B 1 Preparations for Commissioning and Operation .........................................2


B 1.1 Burners ............................................................................................................ 2
B 1.2 Combustion Air Supply .................................................................................... 3
B 1.3 Diesel Oil Supply ............................................................................................. 6
B 1.4 Auxiliary Media Supply .................................................................................. 14
B 1.4.1 Atomising / Purging Air Supply ................................................................... 14
B 1.4.2 Cooling Air Supply ...................................................................................... 21
B 1.4.3 Instrument Air Supply ................................................................................. 24

B 2 Principles of Operation ................................................................................35


B 2.1 General.......................................................................................................... 35
B 2.2 Furnace Purging ............................................................................................ 35
B 2.3 Ignitor ............................................................................................................ 35
B 2.4 Start Program Fuel Oil ................................................................................... 36
B 2.5 Stop Fuel Oil.................................................................................................. 36

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 1 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

B1 Preparations for Commissioning and Operation

The following shows a listing of activities to be carried out at the burners


prior to their commissioning and operation. For assignment of components
refer to draw. no. 1612 13-0-05 resp. 1612 13-1-01 using the item num-
bers in brackets.

B 1.1 Burners
Generally, check if all burner-related components have been installed cor-
rectly and any media connections to the associated burner parts have been
fitted securely and tightly. Particular attention should be paid to the parts
mentioned below:

• Scanners of flame monitors (15, 0111) adjusted and electric cables


connected.
- Bolted connections of swivel mounts (17) tightened sufficiently.

- Hoses (8.23) for cooling air supply connected tightly.

- Ball valves (16) for sighting tube isolations opened completely.

- Ball valves (8.13) for cooling air supply opened completely.

• Ignition lances (12, 2.01) fastened sufficiently to cylinder guide blocks of


extend / retract mechanisms.
- End position limit switches (27, 2.06) at linear cylinders (14) mounted
securely.

- Electric cables of ignition devices connected.

- Hoses (8.23) for cooling air supply connected tightly.

- Ball valves (8.13) for cooling air supply opened completely.

Note: Inital commissioning of the ignitors has to be carried out acc. to the
special manufacturer’s instructions. For details refer to the DURAG

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 2 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

manual “D-HG 400 High Energy Ignition Device”, assorted in Vol. C 6,


Reg. 05-4_item no. 2.01.

• Oil lances (7, 1.01) fastened sufficiently to cylinder guide blocks of ex-
tend / retract mechanisms.
- End position limit switches (27, 1.12) at linear cylinders (9) mounted
securely.

- Hose connections and fittings for liquid fuel and atomising medium
supply connected tightly to oil lances.

- Hoses (8.22, 8.23) for cooling air supply connected tightly.

- Ball valves (8.12, 8.13) for cooling air supply opened completely.

• Limit switches at combustion air control damper units (1.16, 1.16.1)


mounted securely.

• Instrument valves (1.21) at pressure gauges (23, 0101) opened.

• Lever mechanisms (5) for air register adjustments engaged properly.

Based on draw. no. 1612 13-1-01, the tables in the following subchapters
B 1.2 to B 1.4 each show a listing of the conditions to be prepared or to be
existent at the corresponding system-related components prior to
commissioning and operation of the firing system.

B 1.2 Combustion Air Supply


Precondition: Combustion air has to be available per burner with a max.
temperature of 300 °C, at a max. pressure of approx. 0.13 kg/cm2 (g) and
a max. quantity of 38,900 Nm³h.
For commissioning or operation all operating conditions listed below have
to be set or existent:

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 3 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

Boiler 1 – Burner A
Settings at combustion air control damper unit:
(For assignment of components refer to draw. no. 1612 13-1-01-SH 1/8)

1.16 Control damper ready for operation


ZS1 FA1043-A - limit switch (closed position)
ZS2 FA1043-A - limit switch (open position)
1.16.1 Control actuator ready for operation
ZT FA1043-A with accessories
MV FA1043-A
Boiler 1 – Burner B
Settings at combustion air control damper unit:
(For assignment of components refer to draw. no. 1612 13-1-01-SH 2/8)

1.16 Control damper ready for operation


ZS1 FA1043-B - limit switch (closed position)
ZS2 FA1043-B - limit switch (open position)
1.16.1 Control actuator ready for operation
ZT FA1043-B with accessories
MV FA1043-B
Boiler 1 – Burner C
Settings at combustion air control damper unit:
(For assignment of components refer to draw. no. 1612 13-1-01-SH 3/8)

1.16 Control damper ready for operation


ZS1 FA1043-C - limit switch (closed position)
ZS2 FA1043-C - limit switch (open position)
1.16.1 Control actuator ready for operation
ZT FA1043-C with accessories
MV FA1043-C
Boiler 1 – Burner D
Settings at combustion air control damper unit:
(For assignment of components refer to draw. no. 1612 13-1-01-SH 4/8)

1.16 Control damper ready for operation


ZS1 FA1043-D - limit switch (closed position)
ZS2 FA1043-D - limit switch (open position)
1.16.1 Control actuator ready for operation
ZT FA1043-D with accessories
MV FA1043-D

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 4 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

Boiler 2 – Burner A
Settings at combustion air control damper unit:
(For assignment of components refer to draw. no. 1612 13-1-01-SH 5/8)

1.16 Control damper ready for operation


ZS1 FA2043-A - limit switch (closed position)
ZS2 FA2043-A - limit switch (open position)
1.16.1 Control actuator ready for operation
ZT FA2043-A with accessories
MV FA2043-A
Boiler 2 – Burner B
Settings at combustion air control damper unit:
(For assignment of components refer to draw. no. 1612 13-1-01-SH 6/8)

1.16 Control damper ready for operation


ZS1 FA2043-B - limit switch (closed position)
ZS2 FA2043-B - limit switch (open position)
1.16.1 Control actuator ready for operation
ZT FA2043-B with accessories
MV FA2043-B
Boiler 2 – Burner C
Settings at combustion air control damper unit:
(For assignment of components refer to draw. no. 1612 13-1-01-SH 7/8)

1.16 Control damper ready for operation


ZS1 FA2043-C - limit switch (closed position)
ZS2 FA2043-C - limit switch (open position)
1.16.1 Control actuator ready for operation
ZT FA2043-C with accessories
MV FA2043-C
Boiler 2 – Burner D
Settings at combustion air control damper unit:
(For assignment of components refer to draw. no. 1612 13-1-01-SH 8/8)

1.16 Control damper ready for operation


ZS1 FA2043-D - limit switch (closed position)
ZS2 FA2043-D - limit switch (open position)
1.16.1 Control actuator ready for operation
ZT FA2043-D with accessories
MV FA2043-D

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 5 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

B 1.3 Diesel Oil Supply


Precondition: Diesel oil as fuel has to be available per burner at a max.
pressure of 5 kg/cm² (g) and a max. quantity of 3,072 kg/h.

