Escolar Documentos
Profissional Documentos
Cultura Documentos
Gov’t/DPWH ME (QA) rock and gravel (w/o changing their minimum testing requirement for each project (shall not
DPWH Contractors’ and Consultants’ ME (QC) properties) be the only basis of number of testing)
c. Manufactured
Project Cost Limits (DO No. 98, S2016) - Bituminous materials, cement, paint,
ME1: 1P – P150M, 2P – P250M AC, 3P – P200M AC structural reinforcing steel bar
ME2: 1P – NCL, 2P – P300M AC, 3P – P250M AC d. Combined
NON-AME: 3P – P15M AC - Bituminous and Portland cement concrete
( partly or totally manufactured)
Topics in WME-AECE
1. Construction Materials Specifications 2. Handling and Storage of Materials
2. Sampling and Testing Procedures Should be placed in a safe place protected from
3. Test Results Calculations/Interpretation/Evaluation contamination or action of water and accessible
4. DPWH Minimum Testing Requirements to the project site
5. Materials Quality Control Terminologies/Practices
6. Duties and Responsibilities of Materials Engineer 3. Sampling and Testing of Materials
7. Quality Control Implementation/Documentation Proper sampling is indicated in AASHTO and
ASTM. QC requires proper Testing construction
3 Entities method and workmanship
1. The Owner
2. The Implementer Construction Quality Control – A Joint Effort
3. The Consultant in Quality of Works
Inspection
Quality A PROMPT action to assure compliance and minimize
Level of performance in terms of service and life neglect of requirements