HOJA DE METRADO
01 SERVICIO HIGENICO
01.01 ESTRUCTURA
01.01.01 SERVICIOS PROVICIONALES
01.01.01.01 SEÑALIZACION DURANTE LA EJECUCIÓN m2
EDIFICIO 1 1.00 area 100.00
EDIFICIO 2 1.00 area 54.00
EDIFICIO 3 1.00 area 125.00
01.01.01.02 FLETE TERRESTRE glb
1.00
01.01.02 SERVICIO PRELIMINAR
TRAZO, NIVELES REPLANTEO DURANTE LA
01.01.02.01 M2
EJECUCION
SS. HH. 1 1.00 area 11.50
SS. HH. 2 1.00 area 12.68
SS. HH. 3 1.00 area 11.73
SS. HH. 4 1.00 area 12.94
SS. HH. 5 1.00 area 11.05
SS. HH. 6 1.00 area 7.36
SS. HH. 7 1.00 area 7.64
SS. HH. 8 1.00 area 10.51
SS. HH. 9 1.00 area 8.84
SS. HH. 10 1.00 area 9.51
SS. HH. 11 1.00 area 8.40
SS. HH. 12 1.00 area 9.91
SS. HH. 13 1.00 area 8.93
SS. HH. 14 1.00 area 8.93
SS. HH. 15 1.00 area 9.91
SS. HH. 16 1.00 area 9.40
SS. HH. 17 1.00 area 9.40
SS. HH. 18 1.00 area 9.40
SS. HH. 19 1.00 area 9.40
SS. HH. 20 1.00 area 2.43
SS. HH. 21 1.00 area 2.39
SS. HH. 22 1.00 area 1.88
SS. HH. 23 1.00 area 1.80
SS. HH. 24 1.00 area 1.80
SS. HH. 25 1.00 area 1.88
01.01.02.02 LIJADO Y DESMANCHE DE MUROS Y CIELO RASO m2
LIJADO
SS. HH. 1 1.00 17.80 1.35
SS. HH. 2 1.00 17.90 1.35
SS. HH. 3 1.00 14.60 1.35
SS. HH. 4 1.00 17.40 1.50
SS. HH. 5 1.00 12.44 2.09
SS. HH. 6 1.00 18.28 2.20
SS. HH. 7 1.00 12.76 2.20
SS. HH. 8 1.00 13.99 2.20
SS. HH. 9 1.00 14.51 8.54
SS. HH. 10 1.00 13.61 2.60
SS. HH. 11 1.00 14.25 2.60
SS. HH. 12 1.00 15.40 1.00
SS. HH. 13 1.00 15.50 1.00
SS. HH. 14 1.00 15.42 1.90
SS. HH. 15 1.00 15.02 1.90
SS. HH. 16 1.00 15.42 1.90
SS. HH. 17 1.00 15.02 1.90
SS. HH. 18 1.00 15.42 1.90
SS. HH. 19 1.00 15.42 1.90
En Cielo raso
SS. HH. 1 1.00 area 11.50
SS. HH. 2 1.00 area 12.68
SS. HH. 3 1.00 area 11.73
SS. HH. 4 1.00 area 12.94
SS. HH. 5 1.00 area 11.05
SS. HH. 6 1.00 area 7.36
SS. HH. 7 1.00 area 7.64
SS. HH. 8 1.00 area 10.51
SS. HH. 9 1.00 area 8.84
SS. HH. 10 1.00 area 9.51
SS. HH. 11 1.00 area 8.40
SS. HH. 12 1.00 area 9.91
SS. HH. 13 1.00 area 8.93
SS. HH. 14 1.00 area 8.93
SS. HH. 15 1.00 area 9.91
SS. HH. 16 1.00 area 9.40
SS. HH. 17 1.00 area 9.40
SS. HH. 18 1.00 area 9.40
SS. HH. 19 1.00 area 9.40
DESENCHAPE DE MURO
SS. HH. 1 1.00 16.65 1.60
SS. HH. 2 1.00 18.25 1.60
SS. HH. 3 1.00 13.70 1.60
SS. HH. 4 1.00 16.20 1.60
SS. HH. 5 1.00 13.70 1.60
SS. HH. 6 1.00 11.32 1.60
SS. HH. 7 1.00 11.48 1.60
SS. HH. 8 1.00 13.80 1.60
SS. HH. 9 1.00 13.90 1.60
SS. HH. 10 1.00 12.71 1.30
SS. HH. 11 1.00 13.35 1.30
01.01.02.03 DESENCHAPE DE PISO m2
SS. HH. 1 1.00 area 11.50
SS. HH. 2 1.00 area 12.68
SS. HH. 3 1.00 area 11.73
SS. HH. 4 1.00 area 12.94
SS. HH. 5 1.00 area 11.05
SS. HH. 6 1.00 area 7.36
SS. HH. 7 1.00 area 7.64
SS. HH. 8 1.00 area 10.51
SS. HH. 9 1.00 area 8.84
SS. HH. 10 1.00 area 9.51
SS. HH. 11 1.00 area 8.40
01.01.02.04 LIMPIEZA DEL TERRENO MANUAL M2
SS. HH. 1 1.00 area 11.50
SS. HH. 2 1.00 area 12.68
SS. HH. 3 1.00 area 11.73
SS. HH. 4 1.00 area 12.94
SS. HH. 5 1.00 area 11.05
SS. HH. 6 1.00 area 7.36
SS. HH. 7 1.00 area 7.64
SS. HH. 8 1.00 area 10.51
SS. HH. 9 1.00 area 8.84
SS. HH. 10 1.00 area 9.51
SS. HH. 11 1.00 area 8.40
SS. HH. 12 1.00 area 9.91
SS. HH. 13 1.00 area 8.93
SS. HH. 14 1.00 area 8.93
SS. HH. 15 1.00 area 9.91
SS. HH. 16 1.00 area 9.40
SS. HH. 17 1.00 area 9.40
SS. HH. 18 1.00 area 9.40
SS. HH. 19 1.00 area 9.40
SS. HH. 20 1.00 area 2.43
SS. HH. 21 1.00 area 2.39
SS. HH. 22 1.00 area 1.88
SS. HH. 23 1.00 area 1.80
SS. HH. 24 1.00 area 1.80
SS. HH. 25 1.00 area 1.88
01.01.02.05 DEMOLICION Y DESMONTAJE
01.01.02.05.01 DESMONTAJE
01.01.02.05.01.01 DESMONTAJE DE PUERTA und
SS. HH. 1 1.00
SS. HH. 2 1.00
SS. HH. 3 1.00
01.01.02.05.01.02 DESMONTAJE DE LAVADEROS und
SS. HH. 1 3.00
SS. HH. 2 2.00
SS. HH. 3 3.00
SS. HH. 4 3.00
SS. HH. 5 2.00
SS. HH. 8 2.00
SS. HH. 9 2.00
SS. HH. 10 2.00
SS. HH. 11 2.00
01.01.02.05.01.03 DESMONTAJE DE INODORO und
SS. HH. 1 2.00
SS. HH. 2 3.00
SS. HH. 3 3.00
SS. HH. 4 3.00
SS. HH. 5 2.00
SS. HH. 8 3.00
SS. HH. 9 2.00
SS. HH. 10 3.00
SS. HH. 11 2.00
01.01.02.05.01.04 DESMONTAJE DE DIVISIONES DE SS.HH und
SS. HH. 1 2.00
SS. HH. 2 3.00
SS. HH. 3 3.00
SS. HH. 4 3.00
SS. HH. 5 2.00
01.01.02.05.01.05 REMOCION DE TABIQUERIA DE MADERA m2
SS. HH. 8 ### ### ###
SS. HH. 9 ### ### ###
SS. HH. 10 2.00 1.80 1.70
SS. HH. 11 1.00 1.80 1.70
01.01.02.05.02 DEMOLICIONES
01.01.02.05.02.01 DEMOLICIONES DE MURO m2
Servicio Higienico 1 1.00 0.65 1.60
1.00 1.45 0.40
Servicio Higienico 2 1.00 0.60 1.60
1.00 0.68 0.40
Servicio Higienico 3 1.00 1.20 1.60
Servicio Higienico 4 1.00 0.60 1.60
1.00 0.65 0.40
Servicio Higienico 5 1.00 1.60 0.40
1.00 0.65 1.60
Servicio Higienico 8 1.00 0.40 0.40
1.00 1.38 0.40
Servicio Higienico 10 1.00 1.38 0.40
01.01.03 TRABAJOS PRELIMINARES
01.01.03.01 ACARREO DE MATERIAL PROCEDENTE DE DESMONTAJE und
DESMONTAJE DE PUERTA 3.00
DESMONTAJE DE LAVADEROS 21.00
DESMONTAJE DE INODORO 18.00
DESMONTAJE DE DIVISIONES DE SS.HH 13.00
REMOCION DE TABIQUERIA DE MADERA 21.42
01.01.03.02 ACARREO DE MATERIAL PROCEDENTE DE DEMOLICION m3
Muros de Ladrillo
Servicio Higienico 1 1.00 0.65 0.20 1.60
1.00 1.45 0.15 0.40
Servicio Higienico 2 1.00 0.60 0.20 1.60
1.00 0.68 0.10 0.40
Servicio Higienico 3 1.00 1.20 0.20 1.60
Servicio Higienico 4 1.00 0.60 0.20 1.60
1.00 0.65 0.20 0.40
Servicio Higienico 5 1.00 1.60 0.20 0.40
1.00 0.65 0.20 1.60
Servicio Higienico 8 1.00 0.40 0.10 0.40
1.00 1.38 0.10 0.40
Servicio Higienico 10 1.00 1.38 0.10 0.40
01.01.03.03 ACARREO DE MATERIAL PROCEDENTE DE DESCHAPE m3
Desenchape de Muros
SS. HH. 1 1.00 16.65 0.02 1.60
SS. HH. 2 1.00 18.25 0.02 1.60
SS. HH. 3 1.00 13.70 0.02 1.60
SS. HH. 4 1.00 16.20 0.02 1.60
SS. HH. 5 1.00 13.70 0.02 1.60
SS. HH. 6 1.00 11.32 0.02 1.60
SS. HH. 7 1.00 11.48 0.02 1.60
SS. HH. 8 1.00 13.80 0.02 1.60
SS. HH. 9 1.00 13.90 0.02 1.60
SS. HH. 10 1.00 12.71 0.02 1.30
SS. HH. 11 1.00 13.35 0.02 1.30
Desenchape de Pisos
SS. HH. 1 1.00 area 11.50 0.02
SS. HH. 2 1.00 area 12.68 0.02
SS. HH. 3 1.00 area 11.73 0.02
SS. HH. 4 1.00 area 12.94 0.02
SS. HH. 5 1.00 area 11.05 0.02
SS. HH. 6 1.00 area 7.36 0.02
SS. HH. 7 1.00 area 7.64 0.02
SS. HH. 8 1.00 area 10.51 0.02
SS. HH. 9 1.00 area 8.84 0.02
SS. HH. 10 1.00 area 9.51 0.02
SS. HH. 11 1.00 area 8.40 0.02
279.00 279.00
100.00
54.00
125.00
1.00 1.00
1.00
199.60 199.60
11.50
12.68
11.73
12.94
11.05
7.36
7.64
10.51
8.84
9.51
8.40
9.91
8.93
8.93
9.91
9.40
9.40
9.40
9.40
2.43
2.39
1.88
1.80
1.80
1.88
620.59 1,048.30
24.03
24.17
19.71
26.10
26.00
40.22
28.07
30.78
123.92
35.39
37.05
15.40
15.50
29.30
28.54
29.30
28.54
29.30
29.30
187.43
11.50
12.68
11.73
12.94
11.05
7.36
7.64
10.51
8.84
9.51
8.40
9.91
8.93
8.93
9.91
9.40
9.40
9.40
9.40
240.28
26.64
29.20
21.92
25.92
21.92
18.11
18.37
22.08
22.24
16.52
17.36
112.16 112.16
11.50
12.68
11.73
12.94
11.05
7.36
7.64
10.51
8.84
9.51
8.40
199.60 199.60
11.50
12.68
11.73
12.94
11.05
7.36
7.64
10.51
8.84
9.51
8.40
9.91
8.93
8.93
9.91
9.40
9.40
9.40
9.40
2.43
2.39
1.88
1.80
1.80
1.88
3.00 3.00
1.00
1.00
1.00
21.00 21.00
3.00
2.00
3.00
3.00
2.00
2.00
2.00
2.00
2.00
18.00 18.00
2.00
3.00
3.00
3.00
2.00
3.00
2.00
3.00
2.00
13.00 13.00
2.00
3.00
3.00
3.00
2.00
21.42 21.42
###
###
6.12
3.06
8.93 8.93
1.04
0.58
0.96
0.27
1.92
0.96
0.26
0.64
1.04
0.16
0.55
0.55
76.42 76.42
3.00
21.00
18.00
13.00
21.42
2.03
2.03
0.21
0.09
0.19
0.03
0.38
0.19
0.05
0.13
0.21
0.02
0.06
0.06
8.80
6.00
0.53
0.58
0.44
0.52
0.44
0.36
0.37
0.44
0.44
0.33
0.35
2.80
0.23
0.25
0.23
0.26
0.22
0.15
0.15
0.21
0.18
0.19
0.17
3.09 3.09
1.52
1.57
2.33 2.33
0.13
0.12
0.20
0.12
0.12
0.12
0.12
0.12
0.08
0.08
0.07
0.08
0.07
0.08
0.14
0.12
0.07
0.08
0.14
0.12
0.07
0.08
734.81
FACTOR 216.43
22.85
35.03
22.11
19.53
14.87
13.41
13.41
24.20
13.41
24.20
13.41
518.38
55.54
55.54
55.54
55.54
37.03
37.03
37.03
55.54
37.03
55.54
37.03
38.83 38.83
4.37
5.30
4.31
4.22
2.85
2.72
2.72
3.47
2.72
3.43
2.72
39.92 39.92
4.27
5.34
4.41
4.33
2.99
2.86
2.86
3.59
2.86
3.55
2.86
112.16 112.16
11.50
12.68
11.73
12.94
11.05
7.36
7.64
10.51
8.84
9.51
8.40
41.92 41.92
4.27
5.34
4.41
4.33
2.99
2.86
2.86
3.59
2.86
3.55
2.86
317.81 317.81
32.04
32.22
32.04
31.32
32.04
22.68
22.97
25.18
26.44
27.72
33.16
12.84 12.84
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.24
0.24
0.24
0.24
0.24
0.24
3.00 3.00
1.00
1.00
1.00
22.00 22.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
27.00 27.00
2.00
3.00
3.00
3.00
2.00
2.00
2.00
3.00
2.00
3.00
2.00
10.00 10.00
2.00
2.00
2.00
2.00
2.00
78.47 78.47
2.55
1.77
5.10
2.65
5.10
2.65
5.10
2.65
2.55
1.77
3.57
2.38
3.23
2.55
3.23
2.55
3.23
2.55
3.57
2.38
3.23
2.55
3.23
2.55
3.23
2.55
19.00 19.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
9.00 9.00
3.00
3.00
3.00
936.30
630.27
24.03
24.17
17.80
38.63
32.57
40.22
28.07
30.78
123.92
15.40
15.50
30.09
29.33
30.09
29.33
30.09
30.09
30.09
30.09
306.03
11.65
12.83
12.44
14.53
13.64
7.60
7.86
9.68
8.54
15.40
9.50
22.80
22.80
22.80
22.80
22.80
22.80
22.80
22.80
153.00 153.00
55.00
23.00
75.00
3.00
3.00
3.00
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
3.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
3.00
3.00
3.00
2.00
2.00
2.00
3.00
2.00
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
2.50
45.00 45.00
2.00
3.00
3.00
3.00
2.00
3.00
2.00
3.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00 4.00
2.00
2.00
30.00 30.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
2.00
2.00
4.00
2.00
2.00
10.00
2.00
2.00
2.00
2.00
2.00
0.26
0.11
0.15
0.26
0.47
0.51
0.18
0.26
0.18
0.26
17.90 17.90
17.90
11.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
11.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00
2.00
2.00
4.00
6.00
6.00
4.00
4.00
4.00
4.00
6.00
8.00
4.00
4.00
18.00
12.00
6.00
6.00
2.00
2.00
3.00
2.00
4.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.00 4.00
2.00
2.00
4.00 4.00
2.00
2.00
ANALISIS DE PRECIOS UNITARIOS - ESTRUCTURAS
Presupuesto CONTRATACIÓN DE SERVICIOS PARA ACONDICIONAMIENTO DE LOS AMBIENTES DEL LOCAL F01L01 (OXAPAMPA) DE ACUERDO A LO
INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
Materiales
0267110001 CINTA DE SEÑALIZACION und 0.0010
Materiales
0238010004 LIJA PARA PARED plg 0.5150
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Partida 01.02.03 REMOCION DE TABIQUERIA DE MADERA
Rendimiento m2/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010005 PEON hh 2.0000 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 2.0000
0301340001 ANDAMIO METALICO hm 1.0000 0.5000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 2.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Partida 01.02.08 DESCHAPE DE MURO
Rendimiento m2/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m2
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010004 OFICIAL hh 1.0000 0.3200
0101010005 PEON hh 1.0000 0.3200
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
MARTILLO ELECTRICO hm 1.0000 0.3200
Materiales
0246180002 DISCO DE DESBASTE DE 7" und 0.0010
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
MARTILLO ELECTRICO hm 1.0000 0.2286
Materiales
0246180002 DISCO DE DESBASTE DE 7" und 0.0010
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03012200040002 CAMION VOLQUETE DE 10 m3 hm 1.0000 0.3200
Materiales
02130400010001 TIZA BOLSA DE 40 kg und 0.0200
02130600010001 OCRE ROJO kg 0.0100
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301000002 NIVEL TOPOGRAFICO día 1.0000 0.0031
03010000110001 TEODOLITO día 1.0000 0.0031
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000
02070200010002 ARENA GRUESA m3 0.4000
0207070001 AGUA PUESTA EN OBRA m3 0.1850
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.0000
0231010001 MADERA TORNILLO p2 0.0833
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.1000
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.8000
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.1000
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.2000
0231010001 MADERA TORNILLO p2 3.6500
02310500010005 TRIPLAY DE 1.20X2.40 m X 18 mm und 0.0700
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0300
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0300
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02070200010001 ARENA FINA m3 0.0200
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.2500
0290130021 AGUA m3 0.0900
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.2500
Materiales
02041200010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 0.0400
02190100010005 CONCRETO PREMEZCLADO F'C=140 kg/cm2 m3 0.3400
0231010001 MADERA TORNILLO p2 0.3704
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03010600020002 REGLA DE ALUMINIO 1½" X 4" X 10" und 0.0020
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.0068
URAS
450.00
Precio S/. Parcial S/.