Note: In case of any venting or draining valves they have to be closed


prior to starting preparatory activities.

For commissioning or operation all operating conditions listed below have


to be set or existent:

Ident. No. / Item No. Designation Position / Setting

Boiler 1 – Burner A
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 1/8)

V-DO1301 Ball valve (manual shut-off) OPEN


STR-DO1043A Strainer ready for operation,
filter mesh clean
FE-DO1043-A Coriolis flow meter ready for operation
FT DO1043-A - transmitter
ZV-DO1043A Safety relief valve ready for operation,
set to 15.3 kg/cm² (g)
PG DO1043-A2 Pressure gauge ready for operation
V-DO1305 Instrument valve at pressure OPEN
gauge
FCV DO1043-A3 Control valve incl. accessories ready for operation
- limit switch (ignition position)
XV-DO1043-A1 Automatic shut-off valve 1 ready for operation
ZSC DO1043-A1 - limit switch (closed position)
ZSO DO1043-A1 - limit switch (open position)
XV-DO1043-A2 Automatic shut-off valve 2 ready for operation
ZSC DO1043-A2 - limit switch (closed position)
ZSO DO1043-A2 - limit switch (open position)
V-DO1302 Check valve ready for operation
PT DO1043-A2 Pressure transmitter ready for operation
V-DO1325 Instrument valve at pressure OPEN

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 6 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

transmitter
PG DO1043-A Pressure gauge ready for operation
V-DO1303 Instrument valve at pressure OPEN
gauge
PSH DO1043-A1 Pressure switch (max. pressure) ready for operation,
set to 5.9 kg/cm² (g)
V-DO1304 Instrument valve at pressure OPEN
switch
Boiler 1 – Burner B
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 2/8)

V-DO1306 Ball valve (manual shut-off) OPEN


STR-DO1043B Strainer ready for operation,
filter mesh clean
FE-DO1043-B Coriolis flow meter ready for operation
FT DO1043-B - transmitter
ZV-DO1043B Safety relief valve ready for operation,
set to 15.3 kg/cm² (g)
PG DO1043-B2 Pressure gauge ready for operation
V-DO1310 Instrument valve at pressure OPEN
gauge
FCV DO1043-B3 Control valve incl. accessories ready for operation
- limit switch (ignition position)
XV-DO1043-B1 Automatic shut-off valve 1 ready for operation
ZSC DO1043-B1 - limit switch (closed position)
ZSO DO1043-B1 - limit switch (open position)
XV-DO1043-B2 Automatic shut-off valve 2 ready for operation
ZSC DO1043-B2 - limit switch (closed position)
ZSO DO1043-B2 - limit switch (open position)
V-DO1307 Check valve ready for operation
PT DO1043-B2 Pressure transmitter ready for operation
V-DO1326 Instrument valve at pressure OPEN
transmitter

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 7 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

PG DO1043-B Pressure gauge ready for operation


V-DO1308 Instrument valve at pressure OPEN
gauge
PSH DO1043-B1 Pressure switch (max. pressure) ready for operation,
set to 5.9 kg/cm² (g)
V-DO1309 Instrument valve at pressure OPEN
switch
Boiler 1 – Burner C

Settings at “Burner Valve Set” station (10.14):


(For assignment of components refer to draw. no. 1612 13-1-14-SH 3/8)

V-DO1311 Ball valve (manual shut-off) OPEN


STR-DO1043C Strainer ready for operation,
filter mesh clean
FE-DO1043-C Coriolis flow meter ready for operation
FT DO1043-C - transmitter
ZV-DO1043C Safety relief valve ready for operation,
set to 15.3 kg/cm² (g)
PG DO1043-C2 Pressure gauge ready for operation
V-DO1315 Instrument valve at pressure OPEN
gauge
FCV DO1043-C3 Control valve incl. accessories ready for operation
- limit switch (ignition position)
XV-DO1043-C1 Automatic shut-off valve 1 ready for operation
ZSC DO1043-C1 - limit switch (closed position)
ZSO DO1043-C1 - limit switch (open position)
XV-DO1043-C2 Automatic shut-off valve 2 ready for operation
ZSC DO1043-C2 - limit switch (closed position)
ZSO DO1043-C2 - limit switch (open position)
V-DO1312 Check valve ready for operation
PT DO1043-C2 Pressure transmitter ready for operation
V-DO1327 Instrument valve at pressure OPEN
transmitter
PG DO1043-C Pressure gauge ready for operation

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 8 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-DO1313 Instrument valve at pressure OPEN


gauge
PSH DO1043-C1 Pressure switch (max. pressure) ready for operation,
set to 5.9 kg/cm² (g)
V-DO1314 Instrument valve at pressure OPEN
switch
Boiler 1 – Burner D
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 4/8)

