Você está na página 1de 24

Unionbank -Cebu Minglanilla Branch Interior Construction Works Page 1a of 24a Pages

PROPOSAL FORM OF

ZABAT BUILDERS CONSTRAK INC.

UNIONBANK
GF, UnionBank Plaza
Meralco cor. Onyx & Sapphire Sts.,
Ortigas Center, Pasig City

Attention : THE BIDDING COMMITTEE

Subject : INTERIOR CONSTRUCTION WORKS OF


UNIONBANK BRANCH –MINGLANILLA BRANCH

Gentlemen
In accordance with your invitation to bid, we hereby submit our proposal subject to all conditions and
requirements of the plan and specifications as prepared by AZ Architectural Planners, Inc. Unit 1507, 15/F
2210 Cityland Pasong Tamo Tower, Don Chino Roces Ave. Brgy. Pio del Pilar, Makati City and other related
documents for the above mentioned project.

We promise to furnish, deliver, place and complete any and all necessary materials, labor, appliance,
tools and equipment, supplies, utilities, transportation, supervision and other facilities in connection therewith
and to perform all operations for the complete scope of works at our own expense in the lumpsum amount of

PESOS : *** FOUR MILLION ONE HUNDRED FIFTY THOUSAND PESOS ONLY ***

( PHP 4,150,000.00 )

Note : Price quoted is inclusive of all taxes.

We understand that the Owner reserves the right to order additional work or to reduce the scope of
work if deemed necessary. All extra work shall be paid for in accordance with the Bid Schedule included in
this proposal.

Should we may be required to perform work over and above that required by the Contract Documents,
payments shall be based on bare cost of materials and labor plus mark-up per contract.

Prices of materials shall be based on bid unit market prices at the time the work order is made by
the Owner.

Should the current minimum wage be increased by legislation during the pendency of or any time
during the same as that indicated in the Bid Proposal.

Should we be ordered to omit / delete work required by the Contract Documents, we shall credit
the Owner, payments based on the bare cost of materials and labor plus mark-up.

We make this proposal with full knowledge of the kind, quantity and quality of the articles and
services required, and if said Proposal is accepted, we will enter into a contract with good sufficient
securities for the fruitful performance thereof.

We understand that the Owner reserves the right to reject any or all bids and to waive any defects

Authorized Signature: ________________________


Unionbank -Cebu Minglanilla Branch Interior Construction Works Page 2a of 24a Pages

or informality in the bids received and that the Owner may accept any item or group of items of any bid,
unless it is so disqualified by specific limitations.

We will complete the work in accordance with the plans, specifications and other related Contract
Documents within Thirty ( 30 ) CALENDAR DAYS (Sundays and legal holidays included) reckoned
from the date as stipulated in the Notice to Proceed. No request for the extension of time will be
made other than that due circumstances of "force majeure". We understand that time is an essential part
of this proposed Contract and upon failure to complete the work within the stipulated time, we agree to
pay liquidated damages per calendar day of delay as stipulated in the contract.

We certify that we have prepared and or checked and reviewed the contract procedures, contract
schedule, equipment requirements and price submitted with this Proposal.

In the event that we are awarded with this project, we will be assigning a licensed architect or
civil engineer at the site as a full time Project Architect / Engineer and a registered electrical engineer as
a full time Project Electrical Engineer.

We confirm the receipt and consideration of the following bid bulletins prior to the submittal of our
proposal. We have included the work called for in this bid bulletins in our proposed price.

a. Bid Bulletin No. ______________________ Date : ______________________


b. Bid Bulletin No. ______________________ Date : ______________________
c. Bid Bulletin No. ______________________ Date : ______________________

Authorized Signature: ________________________


Unionbank -Cebu Minglanilla Branch Interior Construction Works Page 3a of 24a Pages

SUMMARY OF WORK ITEMS


DIV. SCOPE OF WORKS LUMP SUM COST
02 SITE WORK PHP -
A. Demolition and Dismantling Works -
B. Site Preparation -
03 CONCRETING PHP -
A. Formworks/Scaffoldings -
B. Re-bars and Tie wires -
C. Concrete -
04 MASONRY - PHP -
05 METALS PHP -
A. Structural Steel Works -
B. Grillworks/Miscellaneous Steel Works -
06 CARPENTRY and PLASTIC WORKS PHP -
A. Partitions -
B. Architectural Woodworks -
C. Ceiling Works -
07 THERMAL & MOISTURE PROTECTION PHP -
A. Waterproofing Works -
B. Tinsmithry & Insulation
08 DOORS and WINDOWS PHP -
A. Wood Doors -
B. Glass / PVC and Metal Doors -
C. Door Hardwares -

