[ To Establish First Private Medical College in Chhattisgarh
••
•• SHRI CHANDULAL CHANDRAKAR MEMORIAL
MEDICAL COLLEGE (CCMMC), DURG
(Approved From State Govt. of Chhattisgarh)
•I
I
11.
Run By, 6
CHANDULAL CHANDRAKAR MEMORIAL HOSPITAL
(An existing company incorporated u/s. 25 of the Companies Act, 1956)
G.E. Road Bhila" - Dist. - Durg
wtivvv.chandula spital.com
••
••
DETAILED PROJECTREPORT (DPR)
• EN
CONTTS
•
CHAPTER I: PREAMBLE
• 1.1 Introduction
• 1.2 Executive Summary & Project Overview
•
• CHAPTER IV. FINANCIAL OUTLAY
• 4.1 Assumptions / Significant Points
Project Cost Estimates Means of Finance
4.2
4.3 financial Analysis of Revenue & Cost
4.4 Financial Parameters
4.5 Financial Indicators
4.6 SWOT Analysis
4.7 :Competitors
4.8 ;Conclusion
P2111P 2
•
•
•
CHAPTER V: ACADEMIC PROGRAMMES
5.1 , Basic Academic Philosophy
5.2 Types of Programmes
5.3 Identified Programmes
5.4 Phase-wise Introduction of Programmes & Intake
5.5 Target Date for Start of Academic Programmes
Pa OP
CHAPTER I PREAMABLE
1.1 INTRODUCTION
The proposed institute CCMMC alms to establish itself as an Icon for medical education,
research and consultansy in the new state of Chhattisgarh. The institute will establish
symbiotic relaponship with' environment. Institute will develop links with educational and
developmental organizations at national and international level, and create platform for
interactions of people of high caliber and skills to share knowledge.
The Institute plans to run`MMBS course having the capacity of minimum 100 students per
9 -
year.
PARAMETERS OVERVIEW
Chandulal ChanOrakar Memorial Hospital, a Pvt. Ltd.
Company registered under Sec- 25 of Companies Act
Pave 4
•
•
Registered Office Address:
Chandulal Chandrakar Memorial Hospital
GE Road, Bhilal - 490006
....
Date of Constitution 21' March 1999
1
i) The existing nd &Building, Equipment of Hospital and
--". Nursing CollegrSituated at Nehru Nagar, Bhilai.
ii) 25 Acers of land situated at village Kachandur for
Collateral Security proposed Medical College.
Ili) Proposed Land fihd Building, Infrastructure, Equipment
for the Hospitaland Medical College.
I
Guarantors Personal Guarantee of all the Directors and Members.
Education is a key elem nt of infrastructure f8r the growth of a society. The educational
i -*
education, technical
secondary
infrastructure has severall layers such as primary education, seconda
jpaue
education and higher education. The economic strength of a society depends on the
standard of educational infrastructure, in general, and the quality of Medical education, in
particular. Any society must ensure a free, creative and high-caliber university environment
so as to produce successful Doctor of that society. In India, the growth in the field of
Medical, Management, technJcal and professional education over the past 50 years is
phenomenal. This growth has fuelled the developments in the fields of engineering and
information technology. However, this development needs to be reviewed in view of global
competition as well as an increase in demand for trained quality Doctors in society for best
services in the field of Medical services.
The economy of a country has three segments - Agriculture, Manufacturing and Services.
For a small country like Singapore, the economy can survive and even prosper with only one
or two segments. However, for a large country like India, the economy has to progress on
all three segments. In order to achieve an overall rate of growth a sound 8 to 10 percent, it
is imperative that all three segments have to progress simultaneously. Chhattisgarh being a
new state has come'out with flying colors. The state of Chhattisgarh is industrially well
developed, has sufficient power generation capability and is blessed with abundant natural
resources. In terms of education system also it makes mark in the National level. How ever
• in terms of medical education it lags behind the other states of the country. The state needs
• quality doctors and quality medical service.
•
• In the state there are only three medical college at Raipur, Bilaspur and Jagdalpur which is
not able to fulfilled current demand of doctors. If there is less numbers of doctors,
•
definitively service quality-wiie also decrease. Our aim is to provide each class of society
•
satisfied Medical service.
•
•
•
•
6P.
ill) In the Central Region the state of Madhya Pradesh itself occupies eleven medical
colleges, where as the state of Orrisa is having six Medical Colleges and Chhattisgarh
lags behind with only three medical colleges. Medical Colleges located in the state of
Chhattisgarh are:-
Ours is a closely held company registered u/s. 25 of the companies Act. 1956, thus
p
•, this will be the first private medkai College in the state of Chhattisgarh.
Establishment of the Medical College will reduce the imbalance of medical colleges
and will also increase the number of available doctors in the state, who will be
absorbed in Government Jobs In the state and can be engaged by the private medical
institutions or in self practice, thus will enhance the quality services to the
population.
6 • Paucitysof doctorsIn the state leads to difficulty In providing medical services to the
public in genera1.7Establishment of the- medtcal college will not only redress this
p problem but alsO help to enhance Medical services in the state.
We want to achieve Doctor patient ratio : 10,000 means produce more number of
doctors in the state.
6
I 1.5 ANALYSIS OF MEDICAL COLLEGE IN CHHAtrISGARH STATE —
p •
Sr.No Particulars Nos.
1. No. of Institution already existing Tit State 3 (three)
6 (Govt. Colle§es)
0 2. No. of Seats available in state 300
3. Permission Granted By state Govt. to each 100
college
Pa Ot
7. No. of doctors registered with the employment Nil
exchange
8. Doctors populition ratio in the state 1 : 1,10,000
(The above data is compiled as per the available statistical records with the state
government of Chhattisgat)
At present in the city of burg - Bhiiai there are District Government Hospital of 300 bed,
Sector-9 Hospital Pt. .lawahar !al Nehru Hospital and Research centre of 800 bed, Apollo
BSR Super Speciality Hospital of 350 bed and our existing Hospital Chandulal Chandrakar
Memorial Hospital of 200 bed are only multidisciplinary hospitals which is insufficient to
meet the health needs of the area. Continued research works in the field of medicines are
better carried out in a medical college, which has an academic environment. Establishment
of a Medical College in an area increases general health awareness of the surrounding
population, which is cpnductive in imparting health education regarding national
programmes, immunization, sanitary education and comprehensive health programme to
•
meet the people at large.
. ...
1.6 LATEST DEVELOPMENTS AND FUTURE PROSPECTS WITH IN THE STATE -
Patio R
•
CHAPTER - II THE PROMOTING BODY
We are planning to set -up a Medical college having a capacity of 100 students per year
and to extend the Nursing College which is4siready in existence since last 5 years. Our
Plan to build 500 bed hospital supporting td" Medical College. We have already acquired
permission from the State Government and approval from the Ayush University for the
establishment of the Medical College.
The company has nine directors from various walks of life and all of them are devoted to
work for the development of various activities as spelt out in the aim and objectives of
the company.
PROMOTORS/ DIRECTORS
The Promoters are devoted for the various activities of the proposed medical college.
They are already running Chandulal Chandrakar Memorial Hospital successfully since last
several years and are volved and dedicateVeltime In the field of Medical service and
social welfare activities. They are already directors of Chandulal Chandrakar Memorial
Hospital which is registered under Sec. • 25 of Companies Act, 1956 as not for profit
organisation and planning to be promote& of Proposed Medical College - Shri Chandulal
Chandrakar Memorial Medical College.
PaoP 9
•
•
•
• •0, • •
•
pROMOTORS / DIRECTORS PROFILE
1111.•_•-•••
•
•
•
I) Private Practitioner more than 20
• 7.
Smt. Jyoti Sharma
W/o Dr.H. C. Sharma
Director Graduate
I) Director, Chandulal Chandrakar
.
Memorial Hospital, Bhilal From March -
2000 Onwards.
13/1,Nehrunagar (East)
•b Bhlial,Dist.-Durg (C.G.)
Smt.Asha Chandrakar
Pan. No. ADPS3343J
• 8.
W/o Dr.D.P. Chandrakar
Padmanabhpur, Mukta Nagar
Director
Memorial Hospital, 13hilal From March -
2000 Onwards.
• Dist.-Durg (C.G.)
Pan. No. ABYPC 5786 G
••
Smt. Chandrakanta Verma
Memorial Hospital, Bhilal From March -
W /o Dr. S.R.,Verma
9. Director
2000 Onwards.
74/15, Nehru Nagar (W)
Pan. No. ABJPV 2195 D
BhHai, Dist.- Durg (C.G.)
•
p
••
•
••
o•
p
•
•
p•
•
•
0.
•
•
• SUPER SPECIALIST
•
•
• Cardiology
gy
Dr. (Mrs.) R. P. Verma MD (Med.), DNB (Cardio)
• 2 Nephrology
Dr. (Mrs.) Suman Rao MD (Med.)
•
• 3 Neuro-Medicine Dr. N. S. Dixit
. DM (Neur-Med.)
• 4 Gasteroentrology Dr. Kuldip Solanki MD, DM, PGI
•
• 5 Neuro-Surgery _ Dr. Rajan Tiwari MCH (Neur-Surg)
• 6
• Paed-Surgery Dr. K. Radhakrishna MCH (Paed Surg)
•
• Medicine Dr. M. P. Chandrakar MD (Med.)
• Dr. P. Pandey MD (Med)
• 3 Anaesth.
Dr. G. D. Gandhi
Dr. S. R. Verma
MS (Surg)
MD (Anaesth)
• Dr. (Mrs.) V. Gandhi MD (Anaesth)
• 4 Obst. Dr.(Mrs.) A. J. Murthy MD (Gynaec)
• Gynaecology
Dr.(Mrs.) N. Bhusati MD (Gynaec)
• Dr.(Mrs.) R. Chhatke MD (Gynaec)
• 5 Paediatrics Dr. D. P. Chandra '1- MD (Paed)
• Opthalmology
Dr. C. Sudhakar
Dr. S. Chandraka
MD (Paed)
•
•
•
10 T.B. / Chest Dr. V. Pillai MBBS, DNB
11 Skin & V. D. Dr. U. Bose MBBS, DVD (Skin & VD)
12 Psychiatry • Dr. M.Deb.•Slkdar MBBs, DNB (Psych)
13 Pathology Dr. S. Chandrakar MD (Patho)
Dr. R. K. Chandrakar MD (Patho)
14 Radiology Dr. Shriranjan Rao DMRD, DNB
15 Medical Supdt. Dr. K. P. Waghela. MD (Medicine), DCH
16 Physiotherapy Dr.(Mrs.) Manisha Jain DIP. (Physiotherapy)
17 Dietetician Mrs. Nldhl Dubey DIP. (Nutrition)
•
Dr.K. Sudarsan MS (Ortho)
..
1 Orthopedics Dr.P. Saxena MS (Ortho)
Dr. Sanjay Marwaha MS (Ortho)
Nephrology Dr. S.A. Rizvi MD (Medi)
2
Psychiatry
3 Dr. Ashok Trivedi MD (Psych.)
. Gasteroentrology
4 Dr. H. C. Sharma MD (Med)
MEDICAL OFFICER
t ... ,
4 Dr. (Wt.) Rupa Mukherjee ; MBBS
• •n••n•n•
Page 13
••
•
7 Dr. Raj Kumar Tiwari MBBS
•
SECOND GENERATION
Also the second generation of the promoters and directors has come into existence and most
of them are qualified doctors and some of them are presently undergoing their post graduate
program. It is obvious-frost of them are going to be associated with the proposed medical
college In one or the other way as practicing doctors as well as qualified teachers. The details
in relation to the same have been mentioned overleaf.
•
Paon 14
•
•
•
Ii) There Is scarcity of hospital in the Durg city, our purpose is to provide Quality Medical
service in the city of Durg & Bhlial where the population is approx. 30 lacs. A medical
lrL
•
e
• college also means an attached super speciality Hospital which other wise shall be a
•
dream for this area.
•
years.
• the hospital since last 11 itself a
We have a sound track record of successfully running he
ill) last
• The name and goodwill which has been earned in t
• indication of collective effort and willingness of the management to work towards the
• upliftment of the common people at general.
•
Ill We have a team of quality and experienced doctors who are associated with the
iv)
• existing hospital since last several years.
0
• Again the second generation of the promoters and directors are either qualified MBBS
•• or are pursuing the Post Graduate program for enhancement of the knowledge.
Financially the hospital, their directors, and the members associated with the existing
v1)
company are sound enough to arrange for the initial contribution for the start of the
•
medical college, and hospital. Thus there Is all possible reason for the existing group to
•
think for the establishment of the medical college along with the required hospital.
•
•
S
•
•
3.2 Legal Compliance in relation to Establishment of the Medical College
iii) Guidelines as specified by the Medical Council of India (MCI) are required to
comply with so as to establish the Medical College. The salient features of MCI
is as under:-
d) As per the Regulation "A functional teaching hospital with 300 beds
having a minimum of 60% indoor bed occupancy shall be available at the
time of submission of application to MCI and at the time of first inspection
of the hospital by Medical Council .9f India and upto 2nd renewal of the
medicaltollege. The bed stren:* shIll be 500 with minimum of 75% bed
occupancy at the time of inspiCtion for third renewal and thereafter for
subsequent renewals and reco tion."
Page 17
g) Medical College auditorium, building, laboratory, library, play ground,
Staff quarters, Nurses hostel and Students hostel, etc are to be
constructed as per the specified guidelines.
H. Affiliation from Ayush University, Raipur to run Medical College is received. Letter
No. 2010/2414 dated 24.07.2010
•
III. As per Guidelines of Medical Council of India we have already acquired 25 acres
of Open land at Village- Kachandur, Dist -Durg.
iv. Location of the Proposed College is village Kachandur, which is near to Rungta
Group of Colleges (Engineering College, Dental College, Pharmacy College,
Physiology College) and Maa JagdarTha College (Science College, Art &
Commerce College), With in the radius of 5 Kms are Shankara College
(Engineering College) and Krishna Public School etc.
v. We are already ruining 200 bed fully eqUipped Multi-purpose Hospital, Chandulal
Chandrakar Memorial Hospital since lastal years and also we are successfully
running Nursing College from last 5 Veers having present total capacity 350
students per year
vi. ,
We have team of doctors that have experiences in various department and most
of them are associated with hospital either as Director or Member within the
Farc-10._
Organization. The same team will be associating with the proposed Medical
College along with the new members.
2 Land. Diversion 3
P a pe 1 9
••
m
•
••
OP_
•
• iv) Water arrangenients for the proposed Medical College and Hospital shall be
• taken care of through bore well as sufficient water availability is there
11/ beneath the earth surface. Also water availability through municipality is in
• the process In the surrounding area.
S
• v) Hospital, Medical College along with Students hostel and staff quarter Is
• scheduled to be constructed with in the period of 18 months.
•
• vi) Plant, Machinery, Equipment and Furniture & Fixtures to be Installed as per
• the construction schedule of Medical College & Hospital as and when required.
Implementation sc
Details 2011 2012
^a
Apr Tun Jul
A •r11 Ma Jun 3u1 Au • Sep Nov Dec Jan Mar II May e y Aug
Land
Permissions
&
Clearances
Excavation
Developme
nt of Civil
Constructio
n
Ordering of
Plant &
Machine
_,*,,.H. U.
Utility
Arrangeme
nt
Receipt of
Equipments
Installation
& .
commission •
Ina
Civil works •
finishing
Inauguratio
n
ill. We are already running the Nursing •011ege since last 5 years besides existing
Hospital at Nehru Nagar. We are planning to extend the same college along with
Patna 21
the proposed medical college at village Kachandur, Dist - Durg having the
capacity of atleast 100 students per year. The course duration is of 3 Years.
iv. Receipts & Expenses of Hospital is arrived at on the basis of occupancy level at
•
60%, 70%, 75% for first, second, & third year respectively and there-after 85%
•
of capacity.
