6 5 4 3 2 1

REFERENCE DRAWINGS
TITLE DRAWING N°
PROCESS BUILDING AREA 10 PIPING PLAN A-605-4-005
AREA 20 PIPING PLAN A-605-4-006
AREA 30 PIPING PLAN A-605-4-007 P
AREA 40 PIPING PLAN A-605-4-008
AREA 50 PIPING PLAN A-605-4-009
GEOGRAPHICAL
NORTH

LEGEND

AD AD USTABLE SUPPORT FOF FACE OF FLANGE


BOD BOTTOM OF DUCT HPP HIGH POINT OF PAVING
ELECTRICAL BUILDING 605 BOP BOTTOM OF PIPE PS PIPE SUPPORT
O

PLANT BOS BOTTOM OF SUPPORT SPS SPECIAL SUPPORT


NORTH BOT BOTTOM OF TRAY SOP SETTING OUT POINT
COD CENTRE OF DUCT TOC TOP OF CONCERETE
CLP CENTER LINE PIPE TOF TOP OF FOUNDATION
FF FINISH FLOOR LEVEL TOG TOP OF GRATING
D.R. DRAINAGE TOP TOP OF PLATFORM

B.L. CONCRETE WALL TOR


TOS
TOP OF ROD
TOP OF STEEL N
PLANT CMU WALL
STANDART SUPPORTS
EAST
PIPERACK EL. CHEQUERED PLATE
FUTURE
+8.700
+6.600 GRATING
+5.400 E ISTING
ACCESS WAY
+4.200
UNIT AREA
POINT MARK
BORDER LINE
NOTES M

Z N 213900
1. ALL DIMENSIONS AND COORDINATES ARE
IN MILLIMETRES UNLESS OTHERWISE SPECIFIED.
TOC EL +3300 2. PIPING&FITTINGS TO COMPLY WITH PIPING CLASS DATA SHEETS .
PLTF EL +3510 PIPING CLASSES SPECIFIED ON P&ID.
3. ALL PIPING DIMENSIONS TO FACE OF STEEL FLANGE.
Z E 47571
4. EQUIPMENT LIST IS TO BE PROVIDED BY CLIENT.
605-641B
5. FOR INSTRUMENT TYPE AND NUMBERING REFER TO P&ID AND INSTRUMENT LIST.
6. FOR INSTRUMENT INSTALLATION DETAIL REFER TO RELEVANT INSTALLATION DETAIL DRAWING.
7. FOR VALVE TYPE AND NUMBERING REFER TO P&ID AND VALVE LIST
Z E 49684 8.+- 0.000 ELEVATION CORRESPONDS TO 6725   ABOVE MEAN SEA LEVEL L
Z E 50029 605-640 PLTF EL +12005
9. UCS COORDINATE SYSTEM TO BE SET  3DMODEL  IN AUTOCAD FILE.
605-641A
Ø 10500
HOLD
h: 11500
1000 m3
1. LOCATION AND ELEVATIONS GIVEN IN EQUIPMENT LIST (NOTE-1)
2.  DELETED

B.L.
Z E 207525
3. EQUIPMENT DATUM COORDINATES ARE HOLD.
605-643B
Z E 53300 4. ALL EQIPMENTS ARE IN HOLD AND NOT FINALIZED.
605-242D 5. DESCRIPTIONS OF ALL EQUIPMENTS ARE TO BE INDICATED AFTER EQUIPMENT LIST FINALIZED.

PLTF EL +6785
K
Z E 54870
605-639 Z E 55035
Z E 55300 605-643A
Ø 10500

Z N 206941
h: 12000
605-242C
PLTF EL +2800
B.L.