V-DO1316 Ball valve (manual shut-off) OPEN


STR-DO1043D Strainer ready for operation,
filter mesh clean
FE-DO1043-D Coriolis flow meter ready for operation
FT DO1043-D - transmitter
ZV-DO1043D Safety relief valve ready for operation,
set to 15.3 kg/cm² (g)
PG DO1043-D2 Pressure gauge ready for operation
V-DO1320 Instrument valve at pressure OPEN
gauge
FCV DO1043-D3 Control valve incl. accessories ready for operation
- limit switch (ignition position)
XV-DO1043-D1 Automatic shut-off valve 1 ready for operation
ZSC DO1043-D1 - limit switch (closed position)
ZSO DO1043-D1 - limit switch (open position)
XV-DO1043-D2 Automatic shut-off valve 2 ready for operation
ZSC DO1043-D2 - limit switch (closed position)
ZSO DO1043-D2 - limit switch (open position)
V-DO1317 Check valve ready for operation
PT DO1043-D2 Pressure transmitter ready for operation
V-DO1328 Instrument valve at pressure OPEN
transmitter
PG DO1043-D Pressure gauge ready for operation
V-DO1318 Instrument valve at pressure OPEN
gauge

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 9 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

PSH DO1043-D1 Pressure switch (max. pressure) ready for operation,


set to 5.9 kg/cm² (g)
V-DO1319 Instrument valve at pressure OPEN
switch
Boiler 2 – Burner A
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 5/8)

V-DO2301 Ball valve (manual shut-off) OPEN


STR-DO2043A Strainer ready for operation,
filter mesh clean
FE-DO2043-A Coriolis flow meter ready for operation
FT DO2043-A - transmitter
ZV-DO2043A Safety relief valve ready for operation,
set to 15.3 kg/cm² (g)
PG DO2043-A2 Pressure gauge ready for operation
V-DO2305 Instrument valve at pressure OPEN
gauge
FCV DO2043-A3 Control valve incl. accessories ready for operation
- limit switch (ignition position)
XV-DO2043-A1 Automatic shut-off valve 1 ready for operation
ZSC DO2043-A1 - limit switch (closed position)
ZSO DO2043-A1 - limit switch (open position)
XV-DO2043-A2 Automatic shut-off valve 2 ready for operation
ZSC DO2043-A2 - limit switch (closed position)
ZSO DO2043-A2 - limit switch (open position)
V-DO2302 Check valve ready for operation
PT DO2043-A2 Pressure transmitter ready for operation
V-DO2325 Instrument valve at pressure OPEN
transmitter
PG DO2043-A Pressure gauge ready for operation
V-DO2303 Instrument valve at pressure OPEN
gauge
PSH DO2043-A1 Pressure switch (max. pressure) ready for operation,
set to 5.9 kg/cm² (g)

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 10 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-DO2304 Instrument valve at pressure OPEN


switch
Boiler 2 – Burner B

Settings at “Burner Valve Set” station (10.14):


(For assignment of components refer to draw. no. 1612 13-1-14-SH 6/8)

V-DO2306 Ball valve (manual shut-off) OPEN


STR-DO2043B Strainer ready for operation,
filter mesh clean
FE-DO2043-B Coriolis flow meter ready for operation
FT DO2043-B - transmitter
ZV-DO2043B Safety relief valve ready for operation,
set to 15.3 kg/cm² (g)
PG DO2043-B2 Pressure gauge ready for operation
V-DO2310 Instrument valve at pressure OPEN
gauge
FCV DO2043-B3 Control valve incl. accessories ready for operation
- limit switch (ignition position)
XV-DO2043-B1 Automatic shut-off valve 1 ready for operation
ZSC DO2043-B1 - limit switch (closed position)
ZSO DO2043-B1 - limit switch (open position)
XV-DO2043-B2 Automatic shut-off valve 2 ready for operation
ZSC DO2043-B2 - limit switch (closed position)
ZSO DO2043-B2 - limit switch (open position)
V-DO2307 Check valve ready for operation
PT DO2043-B2 Pressure transmitter ready for operation
V-DO2326 Instrument valve at pressure OPEN
transmitter
PG DO2043-B Pressure gauge ready for operation
V-DO2308 Instrument valve at pressure OPEN
gauge
PSH DO2043-B1 Pressure switch (max. pressure) ready for operation,
set to 5.9 kg/cm² (g)
V-DO2309 Instrument valve at pressure OPEN
switch

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 11 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

Boiler 2 – Burner C
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 7/8)

V-DO2311 Ball valve (manual shut-off) OPEN


STR-DO2043C Strainer ready for operation,
filter mesh clean
FE-DO2043-C Coriolis flow meter ready for operation
FT DO2043-C - transmitter
ZV-DO2043C Safety relief valve ready for operation,
set to 15.3 kg/cm² (g)
PG DO2043-C2 Pressure gauge ready for operation
V-DO2315 Instrument valve at pressure OPEN
gauge
FCV DO2043-C3 Control valve incl. accessories ready for operation
- limit switch (ignition position)
XV-DO2043-C1 Automatic shut-off valve 1 ready for operation
ZSC DO2043-C1 - limit switch (closed position)
ZSO DO2043-C1 - limit switch (open position)
XV-DO2043-C2 Automatic shut-off valve 2 ready for operation
ZSC DO2043-C2 - limit switch (closed position)
ZSO DO2043-C2 - limit switch (open position)
V-DO2312 Check valve ready for operation
PT DO2043-C2 Pressure transmitter ready for operation
V-DO2327 Instrument valve at pressure OPEN
transmitter
PG DO2043-C Pressure gauge ready for operation
V-DO2313 Instrument valve at pressure OPEN
gauge
PSH DO2043-C1 Pressure switch (max. pressure) ready for operation,
set to 5.9 kg/cm² (g)
V-DO2314 Instrument valve at pressure OPEN
switch
Boiler 2 – Burner D

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 12 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

Settings at “Burner Valve Set” station (10.14):


(For assignment of components refer to draw. no. 1612 13-1-14-SH 8/8)