•
•
v. Our Institution Chandulal Chandrakar Memorial Hospital Private Limited is
incorporated under section 25 of the Companied Act, 1956 ( as Non-Profit Making
•
Organisation), hence Income Tax is exempt under section 11 of Income Tax Act,
•
1961.
•
•
vi. Since loan amount is on higher side co ,ession in processing fees as well as rate
•
of Interest is requested. Our past rec In relation to the repayment of term
.40
•
• •
gt
•
•
•
•
•
•
•re
•
••
•
•
NN
••
•
•
•
•
•
Paae 72
•
•
•
p.
Sr. Tr:.
No. Particular ,
Amount
..,
in Crores
Cost of Project 0
tn. PWNr
Exp ... 2 . 37
1••••
NJ NA
Deposit 1.31
Total .
187.98
Means of Finanaq In %
0,
Term Lean 130.00 69.2%
• nn
Promoter contribution *I
Share Capital & Shate I.
Premium 12.50
Deposlt From Directori &
Members 45.48 57.98 30.8%
Total 187.98 100.0%
DIE S. 2.24
.4
7
Means of Finance
i) Contribution from own sources
Share Capital includ g Securities premiu#1 projected for Rs. 1250.00 iacs. The
company has propos d to make fresh iss of 50,00,000 equity shares of Rs. 10
DPP 23
•
each at a premium of Rs. 15 per share. In relation to the same the Authorized
Capital of the company is to be increased from Rs. 1.00 crore to Rs. 10.00 crore.
Deposits from Directors & Members of the Company is Rs. 45.48 Crores. The
Deposit from Members will be interest free and shall be arranged from close friends
and relatives of the promoter's and directors of the company and shall form part of
quasi capital of the owners, the same shall be arranged in a phased manner during
the implementation period of the proposed project.
Also new members will be added to the project from which contributions can be
generated. The Term Loan is being applied to finance the capital investment of the
project. The total stake of owner comes to around 30.80 % of the total cost of
project. .c.
II) Term loan requested from Bank Rs. 130.00 Crores (69.20 %). Total Term
loan Is requested for'site Development & Building Construction, acquisition of Plant &
Machinery;Equipmeht, Furniture & Fixture etc.
• e
The term loan requested for ConstruCtion of Hospital & College Building along-with
Plant & Machinery totbe disbursed as per construction schedule and plan.
Working Capital requirement (Net Current Assets) for the hospital shall be met out
from the own sources of the company and-therefere working capital finance from the
Bank is not required.
The site is selectively chosen considering main points for better academic atmosphere. The
land is spread over 25 acr with pollution free ronment. The main features of land are
its load bearing capacity nd elevation from taxn connectivity road which Is the ideal
condition for building Constfuction.
The Site Development, e.g. filling of ditches, Leveling, Land Scrapping, Internal Roads, Bore
Wells, Pump Sets and Bo t
dary Wall/Fencing etc. are under process. Acquisition Cost of
.
Land & Site Development ti s been added into the Cost of Project (Cop).
It
The Total Cost of Land & Se Development Is Rs .08 Crores.
earP 24
Buildinas and Civil Structure
The construction of the Infrastructure building will be raised to 80306.36 Sqm.Mtrs. Building
will be ready for occupation along with sufficient vehicle parking area, sports and recreation
ground etc. by end of July- August 2012.
The detailed drawings, schedule of building construction are being annexed. The necessary
structural drawings are already approved by the competent authorities. The detailed
Estimates and the Bill of Quantity (B04:2) have been used to estimate the total cost of the
building that comes to Rs 82.09 Crores.
Plant & Machinery , Operation Theatres & O.T.- Eauipment, Electrical Appliances &
1
Installation & Other System, Furniture, Hospital Beds & Trollies, Computer &
Printers & Misc. Fjxed Aisets
1
•
Power Requirement, Scopeof Work, Commercial Terms & Conditions and Price. The perusal
of these Quotations/Offers reveals that the estimated Cost is mention in Cost of Project. The
details are included in the technical/ financial annexure pertaining to above.
The estimation of Preliminary & Pre-Operative Expenses worked out in PR as Rs. 2.37
Crores includes the Consultancy Fee, Insurance, Rent, Traveling and Interest cost during
construction period (IOC) Startup & Misc. Expenditdre, Establishment Exp. Etc.
Estimates of Continaendes
Approximately 2.50 % of provision has been kept towards the Contingencies during the
evaluation of Cost of Project. As per the narration of the Directors the Cost of Fixed Assets
have been considered on the basis of the Negotiated Prices, which may not differ during the
Implementation of the Project thus, the chances of Price Escalation are minimum, however
due to changes in prices, Directors have conservatively estimated the need for 2.50 % of
,
Patin 2S
Deposits
I)
Performance Bank Guarantee of Rs. 700 lacs for 5 years is required to be given to
Medical Council of India, New Delhi.
Bank Guarantee of Rs. 150 lacs - For the establishment of 100 Students Medical
College with the infrastructural facilities
Bank Guarantee of Rs. 550 lacs - For the establishment of 500 bed teaching Hospital
with infrastructure facilities.
404,41 4141ID41 414141..41414 111El4 414,4141 4140414141
II)
The company is required to make a Deposit of Rs. 0.10 Crores to the Chhattisgarh
State Electricity Board [CSEB] for obtaining the additional Power Connection of 600
KVA. The provision Is as per the prevailing norms of CSEB.
Revenues
Patio 26
•
•
•
Working Capital Requirements
Assessment of Working capital requirement
Working Capital Requirement (Net Current Assets) for the hospital shall be met out from
the own sources and -
Internal accruals of the hospital and therefore working capital
finance from the bank is not require. .
The term loan requested for Construction of Hospital & College Building along-with Plant &
Machinery to be disbursed as per construction schedule and plan.
Total loan repayment period Is sought for 10 years including the moratorium period of 18
months.
•
Since loan amount Is on higher side concession in processing fees as well as rate of Interest
Is requested. Our past record in relation to the repayment of term loan with Indian Bank is
within the scheduled time.
• Sensitivity Analysis
• Page 27
•
•
4.5 SWOT ANALYSIS
STRENGTH
The following strengths go in favour of the project
1) The key managerial persons In the existing company are mainly qualified doctors
having experience of more than 20-25 years. Again their second generation and
relatives are also doctors assisting the hospital in various capacities.
2) We are successfully running 200 bed Hospital since last 11 years and has timely
repaid all its dues with in the due date.
3) We are already running Nursing Institute with an average of 350 students per year
since last five years. The same institute ill be extended to the proposed medical
college premises.
4) Permission from the State Government & NOC from Aayush University has already
been acquired.
5) We have already acquired 25 acres of single plot of land which is the primary
requirement as per the MCI guidelines.
OPPORTUNITY
1) The position of, medical facilities with 4in the state requires considerable
Improvement. The current doctor/ Patients ratio is very low (1:110000). With the
establishment of Medical college this gafrcan be reduced.
;se
2) The existing Medital College with in th i te
are only three and that too all are
government colleies. Ours will be 'th t private medical college with in the
state of Chhattisgth.
3) The city of Durg -,Shilal Is known as the educational hub. There are many private
coaching classes In the city where preparation is carried out at the national level.
Approximately 50q students qualify state level and central level medical entrance
examination and most of the students go out of the state for admission in .the
•
Pao, 2R
111
medical college. .
5)
Employment opportunity to the qualified doctors, nurses, and to other section of
the society shall Increase to the greater extent.
THREATS
1)
Permission from Medical Council of India (MCI) New Delhi, is must for running the
Medical College subject to fulfillment.• of the specified conditions under the
relevant statutes as specified. The condIttons as specified shall be taken care of
very seriously and=all the conditions for running the Medical college along with
the Hospital shall bt satisfied with in the due time.
• 2)
To run the Medical College along with the Hospital what is required is the
• intellectual ro
pperty. Qualified and experienced teachers for college and doctors
• for hospitat. Every .possible ,
efforts shall be made to employ the faculties and
• retain them by maintaining the learning and professional environment with in the
Institution.
•
•
•
•
4.7 COMPETITORS
•
•
•
In the state of Chhattisgarh there are only three medical college. The first is at
•
Raipur which is 40- Kms. away from Durg city, the other two colleges is at
Bilaspur (150 Kms.)-
and at Jagdalpuf (32gKms.) There is no Medical College in
• Durg Dist. The competition seems to be only with Raipur and Bilaspur Medical
• Colleges. How ever the number of student pursuing the medical course is far
excess as compared to the present available seat in the state. Again with the
• help of efficient teaching staff and introduction of latest technology and
• equipments the goodwill of the college can be created. Again many of the
students are movin0 out of the state forthigh quality education in the field of
411 medicine, which again can be reduced fct the greater extent in high quality
education along with sufficient training e
• state itself. ronment can be created with in the
•
•
• 4.8 CONCLUSION
•
The long experience of the Direlctors in this line of activity will ensure achievement of the
g. Project Completion on time. The strengths and other factors as explained above clearly
justify the project viability. On the basis of the above .
• facts and figures It may be concluded
that project is definitely viable and is indeed a social and economical venture.
•
• Pave 29
•
•
•
• CHAETIR 3LAGAREMLCEttILQEQpliy
The academic philosophy is to create Seamless Society with global opportunities where
there are no islands of elitism or conclaves of wisdom. The basic academic philosophy is to
create a knowledge society where knowledge would be symmetric amongst all seekers.
Every citizen must have right to study and gain knowledge. The ecology of the college
• depends on a deep and abiding understanding of inquiry, investigation, and discovery along
with prudent decision making is the heart of an enterprise. Everyone at the college should
be a learner. That shared mission binds together all that happens on a campus. The
teaching responsibility of the college is" to make its entire students participant in the
mission.
The college works, to provide its students a foundation for successful lifelong learning. The
curriculum emphasizes inquiry and critical analysis, Independent research, collaborative
work, engagement with society, and effective services skills. The College strives to nurture
Its student lov? of learning and to develop their ability to critically assess problems. The
College encourages discovery, creativity, initiative, responsibility, collaboration, leadership,
and independent thought. These are the attributes that enhance opportunities for
individuals, organizations, and society as a whole.
Courses Name
Permission Granted by Chhattishgarh Govt.
M.B.B.S.
100 Se* ,per year
•
•
ID
2
•
• 5.3 IDENTIFIED PROGRAMMES:
•
• Medial Course —MBBS is full time 5 Y2 years course.
•
• 5.4 PHASE-WISE INTRODUCTION OF PROGRAMME & INTAKE:
•
• The institute will be starting medical courses from the academic year 2012-2013. It is
• envisaged that required amenities, infrastructure, classroom, reception area staff room,
• library, common hall and othe(- required amenities for the proposed programme shall be
• built and made usable by 20th March 2012. Through common entrance examination Pre-
• Medical Examination the intake of student for the first year will be done. First batch will be
• started from July-August 2012.
• Gradually the intake of the students will be IncreaAed to the level of 100 as per the
lb admission status and accordingly the infrastrubture and other facilities will be enhanced.
• Institutes will run MBBS program according to the guidelines set by Medical Council.
•
•
• • Time of application March- April 2012
• Session all start in July-August 2012
• Minimum Qualification Higher Secondary ( With science discipline )
••
ID Minimum Marks
Selection of candidates
Curriculum of Studies
Merit Basis in Premedical Test.
Pre-Medical Test (PMT)
:-As
... per requirement of Pt. Ayush University, Raipur.
• (Chhattisgarh) ,\,
•
•
• 5.5 TARGET DATE FOR START OF ACADEMIC OGRAMMES:
• Target date for the start of Medical College will July-Aug 2012.
•
•
•
•
•
•
•
•
•
• Papp 31
••
•
•
•
•
• CHAPTER — VI: PROPER GOVERANCE AlND ACADEMIC & ADMINISTRATIVE
MANAGEMENT
Proper Governance is the most important factor for all round development of the Institute.
Effective Academic and Administrative management is a natural outcome of proper
Governance.
To achieve this objective, Governing body has been constituted as per the guidelines of All
India Council for Medical Education.
The Governing body meets at least 4 times"' In a year. However, for the smooth functioning
and day to day working following sub-committees approved by the GB have been formed
which takes decisions for executing various requirements of the college.
I) Finance Committee
• II) Purchase Committee
-
III) Building Committee
iv) Staff Selection Committees
The decisions made and executed as per policy and procedure are presented for the
approval of the Chairman and then placed befiite tie Governing Body for final approval.
The College has its own Recruitment Policy and Purchase Procedure approved by the
Governing Body.
The Organizational structure of the institute will be as follows: An organization chart is given
below:
•
6.4 ROLE AND RESPONSIBILITIES OF KEY SiNIOR POSITIONS:
•416
•
Pate 32
•
•
•
•
• Chairman:
Chairman is member of the governingIlody of the College. Chairman with the
•
consent of the Secretary and other executive members approves the budget for the College.
•
He has the authority of modification/ alteration of the procedure, rules and regulations. He
•
presides over all the meetings of College managing committee. He has the authority to
•
disallow any resolution considered to be detrimental to the Interest of the College.
•
• Secretary:
He will be holding the responsibility next to the Chairman. He along with the
•
consent of the Chairman and other executing' members allocates the budget for the College.
• He is one of the authorities for the passing of the bills,
•
• Principal: He
is the head of the College academic section. He is subjected to the Ex-officio
secretary of the governing body. His responsibility is to look after the College academia and
• its function. He
directly reports to the Chairman. ihas the responsibility of setting an
• overall direction of the College.
•
• Administrator: He
is responsible to take care of tl*general administration of the College.
• 1-te shall be directly responsible to the Chairman and tb -
the Principal of the College. He shall
•
be responsible for the proper functioning of infrastructure facilities of the College.
•
• Manager:
He loOks after the proper functioning of infrastructure facilities of the College. He
•
helps the Principal in making purchases of the College. He is responsible for general
• supervision and control over the affairs of the College.
•
• Head of the Departments:
Responsibility of the Head of the Department is to organize,
•
plan and supervise the allocated department with the guidance of the Principal. They will
• directly report to Principal. •
•
Faculty:
Faculty are directly reporting to the Depart ntal Heads. The responsibility and
• authority of Faculty are:
• 1. Imparting education,aboth academic -&
-academic under guidelines and
• schedules of the Cone*.
2. Organizing, implementing & planning a ,
ies related to academic & non-
• academic areas of leanping.
••
•
•
• Pave 33
•
•
3.
Conducting exams, formulating -*ports and maintaining attendance of the
students.
Librarian:
The librarian shall directly report to the Principal. The responsibility and
authority of the Librarian are:
1.
To organize for the easy traceability of the library material.
2.
6 3.
To organize the distribution pattern of the books/ magazines etc in the library.
Non-teaching staff:
They shall report directly the Manager. There responsibilities are
1.
Impltmenting duties in the support areas of the College.
2.
Distributing and collecting letters, documents etc. between and outside
3. Manifesting general cleanliness agencies.
and security related to students and
property. College
••
•
•
•
•
•
•
7.2 PROPOSED LAND USE PATTERN
Building will be ready for occupation along with sufficient vehicle parking area, sports and
recreation ground etc. by end of March- April 2012.
Building is specifically designed with provisions for time independent fast expansion without
Impending the basic feature of prime structure.- It also has a unique feature that every
room, laboratories or corridor will receive sufficient and equal light and air as well as water
Supply. Care has been taken to provide forinak .It
' 'the laboratory lames and pollution free
ro
using proper relevant exhaust facility, which coup :be separated or integrated as per space
d.
requirement. The building has been designed vylth provision of under-ground electrical
cabling computer network cabling & telephone connectivity with intercom facilities. The
echo disturbances have been designed to be minimized to avoid disturbances to one activity
from the other• It also provides an excellent conference hall with all required modem
facilities. Other construction features 'accommodate the directive and norms of MEDICAL
COUNCIL in terms of space and specifically a provision has been made for increased intake
In second session without any further modification/alteration of the structure.
