Você está na página 1de 53

NO URAIAN PEKERJAAN VOLUME

1 2 3
I Pekerjaan Persiapan
1 Bedeng 32
2 Pembersihan lahan 455
3 Pemagaran 87
4 Bouw plank 59.1

II. PEKERJAAN GALIAN PONDASI


1 Galian Tanah Pondasi 65.42
2 Pasang Batu Kali 23.46
3 Urugan Tanah 19.85
4 Lantai Kerja Astamping 21.66

III PEKERJAAN BETON BERTULANG


1 Beton Sloof 5.74
2 Beton Kolom 4.71
3 Beton Ringbalk I 3.45
4 Beton Ringbalk II 3.34
5 Beton Ringbalk III 0.13
6 Beton Plat Dak I 1.44
7 Beton Plat Dak II 0.24

IV Pekerjaan Dinding
1 Pemasangan Bata 491.60
2 Pekerjaan Plester 983.19
3 Pekerjaan Acian 983.19
4 Sponengan 84.80
5 Sudutan 140.00
6 Tali Air 246.00

V PEKERJAAN KUSEN
1 Pasang Kusen Pintu 15
2 Pasang Daun Pintu 23
3 Pasang Kusen Jendela 11
4 Pasang Daun Jendela 11
5 Pasang Angin-Angin 25

VI Pekerjaan Lantai
1 Pasang Lantai Kerja 1:3:5 170
2 Keramik Teras 20x20 24.925
3 Keramik Lantai setara Homogenus Tile 60x60 102
4 Keramik Kamar Mandi 10x20 6

VII PEKERJAAN PLAFON


1 Pasang Rangka Plafon 196.6
2 Pasang Penutup Plafon Gypsum 196.6
3 Pasang List Gypsum 149.34

VIII PEKERJAAN ATAP


1 Pasang Rangka Atap Baja Ringan 283.89
2 Pasang Genteng 236.89
3 Pasang Lisplank 59.6

IX Pekerjaan Finishing
1 Cat Tembok 983.19
2 Cat Plafond 200.6
3 Cat Kayu 137.76

X PEKERJAAN PENGGANTUNG PENGUNCI


1 Pasang Kunci Tanam 16
2 Pasang Engsel Pintu 23
3 Pasang Engsel Jendela 29
4 Pasang Grendel Pintu 16
5 Pasang Grendel Jendela 29
6 Pasang Kait Angin 29

XI PEKERJAAN SANITASI
1 Pemasangan Closet 2
2 Pemasangan Pipa Pvc Θ 4" 16.8
3 Pemasangan Pipa Pvc Θ 3" 30.2
4 Pemasangan Pipa Pvc Θ 1/2" 87.8
5 Pemasangan Keran Air 1/2 " 6
6 Pemasangan Floor Drain 3
7 Pemasangan Tondon Air ( Tangki Air ) 1
8 Pemasangan Septictank 1
9 Pemasangan Sumur Resapan 1
10 Pemasangan Shower Kamar Mandi 2
11 Pemasangan Avour Bak Cuci Dapur 1

XII PEKERJAAN ELEKTRIKAL


1 PASANG TITIK LAMPU 33
2 Pasang Stop Kontak 10
3 Pasang Lampu Down Light 26
4 Pasang Saklar Tunggal 5
5 Pasang Saklar Ganda 6
6 Pasang Lampu Hias 7
7 Pasang Meteran 1300 W 1
SATUAN HARGA SATUAN TOTAL
4 5 6

M2 IDR 1,451,953 IDR 46,462,498


M2 IDR 8,619 IDR 3,921,457
M2 IDR 125,851 IDR 10,949,070
M2 IDR 24,664 IDR 1,457,631
SUBTOTAL IDR 62,790,655

M3 IDR 62,637 IDR 4,097,740


M3 IDR 801,633 IDR 18,806,321
M3 IDR 253,055 IDR 5,023,141
M3 IDR 415,557 IDR 9,000,960
SUBTOTAL IDR 36,928,162

M3 IDR 1,501,086 IDR 8,616,234


M3 IDR 8,627,573 IDR 40,635,870
M 3
IDR 82,435 IDR 284,401
M 3
IDR 82,435 IDR 275,333
M3 IDR 82,435 IDR 10,717
M3 IDR 567,582 IDR 817,318
M 3
IDR 567,582 IDR 136,220
SUBTOTAL IDR 50,776,093

m² IDR 160,389 IDR 78,846,368


m² IDR 66,771 IDR 65,648,631
m² IDR 32,939 IDR 32,385,094
m IDR 32,939 IDR 2,793,210
m IDR 32,939 IDR 4,611,431
m IDR 32,939 IDR 8,102,944
SUBTOTAL IDR 192,387,678

UNIT IDR 4,264,411 IDR 63,966,169


UNIT IDR 741,372 IDR 17,051,551
UNIT IDR 4,383,764 IDR 48,221,400
UNIT IDR 439,329 IDR 4,832,615
UNIT IDR 4,383,764 IDR 109,594,090
SUBTOTAL IDR 243,665,824

m² IDR 135,268 IDR 22,995,609


m² IDR 149,288 IDR 3,721,010
m² IDR 134,317 IDR 13,700,289
m² IDR 137,227 IDR 823,364
SUBTOTAL IDR 41,240,272

M2 IDR 43,770 IDR 8,605,150


M2 IDR 48,119 IDR 9,460,163
M IDR 16,731 IDR 2,498,551
SUBTOTAL IDR 20,563,863

M2 IDR 203,133 IDR 57,667,363


M2 IDR 257,184 IDR 60,924,232
M IDR 62,096 IDR 3,700,950
SUBTOTAL IDR 122,292,545

M2 IDR 29,563 IDR 29,066,301


M 2 IDR 55,160 IDR 11,065,003
M2 IDR 48,996 IDR 6,749,650
SUBTOTAL IDR 46,880,955

Unit IDR 277,565 IDR 4,441,040


Stel IDR 41,644 IDR 957,822
Stel IDR 26,050 IDR 755,445
Unit IDR 26,050 IDR 416,797
Unit IDR 24,602 IDR 713,472
Unit IDR 35,000 IDR 1,015,013
SUBTOTAL IDR 8,299,590

UNIT IDR 2,294,526 IDR 4,589,052


M' IDR 173,234 IDR 2,910,339
M' IDR 225,143 IDR 6,799,333
M' IDR 157,153 IDR 13,798,007
UNIT IDR 123,406 IDR 740,438
UNIT IDR 46,116 IDR 138,349
UNIT IDR 739,300 IDR 739,300
UNIT IDR 4,642,515 IDR 4,642,515
UNIT IDR 2,243,104 IDR 2,243,104
UNIT IDR 725,959 IDR 1,451,918
UNIT IDR 435,959 IDR 435,959
SUBTOTAL IDR 38,488,315

