Você está na página 1de 14

Set Up for Cabling Page 1 of 14

Exercise: Set Up for Cabling


Before you begin Hide/Unhide

Training Files:
Download the training files using the button below, if you have not done so already.

Download

Procedure Setup:
1. To avoid naming conflicts, it is recommended you save your work, click File > Close until no models
display, then click File > Manage Session > Erase Not Displayed.

2. Click File > Manage Session > Set Working Directory and navigate to the PTCU\CreoParametric2
\Projects\Cabling_Manual-1 folder and click OK

3. Click File > Open and double-click ELEC_CABINET.ASM.

Scenario
Piping and Cabling Systems Incorporated (PCSI) is a supplier of fluid and gas piping systems to many industries.
It designs and manufactures fluid and gas piping systems, including the associated electrical control and cabling
systems.

You work in a cross-functional team of engineers involved in the design of electrical harness systems. You are
working on a new manifold piping system, which involves the design of wiring diagrams and the design of
associated electrical harness designs that form part of the manifold control panel. This project takes you through
the activities associated with the development of the wiring diagram and the design of the electrical harness.

Task 1. Inspect the electrical cabinet assembly.

1. Enable only the following Datum Display types: .

2. Notice the electrical control modules and meters inside the electrical cabinet.

3. Notice the red emergency button on cabinet exterior, as well as the red, yellow, and green lights.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 2 of 14

Figure 1

Task 2. Create the cabling assembly structure.

1. From the view manager, activate the Cabling simplified representation.

2. Orient to the 3D_CABINET view orientation.

Figure 2

3. Create a new subassembly named CABLING.ASM using template file MM_KG_SEC_ASSY.ASM.

Figure 3

Assemble the CABLING.ASM sub-assembly using the Default constraint.

4. Activate CABLING.ASM and create a skeleton model named CABLING_SKEL.PRT using the
MM_KG_SEC_PART.PRT template file.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 3 of 14

Figure 4

5. Activate the CABLING_SKEL.PRT and insert a shrinkwrap feature.

Figure 5

Set the referencing type icon to External and accept the Default placement.

6. Specify datum coordinate systems PWR, MOUNT_5, MOUNT_2, and all eight of the submodel COMP*
coordinate systems as datum references.

Do NOT complete the shrinkwrap feature yet.

7. Continue the shrinkwrap definition by specifying the three ROUTE datum axes as references, as
shown.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 4 of 14

Figure 6

8. Edit the shrinkwrap Quality Level to 6.

9. Ignore the CABLING.ASM assembly from the shrinkwrap feature by disabling the subset option for
CABLING.ASM.

Figure 7

10. Complete the shrinkwrap feature.

Click Subset from the dashboard and clear the CABLING.ASM check box.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 5 of 14

11. Open the CABLING.ASM assembly in the Master Rep, expand the skeleton model, and hide the eight
datum features in the model.

12. Orient the model as shown and create a view orientation named 3D_1.

Figure 8

13. Orient the model as shown and create a view orientation named 3D_2.

Figure 9

14. Create a new layer named CSYS_ASSY-REF.

15. Include coordinate system PWR on the layer.

Click New Layer to place the external item on a new layer.

16. Expand layer CSYS_ASSY-REF and add the remaining 10 visible coordinate systems to the IN
CABLING_SKEL.PRT sublayer.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 6 of 14

Figure 10

17. Create a new layer named AXES_ROUTING.

18. Add datum axis ROUTE to the layer.

Click New Layer before placing the external item.

19. Add axes ROUTE_1 and ROUTE_2 to the layer.

Select the existing layer AXES_ROUTING for each and place the item.

20. Hide the AXES_ROUTING layer.

Figure 11

Be careful to add the datum axes to the layer, not the datum axis tags.

Task 3. Assemble the connectors and components to the cabling assembly.

1. Assemble the POWER_BOX.ASM assembly to the PWR coordinate system.

2. Assemble the RELAY.ASM to the MOUNT_5 and MOUNT_2 coordinate systems, respectively.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 7 of 14

Figure 12

Right-click and select New Location to place multiple instances of a component.

3. Assemble the CONN_2_L.PRT to the three coordinate systems under the green, amber, and red
lamps.

4. Assemble the CONN_5_EB.PRT to the coordinate system under the red emergency button switch.

Figure 13

5. Assemble the CONN_9_CM.PRT to the coordinate systems on the two green modules.

When viewing the model in the 3D_2 view orientation, use New Location to assemble to the
green module on the left first, followed by the green module on the right.