In addition to main teaching blocks, the maintenanceodepartment building, pump house, bus
• stop shades, canteen, cafeteria, STD PCO, Banking with ATM facility and vehicle parking
• shade shall be made ready before the commen
ent of academic session. For drinking
water, water coolers are installed, each with aqua
•
•
• ,
•
College bus will regularly ply between the college and the city for students. A visiting doctor
will visit the college on regularbasis.
••
•
••
JP "p op .3 5,_
•
•
7.6 CONSTRUCTION SYSICM AND MATERIALS:
Construction as. per building technical requirements, proper iron designing, as per the
structure approved by qualified engineer and architect under supervision of registered
competent person in practice. This complies with government standard.
• The company has already acquired 25 acres of land which is sufficient as per the norm
• prescribed by Medical Council of India.
•
•
• For Detail Please Refer Financial Project Rep
•
•
•
•
•
•
•
Pam+ 36
•
CHAPTER IX ACTION PLAN FOR IMPLEMETATION
9.1 CONSTRAINTS:
After getting the approval, there seems to be no constraints in undertaking the proposed
institute. As far as the students are concerned, there are three medical colleges at
Chhattlsgarh imparting MBBS course and that too with limited seats. There is much scope
for the institute to fill up the desired seats.
As it is evident from the activity chart that, wherever possible the activities will be
performed in parallel to save time. Sufficient time has been kept for programme marketing
and promotion. This will help in quality student intake In the first year itself. Sufficient time
and efforts will be ppt to appoint quality faculties for teaching.
In the existing hospital also we are having an agreement with the authorized group which
mainly deals in the decomposition of the waste and other hazardous emitted from the
running hospital. A similar arrangement shall be made In the upcoming hospital also so as
to control the medicinal pollution and maintain the enviro9ment eco friendly.
•
•I
••
••
••
• FINANCIAL PROJECT REPORT & CMA
• (To Establish Medical College)
•
•
•
•
• SHRI CHANDULAL CHANDRAKAR MEMORIAL
• MEDICAL COLLEGE (CCMMC), DURG
•
• (Approved From State Govt. of Chhattisgarh)
•
•
•
•
•
•
•
•
•
•
•
• •
• Run By,
CHANDULAL CHANDRAKAR MEMORIAL HOSPITAL
• (An existing company incorporated u/s. 25 of the Companies Act, 1956)
• G.E. Road Bhilai, Dist. - Durg
•
• www.chandu!alhospital.com
•
•
•
•
•
• ta,
LIST OF ANNEXURES
S.NO.ANNEXURE r PARTICULARS Page No.
1. Front Cost of Project and Means of Finance 1
2. Table I Land & Site Development 2
3. Table II Building and Civil Work 3 to 4
4. Table III Equipments 5 to 12
5. Table IV Electrical Cost 13
6. Table V Furniture & Fixtures 14 to 15
7. Table VI ' Misc. Fixed Assets 16 to 18
8. Tabld VII Preliminary' and Pre-operative Expenses 19
, 9. Table VIII
p. 10. Table I*
Deposits
Plant & Machinery - 20
19
): 11.
12.
Table X
Table XI
Term Loan - Disbursement Schedule & Repayment Sch
Revenue Sheet Calculation
21
22 to 28
13. Table XII Depredation 29 to 31
14. Table XIII A Profii Loss Account & DSCR 32 to 34
Table XIII B Balan Sheet & Cash Flow Statement
)
• 15.
16.
Table XIV
Table XV
Wo Capital Requirement
Sens 'ty Analysis_I
36 to 37
35
45
4,
17. Table XVI .
Sensi tity Analysis_II 46
18. CMA -Form
CMA_I Ope ng Statement 38 to 39
•
CMA II Liabilifies Statement • 40
CMA_III Assets Statement 41
CMA_N Pefermance & Financial Indicators 42
CMA_V ABF . 43
)0 CMA_VI Fund Flow S. tatement 44
•
•
•
•
•
110
•
OCHANDULAL CHANDRAKAR MEMORIAL HOSPITAL PRIVATE LIMITED
•
Cr
19.70
Electrical' Installations .-- ''',27.311
N.cocn1-1
I. Vehicle 0.43
Misc. Fixed Agsets 4.04
Contingency ' 4.18
Preliminary & Preoperative Exp 2.37
1-11-1 °
)4,
• Means of Finance In 0/0
:,.
r-i("%i
)
• Deposit From Directors & Members
Total
45.48 57.98
187.98
30.8%
100.0%
DIE 2.24
le
• FC-"))
•
•
•
•
p
0
•
C
p.
• E
O
.-
ti
INCOCTIOCOMCIL
erl 0 tt o1loco0
d 0 p ryo U0
co
co N
ri
an
N
0
N N
9 0
N
N
O
Ol
0
1- a
••
•
•
•
•
•• P'• co to to to co co to
•
N 0
fV
•
• p
. O
0V1' 00 IA 1.0 0 LO
N V. N tO CO ch
•• n•4 M m
• p p
•
•
cc cc
2
• 5
uC
3 3 5
3
• O G
q
3
• 7o
7
If
7
a
a
3 33
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Table-II
• Area as per
Building Plan Area
••
S.no.
I sq.Mt = 10.76
1 College [Wilding
Porch
Ground flobr : 4015 43201.4
a
4015 43201.4
b First Floor:
• e
f
Forth Flock:
Fifth Floor:
4015 43201.4
• Basement?.
• Porch
• 1------2320 24963.2
•
a
b
Porch
Ground Floor:
First Floor:
600
600
600
6456
6456
6456
c Second Floor:
600 6456
d Third Floor:
In e Fourth Floor:
•• Area of Staff Quarter -I Building
5 Staff Quarters -II
1400 25824
i • a
b
c
d
Porch
Ground Floor:
First Floor:
Second Floor:
Third Floor:
•
690
690
690
690
7424.4
7424.4
7424.4
7424.4
e Fourth Floor:
Area ofittaff Quarter -II Buildin 2760 29697.6
•
a
b
c
Porch
Groundoor:
First Fl
Second oor•
•
ry
,
•
495
495
495
495
5326.2
5326.2
5326.2
5326.2
d Third Fl r:
0 e Fourth. Fl r:
Area tall Quarter for Class III Bulk 1980 21304.8
iS a
6 Staff
Porch
Groun
rters for Class IV
n
)
•
c Second FIttor: 171 1839.961
d Third Flocal 171 1839.96
•
Area of Staff Quarter for Class IV Build/ ("684 7359.84
6 Boys Hostel
Porch
a Ground Floor: 1074 11556.24
b First Floor: 1074 11556.24
c Second Floor: 1074 11556.24
d Third Floor: 1074 11556.24
•
Area of Boys Hostel Building I r 4296 46224.96
7 Girls Hostel
Porch .
a Ground Floor: 1074 11556.24
b First Floor: . 1074 11556.24
c Second Floor: 1074 11556.24
d Third Floor: 1074 11556.24
e Fourth Floor: 0
Area of Girls Hostel Building r. 4296 46224.96
7 Nurse's Hostel
• Porch
a • Ground Floor: 1050 11298
b First Floor: 1050 11298
c Second Floor: 1050 11298
d Third Floor: 1050 11298
3
Equipments
)•
•
•
p• lakla:111
'We '
Marty
Rs in Crores
5.99
Details of equipments for Medical colleges
Total Medical equipment Cost 29.64
Meditech
Unit Price
(Rs.)
100000.00
oty
5
( Rs. )
500000.00
O T Table Hydraulic oenrel MI 2003 minor OT
• 0 T Table Hydroulic arthd+ gyny MI 111 major OT
T light Ceiling single Fibre Dome 19 • major OT
Meditech
Meditech
Illedltech
70,000.00
60,000.00
20,000.00
5
5
350000.00
300000.00
100000.00
0 T Light floor model Dome 041 19 5 135000.00
Orthopedic attachment Meditech 27,000.00
• nd 15,000.00 20 300000.00
Suction Machime hivac 450000.00
tiler 90,000.00 5
Multipara Monitor Truscope U 12 • TFT screen
( ECG + SPO2 +.1.11BP + RESP. +TEMP ) majbr OT 375000.00
Multipara Monitor Truscope mini 7.4 • TFT screen filer 75,000.00 5
p
o••
( ECG + SPO2 + N1BP ) minor OT 4500000.00
ISys 450,000.00 10
Bolls Apretus (Anisthisi&maChine ) medisys
with anisthisie ventilator 225000.00
45,000.00 5
Bolls AorellUs 70,000.00 5. 350000.00
Electric Cautry 400 watts ' motor OT 7
rtech
Electric Cautry 250 watts Elrech
20,000.00 5 100000.00
minor OT 97,000.00. 5 485000.00
e
Fs-,1110u42v2s
: .
4P e,/ 11.1 I
14 eke e
NM.= NIM111.11•Fl
LT-Ls.01•1J.:•1.1 t4Ald-..41•31MMMINNIMEL
130000 260000
COAGULATION ANALISER .II 00
M •• .A1
50000 100000
URIN ANALISER 200
a 11(8..•114LI
I
•
Dee Dee E
•-"1-1-77.1.!..11r1=1 111
u 1011
00
280000
111000
••
•• Equipments
•
••
• HOT AIR 01EN 14•14*141 1NCHASE
ilga 01192,.OGICAL INCUBETOR
( Dee Dee Enterpds
Dee Dee Enter p ds
8700
8700
2•
2,
17401
1740Q
•
SET OF LABORATORY GLASS WARE( ONE SET) Dee Dee Enterpris 17000 2 r:L
00
SET OF kOUTINE CHAMICALS /STAINS AND CHEMICALS 17000 2 34000
..
•
EQ8 ' Dee Dee Enterpds
••
ME)PA7H=20 Dee Dee Enterprise Q
SET OF SEROLOGY KITS ( ONE SET 1 Dee Dee Enterpris 10000 2 20000
5E7 OF LABORATORY PLASTIC WARE( ONE SET) Dee Dee Enterprie 1000Q 2 2(MQ,
08C MALERIA DETECTION SYSTEM Dee Dee Enterpds 350000 2 70
MINI VIDAS IMMUNOASSAY ANALYSER Dee Dee Entefpda 850000 a 1700M
•• Refrigerator
Lab autodave
Totpi After Discount
Vat/ C.S.T. 0 5%
Total Amount Payble -
Des Dee Enterpds
Dee Dee Enterpds
10000
30000
Rs in Cr
5%
2
Z.
20000
60000
7930800
396540
0.83
• Details of Modular Operation theatres Equipments Company Unit Price Qty Total amount
•
Seder Medical
Health Systems
Pvt. LW
• -II . • II • el - • 6100
••
7Q 420000
22000 1 22000
• • 000 1 .160000
MiNiIrrrin 4
1 -l. ..• 01.1.1 VAQ
•• ill t..
i I.
1 • t. 1 ... 111.1=11.111111111.
IliliillINIIMPIM
n
IIIIII 1IIIIIIIIIIIKW
300
350
50
500
122 1
. Le,, I
.,,,,
15000
175000
I
•
,
80000 1 80000
' ' 4-/-`- 122 1
•• •
Pendant
Air Handling Unit With AC
..,_ v
Addd: Freight charge 10%
Total Cost includi Freight cost
105000
250000
Rs r-
Rs in Cr.
2
1
0.1
210000
250000
0.1968
0.02
0.22
• Details of ICU Set up cost Company Unit Price Otv Total amount
• Schiller
Healthcare
•
(TA. Ltd
Multiple Monitor Truscoce 12" TFT screen
(ECG+ SP02+NIBP+RESP+TEMP+ETCO21 170000 10 1700000
•• (ECG+ SP02+NIBP+RESP+TEMP)
7 000
32000
10
10
900000
5750000
320000
• •.•
..,1 .s.
.1 •: •1.
1.• 02 .• 1111 1 . L . --:-
511.1.11.
.1
111111. 11
1M.111.11MI
•7 ..1.1.12
•••
•
Total cost 29770000
ISIIIIIIIIIIIIIIIIIPR 00
Total cost Including VAT/CST Rs Cr.
•
3.04
• • .
•
• •
•
• Page 2
•
•
•
• Equipments
o
•
•
•
•
• Details of General eaulontents for hospital Company Unit Price OW Total amount
• 2.600.000, 1 2.600.000.00
4 • 10 100.11
a4162M111 1 400 000
•
Steam Sterilizer
Surgical Diathermy 3LEr
o 500,000.00 1 500,000.00
Philips 37.500,000.00 1 37.500.000.00,
Cath Lab
• Telescope
Pulses Oximonitor
nic 460,000.00
50,000.00
1
1
460,000.00
50,000.00
• ECG Machine
X-Ra Macil 300 MA
1,200,000.00
00 000.00
1
1
1,200,000.00
900,000.00
•
Defibrillator
•00 0111.•
rm
y I infnxiztrunzwionimm......m 0
1,1 1,1 1 11
elli niirivX1101•X•11
• =MEMilMT .1 • 1.01 LI 1 1 1
..„11 0,1 1
LI
1,1
• 1 111 11 0,0.0
IL. L'• '
. 2,0 I •.0
•
I I I 4. 0 0 1,1
• AT At 5% Extra 5%
TOTAL PRICE 'mamma TAX •
121,222,500.00
Rs In Cr. 12.12
•
Details Radiolooy equiginersts for hospital
Vinod Medical
Syistem
• Pvt. Ltd
• Items Name
Siemens Magnetom Harmon, --1T( RS- System)
Price/Item
1
Total Amount
29800000
• (USD 5,96,000)
Siemens Somanatom Spirit 1 11950000
• (USD 2,39,000)
Total Cost Before Taxes 41750000
46968750
•
Total Landed Cost
Computer Radiology Solution 1800000
Siemens Premium Color Dopper 2800000
•
• Details of equipments foej4edical tolteoes Company Unit Price IOW Total amount
• 1. Department of Anatomy
MicroscopeS, Monocular
Des Dee Enterprise
60
5
3000.00
3000.00
180000.00
15000.00
Dissection microscope
• MicrotomeS, rotary
MicrotOmes, Sledge, laNe c td
Cabinet for slides (1000)
2
1
6
4000.00
3000.00
2000.00
8000.00
3000.00
12000.00
)• Incubators
Paraffin embedding bath
Hot plates for flattening
1
1
2
10000.00
10000.00
5000.00
10000.00
10000.00
10000.00
10000.00
Hot air cover fro drying 14 (450C) 1 10000.00
10000.00
I ••
and Sensitivity 1/10 mg 1 10000.00
Balance Earanger capacity %idles Sensitivity. 1/5 gram 2 5000.00 10000.00
2 5000.00 10000.00
)•
Refrigerator
Distilled water still meneS6 kfpe capacity gallon per hour 2i 4000.00 8000.00
•,
•
•• Page
1•
•
• Equipments
•
•
•
• Diamond pencils 4 4000.00 16000.00
• 2. Department of Biochemistry
Fume cupboards 2 3000.00 6000.00
• Balance micro
Votex mixers
1
2
30000.00
20000.00
30000.00
40000.00
•
Urinometers 50 20000.00 1000000.00
Constant temperature water bath 4 20000.00 60000.00
Ryles tube 4 10000.00 40000.00
• Magnetk-stIrrer
1pAMCUM
Plill
f4'"
2
2
50000.00
0000.00
100000.00
100000.00
• Calorimeters
Refrigerators
6
4
20000.00
20000.00
120000.00
80000.00
•
Thermometers 0-110 OC 4 1000.00 4000.00
Cork borer set 1 20000.00 20000.00
Stop watch 4 700.00 2800.00
• Hydrometres, Spirit
Hydrometres, milk
3
3
10000.00
3000.00
10000.00
3000.00
•
Hydrometers, wet and dry BULB 1 10000.00 10000.00
Incubator, electric - 1 10000.00 10000.00
Projector 1 100000.00 100000.00
•
.
