2 Types of Accreditation - Washed/manufactured sand, crushed Quantity stated in the program of works is the basis of

Gov’t/DPWH ME (QA) rock and gravel (w/o changing their minimum testing requirement for each project (shall not
DPWH Contractors’ and Consultants’ ME (QC) properties) be the only basis of number of testing)
c. Manufactured
Project Cost Limits (DO No. 98, S2016) - Bituminous materials, cement, paint,
ME1: 1P – P150M, 2P – P250M AC, 3P – P200M AC structural reinforcing steel bar
ME2: 1P – NCL, 2P – P300M AC, 3P – P250M AC d. Combined
NON-AME: 3P – P15M AC - Bituminous and Portland cement concrete
( partly or totally manufactured)
Topics in WME-AECE
1. Construction Materials Specifications 2. Handling and Storage of Materials
2. Sampling and Testing Procedures Should be placed in a safe place protected from
3. Test Results Calculations/Interpretation/Evaluation contamination or action of water and accessible
4. DPWH Minimum Testing Requirements to the project site
5. Materials Quality Control Terminologies/Practices
6. Duties and Responsibilities of Materials Engineer 3. Sampling and Testing of Materials
7. Quality Control Implementation/Documentation Proper sampling is indicated in AASHTO and
ASTM. QC requires proper Testing construction
3 Entities method and workmanship
1. The Owner
2. The Implementer Construction Quality Control – A Joint Effort
3. The Consultant in Quality of Works
Inspection
Quality A PROMPT action to assure compliance and minimize
Level of performance in terms of service and life neglect of requirements

Quality Control Two-fold Program


To regulate (economical work, safety and beauty) 1. Quality control by the builder/contractor
2. Quality assurance by the owner
Quality Assurance
Materials are regulated in accordance w/ specifications Construction Quality Control
A system which involves the joint but independent
Works of Quality Control efforts of the owner and contractor to achieve the level
Consists of all work elements which contribute to the of quality (check and balance system)
quality of the output of the organization
Contractor Quality Control
Works of Quality Assurance Builder’s task to regulate, test, and inspect his
Consists of all work elements which contribute to the procedures, equipment, materials, and manpower
quality of the output of some other organization
Owner Quality Assurance
The Purpose of Quality Control Owner’s task to verify that the contractor’s quality
a. Ensure the highest quality of work and extend control system is functioning and that the competed
the service of life of any structure parts of the structure are of the specified quality
b. Check and regulate the use of construction
materials and to economize on the cost of Quality Control Program
construction
- First Step: Preparation of the plan or program by
The Quality Control Procedures the contractor
- Includes provisions on how the work should be
1. The Selection of Materials (Location inspected and;
Information) - The quantity, amount, and nature of testing work to
a. Raw be done (random testing, indicates whether a
- Soil, sand and bank or river gravel (w/ project laboratory will be set up to facilitate testing)
little or no processing)
b. Processed Minimum Testing Requirement