Você está na página 1de 1

REPUBLIC OF THE PHILIPPINES

D.E.P.W.
OFFICE OF THE BUILDING OFFICIAL
CITY OF CEBU

RECOMMENDING APPROVAL:

BARS SPACED @
0.40m O.C.
APPROVED BY:
6" CHB PARTITION
WALL PLAIN CEMENT
FINISH BOTHSIDES
BLDG. OFFICIAL DATE

NGL

SPACED @ EVERY 2ND

750
CHB LAYER

(VERIFY ACTUAL)
BARS SP. @ 0.25m.
REST @ 150mm. O.C.

250
CONTINUOUS BARS

50mm. THK.
1750 500 COMPACTED
GRAVEL BEDDING

TYPICAL WALL FOOTING DETAIL


SCALE 1:30MTS

0.10m. THICK LEAN


250

CONCRETE BEDDING
250

1600

250
250 BARS SP. @ 160mm
O.C. BOTHWAYS
250

STIRRUPS SPACED 5 @ 50mm O.C.,


REST @ 150mm O.C.
1600

TYPICAL TIE BEAM DETAIL


SCALE 1:20MTS
250

F1

250
TYPICAL COLUMN & FOOTING DETAIL
SCALE 1:50MTS
150mm. O.C.

COLUMN DETAIL FOR GATE POST


SCALE 1:20MTS

DESIGNED: CHECKED: RECOMMENDING APPROVAL: PROJECT TITLE: APPROVED AS TO PLANS & SPECS: APPROVED: SHEET NO.
REPUBLIC OF THE PHILIPPINES
C E B U C I T Y G O V E R N M E N T
OFFICE OF THE CITY ENGINEER PROPOSED CONSTRUCTION OF INAYAWAN
DEPARTMENT OF ENGINEERING
AND PUBLIC WORKS LANDFILL PERIMETER FENCE II
3RD FLR. YUTIVO BLDG. JAKOSALEM ST. CEBU
ENGR.JONATHAN L. TUMULAK, JR ENGR.NILO C. IGOT ARCH.ELEAZAR R. LIPANG ENGR.JOSEFA T. YLANAN 03 03
CITY
ENGINEER I,DEPW OIC- ASST. CITY ENGINEER, DEPW HEAD, PLANNING & DESIGN DIVISION LOCATION: INAYAWAN, CEBU CITY OIC-CITY ENGINEER, DEPW CEBU CITY MAYOR