PLTF EL +6784
1039 m3

PLTF EL +2500

PLTF EL +5885

FORKLIFT WAY
Z N 206626
Z E 58645

605-642B
1

Z N 213900
Z N 200741
PLTF EL +12015 Z E 59826

PLTF EL +1320 205-242.1B

Z N 189151
Z E 60955

605-642A Z E 61340

205-242.1A 605-644/B Z E 61830

Ø 6000
h: 10500
PLTF EL +11015
PIPERACK EL. Z E 63103 300 m3
PLTF EL +11000
+9.300 605-642.1B
+7.200
+6.000
PLTF EL +11000
+4.800 I
Z E 64862

605-642.1A
GEOGRAPHICAL COORDINATES 3D PLANT COORDINATES
POINT MARK NO DESCRIPTOON
PLTF EL +6560 Z E 66540
1 605-641.1B PLTF EL +5885
PIPERACK EL.
605-256B Z E 67410 605-656A
+8.725
Ø 6000 Ø 6000
+7.525
h: 10500 h: 10500
+6.325 300 m3 300 m3 Z E 68572

PLTF EL EL +3730 605-641.1A

PLTF EL +6560 H
PIPERACK EL.
+9.300
Z E 70653
605-644/A Z E 70830
605-641.2B +7.200
Ø 6000 +6.000
h: 10500 +4.800
PLTF EL+11015

Z N 195900
Z N 186900

300 m3

Z N 213900
Z E 72706
605-642.2A

Z E 74550
G
605-645B

Z N 206740
PLTF EL +2610
Z E 76720

605-645A

1
Z E 78605
Z E 78750 Z E 78750 Z E 78750
E 81750  N 181800  U 250

605-678A
605-678B
Z N 215443

Z N 216803
F
KEY PLAN
Z N 193765

605-665

605-619
605-606
Z N 206700

Z N 208900

Z N 211100

Z N 213300
605-624
Z N 191540
Z N 189100

Z N 199950

WC+DUS
4

TANK
MOBİL

MOBİL TANK

MOBİL TANK

MOBİL TANK

MOBİL TANK

6.40

6.40

PTM 08-076/D
CENTER
7.125

CENTER
PTM 08-076/C
221

(FUTURE)
LINE (Mod

LINE
(P4)
2 REFERANS

(P3)
NOKTASI

Akrilik)

MCC PANEL
KONTROL PANEL

ODASI MERDiVENi
1

ÇAY ODASI

ODASI

C1
-4.500 KODU
MERDiVENi

C
B5
B4
B3
B2
B1
B
TERAZİ

A6
A5
A4
A3
1
P.129

A2
A1
A
E 81750  N 219800  U 200
Z E 83070

A-605-4-0
A-605-4-0
705
TRAFO
605
TRAFO

012
EL.

013
PIPERACK
+8.700
+6.600
544/C +5.400
+4.200
544/B ø7000 +200
h:10.500 (+6.925)
WORLD
ø6000 400 m³
h:10500

605
544/A 605-640
ø6000 Ø 10500
h: 11500
h:10500 1000 m3

505
PIPER
+4.7 ACK EL. 605-643
B
25

1 605-643 A

605-607A

605-625.1

505-545/A
605-620B
605-607B

Z N 212305
E
605-666

605-620A
Z N 211105
Z N 210005
Z N 206605 605-641B

Z N 209005
Z N 208005
605-638.1B

605-639
605-675A
605-675B
605-686B
Z N 187940

605-686A
Z N 189100

Z N 192865

Z N 193765

Ø 13000
605-638.1A

h: 11500
1500 m3 641-1 B
605-638B

605-638A

Z N 200295

605-677A
Z N 195140

Z N 196240

Z N 197400

Z N 199150

Z N 201600
605-698B

605-698A

605-641A

Z N 217086
Z N 190340

Z N 191540
605-614A
605-614B

605-642D 641-1 A

A-605-4-0
605-677B
605-651A

605-642C
605-651B

641-2 B
Z N 203977

Z N 205488

Z N 215785
605-644/B
605-642B Ø 6000
h: 10500

A-605-4-0
TRAFO - 14
300 m3
705-744/A
539 605-642A
641-2 A Ø 7000
h: 10500
400 m3
ø12000 705-744/B

h:10500
Ø 7000
642-2 B h: 10500
400 m3
1200 m³ 540/B
705-744/C
Ø 7000
642-2 A h: 10500

010
ø10500 400 m3
EL.