TITIK IDR 183,438 IDR 6,053,439


TITIK IDR 38,838 IDR 388,375
TITIK IDR 97,588 IDR 2,537,276
UNIT IDR 36,838 IDR 184,188
UNIT IDR 39,838 IDR 239,025
TITIK IDR 55,425 IDR 387,975
UNIT IDR 618,588 IDR 618,588
SUBTOTAL IDR 10,408,866
TOTAL IDR 874,722,818
ppn IDR 87,472,282
TOTAL BIAYA IDR 962,195,100
I PERSIAPAN PEKERJAAN
No Uraian Satuan Koefisien
I. 1 1 M2 Pembuatan Bedeng Buruh
I. 1A Bahan
Dolken Kayu θ 8-10/400 cm Btg 1.2500
Kayu Balok Terentang M3 0.1860
Paku Biasa Kg 0.3000
Semen Portland kg 18.0000
Pasir Beton M3 0.0300
Koral Beton M3 0.0500
Seng Gelombang BJLS 30 Lbr 1.5000
plywood 4mm Lbr 1.3500

I. 1B Tenaga
Pekerja Oh 1.0000
Tukang Kayu Oh 2.0000
Kepala Tukang Oh 0.2000
Mandor Oh 0.0500

I. 2 1 M2 Membersihkan Lapangan & Perataan


Pekerja Oh 0.1000
Mandor Oh 0.0050

I. 3 1 M' Pagar Sementara dari Kayu Tinggi 2 m


I. 3A Bahan
Dolken Kayu θ 8-10/400 cm Btg 1.2500
Semen Portland kg 5.5000
Pasir Beton M3 0.0050
Koral Beton M3 0.0090
Kayu 5/7 M3 0.0720
Paku Biasa 2"-5" Kg 0.0600
Residu Kg 0.4000

I. 3B Tenaga
Pekerja Oh 0.4000
Tukang Kayu Oh 0.2000
Kepala Tukang Oh 0.0200
Mandor Oh 0.0200

I. 4 1 M2 Pengukuran dan Pasang Bouwplank


I. 4A Bahan
Kayu 5/7 M3 0.0120
Paku Biasa 2"-5" Kg 0.0200
Kayu Papan 3/20 M3 0.0070

I. 4B Tenaga
Pekerja Oh 0.1000
Tukang Kayu Oh 0.1000
Kepala Tukang Oh 0.0100
Mandor Oh 0.0050

II. PEKERJAAN GALIAN PONDASI


No Uraian Satuan Koefisien
II.1 Galian Tanah Pondasi
A Tenaga Pekerja
Pekerja OH 0.750
Mandor OH 0.025

II.2 Pasang Batu Kali


A Tenaga Pekerja
Pekerja OH 1.500
Tukang Batu OH 0.750
Kepala Tukang OH 0.075
Mandor OH 0.075

B Bahan
Batu Kali M³ 1.200
Semen Portland Kg 202.000
Pasir Pasang M³ 0.485

II.3 Urugan Tanah


A Tenaga Pekerja
Pekerja OH 0.300
Mandor OH 0.010

B Bahan
Pasir Urug M³ 1.200

II.4 Lantai Kerja Astamping


A Tenaga Pekerja
Pekerja OH 0.780
Tukang Batu OH 0.390
Kepala Tukang OH 0.039
Mandor OH 0.039

B Bahan
Batu Kali M³ 1.200
Pasir Urug 0.432

III PEKERJAAN BETON BERTULANG


Beton sloof
No Uraian Satuan Koefisien
A TENAGA
Pekerja oh 0.104
Tukang Batu oh 0.234
Tukang Kayu oh 0.243
Tukang Besi oh 0.243
Kepala Tukang oh 0.139
Mandor oh 0.118

B BAHAN
Kayu Terentang M³ 0.520
paku Biasa 2"-5" M³ 0.780
Minyak Bekisting Oh 4.850
esi Beton Polos Oh 0.350
Kawat Beton Oh 1.560
Semen Portland Oh 1.400
Pasir Beton Oh 0.331
Koral Beton Oh 0.170

Beton kolom
A TENAGA
Pekerja Oh 7.300
Tukang Batu Oh 0.350
Tukang Kayu Oh 3.300
Tukang Besi Oh 2.100
Kepala Tukang Oh 0.570
Mandor Oh 0.250

B BAHAN
Kayu Terentang M³ 0.400
Paku Biasa 2"-5" Kg 4.000
Minyak Bekisting Lt 2.000
Besi Beton polos Kg 300.000
Kawat Beton Kg 4.500
Semen Portland Kg 323.000
Pasir Beton M³ 0.520
Koral Beton M³ 0.780
Kayu Borneo Balok M³ 0.150
Plywood tebal 9 mm Lbr 3.500
Dolken Kayu Ø 8-10/400 cm Btg 20.000

Beton Ringbalk
A TENAGA
Pekerja Oh 0.100
Tukang Batu Oh 0.033
Tukang Kayu Oh 0.033
Tukang Besi Oh 0.033
Kepala Tukang Oh 0.010
Mandor Oh 0.005

B BAHAN
Kayu Albasiah M³ 0.003
Paku Biasa 2"-5" Kg 0.020
Besi Beton polos Kg 3.600
Kawat Beton Kg 0.050
Semen Portland Kg 5.500
Pasir Beton M³ 0.009
Koral Beton M³ 0.015

Beton plat dak


A TENAGA
Pekerja Oh 0.320
Tukang kayu Oh 0.330
Kepala Tukang Oh 0.033
Mandor Oh 0.006
Tukang Batu Oh 0.250

B BAHAN
Kayu Terentang M³ 0.040
Paku Biasa 2"-5" Kg 0.400
Minyak Bekisting Lt 0.200
Kayu Borneo Balok M³ 0.015
Plywood tebal 9 mm Lbr 0.350
Dolken Kayu galam Ø 8-10/4 m Btg 6.000
Kayu Albasiah M³ 0.003
Besi Beton polos Lt 3.600
Kawat Beton Kg 0.050
Semen Portland Kg 5.500
Pasir Beton Kg 0.009
Koral Beton M³ 0.015

IV PEKERJAAN DINDING
No Satuan Koefisien
Pemasangan Bata
A TENAGA
Pekerja OH 0.300
Tukang Batu OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.015
JUMLAH TENA
B BAHAN
Bata ringan tebal 7.5 cm m³ 8.400
Mortar siap pakai Kg 0.473
JUMLAH HARG
C

Pekerjaan Plester
A TENAGA
Pekerja OH 0.300
Tukang Batu OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.015
JUMLAH TENA
B BAHAN
PC Kg 15.504
PP m³ 0.016
JUMLAH HARG
C

Pekerjaan Acian
A TENAGA
Pekerja OH 0.200
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.010
JUMLAH TENA
B BAHAN
PC Kg 3.250
JUMLAH HARG
C
Sponengan
A TENAGA
Pekerja OH 0.200
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.010
JUMLAH TENA
B BAHAN
PC Kg 3.250
JUMLAH HARG
C

Sudutan
A TENAGA
Pekerja OH 0.200
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.010
JUMLAH TENA
B BAHAN
PC Kg 3.250
JUMLAH HARG
C

Tali Air
A TENAGA
Pekerja OH 0.200
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.010
JUMLAH TENA
B BAHAN
PC Kg 3.250
JUMLAH HARG
C

V PEKERJAAN KUSEN
No Uraian Satuan Koefisien
1 PASANG KUSEN PINTU
V.1A PEKERJA OH 2.1
TUKANG KAYU OH 0.2
KEPALA TUKANG OH 0.035
MANDOR OH 0.3
JUMLAH TENAGA KERJA
V. 1B BAHAN
BALOK KAYU m³ 1.2
LEM KAYU kg 1
JUMLAH HARGA BAHAN