V-DO2316 Ball valve (manual shut-off) OPEN


STR-DO2043D Strainer ready for operation,
filter mesh clean
FE-DO2043-D Coriolis flow meter ready for operation
FT DO2043-D - transmitter
ZV-DO2043D Safety relief valve ready for operation,
set to 15.3 kg/cm² (g)
PG DO2043-D2 Pressure gauge ready for operation
V-DO2320 Instrument valve at pressure OPEN
gauge
FCV DO2043-D3 Control valve incl. accessories ready for operation
- limit switch (ignition position)
XV-DO2043-D1 Automatic shut-off valve 1 ready for operation
ZSC DO2043-D1 - limit switch (closed position)
ZSO DO2043-D1 - limit switch (open position)
XV-DO2043-D2 Automatic shut-off valve 2 ready for operation
ZSC DO2043-D2 - limit switch (closed position)
ZSO DO2043-D2 - limit switch (open position)
V-DO2317 Check valve ready for operation
PT DO2043-D2 Pressure transmitter ready for operation
V-DO2328 Instrument valve at pressure OPEN
transmitter
PG DO2043-D Pressure gauge ready for operation
V-DO2318 Instrument valve at pressure OPEN
gauge
PSH DO2043-D1 Pressure switch (max. pressure) ready for operation,
set to 5.9 kg/cm² (g)
V-DO2319 Instrument valve at pressure OPEN
switch

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 13 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

B 1.4 Auxiliary Media Supply

B 1.4.1 Atomising / Purging Air Supply

Precondition: Plant air as atomising and purging medium has to be availa-


ble per burner at a min. pressure of 4 kg/cm² (g) and a max. quantity of
320 Nm3/h.
Note: In case of any venting or draining valves they have to be closed
prior to starting preparatory activities.
For commissioning or operation all operating conditions listed below have
to be set or existent:
Ident. No. / Item No. Designation Position / Setting

Boiler 1 – Burner A
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 1/8)

V-PA1631 Ball valve (manual shut-off) OPEN


STR-PA1043A Strainer ready for operation,
filter mesh clean
PG PA1043-A1 Pressure gauge ready for operation
V-PA1632 Instrument valve at pressure OPEN
gauge
PRV PA1043-A1 Pressure regulator ready for operation,
set to 4 kg/cm² (g)
PSL PA1043-A1 Pressure switch (min. pressure) ready for operation,
set to 3 kg/cm² (g)
V-PA1633 Instrument valve at pressure OPEN
switch
XV-PA1043-A2 Automatic shut-off valve ready for operation
(atomising air)
ZSC-PA1043-A2 - limit switch (closed position)
ZSO-PA1043-A2 - limit switch (open position)
V-PA1635 Check valve ready for operation
PG PA1043-A2 Pressure gauge ready for operation

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 14 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-PA1637 Instrument valve at pressure OPEN


gauge
XV-PA1043-A3 Automatic shut-off valve ready for operation
(purging air)
ZSC-PA1043-A3 - limit switch (closed position)
ZSO-PA1043-A3 - limit switch (open position)
V-PA1636 Manual regulation valve adjusted (acc. re-
quired amount of air)
V-PA1671 Check valve ready for operation
Boiler 1 – Burner B
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 2/8)

V-PA1641 Ball valve (manual shut-off) OPEN


STR-PA1043B Strainer ready for operation,
filter mesh clean
PG PA1043-B1 Pressure gauge ready for operation
V-PA1642 Instrument valve at pressure OPEN
gauge
PRV PA1043-B1 Pressure regulator ready for operation,
set to 4 kg/cm² (g)
PSL PA1043-B1 Pressure switch (min. pressure) ready for operation,
set to 3 kg/cm² (g)
V-PA1643 Instrument valve at pressure OPEN
switch
XV-PA1043-B2 Automatic shut-off valve ready for operation
(atomising air)
ZSC-PA1043-B2 - limit switch (closed position)
ZSO-PA1043-B2 - limit switch (open position)
V-PA1645 Check valve ready for operation
PG PA1043-B2 Pressure gauge ready for operation
V-PA1647 Instrument valve at pressure OPEN
gauge
XV-PA1043-B3 Automatic shut-off valve ready for operation
(purging air)

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 15 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

ZSC-PA1043-B3 - limit switch (closed position)


ZSO-PA1043-B3 - limit switch (open position)
V-PA1646 Manual regulation valve adjusted (acc. re-
quired amount of air)
V-PA1672 Check valve ready for operation
Boiler 1 – Burner C
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 3/8)

V-PA1651 Ball valve (manual shut-off) OPEN


STR-PA1043C Strainer ready for operation,
filter mesh clean
PG PA1043-C1 Pressure gauge ready for operation
V-PA1652 Instrument valve at pressure OPEN
gauge
PRV PA1043-C1 Pressure regulator ready for operation,
set to 4 kg/cm² (g)
PSL PA1043-C1 Pressure switch (min. pressure) ready for operation,
set to 3 kg/cm² (g)
V-PA1653 Instrument valve at pressure OPEN
switch
XV-PA1043-C2 Automatic shut-off valve ready for operation
(atomising air)
ZSC-PA1043-C2 - limit switch (closed position)
ZSO-PA1043-C2 - limit switch (open position)
V-PA1655 Check valve ready for operation
PG PA1043-C2 Pressure gauge ready for operation
V-PA1657 Instrument valve at pressure OPEN
gauge
XV-PA1043-C3 Automatic shut-off valve ready for operation
(purging air)
ZSC-PA1043-C3 - limit switch (closed position)
ZSO-PA1043-C3 - limit switch (open position)
V-PA1656 Manual regulation valve adjusted (acc. re-
quired amount of air)

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 16 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-PA1673 Check valve ready for operation


Boiler 1 – Burner D
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 4/8)

V-PA1661 Ball valve (manual shut-off) OPEN


STR-PA1043D Strainer ready for operation,
filter mesh clean
PG PA1043-D1 Pressure gauge ready for operation
V-PA1662 Instrument valve at pressure OPEN
gauge
PRV PA1043-D1 Pressure regulator ready for operation,
set to 4 kg/cm² (g)
PSL PA1043-D1 Pressure switch (min. pressure) ready for operation,
set to 3 kg/cm² (g)
V-PA1663 Instrument valve at pressure OPEN
switch
XV-PA1043-D2 Automatic shut-off valve ready for operation
(atomising air)
ZSC-PA1043-D2 - limit switch (closed position)
ZSO-PA1043-D2 - limit switch (open position)
V-PA1665 Check valve ready for operation
PG PA1043-D2 Pressure gauge ready for operation
V-PA1667 Instrument valve at pressure OPEN
gauge
XV-PA1043-D3 Automatic shut-off valve ready for operation
(purging air)
ZSC-PA1043-D3 - limit switch (closed position)
ZSO-PA1043-D3 - limit switch (open position)
V-PA1666 Manual regulation valve adjusted (acc. re-
quired amount of air)
V-PA1674 Check valve ready for operation
Boiler 2 – Burner A
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 5/8)

