAHAGENCO at their
corporate office in Mumbai and on their website, and at
Koradi TPS.
9. Currently there is no system established for Ø A comprehensive Root Cause Analysis (RCA) No Cost RCA
Root Cause Analysis to analyse accident function with specific protocols to be internalized Implication Formats and
cases. Lack of such systems could lead to as part of the job responsibility of EHS supervisor Protocols by
increased chance of recurrence of similar referred under point 5 above. March, 2009
accidents (Ref. No. 6.2)
Agreed Plant Level Environmental Management Measures (including units 1, 2, 3, 4, 5, and 7) for Implementation by KTPS
10. Compliance with Air pollution control Summary of actions already taken (during 2007-08) Cost incurred Completed
requirements as per Mharashtra Pollution include: and
Control Board’s (MPCB) consent Ø Unit-5: complete replacement of bags in bag filter implemented
conditions for Units 1-5 and Unit 7 (Ref. system as part of
No. 3.3) Ø Unit 7: (a) AFGC system has been installed and regular plant
currently under testing and commissioning; O&M costs
Ø All units: (a) Replacement of faulty collecting
electrodoes; (b) Replancement of faulty emitting
electrodes; and (c) Periodic inspection of ESP’s
for alignment of fields for 100% availability.
Further Actions:,
Ø Commissioning of AFGC and Ammonia dosing for
Unit 7 Cost incurred Nov. 2009
Ø Periodic inspection of ESP’s on continual basis for as part of On regular
100% availability of fields regular basis
Ø Thorough assessment of ESP performance and plant O&M
necessary refurbishment for Unit-3 during capital costs Feb. 2009
overhaul
Ø Decommissioning of Unit 1-4 Dec 2012
11. Fugitive Dust Emissions from Coal Handling Ø Implementation of dry fog system (to be supported 1.40 Completed
Plant (Ref. No 4.8). This is also one of the by regular maintenance for effective functioning) June 2008
consent conditions by MPCB. Ø Installation of Dust Suppression system at Wagon 2.50 April, 2009
Tiplers and Coal Handling area (work order placed
by KTPS)
Ø Revamping dust extraction system at impact 3.80 June 2009
crusher of CHP (KTPS is negotiating with M/s
Aerovent Proj. Pvt. Ltd.)
4.5). Referred water pollution abatement is Ø KTPS issued work order (KTPS/Civil.2G/015/WR-75 dtd. 0.36 January
also one of the MPCB consent conditions 08/26/08 ) for rearranging of stone filters at 2009
(Ref. No. 4.5) percolation wells and bund drains
Ø Ongoing work for recovery of CHP toe drain as well 0.97 January
as Booster Pumping House (BPH) to ash water 2009
recovery scheme and subsequent reuse through
settling tank to be completed on priority (Ref:
KTPS/Civil.02G/011/PUR-5642/WO/498/7381 dtd. 09/15/08)
Ø The current water recycling to be extended for rest Estimates and January
of the discharges from ash pond for ash slurry implementatio 2010
preparation and/or any other plant housekeeping n due by KTPS
purposes
16. The Raw Water from Pench Dam is In view of the EADD analysis and preliminary feasibility, 30.-00 December
conveyed to Intake Pond No.3 through open KTPS has agreed to for the option of construction of a 2010
channel. This results on higher levels of separate pipeline from Pench Dam to the Raw Water
chlorides leading to higher chemical Pumping (RWP) sump. Detailed feasibility of this
consumption for treatment in WTP-I and II. option will be established and implemented by KTPS
(Ref No. 4.6)
17. Intake pond No. 3 is infested with aquatic Capital investment for cleaning of Pond No. 3 and 7.50 August 2009
weed and high organic load and turbidity securing bunds with subsequent measures to establish
resulting in high chemical consumption for regular cleaning mechanism
water treatment (Ref. No. 4.6)
18. Disposal of Hazardous Waste (Ref. No. Based on MPCB consent conditions and EADD Cost has been Compliance
3.3) observations, KTPS has made an agreement with M/s V budgeted and Review by
EPL, Nagpur for Hazardous waste disposal at Common incurred by Envt. Cell of
Hazardous Waste Treatment Storage and Disposal KTPS KTPS on
Facility (CHWTSDF) located at Buttibori. The Monthly
arrangement is valid up to 07/25/2012 basis
19. Annual Occupation Health and Safety Mandatory Annual OHS audit as committed in EHS Internal Audit First OHS
(OHS) internal audits as per EHS policy are policy to be complied by KTPS regularly on Annual -cost audit by
currently not conducted (Ref. No. 6.2) basis internalized – March 2009
OHS function
20. Only Annual medical checkups are Regular biannual medical checkups for permanent as 3.2 First
conducted for workers as against biannual well as contract workers complying with the (Annum) compliance
ANNEXURE – I
List of Monitoring Parameters and Locations
ANNEXURE – II
Unit Wise Stack Monitoring Report
r
ne
ly
r il
ry
ch
r
st
er
ay
be
ar
be
be
Ju
Ap
ua
gu
Ju
ob
ar
M
nu
em
br
Au
M
ct
ve
ce
Ja
Fe
O
pt
No
De
Figures 2 and 3 show the trend in the stack emission of
Se
Months
Unit 1 for the year 2003-04 to 2006-07. The unit was shut
down during July – August 2003-04 and August 2004-05.
