No.MRRDA/PMGSY/ACCTT/ / /2017.

Pradhan Mantri Gram Sadak Yojana


MRRDA, Sub.Divison Nanded.
Date:- / /2017.

To,
Executive Engineer( PMGSY)
MRRDA Nanded

Subject :- Name of Work:Upgradation of Road from SH-251 to Shikara-Mangyal-Kamjalga-


Dapkaraja Tq.Mukhed

Submitting here with the II nd RA bill of the above work duly recorded

in M.B.No.153 of page No.01 to 12 for favour of scrutiny and onward and payment to the

party concered.

Please return the M.B to this office after the payment.

M.B.No:- 153

R. M.B.No:-

Bill Rs.:-

Dy.Engineer (PMGSY)
MRRDA, Sub.Division Nanded.
Mukhay Mantri Gram Sadak Programme implemention unit,
MRRDA. Nanded.
NOTES Running Account Bill :- 9th
( For contractors and suppliers this from
provides Only for work or supplier actually Cash Book Voucher No. For the
measured.)
1) The full name of the work as given in the
estimate should be entered against the line Month of /2017.
Name Of Work' expect in the case of bill for
stock materials'.
2) The purpose of supply applicable to the
case should be filled in and the rest stored out.
3) If the outlay on the work is recorded be
sub-heads the total for each sub-head should be
shown in column 5 and agasinst this total there
should be UN entry in column 6 also in no Name of Contractors or supplier
other case should any entries be made in column6.
M/S,G.G.Construction,Nanded
Memorandumn of Payments
4) The figure against (k) should be tested to
Name of Work:Upgradation of Road
see that it agress with the total of Item 4 & 5.
from SH-251 to Shikara-Mangyal-
5) If the net amount to be paid is less than Kamjalga-Dapkaraja Tq.Mukhed
Rs.10 and it can not be included in a cheque
the payment should be made in cash the pay
order being altered suitably and alternation Purpose of Supply:work Done
attested by dated initials.
6) The payees acknowledgement should be for
she gross amount paid as per item 5. Serial No.of the Bill : 9th RA BILL
( i.e.a+b+c) Bill for this work:
7) Payment should be attested by some
known person whem the payee's Reference to Agreement of:NDD-23
acknowledgement is given by a mark seal or
thumb-impression.
8) The coloumn'figures for works Abstract'is Date of order to commencement
not required in the case of suppliers. The work: NDD-23
Account Classification Dt. 20.3.2018
Major head- Due date for
PLAN WORKS Completion of the work:
Date:-
NON PLAN WORKS { ORIGINAL WORKS a) Commun-
Extension granted,if an
From time to the with
Head Repairs & Maintenance Buildiung Reference to authority-
Sub Iiead or Actual date of Completion
Detailed Head 1) Security deposit to be recovered as
per agreement.
Provision during the Rs. 2) Security deposit previously
Current Year recovered
Expenditure incurred Rs. 3) Security deposit to be recoveered
During the current year from this bill.
Balance available Rs. 4) Balance to be recovered.
a) Score out what is not a
I.ACCOUNT OF WORK EXECUTED

Quantity executed (for


supplied) up-to date as
Amount

per Measurment
Item of work supplies ( grouped under sub- up-to-date Since
Unit Sr.no Rate
heads or sub-works of estimate) prevoius
(Total for
cash
5 sub-head)

6
1 2 3 4 Amount
Rs. Rs. Rs.
Clearing and grubbing road land 25947.35
Hect 1 13.729 including uprooting wild vegetation, 356,231
grass, bushes, shrubs, saplings and
Scarifying the existing bituminous road 11.27
Sqm 2 6,142.00 trees of girth upto 300 mm, removal of
surface to a depth of 150 mm and 69,220
stumps of such trees cut earlier and
disposal of scarified material with a lift
disposal of unserviceable
Excavation for roadwork inmaterials soil with and
Cum 3 upto 3 m and lead upto 1000 m as per 1,602,733
stacking of
hydraulic serviceable
excavator of material
0.9 to be
cum bucket
27633.32 Technical Specification Clause 58.00
used or auctioned,
capacity including cutting upto a lead of 1000
and loading
301.4.Including
Excavation in Compaction
ordinary rock in original
using
4 m tippers,
in includingtrimming
removal and
bottom disposal
and side of 275,298
Ground
1037.88 manual means 265.25
top organic
slopes, in soil including
accordancenot exceeding
with loading 150in mm
a
truck and carrying
Construction
in thickness asofper of of excavated
embankment
Technical with
5 8289.97 requirements
material to materials
lines,
embankment
grades and
site with 58.10 481,647
approved
Specification
cross-sections, Clause deposited
201.
and transporting toa
at lift
site
the
up fromto 1.5 m
roadway
embankmentof and lead
cutting
location uptoand 50 m as
excavation
with a lift upto
Construction Embankment with
6 15639.00 directed
1.5from
approvedm and bylead
drain Engineer.
and
materials upto etc complete.
foundation
1000 m asof other
per 426.75 6,673,943
structures
Technical graded andClause
Specification compacted 302.3to
meet requirement of
Construction of sub grade and earthen Tables 300.1 and 436.58
7 6343.68 300.2 as per Technical Specification 2,537,472
shoulders with approved material 400.00
obtained fromof Clause
borrow 301.5
pitssub-base
with all lifts
Construction granular by
8 662.00 and leads, transporting to site, 857,191
providing well graded material, 1294.85
spreading,in
spreading grading
uniform tolayers
required with slope
motor
Providing,
and compacted
laying, spreading
to meet
and
requirement
Cum 9 grader on prepared surface, mixing byof 14,975,087
7209.96 compacting
Table
mix in300.2placewith
stonelead aggregates
method with uptorotavator
1000of specific
m as at 2077.00
per
OMC, Technical
and compacting
Construction Specification
of penetrationwith Clause
smooth
macadam
10 303.1. 3,895,565
22878.75 wheel overroller
prepared to achieve
base by the desireda
providing 170.27
density,
layer of complete
compacted as per Technical
crushed coarse
ConstructionClause
Specification of un-reinforced,
401.spreaderdowel
aggregate using chips with 7619.02
14 jointed at expansion and construction 2,392,956
alternate applications of bituminous
317.25 joint only, plain cement concrete 7542.81
binder and key aggregates and rolling
pavement, thickness as per design,
with a three
Providing wheelof80-100 kN static
Each 18 over a andpreparedfixing subtypical
base,MMGSY with 43 77,057
roller to achieve the desired degree of
4.00 grade cement or any other typeas
informatory sign board with Logo asperper 19264.25
MORD compaction
specifications as per
and Technical
drawing
Clause 1501.2.2
Providing and fixingM30 (Grade), coarse
aClause
typicalMMGSY
Specification 506.
Each 19 and
Citizen fine aggregates
information board conforming
as per to 61,500
4.00 IS:383, maximum size of coarse 15375.00
specification
aggregateofnot
Dismantling exceeding
existing structures25 mm, like
Cum 21 mixed
culverts, in a concrete
bridges, mixer
retaining of
wallsnot less
and 20,216
52.00 388.77
than 0.2
other cum capacity
structures comprising and appropriate
of brick
Earthwork
weigh batcher
masonry, in excavation
including using for structures
approved
disposal of mix
Cum 22 as per drawing and technical 234,141
design, laidmaterial
595.52 unserviceable in approved and fixed
stackingside 393.17
specifications
the formwork
serviceable Clause
(steel material 305.1
channel, with including
laying and
all lift and
Providing
setting out,and laying
construction of dry of rubble
shoring and
Cum 23 leadfixing
of of
1000 125 m micron
as per thick
Technical polythene 270,439
128.50 flooring
bracing, complete
removal
film, wedges,steel
asstumps
of per drawings
plates and and
other
including 2104.58
Specification
technical Clause
specifications 202. Clause 1303.3
deleterious
levelling thematerial formwork and asdisposal upto
per drawing),
a spreading
lead of 50 the m, dressing
concrete of withsides and
shovels,
bottom and backfilling
rakes, compacted using inneedle,
trenches with
screed
excavated
and plate suitable
vibrators material.
and finished In in
Ordinary soil uptp
continuous 3m depth
operation including
provision of contraction and expansion,
construction joints, applying debonding
strips, primer, sealant, dowel bars,
near approaches to bridge/culvert and
construction joints, admixtures as
approved, curing of concrete slabs for
14-days,using curing
compound.....Specification Clause 1501
Quantity executed (for
supplied) up-to date as
Amount

