Você está na página 1de 50

HIDROLOGIA SEMESTRE 2009-II

UNIVERSIDAD NACIONAL
“SANTIAGO ANTUNEZ DE MAYOLO”

FACULTAD DE INGENIERIA CIVIL


ESCUELA PROFESIONAL ING. CIVIL

CURSO : HIDROLOGIA
INFORME : Cuencas Hidrográficas
TEMA : Precipitación Media
DOCENTE : Ing. Esteban Reyes Roque
GRUPO :

HUANSHA VILLANUEVA, Deyvi 061.0709.582


TAMARA MAGUIÑA, Marino 061.0709.474
VALENTIN MILLA, Elmer 052.0709.647

Huaraz - 2010

INDICE

I. TITULO:.............................................................................................. 3
“ESTIMACIÓN DE LA PRECIPITACIÓN MEDIA DE LA CUENCA DEL RIO BUIN”...........3

FIC-UNASAM 1
HIDROLOGIA SEMESTRE 2009-II

II. OBJETIVOS:......................................................................................... 3
3.1 OBJETIVOS GENERALES:.....................................................................3
3.2 OBJETIVOS ESPECIFICOS.....................................................................3
III. MARCO TEÓRICO:...................................................................................3
IV. METODOLOGÍA Y CÁLCULOS:...................................................................12
5.1. METODOLOGÍA:................................................................................12
a) Determinación la precipitación media por el método de polígono de Thiessen, de
la cuenca del rio Buin. 12

b) Determinación la precipitación media por el método isoyetas, de la cuenca del rio


Buin. 13

5.2. CÁLCULOS:.....................................................................................14
a) Precipitación media por el método de polígono de Thiessen, de la cuenca del rio Buin.
14

b) Precipitación media por el método isoyetas, de la cuenca del rio Buin. 18

V. RESULTADOS......................................................................................24
a) Precipitación media por el método de polígono de Thiessen, de la cuenca del rio Buin.
24

b) Precipitación media por el método isoyetas, de la cuenca del rio Buin. 25

VI. CONCLUSIONES....................................................................................26
VII. RECOMENDACIONES.............................................................................26
VIII. BIBLIOGRAFÍA....................................................................................27
ANEXO:.................................................................................................... 28

FIC-UNASAM 2
HIDROLOGIA SEMESTRE 2009-II

I. TITULO:

“ESTIMACIÓN DE LA PRECIPITACIÓN MEDIA DE


LA SUB-CUENCA DEL RIO BUIN”

II. OBJETIVOS:

3.1 OBJETIVOS GENERALES:

a) Estimar la precipitación media de la sub-cuenca del rio Buin.

3.2 OBJETIVOS ESPECIFICOS.

a) Determinar la precipitación media por el método de polígono de

Thiessen, de la sub-cuenca del rio Buin.

b) Determinar la precipitación media por el método isoyetas, de la

sub-cuenca del rio Buin.

III. MARCO TEÓRICO:

2.1 PRECIPITACIÓN.
Según, Máximo Villón Béjar; Pág. 69:

La precipitación, es toda forma de humedad que originándose en las nubes, llega


hasta la superficie del suelo; de acuerdo a esta definición la precipitación puede
ser en forma de:

 Lluvias.
 Granizadas.
 Garuas.
 Nevadas.

Desde el punto de vista de la ingeniería hidrológica, la precipitación es la fuente


primaria del agua de la superficie terrestre, y sus mediciones y análisis, forman
el punto de partida de los estudios concernientes al uso y control del agua.

FIC-UNASAM 3
HIDROLOGIA SEMESTRE 2009-II

2.2 FORMACIÓN DE LAS PRECIPITACIONES.


Los elementos necesarios para la formación de las precipitaciones son los
siguientes:
 Humedad atmosférica
 Radiación polar.
 Mecanismos de enfriamiento del aire.
 Presencia de núcleos higroscópicos para que
haya condensación.
 Mecanismo de crecimiento de crecimiento de

las partículas.

El proceso de la formación de las precipitaciones es el siguiente:

 El aire húmedo, de los estratos bajos es


calentado por conducción.
 El aire húmedo, entonces se torna más leve
que el de las vecindades y experimenta una ascensión adiabática.
 El aire húmedo, entonces se expande y se
enfría a razón de 1oC por cada 100m (expansión adiabática seca)
 A partir de ese nivel, y con núcleos
higroscópicos, el vapor de agua se condensa formando
minúsculas gotas a lo largo de dichos núcleos.
 Dichas gotas se mantienen en suspensión
hasta que por un proceso de crecimiento, alcanza el tamaño
suficiente para precipitar.
Existen dos procesos de crecimiento de las gotas.
 Coalescencia: Es el aumento de tamaño de las gotas debido al
contacto con otras gotas. Además las gotas grandes ya cayendo
incorporan a las gotas más pequeñas.
 Difusión de vapor: Es el proceso por el cual el aire, después del
nivel e condensación continua evolucionando y provoca
difusión(transporte) de vapor súper saturado y su consiguiente

FIC-UNASAM 4
HIDROLOGIA SEMESTRE 2009-II

condensación en torno a las pequeñas gotas que aumentan de


tamaño.

2.3 FORMAS DE PRECIPITACIÓN:


Según, Máximo Villón Béjar; Pág. 70:

 Llovizna; pequeñas gotas de agua, cuyo diámetro varía


entre 0.1 y 0.5mm, las cuales tienen velocidades de caída muy bajas.
 Lluvia; gotas de agua con diámetro mayor a 0.5mm.
 Escarcha; capa de hielo por lo general transparente y
suave, pero que usualmente contiene bolsas de aire.
 Nieve; compuesta de cristales de hielo blanco traslúcido,
principalmente de forma compleja.
 Granizo, precipitación en forma de bolas irregulares de
hielo, que se producen nubes convectivas, pueden ser esféricos, cónicos
o de forma irregular, su diámetro varía entre 5 y 125mm.