Unit – 2 (105 MW):
FIGURE – 2: STACK EMISSION (SPM) – UNIT 1
Particulate Matter (PM) emission of Unit – 2 was found to
PM Emission (Unit 1)
be within the prescribed norm except for the months of
August 2004-05 and October 2006-07 where the PM was
180 recorded as 159 and 161 mg/Nm3 respectively.
PM Value (mg/Nm3)
160 2003-04
140 2004-05
120
100
80
2005-06 NOx emissions for Unit 2 were within the limit of 150 PPM.
60 2006-07
40 Standard
20
0 Figures 4 and 5 show the trend in the stack emission of
Unit 2 for the year 2003-04 to 2006-07. The unit was shit
r
ry
r
ne
ry
ri l
ly
ch
t
er
ay
be
be
us
be
Ju
Ap
ua
a
ob
ar
Ju
nu
ug
em
br
M
ct
ve
te
Ja
A
ec
Fe
O
ep
No
Months
160
140
2003-04 over a period of 8 months during the year 2004-05. The
2004-05
120
100 highest was recorded during the month of June 2004-05
2005-06
80
60
which was 189 mg/Nm3. The PM emission during the year
2006-07
40
Standard
2005-06 was recorded below the limit except for the month
20
0 of December when the PM level was recorded as 168
mg/Nm3.
r
ne
ly
F e ry
ry
ch
ril
Ja r
ay
st
er
r
be
be
be
Ju
Ap
ua
gu
ob
Ju
ar
M
nu
m
em
Au
M
br
ct
ve
ce
O
pt
No
De
Se
Months
NOx emissions for Unit 3 were within the limit of 150 PPM.
Figures 6 and 7 show the trend in the stack emission of
Unit 2 for the year 2003-04 to 2006-07.
FIGURE – 5: STACK EMISSION (NOx) – UNIT 2
The unit was shout down during Oct – Dec 2003 and Feb’
NOx Emission (Unit 2)
04 and during July 2005.
2003-04
120
100 2004-05
80 2005-06 PM Emissions (Unit 3)
60 2006-07
40
20 Standard 200
PM Value (mg/Nm3)
0 2003-04
150
2004-05
De be r
ne
ly
ry
ri l
F e ry
ch
t
Ja r
ay
er
r
s
be
be
Ju
Ap
ua
a
gu
ob
Ju
ar
M
100 2005-06
m
nu
m
M
br
Au
ct
ve
ce
e
O
pt
No
2006-07
Se
50
Months Standard
0
r
ne
ly
Fe ry
ry
ch
ril
r
t
ay
er
be
us
be
be
Ju
Ap
ua
ob
Ju
ar
M
nu
ug
m
em
M
br
ct
ve
ce
Ja
A
O
pt
No
De
Se
Months
FIGURE – 7: STACK EMISSION (NOx) – UNIT 3 Figures 7 and 8 shows the trend in the stack emission of
Unit 4 for the year 2003-04 to 2006-07.