Computer with laser Printer • 1 30000.00 30000.00
Electronic Typewriters 2 10000.00 20000.00
• Slide-Projector
Overhead projector
4
1
22500.00
90000.00
90000.00
90000.00
• Battery operated
SLR camera with accessories
1
1
10000.00
200000.00
10000.00
200000.0
•
Stopwatch 40000.00
X ray view box one in four 4 30000.00 120000.00
View Box Two In one • 3 2000.00 6000.0
• B.P. Apparatus
Anthropometric set
4
1
20000.00
20000.00
80000.0
20000.0
• Hot plates
LModes
1
16
20000.00
10000.00
20000.00
160000.00
•
Leather Strops 2 5000.00 10000.00
Parafln Bath Embedding 1 20000.00 20000.00
•
Slide Warming Table 1 30000.00 30000.00
Stone Carbarandon 2 20000.00 40000.00
Water bath Flowing) 1 20000.00 20000.00
• Distilation plant
Brain knife '
1
8
10000.00
10000.00
10000.00
80000.00
• Black Holder
Digital Spectrometer
50
1
30000.00
3000.00
1500000.00
3000.00
• Digital PH meter
Electric Auto slide prolecter
1
1
20000.00
20000.00
20000.0
20000.00
•
_Spectroscope Lens with adiustableollt 40000.0
•
• Page 4
•
p• Equipments
C Hot plates ..
Hot air (50 degree Ceisus) for special staining
0 Paraffin embedding bath (Ordinary)
0 Electric vacuum embedding baths
2
2
2
2
20000.00
20000.00
10000.00
10000.00
40000.00
40000.00
20000.00
20000.00
Autoclave electric 2 50000.00 100000.00
Distilled water still 1 30000.00 30000.00
Water bath 57 degree Celsius 1 30000.00 30000.00
Rectangular water bath 1 30000.00 30000.00
Centrifuge machine electric Rotofix 1 10000.00 10000.00
Colorimeter Photoelectric Klett. 1 10000.00 10000.00
Cabinet for 1000 slides 2 10000.00 20000.00
C Band saw
Autopsy tables
Histokinmettee or similar complete.
Staining racks for staining In bulk
1
2
1
10
10000.00
20000.00
10000.00
5000.00
10000.00
40000.00
10000.00
50000.00
Troughs for staining in bulk 12 10000.00 120000.00
Coplin Jars 24 5000.00 120000.00
Wat0 bath electric (Tissue Floatation 2 5000.00 10000.00
Balance, Chemical with weights 2 5000.00 10000.00
2 eye-pieces mechanical stage and condensor 60 5000.00 300000.00
Oil Immersion lens for above 60
p 5000.00 300000.00
•
liver Biopsy needle 2 12000.00 24000.00
Box weight analytical 2 12000.00 24000.00
Stop watch reading at 1/5 second. 6 10000.00 60000.00
Ultraviolet lamp. w
1 10000.00 10000.00
pH Meter electric. 1 10000.00 10000.00
Microscope, Binacular, research. 1 20000.00 20000.00
Paper Electrophoresk apparatus vertical 1 20000.00 20000.00
Paper electrophoresis apparatus, horizontal 1 30000.00 30000.00
6.Department of Obstetrics & Gynaecology
• Ayers •spatula
Cytology bottle
Microscope
MR Syringes
Co
30
36
2
10
2001100
3000.00
20000.00
30000.00
60000.00
90000.00
40000.00
300000.00
2 300000.00 600000.00
electro cautery apparatus , 2 100000.00 200000.00
Sim e fetal Droopier 2 30000.00 60000.00
NST machine 4 200000.00 800000.00
p Stitch removal sets
• Dressing sets
Ultrasound machine
10
10
2
20000.00
20000.00
1000000.00
200000.00
200000,00
2000000.00
Page 5
•
• Equipments
•
•
•
•
•
• Weighing machine
2
2
2000.00
2000.00
4000.00
4000.00
•
4
Operating laparoscopy set 2 500000.00 1000000.00
Hystroscopy set 4 200000.00 800000 00
• Hyseromat
Operatin microscope/Loupe
2
3
200000 00
200000.00
400000.00
600000.00
• Electrocautery
Contact microhystroscoPe
1
1
200000.00
200000.00
200000.00
200000.00
•
B.P. Apparatus 2 2000.00
Weighing machine 2 12000 00 24000.00
Fetal Doppler 100000.00 500000.00
•
5
Cardiotocogram machine 2 500000.00 1000000.00
Portable ultrasound 200000.00 , 400000.00
•• D&C set
Hydretubstion set
ILICD Insertion/removal set
High suction machine
Resusckation tray
15
4
3
1
20000 00
20000.00
20000.00
10000.00
100000.00
- 1000.00
300000.0 .
60000 00
10000.00
1000000.00
•
10
E.B. sett° T lights, OT tableslipMATERNITY 0.T. 10 30000 00 300000.00
4
4
20000.00
10000 00
20000.00
20000.00
20000.00
200000.00
100000.00
80000.00
80000 00
80000.00
•
Diagnostic laparoscopy set 4 .200000.00
Laprocator for tubal ligation 4 200000.0C 800000.00
Postputum ligation 2000.00 12000.00
•
6
Outlet forceps 6 30000.00 180000 00
Low mid cavity forceps/kjielland forceps 4 30000.00 120000.00
• Decapitation hook
Craniodast with cephalotribe
2
1
10000.00
20000.00
20000.00
20000.00
• Oldham Perforator
Infusion Pump
EB set
7. Department of Orthopaedics
6
6
6
40000.00
20000.00
5833.33
240000.00
120000.00
35000.00
500000.00
External Fixator 250000.00
•
2
C-Arm (Image Intensifier) 1 300000 00 300000.00
400000.00
20000.00
200000 00
300000.00
240000 00
•
Thermometers (Assorted)Glassware, such as pipettes burettes, 2 10000 00 20000.00
PH Determination apparatus 12 20000.00 240000.0 1
Reagent baths with stopper 2000 cc 7 000900
•
20000.00
1000 cc 24 30000.04 720000.00
500 cc 10000.00 240000 00
•
24
250 cc 60 10000.00 600000.00
100 cc 60 10000.00 600000.00
• 50 cc
9.DepartmentofPha rmacology 1 10000.00 10000.00
•• Electrocardiograph
Spectophotometer Model Du-Badman
Skin and Rectal Thermometer Baron
Antihistamine Chamber with manometer
Flame photometer
1
1
1
1
20000.00
20000.00
200000.00
10000.00
20000.00
20000.00
200000 00
10000.00
•
•
•
• Page 6
•
•• Equipments
••
••
••
10.Depatment of ENT
Nasal Speculum 4 30000.00 120000.00
Tongue depressor 4 30000.00 120000.00
Laryngeal mirrors 4 20000.00 80000.00
••
Nasophary ea' mirrors " 4 20000.00 80000.00
Aural speculum 4 10000.00 40000.00
Ear Suction 2 10000.00 20000.00
Nasal Suction 2 20000.00 40000.00
Suction apparatus
••
1 20000.00 20000.00
Siegies speculum 1 20000.00 20000.00
Tuning fork (512 Hz) 1 20000.00
Otoscope 20000.00
2 10000.00 20000.00
Bayonet forces 1 200000.00 200000.00
••
Bulls lamp 1 200000.00 200000.00
Head lamp
1 300000.00 300000.00
ENT examination chair - 2 300000.00 600000.00
Dobson Home probe 1 200000.00 200000.00
Sterilizer
••
1 200000.00 200000.00
BP apparatus 1 2000.00 2000.00
Stethoscope 1 2000.00 2000.00
MA3OR Operation Theatre. 1 300000.00 300000.00
Tonsillectomy and adenoldet-tomy set
••
1 200000.00 200000.00
Blopod
1 2000.00 2000.00
Boyle-Davis mouth gag
20000040 200000.00
Tonsil holding forceps 1 20000.00 20000.00
Tonsil dissector and pillar retractor 1 10000.00 10000.00
o•
Tonsil snare
1 10000.00 10000.00
Burldt artery forceps 1 20000.00 20000.00
Negus artery forceps 1 10000.00 10000.00
Tonsil scissors 1
Adenotome 10000.00 10000.00
••
1 10000.00 10000.00
Adeno id curette 1 10000.00 10000.00
Yankauer oropharyngeal SuCtion tip 1 10000.00 10000.00
(b)Set for nasal bone HUM Asch forceps 1 20000.00 20000.00
• Winans nasal speculum - 1
••
Freer etrtor 10000.00 10000.00
1 2000.00 2000.00
Balleng s swivel knife 1
Takahashi forceps 3000.00 3000.00
1 2000.00 2000.00
Mallet
I 2000.00 2000.00
••
Ribbon Retractor
2 40000.00 80000.00
Cheek Retractor
2 2000.00 4000.00
(e)Antrostomy setAntral 1 2000.00 2000.00
Retrograde gouge 1
• tight source 20000.00 20000.00
••
1 2000.00 2000.00
• Sickle knife
1 20000.00 20000.00
*Retrograde punch
1 20000.00 20000.00
• Blakesley forceps - straight
1 2000.00 2000.00
- upturn• Optional for MBBS.
20000.00 20000.00
••
Anterior commlssure
1 3000.00 3000.00
laryngoscope
1 20000.00 20000.00
Negus laryngoscope
1 20000.00 20000.00
Lighting system for laryngoscopes
1 20000.00 20000.00
Biopsy forceps
••
Ribbon right angled retractors 2
Curved arteries 3000.00 6000.00
4 3000.00 12000.00
Straight arteries
1 3000.00 3000.00
Cricoid hook
1 30000.00 30000.00
Tracheal dilator
•
1 3000.00 3000.00
(a) Antral wash set Tracer -.
2 3 000 .00 6000.00
Canula
2 3000.00 6000.00
Negus
1 3000.00 3000.00
Lighting system
1 2000.00 2000.00
Physiology Department
perimeter Priestly Smith SAP: 4)84 B & T
6 3000.00 18000.00
Haemoglobinometer. Sahli or hellige (with spaces) 36
Haemocytometers 2000.00 72000.00
36 3000.00 108000.00
Sphygmomanometer
12 2000.00 24000.00
•
Page 7
• Equipments
•
•
•
•
•
•
• Stethoscopes
Stethoscopes, Demonstration- with
Multipleear pieces
Polygraphs
•
12
2
5000.00
5000.00
60000.00
10000.00
S Venus Pressure apparatus
2
2
5000.00
5000.00
10000.00
10000.00
• Spirometer, Ordinary
Gas analysis apparatus, Haldane's 6 150000.00 900000.00
• students type
Van Slyko S apparatus manometric
1
2
3000.00 3000.00 1
•
7000.00 14000.00
Gas analyzer - automatic for CO2 02, N2 5000.06' 5000.00
Douglas bag, complete
6
12
10
9000.00
9000.00
12000.00
12000.00
13000.00
54000.00
9000.00
72000.00
144000.00
130000.00
• Algometer
Apparatus for passive movement
3
20000.00
12000.00
60000.00
36000.00
• Knee hammer
Stethograph
1
12
1 300 0.06
9000.00
13000.00
108000.00
•
10 100000.00 1000000.00
Bicycle ergometer 4 300000.00 1200000.00
01 actometer
•• Opth almoscope
matIc eye
Phakoscope
Perimeters, with charts - 2
1
2
2
1
300000.00
300000.00
500000.00
• 400000.06
300000.00
300000.00
600000.00
1000000.00
400000.00
600000.00
•
Colour percetion lantern Edridde Green 1 200000.00 200000.00
Maddox rod 1 200000.00 200000.00
Newtons colour wheel
•
1 100000.00 100000.00
Tuning forks to test hearing 32-10,000 cps (sets) 2 50000.00 100000.00
Dynamometer
•
1 200000.00 200000.00
Otorhinolaryngoscope 3 500000,00 1500000.00
SterillsertlectrIc 2 900000.00
•
1800000.00
Instrument trolley 1 5000.00 5000.00
Stop watches 6 700.06 4200.00
•
lamboor 1 10000.00 10000.00
Plier
20000.00 20000.00
Plier Goldsmith
• Scissors ordinary
Scissors Goldsmith
1
1
3000.00
2000.00
3000.00
2000.00
•
1 20000.00 20000.00
Hammer 1 2000.00 2000.00
Mortar Iron . S 1
•
3000.00 3000,00
Buck et Iron
1 40000.00 40000.00
Chisel 1 30000.00 30000.00
• Tagan Iron
E.I. Bowls
1 20000.00
30000.00
20000.00
120000.00
•
Drill machine
1 10000.00 10000.00
Modelling day 2 2000.00 4000.00
Chalk day
3 2000.00 6000.00
Mutant day 4 3000.00 12000.00
Yellow clay 2 2000.00 4000.00
Soft stone powder
• Plaster of pans
3 2000.00 6000.00
•• Old raddy
Gum
Nia paper
Plastidne
Wires G.I. copper and wire netting
2
3
4
2
2
3000.00
3000.00
3000.00
3000.00
3000.00
6000.00
9000.00
12000.00
6000.00
6000.00
5 3000.00
•
15000.00
Synthetic Enamel colours 1/16 gallon 3 3000.00
OIl colour brushes. 9000.00
5 3000.00 15000.00
• Soap and ut oil
Epid iascope B A L or alatis 3 3000.00 9000.00
0.04
12000.00
6000.00
3000.00
57574000.00
2302960.00
•
•
•
•
•
•
•
•
•
•
•
•
• Table - IV
•
•• Electrical cost
S.NO P A R T I C U L A R S
With Specification
Qty. Rs./ Unit Amount
Rs in Cr
• Interne ,. 14.80
•• 3.
External
•• 4.
5.
EPBX System
Networking LAN + VPN
Hospitech
Hospitech
1.10
1.00
•• 8.
9.
CCTV + Surveillance
Internal Telephone
wiring and conducting
Hospitech
Hospitech .
0.04
0.07
•
••
••
••
••
_
Table - V
Total 167.62
Vat/ C.S.T. 0 14% 23.47
Total Amount 191.09
Total furniture OW both hospital & Co e 3.95
Table - VI
Misc. Fixed Assets Details
PILLOW COVERS
White Soft Cotton (Bombay Mill) 40.00 1000 40000
Green, Sky Blue, White Casement . 40.00 1000 40000
Dark Green CasementSuperior) -1---- 50.00 1000 50000
4fr k
Check , - I' 50.00 1000 50000
Strips 50.00 1000 50000
DOCTOR'S WEAR -
Scrub 5ult (0.T. Kurta Pyjama)
Super Cotton Pialn(Sky. Blue, Pitch, 300.00 500 150000
Foam Colour, Yello mi
Sky Blue Terricot 250.00 500 125000
KhadifOnion Pink, Blue, Sea Green, Cream) 260.00 500 130000
Surgeon's Gown 220.00 500 110000
STAFF'S WEAR
Staff Apron Branded Half 280.00 500 140000
sleeves White & Coloured
Staff Apron' Branded Full sleeves 300.00 250 75000
Half Sleeves Shirt Ski . Blue Terrycot 200.00 500 100000
Full Sleeves Shirt Skyi3lue Terrycot 250.00 500 125000
Full Pant 300.00 500 150000
Full Pant Branded 325.00 500 162500
Safari Branded 550.00 250 137500
Sister's Salwar Kurta Irerrycot 325.00 250 81250
Sister's saree plain (with blouse) 200.00 250 50000
Sister's Saree White (Colored Border) 200.00 250 50000 •
Plain Saree (Navy Blue, Green Etc.) 200.00 250 50000
•°•
PATIENT'S WEAR -
Patient Gown Simple/Maxi
Check 125 1000 125000
10 ilueTerrycot 140 1000 140000
1•
•
1.
Kurta Pyjama
Check 210 500 105000
ilueTerrycot . . 225 500 112500
1 • Cotton Strips 7
...