2.4 CLASIFICACIÓN DE LA PRECIPITACIÓN.


Según, Máximo Villón Béjar; Pág. 70-72:

La formación de la precipitación, requiere la elevación de una masa de agua


en la atmósfera, de tal manera que se enfríe y parte de su humedad se
condense. Atendiendo al factor que provoca la elevación del aire en la
atmósfera, la precipitación se clasifica en:

a. PRECIPITACIÓN DE CONVECCIÓN:
En tiempo caluroso, se produce una abundante evaporación a partir de la
superficie del agua, formando grandes masas de vapor de agua que por estar
más calientes, se elevan sufriendo un enfriamiento de acuerdo a la
adiabática seca ò húmeda .En el curso de su ascenso, se enfrían según el
gradiente adiabático seco (1ºC/100m), o saturado (0.5ºC/100).
Las masas de vapor se acumulan en los puntos llamados células de
convección (figura 1). A partir de este punto, estas masas pueden seguir
elevándose hasta llegar a las grandes alturas, don encuentran condiciones

FIC-UNASAM 5
HIDROLOGIA SEMESTRE 2009-II

que provocan la condensación y la precipitación. Generalmente viene


acompañada de rayos y truenos. Son precipitaciones propias de las regiones
tropicales, donde las mañanas son muy calurosas, el viento es calmo y hay
una predominancia de movimiento vertical del aire.

Precipitación de Convección.
Figura Nº1

b. PRECIPITACIÓN OROGRÁFICA:
Se producen cuando el vapor de agua que se forma sobre la superficie de
agua es empujada por el viento hacia las montañas, aquí las nubes siguen
por las laderas de las montañas, y ascienden a grandes alturas, hasta
encontrar condiciones para la condensación y la consiguiente precipitación
(figura 2).

Precipitación Orográfica
Figura Nº2

FIC-UNASAM 6
HIDROLOGIA SEMESTRE 2009-II

c. PRECIPITACIÓN CICLÓNICA:
Se producen cuando hay un encuentro de dos masas de aire, con diferente
temperatura y humedad, las nubes más calientes son violentamente
impulsadas a las partes más altas, donde pueden producirse la condensación
y precipitación. Están asociadas con el paso de ciclones o zonas de baja
presión (figura 3).
Todas estas formas de originarse las lluvias, en la naturaleza se presentan
combinadas, de modo que una 'lluvia determinada puede provenir de
cualquiera de las formas o de la combinación de ellas.

Precipitación Ciclónica
Figura Nº3

2.5 CÁLCULO DE LA PRECIPITACIÓN MEDIA.

FIC-UNASAM 7
HIDROLOGIA SEMESTRE 2009-II

Según, Máximo Villón Béjar; Pág. 73-81:

En general, la altura de precipitación que cae en un sitio dado, difiere de la


que cae en los alrededores, aunque sea en sitios cercanos.
Los pluviómetros registran la lluvia puntual, es decir, la que se produce en
el punto en, la que está instalada el aparato. Para muchos problemas
hidrológicos, se requiere conocer la altura de precipitación media de una
zona, la cual puede estar referida a la altura de precipitación diaria, mensual,
anual, media mensual, media anual.

 Altura de precipitación diaria, es la suma de las lecturas observadas en


un día.
 Altura de precipitación media diaria, es el promedio aritmético de las
lecturas observadas en un día.
 Altura de precipitación mensual, es la suma de las alturas diarias,
ocurridas en un mes.
 Altura de precipitación media mensual, es el promedio aritmético de
las alturas de precipitación mensual, correspondiente a un cierto
número de meses.
 Altura de precipitación anual, es la suma de las alturas de
precipitación mensual, ocurridas en un año.
 Altura de precipitación media anual, es el promedio aritmético de las
alturas de precipitación anual, correspondiente a un cierto número de
años.
Para calcular la precipitación media de una tormenta o la precipitación
media anual, existen tres métodos de uso generalizado:

2.5.1. MÉTODO DE POLÍGONOS DE THIESSEN.


Para este método, es necesario conocer la localización de las estaciones en
la zona bajo estudio, ya que para su aplicación, se requiere delimitar la zona
de influencia de cada estación, dentro del conjunto de estaciones.
El método consiste en:
1. Ubicar las estaciones, dentro y fuera de la cuenca.
2. Unir las estaciones formando triángulos, procurando en lo posible que estos
sean acutángulos (ángulos menores de 90°).
3. Trazar las mediatrices de los lados de los triángulos (figura 8) formando
polígonos. (Por geometría elemental, las mediatrices correspondientes a

FIC-UNASAM 8
HIDROLOGIA SEMESTRE 2009-II

cada triángulo, convergen en un solo punto. En un triángulo acutángulo, el


centro de mediatrices, está ubicada dentro del triángulo, mientras que en un
obtusángulo, está ubicada fuera del triángulo).
4. Definir el área de influencia de cada estación, cada estación quedará
rodeada por las líneas del polígono (en algunos casos, en parte por el
parteaguas de la cuenca). El área encerrada por los polígonos de Thiessen y
el parteaguas será el área de influencia de la estación correspondiente.
5. Calcular el área de cada estación.
6. Calcular la precipitación media, como el promedio pesado de las
precipitaciones de cada estación, usando como peso el área de influencia
correspondiente, es decir:

n
1
Pmed 
AT
 P A ……………….( 2 )
i 1
i i

Donde:
Pmed = precipitación media
At= Área total de la cuenca
Ai = Área de influencia parcial del polígono de Thiessen Correspondiente a la
estación i
Pi = Precipitación de la estación i
n = Número de estaciones tomadas en cuenta

Polígono de Thiessen.
Figura Nº4
MÉTODO DE ISOYETAS.

FIC-UNASAM 9
HIDROLOGIA SEMESTRE 2009-II

Para este método, se necesita un plano de isoyetas de la precipitación


registrada, en las diversas estaciones de la zona en estudio. Las isoyetas son
curvas que unen puntos de igual precipitación (figura 9). Este método es el
más exacto, pero requiere de un cierto criterio para trazar el plano de
isoyetas. Se puede decir que si la precipitación es de tipo orográfico, las
isoyetas tenderán a seguir una configuración parecida a las curvas de nivel.
Por supuesto, entre mayor sea el número de estaciones dentro de la zona en
estudio, mayor será la aproximación con lo cual se trace el plano de
isoyetas.