NOx Emission (Unit 3)
FIGURE – 8: STACK EMISSION (PM) – UNIT 4
160
140
NOx Level (P P M )
2003-04
120
2004-05 PM Emissions (Unit 4)
100
80 2005-06
60 2006-07 200
PM Value (mg/Nm3)
40 2003-04
20 Standard 150
2004-05
0
100 2005-06
r
ne
ly
ri l
F e ry
ry
ch
Ja r
ay
st
er
r
De b e
2006-07
be
be
Ju
Ap
ua
gu
a
Ju
ob
ar
M
50
nu
em
m
Au
M
br
ct
ve
ce
Standard
O
pt
No
Se
0
Months
r
ne
ly
ry
ch
il
r
st
er
ay
be
be
be
pr
ar
Ju
ua
gu
ob
Ju
ar
M
m
A
nu
m
em
br
M
Au
ct
ve
ce
Ja
Fe
O
pt
No
De
Se
Unit – 4 (105 MW): Months
2005.
D e be r
ne
ly
F e ry
ry
ri l
ch
Ja r
st
er
ay
be
be
Ju
Ap
ua
gu
ob
Ju
ar
M
nu
em
m
Au
M
br
ct
ve
ce
O
pt
No
Se
Months
PM Value (mg/Nm3)
the peak and the emissions ranged between 400 and 700 800
700
2003-04
2004-05
mg/Nm3. The emissions were 4 to 5 times higher than the 600
500
2005-06
400
prescribed limit. The unit went through a shutdown period 300 2006-07
200
of 7 months starting from December 2004-05 till June 100 Standard
0
2005-06. The emission level recorded after this period was
ry
r
y
r
ne
h
il
er
ly
st
be
ay
be
be
found to be within the prescribed limit.
ar
pr
c
Ju
ua
gu
ob
ar
Ju
M
m
A
nu
em
em
br
Au
M
ct
ve
Ja
c
Fe
pt
No
De
Se
Months
The PM levels were found to be less than 100 mg/Nm3
which is also the prescribed limit according to PPAH. The
high levels of particulate matter during the years 2003-04 FIGURE – 11: STACK EMISSION (NOx) – UNIT 5
and 2004-05 is due to non functioning of the ESP. During
the 7 months shut down period, KTPS had installed the bag
filter in addition to the existing ESP for Unit – 5. This NOx Emission (Unit 5)
ry
r
ne
h
t
er
ly
be
il
ay
be
be
ar
us
pr
c
Ju
ua
ob
ar
Ju
em
M
nu
ug
A
em
em
br
M
ct
Ja
ov
A
ec
t
Fe
O
ep
D
S
Months
Unit – 6 of the KTPS has been chosen for the R&M. FIGURE – 12: STACK EMISSION (PM) – UNIT 6
Therefore, special emphasis has been laid to review the
existing data for Unit – 6 of the plant.
PM Emissions (Unit 6)
P M V alue (m g/Nm 3)
(PM) of Unit – 6 has shown that the PM emission has 500 2003-04
400 2004-05
increased from February 2003 till June 2005. The highest
300 2005-06
during this period was recorded in June 2005 when the PM 200 2006-07
level went has high as 549 mg/Nm3. During the year 2004- 100 Standard
05, the PM emission level was recorded in the range of 180 0
to 220 mg/Nm3 which was higher than the limit of 150
r
ne
ly
ri l
F e ry
ry
ch
Ja r
ay
st
er
r
De b e
be
be
Ju
Ap
ua
gu
a
Ju
ob
ar
M
mg/Nm3. The PM level decreased after a shutdown period
nu
em
m
Au
M
br
ct
ve
ce
O
pt
No
Se
of July 2005. The highest PM level recorded after this Months
period was in the month of October 2006.
The decrease in the PM emission of Unit – 6 is attributed to FIGURE – 13: STACK EMISSION (NOx) – UNIT 6
the partial replacement of bag filters during the shut down
period.