URAIAN PEKERJAAN SATUAN KOEFISIEN


NO
V PEKERJAAN KUSEN
2 PASANG DAUN PINTU
V.1A TENAGA
PEKERJA OH 0.8
TUKANG KAYU OH 2.4
KEPALA TUKANG OH 0.24
MANDOR OH 0.04
JUMLAH TENAGA KERJA
V.1B BAHAN
PAPAN KAYU m³ 0.025
LEM KAYU kg 0.5
PLYWOOD TEBAL 4MM UKURAN (90X220)
1
CM Lembar
JUMLAH HARGA BAHAN

URAIAN PEKERJAAN SATUAN KOEFISIEN


NO

V PEKERJAAN KUSEN
3 PASANG KUSEN JENDELA
V.1A TENAGA
PEKERJA OH 0.8
TUKANG KAYU OH 2.4
KEPALA TUKANG OH 0.24
MANDOR OH 0.04
JUMLAH TENAGA KERJA

V.1B BAHAN
BALOK KAYU m³ 1.2
PAKU 10CM kg 1.25
LEM KAYU kg 1
JUMLAH HARGA BAHAN

URAIAN PEKERJAAN SATUAN KOEFISIEN


NO

V PEKERJAAN KUSEN
4 PASANG DAUN JENDELA
V.1A TENAGA
PEKERJA OH 0.8
TUKANG KAYU OH 2.4
KEPALA TUKANG OH 0.24
MANDOR OH 0.04
JUMLAH TENAGA KERJA
V.1B BAHAN
PAPAN KAYU m³ 0.024
LEM KAYU Kg 0.3
JUMLAH HARGA BAHAN

URAIAN PEKERJAAN SATUAN KOEFISIEN


NO

V PEKERJAAN KUSEN
5 PASANG ANGIN-ANGIN
V.1A TENAGA
PEKERJA OH 0.8
TUKANG KAYU OH 2.4
KEPALA TUKANG OH 0.24
MANDOR OH 0.04
JUMLAH TENAGA KERJA
V.1B BAHAN
BALOK KAYU m³ 1.2
PAKU 10CM kg 1.25
LEM KAYU kg 1
JUMLAH HARGA BAHAN

VI PEKERJAAN LANTAI
No Uraian Satuan Koefisien
Pasang Lantai Kerja 1:3:5
A TENAGA
Pekerja OH 1.2
Tukang Batu OH 0.2
Kepala Tukang OH 0.02
Mandor OH 0.06
Jumlah Tena
B BAHAN
Semen Portland Kg 4.3
Pasir Beton Kg 0.52
Kerikil Kg 0.87

Jumlah Harg
TOTA
Keramik Teras 20x20
A TENAGA
Pekerja OH 0.7
Tukang Batu OH 0.35
Kepala Tukang OH 0.035
Mandor OH 0.035
Jumlah Tena
B BAHAN
Ubin Keramik 20x20 Doos 1.05
Semen Portland Kg 10.4
Pasir Pasang M³ 0.045
Semen Warna Kg 0.5
Jumlah Harg
TOTA
Keramik Lantai setara Homogenus Tile 60x60
A TENAGA
Pekerja OH 0.24
Tukang Batu OH 0.12
Kepala Tukang OH 0.012
Mandor OH 0.012
Jumlah Tena
B BAHAN
Ubin Keramik 60x60 Doos 3.1
Semen Portland 50 Kg Kg 9.6
Pasir Pasang M³ 0.045
Semen Warna Kg 1.5
Jumlah Harg
TOTA
Keramik Kamar Mandi 10x20
A TENAGA
Pekerja OH 0.7
Tukang Batu OH 0.35
Kepala Tukang OH 0.035
Mandor OH 0.035
Jumlah Tena
B BAHAN
Ubin Keramik 10x20 Doos 0.53
Semen Portland 50 Kg Kg 8.19
Pasir Pasang M³ 0.045
Semen Warna Kg 2.75
Jumlah Harg
TOTA

VII PEKERJAAN PLAFON


No Uraian Satuan Koefisien
A Tenaga
Pekerja OH 0.1000
Tukang Kayu OH 0.0500
Kepala Tukang OH 0.0050
Mandor OH 0.0050

B Bahan
Hollow 4/4 btg 0.4150
Hollow 2/4 btg 0.1500
Ramset/Dinabolt buah 4.0000

2 Pasang Penutup Plafon Gypsum


A Tenaga
Pekerja OH 0.1000
Tukang Kayu OH 0.0500
Kepala Tukang OH 0.0050
Mandor OH 0.0050

B Bahan
Gypsum Board (120X240X9) mm lbr 0.3640
Paku Gypsum kg 0.1100
Cotton Plaster buah 0.0720
Compound zak 0.1250

3 Pasang List Gypsum


A Tenaga
Pekerja OH 0.0500
Tukang Kayu OH 0.0500
Kepala Tukang OH 0.0050
Mandor OH 0.0030

B Bahan
List Gypsum m 1.0500
Tepung Gypsum kg 0.1500

VIII PEKERJAAN ATAP


Pemasangan 1 m2 atap pelana rangka atap baja canai dingin
No Uraian Satuan Koefisien
A TENAGA
Pekerja OH 0.734
Tukang besi OH 0.734
Kepala tukang OH 0.073
Mandor OH 0.037
JUMLAH
B BAHAN TENAGA
KERJA
Baja ringan canai dingin C75 kg 3.065
JUMLAH
HARGA
BAHAN
D Jumlah (A+B)
pemasangan 1 m2 atap genteng palentong
A tenaga
Pekerja Oh 0.1500
Tukang Kayu Oh 0.0750
Kepala Tukang Oh 0.0080
Mandor Oh 0.0080
jumlah
B bahan
genteng palentong bh 25.0000
jumlah

C Jumlah (A+B)
pemasangan 1 m2 genteng bubung palentong
A Tenaga
Pekerja Oh 0.4000
Tukang Kayu Oh 0.2000
Kepala Tukang Oh 0.0200
Mandor Oh 0.0020
Jumlah
B Bahan
Genteng bubung palentong buah 5.0000
Semen Portland kg 8.0000
Pasir Pasang m3 0.0320
Jumlah

C Jumlah (A+B)
pasang 1 m1 lisplank GRC ukuran 6 mm x 20 mm
No Uraian Satuan Koefisien
A Tenaga
Pekerja Oh 0.4000
Tukang Kayu Oh 0.2000
Kepala Tukang Oh 0.0200
Mandor Oh 0.0020
jumlah
B Bahan
GRC 4 mm lbr 0.0760
paku berbagai ukuran (1-3 cm) kg 0.0500
jumlah
C Jumlah (A+B)

IX PEKERJAAN FINISHING
No Uraian Satuan Koefisien
A Tenaga
Pekerja Oh 0.0300
Tukang cat Oh 0.0945
Kepala Tukang Oh 0.0095
Mandor Oh 0.0038

B Bahan
Plamir tembok kg 0.1000
Cat dasar kg 0.1000
Cat Penutup 3 X set Vinilex kg 0.3900

IX-2 Cat Plafond


A Tenaga
Pekerja Oh 0.2000
Tukang cat Oh 0.3000
Kepala Tukang Oh 0.0300
Mandor Oh 0.0100