260 500 130000
1 0 O.T. LINEN
28"x28" 33 1000 33000
OTTowel Small
OT towel Large 57"X36" 80 1000 80000
Small Hole Sheet• 28"x28" 40 500 20000
Big Hole Sheet . 57x80" 150 500 75000
Perrineal Gynae Sheet 57"x38" 80 500 40000
• • nstrument Wrapper Small 27"x27" 60 .500 30000
Instrufnent Trolley Cover with Half Wi 57"x36" 150 1000 150000
.eggings Simple Pair 80 500 40000
Face Mask Without Plate 8"x8" 7 500 3500
Face Mask With Plate 8"x8" 8 500 4000
. , 18 500 9000
Gents Cap
1. Gents Cap High Quality 20 500 10000
Ladies Cap 20 500 10000
Ladies Cap High Quality .... 24 500 12000
Eye Sheet White 28"x28" 40 500 20000
Eye Sheet Green Cotton 28"x28" 40 500 20000
DRAW SHEET
White Cotton 36"x56" 50 500 25000
Coloured Cotton Casement 36".8' 65 500 32500
Draw Sheet with Water Proof on One 36 '''- 8" 180 500 90000
,A
BLANKETS
Blue, Green Blankets 225 500 112500
Blue, Green Blankets 350 500 175000
Blue, Green,Red Blankets 550 500 275000
10 Blue high quality
4
p. CURTAINS
• Shower Curtain
Cotton Curtain 7"
•
0#.
300
280
500
500
150000
140000
Cotton Curtain 9" 330 500 165000
Super Quality Imported Curtain (72" x 961 750 500 375000
••
ko
► ••
•
•
•
••
•
•
•
•
•
•
•
•
• Continue...
OTHERS
Baby Set Check
• Flower Print
70
80
250
250
17500
20000
• Baby Print
Binder
90 250 22500
• Pillow •
65
150
250
250
16250
37500
• Mop
Mop
.. 9"x9"
5"x5"
20 250 5000
• COMPUTER
LASER PRINTER
DOT MATRIX PRINTER
90
50
10
22000 1980000
';. 5600
10500
280000
105000
PHOTO COPIER 6 46000 276000
Total 3061000
ADD- VAT ( 4% ) 4% 122440
S
• Total Miscellaneous fixed asset cost
• 3183440 0.32
4.04
•
•
,n
•
•
•
•
••
•
••
•
•
•
••
•
•
• Table - vg
•
• Details of Preliminary & Preoperative expenses
•• •
Preliminary expenditure
Rs. In Crores
• Travelling Expenses
Insurance Charges During Construction
0.50
0.42
• Start-Up & Miscellaneous Expenditure 0.50 "
•
•• Table - VIII
•• Other Deposits
Total Deposit
0.06
1.31
•
•
•
•
•
•
•
••
••
•
Table - IX
, In Tr:
`" Total amount
Details of VehIcjes Price (Rs in Cr)
Marutl omni 9# 10 250000 0.25
Tata Ambulance, 5 355000 0.18
Total cost of Vehicles 0.43
0---1-- Closing
Period Disbursement ".."11 Installment Interest
WInce balance
1 2011-12
April- June 0.00 0.00 0.00 0.00 0.00
lulu-September 20.00 O. 0.00 20.00 0.33
October - December 50.00 2 • li 0.00 70.00 1.46
50.00 • ln 1 II 120.00 3.09
NINIE • 120.00 4.88
2
10.00 120.00 I 1 • 130.00 4.06
Firriprft=11.111/1/11111111111MINIII
.. 130.00 '46711111111 130.00 4.23
571712 D.,•1.111111111111110:111111111.EBELINIIIMMIN 126.18 4.16
rtrrnTErre‘Mi nCLAMEMINEDECRIMIIIMNIIIIII 122.35 4.04
10.06 7.65 16.49
3
1 0.00 122.35 : 118.53 3.91
July - September •. 118.53 114.71 3.79
October - December 0.00 114.71 110.88 3.67
0.00 110.88 107.06 3.54
0.00 15.29 14.91
4 2014-15
pm
ril - June 0.00 107.0§ 3.82 103.24 3.42
lulu - Sootpmbor 0.00 103.24 3.82 99.41 3.29
October - December 0.00 99.41 3.82 95.59 3.17
0.00 95. 91.76 • 3.04
0.00 12.92
5
0.00 87.94 2.92
firrErTITTAMINNM
. illii•MnliMint.f:,* tanswirsam 41 ..,
-MT"! r"rrMrr/IIIIIIIIIMIMIMII•1111111EIE -MIIIIIIIIIFTFII•M 80.29 2.6
111118171! ,,,,
FrrIMMIIIIIIMMIONINIIIIROESEIIIIII111677111111 •.47 2.
0.00 16.29 10.94
6 2016-17
April - June 0.00 76.4 - 3.82 72.65 2.42
- l II • 0.00 72- .... 68.82 2.30
MITTZUMMT•ra. NINWElin 1111E•-
.P..;:4:2 Illiill .0 2.17
PITTMZEMZEMENNIMINSMEANN e.4.1MMIORMI •1.18 2.05
0.00 8.95
1,1.uu
7
0.00 61.1;4 57.35 1.93
0.00
WEilaillIIMMFMINI 53.53 1.80
r.o7zmErrtmammilicImimatislirlim 49.71 1.68
17787:11 =MAME= NMI:11MM MEHL= Iiiii. 45.88 1.
0.00 15.29 6.96
g 2018-19
April - June 0.00 45.88 3.82 42.06 1.43
July - September 0.00 42.06 3.82 38.24 1.30
0.00 38.24 34.41 1.18
FrnITTZETITIMMIMUCCUMMEKKENIMINFMEN 3•. 9 1.0.
0.00 15.29 4.97
9 2019-20
Aorll - lune 0.00 30.59, 3.82 26.76 0.93
lull, - September 0.00 26.76 3,8J 22.94 0.81
October - December 0.00 22.94 • 3.82 19.12 0.68
, .
0.00 19.12 • 15.29 0.56
0.00 pil 2.98
10
0.00 41 11.47 0 .43
Off"hrirrriTMINEMNIME.MMiliMiaidiiMninin 7.6 0.31
(6,•1 Prrnr•M. MINIINNE.FLI IUNIMITIM .82 1.19
iftrirgErrEN
, 0.1.11111INEXAM11111111111 LI 1111M77/11111 0.00 0.06
0.00 15.29 0.99
otal Repayment 130.00 TRUE
B Nursing Charges
Type of Room No of Beds Rate Rs. Rs. In Cr.
General 200 100 20000
Twin a 120 170 20400
Luxury 40 230 9200
ICU 140 325 45500
Total Nursing Charges 500 95100
95100 0.00951
2 In-Patient,Serylces
General 10 150 1500
Twin 25 125 3125
Luxury 80 150 12000
ICU 75 175 13125
190 29750
47250 0.005
CC
2 Contrast X-Rays
Barium Studies 1 795 795
IVP.S 1 795 795
•
• n
•
•
• "Ir r!`"'
3Tt
• si
5 Holti
• 0otYrt.;nlit1.0:.4,5t
•
•
• 11411
11.111. II 1200
1500
4800
3000
• =13
2000
2100
6000
2100
• 1.1i2
1111 1450 1450
1950
• 1950
• 21000
1 0 000
• 0.007
•
• RE ENUE PROM CA IOLO P R DAY
lr IIIIIIII TOO
1
n.gr
1 maC
4
'mmal2m. .ui..."1"' .1 2010 10000
MW1. 3500
2D-Echo
4 1900
S.
1750
• Stress Testir
i"....r11.1.111.1111111111111
Molter Examination
.
11111.11111.1111111
tress Exam m.mmONIIIIIIIIIMIMMIn
2600
• Dobutamine_.
"."771777"
.4.8.114.11111111111111.1.1111111
1111
• 1 :±
•
• Dia nostic Procedures
•
•
•
•
• 0.000
•
•
•
•
•
•
•
•
•
•
•
••
•
•
•
•
•
•
•
•
• 1 REVENUE FROM PUU4ONOLOGY PER DAY
Number Rate Total Rs. In Cr.
• Bronchoscope
PFT
3
2
1100
350
3300
700
•
• 3 REVENUE FROM LABORATORY SERVICES PER DAY
Number Rate Total
Rs.In Cr.
• 1 BIO-CHEMISTRY
Routine
--,
150 11250
••
Hepatic 5. 500 2500
Renal 350 1750
Lipid Profile 300 4500
Electrolyes - 2 .....- 325 8125
-1
2 MICRO-BIOLOGY
`"E
1
•
Miaow%) 15 1875
Culture &Sensitivity
l — 10 150 1500
• 4
Specific Serology 10 175 1750
•
3 PATHOLOGY
Routine s 30 75 2250
•
n Special • 15 300 4500
Histo-Pathology 15 275 4125
•
Cytology 15 200 3000
Total 1
•
67375 0.0067375
• General
Twin 1
55000
65000
110000
65000
• Luxury
ICU
1 " 70000
80000
70000
80000
• Total 5
,
325000 0.0325
• General
Twin
i 35000
40000
70000
80000
• Luxury
ICU 1
. 47000
50000
47000
50000
• Total 572000
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
••
•
• K REVENUE FROM NEPHROLOGY PER DAY
•
AT 100% CAPACITY UTILISATION
Number Rate Total
5 3000 15000
•
Dialysis
Total 15000 0.0015
•
•
L REVENUE FROM OPTHALMIC PER DAY
AT 100% CAPACITY UTILISATION
Number Rate' . Total
Opthalmic surgeries 7 15000 105000
Total z 105000 0.0105
• —
• kt
• Audiometer Charges
Impedence Audiometer Charges
ENT Surgeries
15
10
10
150
200
3500
2250
2000
35000 .
• 39250 0.003925
•
•
lz
• Dent*Surgerles
!Number
15
Rate
4000
Total
60000 0.006
• —
I
•
AT 100% CAPACITY UTILISATION
Number Rate Total
•• Physiotherapy
Rate K."
150
Total
3750 0.000375
•
AT 100% CAPACITY UTILNumber
Incubator 3 156 4500 0.00045
• Registrations OPD
Admission Charges
100
66
250
200
25000
13000
• MLC Charges
Medical Record Charges
2
25
125
125
250
3125
• Ambulance charges
Diet Counselling
5
10
150
75
750
750
•
•
••
••
•
••
•
•
1
Rate
AT 100% CAPACITY UTILIS Number 260000
2010 1300
0.026
Deliveries 2600001
1
Number
200 75 15000
Blood Grouping & Rh tyoIng 100 7500
75
Cross matching 28 60 1680
Others 24180
Expenditure Expenatur
Consummables Doctor Fat a taken*,
Total Daily Income
Department
440000
Room darges
Hospital Share of ConsultancY 47250
S1allsed Diagnostic Services 0 20%
70640 14128
Imaging Services 1871.25 5.614 5%
37425
• Cardiology
Neurology
Gastro-Enterology
Pulmonary Medicine
2200
9800
10500
110
490
1050
16843.75
1,320
3,430
2,100
0
5%
5%
10%
25%
Lab Services 67375
26000 78,000 10%
Maternity Services/Gynecology 260000
87600 58,400 30%
Cath Lab Services 292000
171600 143,000 30%
Cardlo-Thoradc Surgates 572000
Oncology Services
NeuroSciences 2,250 35%
15000 • 5250
•
NephrologY 15000 18,000 25%
Dental 60000
187500 225,000 25%
Surgical Procedures . 750000., a 187.5 0 5%
Physiotherapy Sem/ 3750 •
al
al
al
gti
10001,
005 001 1181:81ISJOONI
ims0Hur04enuemm l
17.56 Total Receipt in cr. At 10004 cap
C•VC EVIC CrI E E•VI E SE'81 twee 19'ET 69'6
orr
gset
svz
1755.50 Taal ROCIaptSIn Takla
054ZT VE OS-19TE 0S-C9TE 05191 E 052581 00'46E1 00-C9ET 05'896
1
300.00
00'00E
09'0
I arms
oro
0.60
00-00E 00' 0V1 00'01IL
09'0 8V 0 91•0
I 00S
00161
two 1 00'80T 1004 00'9E
9E11 9E8 9V0
losampPrisonmail
wantsadadagiolama
'wawaJO
a
a
;
00T
idapad
ad nelfmnomasoli
3112.50 I
1 051981 OS 2981 I I orEssr 1 051191 OVZT9Z 00-5011 oral's 00'0611 05'1E6 . salads* MU•NW04 999119a/1
00'5L9 I OWLE9 arise OVLE8• .cu are 00'009 00'67.5
427.50
00'09E 05'161 + 9994
1 00.511
00'51
00' SZZ
00'51
00'SZZ IRYste
00•ST
00'5ZZ
00' 51
00. 511
00'51
00'511
00'51
oPSTZ
00'ST
00'511
00'51
00'511
00'ST
Wang 199A;51
aimsadmama
1I 1 cirrus
I
00' 0St
11
)S'ZI t OSTTI, OS'ZI t 00' SLE 00.00E 05-401 00'5E1 OS'L9
00'9 OS' S OS'S OS'S 00' S 00' 5 OS•t OS't OS' t
00'51 00' SL 00' SL 00' S L• 00' SL 00' SL 00'09 00' 5V 00'0E 00' ST 10.141484 in 4:081
919110 IN 9601d
1 0S-41£T
00'05E
00'511T
00.05E
00'511T
00'05E
00'511T
00. 05E
OS'LET T
00'05E
OWLETT
0110SE
00'086
00'05E
00;orz
00'0SE
630.00
00' 05E
00'06V
00'05E
soynivoll
00011U013ASA $1
00•OT 00'0T 00'01 00'0T 00•01• 00'01 00'01 00'01 00'01 • 00'01 WWI* ad 001190043
I
J
I
00'0Zr.
H
OS'196 00'548 00'548 00'SL8 OS'Ll7L OS'L9L • 00'0E9 00"081 00'01rT
OS'S 00' 5 00'5 00'S OS' , OS't Oct' 001, 001, 00'9
I 00'SLT 00' SLT 00' 5L1 . ,: 00'SLT 00' SLT • 00'SLT 00'00 • opsor 00' 0L - -WYSE- -
01/611T 00.0001 Or0001
1000.00
00'51.8 00'51.8 OfrOOL 00 '0EV 00'00£ 00'051 mad109AI
Iopt
9
oS.4.
a vl
1!
00' Ir OS' E 00' E 'id Teed T8818115
OSZ OSZ OSZ OSZ OCIT Wards l
Passe* sae mil
•
1001
a
*OW 39 /4P9dc. 19191Wsompondmewl
a 005 001
I SrAd Trsa l 01 431 1 61 48 1 orAs 1 LT sa l 91ssl srAr I VT Inll um!
'Revenue from Medicalcolleges
r.s 1
•
•
'awl"
181' 17 /ouabu guoo l
'InterestDuring Construction I
18817 'Pre lim inary & Preoperative Exp
L£7 •
I —
;4
I 4-
1
4
1 00.00% 1
'L9 98T 'sten ' Iszestr 'Vehicle i2o1 I
1917• ) 1E0' 0 1 0/017r0 IEVO 'Other Assets
105'6Z 1%1 8• S1 10L' LZ 'Equ ipments cost
ILS' IE 1£6' i 1%I6' 91 V9'6Z 'ElectricalInstallations
160'6? 1 0/08S'SI TE' LZ
lsE. s
'Bui lding &Civi l Works
Itite a 1% 13 '9171
11 913 1£ 51) 1 % 1 9 •71 sty& I 'Land &land Development
'Apportioning ofSoft costI
••
•
9
•
I•
•
I•
n
)•
•
••
•
)•••
)••
)•
)•
••
1n•
)•
I•
•
)••
•
.I
.
Gross block
r. cr; co
.4
47;
N
CO
2
r.
N -1
• st;
CO
N
1-1
4:)
,D
1 86.67
N
Cu mu lative de • recitalo n
Oy
r1
el
O
(..4
a; nu °3
.i.
.4
ri
O'
:
ul
I-I
Cr;
0 On
S
6 co;
4:6 0+
S
9. 64 Additio ns
CO
.4
0
0.00
..