NOx Emission (Unit 6)
r
ne
ly
ri l
F e ry
ry
ch
Ja r
ay
st
r
r
De be
be
be
be
Ju
Ap
ua
gu
Ju
ar
M
nu
m
em
c to
Au
M
br
ve
ce
O
pt
No
Se
Months
PM Value (m g/Nm 3)
2006-07 was found to be in the range of 304 to 1001 1000 2003-04
mg/Nm3 with the highest being recorded in the month of 800 2004-05
600 2005-06
June 2005 and the lowest in the month of May 2006. 400 2006-07
200 Standard
The high level of PM emissions is attributed to the 0
inefficiency of the existing ESP for the Unit. At present, the
er
ne
ly
ry
ch
ril
Fe ry
ay
st
Ja r
r
r
be
be
be
Ju
Ap
ua
gu
Ju
ar
ESP has 20 fields and all the twenty fields are operated
nu
c to
m
em
M
Au
br
ve
ce
O
pt
No
De
Se
during the unit operation. However, due to high ash content Months
in the coal procured from local a colliery (which is about 35
– 38%), the particulate matter emission is high. The
present ESP is not capable to handling such high FIGURE – 15: STACK EMISSION (NOx) – UNIT 7
particulate matter emission. KTPS has requested the state
pollution control board to relax the norms for this
NOx Emission (Unit 7)
particular unit till 2008 after which KTPS is planning to
change/modify the existing ESP. 160
140
NOx V alue (P P M )
2003-04
120
NOx emissions for Unit 7 are within the limit of 150 PPM. 100 2004-05
80 2005-06
60 2006-07
Figures 14 and 15 shows the trend in the stack emission of 40
20 Standard
Unit 7 for the year 2003-04 to 2006-07. 0
r
ne
ly
ri l
F e ry
ry
ch
Ja r
ay
st
er
r
D e be
be
be
Ju
Ap
ua
gu
Ju
ob
ar
M
nu
m
em
Au
M
br
ct
ve
ce
O
pt
No
Se
Months
ANNEXURE – III
ETP and STP (Waste Water Analysis)
S. No. Test Parameters UOM Condenser cooling Boiler blow Cooling tower Ash slurry-BPH
down blow down
1 PH - 8.1 - 8.7 6.9
2 Temp. oC 32.0 30.0 30.0 33.0
3 Chlorine mg/l <0.1 <0.1 <0.1 <0.1
4 Suspended solids at mg/l 2.0 1.0 2.0 32050
105oC
5 Oil &Grease mg/l 2.0 2.0 <1.0 10.0
6 Chromium mg/l <0.01 0.01 <0.01 <0.01
7 Total copper mg/l 0.02 0.02 0.01 0.02
8 Total Iron mg/l 0.07 0.01 0.05 0.06
9 Zinc mg/l 0.09 0.25 0.11 0.26
10 Phosphate mg/l 0.1 <0.1 0.7 0.7
11 Mercury mg/l 0.002 <0.001 0.002 0.005
ANNEXURE – IV
Data analyzed during REA
Un-burnt Un-burnt in
Power Generation Coal Consumption Water consumption Calorific in Fly Bottom Ash
Month (Million Kwh) (MT) (L) value of coal Ash % %
Apr-05 126.325 387783 737393 3921 1.21 3.29
May-05 133.662 409210 793117 3922 1.23 3.78
Jun-05 103.242 386806 1324741 3908 1.2 3.89
Jul-05 0 309377 1342092 3815 1.47 5.57
Aug-05 19.065 350895 1574821 3813 1.51 6.24
Sep-05 123.192 372808 1557926 3885 1.41 7.46
Oct-05 130.733 416524 1612567 3810 1.16 6.05
Nov-05 138.188 466209 1760780 3795 0.95 4.92
Dec-05 111.923 486506 1892191 3840 1 4.2
Jan-06 154.55 479559 1723224 3995 1.31 3.88
Feb-06 132.604 388122 1794722 3902 1.04 3.77
Mar-06 129.482 460322 2570813 3917 1.23 4.48
Un-burnt Un-burnt in
Power Generation Coal Consumption Water consumption Calorific value in Fly Bottom Ash
Month (Million Kwh) (MT) (L) of coal Ash % %
Apr-06 138.251 401576 1344615 3883 1.14 4.47
May-06 124.141 411142 1644882 3906 1.07 4.58