B Bahan
Cat Tembok setara Vinilex kg 0.1500
Plamir Tembok kg 0.1600
Rol Cat buah 0.0100

Ampelas lbr 0.5000

IX-3 Cat Kayu


A Tenaga
Pekerja Oh 0.0700
Tukang cat Oh 0.1050
Kepala Tukang Oh 0.0040
Mandor Oh 0.0025

B Bahan
Cat Meni kg 0.2000
Plamir kg 0.1500
Cat dasar kg 0.1700
Cat Penutup 3x setara Sieve kg 0.3500
X PEKERJAAN PENGGANTUNG KUNCI
HARGA SATUAN KUNCI TANAM

NO URAIAN SATUAN KOEFISIEN


A TENAGA
Tukang Kayu Oh 0.500

Kepala Tukang Oh 0.500

B BAHAN
Kunci Tanam Biasa Unit 1

HARGA SATUAN ENGSEL PINTU

NO URAIAN SATUAN KOEFISIEN


A TENAGA
Tukang Kayu Oh 0.125

Kepala Tukang Oh 0.013

B BAHAN
Engsel Pintu Unit 1

HARGA SATUAN ENGSEL JENDELA

NO URAIAN SATUAN KOEFISIEN


A TENAGA
Tukang Kayu Oh 0.125

Kepala Tukang Oh 0.013

B BAHAN
Engsel Jendela Unit 1

HARGA SATUAN GRENDEL PINTU

NO URAIAN SATUAN KOEFISIEN


A TENAGA
Tukang Kayu Oh 0.100

Kepala Tukang Oh 0.01


B BAHAN
Engsel Jendela Unit 1

HARGA SATUAN GRENDEL JENDELA

NO URAIAN SATUAN KOEFISIEN


A TENAGA
Tukang Kayu Oh 0.100

Kepala Tukang Oh 0.01

B BAHAN
Engsel Jendela Unit 1

HARGA SATUAN KAIT ANGIN

NO URAIAN SATUAN KOEFISIEN


A TENAGA
Tukang Kayu Oh 0.125

Kepala Tukang Oh 0.013

B BAHAN
Kait Angin Unit 1

XI PEKERJAAN SANITASI
PEMASANGAN CLOSET
No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 3.30
Tukang batu OH 1.10
Kepala tukang OH 0.01
Mandor OH 0.16

1B BAHAN
Closet duduk Unit 1.00

PEMASANGAN PIPA PVC θ 4"


No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 0.08
Tukang pipa OH 0.135
Kepala tukang OH 0.0135
Mandor OH 0.004

1B BAHAN
PVC θ 4" M 1.20

PEMASANGAN PIPA PVC θ 3"


No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 0.08
Tukang pipa OH 0.135
Kepala tukang OH 0.0135
Mandor OH 0.004

1B BAHAN
PVC θ 3" M 1.20

PEMASANGAN PIPA PVC θ 1/2"


No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 0.036
Tukang pipa OH 0.06
Kepala tukang OH 0.006
Mandor OH 0.002

1B BAHAN
PVC θ 1/2" M 1.20

PEMASANGAN KERAN AIR 1/2"


No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 0.01
Tukang batu OH 0.4
Kepala tukang OH 0.04
Mandor OH 0.005

1B BAHAN
Kran air Unit 1.00
Sealtape Buah 0.03
PEMASANGAN KERAN FLOOR DRAIN
No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 0.01
Tukang batu OH 0.10
Kepala tukang OH 0.01
Mandor OH 0.005

1B BAHAN
Floor Drain Unit 1.00

PEMASANGAN TANDON AIR (TANGKI AIR)


No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 2.00
Tukang batu OH 1.10
Kepala tukang OH 0.001
Mandor OH 0.160

1B BAHAN
Bak tangki Buah 1.00

PEMASANGAN SEPTICTANK
No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 2.00
Tukang besi OH 1.10
Tukang batu OH 1.10
Kepala tukang OH 0.001
Mandor OH 0.160

1B BAHAN
Galian tanah m3 2.2500
Pasir urug m3 0.1070
lantai kerja m3 1.1250
Pas. Bata adk 1pc : 3ps m2 7.5000
Pelat beton K-225 m3 0.1500
Plesteran adk 1pc : 3ps m2 7.5000
Pipa PVC 4" jenis AW m' 9.0000
Pipa GIP 1 1/2" m' 2.5000
PEMASANGAN SUMUR RESAPAN
No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 2.00
Tukang besi OH 1.10
Tukang batu OH 1.10
Kepala tukang OH 0.001
Mandor OH 0.160

1B BAHAN
Galian tanah untuk rembesan m3 1.6880
pas. Ijuk kg 2.7000
Urugan kerikil 3/5 m3 0.5250
Pipa PVC 4" berlubang jenis AW m' 9.0000
Urugan dan Perataan tanah m3 0.5630

PEMASANGAN SHOWER KAMAR MANDI


No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 3.30
Tukang batu OH 1.10
Kepala tukang OH 0.01
Mandor OH 0.16

1B BAHAN
Shower TOTO Unit 1.00

PEMASANGAN AVOUR BAK CUCI DAPUR


No Uraian Satuan Koefisien
1A TENAGA
Pekerja OH 3.30
Tukang batu OH 1.10
Kepala tukang OH 0.01
Mandor OH 0.16

1B BAHAN
Avour Unit 1.00

XII PEKERJAAN ELEKTRIKAL


No Uraian Satuan Koefisien
A TENAGA
PEKERJA OH 0.02
TUKANG LISTRIK OH 0,0630
MANDOR OH 0,0030
JUMLAH TENAGA KERJA
B BAHAN
PIPA LISTRIK 5/8" BTG 3,00
KABEL NYM 3 x 2,5 mm M 4
T DUS BUAH 3,00
L BOW BUAH 4,00
LAS DOP BUAH 3,00
KLEM BUAH 4
MONGKOK BUAH 1,00
SAKLAR BUAH 1,00
FITTING BUAH 1,00
JUMLAH HARGA TOTAL
JUMLAH TOTAL
XII.2 PASANG STOP KONTAK
A TENAGA
PEKERJA OH 0.02
TUKANG LISTRIK OH 0,0630
MANDOR OH 0,0030
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak BUAH 1,00
KABEL LISTRIK NYM 2 X 2,25 M 0,250
JUMLAH HARGA TOTAL
JUMLAH TOTAL
XII.3 PASANG LAMPU DOWN LIGHT
A TENAGA
PEKERJA OH 0.02
TUKANG LISTRIK OH 0,0630
MANDOR OH 0,0030
JUMLAH TENAGA KERJA
B BAHAN
LAMPU DOWN LIGHT BUAH 1,00
KABEL NYM 3 x 2,5 mm M 4
JUMLAH HARGA TOTAL
JUMLAH TOTAL
XII.4 PASANG SAKLAR TUNGGAL
A TENAGA
PEKERJA OH 0.02
TUKANG LISTRIK OH 0,0630
MANDOR OH 0,0030
JUMLAH TENAGA KERJA
B BAHAN
SAKLAR TUNGGAL UNIT 1,00
KABEL LISTRIK NYM 2 X 2,25 M 0,250
JUMLAH HARGA TOTAL
JUMLAH TOTAL
XII.5 PASANG SAKLAR GANDA
A TENAGA
PEKERJA OH 0.02
TUKANG LISTRIK OH 0,0630
MANDOR OH 0,0030
JUMLAH TENAGA KERJA
B BAHAN
SAKLAR GANDA UNIT 1,00
KABEL LISTRIK NYM 2 X 2,25 M 0,250
JUMLAH HARGA TOTAL
JUMLAH TOTAL
XII.6 PASANG LAMPU HIAS
A TENAGA
PEKERJA OH 0.02
TUKANG LISTRIK OH 0,0630
MANDOR OH 0,0030
JUMLAH TENAGA KERJA
B BAHAN
LAMPU HIAS BUAH 1,00
KABEL LISTRIK NYM 2 X 2,25 M 0.25
JUMLAH HARGA TOTAL
JUMLAH TOTAL
XII.7 PASANG METERAN
A TENAGA
PEKERJA OH 0.02
TUKANG LISTRIK OH 0,0630
MANDOR OH 0,0030
JUMLAH TENAGA KERJA
B BAHAN
PIPA LISTRIK 5/8" BTG 3,00
KABEL NYM 3 x 2,5 mm M 15,00
T DUS BUAH 1,00
L BOW BUAH 1,00
KLEM BUAH 24,00
MCB BUAH 1,00
JUMLAH HARGA TOTAL
JUMLAH TOTAL
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 25,000 31,250.00