09 FINISHES PHP -

B. Tileworks -
C. Ceiling Finishes -
D. Natural/Cement Plaster Finishes -
10 SPECIALTIES PHP -
A. Steel Shelves & Lockers -
B. Mirrors/Glass ledge -
C. Security & Decorative Film
D. Stainless Steel -
E. Aluminum Cladding Panel
15 PLUMBING WORKS #REF!
#REF! #REF!
B. Plumbing Fixtures #REF!
15-a #REF! #REF!
A. Airconditioning Works #REF!
#REF! #REF!
15-b FIRE PROTECTION WORKS #REF!
A. Fire Alarm System #REF!
B. Sprinkler Works #REF!
16 ELECTRICAL WORKS PHP 702,173.38
A. Electrical Service Entrance 49,499.06
B. Power Distribution and lighting Systems 512,147.40
C. Telephone and Data Communication
Systems
D. Panelboards 111,081.00
E. Security System 23,345.92
F. Miscellaneous Electrical Works 6,100.00
*** OTHER REQUIRED WORKS #REF! #REF!

Authorized Signature: ________________________


Unionbank -Cebu Minglanilla Branch Interior Construction Works Page 4a of 24a Pages

SUMMARY OF WORK ITEMS


DIV. SCOPE OF WORKS LUMP SUM COST
TOTAL COST INCLUSIVE OF MARK-UP & 12% RVAT #REF!
(INDICATE MAR-UP %USED)

Add : General Requirements PHP -


A. Bond Premiums -
B. Permits -
C. Mobilization / Demobilization -
D. General Cleaning -
E. Temporary Facilities -
F. For Permit / As-Built Plans -
G. Laboratory Testing Fees -
Less material salvage cost if applicable
TOTAL BID COST #REF!
SAY PHP 4,150,000.00
BID MARK-UP USED PLEASE INDICATE

Signature

Submitted by

Position

Firm ZABAT BUILDERS CONSTRAK INC

Date July 17, 2017

END OF SUMMARY OF ARCHITECTURAL/CIVIL/MECHANICAL/ELECTRICAL and PLUMBING Works


SEE ATTACHED DETAILED WORK ITEMS FOR REFERENCE

Authorized Signature: ________________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 5 of 24 Pages

NOTE TO THE BIDDER:


PLEASE INDICATE N.A. WHENEVER ITEMS ARE NOT "NOT APPLICABLE"
PLEASE PRINT ALL PAGES
DETAILED WORK ITEMS
DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS

01 GENERAL REQUIREMENTS
A. Bond Premiums
- Performance,Downpayment, All Risk
Insurance, Guarantee/Warranty Bond Lot
Notes:
- REQUIRED REFUNDABLE CONST Lot
BOND BY GENCON

Sub-Total
B. Permits Lot
- Building / Civil Works / Electrical /
Mechanical /Occupancy Permits
Note: All required payments by Gencon
No payment from UBP
- FALAR 1 & 2 application
- DENR/ECC if applicable
- Signage Permit
Note: Sign & seal in charge by signage KTR
- Inclusive of fire extinguishers sets as
required and approved by BFP
- Business Permit for new branches(Facilitation only)

Sub-Total
C. Mobilization and Demobilization Lot
Note: Add freight cost from Mla if applicable
Sub-Total
D. Gen. Cleaning/Hauling of Debris LEED Compliant Lot
- Clearing/cleaning, removal, hauling
and disposal of construction debris
from time to time (during and after
construction works) up to turn-over
and acceptance of the project.
Sub-Total
E. Temporary Facilities Lot
- Temporary enclosure
- Temporary lighting fixtures, power, water
consumption during construction
Sub-Total
F. For Permit/As-Built Plans
1. For Permit Plans Lot
2. For As-built Plans Lot
Note: Payment to be paid to AZAP.
Gencon to submit as- built to UBP based
on corrections in plans to be submitted
by contractor to AZAP.
- Signed and sealed all trades:
Architectural/ Civil/ Electrical/ Mechanical
Works inclusive of Professional Fees for
signed and sealed As-built plans