per Measurment
Item of work supplies ( grouped under sub- up-to-date Since
Unit Sr.no Rate
heads or sub-works of estimate) prevoius
(Total for
cash
5 sub-head)

6
1 2 3 4 Amount
Rs. Rs. Rs.
Providing concrete for plain/reinforced
Cum 24 concrete in open foundations complete 349,977
68.19 5132.38
as per drawings and technical
Providing concrete for plain/reinforced
Cum 25 specifications Clause 802, 803, 1202 & 1,784,705
329.35 concrete in open foundations complete 5418.87
1203 P.C.C grade M 10
as per drawings and technical
Providing and laying
specifications Clausereinforced
802, 803, cement
1202 &
Rmt 27 826,690
132.50 concrete
1203 pipe CC M-15 culverts
NP3 for includingon first 6239.17
class bedding
Providing
mixing, placing ofingranular
selected hard work
form material
murum inetc
filling
cuning
Cum 28 single row
including including fixing collar
complete.laying in layers of 15 cm. to with 543,510
858.07 cement mortar 1:2 but excluding 633.41
20 cm. thick layers including watering
excavation,
and compactingprotection works, roller. To Total
with vibratary 38285578
backfilling, concrete
100% of max dray density and masonry
etc. Add BLOW 1% 382856
works in head
complete walls and
as directed by parapets
Engineer in
Clause
charge.1106
PWD 600DSRmm dia CD.14 Page Total Rs.
Spec.No.
37902722
Deduct R.A.Bill I st Amount 7242420.00
No. 167 Deduct R.A.Bill IInd Amount 3963216.00
Deduct R.A.Bill IIIrd Amount 2001300.00
Deduct R.A.Bill IIVth Amount 7729700.00
Deduct R.A.Bill Vth Amount 4022753.00
Deduct R.A.Bill VIth Amount 3560338.00
Deduct R.A.Bill VIIth Amount 2948417.00
Deduct R.A.Bill VIIIth Amount 3859133.00
Total 35327277.00
Net Amount Rs. 2575445

II Certificate and Signature

The Measurment were made by ShriN.J.Munde Jr.Eng (PMGSY) and are recorded on page No.66 to 67
Measurment Book No.153 No advance payment has been made previously without detailed Measurment.

Date. / /2017. Dy.Engineer P.M.G.S.Y


MRRDA Sub.Divn.Nanded.
Dated Signature of the contractor.
countersinged

The Second signatiure is only necessary when the office who narwhals the bill is not officer who make the Payment.
MRRDA SUB.DIVISION (PMGSY) Nanded
RECOVERY STATEMENT
Name of Work:Upgradation of Road from MDR 2 To LOKARWADI, NAYAKWADI
M.B.No. 98

Sr.No Name of Quantity issued Rate as per Total Amount Amount Amount be Remarks.
Material to Contractor Tender Already recovered
recovered from this bill

1 2 3 4 5 6 7 8

NILL

Deputy Engineer(PMGSY)
MRRDA Nanded
MRRDA SUB.DIVISION (PMGSY) NANDED
FORM NO.77 ROAD METAL RETURN
Statement of Receipt issues and Balance of Road Metal during the month
Name of Work:Upgradation of Road from MDR 2 To LOKARWADI, NAYAKWADI
MB NO.98

K.M.No Name of Metal Opening Received during Total Expended during Closing Actual check Remarks
Measurment

balance month month balance Date Result


1 2 3 4 5 6 7 8 9 10

1 NIL

Deputy Engineer(PMGSY)
MRRDA Nanded
MRRDA SUB.DIVISION (PMGSY) OSMANABAD.
STEEL CONSUMATION STATEMENT

Name of Work:Upgradation of Road from MDR 2 To LOKARWADI, NAYAKWADI


MB No. 06

Sr.No Item of work done Approx Quantity of work Rate of Quantity of Steel Total Quantity of Steel Quantity ofSteel actually

done Required to be used which should have been

Quantity Unit Quantity Unit used as per design quantity used quantity
1 2 3 4 5 6 7 8

