Escolar Documentos
Profissional Documentos
Cultura Documentos
Total (Rs.)
ADD ; EXTRA O.H.CHARGE
Grand Total ( Rs)
of 112.5 Sqm Wave Floor Date : 18/05/2019
ha Hi-Tech Developers Pvt Ltd.
ha Enterprises
49,079
15% 7,362
56,441
Quantity Abstract sheet
S. No. Items Units Nos. L B H/D. Total
1 Wood Works
Providing and fixing of 75x35mm thik framed Glazed shutter in door /Window with chemically
1.1(a) seasoned wood (Mirandi) 5.5 mmthik plain glass beading nd S.S butt hinges etc complete as per
direction of clints's engineer 5.5 mm thk glass with fixed panener beading, nails etc complete as per
direction of Client's Engineer.
Ground Floor
W1 Sqmt 1.00 0.53 0.95 0.50
W2 Sqmt 1.00 1.30
W3 Sqmt 2.00 0.50 0.65 0.65
W4 Sqmt 1.00 0.80
G.F. Total 1.15
Ground Floor
S.
Nos. Of Villa Villa No.
No. D1S+D1 D-2 D-2A D-3 DW-3
Total 2 1 2 3 1
Nos of
Frame 94x56.5 Rmt Total Rmt Total Rf
Frame
Nos of
Frame 119x56.5 Rmt Total Rmt Total Rf
Frame
D1S+D1 5.28 0.000 0.000
DW-2 14.31 0.000 0.000
DW-3 7.95 0.000 0.00
DW-4 8.85 0.000 0.00
W-1 8.31 0.000 0.00
W-2 8.60 0.000 0.00
W-4 7.11 0.000 0.00
Total Qty 0.00 0.00 0.00 0
Door / Window Frame Work Status
und Floor First Floor
DW-4 W-1 W-2 W-3 W-4 D1 D-2 D-2A D-3 DW-2 DW-3 DW-4
2110x2100 1200x1500 mm 1395x2250 1000x2100 900x2100 880X2100 750x2100 2500X2590 1645x2100 2110x2100
600x1050 mm 900x2250 mm
mm mm mm mm mm mm mm
1 1 1 2 1 1 1 2 3 1 1 1
1 1 1 2 1 1 1 2 3 1 1 1
t Floor Second Floor
W-1 W-3 W-5 D1 D-2 D-2A D-3 DW-2 DW-3 DW-4 W-1 W-3
1 2 1 1 1 2 2 1 1 1 1 1
1 2 1 1 1 2 2 1 1 1 1 1
Remark
W-5
1000x2125 mm
1 41
Doo
Ground Floor
Total 1 1 1 2 3
Nos of
Flush Door Shuttre Shutter size Total Sqm
Shuttre
D1 1.86 0.00
DW-2 1.68 0.00
Total Qty 0.00 0.00
Nos of
Skin Panneld Door Shutter size Total Sqm
Shuttre
D1S 1.86 0.00
D-2 1.65 0.00
D-2A 1.61 0.00
D-3 1 1.35 1.35
DW-3 1.48 0.00
DW-4 1.48 0.00
Total Qty 1.00 1.35
Door / Window Frame Work Status
First Floor Second Flo
1 1 1 1 2 3 1 1 1 1 1
1 1 1 1 2 3 1 1 1 1 1
Second Floor Remark
2 2 1 1 1
2 2 1 1 1 29
TILE DISMANDLING & FIXING
Painting with synthetic enamel paint of approved brand and manufacturer to give an even shade for wood/steel work in two
3.1 coats on new works in all shade over an undercoat of suitable shade with ordinary approved brand and manufacturer inclu
priming coat of approved steel & wood primer,complete.