Sub-Total
G. Laboratory Testing
- Re-bars, CHB, concrete Lot
Note:
1. Tensile strength test for re-bars:
- 3 samples each size of re-bars used
2. Compressive test for CHB:
- 3 samples each size of CHB used
3. Compression test for concrete:

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 6 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
1 sample per 6.0 m3 of concrete
aggregate or fraction thereof of every
pouring for all RC componenst
Sub-Total
02 SITEWORK
A. Demolition and Dismantling Works
1. Demolition/dismantling/excavation works
on areas affected to implement
proposed plans Lot
Sub-Total
B. Site Preparation-Building Only LEED Compliant
1. Soil poisoning at all excavated areas
Note: Provide 5 year warranty Lot
2. 4 mils poyethelene sheet as vapor
barrier for new slab on fill Lot
3. Gravel bed NA m3
4. Excavation incl. of restoration works:
Note: Use concrete cutter
a. Footing
- Cash vault NA m3
- Wall NA m3
- Column NA m3
b. Trenching for sanitary pipes tapping Lot
5. Other required works:
a. Termite proofing Lot
b. Pest Control Lot

Sub-Total
C Site Development Works
1. Parking area
a. Fill/formworks Lot
b. Gravel bed NA m3
c. Rebars kgs
d. Concreting m3
e. Concrete wheel stopper inclusive
traffic paint finish Sets
2. Private electrical pole
a. Excavation, backfilling & formworks Lot
b. Gravel bed m3
c. Rebars kgs
d. Concreting m3
3. Fence-Footings, Columns
a. Excavation, backfilling & formworks Lot
b. Gravel bed m3
c. Rebars kgs
d. Concreting m3
e. CHB m2
f. Tool joint & paint finish 1 side m2
4. Genset house -all inclusive Lot
5. Termite proofing-site development Lot
6. Parking 12.5 mm dia nylon chain Lot
7. Other required works:

Sub-Total
03 CONCRETING
A. Formworks / Scaffoldings Lot
Sub-Total
B. Rebar and Tie wires
- Use Intermediate grade re-bars for all
re-bars works
1. Cash vault

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 7 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
a. Footing NA kgs
b. Floor Slab NA kgs
10mm 14.52 kgs
16mm NA kgs
c. Walls
10mm NA kgs
16mm NA kgs
d. Columns
10mm kgs
12mm kgs
16mm 6.10 kgs
e. Beams
10mm kgs
16mm kgs
f. Top slab
10mm kgs
16mm kgs
2. RC counters
a. Kitchen sink
12mm NA kgs
b. Lavatory NA kgs
3. Slabs
a. On-grade kgs
b. Elevated kgs
c. Tellers concrete platform
12mm kgs
d. Genset concrete platform kgs
4. RC columns kgs
5. RC footings
a. Wall kgs
b. Columns kgs
6. RC beams kgs
7. RC stairs kgs
8. RC tie beams kgs
9. Upstand/Lintel/Bond beams/RC ledges
10mm kgs
12mm kgs
10. Stiffener columns
10mm kgs
12mm kgs
11. Steps and ramp
12mm NA kgs
12. Retaining wall kgs
13. Tie-wires Lot
14. Other required works:

Sub-Total
C. Concrete
Slab on fill- 2500 psi
All other concreting works-3000 psi
1. Cash vault
a. Footing 31.74 m3
b. Floor Slab m3
c. Walls (ORDINARY CONCRETE) m3
c. Walls (LIGHTWEIGHT) m3
d. Columns m3
e. Beams (Included at walls) m3
f. Top slab (LIGHTWEIGHT) m3
2. RC counters
a. Kitchen sink m3
b. Lavatory m3

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 8 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
3. Slabs
a. On-grade m3
b. Elevated
- Conventional m3
- Lightweight m3
c. Teller's concrete platform m3
d. Genset concrete platform m3
4. RC columns m3
5. RC footings
a. Wall m3
b. Columns m3
6. RC beams m3
7. RC stairs m3
8. RC tie beams m3
9. Upstand/Lintel/Bond beams/RC ledges m3
10. Stiffener columns m3
11. Steps and ramp m3
12. Retaining wall m3
13. Other required works:

Sub-Total
04 MASONRY
- Inclusive of mortars, fillers, rebars,
tie wires and other accessories
1. Minimum 400 psi. CHB/CMU
a. 100 mm. thk. m2
b. 150 mm. thk. m2
2. Minimum 750 psi steam cured CHB/CMU
a. 100 mm thk. m2
b. 150 mm. thk. m2
3. Lightweight CHB/CMU
a. 100 mm thk. m2
b. 150 mm. thk. m2
4. Other required works:

Sub-Total
05 METALS
A. Structural Steel Works
Note: Steel shall be regionally sourced.