1 Abutment, Pier,Cap #REF! MT #REF! MT #REF! #REF!


2 Slab #REF! MT #REF! MT #REF! #REF!
Total #REF!

Deputy Engineer(PMGSY)
MRRDA Osmanabad
MRRDA SUB.DIVISION (PMGSY)Nanded
CEMENT CONSUMATION STATEMENT
Name of Work:Upgradation of Road from SH-251 to Shikara-Mangyal-Kamjalga-Dapkaraja
Tq.Mukhed MB No.153

Sr.No Item of work done Approx Quantity of work Rate of Quantity of Total Quantity of Cement Quantity of Cement
done cement Required to be which should have been actually used quantity
used used as per design quantity

Quantity Unit Quantity Unit

1 2 3 4 5 6 7 8
Construction of
un-reinforced,
14 dowel jointed at 317.25 Cum 7.5 Bag 2379.38 2380
expansion and
construction
concrete in open
foundations
24 68.19 Cum 5 Bag 340.95 342
complete P.C.C. M-
10
Providing
concrete for
plain/reinforced
25 concrete in open 329.35 Cum 5.5 Bag 1811.43 1812
foundations
complete CC
M-15

Total= 4535

Deputy Engineer(PMGSY)
MRRDA Nanded
MUKHAY MANTRI GRAM SADAK YOJANA .MRRDA SUB.DIVISION Nanded
Statement of Quantity of Material Consumed & Royalty
Name of Work:Upgradation of Road from SH-251 to Shikara-Mangyal-Kamjalga-Dapkaraja Tq.Mukhed MB No:-153

Amount
If royalty
A.A of Work Amount Royalty of Royalty Royalty tobe
Sr. Date of Amount yet paid its
Name of Works Amount in done paid upto Quantity of material used used paid upto recovered Remarks
No start to be paid chalan
Lakhs upto date date material date from this bill
copy
in Lakhs
1 2 3 4 5 6 7 8 9 10 11 12 13
Construction of
Embankment with 15639.01 1.00 15639.01 141.34 -- 2210418.00 -- --
6 approved materials
Construction of sub
6343.68 1.00 6343.68 141.34 -- 896616.00 -- --
7 grade and earthen
shoulders with
Construction of
approved material 662.00 1.28 847.36 141.34 -- 119766.00 -- --
8 granular sub-base by
obtained from borrow
9 providing
Construction
pits
well graded
G-II with all oflifts and 7209.96 1.50 10814.94 141.34 -- 1528584.00 -- --
material, spreading in
penetration
leads, macadam to
transporting
uniform
10 over layers with
site, prepared
spreading, base by 22878.75 0.078 1784.54 141.34 -- 252227.00 -- --
motor grader
Construction
providing of on
a layer of
grading to required
prepared surface,
14 un-reinforced,
compacted
slope and
mixingatby
dowel
compacted
mix in and 317.25 1.35 428.29 141.34 -- 60534.00 -- --
jointed expansion
to meet requirement
place method
23 construction
dryTable
rubble stonewith
flooring 128.50 1.20 154.20 141.34 -- 21795.00 -- --
of 300.2 with
rotavator at OMC,
lead
and compactingm
upto
concrete in1000
open as
with
24 per Technical
foundations
smooth complete
wheel roller 68.19 1.35 92.06 141.34 _ 13011.00 -- _
Specification
P.C.C. M-10 theClause
to achieve
303.1.
desired density,
Providing
completeconcrete
as per for
plain/reinforced concrete
25 Technical 329.35 1.35 444.62 141.34 _ 62843.00 -- _
in open foundations
Specification Clause
completeCC M-15
401.

28 selected hard murum 858.07 1.00 858.07 141.34 _ 121280.00 -- _


filling
Total 5287074.00
Royalty paid in Ist R.A Bill P.N.13 493786.00
Royalty paid in IInd R.A Bill P.N.17 400319.00
Royalty paid in IIIrd R.A Bill P.N.24 99212.00
Royalty paid in IVth R.A Bill P.N.153 1698674.00
Royalty paid in Vth R.A Bill P.N.26 882952.00
Royalty paid in VIth R.A Bill P.N.27 800000.00
Royalty paid in VIIth R.A Bill P.N.28 500000.00
Royalty paid in VIIIth R.A Bill P.N.29 38591.00
Total 4913534.00
Net Total 373540.00

Deputy Engineer (PMGSY)


MRRDA Nanded
MRRDA,( MMGSY) Nanded
Package No.NDD-23
Abstract of Comparative statement
Sr. Name of work Sanction GOI Cost A) Total Cost of
No. work RS-

1
Name of Work:Upgradation of Road from
SH-251 to Shikara-Mangyal-Kamjalga- 687.32 35397096
Dapkaraja Tq.Mukhed

Total Rs- 687.32 35397096.00

Add below 1% 353970.96

Total GOI Cost Rs- 687.32 35043125

Dy. Engineer (PMGSY) Executive Engineer (PMGSY)


MRRDA Nanded MRRDANanded
DETAILED COMPARATIVE REPORT
NAME OF PIU----Nanded

Name of Work :MSH-16 TO Juna Lobha Tanda ODR-167 Road

PERCENTAGE OF Saving-- 0.00 %


Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

1 2 3 4 5 6 7 8 9 10 11
1 Upgradation of Road from MSH-16 To Juna, Lobha Tanda,
ODR-167 Road Tq.Mukhed Dist.Nanded
Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth
upto 300 mm, removal of stumps of such trees cut earlier
and disposal of unserviceable materials and stacking of Hectare 3.49 22426.74 78269.32 3.550 22426.74 79615.00 1.72 -- 1346 1.72
serviceable material to be used all auctioned up to lead of
1000m including removal and disposal of top organic soil not
exceeding 150mm in thickness as Directed by Engineer In-
charge etc complete.
in area of non thorny gungles
2 Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth
upto 300 mm, removal of stumps of such trees cut earlier
and disposal of unserviceable materials and stacking of
serviceable material to be used all auctioned up to lead of
1000m including removal and disposal of top organic soil not Hectare 2.33 23643.70 55089.82 2.37 23643.70 56036.00 1.72 -- 946 1.72
exceeding 150mm in thickness as Directed by Engineer In-
charge etc complete.
in area of thorny gungles

3 Excavation for roadway in soil by mechanical means


including cutting and pushing the earth to site of
embankment up to a distance of 100 m including trimming
bottom and side slopes in accordance with requirements of
lins, grades and cross-section
Cum 12120.09 63.04 764050.47 0.00 63.04 0.00 -100.00 764050 -- -100.00