6. Assemble the CONN_2_MS.PRT to the two coordinate systems on the sides of the brown manual
switch.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 8 of 14

Figure 14

When viewing the model in the 3D_2 view orientation, use New Location to assemble to the
coordinate system on the left first, followed by the coordinate system on the right.

7. Hide the CSYS_ASSY-REF layer.

8. Save the layer status.

Task 4. Manually designate the connectors.

1. With the CABLING.ASM assembly open, switch to the Cabling application.

2. Orient to the 3D_2 view orientation.

3. Manually designate the following reference designators to the following connectors:


◾ L-01 to the red lamp connector

◾ L-02 to the amber lamp connector

◾ L-03 to the green lamp connector

◾ SW-01 to the large red emergency button connector

◾ MS-1 to the connector on the left, on the brown switch component

4. Rename the REF_DES column of the Cabling Parameters appropriately for each connector.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 9 of 14

Figure 15

Figure 16

Specify all available entry ports for each connector, unhiding the CSYS_WIRE-PORTS layer as
necessary.

Specify an internal length of 2.0 and the ROUND port type for each designated connector.

Remember to toggle Ref Designator Labels on to view the labels in the graphics window.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 10 of 14

5. Manually designate the CM-01 reference designator to the connector on the green control module on
the left.

Specify entry ports 5, 4, 3, 2, 1, P, N, G, and S, unhiding the CSYS_WIRE-PORTS layer as


necessary.

Specify an internal length of 2.0 and the ROUND port type.

6. Manually designate the CM-02 reference designator to the connector on the green control module on
the right.

Specify entry port ENTRY, unhiding the coordinate system in the model as necessary.

Specify an internal length of 2.0 and the FLAT port type.

7. Rename the REF_DES column of the Cabling Parameters appropriately.

Figure 17

Figure 18

8. Manually designate the PB-01 reference designator to the power box assembly.

Specify entry ports P, N, G, and S. It may be easier to select these coordinate systems from the
model tree.

Specify an internal length of 2.0 and the WIRE port type.

It is possible to directly select the entry ports because they are assembly features.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 11 of 14

9. Rename the REF_DES column of the Cabling Parameters appropriately.

Figure 19

Figure 20

Relays are assemblies that contain parts that serve as connectors, so we must designate using
subconnectors.

10. In the model tree, expand the first RELAY.ASM and manually designate the COIL-1.PRT, NCC-1.PRT,
and NOC-1.PRT parts as you would any connector.

Specify entry ports ENTRY_1 and ENTRY_2 for each model, using the model tree.

Specify an internal length of 0 and the ROUND port type.

11. Manually designate the RL-01 reference to the first instance of the RELAY.ASM from the model tree.

Specify subconnector members COIL-1.PRT, NCC.PRT, and NOC.PRT.

Click Add SubConn from the menu manager.

12. Repeat this same procedure to manually designate the RL-02 reference to the second RELAY.ASM in
the model tree.

13. Rename the REF_DES column of the Cabling Parameters appropriately.

Figure 21

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 12 of 14

Figure 22

14. At this time you are done designating references.

15. Notice that the reference designator labels for RL-01, RL-02, and PB-01 display at a default location
with no leaders.

Figure 23

16. Move the reference designator labels to the approximate locations shown. Move the other reference
designator labels as desired.

Figure 24

Edit the selection filter to Annotation, select a label, then right-click and select Move to move
the label.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 13 of 14

Leaders are not created for designated assembly connectors. You will create leaders for
assembly connectors later in the project on the drawing. If desired, you could delete the
annotations and create new ones with leaders.

17. In the model tree, add the Designation column from the Cable Info Type.

Click Settings and select Tree Columns.

18. Notice that the designations for the components are now visible.

Figure 25

Task 5. Create the harness part.

1. Create a harness named HARNESS_1.PRT using the MM_KG_SEC_PART.PRT template. The Type
should be Part, and the Sub-type should be Harness.

2. Hide the four datum features in HARNESS_1.PRT.

3. Save the display status of the model and save the CABLING.ASM assembly.

Task 6. Create the spools.

1. Read in all 16 spools from the working directory.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017
Set Up for Cabling Page 14 of 14

Figure 26

Figure 27

This completes the exercise.

http://precisionlms.ecorp.cat.com/precisionlms/standard-content/coach_cp_6697620f-0f6... 31-10-2017

Você também pode gostar