Jun-06 137.534 429056 1494258 3830 1.27 4.15
Jul-06 123.909 459073 1641949 3681 1.42 4.55
Aug-06 115.036 469439 1573467 3326 1.11 5.44
Sep-06 114.581 488947 1577781 3401 1.09 4.53
Oct-06 121.91 472304 1741951 3600 0.98 4.88
Nov-06 107.163 480746 1548756 3665 0.94 5.44
Dec-06 50.457 443545 1738353 3712 1.12 5.66
Jan-07 137.026 522533 1714936 3731 0.97 4.87
Feb-07 131.177 450851 1564609 3770 0.84 4.96
Mar-07 145.196 450440 1593383 3737 0.85 4.7
gas of coal
Fly ash
Ratio of Cp of Silica 0.5 kCal/kg C
Bottom to Temperature of the
Fly ash 20:80 ash 1400 C
I kg of Ambient temperature 28 C
Carbon 33820 kJ/kg of carbon Heat loss 43.97 kCal/kg of coal
Unburnt Heat loss % 1.13 %
carbon 0.00246144 kg of Carbon/kg of coal
Heat value Heat losses in Fly ash
by burning Ash percent in coal 32.05 kg of Ash / 100 kg of coal
of 1 kg of Ratio of Bottom to
carbon 83 kJ/kg of coal Fly ash 20:80
Loss due
to fly ash 0.76 % Botton ash 0.2564 kg of ash/ kg of coal
Cp of Silica 0.5 kCal/kg C
Temperature of the
Heat loss due to partial conversion of C to CO ash 169 C
CO % in flue gas 21.00 ppm Ambient
Mass flow rate of fuel 143000 kg/h temperature 28 C
Loss due to CO 482978 kCal/h Heat loss 18.08 kCal/kg of coal
Heat loss % 0.47 %
Heat input 554983000 kCal/h
Loss due to CO in % 0.087 %
Indirect Thermal efficiency of the
Heat losses in bottom ash boiler 81.04 %
kg of Ash / 100 kg of
Ash percent in coal 32.05 coal REHEATERS AND CONDENSERS
Ratio of Bottom to Fly
ash 20:80 Heat addition in the reheater
Bottom ash 0.0641 kg of ash/ kg of coal Parameters Values Unit
Flue kmol Molecular Weight Weight of unit LHS RHS LHS RHS
gas weight 23.2 kmol of O2 CO2 O2 CO2 O2 CO2 CO2
% % % % % % O2 % %
kmol flue gas
O2 4.4 32 140.8 31.23 10/11/2 15.30
007 Hrs 152 5.6 13.2 4 15 7 11.8 5.4 13.6
CO2 14.6 44 642.4 142.49
10/12/2 11.00
N2 81 28 2268 503.05
007 Hrs. 175 4.4 14.6 16 3 5.8 13.2 14.6 4.4
Total 100
676.77 100
Flue Gas
kg of Analysis 152 MW APH in RHS
coal
APH in LHS O2 5.6 % O2 4 %
CO2 13.2 % CO2 15 %
Quantity of flue gas 677 kg/100 kg of coal
N2 81.2 % N2 81 %
generated
Total 100 % Total 100 %
Quantity of flue gas 6.77 kg of air / kg of APH out LHS APH out RHS
generated coal O2 7 % O2 5.4 %
Total air would have 5.77 kg of air / kg of CO2 11.8 % CO2 14.6 %
supplied coal N2 81.2 % N2 80 %
Excess air percent 26.5 kg of air / kg of Total 100 % Total 100 %
coal
Thereoritical air 4.24 kg of air / kg of OPERATIONAL DATA given from the plant personnel
required coal
STEAM EXTRACTION
ANNEXURE – IV
Energy – Environment Comparison
Revised coal Revised electricity Revised efficiency CO2 SO2 CO Particulate Water
Month consumption generation of the plant emissions emissions emissions NOX matter emitted consumption
MT Million kWh % MT MT MT MT MT/month MT/month
Apr-06 90451 121 29.51 128881 299 7 37 55.58 20004
May-06 89598 121 29.51 127665 297 7 35 34.68 19896
Jun-06 91464 121 29.51 130324 301 7 36 44.25 20014
Jul-06 95182 121 29.51 135622 316 7 39 43.29 19954
Aug-06 105536 121 29.51 150374 349 8 42 56.68 24613