Isoyetas
Figura Nº9

FIC-UNASAM 10
HIDROLOGIA SEMESTRE 2009-II

El método consiste en:


1. Ubicar las estaciones dentro y fuera de la cuenca.
2. Trazar las isoyetas, interpolando las alturas de precipitación entre las diversas
estaciones, de modo similar a cómo se trazan las curvas de nivel.
3. Hallar las áreas A1 , A2 , A3 ,........, An 1 , An entre cada 2 isoyetas seguidas.
4. Si P1 , P2 , P3 ,........, Pn 1 , Pn son las precipitaciones representadas por las
5. Isoyetas respectivas, calcular la precipitación media utilizando:

 P0  P1 P  P2 P  Pn 
 A1  1 A2  ......  n 1 An 
2 2 2
Pmed  
A1  A2  .....  An

1 n
Pi 1  Pi
Pmed 
AT

i 1 2
Ai ……………….( 3 )

Donde:
Pmed = precipitación media

FIC-UNASAM 11
HIDROLOGIA SEMESTRE 2009-II

At = área total de la cuenca


Pi = altura de precipitación de las isoyetas i
Ai = área parcial comprendida entre las isoyetas Pi 1 y Pi
n = número de áreas parciales

IV. METODOLOGÍA Y CÁLCULOS:

5.1. Metodología:
Para el presente trabajo se usaron los siguientes materiales y equipos:
MATERIALES Y EQUIPOS
 Plano digital de la cuenca del santa.
 Computadora Pentium Corel Duo 2.
 Impresora hp laser 1020.
 Software AutoCAD 2010.
 Software Civil 3D.
 Software Microsoft office 2007.
a) Determinación la precipitación media por el método de polígono de

Thiessen, de la sub - cuenca del rio Buin.


 Se delimita la cuenca (esto se saco del informe Nº 1).
 Se ubica las estaciones presentes en la cuenca del santa según sus

coordenadas UTM.
 Se forman triángulos acutángulos para la sub-cuenca del rio Buin, con

las estaciones de Yungay, LLanganuco y Chancos que son las más

cercanas y únicas que cumplen con los condiciones del método de

polígono de thiessen.
 Se traza las mediatriz al triangulo en cada lado para subdividir las

áreas de influencia correspondientes a cada estación.


 Se calcula las áreas parciales dentro de la cuenca del rio Buin.
 Se calcula la precipitación media con la hoja de cálculo.
b) Determinación la precipitación media por el método isoyetas, de la

sub-cuenca del rio Buin.


Se sigue la siguiente Metodología:
 Los datos que se tienen sobre la precipitación en cada uno de las
estaciones de parón y colindantes ella (mensual y anual), los ubicamos
en el plano.
 Ubicado las precipitaciones en el plano precedemos a trazar las curvas
de igual precipitación con la ayuda de AutoCad Civil 3D 2010. para
cada uno de los meses y anualmente.

FIC-UNASAM 12
HIDROLOGIA SEMESTRE 2009-II

 Trazado dichas curvas se proceden a medir las áreas (internas)


limitadas entre dos curvas (curvas de igual precipitación) consecutivas
y los límites de la subcuenca.
 Hallado todas las áreas interiores procedemos a calcular la
precipitación media multiplicanda dicha área por el promedio de la
precipitación entre curvas de igual precipitación. y esta dada por la
formula:

 n 1  Pi  Pi 1  
   2 Ai ,i 1 
P   i 1  n 1  
 
  Ai ,i 1 
 i 1 
DONDE:
n = Número de curvas de precipitación.
Pi = Precipitación correspondiente a la curva de igual precipitación
"i"
Pi+1 = Precipitación correspondiente a la curva de igual precipitación
"i+1"
Ai,i+1 =Área entre curvas dee igual precipitación i e i+1.

5.2. Cálculos:
a) Precipitación media por el método de polígono de Thiessen, de la
sub - cuenca del rio Buin

METODO DEL POLIGONO DE THIESSEN

Área parcial
E1 7026665.2359
E2 46032366.5313
E3 108306344.6126
TOTAL 161365376.3797

Tenemos la siguiente fórmula para determinar la precipitación media en una cuenca :

n
1

Pmeddonde:
At
AP
i 1
i i
P med Precipitación media.

FIC-UNASAM 13
HIDROLOGIA SEMESTRE 2009-II

determinación por de la precipitación media por meses

SETIEMBRE

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 7.11 7026665.2359 4.35451 49959589.83
Llanganuco 16.4 46032366.53 28.5268 754930811.1
Chancos 9.2 108306344.61 67.1187 996418370.4
 161365376.38 100.00 1801308771.4

PRECIPITACION MEDIA = 11.1629 mm

OCTUBRE

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 17.4 7026665.2359 4.3545 122263975.1
Llanganuco 43.3 46032366.53 28.5268 1993201470.8
chancos 36.2 108306344.61 67.1187 3920689675.0
 161365376.38 100.00 6036155120.9

PRECIPITACION MEDIA = 37.4068 mm


NOVIEMBRE

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 24 7026665.2359 4.3545 168639965.7
Llanganuco 58.2 46032366.53 28.5268 2679083732.1
chancos 45.7 108306344.61 67.1187 4949599948.8
 161365376.38 100.00 7797323646.6

PRECIPITACION MEDIA = 48.3209 mm

DICIEMBRE

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 26.6 7026665.2359 4.3545 186909295.3
Llanganuco 75.7 46032366.53 28.5268 3484650146.4
chancos 58.3 108306344.61 67.1187 6314259890.9
 161365376.38 100.00 9798910037.3

PRECIPITACION MEDIA = 60.7250 mm

ENERO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A

FIC-UNASAM 14
HIDROLOGIA SEMESTRE 2009-II

Yungay 46.1 7026665.2359 4.3545 323929267.4


Llanganuco 91.2 46032366.53 28.5268 4198151827.7
chancos 86.34 108306344.61 67.1187 9351169793.9
 161365376.38 100.00 13873250888.9

PRECIPITACION MEDIA = 85.9741 mm

FEBRERO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 71.2 7026665.2359 4.3545 500298564.8
Llanganuco 107.9 46032366.53 28.5268 4966892348.7
chancos 92.8 108306344.61 67.1187 10050828780.0
 161365376.38 100.00 15518019693.6

PRECIPITACION MEDIA = 96.1670 mm

MARZO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 82.4 7026665.2359 4.3545 578997215.4
Llanganuco 134.6 46032366.53 28.5268 6195956535.1
chancos 127.7 108306344.61 67.1187 13830720207.0
 161365376.38 100.00 20605673957.6

PRECIPITACION MEDIA = 127.6958 mm

ABRIL

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 40.6 7026665.2359 4.35451 285282608.6
Llanganuco 74.4 46032366.53 28.5268 3424808069.9
chancos 74.1 108306344.61 67.1187 8025500135.8
 161365376.38 100.00 11735590814.3

PRECIPITACION MEDIA = 72.7268 mm

MAYO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 6.1 7026665.2359 4.3545 42862657.94
Llanganuco 23.5 46032366.53 28.5268 1081760613.5
chancos 17.6 108306344.61 67.1187 1906191665.2
 161365376.38 100.00 3030814936.6