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 17 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-PA2631 Ball valve (manual shut-off) OPEN


STR-PA2043A Strainer ready for operation,
filter mesh clean
PG PA2043-A1 Pressure gauge ready for operation
V-PA2632 Instrument valve at pressure OPEN
gauge
PRV PA2043-A1 Pressure regulator ready for operation,
set to 4 kg/cm² (g)
PSL PA2043-A1 Pressure switch (min. pressure) ready for operation,
set to 3 kg/cm² (g)
V-PA2633 Instrument valve at pressure OPEN
switch
XV-PA2043-A2 Automatic shut-off valve ready for operation
(atomising air)
ZSC-PA2043-A2 - limit switch (closed position)
ZSO-PA2043-A2 - limit switch (open position)
V-PA2635 Check valve ready for operation
PG PA2043-A2 Pressure gauge ready for operation
V-PA2637 Instrument valve at pressure OPEN
gauge
XV-PA2043-A3 Automatic shut-off valve ready for operation
(purging air)
ZSC-PA2043-A3 - limit switch (closed position)
ZSO-PA2043-A3 - limit switch (open position)
V-PA2636 Manual regulation valve adjusted (acc. re-
quired amount of air)
V-PA2671 Check valve ready for operation
Boiler 2 – Burner B

Settings at “Burner Valve Set” station (10.14):


(For assignment of components refer to draw. no. 1612 13-1-14-SH 6/8)

V-PA2641 Ball valve (manual shut-off) OPEN


STR-PA2043B Strainer ready for operation,
filter mesh clean
PG PA2043-B1 Pressure gauge ready for operation

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 18 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-PA2642 Instrument valve at pressure OPEN


gauge
PRV PA2043-B1 Pressure regulator ready for operation,
set to 4 kg/cm² (g)
PSL PA2043-B1 Pressure switch (min. pressure) ready for operation,
set to 3 kg/cm² (g)
V-PA2643 Instrument valve at pressure OPEN
switch
XV-PA2043-B2 Automatic shut-off valve ready for operation
(atomising air)
ZSC-PA2043-B2 - limit switch (closed position)
ZSO-PA2043-B2 - limit switch (open position)
V-PA2645 Check valve ready for operation
PG PA2043-B2 Pressure gauge ready for operation
V-PA2647 Instrument valve at pressure OPEN
gauge
XV-PA2043-B3 Automatic shut-off valve ready for operation
(purging air)
ZSC-PA2043-B3 - limit switch (closed position)
ZSO-PA2043-B3 - limit switch (open position)
V-PA2646 Manual regulation valve adjusted (acc. re-
quired amount of air)
V-PA2672 Check valve ready for operation
Boiler 2 – Burner C
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 7/8)

V-PA2651 Ball valve (manual shut-off) OPEN


STR-PA2043C Strainer ready for operation,
filter mesh clean
PG PA2043-C1 Pressure gauge ready for operation
V-PA2652 Instrument valve at pressure OPEN
gauge
PRV PA2043-C1 Pressure regulator ready for operation,
set to 4 kg/cm² (g)

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 19 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

PSL PA2043-C1 Pressure switch (min. pressure) ready for operation,


set to 3 kg/cm² (g)
V-PA2653 Instrument valve at pressure OPEN
switch
XV-PA2043-C2 Automatic shut-off valve ready for operation
(atomising air)
ZSC-PA2043-C2 - limit switch (closed position)
ZSO-PA2043-C2 - limit switch (open position)
V-PA2655 Check valve ready for operation
PG PA2043-C2 Pressure gauge ready for operation
V-PA2657 Instrument valve at pressure OPEN
gauge
XV-PA2043-C3 Automatic shut-off valve ready for operation
(purging air)
ZSC-PA2043-C3 - limit switch (closed position)
ZSO-PA2043-C3 - limit switch (open position)
V-PA2656 Manual regulation valve adjusted (acc. re-
quired amount of air)
V-PA2673 Check valve ready for operation
Boiler 2 – Burner D
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 8/8)

V-PA2661 Ball valve (manual shut-off) OPEN


STR-PA2043D Strainer ready for operation,
filter mesh clean
PG PA2043-D1 Pressure gauge ready for operation
V-PA2662 Instrument valve at pressure OPEN
gauge
PRV PA2043-D1 Pressure regulator ready for operation,
set to 4 kg/cm² (g)
PSL PA2043-D1 Pressure switch (min. pressure) ready for operation,
set to 3 kg/cm² (g)
V-PA2663 Instrument valve at pressure OPEN
switch

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 20 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

XV-PA2043-D2 Automatic shut-off valve ready for operation


(atomising air)
ZSC-PA2043-D2 - limit switch (closed position)
ZSO-PA2043-D2 - limit switch (open position)
V-PA2665 Check valve ready for operation
PG PA2043-D2 Pressure gauge ready for operation
V-PA2667 Instrument valve at pressure OPEN
gauge
XV-PA2043-D3 Automatic shut-off valve ready for operation
(purging air)
ZSC-PA2043-D3 - limit switch (closed position)
ZSO-PA2043-D3 - limit switch (open position)
V-PA2666 Manual regulation valve adjusted (acc. re-
quired amount of air)
V-PA2674 Check valve ready for operation

B 1.4.2 Cooling Air Supply

Precondition: Plant air as cooling medium has to be available per boiler


with ambient temperature, at a pressure of 0.1 kg/cm² (g) and a quantity of
200 Nm³/h.