0.00
0.00
0.00
0.00
7.56
0.00
0.00 As per IS Code 1200-
0.00 15 factor
1.2 in flush door and
0.00 0.8 in glazed
0.00 shutter(one Side)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.56
t
Distempering with oil bound washable distemper of approved brand and manufacturer to give an
3.30
even shade on new work as per direction of client's engineer
A GROUND FLOOR
i TOILET T-1 Sqm. 0 1.50 2.00 0.00
COUNTER 1 0.6 0.6 0.36
Total Rough
Total Qty Remarks Fair Side
Villas Side
0.51 0.51
0.00 1.03
0.69 0.69
1.37 0.00
10.51 0.00
10.51 0.00
4.07 4.07
8.13 0.00
-0.75 -0.75
50% Deduc -1.65 0.00
50% Deduc 0.60 0.00
50% Deduc -0.90 0.00
10.50 0.00
10.50 0.00
4.07 4.07
0.00 8.13
-4.22 0.00
1.05 0.00
0.85 0.00
0.00 2.06
1.49 1.49
13.56 0.00
8.06 0.00
0.00 5.50
6.54 6.54
0.00 18.97
5.89 0.00
50% Deduc 0.00 -1.76
50% Deduc -0.75 0.00
50% Deduc 0.00 -1.00
50% Deduc -0.90 0.00
-3.14 0.00
0.50 0.00
0.31 0.00
50% Deduc -1.01 0.00
3.23 3.23
6.35 0.00
50% Deduc 0.00 -0.29
-0.90 0.00
1.51 0.00
0.40 0.00
5.93 5.93
5.18 5.18
10.35 0.00
-1.00 0.00
50% Deduc -1.00 0.00
0.00 0.00
Measurment Sheet
Painting with synthetic enamel paint of approved brand and manufacturer to give an even shade for wood/steel work in two
3.1 coats on new works in all shade over an undercoat of suitable shade with ordinary approved brand and manufacturer inclu
priming coat of approved steel & wood primer,complete.
Mummty Floor
Internal Staircase
1 Staircase Railing Sqmt 6 2.250 1.150 1.00
0.220 1.150 1.00
1.150 1.000 1.00
Railing
Balcony Railing 1st & 2nd
1 Floor Sqmt 4.784 1.00 1.00
Balcony Railing Terrace
2 Floor Sqmt 3 1.00 1.00
Total
Total Remark
5.04
5.04
4.54
8.87
11.34
0.00
0.00 As per IS Code 1200-
0.00 15 factor
1.2 in flush door and
4.03 0.8 in glazed
1.62 shutter(one Side)
4.03
2.52
2.88
5.02
2.02
3.24
0.00
60.19
As per IS Code
0.00 1200-15
1.1 in MS door
(One Side)
0.00
0.00
0.00
75.71
t
M/s. Abhilasha Enterprises
Project : Wave city NH-24 GZB 28th RA Bill
Measurement Sheet for Plastering 112 Sqm Villa
Sr. No Description Unit No. L B D Qty GF FF
Less at GF
D-1S Sqm. -0.5 1.00 2.00 -1.00
W-2 Sqm. -1 1.40 2.25 -3.14
W-4 Sqm. -1 0.90 2.25 -2.03
W-1 Sqm. -0.5 1.20 1.50 -0.90
Mumty
Short Wall Front side Sqm. 0.70 0.96 0.00
1.34 1.15 0.00
2.50 1.74 0.00
Less
W5 Sqm. 1.00 2.13 0.00
TERRACE FLOOR
External wall Sqm. 8.65 1.15 0.00
REAR ELEVATION SF
Grid F/1-7 Sqm. 7.50 2.9 0.00
Grid 2-7 Parapet wall External si Sqm. 6.89 1.15 0.00
Grid 2-7 Parapet wall internal sid Sqm. 11.04 1.12 0.00
Less at SF
DW-3 Sqm. 1.65 2.00 0.00
Sqm. 0.75 0.8 0.00
DW-4 Sqm. 2.11 2.00 0.00
Sqm. 1.21 0.8 0.00
0 0.00
0.00 0.00