FIC-UNASAM 15
HIDROLOGIA SEMESTRE 2009-II

PRECIPITACION MEDIA = 18.7823 mm

JUNIO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 1.2 7026665.2359 4.3545 8431998.283
Llanganuco 2.9 46032366.53 28.5268 133493862.9
chancos 1.8 108306344.61 67.1187 194951420.3
 161365376.38 100.00 336877281.5

PRECIPITACION MEDIA = 2.0877 mm

JULIO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 0.2 7026665.2359 4.3545 1405333.047
Llanganuco 1 46032366.53 28.5268 46032366.5
chancos 0.3 108306344.61 67.1187 32491903.4
 161365376.38 100.00 79929603.0

PRECIPITACION MEDIA = 0.4953 mm

AGOSTO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 0.6 7026665.2359 4.3545 4215999.142
Llanganuco 4.3 46032366.53 28.5268 197939176.1
chancos 1.9 108306344.61 67.1187 205782054.8
 161365376.38 100.00 407937230.0

PRECIPITACION MEDIA = 2.5280 mm

ANUAL

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 323.8 7026665.2359 4.3545 2275234203
Llanganuco 633.3 46032366.53 28.5268 29152297724.3
chancos 552.1 108306344.61 67.1187 59795932860.6

FIC-UNASAM 16
HIDROLOGIA SEMESTRE 2009-II

 161365376.38 100.00 91223464788.2

PRECIPITACION MEDIA = 565.3224 mm

b) Precipitación media por el método isoyetas, de la sub - cuenca del rio Buin.
MÉTODO DE LAS ISOYETAS.

Definición de las estaciones:

ESTACION P E N P(mm)-ENE P(mm)-FEB P(mm)-MAR P(mm) -ABR


YUNGAY E1 198,730.93 8,987,140.84 46.10 71.20 82.40 40.60
CAHUISH E4 252,597.44 8,928,626.18 129.80 160.60 167.30 113.70
HUILLCA E5 212,704.61 9,028,531.89 145.30 127.60 167.60 109.10
CHACCHAN E9 195,899.35 8,943,120.15 40.50 57.70 58.80 24.90

P(mm)-
P(mm)-MAY P(mm)-JUN P(mm)-JUL P(mm)-AGO P(mm)-SEP P(mm)-OCT P(mm)-NOV P(mm)-DIC AÑO

6.10 1.20 0.20 0.60 7.40 17.40 24.00 26.60 323.80


55.30 14.10 4.50 11.50 37.40 85.80 88.80 120.30 989.20
52.60 56.20 11.60 24.70 44.00 89.00 110.00 111.80 1,049.30
3.20 0.70 0.10 1.00 5.50 14.40 18.90 32.70 258.30

Cálculos:

ENERO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


55
A1 2795167.9000 60 57.5 160722154.25
A2 6046089.4800 65 62.5 377880592.50
A3 7130083.1440 70 67.5 481280612.22
A4 8666436.5200 75 72.5 628316647.70
A5 8956423.1940 80 77.5 694122797.54
A6 8416772.5550 85 82.5 694383735.79
A7 8500655.0590 90 87.5 743807317.66

FIC-UNASAM 17
HIDROLOGIA SEMESTRE 2009-II

A8 8845727.8730 95 92.5 818229828.25


A9 12893844.3600 100 97.5 1257149825.10
A10 17919033.4680 105 102.5 1836700930.47
A11 18491124.2560 110 107.5 1987795857.52
A12 16980865.3300 115 112.5 1910347349.63
A13 13280880.9120 120 117.5 1560503507.16
A14 10273959.1560 125 122.5 1258559996.61
A15 8088895.8570 130 127.5 1031334221.77
A16 3925783.1270 135 132.5 520166264.33
A17 153634.1880 140 137.5 21124700.85
TOTAL 161365376.3790 15982426339 99.04495

FEBRERO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


80
A1 1776727.2750 85 82.5 146580000.2
A2 7905380.0640 90 87.5 691720755.6
A3 12153028.0170 95 92.5 1124155092
A4 13288727.3140 100 97.5 1295650913
A5 12723658.4520 105 102.5 1304174991
A6 15350390.9570 110 107.5 1650167028
A7 24988410.0310 115 112.5 2811196128
A8 26605255.9070 120 117.5 3126117569
A9 23486970.8410 125 122.5 2877153928
A10 14763101.0610 130 127.5 1882295385
A11 7677163.6230 135 132.5 1017224180
A12 646562.8380 140 137.5 88902390.23
TOTAL 161365376.3800 18015338361 111.6431

MARZO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


90
A1 1798217.3480 95 92.5 166335104.69
A2 5625487.2050 100 97.5 548485002.49
A3 7749984.4250 105 102.5 794373403.56
A4 9754012.0030 110 107.5 1048556290.32
A5 9967735.2420 115 112.5 1121370214.73
A6 9460241.9470 120 117.5 1111578428.77
A7 9743464.4080 125 122.5 1193574389.98
A8 11364451.2070 130 127.5 1448967528.89
A9 19299052.0950 135 132.5 2557124402.59

FIC-UNASAM 18
HIDROLOGIA SEMESTRE 2009-II

A10 20471380.5690 140 137.5 2814814828.24


A11 19896639.3780 145 142.5 2835271111.37
A12 14889035.4890 150 147.5 2196132734.63
A13 11180614.4860 155 152.5 1705043709.12
A14 7829389.5250 160 157.5 1233128850.19
A15 2335670.5190 165 162.5 379546459.34
TOTAL 161365375.8460 21154302458.89 131.0957

ABRIL

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


45
A1 313800.7410 50 47.5 14905535.20
A2 6169258.8310 55 52.5 323886088.63
A3 9389983.4550 60 57.5 539924048.66
A4 12203190.8770 65 62.5 762699429.81
A5 11914783.5820 70 67.5 804247891.79
A6 11674238.5910 75 72.5 846382297.85
A7 13732653.2200 80 77.5 1064280624.55
A8 23818211.8400 85 82.5 1965002476.80
A9 25164240.3860 90 87.5 2201871033.78
A10 21249531.6750 95 92.5 1965581679.94
A11 14531395.2100 100 97.5 1416811032.98
A12 9430915.8790 105 102.5 966668877.60
A13 1773172.0940 110 107.5 190616000.11
TOTAL 161365376.3810 13062877017.67 80.95217