1. Structural steel componets of the ff:


a. Mezzanine flooring Lot
b. Vault
25mm MS.PLATE kgs
6.0mm MS.PLATE kgs
8x11.5 Channel kgs
12mm x 117mm Anchor bolt pcs
12mm x 3 Expansion shield pcs
c. Canopy Lot
d. Stairs Lot
e. Signage framing Lot
f. Roof Lot
2. CHB steel base connectors Lot
3. Fire exit landing Lot
4 Fire exit ladder rungs Lot
5. Other required works:
a. Slab support
- Channel Lot
- Decking m2
b. ACCU platform 3.00 Sets

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 9 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
c. Carbon Fiber Lot
Concrete Solution Builders & Supply
Joey Zialcita- 0917-5378553

Sub-Total
B. Grillworks/Miscellaneous Steel Works
1. Grill housing c/w Yale padlocks
a. ACCU 3.00 Sets
b. Electric meter Sets
c. Water meter Sets
2. Security grills inside ceiling
a. 12 mm dia rebars at 200 mm OCBW m2
50mm x 175mm x 3mm kgs
Plate/ Bolts/ Clip angle lot
3. Cash vault grills
a. MG-1: Grill panel m2
4. Stair railings
Note: SS handrail under stainless steel
a. Floor support type
- Interior Lot
- Exterior Lot
b. Wall mounted type Lot
5. Grillworks at the ff:
a. At windows (New & existing) m2
b. At open patio m2
6. Tellers elevated floor steel platform Lot
7. Ceiling framing Lot
8. Other required works:

Sub-Total
06 CARPENTRY and PLASTIC WORKS
Note:
- Inclusive of all accessories and
consummables, i.e. nails, glue,
cabinet hardwares and others.

A. Partitions
1. 12.5 mm. Thk floor to ceiling gypsum
board partition on metal studs:
a. Single wall m2
b. Double wall m2
2. Other required works:

Sub-Total
B. Architectural Woodworks
Note: Tellers, new accounts,forms counter,
back cabinets,Marketing wall
and guard's podium by Owner (OSM)
Note: 1.Wood shall not have addtl. Urea formaldehyde
2. Wood shall be certified wood w/ certificate
1. Overhead cabinet at the following:
a. Pantry m3
b. Cash vault
- Above SDB cabinet m3
- Inside cash area m3
2. Guards/Janitors wooden closet m3
3. Wall counters:
a. Pantry 3.40 LM
b. Working counter LM
4. FCU piping plywood cladding Sets
5. Modular SDB booth (Phenolic type)

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 10 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
a. Cubicle type c/w counter, mirror &
covelight Lot
b. Open counter type Lot
Supplier: GS Go Bros
Kristina- 0917-8198568
6. Cabinets above Signature card lateral file m3
7. Floor to ceiling cabinets at vault ante room m3
8. CIW signature card cabinet m3
9. Other required works:

Sub-Total
D. Ceiling Works
1. Cove LM
2. Other required works:

Sub-Total
07 THERMAL & MOISTURE PROTECTION
A. Waterproofing Works
Note: Provide 5 years warranty
Conduct flood testing for 72 hours.
1. Monoprufe WP m2
For pantry and toilets
Notes: Provide if area is with basement
or at upper level.
2. Reactamine 760 polyurea for roof decks m2
3. Unidri Super 20 plus CG 703/891 for Cistern m2
American Technologies Inc :
Ms Maricar 584 0000 loc. 3153
4. Boysen Plexibond for firewalls m2
5. Other required works:
Sub-Total
B. Tinsmithry & Insulation
1. Ga. 26 prepainted long span roofing
c/w flashing
a. Galvanized type m2
b. Aluminum type m2
2. Insulation-R+ Heatshield III m2
Sub-Total
08 DOORS and WINDOWS
Note: 1.Wood shall not have addtl. Urea formaldehyde
2. Wood shall be certified wood w/ certificate
A. Wood Doors
1. 44.5 mm. thk. FHC door with
6 mm. thk. Marine plywood on both
sides on KD tanguile frame
a. WD-1a: 600 mm width 1.00 Set
b. WD-1b: 700 mm width NA Set
c. WD-1c: 800 mm width 2.00 Set
d. WD-1d: 900 mm width 2.00 Set
e. WD-1e: 1000 mm width NA Set
2. 44.5 mm thk solid wood full louver door in
KD tanguile door jamb
a. WD-2: 700 mm width NA Set
b. WD-2a: 1200 mm width NA Set
c. WD-2b: 1400 mm width NA Set
d. WD-2c: 1600 mm width NA Set
3. Other required works
Sub-Total
B. Glass / PVC and Metal Doors
1. 12..0 mm thk tempered clear glass on
top & bottom FD-100 aluminum frame on
aluminum tubular frame all in beige
powder coated finish complete with