IDR 2,444,558 454,687.70
IDR 10,000 3,000.00
IDR 1,340 24,120.00
IDR 1,500 45.00
IDR 135,000 6,750.00
IDR 144,584 216,876.00
IDR 287,843 388,588.58
JUMLAH 1,125,317.27

IDR 78,178 78,177.92


IDR 107,759 215,517.50
IDR 124,662 24,932.42
IDR 160,159 8,007.95
JUMLAH 326,635.79
JUMLAH KESELURUHAN 1,451,953.06

IDR 78,178 7,817.79


IDR 160,159 800.80
JUMLAH 8,618.59

IDR 25,000 31,250.00


IDR 1,340 7,370.00
IDR 125,000 625.00
IDR 135,000 1,215.00
IDR 126,060 9,076.32
IDR 10,000 600.00
IDR 42,989 17,195.71
JUMLAH 67,332.03

IDR 78,178 31,271.17


IDR 107,759 21,551.75
IDR 124,662 2,493.24
IDR 160,159 3,203.18
JUMLAH 58,519.34
JUMLAH KESELURUHAN 125,851.37

IDR 126,060 1,512.72


IDR 10,000 200.00
IDR 330,000 2,310.00
JUMLAH 4,022.72

IDR 78,178 7,817.79


IDR 107,759 10,775.87
IDR 124,662 1,246.62
IDR 160,159 800.80
JUMLAH 20,641.08
JUMLAH KESELURUHAN 24,663.80

Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 58,633.44


IDR 160,159 4,003.98
JUMLAH HARGA TENAGA KERJA 62,637.42

IDR 78,178 117,266.88


IDR 101,000 75,750.00
IDR 124,662 9,349.66
IDR 160,159 12,011.93
JUMLAH HARGA TENAGA KERJA 214,378.46

IDR 185,000 222,000.00


IDR 1,340 270,680.00
IDR 195,000 94,575.00
JUMLAH HARGA BAHAN 587,255.00
JUMLAH HARGA 801,633.46

IDR 78,178 23,453.38


IDR 160,159 1,601.59
JUMLAH HARGA TENAGA KERJA 25,054.97

IDR 190,000 228,000.00


JUMLAH HARGA BAHAN 228,000.00
JUMLAH HARGA 253,054.97

IDR 78,178 60,978.78


IDR 101,000 39,390.00
IDR 124,662 4,861.82
IDR 160,159 6,246.20
JUMLAH HARGA TENAGA KERJA 111,476.80

IDR 185,000 222,000.00


IDR 190,000 82,080.00
JUMLAH HARGA BAHAN 304,080.00
JUMLAH HARGA 415,556.80

Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 8,130.50


IDR 101,000 23,634.00
IDR 107,759 26,185.38
IDR 101,000 24,543.05
IDR 124,662 17,328.03
IDR 160,159 18,898.77
Jumlah 118,719.73

IDR 2,444,558 1,271,169.90


IDR 10,000 7,800.00
IDR 10,000 48,500.00
IDR 26,554 9,293.90
IDR 13,000 20,280.00
IDR 1,340 1,876.00
IDR 1,500 496.50
IDR 135,000 22,950.00
Jumlah IDR 1,382,366
Jumlah Keseluruhan IDR 1,501,086

IDR 78,178 570,698.80


IDR 101,000 35,350.00
IDR 107,759 355,603.87
IDR 101,000 212,100.42
IDR 124,662 71,057.39
IDR 160,159 40,039.77
Jumlah 1,284,850.25

IDR 2,444,558 977,823.00


IDR 10,000 40,000.00
IDR 10,000 20,000.00
IDR 12,000 3,600,000.00
IDR 13,000 58,500.00
IDR 1,340 432,820.00
IDR 1,500 780.00
IDR 135,000 105,300.00
IDR 8,500,000 1,275,000.00
IDR 95,000 332,500.00
IDR 25,000 500,000.00
Jumlah 7,342,723.00
Jumlah Keseluruhan 8,627,573.25

IDR 78,178 7,817.79


IDR 101,000 3,333.00
IDR 107,759 3,556.04
IDR 101,000 3,333.01
IDR 124,662 1,246.62
IDR 160,159 800.80
Jumlah 20,087.25

IDR 2,963,100 8,889.30


IDR 10,000 200.00
IDR 12,000 43,200.00
IDR 13,000 650.00
IDR 1,340 7,370.00
IDR 1,500 13.50
IDR 135,000 2,025.00
Jumlah 62,347.80
Jumlah Keseluruhan 82,435.05

IDR 78,178 25,016.93


IDR 107,759 35,560.39
IDR 124,662 4,113.85
IDR 160,159 960.95
IDR 101,000 25,250.00
Jumlah 90,902.12

IDR 2,444,558 97,782.30


IDR 10,000 4,000.00
IDR 10,000 2,000.00
IDR 8,500,000 127,500.00
IDR 95,000 33,250.00
IDR 25,000 150,000.00
IDR 2,963,100 8,889.30
IDR 12,000 43,200.00
IDR 13,000 650.00
IDR 1,340 7,370.00
IDR 1,500 13.50
IDR 135,000 2,025.00
Jumlah 476,680.10
Jumlah Keseluruhan 567,582.22

Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 23,453.38


IDR 101,000 15,150.00
IDR 124,662 1,869.93
IDR 160,159 2,402.39
JUMLAH TENAGA KERJA 42,875.69

IDR 9,223 77,469.00


IDR 84,660 40,044.18
JUMLAH HARGA BAHAN 117,513.18
Jumlah (A+B) 160,388.87

IDR 78,178 23,453.38


IDR 101,000 15,150.00
IDR 124,662 1,869.93
IDR 160,159 2,402.39
JUMLAH TENAGA KERJA 42,875.69

IDR 1,340 20,775.36


IDR 195,000 3,120.00
JUMLAH HARGA BAHAN 23,895.36
Jumlah (A+B) 66,771.05

IDR 78,178 15,635.58


IDR 101,000 10,100.00
IDR 124,662 1,246.62
IDR 160,159 1,601.59
JUMLAH TENAGA KERJA 28,583.80

IDR 1,340 IDR 4,355.000


JUMLAH HARGA BAHAN IDR 4,355.000
Jumlah (A+B) IDR 32,938.795
IDR 78,178 15,635.58
IDR 101,000 10,100.00
IDR 124,662 1,246.62
IDR 160,159 1,601.59
JUMLAH TENAGA KERJA 28,583.80