It is essential that the air is dry and in oil and dust-free condition.
For commissioning or operation all operating conditions listed below have
to be set or existent:

Ident. No. / Item No. Designation Position / Setting

Boiler 1 – Burner A
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 1/8)

V-PA1638 Ball valve for cooling air supply OPEN


of oil lance diffuser tube

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 21 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-PA1639 Ball valve for cooling air supply OPEN


of diffuser tube carrier tube
V-PA1640 Ball valve for cooling air supply OPEN
of ignition lance guide tube
V-PA1636 Ball valve for cooling / purge air OPEN
supply of flame scanner
Boiler 1 – Burner B
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 2/8)

V-PA1648 Ball valve for cooling air supply OPEN


of oil lance diffuser tube
V-PA1649 Ball valve for cooling air supply OPEN
of diffuser tube carrier tube
V-PA1650 Ball valve for cooling air supply OPEN
of ignition lance guide tube
V-PA1656 Ball valve for cooling / purge air OPEN
supply of flame scanner
Boiler 1 – Burner C
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 3/8)

V-PA1658 Ball valve for cooling air supply OPEN


of oil lance diffuser tube
V-PA1659 Ball valve for cooling air supply OPEN
of diffuser tube carrier tube
V-PA1660 Ball valve for cooling air supply OPEN
of ignition lance guide tube
V-PA1676 Ball valve for cooling / purge air OPEN
supply of flame scanner
Boiler 1 – Burner D
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 4/8)

V-PA1668 Ball valve for cooling air supply OPEN


of oil lance diffuser tube
V-PA1669 Ball valve for cooling air supply OPEN
Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:
24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 22 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

of diffuser tube carrier tube


V-PA1670 Ball valve for cooling air supply OPEN
of ignition lance guide tube
V-PA1696 Ball valve for cooling / purge air OPEN
supply of flame scanner
Boiler 2 – Burner A
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 5/8)

V-PA2638 Ball valve for cooling air supply OPEN


of oil lance diffuser tube
V-PA2639 Ball valve for cooling air supply OPEN
of diffuser tube carrier tube
V-PA2640 Ball valve for cooling air supply OPEN
of ignition lance guide tube
V-PA2636 Ball valve for cooling / purge air OPEN
supply of flame scanner
Boiler 2 – Burner B
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 6/8)

V-PA2648 Ball valve for cooling air supply OPEN


of oil lance diffuser tube
V-PA2649 Ball valve for cooling air supply OPEN
of diffuser tube carrier tube
V-PA2650 Ball valve for cooling air supply OPEN
of ignition lance guide tube
V-PA2656 Ball valve for cooling / purge air OPEN
supply of flame scanner
Boiler 2 – Burner C
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 7/8)

V-PA2658 Ball valve for cooling air supply OPEN


of oil lance diffuser tube
V-PA2659 Ball valve for cooling air supply OPEN
of diffuser tube carrier tube
Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:
24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 23 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-PA2660 Ball valve for cooling air supply OPEN


of ignition lance guide tube
V-PA2676 Ball valve for cooling / purge air OPEN
supply of flame scanner
Boiler 2 – Burner D
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 8/8)

V-PA2668 Ball valve for cooling air supply OPEN


of oil lance diffuser tube
V-PA2669 Ball valve for cooling air supply OPEN
of diffuser tube carrier tube
V-PA2670 Ball valve for cooling air supply OPEN
of ignition lance guide tube
V-PA2696 Ball valve for cooling / purge air OPEN
supply of flame scanner

B 1.4.3 Instrument Air Supply

Precondition: Instrument air has to be available per boiler at a min. pres-


sure of 4 kg/cm² (g) and a quantity of approx. 30 Nm³/h for start-up and
approx. 4 Nm³/h for normal operation.
It is essential that the air is dry and in oil and dust-free condition.

For commissioning or operation all operating conditions listed below have


to be set or existent:

Ident. No. / Item No. Designation Position / Setting

Boiler 1 – Burner A
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 1/8)

V-IA1621 Pressure filter regulator ready for operation,


filter element clean

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 24 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-IA1627 Air distributor 1: ball valves CLOSED


V-IA1630 (optional connections)
V-IA1629 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (purging air)
V-IA1628 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (atomising air)
V-IA1635 Air distributor 2: ball valve CLOSED
(optional connection)
V-IA1633 Air distributor 2: ball valve for OPEN
supply line to diesel oil control
valve
V-IA1632 Air distributor 2: ball valves for OPEN
V-IA1634 supply lines to automatic shut-off
valve combination (diesel oil)
SV-DO1043-A1 Pilot valves at automatic shut-off ready for operation
SV-DO1043-A2 valve combination (diesel oil)
SV-PA1043-A2 Pilot valve at automatic shut-off ready for operation
valve (atomising air)
SV-PA1043-A3 Pilot valve at automatic shut-off ready for operation
valve (purging air)
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 1/8)

V-IA1626 Pressure filter regulator ready for operation,


filter element clean
V-IA1623 Air distributor 3: ball valves CLOSED
V-IA1624 (optional connections)
V-IA1625 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at
ignition lance
V-IA1622 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at oil
lance
SV-DO1043-A4 Pilot valve at linear cylinder for ready for operation
extension and retraction of

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 25 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

ignition lance
SVC-DO1043-A5 Pilot valve at linear cylinder for ready for operation
SVO-DO1043-A5 extension and retraction of oil
lance
Boiler 1 – Burner B
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 2/8)

V-IA1641 Pressure filter regulator ready for operation,


filter element clean
V-IA1647 Air distributor 1: ball valves CLOSED
V-IA1650 (optional connections)
V-IA1649 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (purging air)
V-IA1648 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (atomising air)
V-IA1655 Air distributor 2: ball valve CLOSED
(optional connection)
V-IA1653 Air distributor 2: ball valve for OPEN
supply line to diesel oil control
valve
V-IA1652 Air distributor 2: ball valves for OPEN
V-IA1654 supply lines to automatic shut-off
valve combination (diesel oil)
SV-DO1043-B1 Pilot valves at automatic shut-off ready for operation
SV-DO1043-B2 valve combination (diesel oil)
SV-PA1043-B2 Pilot valve at automatic shut-off ready for operation
valve (atomising air)
SV-PA1043-B3 Pilot valve at automatic shut-off ready for operation
valve (purging air)
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 2/8)

V-IA1646 Pressure filter regulator ready for operation,


filter element clean

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 26 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-IA1643 Air distributor 3: ball valves CLOSED