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 11 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
H-type door handle with lock
a. GD-1a:1800 mm width 2 leaf NA Set
b. GD-1b:1600 mm width 2 leaf NA Set
c. GD-2a: 1000 mm width 1 leaf NA Set
d. GD-2b: 900 mm width 1 leaf NA Set
2. 12..0 mm thk tempered clear glass on
concealed aluminum C holder with patch fittings
complete with H-type door handle with lock
a. GD-3:1800 mm width 2 leaf 1.00 Set
b. GD-4: 900 mm width 1 leaf Set
2. PD-2 :Phenolic divider/partition
a. Water closet cubicle 1.00 Set
b. Urinal divider 1.00 Set
3. Ga. 22 roll-up shutter beige pre-painted
with 3 rows of view slots m2
4. Steel louver door on Ga. 18 steel jamb
a. MD-1 : 900 mm width 1 leaf NA Set
b. MD-2a :1200 mm width- 2 leaf NA Set
c. MD-2b: 1400 mm width- 2 leaf NA Set
d. MD-2c: 1600 mm width-2 leaf NA Set
e. MD-2d: 1800 mm width-2 leaf NA Set
7.. 44.5 mm. thk fire rated steel plate FHC
metal door with panic lever device
a. MD-3: 900 mm width- 1 leaf Set
b. MD-3a: 1000mm width - 1 leaf Set
8. Steel grill door at vault
a. MGD-1:900 mm width swing door 1.00 Set
b. MGD-1a:900 mm sliding door 1.00 Set
9. Mesh type door on Ga. 18 GI pipe framing
a. MD-4 : 900 mm width 1 leaf Set
b. MD-4a :1200 mm width- 2 leaf Set
c. MD-4b: 1800 mm width- 2 leaf Set
10. PVC accordion door
a. PD-3: One side NA Set
b. PD-3a: 2 sides NA Set
11. 12..0 mm thk tempered clear glass on
top & bottom patch fitted lock and hinges
with H-type door handle 1500mm long
a. FGD-1:1800 mm width - 2 leaf
12. Other required works
Low Glass Partition lot

Sub-Total
C. Door Hardwares
Notes: 1. Glass doors locks, door closers &
hinges inclusive at door costings
2. Specified hardwares in this bid
form to supercede hardwares
indicated in the plans.
1. Locksets:
a. Lever keyed type (Wood & Metal door) 9.00 Set
- Schlage brand satin stainless
b.Cylindrical non-keyed type (Toilet door) 1.00 Set
- Schlage brand satin stainless
2. Deadbolt keyed both sides -Metal/Grill door:
- Schlage brand satin stainless Set
3. Door closer-Surface mounted silver finish
a. For wood doors-Ryobi 8803 Set
Authorized Signature: _______________________
Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 12 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
b. For PVC doors-Ryobi 901 Set
4. Door Stopper (Wood & Metal door) Set
- Hafele 93700702 stainless
5. Toilet ID-Male Female Stainless Set
6. Hinges-3-1/2" x 3-1/2" LP Satin stainless
hinges Fuji Japan brand. Provide 3
pcs./ FHC door, 4 pcs/louver door & Set
7. Yale padlocks 2.00 Pcs
9. Other required works:
c. SS railing support Lot
d. Steel casement window Lot
6. Epoxy painting c/w epoxy primer
Use B2900 B/S Acqua Epoxy White Part A w/
B/S Primeguard Primer
a. Metal door (Exterior use)
- Door panel m2
- Door jamb LM
b. ACCU platform & grills Set
c. Electric & water meter grills Set
d. Steel components of the ff:
- Vault Lot
- Canopy Lot
d. Steel awning window Lot
f. Fire exit landing & ladder rung Lot
g. Window grills Lot
h. Exterior steel railings Lot
7. Flat enamel paint finish
Use Davies Megacryl Flat Latex
a. All gypsum ceilings m2
b. All hardiflex ceilings m2
8. Boysen Arcytex plain exterior
Use B715 Wallguard Dirt Resisting Semi-gloss
Latex White or B/S B715 Permacoat Semi-gloss
Latex paint finish
9. Other required works:
Interior Walls m2