450.00 450.00
450.00
500.00
Precio S/. Parcial S/.
500.00 500.00
500.00
1.75
17.03 1.70
1.70
49.00 0.05
0.05
4.36
Precio S/. Parcial S/.
15.33 3.07
3.07
2.50 1.29
1.29
15.79
Precio S/. Parcial S/.
15.33 15.33
15.33
15.33 0.46
0.46
15.67
Precio S/. Parcial S/.
15.33 15.33
15.33
15.33 0.31
6.00 0.03
0.34
21.43
Precio S/. Parcial S/.
21.01 21.01
21.01
21.01 0.42
0.42
14.18
Precio S/. Parcial S/.
21.01 5.25
17.03 8.52
13.77
13.77 0.41
0.41
15.75
Precio S/. Parcial S/.
21.01 11.20
15.33 4.09
15.29
15.29 0.46
0.46
15.75
Precio S/. Parcial S/.
21.01 11.20
15.33 4.09
15.29
15.29 0.46
0.46
10.96
Precio S/. Parcial S/.
17.03 5.45
15.33 4.91
10.36
10.36 0.31
90.00 0.29
0.60
9.45
Precio S/. Parcial S/.
17.03 9.08
9.08
97.00 0.10
0.10
9.08 0.27
0.27
7.82
Precio S/. Parcial S/.
17.03 3.89
15.33 3.50
7.39
7.39 0.22
90.00 0.21
0.43
9.45
Precio S/. Parcial S/.
17.03 9.08
9.08
97.00 0.10
0.10
9.08 0.27
0.27
3,500.00
Precio S/. Parcial S/.
3,500.00 3,500.00
3,500.00
38.90
Precio S/. Parcial S/.
15.33 9.81
9.81
9.81 0.29
90.00 28.80
29.09
1.96
Precio S/. Parcial S/.
15.33 1.15
21.01 0.53
1.68
5.00 0.10
7.50 0.08
0.18
1.68 0.05
6.36 0.02
8.40 0.03
0.10
336.47
Precio S/. Parcial S/.
21.01 10.51
17.03 8.52
15.33 61.32
80.35
55.00 49.50
55.00 22.00
5.00 0.93
20.50 164.00
4.66 0.39
236.82
25.00 2.50
21.00 16.80
19.30
58.70
Precio S/. Parcial S/.
21.01 14.01
17.03 11.35
15.33 7.67
33.03
4.50 0.45
4.23 0.85
6.00 21.90
21.18 1.48
24.68
33.03 0.99
0.99
5.44
Precio S/. Parcial S/.
21.01 0.76
17.03 1.24
2.00
4.50 0.14
3.15 3.24
3.38
2.00 0.06
0.06
24.11
Precio S/. Parcial S/.
21.01 14.01
14.01
130.00 2.60
20.50 5.13
5.00 0.45
8.18
14.01 0.42
6.00 1.50
1.92
67.97
Precio S/. Parcial S/.
21.01 3.43
17.03 0.93
15.33 5.01
9.37
4.23 0.17
169.49 57.63
4.66 1.73
59.53
9.37 0.28
89.00 0.18
8.40 0.06
0.52
PRESUPUESTO - ARQUITECTUTA
Presupuesto
CONTRATACIÓN DE SERVICIOS PARA ACONDICIONAMIENTO DE LOS AMBIENTES DEL LOCAL F01L01 (OXAPAMPA) DE ACU
LOS INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
: CONTRATACION DE SERVICIOS PARA ACONDICONAMIENTO DE LOS AMBIENTES DE LAS FACULTADES DE CIENCIAS AGROPECUARIAS
SERVICIO
INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
EJECUTA : UNIVERSIDAD NACIONAL DANIEL ALCIDES CARRION
UBICACIÓN : CIUDAD UNIVERSITARIA - YANACANCHA - PASCO - PASCO
HOJA DE METRADO
DIMENSIONES
ITEM DESCRIPCION UND. CANT.
LARGO
01.02 ARQUIITECTURA
01.02.01 ENCHAPE
01.02.01.01 PISO DE CERAMICO DE ALTO TRANSITO m2
SS. HH. 1 1.00 area
SS. HH. 2 1.00 area
SS. HH. 3 1.00 area
SS. HH. 4 1.00 area
SS. HH. 5 1.00 area
SS. HH. 6 1.00 area
SS. HH. 7 1.00 area
SS. HH. 8 1.00 area
SS. HH. 9 1.00 area
SS. HH. 10 1.00 area
SS. HH. 11 1.00 area
01.02.01.02 MESA DE LAVADERO m2
SS. HH. 1 1.00 area
SS. HH. 2 1.00 area
SS. HH. 3 1.00 area
SS. HH. 4 1.00 area
SS. HH. 5 1.00 area
SS. HH. 6 1.00 area
SS. HH. 7 1.00 area
SS. HH. 8 1.00 area
SS. HH. 9 1.00 area
SS. HH. 10 1.00 area
SS. HH. 11 1.00 area
01.02.01.03 ZOCALO EN SS.HH m2
SS. HH. 1 1.00 17.80
SS. HH. 2 1.00 17.90
SS. HH. 3 1.00 17.80
SS. HH. 4 1.00 17.40
SS. HH. 5 1.00 17.80
SS. HH. 6 1.00 12.60
SS. HH. 7 1.00 12.76
SS. HH. 8 1.00 13.99
SS. HH. 9 1.00 14.69
SS. HH. 10 1.00 15.40
SS. HH. 11 1.00 18.42
02.05 PINTURAS
02.05.01 PINTURA LATEX EN INTERIORES A DOS MANOS m2
En Muros
SS. HH. 1 1.00 17.80
SS. HH. 2 1.00 17.90
SS. HH. 3 1.00 17.80
SS. HH. 4 1.00 17.40
SS. HH. 5 1.00 12.44
SS. HH. 6 1.00 18.28
SS. HH. 7 1.00 12.76
SS. HH. 8 1.00 13.99
SS. HH. 9 1.00 14.51
SS. HH. 10 1.00 15.40
SS. HH. 11 1.00 15.50
SS. HH. 12 1.00 15.42
SS. HH. 13 1.00 15.02
SS. HH. 14 1.00 15.42
SS. HH. 15 1.00 15.02
SS. HH. 16 1.00 15.42
SS. HH. 17 1.00 15.42
SS. HH. 18 1.00 15.42
SS. HH. 19 1.00 15.42
En Cieloraso
SS. HH. 1 1.00 area
SS. HH. 2 1.00 area
SS. HH. 3 1.00 area
SS. HH. 4 1.00 3.46
SS. HH. 5 1.00 3.41
SS. HH. 6 1.00 area
SS. HH. 7 1.00 area
SS. HH. 8 1.00 area
SS. HH. 9 1.00 area
SS. HH. 10 1.00 area
SS. HH. 11 1.00 area
SS. HH. 12 1.00 2.43
SS. HH. 13 1.00 2.43
SS. HH. 14 1.00 2.43
SS. HH. 15 1.00 2.43
SS. HH. 16 1.00 2.43
SS. HH. 17 1.00 2.43
SS. HH. 18 1.00 2.43
SS. HH. 19 1.00 2.43
MBIENTES
DIMENSIONES
PARCIAL SUB TOTAL TOTAL
ANCHO ALTO
112.16 112.16
11.50 11.50
12.68 12.68
11.73 11.73
12.94 12.94
11.05 11.05
7.36 7.36
7.64 7.64
10.51 10.51
8.84 8.84
9.51 9.51
8.40 8.40
41.92 41.92
4.27 4.27
5.34 5.34
4.41 4.41
4.33 4.33
2.99 2.99
2.86 2.86
2.86 2.86
3.59 3.59
2.86 2.86
3.55 3.55
2.86 2.86
317.81 317.81
1.80 32.04
1.80 32.22
1.80 32.04
1.80 31.32
1.80 32.04
1.80 22.68
1.80 22.97
1.80 25.18
1.80 26.44
1.80 27.72
1.80 33.16
3.00 3.00
1.00
1.00
1.00
27.00 27.00
2.00
3.00
3.00
3.00
2.00
2.00
2.00
3.00
2.00
3.00
2.00
10.00 10.00
2.00
2.00
2.00
2.00
2.00
16.00 16.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
78.47 78.47
1.70 2.55
1.70 1.77
1.70 5.10
1.70 2.65
1.70 5.10
1.70 2.65
1.70 5.10
1.70 2.65
1.70 2.55
1.70 1.77
1.70 3.57
1.70 2.38
1.70 3.23
1.70 2.55
1.70 3.23
1.70 2.55
1.70 3.23
1.70 2.55
1.70 3.57
1.70 2.38
1.70 3.23
1.70 2.55
1.70 3.23
1.70 2.55
1.70 3.23
1.70 2.55
19.00 19.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
9.00 9.00
3.00
3.00
3.00
936.30
630.27
1.35 24.03
1.35 24.17
17.80
1.50 12.53 38.63
2.09 6.57 32.57
2.20 40.22
2.20 28.07
2.20 30.78
8.54 123.92
1.00 15.40
1.00 15.50
1.90 0.79 30.09
1.90 0.79 29.33
1.90 0.79 30.09
1.90 0.79 29.33
1.90 0.79 30.09
1.90 0.79 30.09
1.90 0.79 30.09
1.90 0.79 30.09
306.03
11.65 11.65
12.83 12.83
12.44 12.44
4.20 14.53
4.00 13.64
7.60 7.60
7.86 7.86
9.68 9.68
8.54 8.54
15.40 15.40
9.50 9.50
4.70 11.37 22.80
4.70 11.37 22.80
4.70 11.37 22.80
4.70 11.37 22.80
4.70 11.37 22.80
4.70 11.37 22.80
4.70 11.37 22.80
4.70 11.37 22.80
ANALISIS DE PRECIOS UNITARIOS - ARQUITECTURA
Presupuesto CONTRATACIÓN DE SERVICIOS PARA ACONDICIONAMIENTO DE LOS AMBIENTES DEL LOCAL F01L01 (OXAPAMPA) DE
ACUERDO A LOS INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
Materiales
0213070001 FRAGUA kg 0.5000 6.50
0222080017 PEGAMENTO PARA CERAMICO bol 0.6667 24.50
NIVELADOR DE MAYOLICA und 9.0000 0.45
0225020121 CERAMICA DE ALTO TRANSITO 60 X 60 m2 1.0000 28.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 11.47
Materiales
0213070001 FRAGUA kg 0.2500 6.50
0222080017 PEGAMENTO PARA CERAMICO bol 0.2500 24.50
0225020136 PORCELANATO DE 60 X 60 m2 1.0000 39.00
0241060001000 RODOPLAST PARA BORDE MAYOLICAS m 2.0500 4.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.12
Materiales
0213070001 FRAGUA kg 0.2000 6.50
0222080017 PEGAMENTO PARA CERAMICO bol 0.2500 21.20
228050039 PORCELANATO PARA ZOCALO DE 30 X 60 m2 1.0000 32.00
NIVELADOR DE MAYOLICA und 7.0000 0.45
0241060001000 RODOPLAST PARA BORDE MAYOLICAS m 1.0000 4.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 15.03
Materiales
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 1" kg 0.0750 4.66
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.0380 4.66
0222110001 COLA SINTETICA gal 0.0750 29.50
0231010001 MADERA TORNILLO p2 12.0000 7.50
0238010001 LIJA PARA MADERA plg 2.1000 2.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 304.32
Materiales
0204030005 DIVISIONES DE SS.HH. SEGÚN DISEÑO INC MON m2 1.0000 320.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 72.68
Partida 02.04.02 DIVISIONES PARA URINARIOS INCLUIDO MONTAJE
Rendimiento m2/DIA 4.0000 EQ. 4.0000 osto unitario directo por : m2 344.86
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 2.0000 21.01
0101010005 PEON hh 1.0000 2.0000 15.33
Materiales
0204030006 DIVISIONES PARA URINARIOS INCLUIDO MONTAJm2 1.0000 270.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 72.68
Materiales
0204030007 MANTENIMIENTO DE DIVISIONES DE SS.HH. m2 1.0000 85.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 29.07
Materiales
0237060001000 BISAGRA CAPUCHINA ALUMINIZADA 3 1/2"x3 1/und 1.0000 4.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 8.00
Materiales
0237100002 CIERRAPUERTA HIDRAULICA DE ALUMINIO DE 1 und 1.0000 260.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 21.01
Materiales
0237170001000 TIRADOR PARA PUERTA DE ACERO INOXIDABLE und 1.0000 49.27
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 11.20
Materiales
0238010002000 LIJA DE FIERRO #80 plg 0.1000 1.50
0240010008 PINTURA LATEX SUPERMATE gal 0.0800 65.00
0240150001 IMPRIMANTE gal 0.2000 15.00
0240150002000 SELLADOR A BASE DE LATEX gal 0.0020 129.90
0240150003 PASTA MURAL gal 0.0120 24.70
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.53
Materiales
0238010001 LIJA PARA MADERA plg 0.5000 2.50
0240160001 BARNIZ MARINO gal 0.0800 40.00
0290320010 TAPAPOROS DE MADERA ACABADA CON BARNIZgal 0.0556 45.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 24.23
F01L01 (OXAPAMPA) DE
DE LA UNDAC
Parcial S/.