Sep-06 102397 121 29.51 145902 333 7 40 54.00 23555
Oct-06 97454 121 29.51 138858 322 7 36 69.31 22477
Nov-06 95493 121 29.51 136065 312 7 33 58.68 21629
Dec-06 94339 121 29.51 134420 309 7 35 59.79 20711
Jan-07 93985 121 29.51 133916 309 7 34 52.29 20724
Feb-07 92842 121 29.51 132288 305 7 32 55.70 20734
Mar-07 93935 121 29.51 133845 307 7 31 60.45 20420
ANNEXURE – V
Format for Near Miss Reporting
ANNEXURE – VI
Sample Accident Report
ANNEXURE – VII
Details of Chemicals and Fuel Oil Storages
(Occupational Health and Safety)
Chlorine
Hydrogen Cylinders
FO and LDO
ANNEXURE – VIII
Details of Person Interviewed
(Potential Liability & Risk Assessment)
ANNEXURE – IX
WATER CONSUMPTION & DISCHARGE DETAILS (2007-08)
Month Raw Water Blr Feed C.W. Effluent Gen. Effluent Recovered Discharged Ash Disposal Effluent
Intake m3 Cons.(m3) Cons.(m 3) (m 3) (m3) to Pond-3 Cons. m3 Gen.m3
(Recovered)
1 2 3 4 5 6 7 8
Apr-07 27668523 85091 2338582 472694 472694 0 1227628 1227628
May-07 25567133 85275 2229097 483600 439725 43875 1247894 1247894
Jun-07 15229364 67833 1611435 468000 456300 11700 1199564 1199564
Jul-07 26567566 80662 2066040 531300 493350 37950 1220666 1220666
Aug-07 28130961 74611 2083321 531300 494325 36975 1248630 1248630
Sep-07 29630570 68849 2241743 486000 469300 16700 1202113 1202113
Oct-07 27079739 76358 2109465 500774 463840 36934 1245509 1245509
Nov-07 24782535 76024 1911322 486000 465400 20600 1202460 1202460
Dec-07 25570240 68785 1923837 520219 475800 44419 1224410 1224410
Jan-08 26686196 67960 1924770 286124 271050 15074 1236555 1236555
Feb-08 25435827 65278 1982054 485100 445250 39850 1152509 1152509
Mar-08 27386938 68960 1998794 520800 468845 51955 1226774 1226774
Total 309735592 885686 24420460 5771911 5415879 356032 14634712 14634712
Month Effluent Recovery Discharge m3 Domestic Cons. Effluent Gen. Effluent Discharge m3 Loss m3
m3 (Unrecovered) m3 m3 Recovery m3 (Recovered)
9 10 11 12 13 14 15
Apr-07 685519 542109 306498 54000 37800 16200 542109
May-07 679739 568155 327300 50282 32683 17599 568155
Jun-07 672431 527133 324171 59820 32901 26919 527133
Jul-07 659610 561056 316877 68448 30802 37646 561056
Aug-07 679285 569345 305808 69068 27627 41441 569345
Sep-07 643942 558171 296318 64080 22428 41652 558171
Oct-07 665954 579555 304367 74338 33452 40886 579555
Nov-07 639896 562564 320756 71250 39188 32062 562564
Dec-07 451263 773147 323676 72912 36456 36456 773147
Jan-08 427148 809407 309559 69874 31443 38431 809407
Feb-08 623514 528995 289605 63974 29552 34422 528995
Mar-08 664225 562549 300798 72013 36673 35340 562549
Total 7492526 7142186 3725733 790059 391005 399054 7142186
Note: Apart from the unrecovered water of 7142186 m3 as mentioned in the cess recoreds, it was also observed that 18326431 m 3 (from Stream 2 of
Khasara ash bund (12251736 m3) and CHP&BPH outlet (6074695 m3)) is also unrecovered and unaccounted for in the cess records. Therefore, the
water recovered would not match with the cess records and the water balance statement.