1
ZVO SVO 6V0 ZZ'O 6r0 S£'0 I 6£' 0 Z4' 0
£0' 0 £0.0 rli £0'0 £0.0 £0'0 £04 0 £0'0 ilr E0'0 %Vei l
E0' 0 £0'0
00' 0 94. 0
Sr°
6717-1 .—
.
.. SVO 6£' 0 I zvo1 00'0 I
•
Ft:176-1 1:7'17n 7E97-1 95' 8T WOE 467ZI ET' SZ I 4N I
Ulq4 e IJCLAJ O UI
i
16-717 1 6F17-I .—
7;17-1.
.. 11•
fl 6'• 6• Z 6T' Z I 6T 'Z I %Z te LI arirlitinne
00'0 OS'6Z Other Assets
66' 11 8V4T LV9T 9S' 81 SCOZ 467Z EVSZ ZE• LZ 00'0
I 08' 6
'
-..—•
.
.—
—..
.. 1•:- Net block
ST' S 6440T ERZ( LV ST ZS' LT 98'61 OZ7Z S S'4Z 68'9Z Era Deprec iatio n
4E7 VE'Z
N
It
N
4E7 _..4£' Z 4£7 4E7 4£t VET 4£7 4£ 7 Addit ions
00'0 LSIE
1.71;11 ILVST I 1-7(7giTI or ss.vz I 61r9Z £r6Z 000 I 4507 541.61000a pnr y
rThr
oViinI 94' 0Z I Z97Z ILevzI £6' 9Z 1-Pv 14-iori I
it
S'L In IT
4E8'
1
-77-1
9. I 9T 7 1-9'77F7 I 9T7 1I 9T 'Z I 9VZ I
9I'Z 1%ZteL,
Atirlitinne
00'0 60'6Z ElectricalInsta llations
1
I
Z9TZ LL* 1:7 £6'9Z 00'0
99'6 Z811
II
I
86' ET PT'9T Or8T 94' 0Z
I
I • '
,:onan
O•
'..
Ni '1E1
ry °'
N 0,
•
•
•
I
I
I
I Deprecia tion
ri
m
a
ni
ni
•I
N
Cr:
N
.
N
.
N
Nf
ni
I•
r.i
NI Additio ns
Q
1
I
1
I
I
r.:
.41: Cg
Building &Civil Works
c;
.
N
.4
^
a
.
N
ri
r..I
1 )1JvI4 40 N1
TI
9'8 1777171-7917-- 1 T 9' 8 T94 8 1 19' 8 . T9'8
uoge piuud ( i
1-7: o 1 1%0
I
,...
0 0.0 I 191 bULI I4i PPV I
r7Fir ocro imanacquiva pails 9i piing 9
•
L.751171-77473— I T9'8 I T9'9 T9' 8 I all
I 1.30 1:1 0.1 0 d0Jo SUWON'
.
I ZT ET ET I
ZT ET ET ET ET ZT
ZZ Ad TZ AA OZAd 6T Ad 8T Ad LT Ad 9T Ad ST A.1 PT M I SLMDeprecia tion
.
o••
•
•
o•
o•
o••
40
•
•
•
•
•
•
•
•
,
4-7
45
2
C
O
N
N
t6
N
Cr;
0
1.6
N
N
CO
O
1-1
cO
N
'-4
0
N
Ot
N
to
N
to
71-
•-•,
Rwe—i 17cf 1 TO 'VI 1817' 91 1£' 6T T8'ZZ 1 178'9Z I 1
1 moo n4a N I
!Depre ciation
1-gT7rn 6L' 1 0 T 7 IL177 1I6 7 1 E0171.
L.T 17 E Ii7L17,1%s i 1
IbTf0-7-1 loo•o 100'0 100 . 0 1 00'0 ILS' TE I
100' 0 suo l4IPPV I
M7-7 1ZT' OT 1 TO'i7T _I18V91 16£' 61 11-8'ZZIV78' 9Z 100'0 1 1 ;so*satiatuciinim i
^'t
FF6L--7 11C 6' Zi
I
IWT-11677-71 7).7' 17-1 Z [89 - Z Sre ILE. I U
%CI
1176' I
suo mppvi
-
1W07-1'aro 7Y07-7Itr6715-1100'01 00' 0
0(1 1 0 0' 0 C::)13110 0' 0 1160'6Z 1 1
IElectrical Installations !
IL8 - LI 10,TZ 1IE CV Z1100-0
,
irE97-71£6-L
n
ITT 67-1 I T67T- 16T' SI
1,
I
1-6171 -1 WL7C-1 0' 911. 1£9• T S ILE - Ls Rt'E9
1
1£8'tiL locsL I maoici4aN I
!Depreciation
18T' t, 19T' s J1VCS 1L£' 9 lg oL 1 Llir z IVC8 1%0T
Mr.7.1locro 10 0 . 011):1-7100' 0 1 00 0 100' 0 100' 0 11717' LO 1 I suo llIPPV 1
!Bu i ld ing & Civil Wor ks I
WEI-71179' LE 1Z8' 1 17 12.7' 9T-
771£ 91 S ILE' LS ISL' E9 1 00 8L 100' 0
!Neiblock
179-7111' 8-77 1165:1-711_19'8 119' 8 119' 8 119' 8 11 9'8 I119' 8 IDepreciatIon
to 10 1%0
o
to 1 0 10 10 10
lavo_ RTC:TO-71.60747100' 0 1 0 0' 0 100-0 Iry0 100' 0119' 8 suonippvi
I119' 8 1 00'0 1 ati !Land & Site develoonie
rr§73-71W9 119' 9 1'19' 8 119' 8 11 9' 8
!Months of operation
Tr Zt Zi Zi IZTIZTIZT ZT IZ T
I
-Tz=1
. .4 ar—Z--
'141.1
-317—
AAFILVAT
A/..1
77- I.1? I.da L 11.1
AAI.2T Ad
o
Mr IR11111113111111
1
t
'•
•
•
•
•
•
•
•
Table - XIII -A
• Particulars
•
' FY 12 FY 13 FY 14 FY IS FY 16. FY 17 FY 18 FY 19 FY 20
cite In Crore'
FY 21
Total Capacity 500 beds
14.50 4 17.00
84.30
17.50
93.63
18.00
111.98
18.50
116.26
19.00
-
116.26
19.50
118.89
20.00
118.89
20.50
118.89
21.00
Total Revenue 16.00 86.61 101.80 111.63 130.48 135.26 195,76 138.89 139.39 139.89
•
A.Personnel Cost •
• Salaries
Contribution to PF
Staff welfare
1.50
0.25
0.15
8.66
1.04
.0.09
10.18
1.22
0.10
11.16
1.34
0.11
13.05
1,57
0.13
13.53
1.62
0.14
13.58
1.63
0.14
13.89
1.67
0.14
13.94
1.67
0.14
13.99
1.68
0.14
• Wages
Total Personnel cost
B.OperaUonal Exp
Consumables
Cost of Pharmacy
0.15
2.05
0.90
0.75
0.87
10.65
12.50
3.12
1.02
12.52.
14.58
3.65
1.12
13.73
15.62
3.91
1.30 , 1.35
16.05.
17.71
4.43
16.64
17.71
4.43
1.36
16.70
17.71
4.43
1.39
17.08
17.71
4.43
1.39
17.15
17.71
4.43
1.40
17.21
17.71
4.43
Consultants Fee 1,80 12.88 15.03 16.10 18.25 18.25 18.25 18.25 18.25 18.25
Power & Fuel 0.64 1.30 1.53 1.67 1.96 2.0$, 2.04. 2.08 2.09 2.10
House Keeping 0.10 0.43 0.51 0.56 0.65 0.68 0.68 0.69 0.70 0.70
Total Operational Cost 2.39 30.24 35.29 37.86 42.99 43.09 43.10 43.16 43.17 43.18
C. UTILITIES
Water Charges 0.15 0.26 0.31 0.33 0.39 0.41 0,41 0.42 0.42 0.42
Laundry Exp 0.02 0.04 0.05 0.06. 0.07 0.07 0.07 0.07 0.07 0.07
•
•
•
••
•
p•
•
•
•
Total Utilities I 0.57 1.69 1.99 2.18 2.54 2.64 2.65 2.71 2.72 2.73
D.AdminIstrative Expenses:
Postage & Telegram 0.10 0.43 0.51 0.56 0.65 0.68 0.68 0.69 0.70 0.70
Printing & Stationary 0.10 0.43 0.51 0.56 0.65 0.68 0.68 0.69 0.70 0.70
Insurance 0.25 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
Travelling & Conveyance 0.15 0.22 0.25 0.28 0.33 0.34 0.34 0.35 0.35 0.35
Advertisement & Business prc 0.10 0.43 0.51 0.56 0.65 0.68 0.68 0.69 0.70 0.70
Remuniration to auditors 0.15 0.22 0.25 0.28 0.33 0.34 0.34 0.35 0.35 0.35
Directors Remuneration 0.15 0.22 0.25 0.28 0.33 0.34 0.34 0.35 0.35 0.35
Professional Charges 0.09 0.09 0.10 0.11 0.13 0.14 0.14 0.14 0.14 0.14
Misdlaneous Eel) 0.29 0.43 0.51 0.56 0.65 0.68 0.68 0.69 0.70 0.70
Total Administrative Exper 1.38 2.89 3.32 3.60 4.14 4.27 4.29
Total Operating 4.38 4.39 4.41
Expenses 6.39 45.47 53.12 57.37 65.72 66.64 66.73 67.33 . 67.43 67.52
(A+111+C+D)
EBDITA 9.61 41.14 48.68 54.26 64.76 68.62 69.03 71.56 71.97 72.37
FINANCIAL EXPENSES: • -
Interest 8.08 16.89 14.91 12.92 10.94 8.95 6.96 4.97 2.98 0.99
E. TOTAL FINANCIAL EXPE 8.08 = 16.89 14.91 12,92 10.94 8.95 6.96 4.97 2.98 0,99
EEIDTA 1.53 24.25 33.77 41.34 53.82 59.68 62.07 66.59 68.99 71.38
less : Depredation 1.45 9.64 9.64 9.64 , 9.64 9.64 9.64 9.64 9.64 e 9.64
PST 0.08 14.61 24,13 31.69 44.18 50.03 52.42 56.95 59.34 61.73
Add: l)Other Income 0.08 0.43 0.51 , 0.56 0.65 0.68 0.68 0.69 0.7 0.7
II)Prellminary Expenses Write off
Profit/Loss Before Taxation 0.16 15.04 24.64 32.25 44.83 50.71 53.10 57.64 60.04 62.43 .
Provision for taxes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PAT 0.16 15.04 24.64 32.25 44.83 50.71 53.10 57.64 60.04 62.43
% of PAT to Turn Over 1.00 17.36 24.20 28.89 34.35 37.49 39.12 41.50 43.07 44.63
Particulars FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 Total
Profit after Tax 15.04 24.64 32.25 44.83 ♦ 50.71 53.10 57.64 60.04 62.43 400.68
Add: Depreciation 9.64 9.64 9.64 9.64 9.64 9.64 9.64 9.64 9.64 86.80
Add: Interest on Term Loan 16.89 14.91 12.92 10.94 8,95 6.96 4,97 2.98 0.99 80.51
Available Surplus 41.57 49.19 54.82 65.41 69.30 69.71 72.25 72.67 73.07 568.00
Interest On Term Loan 16.89 14.91 12.92 10.94 8.95 6.96 4.97 2.98 0.99 80.51
Instalment of Term.Loan .8.54 16.18 15.29 15.29 15.29 15.29 15.29 15.29 15.29 131.78
Total 25.43 31.10 28.22 26.23 24.24 22.25 20.26 18.28 16.29 212.29
Yearly Gross DSCR 1.64 1.58 1.94 '_2.49 2.86 3.13 3.57 3.98 4.49 2.68
Yearly Net DSCR 2.89 2.12 2.74 3.56 3.95 4.10 4.40 4.56 4.71 3.70
I I 9E :0 9E* 0 9E' 00j 9E*0 9E' 0 9E* 0 1 9 E* 0 9E* 0 1 9E*0
12. 00%1 IWCloan interest
I
I
I VE' E 9L' Ej SC E 1 i7L'1E llib.lueeW
0130 A4
MI
1L9' £ j99' E SS' E
1 S C .171 LO' S 90' SI SO' S100'S 661? 16171BT •-17
O• Z
00' E 1 00' E 1 00' E 100' £' OOT rout- 100r [-DY E - 1 00' E
1 .
L yz 1•of t
56' £1 SET
00' E I 75% I IWC ban lim it
I VE* 9 9C9 SC9I17L' 9 L9' 9 199'91SS'9 1 -1TL'
;
L S 1 - r
L z 's I os •t, ' Working capita l gap
I 178' T I
t78'T 1t?S' T I t'rri Itr ir T I birT I178' T
•
•
E9° T ZS .T
'Tota l
.
178' T I I78' T
•
1
...-
179. 1 ItP8' T 178 . 1It E• T I t'81 E9' T ZS' T OE' T 1-1-7 'Current lia bi lities
I
L seamen4ualin31
o
i
.
1
f
.
1
o
1
1_114'8I T9'8 109' 8 8 S .g I TS'S IOS'S I I 6E79 I EE'L. 6 47 9 o rs I I__. . __mil
ZYZj I 6L'Z -1I Bet j - ZCZ- 1 Lez I- 'Others
3NININ
i•
I
.1
•• °8-Z LEL . '1-717A7
1-1
o
rn
fn In
tO N. 1Y1
N re)
T N. Ln
e; 1 ci
re) vi 0
tO N r)
Crt N It
P1
Spare Parts for mainte nance
<6
)0 N re)
) N re)
ni .-; c3
In
N 111 N
CO
•C000
C in Ln °
•
I.
I
•
.
; 1-1
rn
ejl
0) N
i Medicines & supplime nts
e; ..-;
trt leo
0 Tr
vr to
LA
tO N
.
Tr
Co J1
01
ko
4
V)
Consumma bles
N
Current assets
in
4°
N
I
N
14
rr
r4
Months of operation
N
1-1
N
ZZ TZ M I OZAA I 6TM I STAI LTMi 9Tj
Ai STM I VTAl ETM I 'Particular
Working Capita lDeta ils
•
•
••
•
••
•
•
•
•
••
•
•
•
•
•
•
•
•
•
•
•
•
•
•
••
•
•
•
•
•
•
•
•
•
•
S
•
•
•
S
S
••
IIC Ad1 UL AdI 6T Ad
I
.
.
••
L.99. trte6T V
i
1
)
rr) In o
LL1 -
sE o
to v. 1
,•
: ,4 ri 2
•i .,
,„ 0 .... ei o'N
v4 v.1
••• )
1
1
•
0
In
..4 0
v4
CD
r.
cn
4 "I
8 1
ItiL iC ICC Z
L-17LE1
P1 Ifl .-1
LEI---
)
SE'
1
7
01
w -4 cl en6
i up un ••;
1
••
C4 vg r. .4
.
I ST Ad
332.35
r. co
up pr v4
. el co o N r,".
LPL
••
n to
.i
..4 f4 ui t: IA •-1
m
0 IN ;
(4 NI-
a,
.4 0 1-I
I LTM 9T Ad ST M PT M
bC• 6R7
M3 0 03 c^
ri —1 .-n 8 rY
iC Z
0 Cil
0 N 01 ki 0
I-1 0 ..4
••
££'
C'T'AC7
to rd. N vg
CD CO w
in
PI Tf
I9* Z
r: rn C5
0_
cn Mi u)
YD :1 f. It „
..4
I
••
.
G.L7. 40
IEV Z
0 PI 0 0-1 co I
EIZ).