8.40
3.07
11.47
3.25
16.33
4.05
28.50
52.13
0.34
0.34
Parcial S/.
14.01
5.11
19.12
1.63
6.13
39.00
9.23
55.99
0.57
0.57
Parcial S/.
14.01
1.02
15.03 18
2.7
1.30 6.6666666667
5.30
32.00
3.15
4.50
46.25
0.45
0.45
Parcial S/.
168.08
136.24
304.32
0.35
0.18
2.21
90.00
5.25
97.99
9.13
9.13
Parcial S/.
42.02
30.66
72.68
320.00
320.00
2.18
2.18
Parcial S/.
42.02
30.66
72.68
270.00
270.00
2.18
2.18
Parcial S/.
16.81
12.26
29.07
85.00
85.00 22.5
0.87
0.87
Parcial S/.
8.00
8.00
4.00
4.00
0.40
0.40
ERTA DE MADERA
Parcial S/.
21.01
21.01
260.00
260.00
0.63
0.63
Parcial S/.
11.20
11.20
49.27
49.27
0.34
0.34
Parcial S/.
25,000.00
25,000.00
23.8800000
Parcial S/.
8.40 8.40000
6.13 6.13000
14.53 14.53000
-
0.15 0.15000
5.20 5.20000
3.00 3.00000
0.26 0.26000
0.30 0.30000
8.91 8.91000
-
0.44 0.44000
0.44 0.44000
Parcial S/.
14.01
10.22
24.23
1.25
3.20
2.50
6.95
0.73
0.73
PRESUPUESTO - SANITARIAS
Presupuesto
CONTRATACIÓN DE SERVICIOS PARA ACONDICIONAMIENTO DE LOS AMBIENTES DEL LOCAL F01L01 (OXAPAMPA) DE A
INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
Err:509
Err:509 1.82 Err:509
Err:509 5,000.00 Err:509
Err:509
Err:509 587.54 Err:509
Err:509 285.54 Err:509
Err:509 176.54 Err:509
45.00 60.59 2,726.46
4.00 74.99 299.95
30.00 99.49 2,984.64
Err:509
Err:509
Err:509 13.77 Err:509
Err:509 14.27 Err:509
Err:509
Err:509
Err:509 29.13 Err:509
Err:509
Err:509 4.05 Err:509
Err:509 4.45 Err:509
Err:509
Err:509 51.78 Err:509
Err:509 59.58 Err:509
Err:509
Err:509 3.11 Err:509
Err:509 3.51 Err:509
Err:509 2.65 Err:509
Err:509 2.81 Err:509
Err:509 3.51 Err:509
Err:509 5.81 Err:509
Err:509 3.11 Err:509
Err:509 3.51 Err:509
Err:509 4.80 Err:509
Err:509 2.11 Err:509
Err:509
4.00 19.43 77.73
4.00 64.16 256.65
Err:509 36.04 Err:509
Err:509 37.04 Err:509
Err:509 10.41 Err:509
Err:509 9.41 Err:509
Err:509 10.41 Err:509
Err:509 20.15 Err:509
Err:509 20.35 Err:509
Err:509
Err:509 40.67 Err:509
Err:509 44.77 Err:509
Err:509 66.67 Err:509
Err:509 17.92 Err:509
Err:509 60.92 Err:509
Err:509
Err:509 1.58 Err:509
Err:509 5,000.00 Err:509
HOJA DE METRADOS
MEJORAMIENTO FÍSICO DE LOS AMBIENTES
: CONTRATACION DE SERVICIOS PARA ACONDICONAMIENTO DE LOS AMBIENTES DE LAS FACULTADES DE CIENCIAS AGROPECUARIAS Y ODONTOLOGIA DE
SERVICIO
ACUERDO A LOS INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
EJECUTA : UNIVERSIDAD NACIONAL DANIEL ALCIDES CARRION
UBICACIÓN : CIUDAD UNIVERSITARIA - YANACANCHA - PASCO - PASCO
HOJA DE METRADO
DIMENSIONES
ITEM DESCRIPCION UND. CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO
01.03 INSTALACIONES SANITARIAS
01.03.01 REFACCIONES E INSTALACION
Presupuesto CONTRATACIÓN DE SERVICIOS PARA ACONDICIONAMIENTO DE LOS AMBIENTES DEL LOCAL F01L01 (OXAPAMPA) D
CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
Materiales
0207070001 AGUA PUESTA EN OBRA m3
0213040001 TIZA kg
02760100100001 WINCHA METALICA DE 50 m und
Equipos
03014900010001 CORDEL rll
Materiales
02460300010004 TUBO DE ABASTO ALUMINIO TRENZADO 1/2"X7/8" und
02460700010002 PERNO DE ANCLAJE PARA SUJECION DE INODORO und
0246140001 ANILLO DE CERA PARA INODORO und
02470200010010 INODORO NACIONAL ONE PIECE TREBOL COLOR BLANCO + ASIENund
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Partida 03.02.02 URINARIO NACIONAL MODELO CADET
Rendimiento und/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla
Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 0.5000
Materiales
02460100050001 DESAGUE PARA URINARIO CON NIPLE Y EMPAQUETADURA und
02460400010002 UÑAS DE SUJECION PARA URINARIO und
02460900010001 BRIDA 3/4" PARA URINARIO CADET und
02471100010002 URINARIO NACIONAL CADET BLANCO und
02510100010001 TORNILLOS 2" X 12" P/URINARIO CADET und
0256040002 LLAVE PULSAOR DE URINARIO und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02460300010001 TUBO DE ABASTO 1/2" und
02460800010003 TRAMPA P P/LAVAT. 1 1/4" und
02470100010008 OVALIN COLOR BLANCO und
02560400010005 LLAVE DE LAVATORIO und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Rendimiento und/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : und
Materiales
201010043 ANILLO DE CERA CON GUIA PARA INODORO und
201010043 PERNO DE ANCLAJE PARA INODORO + CAPUCHON BLANCO X2 UNund
201010043 KIT PARA TANQUE DE SANITARIO und
0246230003 ACCESORIOS DE LIMPIEZA und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Rendimiento und/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : und
Materiales
02160100040012 LLAVE PARA URINARIO CON PULSADOR
0215090003 PERNOS DE ANCLAJE PARA URINARIO
02160100040013 EMPAQUE PARA DESAGUE DE URINARIO
0246230003 ACCESORIOS DE LIMPIEZA und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Rendimiento und/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : und
Materiales
02460300010001 TUBO DE ABASTO 1/2" und
02460800010003 TRAMPA P P/LAVAT. 1 1/4" und
02560400010005 LLAVE DE LAVATORIO und
0246230003 ACCESORIOS DE LIMPIEZA und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
0222080017 PEGAMENTO PARA CERAMICO bol
02460200010001 SUMIDERO CROMADO ROSCADO DE 2" und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
0222080017 PEGAMENTO PARA CERAMICO bol
02461200020003 REGISTRO CROMADOS ROSCADO DE 4" und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02050700020002 TUBERIA PVC-SAP C-10 S/P DE 1/2" X 5 m m
02050900020001 CODO PVC-SAP C/R 1/2" X 90° und
02051100010001 TEE PVC-SAP S/P 1/2" und
0241030001 CINTA TEFLON und
02490200010002 CODO BRONCE DE 1/2" X 90° und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02050700020031 TUBERIA PVC SAP DE 1/2" m
0222080004 PEGAMENTO PARA CPVC und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02050700020031 TUBERIA PVC SAP DE 1/2" m
0222080004 PEGAMENTO PARA CPVC und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02150500020001 UNION UNIVERSAL CPVC DE 1/2" CON ROSCA und
0219140004 NIPLE PVC DE 1/2" und
0241030001 CINTA TEFLON und
0253180003 VALVULA DE BOLA DE 1/2" und
0261080005 ADAPTADOR DE 1/2" und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
0222080018 PEGAMENTO PARA CPVC gal
0261080005 ADAPTADOR DE 1/2" und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
0222080018 PEGAMENTO PARA CPVC gal
0261080005 ADAPTADOR DE 3/4" und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
0241030001 CINTA TEFLON und
0261080005 CODO CON ROSCA 1/2" x 90° und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02051000020011 CODO PVC SAP 1/2" X 90° und
0215090001 PEGAMENTO CPVC und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02051000020011 CODO PVC SAP 3/4" X 90° und
0215090001 PEGAMENTO CPVC und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
0222080018 PEGAMENTO PARA CPVC gal
0261080005 REDUCCION DE 3/4" A 1/2" und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02051000020011 TEE PVC SAP DE 1/2" und
0215090001 PEGAMENTO CPVC und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02051000020011 TEE PVC SAP DE 3/4" und
0215090001 PEGAMENTO CPVC und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02051000020011 UNION UNIVERSAL DE 1/2" CON ROSCA und
0241030001 CINTA TEFLON und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02051000020011 UNION SIMPLE DE 1/2" und
0215090001 PEGAMENTO CPVC und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02060100010003 TUBERIA PVC-SAL 2" X 3 m m
02060200030001 CODO PVC-SAL 2" X 90° und
02060700010001 TEE SANITARIA PVC-SAL DE 2" und
02061700010001 YEE PVC SAL SIMPLE DE 2" und
0222080013 PEGAMENTO PARA PVC DE 1/4 GLN und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02060100010007 TUBERIA PVC-SAL 4" X 3 m m
02060700010003 TEE SANITARIA PVC-SAL DE 4" und
02061400010002 REDUCCION PVC-SAL DE 4" A 2" und
0222080013 PEGAMENTO PARA PVC DE 1/4 GLN und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02060100010007 TUBERIA PVC-SAL 4" X 3 m m
0222080016 PEGAMENTO PARA CPVC gal
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02061700010012 YEE PVC SAP CON REDUCCION DE 4" x 2" und
0222080012 PEGAMENTO PARA PVC gal
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
0205090003 CODO PVC SAP 2 x 90° und
0222080012 PEGAMENTO PARA PVC gal
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02060500010030 YEE SANITARIA PVC-SAP 4" und
0222080012 PEGAMENTO PARA PVC gal
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02050700020025 TUBERIA PVC SAP 2" m
0205090003 CODO PVC SAP 2 x 90° und
02460200010001 SUMIDERO CROMADO ROSCADO DE 2" und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02050700020026 TUBERIA PVC SAP 4" m
0205090005 CODO PVC SAP 4 x 90° und
02461200020003 REGISTRO CROMADOS ROSCADO DE 2" und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Partida 03.05.01 DISPENSADOR DE JABON LIQUIDO 1 LITRO
Rendimiento und/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla
Mano de Obra
0101010003 OPERARIO hh 0.5000
Materiales
02461800010003 DISPENSADOR DE JABON LIQUIDO 1 LITRO und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02461800010004 DISPENSADOR DE PAPEL HIGIENICO und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02461800010004 DISPENSADOR DE PAPEL TOALLA CON DISEÑO INTERFOLIADO und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02460800010003 TRAMPA P P/LAVAT. 1 1/4" und
0241030001 CINTA TEFLON und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Materiales
02560400010007 LLAVE TIPO CUELLO DE GANSO PARA LAVATORIO und
0241030001 CINTA TEFLON und
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
DISEÑO INTERFOLIADO
to unitario directo por : und 66.67
Cantidad Precio S/. Parcial S/.
RIOS EN LABORATORIOS
to unitario directo por : und 17.92
Cantidad Precio S/. Parcial S/.
ANSO EN LABORATORIOS
to unitario directo por : und 60.92
Cantidad Precio S/. Parcial S/.
Presupuesto
CONTRATACIÓN DE SERVICIOS PARA ACONDICIONAMIENTO DE LOS AMBIENTES DEL LOCAL F01L01 (OXAPAMPA) DE ACUERDO A LOS
INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
: CONTRATACION DE SERVICIOS PARA ACONDICONAMIENTO DE LOS AMBIENTES DE LAS FACULTADES DE CIENCIAS AGROPECUARIAS Y OD
SERVICIO
INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
EJECUTA : UNIVERSIDAD NACIONAL DANIEL ALCIDES CARRION
UBICACIÓN : CIUDAD UNIVERSITARIA - YANACANCHA - PASCO - PASCO
HOJA DE METRADO
DIMENSIONES
ITEM DESCRIPCION UND. CANT.