V-IA1644 (optional connections)
V-IA1645 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at
ignition lance
V-IA1642 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at oil
lance
SV-DO1043-B4 Pilot valve at linear cylinder for ready for operation
extension and retraction of
ignition lance
SVC-DO1043-B5 Pilot valve at linear cylinder for ready for operation
SVO-DO1043-B5 extension and retraction of oil
lance
Boiler 1 – Burner C
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 3/8)

V-IA1661 Pressure filter regulator ready for operation,


filter element clean
V-IA1667 Air distributor 1: ball valves CLOSED
V-IA1670 (optional connections)
V-IA1669 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (purging air)
V-IA1668 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (atomising air)
V-IA1675 Air distributor 2: ball valve CLOSED
(optional connection)
V-IA1673 Air distributor 2: ball valve for OPEN
supply line to diesel oil control
valve
V-IA1672 Air distributor 2: ball valves for OPEN
V-IA1674 supply lines to automatic shut-off
valve combination (diesel oil)
SV-DO1043-C1 Pilot valves at automatic shut-off ready for operation

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 27 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

SV-DO1043-C2 valve combination (diesel oil)


SV-PA1043-C2 Pilot valve at automatic shut-off ready for operation
valve (atomising air)
SV-PA1043-C3 Pilot valve at automatic shut-off ready for operation
valve (purging air)
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 3/8)

V-IA1666 Pressure filter regulator ready for operation,


filter element clean
V-IA1663 Air distributor 3: ball valves CLOSED
V-IA1664 (optional connections)
V-IA1665 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at
ignition lance
V-IA1662 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at oil
lance
SV-DO1043-C4 Pilot valve at linear cylinder for ready for operation
extension and retraction of
ignition lance
SVC-DO1043-C5 Pilot valve at linear cylinder for ready for operation
SVO-DO1043-C5 extension and retraction of oil
lance
Boiler 1 – Burner D
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 4/8)

V-IA1681 Pressure filter regulator ready for operation,


filter element clean
V-IA1687 Air distributor 1: ball valves CLOSED
V-IA1690 (optional connections)
V-IA1689 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (purging air)
V-IA1688 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (atomising air)
Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:
24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 28 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-IA1695 Air distributor 2: ball valve CLOSED


(optional connection)
V-IA1693 Air distributor 2: ball valve for OPEN
supply line to diesel oil control
valve
V-IA1692 Air distributor 2: ball valves for OPEN
V-IA1694 supply lines to automatic shut-off
valve combination (diesel oil)
SV-DO1043-D1 Pilot valves at automatic shut-off ready for operation
SV-DO1043-D2 valve combination (diesel oil)
SV-PA1043-D2 Pilot valve at automatic shut-off ready for operation
valve (atomising air)
SV-PA1043-D3 Pilot valve at automatic shut-off ready for operation
valve (purging air)
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH4/8)

V-IA1686 Pressure filter regulator ready for operation,


filter element clean
V-IA1683 Air distributor 3: ball valves CLOSED
V-IA1684 (optional connections)
V-IA1685 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at
ignition lance
V-IA1682 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at oil
lance
SV-DO1043-D4 Pilot valve at linear cylinder for ready for operation
extension and retraction of
ignition lance
SVC-DO1043-D5 Pilot valve at linear cylinder for ready for operation
SVO-DO1043-D5 extension and retraction of oil
lance
Boiler 2 – Burner A
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 5/8)

V-IA2621 Pressure filter regulator ready for operation,


filter element clean

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 29 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-IA2627 Air distributor 1: ball valves CLOSED


V-IA2630 (optional connections)
V-IA2629 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (purging air)
V-IA2628 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (atomising air)
V-IA2635 Air distributor 2: ball valve CLOSED
(optional connection)
V-IA2633 Air distributor 2: ball valve for OPEN
supply line to diesel oil control
valve
V-IA2632 Air distributor 2: ball valves for OPEN
V-IA2634 supply lines to automatic shut-off
valve combination (diesel oil)
SV-DO2043-A1 Pilot valves at automatic shut-off ready for operation
SV-DO2043-A2 valve combination (diesel oil)
SV-PA2043-A2 Pilot valve at automatic shut-off ready for operation
valve (atomising air)
SV-PA2043-A3 Pilot valve at automatic shut-off ready for operation
valve (purging air)
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 5/8)

V-IA2626 Pressure filter regulator ready for operation,


filter element clean
V-IA2623 Air distributor 3: ball valves CLOSED
V-IA2624 (optional connections)
V-IA2625 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at
ignition lance
V-IA2622 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at oil
lance
SV-DO2043-A4 Pilot valve at linear cylinder for ready for operation
extension and retraction of

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 30 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

ignition lance
SVC-DO2043-A5 Pilot valve at linear cylinder for ready for operation
SVO-DO2043-A5 extension and retraction of oil
lance
Boiler 2 – Burner B
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 6/8)

V-IA2641 Pressure filter regulator ready for operation,


filter element clean
V-IA2647 Air distributor 1: ball valves CLOSED
V-IA2650 (optional connections)
V-IA2649 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (purging air)
V-IA2648 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (atomising air)
V-IA2655 Air distributor 2: ball valve CLOSED
(optional connection)
V-IA2653 Air distributor 2: ball valve for OPEN
supply line to diesel oil control
valve
V-IA2652 Air distributor 2: ball valves for OPEN
V-IA2654 supply lines to automatic shut-off
valve combination (diesel oil)
SV-DO2043-B1 Pilot valves at automatic shut-off ready for operation
SV-DO2043-B2 valve combination (diesel oil)
SV-PA2043-B2 Pilot valve at automatic shut-off ready for operation
valve (atomising air)
SV-PA2043-B3 Pilot valve at automatic shut-off ready for operation
valve (purging air)
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 6/8)

V-IA2646 Pressure filter regulator ready for operation,


filter element clean

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 31 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-IA2643 Air distributor 3: ball valves CLOSED


V-IA2644 (optional connections)
V-IA2645 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at
ignition lance
V-IA2642 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at oil
lance
SV-DO2043-B4 Pilot valve at linear cylinder for ready for operation
extension and retraction of
ignition lance
SVC-DO2043-B5 Pilot valve at linear cylinder for ready for operation
SVO-DO2043-B5 extension and retraction of oil
lance
Boiler 2 – Burner C
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 7/8)