Plate – I
Monitoring Locations
Note: Ground Water Location cannot be identified on the layout as it is out of the boundary
Plate – II A
Water Flow Schematic
[Flow measurements taken during the audit period have been represented. The flow schematic is not conclusive as measurements were not possible at
all inlet and outlet points]
Open stream
(river) AWR ( Khasara )
16643.1 cu.m/day CHP +BPH FFPH
OVERFLOW
Koradi Ash Bund
Outside Booster PH AHP - I
AWR (Koradi)
open 704.85 cu.m/hr
drain
Stage I and II surface runoffs and Pre-
AHP - II ETP treatment effluents and boiler blow downs
461.5 cu.m/hr
Ash Slurry Line (U 5)
Lift Unit 5, 6 & 7 (U 6)
(U5) 287719 cu.m/day
Pump (U 7)
(U6) 326021 cu.m/day
Cooling tower
294645 cu.m/day
WTP - I SW
Units 1,2,3 & 4
Cooling tower
cu.m/day
DM SW
cu.m/day
Square
Tank Ash Slurry Line
(U7)
1314.25
cu.m/hr
Over flow
Dalmia pump
house
Inflow
from Pench Pond No. 3 Pond No. 2
Dam
(963,964.29 cu.m/day) 40% Channel
60% Channel
Un – recovered from ETP
Over flow nalah
PLATE – II B
Proposed flow meter installation locations
Open stream
(river) AWR ( Khasara )
CHP +BPH FFPH
OVERFLOW
Koradi Ash Bund
Outside Booster PH AHP - I
AWR (Koradi)
open
drain
Stage I and II surface runoffs and Pre-
AHP - II ETP treatment effluents and boiler blow downs
Ash Slurry Line (U 5)
Lift Unit 5, 6 & 7 (U 6)
Pump (U 7)
Cooling tower
WTP - I
SW
Units 1,2,3 & 4
Cooling tower
DM SW
Square
Tank Ash Slurry Line
Over flow
Dalmia pump
house
Inflow
from Pench Pond No. 3 Pond No. 2
Dam
40% Channel
60% Channel
Un - recovered
Over flow nalah
Plate – III
Proposed pipeline from Pench feed
Plate – IV
ETP Schematic
Over flow
D. D. D.
C C
X
D. D.
D.C
Screen C C
chamber
Sump No.1 Pump
Settler Eff.
Inlet Settling Tank-1 sump Settler
No.2 Out
cham Effluent No.3
let Sludge
ber inlet Pump
Sump No.2 pump P.H house
Valve Settling Tank-2 Settler
Pump
cham No.1
house
Valve
chamber
Removed
Manually
X Ext
chambe
r
Effluent Ext Ext.
from stage-I
New cham
chamber New
cham AHP Stage II
Plate – V
STP Schematic
Garden pumps
1,2,3
Grit
chamber ART-1
RSP-1 RSP-2 RSP-
SP-1 SP-2 AERATING TANK
LABORATORY
1 2 3 4
COLONY END
5 6 7 8
DISCLAIMER
As it is practically not possible to study all the required aspects in its entirety thoroughly during the limited time period of the study, based
on our methodology, we carried out the study through review of related documents provided by the management of MAHAGENCO,
discussions with the management personnel and other key people, physical observations at the site, which helped us in identifying issues
and concerns, if any, associated with KTPS. Consequently, this report may not necessarily address all related matters perceived as
important by the management.
The information provided in this report is based on site reconnaissance, data and information made available to Ernst & Young during the
site visit, interviews and investigations during the site visit, and therefore, the finding of this report are valid as of the time period of the
site visit. Conclusion drawn from information available from documents / information made available to Ernst & Young Pvt. Ltd., pertain to
the time of generation of the respective documents and significance or accuracy of the same at the time of the site reconnaissance has not
be verified. Ernst & Young Pvt. Ltd., does not own the responsibility of information collated from interviews or discussion in the course of
the environmental audit and due diligence assessment.
The assessment was performed with the degree of care and skill ordinarily exercised under similar conditions by reputable, qualified EHS
professionals practicing the same or similar locality. The conclusions and recommendations represent professional judgments and are
based on the interpretation of such data / information made available to Ernst & Young Pvt. Ltd.
This report is solely for the information of MAHAGENCO and should not be used, circulated, quoted or otherwise referred to for any other
purpose, nor included or referred to in whole or in part in any document without our prior written consent.