Sub-Total
B. Tileworks
1. FF-1 : 600 mm. x 600 mm. polished tiles
Supplier: Felport Noel Tabla 60.75 m2
0922-9471327
2. FF-2: 305 mm x 305 mm x 3.0 mm thk
Armstrong Excelon Imperial Vinyl tiles NA m2
Sandrift White
Supplier: World Home Depot
Chiqui Medel - 0917-8386106
3. FF-3: 200 mm x 200 mm Mariwasa
Maskara White unglazed ceramic tiles 5.12 m2
4. WF-3: 200 mm x 200 tiles Mariwasa
Romana white glazed tiles 18.72 m2
5. WB-2: 1 layer 200 mm x 200 mm
Mariwasa Maskara White unglazed tiles 18.72 m2
6. 20 mm. thk. CDS China granite/ Bulacan
beige marble slab at incl. of splashguard
at 200 mm. High at the ff:
a. Lavatory counter 0.30 m2
b. Kitchen sink counter 0.30 m2
7. FF-7: 300 mm x 300 mm Peppermint
gloss homogenous tiles
Supplier: GD Building Products
Jeffrey Shih: 0917-8425762 36.81 m2
8. FF-8: 100 mm x 100 mm x 10 mm thk

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 13 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
yellow paver tile as parking lines.
Supplier: GD Building Products 94.00 m2
Jeffrey Shih: 0917-8425762
9. 3M Brand Rubber Matt Gray Color
10. Other required works:

Sub-Total
C. Ceiling Finishes
1. C-1: 10 mm thk x 600 mm x 600 mm
Boral brand PVC laminated board
Shades profile on baked white
T-runners with perimeter angle
moulding NA m2
2. C-2: 12.5 mm thk Knauf brand gypsum
board ceiling on metal furring 20.25 m2
Supplier: World Home Depot
Chiqui Medel - 0917-8386106
3. C-3: 4.5 mm thk Hardiflex ceiling on
metal furring NA m2
4. C-6: Metal spandrel beige color panel
on metal furring NA m2
4. Covelights NA LM
5. False beams NA LM
6. Other required works:

Sub-Total
D. Natural/Cement Plaster Finishes
1. Plain cement/plaster finish for all existing
new CHB/ concrete walls and slabs NA m2
2. FF-4: No. 5 Beige pebble washout finish NA m2
3. FF-5: Plain cement finish NA m2
4. Other required works:

Sub-Total
10 SPECIALTIES
A. Steel Shelves & Lockers
1. Steel lockers
a. 9 openings 1.00 Sets
b. 3 openings (Guards/Janitors) 1.00 Sets
Sub-Total
B. Mirrors/Glass ledge
1. 100 wide clear glass ledge NA Sets
2. Facial mirror at toilet-frameless 1.00 Sets
3. Full body mirror at pantry (.70 x 1.50) 1.00 Sets
Sub-Total
C. Security & Decorative film/tints
1. 3M brand 4 mils clear security film
at main doors & glass panels NA m2
a. Travel expenses of installaler Lot
2. 3M brand 1-way silver tint
3. 3M brand Scotchcal frosted strip type
decorative film m2
Sub-Total
D. Stainless Steel
1. Grab bar for the disabled 1.00 Sets
2. Stair handrail NA LM
3. Ga. 18 roof gutters NA LM
4. Ramp for the disabled (both sides) 2.70 Sets
Sub-Total

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 14 of 24 Pages

DETAILED WORK ITEMS


DIV. SCOPE OF WORKS QTY UNIT MATERIAL LABOR
and SPECIFICATIONS
E.Aluminum Cladding Panel
1. C-7: 4.0 mm thk ACP exterior grade m2
Sub-Total

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 15 of 24 Pages

LUMP SUM
COST

-
-

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 16 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 17 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 18 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 19 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 20 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 21 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 22 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 23 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________


Unionbank - Cebu Minglanilla Branch Interior Construction Works Page 24 of 24 Pages

LUMP SUM
COST

Authorized Signature: _______________________

Você também pode gostar