Escolar Documentos
Profissional Documentos
Cultura Documentos
FAHSS/TÜV
Member of TÜV NORD Gr
INSULATION RESISTANCE RE
REPORT NO. AFI-IR-2019-001
CLIENT: ALAA FOR INDUSTRY (AFI) P.O. NO.
P. O. BOX 9998, DAMMAM-31423. JOB/CONTRACT NO.
KINGDOM OF SAUDI ARABIA. TEST DATE
LOCATION
COMPONENT TRIPLE SWING JOINT ASSEMBLY ID. NO
MATERIAL SPECIFICATION CARBON STEEL NOMINAL THICKNES
INSPECTION STANDARD As Per OEM Recommendation APPARATUS / MODE
Background:
A site visit was conducted at AFI as requested by email in order to inspect &
isolating flange of a triple elbow in AFI yard
Continuity check
Observations & Actions:
1- The assembly was isolated completely from the ground prior to test
2- All hoses across the flange were not connected.
3- Visually inspected the assembly and found ok.
4- The continuity check was done across the insulation flange joint an
5- Insulation resistance testing was done across the flange at test volt
General Arrangement of the Assembly
Remarks & Recommendations:
1- Measured IR is excellent & acceptable as per standard.
2- Isolating the assembly by dry thick wood or any other acceptable in
3- Testing to be done after drying the assembly internally.
Not allowed to use metallic washer touching directly the object body
4-
checked properly before using.
5- It's better to carry out the Megger testing during assembly connectio
MEASURED IR 4.28 MW
REMARKS :
INSPECTOR'S NAME Anantha Kumar.A APPROVED BY
Eng.Saed Barakat
SIGNATURE
ORIGINAL - CLIENT
COPY - FAHSS/TUV INV FILE
ng Co.
FAHSS/TÜV
of TÜV NORD Group
N RESISTANCE REPORT
SHEET 01 OF 01
200029951
JOB/CONTRACT NO. N/A
21-Jan-19
AFI YARD AT DAMMAM IND. AREA
ID. NO LA-111 (JOINT ASSEBLY)
NOMINAL THICKNESSN/A
APPARATUS / MODEL:INSULATION MULTIMETER / FLUKE 1555
ng assembly connection.
INSPECTION
Eng.Saed Barakat AUTHORITY
FAHSS/TÜV NORD
CHECK DATE :21 January 2019 NEXT INSPECTION DATE: N/A
FM-ND-03/A REV 0