V-IA2661 Pressure filter regulator ready for operation,


filter element clean
V-IA2667 Air distributor 1: ball valves CLOSED
V-IA2670 (optional connections)
V-IA2669 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (purging air)
V-IA2668 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (atomising air)
V-IA2675 Air distributor 2: ball valve CLOSED
(optional connection)
V-IA2673 Air distributor 2: ball valve for OPEN
supply line to diesel oil control
valve
V-IA2672 Air distributor 2: ball valves for OPEN
V-IA2674 supply lines to automatic shut-off
valve combination (diesel oil)
SV-DO2043-C1 Pilot valves at automatic shut-off ready for operation

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 32 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

SV-DO2043-C2 valve combination (diesel oil)


SV-PA2043-C2 Pilot valve at automatic shut-off ready for operation
valve (atomising air)
SV-PA2043-C3 Pilot valve at automatic shut-off ready for operation
valve (purging air)
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 1612 13-1-01-SH 7/8)

V-IA2666 Pressure filter regulator ready for operation,


filter element clean
V-IA2663 Air distributor 3: ball valves CLOSED
V-IA2664 (optional connections)
V-IA2665 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at
ignition lance
V-IA2662 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at oil
lance
SV-DO2043-C4 Pilot valve at linear cylinder for ready for operation
extension and retraction of
ignition lance
SVC-DO2043-C5 Pilot valve at linear cylinder for ready for operation
SVO-DO2043-C5 extension and retraction of oil
lance
Boiler 2 – Burner D
Settings at “Burner Valve Set” station (10.14):
(For assignment of components refer to draw. no. 1612 13-1-14-SH 8/8)

V-IA2681 Pressure filter regulator ready for operation,


filter element clean
V-IA2687 Air distributor 1: ball valves CLOSED
V-IA2690 (optional connections)
V-IA2689 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (purging air)
V-IA2688 Air distributor 1: ball valve for OPEN
supply line to automatic shut-off
valve (atomising air)
Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:
24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 33 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

Ident. No. / Item No. Designation Position / Setting

V-IA2695 Air distributor 2: ball valve CLOSED


(optional connection)
V-IA2693 Air distributor 2: ball valve for OPEN
supply line to diesel oil control
valve
V-IA2692 Air distributor 2: ball valves for OPEN
V-IA2694 supply lines to automatic shut-off
valve combination (diesel oil)
SV-DO2043-D1 Pilot valves at automatic shut-off ready for operation
SV-DO2043-D2 valve combination (diesel oil)
SV-PA2043-D2 Pilot valve at automatic shut-off ready for operation
valve (atomising air)
SV-PA2043-D3 Pilot valve at automatic shut-off ready for operation
valve (purging air)
Settings upstream consumers (burner area):
(For assignment of components refer to draw. no. 2611 13-1-01-SH8/8)

V-IA2686 Pressure filter regulator ready for operation,


filter element clean
V-IA2683 Air distributor 3: ball valves CLOSED
V-IA2684 (optional connections)
V-IA2685 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at
ignition lance
V-IA2682 Air distributor 3: ball valve for OPEN
supply line to linear cylinder at oil
lance
SV-DO2043-D4 Pilot valve at linear cylinder for ready for operation
extension and retraction of
ignition lance
SVC-DO2043-D5 Pilot valve at linear cylinder for ready for operation
SVO-DO2043-D5 extension and retraction of oil
lance

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 34 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

B2 Principles of Operation

The control system is not in the scope of supply of M&S.

The operation instructions of the control system of the firing system have
therefore to be prepared by the supplier of the control system.
In the following there are only described the principles of operation.

Note: Refer also to M&S Doc. No. 1612 13-4-105 “General Description of
Burner Management System (BMS)” .

B 2.1 General
The start and stop sequences of the burner must be managed by an ac-
cording control system.

All required pressures and quantities of air and fuel, the positions of
valves or dampers as well as the flame detection of the main flame or the
ignitor operation must be monitored and controlled by the control system
in failsafe technology.

Prior to burner start, all manual valves have to be set in operation position,
the corresponding automatic equipment has to be ready for operation.

Note: Do not start a boiler with full load!

B 2.2 Furnace Purging


For furnace purging the damper has to be opened by the control system.

B 2.3 Ignitor
For main flame ignition the burner is provided with a high energy ignitor.

It is useful to proof the function of the ignitor by separate signals „start


ignitor“ and „stop ignitor“. Testing of the ignitor only should be possible if
the furnace is purged and the burner is out of operation.

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 35 of 36
OPERATION AND MAINTENANCE
MANUAL

Client / FORMOSA HEAVY Project /


Kunde: Kennwort:
LMYP-1
INDUSTRIES CORP.
Sales Order No. / Supplier Order No. /
AG-Auftrags-Nr.:
XZ 2M EPNA 4600 AN-Auftrags-Nr.:
1612 13

Order Scope /
Auftrag:
START-UP BURNER AND FIRING SYSTEM

B 2.4 Start Program Fuel Oil


If the signal „Start fuel oil ready“ is given, the fuel oil start program can be
started.

The fuel oil control valve, air control and burner air damper move to igni-
tion position and the ignitor starts running.

If the ignitor is in operation and all other operation conditions are fulfilled,
the fuel shut-off valves will open and the ignition safety time starts running
in the BMS.

After run down of the ignition safety time, the burner stays in operation, if
at least the flame detector sees the main flame.
The ignitor will be switched off automatically.

B 2.5 Stop Fuel Oil


Normally the oil lance should be cleaned with purging air after a burner
shut-down. Therefore, an according program sequence has to be provided
in the control system.

Issued / Erstellt: Checked / Geprüft: Revision / Änderung: Doc. No. / Dok.-Nr.:


24-02-2015 25-02-2015 Bu 24-02-2015 1612 13-4-099_Vol. B
S. Buck P. Kaphengst Rev. 0 Page / Seite: 36 of 36

Você também pode gostar