IDR 1,340 IDR 4,355.000


JUMLAH HARGA BAHAN IDR 4,355.000
Jumlah (A+B) IDR 32,938.795

IDR 78,178 15,635.58


IDR 101,000 10,100.00
IDR 124,662 1,246.62
IDR 160,159 1,601.59
JUMLAH TENAGA KERJA 28,583.80

IDR 1,340 4,355.00


JUMLAH HARGA BAHAN 4,355.00
Jumlah (A+B) 32,938.80

IDR 78,178 15,635.58


IDR 101,000 10,100.00
IDR 124,662 1,246.62
IDR 160,159 1,601.59
JUMLAH TENAGA KERJA 28,583.80

IDR 1,340 4,355.00


JUMLAH HARGA BAHAN 4,355.00
Jumlah (A+B) 32,938.80

Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 164,173.63


IDR 107,759 21,551.75
IDR 124,662 4,363.17
IDR 160,159 48,047.72
TENAGA KERJA IDR 238,136.3
IDR 3,300,000 3,960,000.00
IDR 44,000 44,000.00
HARGA BAHAN 4,026,275.00
4,264,411.27
HARGA SATUAN JUMLAH

IDR 78,178 62,542.33


IDR 107,759 258,621.00
IDR 124,662 29,918.90
IDR 160,159 6,406.36
TENAGA KERJA 357,488.60

IDR 2,860,000 71,500.00


IDR 44,000 22,000.00

IDR 287,843 287,843.39

HARGA BAHAN 383,883.19


741,371.79
HARGA SATUAN JUMLAH

IDR 78,178 62,542.33


IDR 107,759 258,621.00
IDR 124,662 29,918.90
IDR 160,159 6,406.36
TENAGA KERJA 357,488.60

IDR 3,300,000 3,960,000.00


IDR 17,820 22,275.00
IDR 44,000 44,000.00
HARGA BAHAN 4,026,275.00
4,383,763.60
HARGA SATUAN JUMLAH

IDR 78,178 62,542.33


IDR 107,759 258,621.00
IDR 124,662 29,918.90
IDR 160,159 6,406.36
TENAGA KERJA 357,488.60

IDR 2,860,000 68,640.00


IDR 44,000 13,200.00
HARGA BAHAN 81,840.00
439,328.60
HARGA SATUAN JUMLAH

IDR 78,178 62,542.33


IDR 107,759 258,621.00
IDR 124,662 29,918.90
IDR 160,159 6,406.36
TENAGA KERJA 357,488.60

IDR 3,300,000 3,960,000.00


IDR 17,820 22,275.00
IDR 44,000 44,000.00
HARGA BAHAN 4,026,275.00
4,383,763.60

Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 93,813.50


IDR 101,000 20,200.00
IDR 124,662 2,493.24
IDR 160,159 9,609.54
Jumlah Tenaga Kerja 126,116.29

IDR 1,340 5,762.00


IDR 1,500 780.00
IDR 3,000 2,610.00

Jumlah Harga Bahan 9,152.00


TOTAL 135,268.29

IDR 78,178 54,724.54


IDR 101,000 35,350.00
IDR 124,662 4,363.17
IDR 160,159 5,605.57
Jumlah Tenaga Kerja 100,043.28

IDR 24,500 25,725.00


IDR 1,340 13,936.00
IDR 195,000 8,775.00
IDR 1,618 809.00
Jumlah Harga Bahan 49,245.00
TOTAL 149,288.28

IDR 78,178 18,762.70


IDR 101,000 12,120.00
IDR 124,662 1,495.94
IDR 160,159 1,921.91
Jumlah Tenaga Kerja 34,300.55

IDR 24,500 75,950.00


IDR 1,340 12,864.00
IDR 195,000 8,775.00
IDR 1,618 2,427.00
Jumlah Harga Bahan 100,016.00
TOTAL 134,316.55

IDR 78,178 54,724.54


IDR 101,000 35,350.00
IDR 124,662 4,363.17
IDR 160,159 5,605.57
Jumlah Tenaga Kerja 100,043.28

IDR 24,500 12,985.00


IDR 1,340 10,974.60
IDR 195,000 8,775.00
IDR 1,618 4,449.50
Jumlah Harga Bahan 37,184.10
TOTAL 137,227.38

Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 7,817.79


IDR 107,759 5,387.94
IDR 124,662 623.31
IDR 160,159 800.80
Jumlah Harga Tenaga 14,629.84

IDR 36,000 14,940.00


IDR 28,000 4,200.00
IDR 2,500 10,000.00
Jumlah Harga Bahan 29,140.00
Jumlah Harga 43,769.84

IDR 78,178 7,817.79


IDR 107,759 5,387.94
IDR 124,662 623.31
IDR 160,159 800.80
Jumlah Harga Tenaga 14,629.84

IDR 53,000 19,292.00


IDR 60,000 6,600.00
IDR 13,500 972.00
IDR 53,000 6,625.00
Jumlah Harga Bahan 33,489.00
Jumlah Harga 48,118.84

IDR 78,178 3,908.90


IDR 107,759 5,387.94
IDR 124,662 623.31
IDR 160,159 480.48
Jumlah Harga Tenaga 10,400.62

IDR 5,000 5,250.00


IDR 7,200 1,080.00
Jumlah Harga Bahan 6,330.00
Jumlah Harga 16,730.62

Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 57,382.59


IDR 101,000 74,134.15
IDR 124,662 9,100.33
IDR 160,159 5,925.89
146,542.96
IDR 18,463 56,589.82
56,589.82

203,132.77

IDR 78,178 11,726.69


IDR 107,759 8,081.91
IDR 124,662 997.30
IDR 160,159 1,281.27
22,087.16

IDR 5,500 137,500.00


137,500.00

159,587.16

IDR 78,178 31,271.17


IDR 107,759 21,551.75
IDR 124,662 2,493.24
IDR 160,159 320.32
55,636.48

IDR 5,000 25,000.00


IDR 1,340 10,720.00
IDR 195,000 6,240.00
41,960.00

97,596.48

Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 31,271.17


IDR 107,759 21,551.75
IDR 124,662 2,493.24
IDR 160,159 320.32
55,636.48

IDR 60,000 4,560.00


IDR 38,000 1,900.00
6,460.00
62,096.48
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 2,345.34