LARGO
04 TOPICO
1.00 AREA
1.00 AREA
1.00 AREA
1.00 VOLUMEN
1.00 VOLUMEN
1.00 VOLUMEN
1.00 AREA
1.00 VOLUMEN
04.03.01 CIMIENTO
04.03.01.01 CONCRETO f'c=175 kg/cm2 m3
1.00 VOLUMEN
04.03.02 SOBRECIMIENTO
1.00 VOLUMEN
1.00 AREA
1.00 VOLUMEN
04.03.04 VEREDA
1.00 AREA
1.00 VOLUMEN
1.00 AREA
04.04.02 COLUMNAS
1.00 VOLUMEN
17.82
1.00 AREA
04.04.03 VIGAS
1.00 VOLUMEN
04.04.03.02 ACERO FY= 4200 kg/cm2 GRADO 60 kg
7.92
1.00 AREA
04.05 ALBAÑILERIA
1.00 AREA
1.00 AREA
1.00 AREA
04.07 CIELORRASOS
1.00 AREA
1.00 AREA
1.00 AREA
04.09 PINTURAS
1.00 AREA
1.00 AREA
04.11 CERRAJERIA
8.00
1.00
1.00
1.00 AREA
1.00 AREA
1.00 AREA
2.86
1.00
2.00
1.00
1.00
1.00
3.00
3.00
4.00
3.00
14.08
2.00
2.00
04.15.02.01.08 VALVULA DE BOLA DE 3/4" und
1.00
BIENTES
DIMENSIONES
PARCIAL SUB TOTAL TOTAL
ANCHO ALTO
37.00 37.00
37.00 37.00
37.00 37.00
37.00 37.00
37.00 37.00
37.00 37.00
21.14 21.14
21.14 21.14
4.32 4.32
4.32 4.32
4.32 4.32
4.32 4.32
14.30 14.30
14.30 14.30
2.10 2.10
2.10 2.10
16.26 16.26
16.26 16.26
4.72 4.72
4.72 4.72
13.60 13.60
13.60 13.60
14.50 14.50
14.50 14.50
3.28 3.28
3.28 3.28
2.68 2.68
2.68 2.68
13.40 13.40
13.40 13.40
1.08 1.08
1.08 1.08
17.82 17.82
17.82
24.00 24.00
24.00 24.00
0.63 0.63
0.63 0.63
7.92 7.92
7.92
9.60 9.60
9.60 9.60
28.05 28.05
28.05 28.05
42.75 42.75
42.75 42.75
52.50 52.50
52.50 52.50
28.64 28.64
28.64 28.64
28.64 28.64
28.64 28.64
45.32 45.32
45.32 45.32
58.14 58.14
58.14 58.14
52.50 52.50
52.50 52.50
6.09 6.09
2.10 4.20
2.10 1.89
8.00 8.00
8.00
1.00 1.00
1.00
1.00 1.00
1.00
0.24 0.24
0.24 0.24
27.10 27.10
27.10 27.10
2.20 2.20
2.20 2.20
0.15 0.15
1.44 0.10 0.07
0.50 0.80 0.08
2.72 2.72
2.72
13.41 13.41
3/8. 0.58 13.41
2.86 2.86
2.86
2.86 2.86
2.86
1.00 1.00
1.00
1.00 1.00
1.00
2.00 2.00
2.00
1.00 1.00
1.00
1.00 1.00
1.00
1.00 1.00
1.00
3.00 3.00
3.00
3.00 3.00
3.00
4.00 4.00
4.00
3.00 3.00
3.00
14.08 14.08
14.08
2.00 2.00
2.00
2.00 2.00
2.00
1.00 1.00
1.00
Partida 04.01.01 SEÑALIZACION DURANTE LA EJECUCION
Materiales
0241020002 CINTA DE SEÑALIZACIÓN und 0.0010
Materiales
0213010004 YESO (5kg) bol 0.2000
0270120028 CORDEL m 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
0201030001 GASOLINA gal 0.1300
0290130022 AGUA m3 0.0800
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301100003 COMPACTADORA DE PLANCHA día 1.0000 0.0500
Equipos
0301000014 NIVELADORA día 1.0000 0.0125
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
0201030001 GASOLINA gal 0.1300
0290130022 AGUA m3 0.0800
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301100003 COMPACTADORA DE PLANCHA día 1.0000 0.0500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03012900010007 RETROEXCAVADORA hm 1.0000 0.1231
03012900010008 VOLQUETE hm 1.0000 0.1231
Materiales
02070200010002 ARENA GRUESA m3 0.4000
0207030001 HORMIGON m3 0.4000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000
0290130022 AGUA m3 0.1500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333
Materiales
02070200010002 ARENA GRUESA m3 0.4000
0207030001 HORMIGON m3 0.4000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000
0290130022 AGUA m3 0.1500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333
Materiales
02040100020002 ALAMBRE NEGRO N° 8 kg 0.5000
02041200010003 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200
0231010001 MADERA TORNILLO p2 3.7000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02070200010002 ARENA GRUESA m3 0.4000
0207030001 HORMIGON m3 0.4000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000
0290130022 AGUA m3 0.1500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333
Materiales
02040100020002 ALAMBRE NEGRO N° 8 kg 0.5000
02041200010003 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200
0231010001 MADERA TORNILLO p2 3.7000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02070200010002 ARENA GRUESA m3 0.4000
0207030001 HORMIGON m3 0.4000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000
0290130022 AGUA m3 0.1500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333
Materiales
02070200010001 ARENA FINA m3 0.0050
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1000
0290130022 AGUA m3 0.0400
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.5000
02070200010001 ARENA FINA m3 0.5000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000
0290130022 AGUA m3 0.1800
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301290001 VIBRADOR PARA CONCRETO hm 0.2000 0.1000
0301290003 MEZCLADORA DE CONCRETO hm 0.2000 0.1000
Materiales
02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0200
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 0.1200
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02040100020002 ALAMBRE NEGRO N° 8 kg 0.5000
02041200010003 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200
0231010001 MADERA TORNILLO p2 3.7000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.5000
02070200010001 ARENA FINA m3 0.5000
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000
0290130022 AGUA m3 0.1800
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
0301290001 VIBRADOR PARA CONCRETO hm 0.2000 0.1000
0301290003 MEZCLADORA DE CONCRETO hm 0.2000 0.1000
Materiales
02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0200
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 0.1200
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02040100020002 ALAMBRE NEGRO N° 8 kg 0.5000
02041200010003 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200
0231010001 MADERA TORNILLO p2 3.7000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Partida 04.05.01 MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCL
Materiales
02041200010004 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 0.0200
02070200010003 ARENA GRUESA m3 0.0260
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.2320
0216010017 LADRILLO KING KONG DE ARCILLA 9 X 14 X 24 cm und 33.0000
0231010001 MADERA TORNILLO p2 0.4300
0290130022 AGUA m3 0.0010
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02070200010001 ARENA FINA m3 0.0020
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3000
0290130022 AGUA m3 0.0060
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 1.0000
Materiales
02070200010001 ARENA FINA m3 0.0020
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3000
0290130022 AGUA m3 0.0060
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 1.0000
0301340010 ANDAMIO METALICO día 1.0000 0.0667
Materiales
02040100030001 ALAMBRE GALVANIZADO N° 8 kg 0.1500
0204120004 CLAVO CLIP POWER FULL cto 0.0200
0204120005 CLAVOS DDE ACERO cja 0.0200
0207010011 PERFIL PRINCIPAL CMC 1812 15/16X3.66M pza 0.7500
0207010012 PERFIL SECUNDARIO CMC 1823 15/16X0.61M pza 1.7500
0234020018 BALDOSAS ACUSTICAS DE .60 X .60 m2 1.1500
0255100007 FULMINANTE MARRON/VERDE/AMARILLO POWERFcto 0.0500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
0213070001 FRAGUA kg 0.5000
0222080017 PEGAMENTO PARA CERAMICO bol 0.2500
NIVELADOR DE MAYOLICA und 9.0000
0228050037 PORCELANATO DE ALTO TRANSITO DE 60 X 60 m2 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
0213070001 FRAGUA kg 0.2000
0222080017 PEGAMENTO PARA CERAMICO bol 0.2500
228050039 PORCELANATO PARA ZOCALO DE 30 X 60 m2 1.0000
NIVELADOR DE MAYOLICA und 7.0000
02410600010001 RODOPLAST PARA BORDE MAYOLICAS m 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02380100020003 LIJA DE FIERRO #80 plg 0.1000
0240010008 PINTURA LATEX SUPERMATE gal 0.0800
0240150001 IMPRIMANTE gal 0.2000
02401500020001 SELLADOR A BASE DE LATEX gal 0.0020
0240150003 PASTA MURAL gal 0.0120
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02380100020003 LIJA DE FIERRO #80 plg 0.1000
0240010008 PINTURA LATEX SUPERMATE gal 0.0800
0240150001 IMPRIMANTE gal 0.2000
02401500020001 SELLADOR A BASE DE LATEX gal 0.0020
0240150003 PASTA MURAL gal 0.0120
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02041200010001 CLAVOS PARA MADERA CON CABEZA DE 1" kg 0.0750
02041200010003 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.0380
0222110001 COLA SINTETICA gal 0.0750
0231010001 MADERA TORNILLO p2 12.0000
0238010001 LIJA PARA MADERA plg 2.1000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 21.0000 EQ. 21.0000 Costo unitario directo por : und
Materiales
02370600010003 BISAGRA CAPUCHINA ALUMINIZADA 3 1/2"x3 1/2" und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Rendimiento pza/DIA 7.0000 EQ. 7.0000 Costo unitario directo por : pza
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento pza/DIA 7.0000 EQ. 7.0000 Costo unitario directo por : pza
Materiales
0237050003 CERRADURA DE BOLA PARA PUERTA DE SERVICIO Hund 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 6.0000 EQ. 6.0000 Costo unitario directo por : und
Materiales
0237050004 CERRADURADE TRES GOLPES PARA PUERTA DE und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und
Materiales
0204030005 VENTANAS METALICA - INCLUIDO MONTAJE m2 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
TUBO CUADRADO DE 2X2X6m DE 2mm m 3.7639
0272040062 SOLDADURA SAL INDUSTRIAL BENTONITA kg 0.3691
DISCO DE CORTE DE 14" PARA FIERRO und 0.0739
DISCO DE DESBASTE 4 1/2" und 0.2215
DISCO POLIFAN 4 1/2" und 0.2215
PINTURA EPOXICA gln 0.0185
PERNO DE ANCLAJE 1/4x2 1/4" und 1.5499
TECHO POLICARBONATO 6 mm 2.90x1.05 metros m2 1.1000
PERNO AUTORROSCANTE 10 x 2" und 1.5499
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02221000010001 SILICONA TRANSPARENTE PEGAFAN 310 ml und 0.5000
0243010011 CRISTAL TEMPLADO DE 8 mm m2 1.0500
0258090002 ACCESORIOS PARA MAMPARAS DE VIDRIO jgo 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Materiales
02221000010001 SILICONA TRANSPARENTE PEGAFAN 310 ml und 1.0000
0243010011 CRISTAL TEMPLADO DE 8 mm m2 1.0500
0258090002 ACCESORIOS PARA MAMPARAS DE VIDRIO jgo 0.7500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000
Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000
02070200010002 ARENA GRUESA m3 0.4000
0207070001 AGUA PUESTA EN OBRA m3 0.1850
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.0000
0231010001 MADERA TORNILLO p2 0.0833
Equipos
03012900010004 VIBRADOR A GASOLINA día 1.0000 0.1000
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.8000
Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 0.1000
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.2000
0231010001 MADERA TORNILLO p2 3.6500
02310500010005 TRIPLAY DE 1.20X2.40 m X 18 mm und 0.0700
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg 0.0300
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 1.0300
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02070200010001 ARENA FINA m3 0.0200
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.2500
0290130021 AGUA m3 0.0900
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
03010600020001 REGLA DE ALUMINIO 1" X 4" X 8" und 0.2500
Materiales
0213070001 FRAGUA kg 0.2500
0222080017 PEGAMENTO PARA CERAMICO bol 0.2500
0225020136 PORCELANATO DE 60 X 60 m2 1.0000
02410600010001 RODOPLAST PARA BORDE MAYOLICAS m 2.0500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : und
Materiales
02460300010004 TUBO DE ABASTO ALUMINIO TRENZADO 1/2"X7/8"und 1.0000
02460700010002 PERNO DE ANCLAJE PARA SUJECION DE INODORO und 2.0000
0246140001 ANILLO DE CERA PARA INODORO und 1.0000
02470200010010 INODORO NACIONAL ONE PIECE TREBOL COLOR Bund 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : und
Materiales
02460300010001 TUBO DE ABASTO 1/2" und 1.0000
02460800010003 TRAMPA P P/LAVAT. 1 1/4" und 1.0000
02470100010008 LAVATORIO + PEDESTAL TIPO AVANTE und 1.0000
02560400010005 LLAVE DE LAVATORIO und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02460300010001 TUBO DE ABASTO 1/2" und 1.0000
02460800010003 TRAMPA P P/LAVAT. 1 1/4" und 1.0000
02470100010008 OVALIN COLOR BLANCO und 1.0000
02560400010005 LLAVE DE LAVATORIO und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : und
Código Descripción Recurso Unidad Cuadrilla Cantidad
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.2667
Materiales
02461800010003 DISPENSADOR DE JABON LIQUIDO 1 LITRO und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : und
Materiales
02461800010004 DISPENSADOR DE PAPEL HIGIENICO und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : und
Materiales
02461800010004 DISPENSADOR DE PAPEL TOALLA CON DISEÑO INT und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : und
Materiales
02051000020011 CODO PVC SAP 3/4" X 90° und 1.0000
0215090001 PEGAMENTO CPVC und 0.0020
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento und/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : und
Materiales
0222080018 PEGAMENTO PARA CPVC gal 0.0020
0261080005 REDUCCION DE 3/4" A 1/2" und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Rendimiento pto/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : pto
Materiales
02050700020002 TUBERIA PVC-SAP C-10 S/P DE 1/2" X 5 m m 3.0000
02050900020001 CODO PVC-SAP C/R 1/2" X 90° und 2.0000
02051100010001 TEE PVC-SAP S/P 1/2" und 0.5000
0241030001 CINTA TEFLON und 0.1000
02490200010002 CODO BRONCE DE 1/2" X 90° und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02051000020011 TEE PVC SAP DE 3/4" und 1.0000
0215090001 PEGAMENTO CPVC und 0.0020
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02050700020031 TUBERIA PVC SAP DE 1/2" m 1.0000
0222080004 PEGAMENTO PARA CPVC und 0.0020
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02051000020011 UNION SIMPLE DE 3/4" und 1.0000
0215090001 PEGAMENTO CPVC und 0.0020
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02150500020001 UNION UNIVERSAL CPVC DE 1/2" und 2.0000
0219140004 NIPLE PVC DE 1/2" und 4.0000
0241030001 CINTA TEFLON und 0.1000
0253180003 VALVULA DE BOLA DE 3/4" und 1.0000
0261080005 ADAPTADOR DE 1/2" und 2.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
0205090003 CODO PVC SAP 2 x 90° und 1.0000
0222080012 PEGAMENTO PARA PVC gal 0.0020
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02060100010003 TUBERIA PVC-SAL 2" X 3 m m 1.0500
02060200030001 CODO PVC-SAL 2" X 90° und 0.3200
02060700010001 TEE SANITARIA PVC-SAL DE 2" und 0.3900
02061700010001 YEE PVC SAL SIMPLE DE 2" und 0.1600
0222080013 PEGAMENTO PARA PVC DE 1/4 GLN und 0.0700
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02060100010007 TUBERIA PVC-SAL 4" X 3 m m 2.6000
02060700010003 TEE SANITARIA PVC-SAL DE 4" und 0.6000
02061400010002 REDUCCION PVC-SAL DE 4" A 2" und 0.6000
0222080013 PEGAMENTO PARA PVC DE 1/4 GLN und 0.0200
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02050700020025 TUBERIA PVC SAP 2" m 0.6000
0205090003 CODO PVC SAP 2 x 90° und 1.0000
02460200010001 SUMIDERO CROMADO ROSCADO DE 2" und 1.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02060100010003 TUBERIA PVC-SAL 2" X 3 m m 1.0000
0222080016 PEGAMENTO PARA CPVC gal 0.0500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02060100010007 TUBERIA PVC-SAL 4" X 3 m m 1.0000
0222080016 PEGAMENTO PARA CPVC gal 0.0500
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
Materiales
02060500010030 YEE SANITARIA PVC-SAP 4" und 1.0000
0222080012 PEGAMENTO PARA PVC gal 0.0020
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000
1.75
17.03 1.70
1.70
49.00 0.05
0.05
NTE LA EJECUCION
5.99
21.01 0.84
15.33 0.61
1.45
20.00 4.00
0.50 0.50
4.50
1.45 0.04
0.04
1.27
15.33 1.23
1.23
1.23 0.04
0.04
33.75
21.01 24.01
15.33 8.76
32.77
32.77 0.98
0.98
14.34
17.03 6.81
15.33 3.07
9.88
12.00 1.56
5.00 0.40
1.96
9.88 0.30
44.00 2.20
2.50
3.71
21.01 2.10
15.33 0.77
2.87
60.00 0.75
2.87 0.09
0.84
PARA VEREDA
14.34
17.03 6.81
15.33 3.07
9.88
12.00 1.56
5.00 0.40
1.96
9.88 0.30
44.00 2.20
2.50
15.69
21.01 2.59
15.33 1.89
4.48
4.48 0.13
60.00 7.39
30.00 3.69
11.21
274.32
21.01 11.20
15.33 8.18
19.38
50.00 20.00
52.00 20.80
20.50 170.15
5.00 0.75
211.70
19.38 0.58
80.00 42.66
43.24
274.32
50.00 20.00
52.00 20.80
20.50 170.15
5.00 0.75
211.70
19.38 0.58
80.00 42.66
43.24
39.96
21.01 11.20
17.03 9.08
20.28
3.50 1.75
3.80 1.14
4.30 1.38
4.00 14.80
19.07
20.28 0.61
0.61
274.32
21.01 11.20
15.33 8.18
19.38
50.00 20.00
52.00 20.80
20.50 170.15
5.00 0.75
211.70
19.38 0.58
80.00 42.66
43.24
39.96
21.01 11.20
17.03 9.08
20.28
3.50 1.75
3.80 1.14
4.30 1.38
4.00 14.80
19.07
20.28 0.61
0.61
274.32
21.01 11.20
15.33 8.18
19.38
50.00 20.00
52.00 20.80
20.50 170.15
5.00 0.75
211.70
19.38 0.58
80.00 42.66
43.24
O EN VEREDAS
14.71
Precio S/. Parcial S/.