4 Excavation for roadway in soil by mechanical means


including cutting and pushing the earth to site of
embankment up to a distance of 1000 m including trimming
bottom and side slopes in accordance with requirements of
lins, grades and cross-section
Cum 34256.96 60.80 2082823.17 17650.31 60.80 1073139.00 -48.48 1009684 -- -48.48
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

5 Excavation for roadway in ordinary rock with hydraulic


excavator of 0.9 cum bucket capacity including cutting and
loading in tippers, transporting to embankment site with a
lift upto 1.5 m and lead upto 100 m, trimming bottom and
side slopes in accordance with requirements of lins, grades
and cross-section as Directed by Engineer. Cum 2854.75 106.08 302831.88 11178.53 106.08 1185818.00 291.58 -- 882986 291.58

6 Excavation for roadway in ordinary rock with hydraulic


excavator of 0.9 cum bucket capacity including cutting and
loading in tippers, transporting to embankment site with a
lift upto 1.5 m and lead upto 1000 m, trimming bottom and
side slopes in accordance with requirements of lins, grades
and cross-section as Directed by Engineer. Cum 7993.29 97.30 777747.12 0.00 97.30 0.00 -100.00 777747 -- -100.00

7 Excavation for roadway in hard rock with hydraulic excavator


of 0.9 cum bucket capacity including cutting and loading in
tippers, transporting to embankment site with a lift upto 1.5
m and lead upto 1000 m, trimming bottom and side slopes
in accordance with requirements of lins, grades and cross-
section as Directed by Engineer. Cum 570.95 300.40 171513.38 588.34 300.40 176737.00 3.05 -- 5224 3.05

8 Earth work for Embankment-Construction of embankment in


desired shape and size with approved material disposed at
site from roadway cutting and excavation of drains and
foundation of the structures including setting out stripping
the top soil to 150mm including making horizontal benches
in the existing embankment compacting watering the Cum 52571.21 59.26 3115369.90 16696.10 59.26 989411.00 -68.24 2125959 -- -68.24
earthwork in layers not exceeding 200 mm with vibratory
roller to a 98% of maximum lab dry density

9 Scarifying the existing bituminous road- Scarifying the


existing bituminous road surface to a minimum depth of 150
mm All the particles shall be reduced by breaking it to
maximum size of 50mm to produce a uniform layer. The
surface then shall be compacted with vibratory roller
Sqm 9101.25 13.26 120682.58 15168.75 13.26 201138.00 66.67 -- 80455 66.67
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

10 Construction of granular sub-base of Grading 1 by providing


well graded material, spreading in uniform layers with motor
grader on prepared compacted surface, mixing by mix in
place method with rotavator at OMC in required Grade and
camber watering and compacting with Vibratory roller to
achieve at least 100% of maximum dry density for the Cum 4438.37 1272.69 5648653.14 3668.40 1272.69 4668723.00 -17.35 979930 -- -17.35
material determined.

11 G II WBM Providing ,laying, Spreading and Compacting


stone aggregate of specific size to water bound macadam
specification and transporting the material, preparation
surface, spreading in uniform thickness, hand packing,
rolling with vibratory roller stages to proper grade and
camber and super elevation, applying and booming stone Cum 5087.71 1645.07 8369625.86 3865.17 1645.07 6358465.00 -24.03 2011161 -- -24.03
screening and binding material to fill up the coarse
aggregate watering and compacting to required density.

12 Construction of Penetration macadam over prepared base


including providing a Layer of Compacted crushed coarse
aggregate and camber alternative application of bitumen
binder with bitumen sprayer at rate 175 175kg/100sqm 8
Spreading key aggregate rolling with vibratory roller to
active the desired degree and comber etc Sqm 36085.68 152.89 5517009.53 27250.50 152.89 4166231.00 -24.48 1350779 -- -24.48

13 Providing and applying tack coat with Bitumen Emulsion RS-


1 using pressure distributor at the rate of 0.25 to 0.30 kg
per sqm on the prepared Bitumenous surface cleaned with
air compressor hydraulic broom including cleaning surface,
arrengement of traffic etc complet.
Sqm 36085.68 8.64 311817.15 27250.50 8.64 235472.00 -24.48 76345 -- -24.48

14 Providing laying and rolling of open graded premix carpet as


wearing coarse of 20 mm thickness composed of 13.20mm
to 5.60mm aggregate using 60to70 grade (S-65) bitumen to
the required line, grade and camber on a previously
prepared base including mixing aggregate and binder on a
suitable hot mix paints, laying with mechanical paver Sqm 36085.68 114.86 4144719.15 27250.50 114.86 3129930.00 -24.48 1014789 -- -24.48
finisher and rolling with a power roller finished to required
grades camber etc complete.
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

15 Seal coat- Providing and laying liquid seal coat of type A and
sealing wide in a bituminous surface laid to the specified
level grades and cross fall including transporting materials
cleaning surface to remove loose material dirt and dust,
cleaning surface with compressor, heating bitumen to 1500
to 1630 c spraying with mechanical sprayer at the rate of Sqm 36085.68 40.15 1448843.95 27250.50 40.15 1094111.00 -24.48 354733 -- -24.48
9.80 kg/10 sqm spreading stone chips at rate 0.09
cum/10sqm, rolling with 80 to 100 Kn static weight Vibratory
roller as directed by engineer in charge.
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

16 Reinforced cement concrete M15 grade kilometre


stone/local stone of standard design as per IRC:8 fixing in
position including painting and printing, etc as per drawing
and Technical Specification Clause 1703
5th KM Stones precast
Each 2.00 3666.80 7333.60 1.00 3666.80 3667.00 -50.00 3667 -- -50.00

17 Reinforced cement concrete M15 grade kilometre


stone/local stone of standard design as per IRC:8 fixing in
position including painting and printing, etc as per drawing
and Technical Specification Clause 1703
KM Stones precast
Each 9.00 2145.88 19312.92 7.00 2145.88 15021.00 -22.22 4292 -- -22.22

18 Reinforced cement concrete M15 grade 200 m stone stone


of standard design as per IRC:8 fixing in position including
painting and printing, etc as per drawing and Technical
Specification Clause 1703