IDR 76,000 7,182.00
IDR 124,662 1,184.29
IDR 160,159 608.60
JUMLAH Rp 11,320

IDR 17,500 1,750.00


IDR 37,205 3,720.53
IDR 32,750 12,772.50

JUMLAH Rp 18,243
Jumlah (A+B) Rp 29,563

IDR 78,178 15,635.58


IDR 76,000 22,800.00
IDR 124,662 3,739.86
IDR 160,159 1,601.59
JUMLAH Rp 43,777

IDR 32,750 4,912.50


IDR 17,500 2,800.00
IDR 27,000 270.00

IDR 6,800 3,400.00


JUMLAH Rp 11,383
Jumlah (A+B) Rp 55,160

IDR 78,178 5,472.45


IDR 144,584 15,181.32
IDR 124,662 498.65
IDR 160,159 400.40
JUMLAH Rp 21,553

IDR 11,615 2,323.00


IDR 17,500 2,625.00
IDR 37,205 6,324.90
IDR 46,200 16,170.00
JUMLAH Rp 27,442.90
Jumlah (A+B) Rp 48,995.72
HARGA SATUAN (RP) JUMLAH HARGA (RP)

IDR 107,759 53,879.37


IDR 124,662 62,331.04
JUMLAH 116,210.41

IDR 161,355 161,354.56


JUMLAH 161,354.56
JUMLAH KESELURUHAN 277,564.97

HARGA SATUAN (RP) JUMLAH HARGA (RP)

IDR 107,759 13,469.84


IDR 124,662 1,620.61
JUMLAH 15,090.45

IDR 26,554 26,554.00


JUMLAH 26,554.00
JUMLAH KESELURUHAN 41,644.45

HARGA SATUAN (RP) JUMLAH HARGA (RP)

IDR 107,759 13,469.84


IDR 124,662 1,620.61
JUMLAH 13,469.84

IDR 12,580 12,580.00


JUMLAH 12,580.00
JUMLAH KESELURUHAN 26,049.84

HARGA SATUAN (RP) JUMLAH HARGA (RP)

IDR 107,759 10,775.87


IDR 124,662 1,246.62
JUMLAH 12,022.50

IDR 12,580 12,580.00


JUMLAH 12,580.00
JUMLAH KESELURUHAN 24,602.50

HARGA SATUAN (RP) JUMLAH HARGA (RP)

IDR 107,759 10,775.87


IDR 124,662 1,246.62
JUMLAH 12,022.50

IDR 12,580 12,580.00


JUMLAH 12,580.00
JUMLAH KESELURUHAN 24,602.50

HARGA SATUAN (RP) JUMLAH HARGA (RP)

IDR 107,759 13,469.84


IDR 124,662 1,620.61
JUMLAH 15,090.45

IDR 19,910 19,910.00


JUMLAH 19,910.00
JUMLAH KESELURUHAN 35,000.45

CLOSET
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 257,987.13


IDR 101,000 111,100.00
IDR 124,662 1,246.62
IDR 160,159 25,625.45
JUMLAH 395,959.20

IDR 1,898,567 1,898,567.00


JUMLAH 1,898,567.00
JUMLH A+B 2,294,526.20
A PVC θ 4"
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 6,332.41


IDR 24,500 3,307.50
IDR 124,662 1,682.94
IDR 160,159 640.64
JUMLAH 11,963.49

IDR 134,393 161,271.00


JUMLAH 161,271.00
JUMLAH A+B 173,234.49
A PVC θ 3"
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 6,332.41


IDR 24,500 3,307.50
IDR 124,662 1,682.94
IDR 160,159 640.64
JUMLAH 11,963.49

IDR 177,650 213,180.00


JUMLAH A+B 225,143.49
PVC θ 1/2"
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 2,814.41


IDR 24,500 1,470.00
IDR 124,662 747.97
IDR 160,159 320.32
JUMLAH 5,352.70

IDR 126,500 151,800.00


JUMLAH 151,800.00
JUMLAH A + B 157,152.70
AN AIR 1/2"
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 781.78


IDR 101,000 40,400.00
IDR 124,662 4,986.48
IDR 160,159 800.80
JUMLAH 46,969.06

IDR 76,340 76,340.00


IDR 3,892 97.30
JUMLAH 76,437.30
JUMLAH A + B 123,406.36
FLOOR DRAIN
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 781.78


IDR 101,000 10,100.00
IDR 124,662 1,246.62
IDR 160,159 800.80
JUMLAH 12,929.20

IDR 33,187 33,187.00


JUMLAH 33,187.00
JUMLAH A + B 46,116.20
AIR (TANGKI AIR)
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 156,355.84


IDR 101,000 111,100.00
IDR 124,662 124.66
IDR 160,159 25,625.45
JUMLAH 293,205.95

IDR 446,094 446,094.00


JUMLAH 446,094.00
JUMLAH A + B 739,299.95
PTICTANK
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 156,355.84


IDR 144,584 159,042.40
IDR 101,000 111,100.00
IDR 124,662 124.66
IDR 160,159 25,625.45
JUMLAH 452,248.35

IDR 62,637 140,934.20


IDR 190,000 20,330.00
IDR 1,400,000 1,575,000.00
IDR 180,959 1,357,196.18
IDR 1,475,666 221,349.90
IDR 68,922 516,917.63
IDR 33,598 302,383.17
IDR 22,462 56,155.18
JUMLAH 4,190,266.24
JUMLAH A + B 4,642,514.59
UR RESAPAN
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 156,355.84


IDR 144,584 159,042.40
IDR 101,000 111,100.00
IDR 124,662 124.66
IDR 160,159 25,625.45
JUMLAH 452,248.35

IDR 77,567 130,933.57


IDR 372,575 1,005,952.69
IDR 24,500 12,862.50
IDR 69,702 627,313.50
IDR 24,500 13,793.50
JUMLAH IDR 1,790,856
JUMLAH A + B 2,243,104.11
KAMAR MANDI
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 257,987.13


IDR 101,000 111,100.00
IDR 124,662 1,246.62
IDR 160,159 25,625.45
JUMLAH 395,959.20

IDR 330,000 330,000.00


JUMLAH 330,000.00
JUMLAH A+B 725,959.20
AK CUCI DAPUR
Harga Satuan (Rp) Jumlah Harga (Rp)

IDR 78,178 257,987.13


IDR 101,000 111,100.00
IDR 124,662 1,246.62
IDR 160,159 25,625.45
JUMLAH 395,959.20

IDR 40,000 40,000.00


JUMLAH 40,000.00
JUMLAH A+B 435,959.20

Harga Satuan (Rp) Jumlah Harga (Rp)


IDR 78,178 1,563.56
IDR 24,500 #VALUE!
IDR 160,159 #VALUE!
3,587.54

IDR 6,500 #VALUE!


IDR 15,500 62,000.00
IDR 10,000 #VALUE!
IDR 4,000 #VALUE!
IDR 450 #VALUE!
IDR 1,000 4,000.00
IDR 5,000 #VALUE!
IDR 27,000 #VALUE!
IDR 15,000 #VALUE!
179,850.00
183,437.54

IDR 78,178 1,563.56


IDR 24,500 #VALUE!
IDR 160,159 #VALUE!
3,587.54

IDR 32,000 #VALUE!


IDR 13,000 3,250,000.00
35,250.00
38,837.54

IDR 78,178 1,563.56


IDR 24,500 #VALUE!
IDR 160,159 #VALUE!
3,587.54

IDR 32,000 #VALUE!


IDR 15,500 62,000.00
94,000.00
97,587.54

IDR 78,178 1,563.56


IDR 24,500 #VALUE!
IDR 160,159 #VALUE!
3,587.54
IDR 30,000 #VALUE!
IDR 13,000 3,250,000.00
33,250.00
36,837.54

IDR 78,178 1,563.56


IDR 24,500 #VALUE!
IDR 160,159 #VALUE!
IDR 3,588

IDR 33,000 #VALUE!