0"
OCT'
01 111 N N " 1
%Ai S'
cn
*1:
0 Is. CT
••
vg VI vg 1
1
11
I
21E311-
35. 60
6:79
I407
T.. „
•t) n 0 vg
rn rn 0 C, cno,
r4 CI
S 4.
c) . 1
Z:°
••
.41rZ r: r: ,0
01
cn (4
• kt) .r CD
T
v4 v4
v4
ME MORIAL HOSPITA
—
I
IEL . T
c si _, r,
cs Ad
up Ir in I
Ar. •.1.71• 10
en r. N
••
CD CD)C2 4 u'
r4 • r: - an
to 1-1 N 03 la of r% r%
vg
1
I
Izz. o
1-8Z' £
••
ZTM
0 CD
r• •
El :i 4
1 c, ;4
v-i • •-n
0 r4 C4
e4 CD t4 CO. st•
„I rs OD N N.
I
mooPin
II
to
in 11, et CO el
••
IA IS ui N ri
,tt to
1
P&L
.
••
Existing Unsecured loan from Members
Deposit From Directors & Members
Total
••
Spare Parts for ma intenance
PyenvItini . . .
••
Tota l Gross Block
sauri'gem
Gross Block
ASSETS
Capita l WIP
••
Term Loan
PATfrom
NetBlock
I 1
SJOUlril
.0
to 1
11
••
1;
.L
•
••
•
•
Ls• ssr r-011536z ZtetrtaZ IrEir ar SO'Strt OVOOT ILL-C9 •
09•SE 13Z'WT ST'L qs e
LL' 9S SE' 17S z6I S _Lt.t.• L t. IS 6 ' i7t7 LV9Z I ZE' LT I tPrIT SI' L
'Cashflow
c0.1 I- VS11 mod
188. 01
T0'0
r.
0
6
14
N
ch
Total
It
46
m
a
•4
co
1
44.
cl,
N
i
WCloan
^
.s- ...d.
Current liabilities
.
V3 0
o; o
•S 0
CA 6
m6
o; 6
1/40 '0
0
V3 r•I
`g! ''
N
at 6
S Pli
<A 6
co to
W N
0 0
r: .4
Depreciation
1:1-
a
rEtr9 I VO'09 tVLS I Lov es I ICO SI cal70 S Z' E • 1 to I 1,0' STII 1— OL' Z I 1W'
I I 00 . 0 II00' 0II00. 0 00' 01 efitro-1 oo' oIP --15071-3--1 r— ' Foreig n loan
13.00' 0 II00' 0 00' 0I
6Z' S T- I 6Z' ST- I16V91- FTT17"*T-1
121. 07
6Z' ST- II 6Z
'Term loan
LfirST- I 6Z' ST- I L6Z' ST-
0J o 1' 1+ II 9 E1 9 I siagui
Equity Share Capital &Deposit From Me
I 'CZ AiIr.0X ,AdI 61: AdI STAdI LTAd 9IAA I ST A.4I AA I ot Ad :iI Z't I smog
n1 et.211,1.3.p7;,.!'i. --r&"1.1 eln-111$144
....
:
171/TIPM•MMR1.1
)•
1 ••
1••
Selling General & Admn Expen 2.89 3.32 3.60 4.14 4.27 4.29 4.38 4.39 4.41
Interest - WC -
Interest - Term Loan 16.89 14.91 12.92 10.94 8.95 6.96 4.97 2.98 0.99
Others )i,
•
► •
Difference in stock
Total 72.00
-
77.68 79.94
- -
116.30 85.23
-
83.34
-
81.95
-
80.05
-
78.16
• Fixed Cost 45.30 46.47 46.27 .77 46.23 44.29 42.59 40.65 38.71
••
Variable Cost 26.70 31.20 33.67 + .53 39.00 39.05 39.35 39.40 39.45
Contribution 59.91 70.60 77.961 .94 96.26 96.71 99.54 99.99 100.44
Operating Profit . 14.61 24.13 31.69", .18 50.03 52.42 56.95
; 59.34 61.73
Profit 15.04 24.64 32.25 .63 50.71 53.10 57.64 60.04 62.43
Break Even sales 65.49 67.01 66.25 ..79 64.96 62.17 59.43 56.67 53.91
Break Even Sales (%) 75032% 65.83% 59.35% 95% 48.02% 45.79% 42.79%
-
40.65% 38.54%
Cash freak Even 51.55 53.11 52.44 .10 51.41 48.63 45.67 43.22
.
40.48
Cash Break Even (%) e 59.52% 52.17% 46.98% % 38.01% 35.82% 33.10% 31.01% 28.94%
NO r Sti
)
•
4N
IF DECREASE IN SALES BY
Contribution
Fixed Cost
5.00%
56.58
45.30
65.51
46.47
'TS4
72.36 •.42 89.50 89.92 92.60 93.02 93.45
•
46.27 .77 46.23 44.29 42.59 40.65 38.71
Variable Cost 28.70 31.20 33.67 53 39.00 39.05 39.35 39.40 39.45
I Break Even sales 67,06 68.61 67.79 '.32 66.37 63.52 60.69 57.87 55.05
Break Even Sales (%) 81.30% 70.77% 63.77% ,78% 51.52% 49.13% 45.88% 43.59% 41.32%
Cash Break Even 58.34 60.09 59.x1
•
. 1.15 .s. 58.05 54.91 51.89 48.79 45.69
Cash Break Even (%) 64.00% 56.08% 50.47% r ' • 2% 40.77% 38.43% 35.49% 33.25% 31.02%
)
IF INCREASE IN VARIABLE COST BY
5.00%
Contribution 58.58 69.04 76.28 90.02 94.31 94.76 97.57 98.02 98.47
Fixed Cost 45.30 46.47 46.27 4797 46.23 44.29 42.59 40.65 38.71
Variable Cost 28.03 32.76 35.36 .46 40.95 41.00 41.32 41.37 41.42
Break Even sales 68.98 68.53 67.71 .24 66.30 63.45 60.63 57.81 54.99
Break Even Sales (%) 77,34% 67.32% 60.66% 7% 49.02% 46.74% 43.65% 41.47% 39.31%
Contribution
5.00%
59.91 70.60 77.96 96.26 96.71 99.54 99.99 100.44
Fixed Cost 45.30 46.47 46.27 .77 46.23 44.29 42.59 40.65 38.71
Variable Cost 26.70 31.20 33.67 •.53 39.00 39.05 39.35 39.40 39.45
Break Even sales 65.49 67.01 66.25 .79 64.96 62.17 59.43 56.67 53.91
•
Break Even Sales (%) 7.5. 65.83% 59.35% 5% 48.02% 45.79% 42.79% 40.65% 38.54%
Cash Break Even 53.11 52.44 .10 51.41 48.63 45.97 43.22 40.48
Cash Break Even (%) 52.17% 46.98 % 38.01% 35.82% 33.10% 31.01% 28.94%
f a
•
•
••
•
•
•
•
'
•
•
S
• Sensitivity Anolvsis
S
• Table - XV-IX
• Decrease In sales by
• 5.00% 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total
• Net Sales
Term Loan Interest
86.61
18.89
101.80 111.63
14.91 12.92
130.48
10.94
135.26
8.95
135.76
6.96-
138.89
4.97
139.39
2.98
139.89
0.99
142.52 979.83
•
- 79.52
Decrease in sates by 82.28 96.71 , 106.05 123.96 128.50 128.97 131.95 132.42 132.90 135.39 930.84
• Difference 4.33 5.09 5.58 6.52 6.76 6.79 6.94 6.97 6.99 7.13. 48.99
• Cash Accrual 24.68 34.28 41.90 54.47 7 60.36 62.75 67.28 69.69 72.08 63.25 415.41
• Aci Cash Accrual 20.35 29.19 3622 47.95 .59 55.96 60.34 62.72 65.08 56.12 366.41
• T.L.Reypayment 824 16.18 15.29 15.29 15.29
•
15.29 15.29 1529 15.29 0.00 116.49
4,,,
Net QSCR 2.38 . 1.80 2.37 3.13 .V, 3.50 3.66 3.95 4.10 4.26 ODIWOI 3.15
• Gross DSCR • 1.46 1.42 1.74 2.24 7 2.58 2.83 3.22 3.59 - 4.06 ODIV/OI 2.28
•
• Increase In Operational cost by
5.00% 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total
• Net Sales 86.61 101.80
• 111.63 130.48 135.26 135.76 138.89 139.39 139.89 142.52 979.83
• Operational Cost 55.11 62.76 67.02 75.37 76.28 • 76.38 76.98 77.07 77.17 73.56 566.96
• RM cost Increase by 57.87 65.90 70.37 79.14 80.09 80.20 80.82 80.92 81.02 77.24 595.31
• Difference
Cash Accruals
2.76
24.68
3.14
34.28
3.35
41.90
3.77
54.47
.3.81
60.36
3.82
62.75
3.85 3.85 3.86 3.68 28.35
63.43
69.69
65.83
72.08
6822
63.25
59.57
415.41
387.06
40
• T.L.Reypayment 8.54 16.18 15.29 15.29 -' 5.29 15.29 15.29 15.29 15.29 0.00 116.49
• Net DSCR 2.67 1.92 2.62 3.3 3.70 3.85 4.15 4.30 4.46 #DIV/0l 3.32
• Gross DSCR 1.63 1.48 1.82 2.35 .70 2.96 3.38 3.77 4.25 #DIV/01 2.38
1••
• . '
•
• •
•
DSCR & Margin of Safety
DSCR STATEMENT
Particulars FY 13 FY 14 FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 Total
Net Sales 86.61 101.80 111.63 130.48 135.26 135.76 138.89 139.39 139.89 1,119.72
Sources
Cash Accrual 24.68 34.28 41.90 7-64.47 60.36 62.75 67.28 69.69 72.08 487.48
TL Interest 16.89 14.91 12.92 410.94 8.95 6.96 4.97 2.98 0.99 80.51
Total Sources 41.57 49.19 64.82 4 65.41 69.30 69.71 72.25 72.67 73.07 668.00
Obligations
TI. Instalment 8.54 16.18 15.29 15.29 15.29 15.29 15.29 15.29 15.29 131.78
IFST Loan Repayment
-
Total Repayment obligation 8.64 16.18 15.29 16.29 15.29 16.29 15.29 - 15.29 15.29 131.78
TL Interest 16.89 14.91 12.92 10.94 .8.95 6.96 4.97 2.98 0.99 80.51
Total 25.43 31.10 28.22 26.23 24.24 22.25 20.26 18.28 16.29 212.29
Gross DSCR 1.64 1.58 1.94 2.49 2.86 3.13 3.67 3.98 4.49 2.68
Average GDSCR
Net DSCR 2.89 2.12 2.74 3.56 .3.95 4.10 4.40 4.66 4.71 3.70
Average NDSCR
;,.
MARGIN OF SECURITY
Particulars 31.03 2013 2014 2016 2016 2017 . 2018 2019 2020 2021
WW1 of Fixed Assets 119.57 169.92 160.28 , 63 140.99 131.34 121.70 112.05 102.41
TL Outstanding .123.25 107.06 91.76 7 61.18 45.88 30.59 15.29 0.00
Margin 56.31 62.88 68.51 6 79.81 85.46 91.11 96.76 102.41
Security Margin (%) 31.36 36.99 42.76 3 56.61 65.07 74.86 86.35 100.00
Average Security Margin (%) 60.36
,....
•
•
1 ,
_
II 9L'ZL 1 89'ZL LI19'ZL 1sort 1.0' ZL 1£Z' 1.L 1 Ztf*Z9 I W69 zrzs 1 9te9 16V9 pz•9 telorqns
(ssepoid-ul-wpoisSuluedO:aay IIIA
I
.
I
.
9 Jzz•z9 I 9t e9 16£'9
SUB TOTAL (ITOVI)
11 9CZL Erazt J 09'ZL 1 60'ZL 1 1.0'ZL. 1ertt 1new 1 W6 prs !F
A
t4 6
11 1,9'6 1111'6 • I P9'6 I 1,9'6 1 19 '6 I- 49'6 1W6 1,49'6 1 M .° two uosepeud ea YA
1199'61 1 L9'61. J L•61. J45'61. 1 £T6 1. 1 617'61. 19 1'L1. [abysm. occ i. z£1) [Wo I LZ'O __ 1 sesuecbc3 'kw 16410 IT;
(ProfessionalFees)
111.rti. J
1gytt 90 L'. 0E9 1. J 49' 9 1 1SO'91. 1 CL'a 1zsz t J scyz 1 -Lys 1 642 Direct labour 'I
PT!
110'.'Z 160'Z J vozJ cot 1 96' 1 1 L9' 1. 1cs' i. oc' t1,x:0 iwo1 8E *0i
Power and fuel
11ettrz 1 zrsz jzz•vz I tvsz 9117Z 1
60'n ortz 1 9E 61. Z6'91. o ca L9' 1 ez. 1
1 1 snoueEipul(q)
E
i--
1 _ Paltotiwl
11ez•trz 1zz'sq zz-vz LL'tz 91.3,Z I 6017Z J J 9L'61. 126'91. ocyz LTI. 1 en. 1 1 modsJets()
1 snoueeipul(q)
Iin the process of manufactureL _
papadaa (a)
/w e
I stores and other items used1
I
I m
a
., .
I
-
LammialiaLbi -NPORIABSWItu meu
—.
tiaraI
10
7 (pesaenuue)meat
I SI/COIL°of 09iedUle° "182 1
U 9£'0 1 9E•0 1.E'Z L£'0 I135.76I I99£ 1 99'91 1 99'6 1 1,211. 190E31,41 13Z ZteLZ 101) 01(-)1181 •10 (+) 041868 961
I 9r5£1 1woe'. 1 £9' 1 11 1 09' 10 11119'98
Net sales ( item 1 - item 2 )
11 69'6£1 6£'6£ 1 6933£1 00'91 1 OS'ZI 1.9"6
*0
I 139.39I 1 39.89I I I 135. 78 1
69'm.1
130.48
9z•sei. 1£9' 111 1 09' 1.01 I 19'99 dot !.1 os'z i. 1 tW6 . lulo.L
92189Po:hal
I135.78 eutoota°mane*
138.89 I 130.48 I
11891E116£'6£1 19Z'9£1 1tom 1osr1 01 19'99 ram1 oszt 1.9'6 I feirS 044GWOO
11 zi 1 it 01. 1 I 9 II s II 1F z 1 I 'I. 19,7110E6161 5-1
fl•(ad Ilad lad 'raid I • 1 lard . "fad etewns31 llpneun pampav I
II LUZIOZOZ 61,0Z
r
1 gLoz1 L1OZ 9102 stoz atoz OI,OZ zit:1z1 tozI () in1
yoJewIs m buipue
, I
saiwo l NIINnoriv
ttealsI
FORM I I : OPERATING S TATEMENT I
1 ASSESSMENT OF WORKINGCAPITAL REQUIREMENT
—..—
—•
•
4
'•
0
0
•
0
•
C
I•
9
-
0 14. N CO O
0 CO
a. N 0 8
0
ID co 8
8 8 8
O
a.
g g
40 T-
N
W ID
0
U)
z8
U)
03
•r•
0 22 O O O
r- <6 0 to O 0
r O
N ri ri
O r.- 00 03 co
oi ‘47 ! 0 N CI) co
sr F, 00 03 0 rZ
v 8
• 0 ' 0
U)
CD t••• V.•
• In 0
ID
0
ID0 07
R' 4 0 Cq
N
1• 8 g8 co
0;4
a•
N 0 8
CI;
oi 171 17.1
N
O O O a
Cs1 8
•
R
s CD
CO
CC!
ID 0 O 8 8
O
3 .4D co co co co co
ID d O O
O 8
O O
91—
0OY g." 41
O
I-
O ID O CD O r (71
N 0 ;3:
13' co co O
O O co INO co
gr. U) U) O
1
0 0 0 0 CR O co CO
0 0 0 0 O 8 .G
O
0
C I I ID
I
a a
a
O
a
c
I 1
a 0
0
g
cr
a
3 cb g co 0.