Each 40.00 612.30 24492.00 31.00 612.30 18981.00 -22.50 5511 -- -22.50

19 Reinforced cement concrete M15 grade boundary


pillars/local stone of standard design as per IRC:25, fixed in
position including finishing and lettering but excluding
painting as per drawing and Technical Specification
Clause 1704
Each 564.00 541.52 305417.28 484.00 541.52 262096.00 -14.18 43321 -- -14.18

20 Providing and fixing of typical MMGSY informatory sign board


with Logo as per MORD specifications and drawing. Three MS
Plates of 1.6 mm thick, top and middle plate duly welded
with MS flat iron 25mm x 5m size on back on edges. The
lower plate will be welded with MS angle iron frame of
25mm x 25mm x 5mm. The angle iron frame of the lower Each 3.00 16830.00 50490.00 3.00 16830.00 50490.00 0.00 -- -- 0.00
most plate and flat iron frame of middle plate will be welded
to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly
embedded in cement concrete M-15 grade blocks of 450mm
x 450mm x 600mm, 600mm below ground level. The top
most diamond plate will be welded to middle plate by 47mm
x 47mm of 12 SWG steel plate tube. All M.S. will be stove
enameled on both sides. Lettering and printing arrows,
border etc. will be painted with ready mixed synthetic
enamel paint of superior quality in required shade and
colour. All sections of framed posts and steel tube will be
painted with primer and two coats of epoxy paint as per
drawing Clause 1701 and Annexure 1700.1 (I.NO-10.16)
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

21 Providing and fixing of typical MMGSY informatory sign board


with Logo as per MORD specifications and drawing. Three MS
Plates of 1.6 mm thick, top and middle plate duly welded
with MS flat iron 25mm x 5m size on back on edges. The
lower plate will be welded with MS angle iron frame of
25mm x 25mm x 5mm. The angle iron frame of the lower Each 3.00 19329.62 57988.86 3.00 19329.62 57989.00 0.00 -- 0 0.00
most plate and flat iron frame of middle plate will be welded
to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly
embedded in cement concrete M-15 grade blocks of 450mm
x 450mm x 600mm, 600mm below ground level. The top
most diamond plate will be welded to middle plate by 47mm
22 Providing
x 47mm ofand 12 fixing of semi
SWG steel reflective
plate cautionary,
tube. All mandatory
M.S. will be stove
and informatory
enameled on bothsign board
sides. as per IRC:67
Lettering made of
and printing 1.5 mm
arrows,
thick
borderMS Sheet
etc. duly
will be stove white
painted colourmixed
with ready in front and gray
synthetic
colour
enamelon backofwith
paint red reflective
superior quality inborder of 65
required mmand
shade width
and required
colour. letters of
All sections and figures
framed withand
posts reflective tapewill be
steel tube
engineering
painted with grade
primerasand pertwoClause
coats1701.3.9
of epoxyofpaint
MORD perRural Each
asfor 90.00 2425.56 218300.40 90.00 2425.56 218300.00 0.00 0 -- 0.00
Roads
drawing of Clause
required shade
1701 andand colour supported
Annexure and welded
1700.1 (I.NO-10.16)
on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the
ground by mean of properly designed foundations with M-15
grade cement concrete 450x450x600 mm, 600 mm below
ground level as per approved drawing Clause 1701.2.2
23 Providing
(600 mm Equiand fixing of semi
Triangulr board)reflective cautionary, mandatory
and informatory sign board as per IRC:67 made of 1.5 mm
thick MS Sheet duly stove white colour in front and gray
colour on back with red reflective border of 65 mm width
and required letters and figures with reflective tape
engineering grade as per Clause 1701.3.9 of MORD for Rural Each 12.00 3511.96 42143.52 12.00 3511.96 42144.00 0.00 -- 0 0.00
Roads of required shade and colour supported and welded
on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the
ground by mean of properly designed foundations with M-15
grade cement concrete 450x450x600 mm, 600 mm below
ground level as per approved drawing Clause 1701.2.2
24 Dismantling
(600 mm Square of existing
board)structures like culverts, bridges,
retaining walls and other structures comprising of brick
masonry, including disposal of unserviceable material and
stacking the serviceable material with all lift and lead of
1000 m as per Technical Specification Clause 202.
Cum 71.00 384.04 27266.84 71.00 384.04 27267.00 0.00 -- 0 0.00

25 Removing all types of Hume pipes and stacking within a lead


of 1000 m including Earthwork and Dismantling of Masonry
Works as per Technical Specification Clause 202 as directed
by Engineer in charge etc complet.
600 mm to 900 mm dia
Rmt 45.00 376.90 16960.50 45.00 376.90 16961.00 0.00 -- 1 0.00
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

26 Removing all types of Hume pipes and stacking within a lead


of 1000 m including Earthwork and Dismantling of Masonry
Works as per Technical Specification Clause 202 as directed
by Engineer in charge etc complet.
above 900 mm dia
Rmt 7.50 645.26 4839.45 7.50 645.26 4839.00 -0.01 0 -- 0.00

27 Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of side as directed by Engineer in charge etc
complet. Cum 476.46 196.86 93795.92 643.25 196.86 126630.00 35.01 -- 32834 35.01
ordinory soil

28 Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of side as directed by Engineer in charge etc
complet. Cum 206.92 536.72 111058.10 350.88 536.72 188324.00 69.57 -- 77266 69.57
ordinory Rock

29 Earthwork in excavation for structures as per drawing and


technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of side as directed by Engineer in charge etc
complet. Cum 158.83 718.80 114167.00 0.00 718.80 0.00 -100.00 114167 -- -100.00
Hard rock

30 Providing concreting for plain/reinforced concrete in open


foundation as per drawing and technical specification for CC
M10 including transporting all material mixing, placing in
form work compacting with needle vibrators of suitable size
finishing and curing etc. complete.
Cum 80.46 4808.54 386895.26 130.59 4808.54 627947.00 62.30 -- 241052 62.30
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

31 Providing concreting for plain/reinforced concrete in open


foundation as per drawing and technical specification for CC
M15 including transporting all material mixing, placing in
form work compacting with needle vibrators of suitable size
finishing and curing etc. complete.