IDR 13,000 3,250,000.00
36,250.00
39,837.54

IDR 78,178 1,563.56


IDR 24,500 #VALUE!
IDR 160,159 #VALUE!
3,587.54

IDR 45,000 #VALUE!


IDR 13,000 3,250.00
48,250.00
51,837.54
55,425.07

IDR 78,178 1,563.56


IDR 24,500 #VALUE!
IDR 160,159 #VALUE!
3,587.54

IDR 6,500 #VALUE!


IDR 15,500 #VALUE!
IDR 330,000 #VALUE!
IDR 4,000 #VALUE!
IDR 1,000 #VALUE!
IDR 5,000 #VALUE!
615,000.00
618,587.54
DAFTAR HARGA PEKERJA

DAFTAR HARGA MATERIAL &PEKERJA


No Bahan Satuan
1 Air Liter
2 Ampelas lbr
3 Avour Unit
4 Baja ringan canai dingin C75 kg
5 Bak tangki Buah
6 BALOK KAYU m³
7 Bata ringan tebal 7.5 cm m³
8 Batu Kali M³
9 Besi Beton Kg
10 Besi Beton polos Kg
11 Cat dasar kg
12 Cat Meni Kg
13 Cat Penutup 3 X set Vinilex kg
14 Cat Penutup 3x setara Sieve kg
15 Cat Tembok setara Vinilex kg
16 Closet duduk Unit
17 Compound zak
18 Cotton Plaster buah
19 Dolken Kayu Ø 8-10/400 cm Btg
20 Engsel Jendela Unit
21 Engsel Pintu Unit
22 FITTING BUAH
23 Floor Drain Unit
24 Galian tanah m3
25 Galian tanah untuk rembesan m3
26 Genteng bubung palentong buah
27 genteng palentong bh
28 GRC 4 mm lbr
29 Grendel Jendela Unit
30 Grendel Pintu Unit
31 Gypsum Board (120X240X9) mm lbr
32 Hollow 2/4 btg
33 Hollow 4/4 btg
34 KABEL LISTRIK NYM 2 X 2,25 M
35 KABEL NYM 3 x 2,5 mm M
36 Kait Angin Unit
37 Kawat Beton Kg
38 Kayu Albasiah M³
39 Kayu Borneo Balok M³
40 Kayu Balok Terentang M3
41 Kepala Tukang OH
42 Kerikil Kg
43 KLEM BUAH
44 Koral Beton M³
45 Kran air Unit
46 Kunci Tanam Biasa Unit
47 L BOW BUAH
48 LAMPU DOWN LIGHT BUAH
49 LAMPU HIAS BUAH
50 lantai kerja m3
51 LAS DOP BUAH
52 LEM KAYU kg
53 List Gypsum m
54 Mandor OH
55 MCB BUAH
56 Minyak Bekisting Lt
57 MONGKOK BUAH
58 Mortar siap pakai Kg
59 PAKU 10 CM kg
60 paku berbagai ukuran (1-3 cm) kg
61 Paku Biasa 2"-5" Kg
62 Paku Gypsum kg
63 PAPAN KAYU m³
64 Pas. Bata adk 1pc : 3ps m2
65 pas. Ijuk kg
66 Pasir Beton M³
67 Pasir Beton Kg
68 Pasir Pasang m3
71 Pasir Urug M³
73 PC Kg
74 Pekerja OH
75 Pelat beton K-225 m3
76 Pipa GIP 1 1/2" m'
77 PIPA LISTRIK 5/8" BTG
78 Pipa PVC 4" berlubang jenis AW m'
79 Pipa PVC 4" jenis AW m'
80 Plamir kg
81 Plamir tembok kg
82 Plesteran adk 1pc : 3ps m2
83 PLYWOOD TEBAL 4MM UKURAN (90X220) CM Lembar
84 Plywood tebal 9 mm Lbr
85 PP m³
86 PVC θ 1/2" M
87 PVC θ 3" M
88 PVC θ 4" M
89 Ramset/Dinabolt buah
90 Rol Cat buah
91 SAKLAR GANDA UNIT
92 SAKLAR TUNGGAL UNIT
93 Sealtape Buah
94 Semen Portland kg
95 Semen Portland 50 Kg Kg
96 Semen Warna Kg
97 Shower TOTO Unit
98 Steger werk ls
99 Stop Kontak BUAH
100 T DUS BUAH
101 Tepung Gypsum kg
102 Tukang cat Oh
103 Tukang Kayu OH
104 Ubin Keramik 10x20 Doos
105 Ubin Keramik 20x20 Doos
106 Ubin Keramik 60x60 Doos
107 Urugan dan Perataan tanah m3
108 Urugan kerikil 3/5 m3
Tukang Besi Oh
Kayu 5/7 M3
Residu Kg
Kayu Papan 3/20 M3
Tukang Batu Oh
Seng Gelombang BJLS 30 Lbr
Tukang listrik oh
Harga satuan
IDR 689
IDR 6,800
IDR 40,000
IDR 18,463
IDR 446,094
IDR 3,300,000
IDR 9,223
IDR 185,000
IDR 10,000
IDR 12,000
IDR 37,205
IDR 11,615
IDR 32,750
IDR 46,200
IDR 32,750
IDR 1,898,567
IDR 53,000
IDR 13,500
IDR 25,000
IDR 12,580
IDR 26,554
IDR 15,000
IDR 33,187
IDR 62,637
IDR 77,567
IDR 5,000
IDR 5,500
IDR 60,000
IDR 26,550
IDR 45,575
IDR 53,000
IDR 28,000
IDR 36,000
IDR 13,000
IDR 15,500
IDR 19,910
IDR 13,000
IDR 2,963,100
IDR 8,500,000
IDR 2,444,558
IDR 124,662
IDR 3,000
IDR 1,000
IDR 135,000
IDR 76,340
IDR 161,355
IDR 4,000
IDR 32,000
IDR 45,000
IDR 1,400,000
IDR 450
IDR 44,000
IDR 5,000
IDR 160,159
IDR 400,000
IDR 10,000
IDR 5,000
IDR 84,660
IDR 17,820
IDR 38,000
IDR 10,000
IDR 60,000
IDR 2,860,000
IDR 180,959
IDR 372,575
IDR 125,000
IDR 1,500
IDR 195,000
IDR 190,000
IDR 81,950
IDR 78,178
IDR 1,475,666
IDR 22,462
IDR 6,500
IDR 69,702
IDR 33,598
IDR 17,500
IDR 17,500
IDR 68,922
IDR 287,843
IDR 95,000
IDR 275,000
IDR 126,500
IDR 177,650
IDR 134,393
IDR 2,500
IDR 27,000
IDR 33,000
IDR 30,000
IDR 3,892
IDR 1,340
IDR 81,950
IDR 1,618
IDR 385,000
IDR 232,815
IDR 32,000
IDR 10,000
IDR 7,200
IDR 76,000
IDR 107,759
IDR 74,830
IDR 66,380
IDR 422,400
IDR 20,879
IDR 330,000
IDR 101,000
IDR 126,060
IDR 42,989
IDR 330,000
IDR 101,000
144,584.00
IDR 24,500

Você também pode gostar