21.01 8.40
15.33 3.07
11.47
130.00 0.65
20.50 2.05
5.00 0.20
2.90
11.47 0.34
0.34
331.25
21.01 10.51
17.03 8.52
15.33 7.67
26.70
50.00 25.00
130.00 65.00
20.50 198.85
5.00 0.90
289.75
26.70 0.80
60.00 6.00
80.00 8.00
14.80
5.73
21.01 1.05
17.03 1.70
2.75
4.00 0.08
23.50 2.82
2.90
2.75 0.08
0.08
39.96
21.01 11.20
17.03 9.08
20.28
3.50 1.75
3.80 1.14
4.30 1.38
4.00 14.80
19.07
20.28 0.61
0.61
331.25
21.01 10.51
17.03 8.52
15.33 7.67
26.70
50.00 25.00
130.00 65.00
20.50 198.85
5.00 0.90
289.75
26.70 0.80
60.00 6.00
80.00 8.00
14.80
5.73
21.01 1.05
17.03 1.70
2.75
4.00 0.08
23.50 2.82
2.90
2.75 0.08
0.08
39.96
21.01 11.20
17.03 9.08
20.28
3.50 1.75
3.80 1.14
4.30 1.38
4.00 14.80
19.07
20.28 0.61
0.61
63.87
21.01 14.01
15.33 5.11
19.12
4.31 0.09
50.00 1.30
20.50 4.76
1.10 36.30
4.00 1.72
5.00 0.01
44.18
19.12 0.57
0.57
27.69
21.01 11.20
15.33 4.09
15.29
130.00 0.26
20.50 6.15
5.00 0.03
6.44
15.29 0.46
5.50 5.50
5.96
31.03
21.01 11.20
15.33 4.09
15.29
130.00 0.26
20.50 6.15
5.00 0.03
6.44
15.29 0.46
5.50 5.50
50.00 3.34
9.30
OSAS DE 60 X 60 E=5/8"
68.45
21.01 8.40
17.03 6.81
15.33 12.26
27.47
5.25 0.79
11.86 0.24
11.86 0.24
10.50 7.88
3.50 6.13
21.19 24.37
10.17 0.51
40.16
27.47 0.82
0.82
NSITO 60 X60
73.87
21.01 14.01
15.33 5.11
19.12
6.50 3.25
31.50 7.88
0.45 4.05
39.00 39.00
54.18
19.12 0.57
0.57
72.78
21.01 24.01
15.33 1.75
25.76
6.50 1.30
21.20 5.30
32.00 32.00
0.45 3.15
4.50 4.50
46.25
25.76 0.77
0.77
23.88
21.01 8.40
15.33 6.13
14.53
1.50 0.15
65.00 5.20
15.00 3.00
129.90 0.26
24.70 0.30
8.91
14.53 0.44
0.44
23.88
21.01 8.40
15.33 6.13
14.53
1.50 0.15
65.00 5.20
15.00 3.00
129.90 0.26
24.70 0.30
8.91
14.53 0.44
0.44
411.44
21.01 168.08
17.03 136.24
304.32
4.66 0.35
4.66 0.18
29.50 2.21
7.50 90.00
2.50 5.25
97.99
304.32 9.13
9.13
12.40
21.01 8.00
8.00
4.00 4.00
4.00
8.00 0.40
0.40
89.73
21.01 24.01
24.01
65.00 65.00
65.00
24.01 0.72
0.72
DE SERVICIO HIGIENICO
62.86
21.01 24.01
24.01
38.13 38.13
38.13
24.01 0.72
0.72
DRIO CORREDIZO
134.90
21.01 28.01 xx
15.33 20.44
48.45
85.00 85.00
85.00
48.45 1.45
1.45
20.16
20.16 20.16
20.16
116.25
21.01 16.81
15.33 12.26
29.07
85.00 85.00
85.00
72.68 2.18
2.18
205.63
21.01 42.02
15.33 30.66
72.68
15.00 56.46
14.00 5.17
17.50 1.29
4.50 1.00
9.90 2.19
250.00 4.63
2.00 3.10
51.06 56.16
0.50 0.77
130.77
72.68 2.18
2.18
8.40
8.40 8.40
8.40
COLORO ARENADO DE 8MM S/DISEÑO
240.21
21.01 11.20
15.33 4.09
15.29
10.50 5.25
189.44 198.91
20.00 20.00
224.16
15.29 0.76
0.76
247.17
21.01 14.01
15.33 7.67
21.68
10.50 10.50
189.44 198.91
20.00 15.00
224.41
21.68 1.08
1.08
336.47
21.01 10.51
17.03 8.52
15.33 61.32
80.35
55.00 49.50
55.00 22.00
5.00 0.93
20.50 164.00
4.66 0.39
236.82
25.00 2.50
21.00 16.80
19.30
SA DE BAÑOS
58.70
21.01 14.01
17.03 11.35
15.33 7.67
33.03
4.50 0.45
4.23 0.85
6.00 21.90
21.18 1.48
24.68
33.03 0.99
0.99
2 EN MESA DE CONCRETO
5.44
21.01 0.76
17.03 1.24
2.00
4.50 0.14
3.15 3.24
3.38
2.00 0.06
0.06
24.11
21.01 14.01
14.01
130.00 2.60
20.50 5.13
5.00 0.45
8.18
14.01 0.42
6.00 1.50
1.92
TO DE 60 X 60
89.74
Precio S/. Parcial S/.
21.01 24.01
15.33 8.76
32.77
6.50 1.63
24.50 6.13
39.00 39.00
4.50 9.23
55.99
32.77 0.98
0.98
587.54
21.01 21.01
15.33 7.67
28.68
7.50 7.50
1.50 3.00
7.50 7.50
540.00 540.00
558.00
28.68 0.86
0.86
192.86
21.01 21.01
15.33 7.67
28.68
15.00 15.00
12.00 12.00
110.00 110.00
55.00 55.00
192.00
28.68 0.86
0.86
176.54
Precio S/. Parcial S/.
21.01 21.01
15.33 7.67
28.68
15.00 15.00
12.00 12.00
65.00 65.00
55.00 55.00
147.00
28.68 0.86
0.86
40.67
Precio S/. Parcial S/.
21.01 5.60
5.60
34.90 34.90
34.90
5.60 0.17
0.17
44.77
21.01 5.60
5.60
39.00 39.00
39.00
5.60 0.17
0.17
DISEÑO INTERFOLIADO
66.67
21.01 5.60
5.60
60.90 60.90
60.90
5.60 0.17
0.17
3.51
1.90 1.90
230.00 0.46
2.36
1.12 0.03
0.03
5.81
21.01 1.12
1.12
230.00 0.46
4.20 4.20
4.66
1.12 0.03
0.03
29.13
21.01 5.60
15.33 4.09
9.69
2.85 8.55
2.10 4.20
2.10 1.05
1.50 0.15
5.20 5.20
19.15
9.69 0.29
0.29
3.51
21.01 1.12
1.12
1.90 1.90
230.00 0.46
2.36
1.12 0.03
0.03
4.45
Precio S/. Parcial S/.
21.01 0.84
15.33 0.61
1.45
2.50 2.50
230.00 0.46
2.96
1.45 0.04
0.04
2.11
Precio S/. Parcial S/.
21.01 1.12
1.12
0.50 0.50
230.00 0.46
0.96
1.12 0.03
0.03
51.78
Precio S/. Parcial S/.
21.01 14.01
14.01
3.50 7.00
0.80 3.20
1.50 0.15
25.00 25.00
1.00 2.00
37.35
14.01 0.42
0.42
59.58
Precio S/. Parcial S/.
21.01 14.01
14.01
3.50 7.00
2.00 8.00
1.50 0.15
27.00 27.00
1.50 3.00
45.15
14.01 0.42
0.42
9.41
Precio S/. Parcial S/.
21.01 5.60
5.60
3.50 3.50
72.03 0.14
3.64
5.60 0.17
0.17
20.35
Precio S/. Parcial S/.
21.01 8.40
8.40
4.50 2.70
3.50 3.50
5.50 5.50
11.70
8.40 0.25
0.25
19.43
Precio S/. Parcial S/.
21.01 7.00
15.33 5.11
12.11
2.50 2.63
2.20 0.70
4.50 1.76
3.80 0.61
18.00 1.26
6.96
12.11 0.36
0.36
64.16
Precio S/. Parcial S/.
21.01 28.01
15.33 20.44
48.45
3.50 9.10
4.50 2.70
3.50 2.10
18.00 0.36
14.26
48.45 1.45
1.45
20.15
Precio S/. Parcial S/.
21.01 8.40
8.40
5.00 3.00
3.50 3.50
5.00 5.00
11.50
8.40 0.25
0.25
36.04
Precio S/. Parcial S/.
21.01 16.81
15.33 12.26
29.07
2.50 2.50
72.03 3.60
6.10
29.07 0.87
0.87
37.04
Precio S/. Parcial S/.
21.01 16.81
15.33 12.26
29.07
3.50 3.50
72.03 3.60
7.10
29.07 0.87
0.87
10.41
Precio S/. Parcial S/.
21.01 5.60
5.60
4.50 4.50
72.03 0.14
4.64
5.60 0.17
0.17
10.41
Precio S/. Parcial S/.
21.01 5.60
5.60
4.50 4.50
72.03 0.14
4.64
5.60 0.17
0.17
PRESUPUESTO - LOSA DEPORTIVA
Presupuesto
CONTRATACIÓN DE SERVICIOS PARA ACONDICIONAMIENTO DE LOS AMBIENTES DEL LOCAL F01L01 (OXAPAMPA) DE A
INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
: CONTRATACION DE SERVICIOS PARA ACONDICONAMIENTO DE LOS AMBIENTES DE LAS FACULTADES DE CIENCIAS AGROPECUARIAS Y ODO
SERVICIO
DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
EJECUTA : UNIVERSIDAD NACIONAL DANIEL ALCIDES CARRION
UBICACIÓN : CIUDAD UNIVERSITARIA - YANACANCHA - PASCO - PASCO
HOJA DE METRADO
05 AREA DEPORTIVA
05.01 SS.HH. - DUCHA - GRADERIAS
05.01.01 SERVICIOS PRELIMINARES
05.01.01.01 SEÑALIZACION DURANTE LA EJECUCION M2 1.00
05.01.01.02 TRAZO, NIVELES Y REPLANTEO DURANTE LA EJECUCION M2 1.00
05.01.01.03 LIMPIEZA MANUAL DE TERRENO M2 1.00
05.01.02 MOVIMIENTO DE TIERRAS
05.01.02.01 Excavación de zanjas para Cimiento M3
EJE A, B, C, D, E, F, G y H
ENTRE 1-2 1.00
ENTRE 2-3 1.00
EJE 1, 2 y 3 3.00
05.01.03.02 Sobrecimientos
05.01.03.02.01 Sobrecimiento Concreto 1:8 + 25% P.M. M3
EJE A, B, C, D, E, F, G y H
ENTRE 1-2 1.00
ENTRE 2-3 1.00
EJE 1, 2 y 3
3.00
05.01.03.03 Solados
05.01.03.03.01 Solado para Zapatas E=4" 1:12 M3
Z1 2.00
05.01.03.04 Falso piso
05.01.03.04.01 Falso piso E=4" de concreto 1:10 M3
VESTIDOR 1 1.00
LIMPIEZA 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
PASADIZO 1.00
05.01.03.05 Vereda
05.01.03.05.01 Concreto F'C = 175 kg/cm2 M3
Vereda 1.00
1.00
05.01.03.05.02 Encofrado y desencofrado M2
2.00
2.00
4.00
05.01.03.05.03 Piso de Cemento Pulido y Bruñado M3
Vereda 1.00
1.00
05.01.04 CONCRETO ARMADO
05.01.04.01 Zapatas
05.01.04.01.01 Concreto en Zapatas F'C = 210 kg/cm2 M3
Z1 2.00
05.01.04.04 GRADAS
05.01.04.04.01 Concreto en Gradas F'C = 210 kg/cm2 M3
2.00
4.00
05.01.04.04.02 Acero en Gradas f'y=4200 kg/cm2. KG
7.00
7.00
7.00
7.00
05.01.04.04.03 Encofrado y desencofrado en Gradas M2
7.00
1.00
05.01.05 ALBAÑILERIA
05.01.05.01 Muro ladrillo de arcilla de soga C.A. 1:4 M2
EJE A-A
ENTRE 1-2 1.00
ENTRE 2-3 1.00
EJE B-B
ENTRE 1-2 2.00
ENTRE 2-3 1.00
EJE A'-B'
ENTRE 1-2 1.00
ENTRE 2-3 1.00
EJE 1-1
ENTRE A-B 1.00
EJE 1'-1'
ENTRE A'-B' 2.00
EJE 2-2
ENTRE A-B 1.00
EJE 2'-2'
ENTRE A-B 2.00
EJE 3-3
ENTRE A-B 1.00
05.01.06 REVOQUES, ENLUCIDOS Y MOLDURAS
05.01.06.01 Tarrajeo en muros interiores Cemento Arena 1:5 M2
SS.HH
VESTIDOR 1 1.00
puerta (1.00)
ventana (1.00)
LIMPIEZA 1.00
Puerta (1.00)
ventana (1.00)
VESTIDOR 2 1.00
puerta (1.00)
ventana (1.00)
S.H. V 1.00
(1.00)
(1.00)
S.H DISCAPACITADOS 1.00
(1.00)
(1.00)
S.H.M. 1.00
(1.00)
(1.00)
05.01.06.02 Tarrajeo en muros exteriores Cemento Arena 1:5 M2
SS.HH 2.00
2.00
(1.00)
(1.00)
05.01.08 PISOS Y PAVIMENTOS
05.01.08.01 Pisos Porcelanato M2
VESTIDOR 1 1.00
LIMPIEZA 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
PASADIZO 2.00
05.01.09 ZOCALOS
05.01.09.01 Zocalo ceramico H=1.5 M M2
SS.HH
VESTIDOR 1 1.00
(1.00)
LIMPIEZA 1.00
(1.00)
VESTIDOR 2 1.00
(1.00)
S.H. V 1.00
(1.00)
S.H DISCAPACITADOS 1.00
(1.00)
S.H.M. 1.00
(1.00)
05.01.10 CARPINTERIA METALICA
05.01.10.01 Tabiqueria contraplacada metalica tubo 1" M2 1.00
05.01.10.02 Baranda de tubo negro de 2" x1.00 m ML 1.00
05.01.11 CARPINTERIA DE MADERA
05.01.11.01 Puerta Apanelada de Madera Tornillo M2
VESTIDOR 1 1.00
LIMPIEZA 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.12 CERRAJERÍA
05.01.12.01 Cerradura puerta de sobre poner de 2 UND 6.00
05.01.12.02 Bisagras Aluminizadas 3"" PZA 24.00
05.01.13 VIDRIOS, CRISTALES Y SIMILARES
05.01.13.01 Vidrio triple nacional M2
V1 1.00
V2 1.00
05.01.14 PINTURA
05.01.14.01 Pintura en muros interiores c/latex 2 manos M2
SS.HH
VESTIDOR 1 1.00
(1.00)
(1.00)
LIMPIEZA 1.00
(1.00)
(1.00)
VESTIDOR 2 1.00
(1.00)
(1.00)
S.H. V 1.00
(1.00)
(1.00)
S.H.M. 1.00
(1.00)
(1.00)
05.01.14.02 Pintura en muros exteriores c/latex 2 manos M2
SS.HH 2.00
2.00
(1.00)
(1.00)
05.01.14.03 Pintura en cielo raso c/latex 2 manos M2 1.00
05.01.14.04 Pintura en Carpinteria metalica M2 1.00
05.01.14.05 Pintura en Puertas con barniz 2 manos M2
VESTIDOR 1 1.00
LIMPIEZA 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.15 JUNTAS DE DILATACION
05.01.15.01 Junta asfaltica e=1" M 1.00
05.01.16 INSTALACIONES SANITARIAS
05.01.16.01 APARATOS SANITARIOS Y ACCESORIOS
05.01.16.01.01 APARATOS SANITARIOS
05.01.16.01.01.01 LAVADEROS CON PEDESTAL UND 6.00
05.01.16.01.01.02 INODOROS CON FLUXOMETRO UND 7.00
05.01.16.01.01.03 URINARIOS CON FLUXOMETRO UND 3.00
05.01.16.01.01.04 DISPENSADORES DE PAPEL HIGIENICO UND 3.00
05.01.16.01.01.05 DISPENSADORES DE SECADO DE MANO UND 3.00
05.01.16.01.01.06 DISPENSADORES DE TACHOS UND 7.00
05.01.16.01.02 REDES DE DERIVACION DE DESAGUE
05.01.16.01.02.01 Salida PVC SAP desague Ø 2" PTO
VESTIDOR 1 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.02.02 Salida PVC SAP ventilacion Ø 2" PTO 1.00
05.01.16.01.02.03 Salida PVC SAP desague Ø 4" PTO
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.02.04 Tuberia PVC SAL Ø 2" M
VESTIDOR 1 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
04.01.19.01.01.05 Tuberia PVC SAL Ø 4" M
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
RED DE DESAGUE 1.00
05.01.16.01.02 ACCESORIOS R/DERIV DE DESAGUE
05.01.16.01.02.01 Yee PVC SAP Ø 4" UND 1.00
05.01.16.01.02.02 Yee PVC SAP Ø 4" A 2" UND 1.00
05.01.16.01.02.03 Yee PVC SAP Ø 2" UND 1.00
05.01.16.01.02.04 Codo 45° PVC SAP Ø 2" UND
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.02.05 Caja de Registro de desague de 12"x24" UND 1.00
05.01.16.01.02.06 Suministro de bronce Ø 2" UND
VESTIDOR 1 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.02.07 Registro rosacado de bronce Ø 4" UND
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.03 SISTEMAS DE AGUA FRIA
05.01.16.01.03.01 Salida PVC SAP Ø 1/2" PTO
VESTIDOR 1 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.03.02 Tuberia PVC SAP Ø 1/2" M
VESTIDOR 1 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.03.03 Válvula de compuerta de bronce de union roscdo Ø ½" UND 1.00
05.01.16.01.03.04 Codo PVC SAP Ø 1/2" UND
VESTIDOR 1 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.03.05 Tee PVC SAP Ø 1/2" UND
VESTIDOR 1 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.03.06 Caño de bronce estándar llave de 1/2" UND
VESTIDOR 1 1.00
VESTIDOR 2 1.00
SS.HH V 1.00
SS.HH M 1.00
SS.HH DISCAPACITADO 1.00
05.01.16.01.03.07 Acsesorios de Ducha UND 1.00
05.01.16.01.03.08 Suninistro de Bronce UND 1.00
DIMENSIONES
CANT. PARCIAL TOTAL
LARGO ANCHO ALTO
33.62
23.04
8.00 1.20 1.00 1.20 23.04
4.20
52.45 13.11
175.21
1.00 26.75 6.55 175.21
45.42
2.00 5.35 1.24 13.25
1.00 24.75 1.30 32.18
33.62
33.62
1.92
8.00 1.20 1.00 0.10 1.92
55.33
AREA 9.55 9.55
AREA 4.26 4.26
AREA 9.55 9.55
AREA 10.57 10.57
AREA 10.57 10.57
AREA 4.26 4.26
AREA 6.57 6.57
6.81
2.00 5.35 1.24 0.15 1.99
1.00 24.75 1.30 0.15 4.83
22.71
2.00 5.35 0.30 6.42
1.00 24.75 0.30 14.85
1.00 1.20 0.30 1.44
45.42
2.00 5.35 1.24 13.25
1.00 24.75 1.30 32.18
11.52
8.00 1.20 1.00 0.60 11.52