Cum 63.42 4903.85 311002.17 0.00 4903.85 0.00 -100.00 311002 -- -100.00

32 Providing Laying cement concrete pipe of NP3 for Culverts


on bedding of concrete M10 with thickness of 15cm in a
required single row, before laying pipe, shall be tested at the
place of manufacturing, pipe shall be laid after approval of
foundation be Engineer in charge. cushioning of 600mm,
including fixing coller joint with cement mortar 1:2 finishing
and curing. Rmt 100.00 7094.00 709400.00 122.50 7094.00 869015.00 22.50 -- 159615 22.50
1000 nn

33 Providing Laying cement concrete pipe of NP2 for Culverts


on bedding of concrete M10 with thickness of 15cm in a
required single row, before laying pipe, shall be tested at the
place of manufacturing, pipe shall be laid after approval of
foundation be Engineer in charge. cushioning of 600mm,
including fixing coller joint with cement mortar 1:2 finishing Rmt 150.00 1797.54 269631.00 150.00 1797.54 269631.00 0.00 -- -- 0.00
and curing.
600 nn

34 Plain/reinforced cement concrete in substructure


complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204
I.i ) P.C.C grade M 15 / Nominal mix (1:2.5:5)

Cum 834.83 5227.29 4363898.51 931.37 5227.29 4868541.00 11.56 -- 504642 11.56
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

35 Filler Joint
(V) Providing Tar paper bearing of approved quality in proper
size etc. complete (Rate as per PWD CSR 2017-18)

sqm 28.73 61.20 1758.15 0.00 61.20 0.00 -100.00 1758 -- -100.00

36 Plain/reinforced cement concrete in substructure


complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204
I.iii ) R.C.C grade M 20

Cum 13.12 5769.05 75689.99 0.00 5769.05 0.00 -100.00 75690 -- -100.00
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

37 Providing and laying reinforced cement concrete in


superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5
II) R.C.C M 25

Cum 47.08 6540.73 307937.76 0.00 6540.73 0.00 -100.00 307938 -- -100.00

38 Providing and laying cement concrete wearing course M


30 grade Excluding reinforcement complete as per
drawing and technical specifications Clauses 800 and
1206.3

Cum 252.38 6666.39 1682463.51 431.41 6666.39 2875947.00 70.94 -- 1193483 70.94

39 Supplying, fitting and placing TMT bar reinforcement, in


substructure complete as per drawings and technical
specifications Clauses 1000 and 1202 SOR Item No-11.8 -
TMT Bar Reinforcement, Including cutting bending hooking
placing in position. tying with stainless steel binding wire etc
complete. MT 22.19 45771.61 1015690.33 21.571 45771.61 987339.00 -2.79 28351 -- -2.79

40 Supplying, fitting and placing TMT bar reinforcement, in


superstructure complete as per drawings and technical
specifications Clauses 1000 and 1202 SOR Item No-11.8 -
TMT Bar Reinforcement, Including cutting bending hooking
placing in position. tying with stainless steel binding wire etc
complete. MT 3.77 47268.37 178031.59 0.00 47268.37 0.00 0.00 0 0 -100.00

41 I) Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment, wing wall,
return wall with 100 mm dia AC pipe extending through the
full width of the structures with slope of 1(V):20(H) towards
drawing face complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7 Each 598.00 209.82 125472.36 598.00 209.82 125472.00 0.00 0 0 0.00
b) P.V.C. pipe 100 mm dia
Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

42 Providing and laying filter media with granular crushed


aggregates as per specification to a thickness of not less
than 600 mm with smaller size towards the soil and
bigger size towards the wall and providing over the entire
surface behind abutment, wing wall, return wall to the full
height, compacted to firm condition complete as per drawing Cum 172.63 1818.05 313853.95 150.75 1818.05 274071.00 0.00 0 0 -12.68
and technical specification Clause 1204.3.8

43 Construction of flexible apron 1 m thick comprising of


loose stone boulders weighing not less then 25 kg beyond
curtain wall

Cum 86.20 1439.53 124087.66 0.00 1439.53 0.00 0.00 0 0 -100.00

44 Drainage spouts complete as per drawing and technical


specifications Clause 1209

Each 8.00 1600.42 12803.38 0.00 1600.42 0.00 0.00 0 0 -100.00

45 ii) Providing and fixing 20 mm thick compressible fibre


board in expansion joint complete as per drawing
and technical specifications(250mm deep)

Rmt 132.00 380.56 50233.92 0.00 380.56 0.00 0.00 0 0 -100.00

46 iii) Providing and fixing in position 20 mm thick premoulded


joint filler in expansion joint for fixed ends of simply
supported spans, covered with sealant complete as per
drawing and technical specifications

Rmt 31.92 380.56 12147.48 132.00 380.56 50234.00 0.00 0 0 313.53


Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

47 Providing and fixing in position pipe railing consisting of IS


Rolled steel joist posts designation IS MB 100 (100x50) at
2.5 m interval and three rows of 50 mm dia steel pipes
(light) including fixing in position on bridge deck
complete as per drawing and technical specifications
Clause 1208.2 RMT 25.56 1665.75 42576.67 0.00 1665.75 0.00 0.00 0 0 -100.00

48 Painting two coats including primer coat after filling the


surface with synthetic enamel paint in all shades on
new, plastered / concrete surfaces as per drawing and
Technical Specification Clause 1701

Sqm 14.99 125.46 1880.65 7.20 125.46 903.00 0.00 0 0 -51.97

49 Printing new letter and figures of any shade with synthetic


enamel paint black or any other approved colour to give an
even shade as per drawings and Technical Specification
Clause 1701

Per cm heig 1200.00 0.72 864.00 640.00 0.72 461.00 0.00 0 0 -46.67

Total 43988931.13 35397096 -19.53 11360875 3177559

Add above4.97 % 1759236

ADD FOR CGST AND SGST 12% ADD FOR CGST AND SGST 12% 4247652

ADD FOR ROYALTI AS PER STATEMENT 1629756

A) Total Cost of work RS- 43033739


Extra Item Proposed

Construction of embankment with approved material obtained from


borrow pits with a lift up to 1.5 m, transporting to site, spreading,
1 grading to required slope and compacting to meet requirement of 2676.55 345.24 924051.00
tables 300.1 and 300.2 with a lead up to 1000 m as per Technical
specification Clause 301.2

2 Construction of Shoulders as per Technical specification clause 407 9645.00 354.92 3423203.00

GOI COST- 511.19Lack B) Extra Item Cost 4347254.00


Sr.N Item of Work As per santioned As per Work done Qty Diff in % Less Excess Remark /
o. Reason
Quantity Rate Amount Quantity Rate Amount Percentage of
Cum
qty. Less/Excess