MAYO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


10
A1 4701097.1820 15 12.5 58763714.8
A2 13993885.1100 20 17.5 244892989
A3 18027807.8570 25 22.5 405625677
A4 17293701.1260 30 27.5 475576781
A5 26988322.2400 35 32.5 877120473
A6 36988801.9460 40 37.5 1387080073
A7 27241485.4440 45 42.5 1157763131
A8 14897168.2410 50 47.5 707615491
A9 1233067.5270 55 52.5 64736045.2

FIC-UNASAM 19
HIDROLOGIA SEMESTRE 2009-II

TOTAL 161365336.6730 5379174376 33.3354

JUNIO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


0
A1 7685078.2310 5 2.5 19212695.58
A2 15101793.6490 10 7.5 113263452.37
A3 18131838.2290 15 12.5 226647977.86
A4 18305777.0660 20 17.5 320351098.66
A5 28954091.0540 25 22.5 651467048.72
A6 35488853.4190 30 27.5 975943469.02
A7 25360646.1370 35 32.5 824220999.45
A8 12337298.5410 40 37.5 462648695.29
TOTAL 161365376.3260 3593755436.94 22.2709

JULIO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


0
A1 16994351.7860 2 1 16994351.79
A2 33541205.0570 4 3 100623615.17
A3 54204151.3250 6 5 271020756.63
A4 50146201.1200 8 7 351023407.84
A5 6479446.0750 10 9 58315014.68
TOTAL 161365355.3630 797977146.10 4.9452

AGOSTO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


2
A1 11890647.2750 4 3 35671941.83
A2 14862084.9490 6 5 74310424.75
A3 15609295.9320 8 7 109265071.52
A4 15643118.7300 10 9 140788068.57
A5 23823468.7430 12 11 262058156.17
A6 33155866.7480 14 13 431026267.72
A7 25074961.5210 16 15 376124422.82
A8 17438452.8060 18 17 296453697.70
A9 3867479.6760 20 19 73482113.84
TOTAL 161365376.3800 1799180164.92 11.1497

SETIEMBRE

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


10

FIC-UNASAM 20
HIDROLOGIA SEMESTRE 2009-II

A1 1278703.7490 12 11 14065741.24
A2 6784408.5250 14 13 88197310.83
A3 7587826.7800 16 15 113817401.70
A4 9438746.4760 18 17 160458690.09
A5 9706537.0810 20 19 184424204.54
A6 9146313.6560 22 21 192072586.78
A7 9383983.6150 24 23 215831623.15
A8 10300093.6820 26 25 257502342.05
A9 17426895.6790 28 27 470526183.33
A10 20086963.7770 30 29 582521949.53
A11 19645818.7580 32 31 609020381.50
A12 15359358.7880 34 33 506858840.00
A13 11769938.6420 36 35 411947852.47
A14 9129781.8940 38 37 337801930.08
A15 4226895.3310 40 39 164848917.91
A16 93109.9450 42 41 3817507.75
TOTAL 161365376.3780 4313713462.94 26.7326

OCTUBRE

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


25
A1 6229947.6530 30 27.5 171323560.46
A2 8928835.9820 35 32.5 290187169.42
A3 11800577.9650 40 37.5 442521673.69
A4 11801601.1460 45 42.5 501568048.71
A5 11365667.4540 50 47.5 539869204.07
A6 12388618.9160 55 52.5 650402493.09
A7 22002253.7540 60 57.5 1265129590.86
A8 24723800.6500 65 62.5 1545237540.63
A9 22171473.1810 70 67.5 1496574439.72
A10 15511676.3660 75 72.5 1124596536.54
A11 10829207.2410 80 77.5 839263561.18
A12 3611689.0720 85 82.5 297964348.44
TOTAL 161365349.3800 9164638166.77 56.7943

NOVIEMBRE

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


30
A1 3328259.4990 35 32.5 108168433.72
A2 7065610.2200 40 37.5 264960383.25
A3 9043593.9870 45 42.5 384352744.45
A4 10599544.7360 50 47.5 503478374.96
A5 10038037.9710 55 52.5 526996993.48
A6 9957757.9330 60 57.5 572571081.15

FIC-UNASAM 21
HIDROLOGIA SEMESTRE 2009-II

A7 10496270.4020 65 62.5 656016900.13


A8 16453844.4360 70 67.5 1110634499.43
A9 21649065.4400 75 72.5 1569557244.40
A10 21223858.5500 80 77.5 1644849037.63
A11 16602487.6290 85 82.5 1369705229.39
A12 12495595.5280 90 87.5 1093364608.70
A13 9381706.0680 95 92.5 867807811.29
A14 3029743.9790 100 97.5 295400037.95
TOTAL 161365376.3780 10967863379.92 67.9691
DICIEMBRE

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


40
A1 6499737.9300 45 42.5 276238862.03
A2 7253562.2030 50 47.5 344544204.64
A3 9339945.6080 55 52.5 490347144.42
A4 9790733.0580 60 57.5 562967150.84
A5 9378915.8590 65 62.5 586182241.19
A6 9381973.4190 70 67.5 633283205.78
A7 10119261.0010 75 72.5 733646422.57
A8 17614589.2290 80 77.5 1365130665.25
A9 19702213.2320 85 82.5 1625432591.64
A10 20155615.5030 90 87.5 1763616356.51
A11 16321319.3030 95 92.5 1509722035.53
A12 11997698.9150 100 97.5 1169775644.21
A13 8888304.3280 105 102.5 911051193.62
A14 4668782.5870 110 107.5 501894128.10
A15 252724.2050 115 112.5 28431473.06
TOTAL 161365376.3800 12502263319.39 77.4779

ANUAL

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


400
A1 5749045.7190 450 425 2443344430.58
A2 8587731.5910 500 475 4079172505.73
A3 11604583.0810 550 525 6092406117.53
A4 11860956.1310 600 575 6820049775.33
A5 11295542.6740 650 625 7059714171.25
A6 12106739.2080 700 675 8172048965.40
A7 20815525.9790 750 725 15091256334.78
A8 24672927.1160 800 775 19121518514.90
A9 22617908.2140 850 825 18659774276.55
A10 16128764.8130 900 875 14112669211.38
A11 11437820.6540 950 925 10579984104.95

