ZXUR 9000 Hardware

Installation
Objectives

 To be familiar with ZXUR 9000 hardware


installation
 To master the method of connecting ZXUR 9000
cables
 To be familiar with the power-on & power-off of
ZXUR 9000

2
Contents

 Cabinet Installation
 Cable Installation
 Equipment Power-On & Power-Off
 Board Installation
 Attached Equipment Installation

3
Cabinet Installation Modes

 The cabinet can be installed in two modes:


 Cabinet installation on adjustable base: This installation mode is applied
when the equipment room has the antistatic floor. In this mode, the
installation personnel should use the adjusting washer, which is provided by
ZTE Corporation, to adjust the level of the cabinet.
 Cabinet installation on cement floor: This installation mode is applied when
the equipment room does not have the antistatic floor.

 After a single cabinet is installed, if it is required to connect


multiple cabinets, adjacent cabinets should be connected.

© ZTE All rights reserved 4


Cabinet Installation Flow

© ZTE All rights reserved 5


Cabinet Installation Flow

© ZTE All rights reserved 6


Cabinet Components
Adjusting Washer

 When the floor on which the cabinet is installed is not


flat, installation personnel can use the adjusting
washer to adjust the height of the cabinet or the
adjustable base. The washer has two types of
thickness: 1 mm and 2 mm.

© ZTE All rights reserved 7


Cabinet Components
Adjustable Base – Installation Diagram (Front View)

1. 机柜
2. 防静电地板
3. 可调底座
4. 地基

1. Cabinet 3.
Adjustable Base
2. Antistatic Floor 4.
Groundsill
© ZTE All rights reserved 8
Installation Flow – Step 1
Removing Cabinet Front/Rear Door

1. Remove the grounding


cable connecting the rack
and the lower part of the
door 2. Remove the front door
and the rear door of the
© ZTE All rights reserved 9 cabinet
Installation Flow – Step 2
Positioning & Installing Expansion Bolts
 According to the installation drilling template, decide the
positions of expansion bolt holes.

1. The four holes marked with1 are for installing the adjustable base.
2. The four holes marked with2 are for installing the cabinet on the cement
floor.
© ZTE All rights reserved 10
Installation Flow – Step 2
Positioning & Installing Expansion Bolts

 Positioning expansion bolts

© ZTE All rights reserved 11


Installation Flow – Step 3
Installing Adjustable Base (For Cabinet Installation on Adjustable Base Only)

1. Spring washer 2. Flat washer 3. Insulating gasket 4. Sleeve


5. Hexagon head bolt M12×90 6. Insulating washer 7.
Adjusting washer
© ZTE All rights reserved 12
Installation Flow – Step 4
Fixing Cabinet

1. Cabinet installation on cement floor 2. Cabinet installation on adjustable


base

© ZTE All rights reserved 13


Installation Flow – Step 5
Insulation Test

1. Cabinet installation on cement floor 2. Cabinet installation on adjustable


base

© ZTE All rights reserved 14


Installation Flow – Step 6
Plugging in Antistatic Wrist Strap

Plug the antistatic


wrist strap into
the ESD hole of
the service
subrack

© ZTE All rights reserved 15


Installation Flow – Step 7
Installing Indoor Cable Tray & Cable Drum

© ZTE All rights reserved 16


Installation Flow – Step 8
Installing Side Door

© ZTE All rights reserved 17


Installation Flow – Step 9
Installing Cabinet Front/Rear Door

1. Pin
2. Hinge

© ZTE All rights reserved 18


Installation Flow – Step 10
Cabinet Grounding

 Top routing: Connect End A of the grounding cable with the grounding nut at
the top of the outer cabinet, and then extend to the cabling rack. Connect
End B with the PE copper bar on the DC Power Cabinet.
 Bottom routing: Connect End A of the grounding cable with the grounding
nut at the bottom of the inner cabinet. Lead the cable out of the cabinet
bottom to the anti-static floor. Connect End B with the PE copper bar on the
DC Power Cabinet.
© ZTE All rights reserved 19
Installation Flow – Step 11
Connecting Adjacent Cabinets

1. Connecting plate for combining cabinets


2. Cross recess head screw (M4×12)

© ZTE All rights reserved 20


Contents

 Cabinet Installation
 Cable Installation
 Equipment Power-On & Power-Off
 Board Installation
 Attached Equipment Installation