H : 7000mm
YUKS.
h:11500 PIPERACK

23 TON
TANK YUKS.
H : 7000mm

153-B
+9.300
1000 m³

23 TON

TANK
153-A
+7.200

011
642-1 B
04-118-C 605-656/A +6.000
37 TON
Ø 6000 +4.800
TANK YUKS.
H : 7200mm h: 10500 605-644/A
605-656/B 300 m3 642-1 A
+0.400
+0.400 Ø 6000
+0.400 Ø 6000 h: 10500
h: 10500 300 m3
300 m3
EL.
PIPERACK
+9.300
04-118-B
25 TON +7.200
TANK YUKS.
H : 4000mm
+6.000
+4.800

705-745 A
EL.

705-745 B
04-153-E +0.400

705-745 C
30 TON PIPERACK
TANK YUKS. +0.400
+7.725
H : 8000mm
605-645 B
+6.525

HAVALI KON
+5.325
605-645 A

04-152
505-542/A 04-118-A
25 TON
YUKS.
TANK

505-542/B 540/A 04-153-F


+0.400
H : 4000mm
+200
(+6.925)
WORLD
30 TON
ø10500 TANK YUKS. +0.400

04-151
H : 8000mm

505-541/A h:11500
1000 m³ +0.200

505-541/B

556 +0.200

505-543/A

ø6000
h:10500 505-543/B

300 m³

04-119/D
04-119/C
04-119/B
04-119/A
DEN

04-154/D
04-154/C
04-154/B
04-154/A
+ 550
+ 550
505-543/C

+ 400

505-524

A-605-4-0
505-536

505-519
+ 400

505-574

C
L

SER
C
L
505-506

C
L
505-565

CL
505-584
505-513

C
L
CL
505-536

C
L
+ 400

CL
+ 550

505-520/B
505-575/A

009
505-575/B
505-538/A
505-538/B
505-507/A
505-507/B
505-566
505-586/A
505-586/B
505-514/A
505-514/B
DISCHARGE
C
L

505-525/A
505-525/B
505-525/C
505-554/A
505-554/B
505-518/A
505-518/B
P.134

505-551/A

505-550
505-551/B
505-505/A
505-505/B
505-595/A

505-564/A
505-595/B

505-564/B
505-599/A
505-594/B

505-599/B
505-527/A

505-568/A
P.133

505-568/B
505-503/A
505-503/B
505-510/A
505-510/B
505-594/A
505-527/B
505-522
P.132
505-504
URE 505-527/C
505-FUT 505-516

505-567
505-501 P.130
505-592

GEOGRA
NORTH
PH
ICAL
Z E 91000
Z E 91200

1
605-699A
605-699B
Z N 196450

Z N 197950
605-694B

605-694A

605-654A

605-625A
605-654B

Z N 215500

Z N 217400

Z N 219300

NORTH
Z N 213950

PLANT
605-610B

605-625B
Z N 212250
Z N 181900

605-668B

605-605B
Z N 193100
605-610A
Z N 185500

605-664B

605-625C
Z N 187150

Z N 199550

Z N 201650
Z N 183700

605-668A

605-664A
605-605A

Z N 203950

Z N 205650
Z N 194700

605-650

605-618A
605-618B
Z N 207450

Z N 209050

Z N 210650
605-603A
Z N 191300
605-603B
Z N 189100

PLANT
EAST
1
605-627A THIS DRAWING C

Z E 94950

Z E 96750

605-627B
Z E 97195

PLTF EL +3515
605-695A 

605-603.1A
Z N 186140

Z N 187040

Z N 187900

Z N 188800
605-695B 

605-603.1B

1 31/05/2019 ISSUED FOR APPROVAL A.B. S.O. V.A. / G.K.


Z N 183700
605-692

Z N 191300

0 17/10/2018 ISSUED FOR APPROVAL A.B. S.O./A.K.K. V.A. / C.G.


Z N 196300

A
Z N 200600

605-627C 13/07/2018 ISSUED FOR REVIEW A.B. S.O./A.K.K. V.A. / C.G.


Z N 205250

Z E 99320
Z N 210650

AKRiLiK KiMYA SANAYii A.Ş.
E 100000  N 219800  U 200
E 100000  N 181800  U 200

AKSA
605 SOLVENT RECOVERY PLANT
B.L.
E 107755  N 186423  U 200

PLOT PLAN
PROCESS BUILDING AREA &TANK AREA 0 - +200

1 1/100
P.130 449 A-605-1-002
1of11 A0
6 5 4 3 2 1 A0