FIC-UNASAM 22
HIDROLOGIA SEMESTRE 2009-II

A12 4487830.8430 1000 975 4375635071.93


TOTAL 161365376.0230 116607573480.28 722.6307

V. RESULTADOS

a) Precipitación media por el método de polígono de Thiessen, de la sub-


cuenca del rio Buin.
 Enero: Ver Anexo Tabla T - 05 y Plano P - 05
 Febrero: Ver Anexo Tabla T - 06 y Plano P - 06
 Marzo: Ver Anexo Tabla T - 07 y Plano P - 07
 Abril: Ver Anexo Tabla T - 08 y Plano P - 08
 Mayo: Ver Anexo Tabla T - 09 y Plano P - 09
 Junio: Ver Anexo Tabla T - 10 y Plano P - 10
 Julio: Ver Anexo Tabla T - 11 y Plano P - 11
 Agosto: Ver Anexo Tabla T - 12 y Plano P - 12
 Setiembre: Ver Anexo Tabla T - 01 y Plano P - 01
 Octubre: Ver Anexo Tabla T - 02 y Plano P - 02
 Noviembre: Ver Anexo Tabla T - 03 y Plano P - 03
 Diciembre: Ver Anexo Tabla T - 04 y Plano P - 04

Tabla De Resumen De Las Precipitaciones Por Meses

MESES PRECIPITACION(mm)
SETIEMBRE 11.1629
OCTUBRE 37.4068
NOVIEMBRE 48.3209
DICIEMBRE 60.7250
ENERO 85.9741
FEBRERO 96.1670
MARZO 127.6958 Precipitación máxima
ABRIL 72.7268
MAYO 18.7823
JUNIO 2.0877
JULIO 0.4953
AGOSTO 2.5280
ANUAL 565.3224

b) Precipitación media por el método isoyetas, de la sub-cuenca del rio Buin.

 Enero: Ver Anexo Tabla I - 05 y Plano PI - 05


FIC-UNASAM 23
HIDROLOGIA SEMESTRE 2009-II

 Febrero: Ver Anexo Tabla I - 06 y Plano PI - 06


 Marzo: Ver Anexo Tabla I - 07 y Plano PI - 07
 Abril: Ver Anexo Tabla I - 08 y Plano PI- 08
 Mayo: Ver Anexo Tabla I - 09 y Plano PI - 09
 Junio: Ver Anexo Tabla I - 10 y Plano PI - 10
 Julio: Ver Anexo Tabla I - 11 y Plano PI - 11
 Agosto: Ver Anexo Tabla I - 12 y Plano PI - 12
 Setiembre: Ver Anexo Tabla I - 01 y Plano PI - 01
 Octubre: Ver Anexo Tabla I - 02 y Plano PI - 02
 Noviembre: Ver Anexo Tabla I - 03 y Plano PI - 03
 Diciembre: Ver Anexo Tabla I - 04 y Plano PI - 04

Tabla De Resumen De Las Precipitaciones Por Meses

MESES PRECIPITACION(mm)
SETIEMBRE 26.7325
OCTUBRE 56.7943
NOVIEMBRE 67.9691
DICIEMBRE 77.4780
ENERO 99.0450
FEBRERO 111.6431
MARZO 131.0957 Precipitación máxima
ABRIL 80.9521
MAYO 33.3354
JUNIO 22.2709
JULIO 4.9452
AGOSTO 11.1497
ANUAL 722.6307

VI. CONCLUSIONES

a) Se concluye para el método del polígono de thiessen lo siguiente:

 La cuenca del rio Buin no cuenta con una estación interna lo cual

impide realizar más subdivisiones para tener mayor precisión en el

cálculo del área de influencia.

FIC-UNASAM 24
HIDROLOGIA SEMESTRE 2009-II

 El resultado máximo de la precipitación media refleja la realidad de

la zona.

b) Se concluye para el método del isoyetas lo siguiente:

 La cuenca del rio Buin no cuenta con una estación interna por lo tanto

las estaciones que se usaron son 04 externas y que en su interior

contienen a la cuenca, para poder interpolar las curvas de nivel.


 El resultado máximo de precipitación media coincidente con el

método anterior se da en el mes de marzo.

VII. RECOMENDACIONES

 Se recomienda para calcular la precipitación media de una cuenca


usar el método de isoyetas, ya que este tiene mayor precisión a
diferencia del método del polígono de thiessen.

 Es recomendable trabajar con más estaciones, ya que este criterio


mejora la precisión de los cálculos.

VIII. BIBLIOGRAFÍA

 Máximo Villón Béjar. HIDROLOGIA. Editorial Villón, segunda edición,Lima-


Perú,2002

FIC-UNASAM 25
HIDROLOGIA SEMESTRE 2009-II

FIC-UNASAM 26
HIDROLOGIA SEMESTRE 2009-II

ANEXO:

TABLAS
 TABLAS DEL POLÍGONO DE THIESSEN
ENERO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 46.1 7026665.2359 4.3545 323929267.4
Llanganuco 91.2 46032366.53 28.5268 4198151827.7
chancos 86.34 108306344.61 67.1187 9351169793.9
 161365376.38 100.00 13873250888.9

PRECIPITACION MEDIA = 85.9741 mm


Tabla T - 05

FIC-UNASAM 27
HIDROLOGIA SEMESTRE 2009-II

FEBRERO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 71.2 7026665.2359 4.3545 500298564.8
Llanganuco 107.9 46032366.53 28.5268 4966892348.7
chancos 92.8 108306344.61 67.1187 10050828780.0
 161365376.38 100.00 15518019693.6

PRECIPITACION MEDIA = 96.1670 mm


Tabla T – 06
MARZO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 82.4 7026665.2359 4.3545 578997215.4
Llanganuco 134.6 46032366.53 28.5268 6195956535.1
chancos 127.7 108306344.61 67.1187 13830720207.0
 161365376.38 100.00 20605673957.6

PRECIPITACION MEDIA = 127.6958 mm


Tabla T – 07
ABRIL

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 40.6 7026665.2359 4.35451 285282608.6
Llanganuco 74.4 46032366.53 28.5268 3424808069.9
chancos 74.1 108306344.61 67.1187 8025500135.8
 161365376.38 100.00 11735590814.3

PRECIPITACION MEDIA = 72.7268 mm


Tabla T – 08

MAYO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 6.1 7026665.2359 4.3545 42862657.94
Llanganuco 23.5 46032366.53 28.5268 1081760613.5
chancos 17.6 108306344.61 67.1187 1906191665.2
 161365376.38 100.00 3030814936.6

PRECIPITACION MEDIA = 18.7823 mm


Tabla T – 09
JUNIO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 1.2 7026665.2359 4.3545 8431998.283
Llanganuco 2.9 46032366.53 28.5268 133493862.9

