Escolar Documentos
Profissional Documentos
Cultura Documentos
Instructions
1. Do not insert or remove entire rows (This will mess up
the labeling order in the chart).
2. Edit the yellow cells. You can copy and paste, delete,
insert, and sort, as long as you do not insert or delete
entire rows.
To delete an event
1. Delete the Year and Event in columns B and C,
respectively.
2. If the timeline includes 0, make the Year be a value off
the X-Axis scale.
- Or -
1. Delete the year and event.
2. Move all the other events up.
3. Modify the data series so that the last events in the
column are not included in the graph.
To add an event
1. Do not insert a row. Just copy the last row of the table
down as many rows as you need.
2. Modify the data series to include the additional rows.
3. Edit each new data point label, referencing the correct
1800 cell in column G. This is done by clicking on the data
points in the chart. Then click on the specific data label
that you want to edit (this should highlight just the single
data point). Then, with the data point selected, type "="
then select the cell containing the Label (in column G).
http://www.vertex42.com/ExcelArticles/create-a-
timeline.html
Project Timeline Template
© 2005-2009 Vertex42 LLC
Title: Project Timeline
Date Task Days Height Axis Label
1/3/2009 Project Proposal Due 45 39816 Project Proposal Due
1/10/2009 Project Funding Granted 37 39823 Project Funding Granted
1/10/2009 1. Main Task 75 27 39823 1. Main Task
1/10/2009 1.1 Subtask 23 39823 1.1 Subtask
2/9/2009 1.2 Subtask 17 39853 1.2 Subtask
3/1/2009 1.3 Subtask 10 39873 1.3 Subtask
1/30/2009 2. Main Task 68 -20 39843 2. Main Task
1/30/2009 2.1 Subtask -30 39843 2.1 Subtask
3/1/2009 2.2 Subtask -35 39873 2.2 Subtask
3/31/2009 2.3 Subtask -40 39903 2.3 Subtask
Project Timeline
3/31/2009 3. Main Task 100 35 39903 3. Main Task
45 3/31/2009 3.1 Subtask 30 39903 3.1 Subtask
4/30/2009 3.2 Subtask 23 39933 3.2 Subtask
375/30/2009 3.3 Subtask 10 39963 3.3 Subtask
35
4/20/2009 4. Main Task 100 -25 39923 4. Main Task
30
274/20/2009 4.1 Subtask -30 39923 4.1 Subtask
25
235/20/2009 4.2 Subtask 23 -35 39953 4.2 Subtask
6/19/2009 4.3 Subtask -40
20 39983 4.3 Subtask
17
6/19/2009 5. Main Task 80 25 39983
15 5. Main Task
6/19/2009 5.1 Subtask
10 10 20 39983 5.110
Subtask
7/19/2009 5.2 Subtask 15 40013 5.2 Subtask
8/18/2009 5.3 Subtask 10 40043 5.3 Subtask
7/9/2009 6. Main Task -10 40003 6. Main Task
39814 39844.5 39875 39905.5 39936 39966.5 39997 40027.5 40058
7/9/2009 6.1 Subtask -15 40003 6.1 Subtask
8/8/2009 6.2 Subtask -20 -10 40033 6.2 Subtask
9/7/2009 6.3 Subtask -25 -15 40063 6.3 Subtask
20 0 0
-20 -20
10 0 0
-25 -25
-20 0 0
-30 -30 -10 0 0
-35 -35
-40 -40
http://www.vertex42.com/ExcelArticles/create-a-timeline.html
Instructions
Project Proposal Due 1. Do not insert or remove entire rows (This will mess up
Project Funding Granted the labeling order in the chart).
2. Edit the yellow cells. You can copy and paste, delete,
insert, and sort, as long as you do not insert or delete
entire rows.
To delete a Task
Delete the Date and Task in columns B and C,
respectively.
To add a Task
1. Do not insert a row. Just copy the last row of the table
down as many rows as you need.
2. Modify the data series to include the additional rows.
3. Edit each new data point label, referencing the correct
10 cell in column G. This is done by clicking on the data
points in the chart. Then click on the specific data label
that you want to edit (this should highlight just the single
40058
data point). Then, with the data point selected, type "="
then select the cell containing the Label (in column G).
Moving Labels
You may need to move the labels around to get
-20 everything positioned just right, especially if you include
-25 duration lines.
http://www.vertex42.com/ExcelArticles/create-a-
timeline.html