FACT. 95.33
5.00 1.20 0.99 47.66
6.00 1.00 0.99 47.66
10.14
FACT. 1,470.03
4.00 6.00 1.55 297.60
40.00 1.25 0.58 232.00
7.00 25.15 1.55 818.63
168.00 1.25 0.58 121.80
370.35
3.00 6.00 144.00
3.00 25.15 226.35
12.34
7.00 3.50 0.60 0.40 11.76
2.00 1.20 0.30 0.20 0.58
fact 1,519.54
14.00 8.00 0.993 778.51
14.00 3.90 0.993 379.52
14.00 1.60 0.993 155.70
15.00 3.50 0.560 205.80
43.92
4.00 3.50 0.40 39.20
2.00 5.90 0.40 4.72
96.38
96.38
53.06
AREA 9.55 9.55
AREA 4.26 4.26
AREA 9.55 9.55
AREA 10.57 10.57
AREA 10.57 10.57
AREA 4.26 4.26
AREA 2.15 4.30
109.20
6.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00 6.00
24.00 24.00
4.56
4.00 1.50 0.60 3.60
2.00 0.80 0.60 0.96
96.38
6.00 6.00
7.00 7.00
3.00 3.00
3.00 3.00
3.00 3.00
7.00 7.00
13.00
5.00 5.00
2.00 2.00
1.00 1.00
4.00 4.00
1.00 1.00
2.00 2.00 2.00
10.00
5.00 5.00
4.00 4.00
1.00 1.00
26.80
7.60 7.60
4.50 4.50
5.75 5.75
5.75 5.75
3.20 3.20
42.10
5.90 5.90
3.70 3.70
2.50 2.50
30.00 30.00
17.00
2.00 2.00
2.00 2.00
4.00 4.00
7.00 7.00
2.00 2.00
22.75
5.50 5.50
5.50 5.50
4.70 4.70
4.30 4.30
2.75 2.75
2.00 2.00 2.00
34.00
4.00 4.00
4.00 4.00
8.00 8.00
14.00 14.00
4.00 4.00
16.00
2.00 2.00
2.00 2.00
3.00 3.00
3.00 3.00
6.00 6.00
10.00
2.00 2.00
2.00 2.00
1.00 1.00
4.00 4.00
1.00 1.00
4.00 4.00 4.00
4.00 4.00 4.00
6.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
6.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
6.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
57.80
3.20 3.20
4.20 4.20
4.00 4.00
3.20 3.20
4.20 4.20
4.00 4.00
35.00 35.00
78.00
10.00 10.00
10.00 10.00
15.00 15.00
12.00 12.00
15.00 15.00
16.00 16.00
57.80
3.20 3.20
4.20 4.20
4.00 4.00
3.20 3.20
4.20 4.20
4.00 4.00
35.00 35.00
1.00 1.00
1.00 1.00
2.00 2.00
336.85
2.00 28.00 56.00
4.00 19.00 76.00
1.00 12.00 12.00
2.00 2.40 4.80
2.00 26.45 52.90
2.00 15.00 30.00
1.00 11.15 11.15
4.00 5.50 22.00
2.00 18.00 36.00
4.00 9.00 36.00
ANALISIS DE PRECIOS UNITARIOS - LOSA DEPORTIVA
Presupuesto CONTRATACIÓN DE SERVICIOS PARA ACONDICIONAMIENTO DE LOS AMBIENTES DEL LOCAL F01L01 (OXAPAMPA) DE
ACUERDO A LOS INDICADORES CON FINES DE LICENCIAMIENTO INSTITUCIONAL DE LA UNDAC
Rendimiento m2/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m2 1.75
Materiales
0241020002 CINTA DE SEÑALIZACIÓN und 0.0010 49.00
Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo por : m2 5.99
Materiales
0213010004 YESO (5kg) bol 0.2000 20.00
0270120028 CORDEL m 1.0000 0.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.45
Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo por : m2 1.27
Rendimiento m3/DIA 7.0000 EQ. 7.0000 Costo unitario directo por : m3 33.75
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 32.77
Rendimiento m3/DIA 7.0000 EQ. 7.0000 Costo unitario directo por : m3 33.75
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 32.77
Rendimiento m3/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m3 14.34
Materiales
0201030001 GASOLINA gal 0.1300 12.00
0290130022 AGUA m3 0.0800 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 9.88
0301100003 COMPACTADORA DE PLANCHA día 1.0000 0.0500 44.00
Rendimiento m2/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : m2 3.71
Equipos
0301000014 NIVELADORA día 1.0000 0.0125 60.00
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.87
Rendimiento m2/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m2 14.34
Materiales
0201030001 GASOLINA gal 0.1300 12.00
0290130022 AGUA m3 0.0800 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 9.88
0301100003 COMPACTADORA DE PLANCHA día 1.0000 0.0500 44.00
Rendimiento m3/DIA 65.0000 EQ. 65.0000 Costo unitario directo por : m3 15.69
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.48
0301290001000 RETROEXCAVADORA hm 1.0000 0.1231 60.00
0301290001000 VOLQUETE hm 1.0000 0.1231 30.00
Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3 274.32
Materiales
0207020001000 ARENA GRUESA m3 0.4000 50.00
0207030001 HORMIGON m3 0.4000 52.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000 20.50
0290130022 AGUA m3 0.1500 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.38
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333 80.00
Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3 274.32
Materiales
0207020001000 ARENA GRUESA m3 0.4000 50.00
0207030001 HORMIGON m3 0.4000 52.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000 20.50
0290130022 AGUA m3 0.1500 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.38
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333 80.00
Partida 05.01.03.02.02 ENCOFRADO Y DESENCOFRADO
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 39.96
Materiales
0204010002000 ALAMBRE NEGRO N° 8 kg 0.5000 3.50
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000 3.80
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200 4.30
0231010001 MADERA TORNILLO p2 3.7000 4.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.28
Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3 178.45
Materiales
0207020001000 ARENA GRUESA m3 0.3000 50.00
0207030001 HORMIGON m3 0.3000 52.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 5.8000 20.50
0290130022 AGUA m3 0.0900 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.38
0301290003 MEZCLADORA DE CONCRETO hm 0.2000 0.1067 80.00
Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3 274.32
Materiales
0207020001000 ARENA GRUESA m3 0.4000 50.00
0207030001 HORMIGON m3 0.4000 52.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000 20.50
0290130022 AGUA m3 0.1500 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.38
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333 80.00
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 39.96
Materiales
0204010002000 ALAMBRE NEGRO N° 8 kg 0.5000 3.50
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000 3.80
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200 4.30
0231010001 MADERA TORNILLO p2 3.7000 4.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.28
Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3 274.32
Materiales
0207020001000 ARENA GRUESA m3 0.4000 50.00
0207030001 HORMIGON m3 0.4000 52.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000 20.50
0290130022 AGUA m3 0.1500 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.38
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333 80.00
Rendimiento m2/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m2 14.71
Materiales
0207020001000 ARENA FINA m3 0.0050 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1000 20.50
0290130022 AGUA m3 0.0400 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 11.47
Rendimiento m3/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m3 331.25
Materiales
0207010001000 PIEDRA CHANCADA 1/2" m3 0.5000 50.00
0207020001000 ARENA FINA m3 0.5000 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 20.50
0290130022 AGUA m3 0.1800 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 26.70
0301290001 VIBRADOR PARA CONCRETO hm 0.2000 0.1000 60.00
0301290003 MEZCLADORA DE CONCRETO hm 0.2000 0.1000 80.00
Rendimiento kg/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : kg 5.73
Materiales
0204010001000 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0200 4.00
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO kg 0.1200 23.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.75
Rendimiento m3/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m3 331.25
Materiales
0207010001000 PIEDRA CHANCADA 1/2" m3 0.5000 50.00
0207020001000 ARENA FINA m3 0.5000 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 20.50
0290130022 AGUA m3 0.1800 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 26.70
0301290001 VIBRADOR PARA CONCRETO hm 0.2000 0.1000 60.00
0301290003 MEZCLADORA DE CONCRETO hm 0.2000 0.1000 80.00
Rendimiento kg/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : kg 5.73
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.0500 21.01
0101010004 OFICIAL hh 1.0000 0.1000 17.03
Materiales
0204010001000 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0200 4.00
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO kg 0.1200 23.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.75
Rendimiento m3/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m3 331.25
Materiales
0207010001000 PIEDRA CHANCADA 1/2" m3 0.5000 50.00
0207020001000 ARENA FINA m3 0.5000 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 20.50
0290130022 AGUA m3 0.1800 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 26.70
0301290001 VIBRADOR PARA CONCRETO hm 0.2000 0.1000 60.00
0301290003 MEZCLADORA DE CONCRETO hm 0.2000 0.1000 80.00
Rendimiento kg/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : kg 5.73
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.75
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 39.96
Materiales
0204010002000 ALAMBRE NEGRO N° 8 kg 0.5000 3.50
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000 3.80
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200 4.30
0231010001 MADERA TORNILLO p2 3.7000 4.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.28
Rendimiento m3/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m3 331.25
Materiales
0207010001000 PIEDRA CHANCADA 1/2" m3 0.5000 50.00
0207020001000 ARENA FINA m3 0.5000 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 20.50
0290130022 AGUA m3 0.1800 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 26.70
0301290001 VIBRADOR PARA CONCRETO hm 0.2000 0.1000 60.00
0301290003 MEZCLADORA DE CONCRETO hm 0.2000 0.1000 80.00
Rendimiento kg/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : kg 5.73
Materiales
0204010001000 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0200 4.00
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO kg 0.1200 23.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.75
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 39.96
Materiales
0204010002000 ALAMBRE NEGRO N° 8 kg 0.5000 3.50
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000 3.80
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200 4.30
0231010001 MADERA TORNILLO p2 3.7000 4.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.28
Rendimiento m3/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m3 331.25
Materiales
0207010001000 PIEDRA CHANCADA 1/2" m3 0.5000 50.00
0207020001000 ARENA FINA m3 0.5000 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7000 20.50
0290130022 AGUA m3 0.1800 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 26.70
0301290001 VIBRADOR PARA CONCRETO hm 0.2000 0.1000 60.00
0301290003 MEZCLADORA DE CONCRETO hm 0.2000 0.1000 80.00
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 39.96
Materiales
0204010002000 ALAMBRE NEGRO N° 8 kg 0.5000 3.50
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000 3.80
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200 4.30
0231010001 MADERA TORNILLO p2 3.7000 4.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.28
Rendimiento kg/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : kg 5.73
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.75
Partida 05.01.05.01 MURO DE SOGA LADRILLO KING KONG 18 HUECOS DE ARCILLA - MEZCLA
Rendimiento m2/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m2 63.87
Materiales
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 0.0200 4.31
0207020001000 ARENA GRUESA m3 0.0260 50.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.2320 20.50
0216010017 LADRILLO KING KONG DE ARCILLA 9 X 14 X 24 und 33.0000 1.10
0231010001 MADERA TORNILLO p2 0.4300 4.00
0290130022 AGUA m3 0.0010 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.12
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 27.69
Materiales
0207020001000 ARENA FINA m3 0.0020 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3000 20.50
0290130022 AGUA m3 0.0060 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 15.29
0301060002000 REGLA DE ALUMINIO 1" X 4" X 8" und 1.0000 5.50
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 31.03
Materiales
0207020001000 ARENA FINA m3 0.0020 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3000 20.50
0290130022 AGUA m3 0.0060 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 15.29