FIC-UNASAM 28
HIDROLOGIA SEMESTRE 2009-II

chancos 1.8 108306344.61 67.1187 194951420.3


 161365376.38 100.00 336877281.5

PRECIPITACION MEDIA = 2.0877 mm


Tabla T – 10

JULIO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 0.2 7026665.2359 4.3545 1405333.047
Llanganuco 1 46032366.53 28.5268 46032366.5
chancos 0.3 108306344.61 67.1187 32491903.4
 161365376.38 100.00 79929603.0

PRECIPITACION MEDIA = 0.4953 mm


Tabla T – 11
AGOSTO

ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A


Yungay 0.6 7026665.2359 4.3545 4215999.142
Llanganuco 4.3 46032366.53 28.5268 197939176.1
chancos 1.9 108306344.61 67.1187 205782054.8
 161365376.38 100.00 407937230.0

PRECIPITACION MEDIA = 2.5280 mm


Tabla T – 12

ANUAL
ESTACION PRECIPITACION(mm) AREA(m^2) % AREA P*A
Yungay 323.8 7026665.2359 4.3545 2275234203
Llanganuco 633.3 46032366.53 28.5268 29152297724.3
chancos 552.1 108306344.61 67.1187 59795932860.6
 161365376.38 100.00 91223464788.2

PRECIPITACION MEDIA = 565.3224 mm


Tabla T – 13

 TABLAS DE ISOYETAS

ENERO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


55
A1 2795167.9000 60 57.5 160722154.25

FIC-UNASAM 29
HIDROLOGIA SEMESTRE 2009-II

A2 6046089.4800 65 62.5 377880592.50


A3 7130083.1440 70 67.5 481280612.22
A4 8666436.5200 75 72.5 628316647.70
A5 8956423.1940 80 77.5 694122797.54
A6 8416772.5550 85 82.5 694383735.79
A7 8500655.0590 90 87.5 743807317.66
A8 8845727.8730 95 92.5 818229828.25
A9 12893844.3600 100 97.5 1257149825.10
A10 17919033.4680 105 102.5 1836700930.47
A11 18491124.2560 110 107.5 1987795857.52
A12 16980865.3300 115 112.5 1910347349.63
A13 13280880.9120 120 117.5 1560503507.16
A14 10273959.1560 125 122.5 1258559996.61
A15 8088895.8570 130 127.5 1031334221.77
A16 3925783.1270 135 132.5 520166264.33
A17 153634.1880 140 137.5 21124700.85
TOTAL 161365376.3790 15982426339 99.04495

Tabla I – 05

FEBRERO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


80
A1 1776727.2750 85 82.5 146580000.2
A2 7905380.0640 90 87.5 691720755.6
A3 12153028.0170 95 92.5 1124155092
A4 13288727.3140 100 97.5 1295650913
A5 12723658.4520 105 102.5 1304174991
A6 15350390.9570 110 107.5 1650167028
A7 24988410.0310 115 112.5 2811196128
A8 26605255.9070 120 117.5 3126117569
A9 23486970.8410 125 122.5 2877153928
A10 14763101.0610 130 127.5 1882295385
A11 7677163.6230 135 132.5 1017224180
A12 646562.8380 140 137.5 88902390.23
TOTAL 161365376.3800 18015338361 111.6431

Tabla I - 06

MARZO

FIC-UNASAM 30
HIDROLOGIA SEMESTRE 2009-II

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


90
A1 1798217.3480 95 92.5 166335104.69
A2 5625487.2050 100 97.5 548485002.49
A3 7749984.4250 105 102.5 794373403.56
A4 9754012.0030 110 107.5 1048556290.32
A5 9967735.2420 115 112.5 1121370214.73
A6 9460241.9470 120 117.5 1111578428.77
A7 9743464.4080 125 122.5 1193574389.98
A8 11364451.2070 130 127.5 1448967528.89
A9 19299052.0950 135 132.5 2557124402.59
A10 20471380.5690 140 137.5 2814814828.24
A11 19896639.3780 145 142.5 2835271111.37
A12 14889035.4890 150 147.5 2196132734.63
A13 11180614.4860 155 152.5 1705043709.12
A14 7829389.5250 160 157.5 1233128850.19
A15 2335670.5190 165 162.5 379546459.34
TOTAL 161365375.8460 21154302458.89 131.0957

Tabla I - 07

ABRIL

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


45
A1 313800.7410 50 47.5 14905535.20
A2 6169258.8310 55 52.5 323886088.63
A3 9389983.4550 60 57.5 539924048.66
A4 12203190.8770 65 62.5 762699429.81
A5 11914783.5820 70 67.5 804247891.79
A6 11674238.5910 75 72.5 846382297.85
A7 13732653.2200 80 77.5 1064280624.55
A8 23818211.8400 85 82.5 1965002476.80
A9 25164240.3860 90 87.5 2201871033.78
A10 21249531.6750 95 92.5 1965581679.94
A11 14531395.2100 100 97.5 1416811032.98
A12 9430915.8790 105 102.5 966668877.60
A13 1773172.0940 110 107.5 190616000.11
TOTAL 161365376.3810 13062877017.67 80.95217

Tabla I - 08

FIC-UNASAM 31
HIDROLOGIA SEMESTRE 2009-II

MAYO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


10
A1 4701097.1820 15 12.5 58763714.8
A2 13993885.1100 20 17.5 244892989
A3 18027807.8570 25 22.5 405625677
A4 17293701.1260 30 27.5 475576781
A5 26988322.2400 35 32.5 877120473
A6 36988801.9460 40 37.5 1387080073
A7 27241485.4440 45 42.5 1157763131
A8 14897168.2410 50 47.5 707615491
A9 1233067.5270 55 52.5 64736045.2
TOTAL 161365336.6730 5379174376 33.3354

Tabla I - 09

JUNIO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


0
A1 7685078.2310 5 2.5 19212695.58
A2 15101793.6490 10 7.5 113263452.37
A3 18131838.2290 15 12.5 226647977.86
A4 18305777.0660 20 17.5 320351098.66
A5 28954091.0540 25 22.5 651467048.72
A6 35488853.4190 30 27.5 975943469.02
A7 25360646.1370 35 32.5 824220999.45
A8 12337298.5410 40 37.5 462648695.29
TOTAL 161365376.3260 3593755436.94 22.2709

Tabla I - 10
JULIO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


0
A1 16994351.7860 2 1 16994351.79
A2 33541205.0570 4 3 100623615.17
A3 54204151.3250 6 5 271020756.63
A4 50146201.1200 8 7 351023407.84