EIRL 1) Royalty 2676.55 1.00 2676.55 141.34 378303.22

EIRL 2) Royalty 9645.00 1.00 9645.00 141.34 1363224.30

EIRL 1) GST 12% 110886.12 110886.12

EIRL 2) GST 12% 410784.36 410784.36

Total Revised Cost of Project ( A + B ) 49644191

478.91

As the expenditure on work is within GOI Cost submitted for approval less/Excess of quantities for work.
SAVING -32.28

Jr. Engineer Deputy Engineer


MUKHYA MANTRI GRAM SADAK YOJANA (MMGSY)
Maharashtra Rural Road Development Association
MMGSY / Year 2017-2018
COST ESTIMATE FOR 4 VENT H.P. CULVERT
Name of Road :- Name of Work :MSH-16 TO Juna Lobha Tanda ODR-167 Road Block :- Mukhed
road from Km : 0/00 TO 9/00 District :- Nanded
Length in Km. 9/00 Package No. NDD- 62
No.of C.D. 3/100, 3/500

MEASUREMENT & ABSTRACT


No. ITEM OF WORK NO L B D QUTY RATE UNIT AMOUNT (Rs.)
1 Excavation for sturctures
Earthwork in excavation for structures as per drawing and technical
specifications
I. Ordinary soilclause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious material
(SORdisposal
and Item no.11.1
upto /apage
leadno.
of 87
50) m, dressing of sides and bottom and
backfilling
(I) Upto 3.0inom
trenches
depth with excavated suitable material
Chainage = 3/100 U/S Head wall 1 15.00 1.75 1.20 31.50
Chainage = 3/500 U/S Head wall 1 15.00 1.75 1.20 31.50
Chainage = 3/100 D/S Head wall 1 12.00 1.75 1.20 25.2
Chainage = 3/500 D/S Head wall 1 15.00 1.75 1.20 31.50
Chainage = 3/100 below pipe 1 7.00 6.72 0.45 21.17
Chainage = 3/500 below pipe 1 7.00 6.72 0.45 21.17
total 184.57 196.86 Cum 36,334.07

2 Providing concrete for plain / reinforced concrete in open foundations


Providing concrete for plain/reinforced concrete in open foundations
complete as per
I ) P.C.C. grade Mdrawings
10 and technical specifications Clause
(i) Nominal mix 802, 803,
1:3:6
1202 & 1203
For Bed Concrete
Chainage = 3/100 U/S Head wall 1 15.00 1.75 0.15 3.94
Chainage = 3/500 U/S Head wall 1 15.00 1.75 0.15 3.94
Chainage = 3/100 D/S Head wall 1 12.00 1.75 0.15 3.15
Chainage = 3/500 D/S Head wall 1 15.00 1.75 0.15 3.94
Chainage = 3/100 below pipe 1 7.00 6.72 0.15 7.06
Chainage = 3/500 below pipe 1 7.00 6.72 0.15 7.06
Total = 29.09 4,808.54 Cum 139,880.48

3 Providing and laying Reinforced Cement Concrete Pipe NP3 as per


design in Single
Providing Row Reinforced Cement Concrete Pipe NP3 for culverts
and laying
on first
(SOR class
Item bedding
no.9.3 / B / of granular
Page material in single Row including fixing
no. 36)
1000 mm Dia.
Chainage = 3/100 4 7.50 30.00
Chainage = 3/500 4 7.50 30.00
Total = 60.00 7,094.00 Rmt 425,640.00
4 Plain / reinforced cement concrete in sub structure complete as per
drawings
(SOR Itemand technical
no.12.5 / I / i /specification
page no. 93 ) clause 802, 804, 805, 806, 807,
1202 and 1204
For height up to 5 m.
P.C.C. grade M 15 (Nominal mix (1:2.5:5)) 0.45 1.39
Chainage = 3/100 2 15.00 0.92 2.83 78.11
Chainage = 3/500 2 15.00 0.92 2.83 78.11

Deduct for Pipe Area = (0.785*(1.50)^2*(1.39+0.78)/2) 4 0.79 2.250 1.09 -3.41


Deduct for Pipe Area = (0.785*(1.50)^2*(1.39+0.78)/2) 4 0.79 2.250 1.09 -3.41
Chainage = 3/100,3/500 For Guard stone 4 0.45 0.45 0.45 0.81
Total = 150.21 5,227.29 Cum 785,191.23

Total 1,387,045.78

Deputy Engineer Executive Engineer


P.M.G.S.Y. P.M.G.S.Y.
M.R.R.D.A. Nanded M.R.R.D.A. Nanded
MUKHYA MANTRI GRAM SADAK YOJANA (MMGSY)
Maharashtra Rural Road Development Association
MMGSY / Year 2017-2018
Name of Road =MSH-16 To Juna, Lobha Tanda, ODR-167 Road
Length in Km. = Block Mukhed
District Nanded

RATE ANALYSIS
Sr. Rate Amount
Description Units Qty
No. (Rs) (Rs)
CD Work
1 Providing & laying RCC pipe NP3 ###
9.3 - (B) Basic Rate 1000mm Rmt 1.00 6954.90 6954.90
Total 6954.90
Add for Labour amenities 1.00% 69.55
Add for Labour Welfare Cess 1.00% 69.55
Total Rate Rs. 7094.00
2 Printing New Letters and Figures of any ###
Shade
10.1 Basic Rate English and Roman 1.00 0.70 0.70
Per cm height
/
letter
Total 0.70
Add for Labour amenities 1.00% 0.01
Add for Labour Welfare Cess 1.00% 0.01
Total Rate Rs. 0.72
3 Painting Two Coats on New Concrete Surfaces ###
10.5 - Basic Rate Sqm 1.00 123.00 123.00
Total 123.00
Add for Labour amenities 1.00% 1.23
Add for Labour Welfare Cess 1.00% 1.23
Total Rate Rs. 125.46
Bridge Work
4 Excavation for Structure ###
11.1 (I) - Basic Rate (i)Depth Upto - 3 M Cum 1.00 421.00 421.00
Ordinary Soil Total 421.00
Add for Labour amenities 1.00% 4.21
Add for Labour Welfare Cess 1.00% 4.21
Total Rate Rs. 429.42
5 Excavation for Structure ###
1. Ordinary soil up to 3.00 m. depth by Cum 1.00 193.00 193.00
Mechanical means
(SOR Item no.11.1 / I / ii / page no. 43) Total 193.00
Up to 3 m depth by mechanical means (This item shall be
used when total estimate quantity exceeds 100 cum.)