O
Tc 0
co 0 •••
1ff N U) co CO
1M,
TOTAL LIABILITIES
aly WINS SVZCC 'OHM e1VW Leta 9970Z 9C• 9 1 Zrot 99'8
MR
9 Off OLPLC
- •
NET WORTH
VeV91, 00701, 0711 MAN LS' t CZ 0•09t MVO ZZTO1 BOIL 90.59 CO'S) , 68t
(114) selgMlx.1 WINK
g:
1 V11033V1101
-
1
169'0E SZ'CZZ - Watt IPPo1 roc
C. 1:0S Iwon
I 1 CCM 9C11, een OL•
l I "
I
ii/I
/I gi
11
Ce•" COW WV I CO94 CV OS COOP 191f CVO CrIlt .S97 Z1,7 •
r os l
t. Dot
I OSL I Doi ooL
I 09 L On
I ool 1491 1 I eatr ali•JileJ 11.101190
1 I
I 11'0
0 IIV PunA atilPIne /*/••=1•11€113
s-
1
COS COS
'
Mae
co 1 CS 'S COS CS S WS
1 1 CS'S CSS
t
I £9.
[coo
I
TOTALOUTSIDELIABILITIES
swissMAP kluIRIC)
FLUJOM 13N
Lae
901'9 CC"9L Ot•e6 69.901 OCIZI
'St
TOTAL TERM LIABILITIES
09'0C 6WW 61' 19 9E9L LL16 90701 (Wel l Unseats Loans from DIrestorsfirds
OVANICIVI1 VISOI
$13005 MAO
usoisistpssifun 15;1
I
(smAtwoupo*
NIP slowIlInstg ROPIlloss) R
WINOWNW°olol win
Fl
.
I
01 1 (001O I an t 6SVC I gin, 91: 19 LY9L I I 9116 L(1' WTI I. 1 091 I 697
OKA soo4gaMOINE
iweutlnw6111011PX0)111111011111)1 CL
1111111111 .7.11'
li I
111 II i I C*
oots aNO waA,
pololoV) snstIMMNI
Cauroovn Wan
rI. •
33
11
1141
50'01
n
.....
1,'4%.A7•t
RR
V. I
V .
90'01 11;
_,..
..
.
1 4
1 I
wyt,enpnwstunforo4oC99040
. .
,
t ern WS& W'St WV!. 671St ors' ern. too 69'0 69"0 upsnownouppoosai
.
-
(am otiomot ank
I,
MINN trtIonIMISmt901
='..-omiesoopowal
. ,
I
11819•PuOOy NPORIPM•o91
I
CI VI *
W. I I WI I VW 591 I 58' 1 C91. I ZO1 I OC' t I 093 09. 96'0I
two wog snontnuoqMalBotIS I
TV101 ens
0
I
.
.
oa Vdo woos)O
8:9180 WOM (1)I
el Lt II
16101
.
tag I WM I
d
1110Z
fd
LLOZ I !HOZ 1 nozI
saicuoi
Yl nu noz I I tifsnsta rt
IIOZ
NMMSIIf99an, SV
I I
anf.LS Si
• •
•
332.35 374. 70
s.tse 91139Z
212.31
BelIZZ 99• 0Z 99'291
dad
8S
► (00+1 1.410010313SSV 1V101 Cr
4d11•/440211 Pram PVIanaP
Nag '4•144480r8414.10 161M400
•
42 Intingible assets (ostar44,
I I 41 TOTAL OTHERNON•CURR. ASS
.
PTO ro n
luope4aum;w !Wel
I
I -pulNom 4mu1s4Jou4480 1001
7 •OJOIBt St
111018P0041 0
.
.
.
.
.
101UOU1 944440443 (r) •111410(0)
(00( OLIO Sums=
I /4144441)♦ •y4• 44:04pentox81I
siop•nuaospacemen
.
.
?a 814803114 483a4,43.f
•
.
411414148114u14490 (0
switiario5
4.00000 ul 11001.0401 (. (I)
00101
POMO IOU eatp4y4model)
4 , .
cd d gd
•
3
%a as o
1
gi
li
n SI II
°i
..... woe'
8S
ei 4 N SS
SV
14a
SS 3 8
£198 1.1,'
10181. LTL61. El.& 16 17— .
^5
a rsw
E.
e.i
X8
ci g
.8.4 8-
2 S1A
Ng
•-. Et
2a
N?
"4 8
•• 'ZS
j`288
•4 o 1 of
c• SV
..; ol
0: 28
,
03
Pi
N
.1:-:
lal l'I
1.,7 SRI I
i pji Ili!!
am Si
iii I
Ili
I I
.
L5 b
4
1,11- 18V 08V OBI I GCS (11V I sty 1 101r I zee I naisopi(q) . II
osuoclui (4)
j
i
14V
a jt
103 09'S OWS 01 V SL't 201, LLZ
I
‘- .
• ci
psuoiaii•i
• 4444
MOW OUIP01008001001 MOW)
"Pa
:1;
g...1
1:n
:6400001 OC
CJA WO W (04 01111)008w4•34,
MASS P 41118118418111
V• 011A00•11•1011pp
pinpesson0 • 9)q
.
4441i314)8441•44404ilh01243 (10
WAS AO0.9I11031110
Pas 1144111111341011818
0113120 •104388 7pump,
1.1411 .14140 44111•41•3481 80
11118 91191•41/03.3•130034
ir4
IA
AP A
Ig, si
igr4
11`"
0311•1•0 *maPIH1/4•0 SZ
'a!1
a
&USW
IS
somuol
.1 1 I
14044ni 14141 V MINS M
19IS *WWI
p.
b.
It
C
to
•
014-
•
di
i
—
lill
I
• D FINANCI L INDIC Tom I.
M on 31st March
I
Rs 1 Crone
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Particulars Audited Unaud m Pro). ..P • P Pro. P P•. P• P•.
Domestic Sales (Gross) 9.81 12.50 16.00 86.61 101.80 111.83 130.48 135.28 135.78 138.89 139.39 139.89
Export Sales 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net Sales 9.81 12.50 16.00 66.61 101.80 111.63 130.48 135.26 135.78 138.89 139.39 139.89
% rise/tall () in net aides 0.00 27.42 28.00 441.31 17.54 9.66 16.88 3.66 0.37 2.31 0.36 0.36
Operating Profit 0.52 1.20 0.08 14.61 24.13 31.69 44.18 50.03 52.42 68.95 59.34 61.73
Profit Before tax 0.60 1.31 0.18 15.04 24.84 32.25 44.83 50.71 53.10 57.84 60.04 62.43
PBT/ Sales (%) 8.12 10.48 1.00 17.36 24.20 28.89 34.35 37.49 39.12 41.50 43.07 44.83
Profit After Tax 0.60 1.31 0.16 15.04 24.64 32.25 44.83 50.71 53.10 57.64 60.04 62.43
Cash Acaual 1.47 2.14 1.61 24.68 34.28 41.90 54.47 60.36 62.75 87.28 69.69 72.08
PBDIT 2.1 2.72 9.69 41.572 49.192 54.821 85.406 69.30295 69.70745 72.25367 72.66817 73.07267
Paid Up Capitel 0.53: 0.53 5.53 6.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53 5.53
TNW 1.87 3.18 15.73 30.76 55.39 1 87.65 132.47 183.18 238 29 293.92 353.98 416.41
I Adjusted TNW
TOLANW (times) 2.44 p
13.18
1.29
15.73
7.84
30.76
4.05 1.98
187.65
1.07
132.47
0.59
183.18
0.34
236.29
0.20
293.92
0.11
353.98
0.05
416.41
0.00
Adjusted TOL/TNW 2.44 1.29 7.84 4.05 1.96 1.07 0.59 0.34 0.20 0.11 0.05 0.00
NWC 0.13 2.13 3.11 8.130 25.58 52.18 91.36 136.42 183.87 235.88 290.25 362.33
Currant Ratio 1.07 1.93 1.31 1.38 2.52 4.08 8.33 8.96 11.73 14.78 17.94 197.46
TTUTNW 0.67 0.30 1.77 1.35 0.88 0.56 0.34 0.20 0.11 0.04 0.00 0.00
Current ratio without 71. repay 2.04 3.16 8.77 18.50 27.91 42.48 58.83 83.26 108.99 137.18 188.87 197.48
TOUTNW greeting USL as 1.14 0.68 1.92 1.58 1.05 0.89 0.43 0.27 0.17 0.09 0.04 0.00
• mull Eciu5V) - '
Net Sales ITTA (imes) 1.15 1.24 0.09 0.43 0.48 0.49 0.50 0.46 0.41 0.37 0.33 0.30
PBDIT 2.10 2.72 9.89 41.57 49.19 54.82 85.41 69.30 69.71 72.25 72.67 73.07
EFFICIENCY RATIOS I
2010 2011 2012 2013 201 2015 2016 2017 2018 2019 2020 2021
/ Particular Audttiid Unaud =11=111MTICEJE Pro. Pro. ICICFMNIMIMBIGLITIZ
0.09 0.43 i•i 0.49 0.46 0.37 0.33 0.30
I
Net Sales/ Total Tangible 0.50 0.41
9•
1.T5 1.24
Assets (times)
PST/ Total Tangible Assets (%) 7.02 12.94 0.09 7.38 i 14.06 17.30 17.22 15.98 15.38 14.31 13.38
• Operating Cost to sales (%) 94.70 90.40 99.50 63.13 78.30 71.61 66.14 63.01 61.38 59.00 57.43 55.87
Bank Fi nee/ Ct. Assets 0... 0,00 0.00 0.00 0.00 49.00 0:00 0.00 0.00 0.00 0.00 0.00
1n
"
Illri
I Receivables to net Nil 1.17 62.05 17.15 n ;..; 16.66 16.18 15.64 15.59 15.26 15.21 15.16 1
I Safes (dna)
No. PBDIT 2.10 2.72 9.69 41.57 49.1 54.82 65.41 69.30 69.71 72.25 72.87 73.07
• I
I 1=1 Wu acts 1013 1014. sous 2016 2017 2010 20111 2020 lireinill
I
I Current Ratio 1.99 2.51 1.70 1.79 2.90 4.08 6.33 8.96 11.73 14.76 17.94 197.46
I
I
TOUTNW
PEIDITAINTT.
PAT/NET SALES
2.44
IKIEI
1.29
10.48
7.84
1.00
4.05
17.36
1.07
28.89
0.59
94.35
0.34
37.49
0.20
39.12
0.11
41.50
0.05
43.07
0.00
44.631
ll ROCE% • a I
I INV.+RECJSALES • AYS 1 82 17 17 17 16 16 18 15 15 151
ft
lOther CL to TCA (%)
1 1. 9 0 89'9 IC9' 8 11
9 108• 9I. I6t+'PZ 199' 6E 10 9 ZL les.9L 11819 I10g T6
loo.o I loo.oIo n I
[BankFinance to TCA%
loo.o 0 0 '0 1
1617'66 1217'176 I CZ*E6 ILY 1.6 171313 11.9'9L IPE 0 9 lova latz16 1.'8t,109'9 I NWC to TCA (%)
ol d I--
'fold I-load•12.1d laletuns3 Im pn eu n PailPnV
I load I•oaci Iloa d I load 1 sieino we d1
1tzoz Iozoz 6102 Iet.oz Ictaz I9102 gioz IplazIcioz Iz i.oZ 1 Roz 1 o i.o
Loo.o rWV- 1 000 oo•o 0 00 00'0 00'0 00'0 00'0 90'0 Ioo.o 00'0
IS. Cr. To purchases (days)
00'0 00'0 I00.0 00'0 ovo oo.o 00'0 00'0 00'0 00'0 00'0 e 00'0
IRec. to gross sales (days)
krgi
RIP)Pt8Net sales (days)
Z'91. 9f1 9'9 1 -T91., L'91. '1.4141 Z
10ther CL to TCA (%)
— 1 90'9 191 96'6 0 1.171. 1;ZZ 80'9E 6119 £61,9 17 1'0 2 09'1717
IS. Cr. To TCA (%)
t.9*0 09'0 EL'O Z6'0 OL' I. 9E' Z 99'E OP'S 14,14I LWL E 00'617
rcw(77) 00'0 00'0 00'0 0 00 00'0 00'0 00'0 00'0 00'0 00'0 00'0
I Bank Finance to TCA %
I NWC to TCA (%)
617'66 Z171,6 ETE6 L4' 1.6 178'88 ori'8 19'9L 17E'09 OVLZ L.TEZI 61;8t, 09'9
ova.1 00'0 00'0 00'0 00'0 00'0 00'0 00'0
▪
ran 00' 0 oo.o 00'0
I AssessedBank Finance
ci..z
j)
INetWorking Capital (Act/Pro
E' Z 9 £ 9Z*06Z 98'9EZ IL.8* E8 1. Zt,'9£1. 9E' 16 L'Z9 89'9Z 09'9 WEI £1'0
Notting CapftalGap
EVZ9E 9 Z 06Z 911.9£Z
• 11.'L
Z17'9E1., 9£' 16 81;Z9 89'9Z
•
WE El'Z PIREM IOther CL(ExceptBankBorr. )
1r8 tr " t4.1 1. 17 1.11.' P VC 1. Z6'9 4 18'91.• Stoll PO 01. 6Z'Z /k r
811,9£ 0 00 t9Z 0 0Z 99t91 09'801 01'69 6E'Z1P 60'n 91.'E L zp.t, 00
ITotal CA
I r fad I Audited IParticulars
load load d d loa d d d d laleums31 l!PneUnI
izoz OZOZ 6102 8102 LIOZ 9102 91.0Z noz E1OZ Iaoz 1102 0 1 0Z
S9J0J0 111
r qoaegy is le uoay
.
IABFASSESSMENT
.
INP %%NIP it 4Pet 9 %%P P I !AO%Ad' I%%IV itMiPit %%PO 11 lIAPS
• • • • • • •••
°
urn ,
MIII111111111111111 11111•11•1
Ill UND FLOW ( • . I • NM
1 As on 31st March
,
AI /11111111111110 Rein Croros 7-
1 . 111 ,
Ep ooe
2016
..*4$$ $$$
W ....IM( 2012 2013 2014 1 2015 • 2017 201 2021
SOURCES Audited Una Estimate Pr,* Prot .. end. Proj. Prot Prot 171. .._
a. Net Profit (After Tax) 0.60 1.31 0 16 15.04 24.64 402.25 44.63 50.71 53.10 62.43
' 5.52 0 145 9.84 9.64 - 9.64 994 0.64 9.54 994
1] .
! e hems. in Capital 11113111MEM 6.00 0.00 0.00 1-- . 0.00 0.00 0.00 0.00 0.
Id. increase In Tla Ind.a_c d • • 0. 111.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MIN --
0.e z
I. Fixed ,?.. • 0.00 ME_ TrtA 0 00 0.00 0. . 0.00 0.00 0.00 0.00 0.00
1.1.5-1•,,....„.x•.t. ent Peseta 0.00111111141111 0.04 0.00 0.0 _ 0.00. 0 00 0.00 0.00 0.00
•
Others MC11E:El 52.87 0.00 0.00 • 0.00 0.00 0.00 0.00 0.00
R
j.. Total BIEEECONIFLa 170.98 24.88 34.28 41.90 5 60.36 6 72.08
al MINI
ggs kt g
1
rr
!!
0
$g
cid
X88881^$
d tri- 000014
SA888 $g
a. Net Loss 0.00 0.00 0.00 o• • 0.00 0.00
, .k
11$$$$$
aeo e .a
,I -
, Dee in Term Uab. Ind. Pub . . 0.00 0.00 8.18 , ,15.29 15.29
_„,le. inaease in MIN
888 88
00000
0000.4!
ril Fixed Assets EiECEI 170.00 15.00 0.00
ECM 0.00 0.
ail
O
3
sz0 ;
t
NO -14
Proj.
id
221 WS8
.AR 0si$3
39.15
$4$$ § 8
3 ; 0 3 00
..j • Tann - • • - 0.15 3.49 18.98 28.60 47.45 72.08
UI
58.78
"0. 9.