FIC-UNASAM 32
HIDROLOGIA SEMESTRE 2009-II

A5 6479446.0750 10 9 58315014.68
TOTAL 161365355.3630 797977146.10 4.9452

Tabla I - 11
AGOSTO

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


2
A1 11890647.2750 4 3 35671941.83
A2 14862084.9490 6 5 74310424.75
A3 15609295.9320 8 7 109265071.52
A4 15643118.7300 10 9 140788068.57
A5 23823468.7430 12 11 262058156.17
A6 33155866.7480 14 13 431026267.72
A7 25074961.5210 16 15 376124422.82
A8 17438452.8060 18 17 296453697.70
A9 3867479.6760 20 19 73482113.84
TOTAL 161365376.3800 1799180164.92 11.1497

Tabla I – 12

SETIEMBRE

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


10
A1 1278703.7490 12 11 14065741.24
A2 6784408.5250 14 13 88197310.83
A3 7587826.7800 16 15 113817401.70
A4 9438746.4760 18 17 160458690.09
A5 9706537.0810 20 19 184424204.54
A6 9146313.6560 22 21 192072586.78
A7 9383983.6150 24 23 215831623.15
A8 10300093.6820 26 25 257502342.05
A9 17426895.6790 28 27 470526183.33
A10 20086963.7770 30 29 582521949.53
A11 19645818.7580 32 31 609020381.50
A12 15359358.7880 34 33 506858840.00
A13 11769938.6420 36 35 411947852.47
A14 9129781.8940 38 37 337801930.08
A15 4226895.3310 40 39 164848917.91
A16 93109.9450 42 41 3817507.75
TOTAL 161365376.3780 4313713462.94 26.7326

Tabla I - 01
OCTUBRE

FIC-UNASAM 33
HIDROLOGIA SEMESTRE 2009-II

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


25
A1 6229947.6530 30 27.5 171323560.46
A2 8928835.9820 35 32.5 290187169.42
A3 11800577.9650 40 37.5 442521673.69
A4 11801601.1460 45 42.5 501568048.71
A5 11365667.4540 50 47.5 539869204.07
A6 12388618.9160 55 52.5 650402493.09
A7 22002253.7540 60 57.5 1265129590.86
A8 24723800.6500 65 62.5 1545237540.63
A9 22171473.1810 70 67.5 1496574439.72
A10 15511676.3660 75 72.5 1124596536.54
A11 10829207.2410 80 77.5 839263561.18
A12 3611689.0720 85 82.5 297964348.44
TOTAL 161365349.3800 9164638166.77 56.7943

Tabla I - 02

NOVIEMBRE

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


30
A1 3328259.4990 35 32.5 108168433.72
A2 7065610.2200 40 37.5 264960383.25
A3 9043593.9870 45 42.5 384352744.45
A4 10599544.7360 50 47.5 503478374.96
A5 10038037.9710 55 52.5 526996993.48
A6 9957757.9330 60 57.5 572571081.15
A7 10496270.4020 65 62.5 656016900.13
A8 16453844.4360 70 67.5 1110634499.43
A9 21649065.4400 75 72.5 1569557244.40
A10 21223858.5500 80 77.5 1644849037.63
A11 16602487.6290 85 82.5 1369705229.39
A12 12495595.5280 90 87.5 1093364608.70
A13 9381706.0680 95 92.5 867807811.29
A14 3029743.9790 100 97.5 295400037.95
TOTAL 161365376.3780 10967863379.92 67.9691

Tabla I - 03
DICIEMBRE

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


40

FIC-UNASAM 34
HIDROLOGIA SEMESTRE 2009-II

A1 6499737.9300 45 42.5 276238862.03


A2 7253562.2030 50 47.5 344544204.64
A3 9339945.6080 55 52.5 490347144.42
A4 9790733.0580 60 57.5 562967150.84
A5 9378915.8590 65 62.5 586182241.19
A6 9381973.4190 70 67.5 633283205.78
A7 10119261.0010 75 72.5 733646422.57
A8 17614589.2290 80 77.5 1365130665.25
A9 19702213.2320 85 82.5 1625432591.64
A10 20155615.5030 90 87.5 1763616356.51
A11 16321319.3030 95 92.5 1509722035.53
A12 11997698.9150 100 97.5 1169775644.21
A13 8888304.3280 105 102.5 911051193.62
A14 4668782.5870 110 107.5 501894128.10
A15 252724.2050 115 112.5 28431473.06
TOTAL 161365376.3800 12502263319.39 77.4779

Tabla I - 04

ANUAL

A (m2) Pi (mm) Pn=(Pi+Pi+1)/2 (mm) A*Pn Pm (mm)


400
A1 5749045.7190 450 425 2443344430.58
A2 8587731.5910 500 475 4079172505.73
A3 11604583.0810 550 525 6092406117.53
A4 11860956.1310 600 575 6820049775.33
A5 11295542.6740 650 625 7059714171.25
A6 12106739.2080 700 675 8172048965.40
A7 20815525.9790 750 725 15091256334.78
A8 24672927.1160 800 775 19121518514.90
A9 22617908.2140 850 825 18659774276.55
A10 16128764.8130 900 875 14112669211.38
A11 11437820.6540 950 925 10579984104.95
A12 4487830.8430 1000 975 4375635071.93
TOTAL 161365376.0230 116607573480.28 722.6307

Tabla I - 06

FIC-UNASAM 35
HIDROLOGIA SEMESTRE 2009-II

PLANOS

ENERO

FIC-UNASAM 36
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 05

FEBRERO

FIC-UNASAM 37
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 06

MARZO

FIC-UNASAM 38
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 07

ABRIL

FIC-UNASAM 39
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 08
MAYO

FIC-UNASAM 40
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 09

JUNIO

FIC-UNASAM 41
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 10

JULIO

FIC-UNASAM 42
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 11

AGOSTO

FIC-UNASAM 43
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 12

SETIEMBRE

FIC-UNASAM 44
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 01
OCTUBRE

FIC-UNASAM 45
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 02
NOVIEMBRE

FIC-UNASAM 46
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 03
DICIEMBRE

FIC-UNASAM 47
HIDROLOGIA SEMESTRE 2009-II

Plano PI - 04
ANUAL

FIC-UNASAM 48
HIDROLOGIA SEMESTRE 2009-II

FIC-UNASAM 49
HIDROLOGIA SEMESTRE 2009-II

Plano PI – 13

FIC-UNASAM 50

Você também pode gostar