Add for Labour amenities 1.00% 1.93


Add for Labour Welfare Cess 1.00% 1.93
Total Rate Rs. 196.86
6 Excavation for Structure ###
11.1 (II) - Basic Rate Depth Upto - 3 M Cum 1.00 526.20 526.20
Ordinary Rock ( not required blasting) Total 526.20
Add for Labour amenities 1.00% 5.26
Add for Labour Welfare Cess 1.00% 5.26
Total Rate Rs. 536.72
7 Excavation for Structure
11.1 (III) - Basic Rate Depth Upto - 3 M Cum 1.00 704.70 704.70
Hard Rock ( required blasting) Total 704.70
Add for Labour amenities 1.00% 7.05
Add for Labour Welfare Cess 1.00% 7.05
Total Rate Rs. 718.80
9 Providing Concrete for Open foundation ###
11.4 - (I)Basic Rate P.C.C.M-10
( Nominal Mix 1:3:6) Cum 1.00 4033.40 4033.40
Transportation Charges Cement MT 0.250 429.20 107.30
Transportation Charges Sand Cum 0.48 672.40 322.75
Transportation Charges Crush Metal Cum 0.96 261.26 250.81
Total 4714.26
Add for Labour amenities 1.00% 47.14
Add for Labour Welfare Cess 1.00% 47.14
Total Rate Rs. 4808.54
10 Providing Concrete for Open foundation ###
11.4 - (II)Basic Rate P.C.C.M-15
( Nominal Mix 1:2.5:5) Cum 1.00 4157.90 4157.90
Transportation Charges Cement MT 0.275 429.20 118.03
Transportation Charges Sand Cum 0.48 672.40 322.75
Transportation Charges Crush Metal Cum 0.8 261.26 209.01
Total 4807.69
Add for Labour amenities 1.00% 48.08
Add for Labour Welfare Cess 1.00% 48.08
Total Rate Rs. 4903.85
11 Plain/reinforced cement concrete in ###
substructure
12.5 - (I)Basic Rate P.C.C.M-15 Hight upto 5m
Cum 1.00 4475.00 4475.00
Transportation Charges Cement Cum 0.275 429.20 118.03
Transportation Charges Sand Cum 0.480 672.40 322.75
Transportation Charges Crush Metal Cum 0.800 261.26 209.01
Total 5124.79
Add for Labour amenities 1.00% 51.25
Add for Labour Welfare Cess 1.00% 51.25
Total Rate Rs. 5227.29
12 Plain/reinforced cement concrete in ###
substructure
12.5 - (III)Basic Rate R.C.C.M-20 Hight upto 5m
Cum 1.00 4968.00 4968.00
Transportation Charges Cement Cum 0.350 429.20 150.22
Transportation Charges Sand Cum 0.450 672.40 302.58
Transportation Charges Crush Metal Cum 0.900 261.26 235.13
Total 5655.93
Add for Labour amenities 1.00% 56.56
Add for Labour Welfare Cess 1.00% 56.56
Total Rate Rs. 5769.05
13 Supplying & Fitting TMT Bar Sub Structre ###
12.7 - Basic Rate MT 1.00 44390.50 44390.50
Transportation Charges Steel MT 1.05 460.60 483.63
Total 44874.13
Add for Labour amenities 1.00% 448.74
Add for Labour Welfare Cess 1.00% 448.74
Total Rate Rs. 45771.61
14 Weep Holes ###
12.9 - (b) Basic Rate Each 1.00 205.70 205.70
P.V.C.Pipe 100 mm dia. Total 205.70
Add for Labour amenities 1.00% 2.06
Add for Labour Welfare Cess 1.00% 2.06
Total Rate Rs. 209.82
16 Providing Concrete for Super Structre ###
13.1 - (II)Basic Rate R.C.C.M-25 Cum 1.00 5703.10 5703.10
Transportation Charges Cement Cum 0.400 429.20 171.68
Transportation Charges Sand Cum 0.450 672.40 302.58
Transportation Charges Crush Metal Cum 0.900 261.26 235.13
Total 6412.49
Add for Labour amenities 1.00% 64.12
Add for Labour Welfare Cess 1.00% 64.12
Total Rate Rs. 6540.73
17 Supplying, fitting, and placing TMT bar ###
reinforcement in superstructure complete
13.3- Basic Rate
MT 1.00 45857.90 45857.90
Transportation Charges Steel MT 1.05 460.60 483.63
Total 46341.53
Add for Labour amenities 1.00% 463.42
Add for Labour Welfare Cess 1.00% 463.42
Total Rate Rs. 47268.37
19 Providing and fixing in position pipe railing ###
consisting of IS Rolled steel joist posts
13.8 -Basic Rate RMT 1.00 1630.10 1630.10
Transportation of Steel MT 0.0065 460.60 2.99
Total 1633.09
Add for Labour amenities 1.00% 16.33
Add for Labour Welfare Cess 1.00% 16.33
Total Rate Rs. 1665.75
20 Drainage spouts complete as per drawing and technical ###
specifications Clause 1209

13.10 -Basic Rate Each 1.00 1567.20 1567.20


Transportation of Steel MT 0.004 460.60 1.84
Total 1569.04
Add for Labour amenities 1.00% 15.69
Add for Labour Welfare Cess 1.00% 15.69
Total Rate Rs. 1600.42
21 Filler Joint
Providing and fixing in position 20 mm thick premoulded
joint filler in expansion joint for fixed ends of simply
supported spans,

13.16 -(III) Basic Rate Rmt 1.00 373.10 373.10


Total 373.10
Add for Labour amenities 1.00% 3.73
Add for Labour Welfare Cess 1.00% 3.73
Total Rate Rs. 380.56
23 Tar Paper Bearing ###
13.16 -V Basic Rate sqm 1.00 60.00 60.00
P.V.C.Pipe 100 mm dia. Total 60.00
Add for Labour amenities 1.00% 0.60
Add for Labour Welfare Cess 1.00% 0.60
Total Rate Rs. 61.20
24 Construction of flexible apron 1 m thick ###
comprising of loose stone boulders
14.10 - Basic Rate
Cum 1.00 1097.80 1097.80
Transportation Charges of Stone boulder (25 kg mi Cum 1.000 261.26 261.26