21
Cable Installation

• Power cable installation


Power Cables

• Grounding cable installation


Grounding
Cables

• Line reference clock cable


• BITS reference clock cable
Clock Cables
• Inter-shelf clock cable

© ZTE All rights reserved 22


Cable Installation

• Media plane interconnection fiber


• Control plane interconnection Ethernet cable
• Interface fiber
Service • Interface network cable
Cables • Interface E1/T1 cable

• OMC network cable


Other • PD485 cable
Cables

© ZTE All rights reserved 23


Cable Installation
Cabling of Power Cables Inside the Cabinet

1. No.1/3/5/7 : -48V
2. No.2/4/6/8 : -48VRTN

© ZTE All rights reserved 24


Cable Installation
Cabling of Power Cables Outside the Cabinet

© ZTE All rights reserved 25


Cable Installation
Installing Grounding Cable

© ZTE All rights reserved 26


Cable Installation
Installing Grounding Cable

© ZTE All rights reserved 27


Cable Installation
Installing Grounding Cable

© ZTE All rights reserved 28


Cable Installation
Installing Grounding Cable

© ZTE All rights reserved 29


Cable Installation
Installing Clock Cable – Cabling of Line Reference Clock Cables

© ZTE All rights reserved 30


Cable Installation
Installing Clock Cable – Cabling of BITS Reference Clock Cables

© ZTE All rights reserved 31


Cable Installation
Installing Clock Cable – Inter-Shelf Clock Cables

1. 8P8C straight cable crimped connector 2. Horizontal twisted pair


cable
3. Labels

© ZTE All rights reserved 32


Cable Installation
Installing Clock Cable – Inter-Shelf Clock Cables

© ZTE All rights reserved 33


Cable Installation
Installing Service Cable – Cabling of Media Plane Interconnection Fibers

© ZTE All rights reserved 34


Cable Installation
Installing Service Cable – Cabling of Control Plane Interconnection Ethernet
Cables

© ZTE All rights reserved 35


Cable Installation
Installing Service Cable – Interface Fibers

© ZTE All rights reserved 36


Cable Installation
Installing Service Cable – Cabling of Interface Network Cables

© ZTE All rights reserved 37


Cable Installation
Installing Service Cable – Cabling of Interface E1/T1 Cable

© ZTE All rights reserved 38


Cable Installation
Installing Other Cables – Cabling of OMC Cables

© ZTE All rights reserved 39


Cable Installation
Installing Other Cables – Cabling of the PD485 Cable

© ZTE All rights reserved 40


Contents

 Cabinet Installation
 Cable Installation
 Equipment Power-On & Power-Off
 Board Installation
 Attached Equipment Installation

41
Equipment Power-On and Power-Off

 Power-on check:
 Plug out all boards
 Use a multimeter to measure whether the power output from the DC
distribution cabinet satisfies the voltage fluctuation range: -57 V DC ~ -40 V
DC.
 Use a multimeter to measure the power input to the service subracks. The
voltage range should be -57 V DC ~ -40 V DC.
 Set the air switch of the power distribution subrack as ON. Observe the PWR
IN indicator on the power distribution subrack. The indicator should be on.
 Set the air switch for each service subrack on power distribution box as "ON".
The fans in the service subracks should operate normally.
 Insert all boards to the correct slots.

© ZTE All rights reserved 42


Equipment Power-On and Power-Off

 Power-off procedure:
 Turn off the -48 V power switch corresponding to the service subrack on the
panel of the power distribution subrack.
 Turn off the -48 V power supply output to the cabinet on the DC power
distribution cabinet.

© ZTE All rights reserved 43


Contents

 Cabinet Installation
 Cable Installation
 Equipment Power-On & Power-Off
 Board Installation
 Attached Equipment Installation

44
Board Installation
Plugging in Boards

© ZTE All rights reserved 45


Board Installation
Plugging out Boards

© ZTE All rights reserved 46


Contents

 Cabinet Installation
 Cable Installation
 Equipment Power-On & Power-Off
 Board Installation
 Attached Equipment Installation

47
Attached Equipment Installation

 The following accessories are required to be installed after the


ZXUR 9000 equipment is installed:
 Alarm box
 Environment monitoring system
 Power distribution subrack
 Smog Sensor
 Infrared Sensor
 Temperature/Humidity Sensor
 Access Control Sensor
 Switch

© ZTE All rights reserved 48


Thank you