0301060002000 REGLA DE ALUMINIO 1" X 4" X 8" und 1.0000 5.50
0301340010 ANDAMIO METALICO día 1.0000 0.0667 50.00
Rendimiento m/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : m 41.84
Materiales
0204120001000 CLAVOS PARA MADERA CON CABEZA 1 1/2" kg 0.0300 3.20
0231050001000 TRIPLAY LUPUNA 4 x 8 x 4 mm pln 0.7500 23.70
0238010003000 LISTONE DE MADERA DE 2"x2" p 3.0000 3.10
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.23
Rendimiento m2/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m2 76.73
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4000 21.01
0101010005 PEON hh 1.0000 0.4000 15.33
Materiales
0213070001 FRAGUA kg 1.5000 4.50
0222080018 PEGAMENTO PARA CERAMICOS kg 2.5000 1.80
0228050036 PORCELANATO DE ALTO TRANSITO DE 60 x 60 m2 1.0500 48.00
0263030001 CRUCETAS und 0.0010 60.00
0290130022 AGUA m3 0.0100 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.53
Rendimiento m2/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m2 62.03
Materiales
0213070001 FRAGUA kg 1.5000 4.50
0222080018 PEGAMENTO PARA CERAMICOS kg 2.5000 1.80
0225020121 CERAMICA CELIMA 0.30X0.30 cm m2 1.0500 34.00
0263030001 CRUCETAS und 0.0010 60.00
0290130022 AGUA m3 0.0100 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.53
Rendimiento m2/DIA 5.0000 EQ. 5.0000 Costo unitario directo por : m2 344.80
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 58.15
0301270002 MOTOSOLDADORA día 1.0000 0.2000 23.10
Rendimiento m/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : m 108.76
Materiales
0240020003 PINTURA ESMALTE SINTETICO TEKNO gal 0.1500 55.80
0255080014000 SOLDADURA CELLOCROP P 3/16" kg 0.5200 47.00
0272010090 TUBO NEGRO DE ACERO D=2", E=4mm pza 0.9500 37.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 36.34
0301270002 MOTOSOLDADORA día 1.0000 0.1250 23.10
Rendimiento pza/DIA 1.0000 EQ. 1.0000 osto unitario directo por : pza 1,400.00
Rendimiento pza/DIA 20.0000 EQ. 20.0000 osto unitario directo por : pza 85.87
Materiales
0237020002 CERRADURA DE 03 GOLPES und 1.0000 85.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 0.84
Rendimiento und/DIA 18.0000 EQ. 18.0000 osto unitario directo por : und 14.23
Materiales
0237060001000 BISAGRA CAPUCHINA ALUMINIZADA 3 1/2"x3 1/und 1.0000 12.30
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.87
Rendimiento p2/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : p2 8.40
Rendimiento m2/DIA 14.0000 EQ. 14.0000 Costo unitario directo por : m2 30.06
Materiales
0205110001002 THINER gal 0.0500 18.00
0238010005 LIJA DE FIERRO #80 plg 1.0000 1.50
0240010008 PINTURA LATEX SUPERMATE gal 0.0800 41.00
0240150001 IMPRIMANTE gal 0.0320 40.00
0267110023 SELLADOR A BASE DE LATEX gal 0.0380 45.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.77
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 31.97
Materiales
0205110001002 THINER gal 0.0500 18.00
0238010005 LIJA DE FIERRO #80 plg 1.0000 1.50
0240010008 PINTURA LATEX SUPERMATE gal 0.0800 41.00
0240150001 IMPRIMANTE gal 0.0320 40.00
0267110023 SELLADOR A BASE DE LATEX gal 0.0380 45.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.38
0301340010 ANDAMIO METALICO día 1.0000 0.0667 50.00
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 31.97
Materiales
0205110001002 THINER gal 0.0500 18.00
0238010005 LIJA DE FIERRO #80 plg 1.0000 1.50
0240010008 PINTURA LATEX SUPERMATE gal 0.0800 41.00
0240150001 IMPRIMANTE gal 0.0320 40.00
0267110023 SELLADOR A BASE DE LATEX gal 0.0380 45.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.38
0301340010 ANDAMIO METALICO día 1.0000 0.0667 50.00
Rendimiento m2/DIA 50.0000 EQ. 50.0000 Costo unitario directo por : m2 9.87
Materiales
0205110001002 THINER gal 0.0120 18.00
0240070001 PINTURA ANTICORROSIVA gal 0.0900 62.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.95
Rendimiento m/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m 6.93
Materiales
0201050001000 ASFALTO RC-250 gal 0.0185 12.50
0207020001000 ARENA FINA m3 0.0020 130.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.31
0301100006 COCINA ASFALTICA hm 1.0000 0.1333 7.50
Subcontratos
0415040013 SC EXCAVACION DE JUNTA DE LOSA DEPORTIVAm 1.0000 1.00
Materiales
0247010002001 LAVATORIO OVALIN COLOR BLANCO und 1.0000 139.00
0290240007 ACCESORIOS PARA LAVATORIO und 1.0000 40.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.01
Rendimiento und/DIA 4.0000 EQ. 4.0000 osto unitario directo por : und 678.48
Materiales
0247020004 INODORO und 1.0000 220.00
0270110330 FLUXOMETRO PARA INODORO und 1.0000 415.20
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 42.02
Rendimiento und/DIA 4.0000 EQ. 4.0000 osto unitario directo por : und 723.36
Materiales
0247110003 URINARIO und 1.0000 240.00
0270110325 FLUXOMETRO PARA URINARIO und 1.0000 440.08
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 42.02
Partida 05.01.15.01.01.04 DISPENSADORES DE PAPEL HIGIENICO/JABONERA
Rendimiento und/DIA 8.0000 EQ. 8.0000 osto unitario directo por : und 105.16
Materiales
0262090005 DISPENSADOR DE JABON LIQUIDO und 1.0000 58.00
0262090006 DISPENSADOR DE PAPEL HIGIENICO und 1.0000 45.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.10
Rendimiento und/DIA 8.0000 EQ. 8.0000 osto unitario directo por : und 1,102.16
Materiales
0262090010 DISPENSADOR DE SECADO DE MANOS und 1.0000 1,100.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.10
Rendimiento und/DIA 1.0000 EQ. 1.0000 osto unitario directo por : und 91.00
Rendimiento pto/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : pto 22.26
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.4000 21.01
Materiales
0205070002003 TUBERIA PVC SAL Ø 2" m 1.0000 4.10
0205100002001 CODO PVC SAL 2" x90º und 1.0000 4.80
0205110001001 TEE PVC SAL DE 2" x 2" und 1.0000 4.00
0205110001002 TEFLON und 0.1000 2.50
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 8.40
Rendimiento pto/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : pto 22.26
Materiales
0205070002003 TUBERIA PVC SAL Ø 2" m 1.0000 4.10
0205100002001 CODO PVC SAL 2" x90º und 1.0000 4.80
0205110001001 TEE PVC SAL DE 2" x 2" und 1.0000 4.00
0205110001002 TEFLON und 0.1000 2.50
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 8.40
Rendimiento pto/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : pto 29.12
Materiales
0205070002002 TUBERIA PVC SAL Ø 4" m 1.0000 10.80
0205100002001 CODO PVC SAL 4" x90º und 1.0000 8.50
0205110001002 TEFLON und 0.0500 2.50
0206070001000 TEE SANITARIA PVC-SAL DE 4" und 1.0000 7.50
0222080012 PEGAMENTO PARA PVC gal 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.68
Rendimiento m/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m 8.48
Materiales
0205070002003 TUBERIA PVC SAL Ø 2" m 1.0500 4.10
0205110001002 TEFLON und 0.1000 2.50
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.36
Rendimiento m/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m 12.41
Materiales
0205070002002 TUBERIA PVC SAL Ø 4" m 1.0000 10.80
0222080012 PEGAMENTO PARA PVC gal 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.12
Rendimiento und/DIA 20.0000 EQ. 20.0000 osto unitario directo por : und 13.04
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.2000 21.01
Materiales
0205110001002 TEFLON und 0.1000 2.50
0206170001001 YEE PVC SAL 4" x 4" und 1.0000 8.00
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.20
Rendimiento und/DIA 20.0000 EQ. 20.0000 osto unitario directo por : und 10.44
Materiales
0205110001002 TEFLON und 0.1000 2.50
0206170001000 YEE PVC SAL 4" x 2" und 1.0000 8.00
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.68
Rendimiento und/DIA 40.0000 EQ. 40.0000 osto unitario directo por : und 6.87
Materiales
0205110001002 TEFLON und 0.1000 2.50
0206170001001 YEE PVC SAL 2" x 2" und 1.0000 4.00
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.10
Partida 05.01.15.02.04 CODO PVC SAP 2" x 45°
Rendimiento und/DIA 45.0000 EQ. 45.0000 osto unitario directo por : und 4.68
Materiales
0205100002000 CODO PVC SAP 2" X 45° und 1.0000 3.20
0205110001002 TEFLON und 0.1000 2.50
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 0.75
Rendimiento pza/DIA 4.0000 EQ. 4.0000 osto unitario directo por : pza 115.26
Materiales
0207020001000 ARENA FINA m3 0.0200 130.00
0207030001 HORMIGON m3 0.0100 52.00
0209040001 TAPA CON MARCO FIERRO FUNDIDO PARA DESAG
pza 1.0000 21.80
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.7500 20.50
0290130022 AGUA m3 0.0200 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 72.68
Rendimiento pza/DIA 6.0000 EQ. 6.0000 osto unitario directo por : pza 20.43
Materiales
0246120003000 REGISTRO DE BRONCE DE 4" und 1.0000 6.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.01
Rendimiento und/DIA 6.0000 EQ. 6.0000 osto unitario directo por : und 20.43
Materiales
0246120003000 REGISTRO DE BRONCE DE 4" und 1.0000 6.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.01
Rendimiento und/DIA 10.0000 EQ. 10.0000 osto unitario directo por : und 15.11
Materiales
0205070002003 TUBERIA PVC SAP C-10 Ø 1/2" m 1.0000 1.50
0205100002000 CODO PVC SAP 1/2" X 90° und 1.0000 2.00
0205110001001 TEE PVC SAP DE 1/2" x 1/2" und 1.0000 2.50
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 8.40
Rendimiento m/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m 5.50
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
0101010003 OPERARIO hh 0.5000 0.1600 21.01
Materiales
0205070002003 TUBERIA PVC SAP C-10 Ø 1/2" m 1.0500 1.50
0222080012 PEGAMENTO PARA PVC gal 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.36
Rendimiento und/DIA 25.0000 EQ. 25.0000 osto unitario directo por : und 27.96
Materiales
0253180004 VALVULA COMPUERTA DE BRONCE DE 1/2" und 1.0000 24.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.36
Rendimiento und/DIA 45.0000 EQ. 45.0000 osto unitario directo por : und 4.48
Materiales
0205100002000 CODO PVC SAP 2" X 90° und 1.0000 3.00
0205110001002 TEFLON und 0.1000 2.50
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 0.75
Partida 05.01.15.03.05 TEE PVC SAP DE 1/2''
Rendimiento und/DIA 40.0000 EQ. 40.0000 osto unitario directo por : und 3.39
Materiales
0205110001001 TEE PVC SAP DE 1/2" x 1/2" und 1.0000 2.50
0222080020 PEGAMENTO PARA CPVC und 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 0.42
Rendimiento und/DIA 15.0000 EQ. 15.0000 osto unitario directo por : und 44.77
Materiales
0247070004 CAÑO DE BRONCE 1/2" ESTANDAR C/ACESORIOund 1.0000 39.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 5.60
Rendimiento und/DIA 15.0000 EQ. 15.0000 osto unitario directo por : und 144.59
Materiales
0256040004 LLAVE PARA DUCHA und 1.0000 95.00
0290240009 ACCESORIOS PARA DUCHA und 1.0000 45.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 1.0000 4.54
Partida 05.01.15.03.08 SUMINISTRO DE BRONCEØ 2"
Rendimiento und/DIA 15.0000 EQ. 15.0000 osto unitario directo por : und 31.77
Materiales
0222100002 SUMIDERO und 1.0000 26.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 5.60
Rendimiento m/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : m 34.22
Materiales
0246160001000 GANCHO PLATINA P/CANALETA 5/8" X 1/8" und 1.0000 4.00
0292030002 CANAL CUADRADO DE 11x8x8 CALAMINA DE 3" m 1.0000 25.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 5.07
Rendimiento m/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m 15.62
Materiales
0205070002003 TUBERIA PVC SAL Ø 3" m 1.0500 6.20
0222080012 PEGAMENTO PARA PVC gal 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 8.40
Rendimiento pza/DIA 12.0000 EQ. 12.0000 osto unitario directo por : pza 15.67
Materiales
0205100002001 CODO PVC SAL 3" x 45º und 1.0000 8.00
0222080012 PEGAMENTO PARA PVC gal 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 7.00
Rendimiento pto/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : pto 47.81
Materiales
0205010001000 TUBERIA PVC-SAP ELECTRICA DE 3/4" X 3 m (2 und 1.0000 5.50
0205020001000 CURVAS PVC-SAP ELECTRICAS 3/4" (20 mm) und 2.0000 1.00
0205030001000 UNIONES PVC-SAP 3/4" ELECTRICAS (20 mm) und 1.0000 2.00
0222080012 PEGAMENTO PARA PVC gal 0.0020 230.00
0241020001 CINTA AISLANTE rll 0.0250 2.80
0262130001000 TOMACORRIENTE UNIVERSAL DOBLE + L.T. und 1.0000 12.00
0270010015 ALAMBRE TW 4 mm2 m 15.0000 1.10
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 9.01
Materiales
0262050002000 INTERRUPTOR BIPOLAR MODUS 642A pza 1.0000 26.80
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 84.04
Rendimiento und/DIA 10.0000 EQ. 10.0000 osto unitario directo por : und 147.75
Materiales
0205020001000 CURVAS PVC-SAP ELECTRICAS 3/4" (20 mm) und 1.0000 1.00
0241020001 CINTA AISLANTE rll 0.1000 2.80
0246250009 TUBO PVC SEL 3/4" m 1.0500 2.70
0270110324 FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PAund 1.0000 120.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 22.94
Rendimiento m/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m 5.50
Materiales
0205070002003 TUBERIA PVC SAP C-10 Ø 1/2" m 1.0500 1.50
0222080012 PEGAMENTO PARA PVC gal 0.0020 230.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.36
Rendimiento m/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : m 3.04
Materiales
0241020001 CINTA AISLANTE rll 0.0100 2.80
0270000002000 CABLE THW # 14 AWG m 1.0500 1.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.90
Rendimiento m/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : m 4.60
Materiales
0241020001 CINTA AISLANTE rll 0.0250 2.80
0270000002000 CABLE THW # 12 AWG m 1.0500 1.42
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.95
Rendimiento pza/DIA 2.0000 EQ. 2.0000 osto unitario directo por : pza 832.72
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 145.36
Rendimiento m2/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m2 26.61
Materiales
0207020001000 ARENA FINA m3 0.0020 130.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.3000 20.50
0290130022 AGUA m3 0.0060 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.58
Rendimiento m2/DIA 14.0000 EQ. 14.0000 Costo unitario directo por : m2 30.06
Materiales
0205110001002 THINER gal 0.0500 18.00
0238010005 LIJA DE FIERRO #80 plg 1.0000 1.50
0240010008 PINTURA LATEX SUPERMATE gal 0.0800 41.00
0240150001 IMPRIMANTE gal 0.0320 40.00
0267110023 SELLADOR A BASE DE LATEX gal 0.0380 45.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.77
Rendimiento und/DIA 1.0000 EQ. 1.0000 osto unitario directo por : und 512.00
Rendimiento m/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : m 33.80
Materiales
0205110001002 THINER gal 0.0090 18.00
0240020001 PINTURA ESMALTE gal 0.0900 55.88
0240070001 PINTURA ANTICORROSIVA gal 0.0100 62.00
0246250004 TUBO CUADRADO DE ACERO LIVIANO 2" und 0.2000 65.52
0255080014000 SOLDADURA CELLOCROP P 3/16" kg 0.2000 47.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 5.33
Rendimiento m2/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m2 237.90
Materiales
0204020012 ANCLAJE DE ACERO CORRUGADO 1/2" und 4.0000 0.80
0228050039 POLICARBONATO INCOLORO MACIZO 6MM m2 1.0500 120.00
0240020005 PINTURA ESMALTE Y PINTURA BASE ZINCROMATm2 0.4000 28.00
0246030001001 TUBO DE ACERO NEGRO RECTANGULAR DE 2"x m 0.0500 18.00
0255080014000 SOLDADURA CELLOCROP P 3/16" kg 1.8000 47.00
0262130004 TORNILLO AUTORROSCANTE DE 2 1/2" CON TUund 2.2000 0.30
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 8.81
0301220004000 EQUIPO DE CORTE Y/O SOLDADURA hm 0.5000 0.1600 4.20
0301340010 ANDAMIO METALICO día 0.8000 0.0320 50.00
Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo por : m2 1.27
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.23
Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo por : m2 5.99
Materiales
0213010004 YESO (5kg) bol 0.2000 20.00
0270120028 CORDEL m 1.0000 0.50
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.45
Rendimiento m3/DIA 28.0000 EQ. 28.0000 Costo unitario directo por : m3 27.83
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2857 21.01
0101010005 PEON hh 1.0000 0.2857 15.33
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 10.38
0301290001000 RETROEXCAVADORA hm 1.0000 0.2857 60.00
Rendimiento m3/DIA 65.0000 EQ. 65.0000 Costo unitario directo por : m3 15.69
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.48
0301290001000 RETROEXCAVADORA hm 1.0000 0.1231 60.00
0301290001000 VOLQUETE hm 1.0000 0.1231 30.00
Rendimiento m3/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m3 57.53
Materiales
0207020001000 ARENA GRUESA m3 0.2000 50.00
0207030001 HORMIGON m3 0.8000 52.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.82
0301100007 COMPACTADORA DE PLANCHA día 1.0000 0.0167 120.00
Materiales
0207020001000 ARENA GRUESA m3 0.4000 50.00
0207030001 HORMIGON m3 0.4000 52.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.3000 20.50
0290130022 AGUA m3 0.1500 5.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.38
0301290003 MEZCLADORA DE CONCRETO hm 1.0000 0.5333 80.00
Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 39.96
Materiales
0204010002000 ALAMBRE NEGRO N° 8 kg 0.5000 3.50
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 2" kg 0.3000 3.80
0204120001000 CLAVOS PARA MADERA CON CABEZA DE 3" kg 0.3200 4.30
0231010001 MADERA TORNILLO p2 3.7000 4.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 20.28
Rendimiento m/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m 6.93
Materiales
0201050001000 ASFALTO RC-250 gal 0.0185 12.50
0207020001000 ARENA FINA m3 0.0020 130.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.31
0301100006 COCINA ASFALTICA hm 1.0000 0.1333 7.50
Subcontratos
0415040013 SC EXCAVACION DE JUNTA DE LOSA DEPORTIVAm 1.0000 1.00
Rendimiento und/DIA 12.0000 EQ. 12.0000 osto unitario directo por : und 323.95
Materiales
0201050006 NET DE VOLEY und 1.0000 67.00
0228050040 POSTES DE METAL LAC D=3" PARA VOLEY pza 2.0000 120.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 16.46
Rendimiento und/DIA 5.0000 EQ. 5.0000 osto unitario directo por : und 2,130.70
Materiales
0201030007 MALLA DE ARCO DE FULBITO m2 3.5000 60.00
0268300009 TABLERO DE BASQUET und 1.0000 280.00
0270110331 ARCO PARA FULBITO CON TABLERO DE BASQUEund 1.0000 1,600.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 39.51
Rendimiento m2/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : m2 15.39
Materiales
0205110001002 THINER gal 0.0050 18.00
0240020006 PINTURA ESMALTE SINTETICO gal 0.0100 64.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.23
F01L01 (OXAPAMPA) DE
DE LA UNDAC
Parcial S/.
1.70
1.70
0.05
0.05
Parcial S/.
0.84
0.61
1.45
4.00
0.50
4.50
0.04
0.04
Parcial S/.
1.23
1.23
0.04
0.04
Parcial S/.
24.01
8.76
32.77
0.98
0.98
Parcial S/.
24.01
8.76
32.77
0.98
0.98
Parcial S/.
6.81
3.07
9.88
1.56
0.40
1.96
0.30
2.20
2.50
Parcial S/.
2.10
0.77
2.87
0.75
0.09
0.84
Parcial S/.
6.81
3.07
9.88
1.56
0.40
1.96
0.30
2.20
2.50
Parcial S/.
2.59
1.89
4.48
0.13
7.39
3.69
11.21
Parcial S/.
11.20
8.18
19.38
20.00
20.80
170.15
0.75
211.70
0.58
42.66
43.24
Parcial S/.
11.20
8.18
19.38
20.00
20.80
170.15
0.75
211.70
0.58
42.66
43.24
Parcial S/.
11.20
9.08
20.28
1.75
1.14
1.38
14.80
19.07
0.61
0.61
Parcial S/.
11.20
8.18
19.38
15.00
15.60
118.90
0.45
149.95
0.58
8.54
9.12
Parcial S/.
11.20
8.18
19.38
20.00
20.80
170.15
0.75
211.70
0.58
42.66
43.24
Parcial S/.
11.20
9.08
20.28
1.75
1.14
1.38
14.80
19.07
0.61
0.61
Parcial S/.
11.20
8.18
19.38
20.00
20.80
170.15
0.75
211.70
0.58
42.66
43.24
Parcial S/.
8.40
3.07
11.47
0.65
2.05
0.20
2.90
0.34
0.34
Parcial S/.
10.51
8.52
7.67
26.70
25.00
65.00
198.85
0.90
289.75
0.80
6.00
8.00
14.80
Parcial S/.
1.05
1.70
2.75
0.08
2.82
2.90
0.08
0.08
Parcial S/.
10.51
8.52
7.67
26.70
25.00
65.00
198.85
0.90
289.75
0.80
6.00
8.00
14.80
Parcial S/.
1.05
1.70
2.75
0.08
2.82
2.90
0.08
0.08
Parcial S/.
10.51
8.52
7.67
26.70
25.00
65.00
198.85
0.90
289.75
0.80
6.00
8.00
14.80
Parcial S/.
1.05
1.70
2.75
0.08
2.82
2.90
0.08
0.08
Parcial S/.
11.20
9.08
20.28
1.75
1.14
1.38
14.80
19.07
0.61
0.61
Parcial S/.
10.51
8.52
7.67
26.70
25.00
65.00
198.85
0.90
289.75
0.80
6.00
8.00
14.80
Parcial S/.
1.05
1.70
2.75
0.08
2.82
2.90
0.08
0.08
Parcial S/.
11.20
9.08
20.28
1.75
1.14
1.38
14.80
19.07
0.61
0.61
Parcial S/.
10.51
8.52
7.67
26.70
25.00
65.00
198.85
0.90
289.75
0.80
6.00
8.00
14.80
Parcial S/.
11.20
9.08
20.28
1.75
1.14
1.38
14.80
19.07
0.61
0.61
Parcial S/.
1.05
1.70
2.75
0.08
2.82
2.90
0.08
0.08
Parcial S/.
14.01
5.11
19.12
0.09
1.30
4.76
36.30
1.72
0.01
44.18
0.57
0.57
Parcial S/.
11.20
4.09
15.29
0.26
6.15
0.03
6.44
0.46
5.50
5.96
Parcial S/.
11.20
4.09
15.29
0.26
6.15
0.03
6.44
0.46
5.50
3.34
9.30
Parcial S/.
5.60
4.54
4.09
14.23
0.10
17.78
9.30
27.18
0.43
0.43
Parcial S/.
8.40
6.13
14.53
6.75
4.50
50.40
0.06
0.05
61.76
0.44
0.44
Parcial S/.
8.40
6.13
14.53
6.75
4.50
35.70
0.06
0.05
47.06
0.44
0.44
Parcial S/.
33.62
24.53
58.15
231.00
23.50
25.79
280.29
1.74
4.62
6.36
Parcial S/.
21.01
15.33
36.34
8.37
24.44
35.63
68.44
1.09
2.89
3.98
Parcial S/.
1,400.00
1,400.00
Parcial S/.
0.84
0.84
85.00
85.00
0.03
0.03
Parcial S/.
1.87
1.87
12.30
12.30
0.06
0.06
Parcial S/.
8.40
8.40
Parcial S/.
12.01
8.76
20.77
0.90
1.50
3.28
1.28
1.71
8.67
0.62
0.62
Parcial S/.
11.20
8.18
19.38
0.90
1.50
3.28
1.28
1.71
8.67
0.58
3.34
3.92
Parcial S/.
11.20
8.18
19.38
0.90
1.50
3.28
1.28
1.71
8.67
0.58
3.34
3.92
Parcial S/.
2.72
1.23
3.95
0.22
5.58
5.80
0.12
0.12
Parcial S/.
2.27
2.04
4.31
0.23
0.26
0.49
0.13
1.00
1.13
1.00
1.00
Parcial S/.
14.01
14.01
139.00
40.00
179.00
0.42
0.42
Parcial S/.
42.02
42.02
220.00
415.20
635.20
1.26
1.26
Parcial S/.
42.02
42.02
240.00
440.08
680.08
1.26
1.26
Parcial S/.
2.10
2.10
58.00
45.00
103.00
0.06
0.06
Parcial S/.
2.10
2.10
1,100.00
1,100.00
0.06
0.06
Parcial S/.
91.00
91.00
Parcial S/.
8.40
8.40
4.10
4.80
4.00
0.25
0.46
13.61
0.25
0.25
Parcial S/.
8.40
8.40
4.10
4.80
4.00
0.25
0.46
13.61
0.25
0.25
Parcial S/.
1.68
1.68
10.80
8.50
0.13
7.50
0.46
27.39
0.05
0.05
Parcial S/.
3.36
3.36
4.31
0.25
0.46
5.02
0.10
0.10
Parcial S/.
1.12
1.12
10.80
0.46
11.26
0.03
0.03
Parcial S/.
4.20
4.20
0.25
8.00
0.46
8.71
0.13
0.13
Parcial S/.
1.68
1.68
0.25
8.00
0.46
8.71
0.05
0.05
Parcial S/.
2.10
2.10
0.25
4.00
0.46
4.71
0.06
0.06
Parcial S/.
0.75
0.75
3.20
0.25
0.46
3.91
0.02
0.02
Parcial S/.
42.02
30.66
72.68
2.60
0.52
21.80
15.38
0.10
40.40
2.18
2.18
Parcial S/.
14.01
14.01
6.00
6.00
0.42
0.42
Parcial S/.
14.01
14.01
6.00
6.00
0.42
0.42
Parcial S/.
8.40
8.40
1.50
2.00
2.50
0.46
6.46
0.25
0.25
Parcial S/.
3.36
3.36
1.58
0.46
2.04
0.10
0.10
Parcial S/.
3.36
3.36
24.50
24.50
0.10
0.10
Parcial S/.
0.75
0.75
3.00
0.25
0.46
3.71
0.02
0.02
Parcial S/.
0.42
0.42
2.50
0.46
2.96
0.01
0.01
Parcial S/.
5.60
5.60
39.00
39.00
0.17
0.17
Parcial S/.
4.54
4.54
95.00
45.00
140.00
0.05
0.05
Parcial S/.
5.60
5.60
26.00
26.00
0.17
0.17
Parcial S/.
2.80
2.27
5.07
4.00
25.00
29.00
0.15
0.15
Parcial S/.
8.40
8.40
6.51
0.46
6.97
0.25
0.25
Parcial S/.
7.00
7.00
8.00
0.46
8.46
0.21
0.21
Parcial S/.
8.40
0.61
9.01
5.50
2.00
2.00
0.46
0.07
12.00
16.50
38.53
0.27
0.27
Parcial S/.
84.04
84.04
26.80
26.80
2.52
2.52
Parcial S/.
16.81
6.13
22.94
1.00
0.28
2.84
120.00
124.12
0.69
0.69
Parcial S/.
3.36
3.36
1.58
0.46
2.04
0.10
0.10
Parcial S/.
1.05
0.85
1.90
0.03
1.05
1.08
0.06
0.06
Parcial S/.
2.10
0.85
2.95
0.07
1.49
1.56
0.09
0.09
Parcial S/.
84.04
61.32
145.36
38.00
38.00
102.00
205.00
300.00
683.00
4.36
4.36
Parcial S/.
13.45
6.13
19.58
0.26
6.15
0.03
6.44
0.59
0.59
Parcial S/.
12.01
8.76
20.77
0.90
1.50
3.28
1.28
1.71
8.67
0.62
0.62
Parcial S/.
512.00
512.00
Parcial S/.
2.10
1.70
1.53
5.33
0.16
5.03
0.62
13.10
9.40
28.31
0.16
0.16
Parcial S/.
3.36
5.45
8.81
3.20
126.00
11.20
0.90
84.60
0.66
226.56
0.26
0.67
1.60
2.53
Parcial S/.
1.23
1.23
0.04
0.04
Parcial S/.
0.84
0.61
1.45
4.00
0.50
4.50
0.04
0.04
Parcial S/.
6.00
4.38
10.38
0.31
17.14
17.45
Parcial S/.
2.59
1.89
4.48
0.13
7.39
3.69
11.21
SE GRANULAR)
Parcial S/.
2.80
1.02
3.82
10.00
41.60
51.60
0.11
2.00
2.11
Parcial S/.
11.20
8.18
19.38
20.00
20.80
170.15
0.75
211.70
0.58
42.66
43.24
Parcial S/.
11.20
9.08
20.28
1.75
1.14
1.38
14.80
19.07
0.61
0.61
Parcial S/.
2.27
2.04
4.31
0.23
0.26
0.49
0.13
1.00
1.13
1.00
1.00
Parcial S/.
11.35
5.11
16.46
67.00
240.00
307.00
0.49
0.49
Parcial S/.
27.25
12.26
39.51
210.00
280.00
1,600.00
2,090.00
1.19
1.19
Parcial S/.
5.60
4.54
4.09
14.23
0.09
0.64
0.73
0.43
0.43
01 Estructuras #REF!
02 Arquitectura Err:509
03 Sanitarias Err:509
04 Topico 42,592.54
05 Losa Deportiva 246,664.28
06 Equipamiento 1 122,883.24 #REF! Equipamiento CD
07 Equipamiento 2 #REF! #REF! Equipamiento CT