Item Description Rate Unit Remarks

No
1 Topographic Survey
Topographic and cadastral
survey for command area
including canal alignment
works of irrigation projects by
using Total station GPS, etc.
with minimum 20 number of
point reading per ha, to
generate 30mx30m grid and
0.5 m interval contours
including transfer of entire
data to computer system in
different geo-referenced
layers / themes using features 17600/- Sq.km
of standard software,
compatible with design
software packages, including
supply of soft and hard copies
of point readings, including As CPWD SOR
digitizing village maps and 2014-15
super imposing the contours
on village map (scale 1in
4000) including marking all
permanent features like
roads, cart tracks, existing
canals, temples, tanks, forest
boundary and electric poles,
etc., including marking of
ridges and valleys on survey
sheet including supply of 4
soft copies and 4 hard copies
after approval of competent
authority, preparation &
submission of 10m x10m grid
for all structures of canal etc.
complete.
2 1.20 Data interpretation of 5000/- Each
Satellite Remote Sensing Data
/ imaginaries procured from
Indian Remote Sensing
Satellite IRS-LISS III, Resource
sesat-II Cartosat-I from
National Remote Sensing
Centre/ ISRO for creating
layers for mapping of
different uses, for one
toposheet (1:50,000) and one
layer excluding cost of
imaginaries etc. complete.
3 Digitization of features, such 2000/- Each
as road, canal, water bodies,
monuments, river/ nalla,
boundaries, landmarks etc.
complete of one toposheet
(1:50000)
4 Geo-rectification of carto-sat 2000/- Each
data of one toposheet
(1:50000) using appropriate
software.
5 Dag-belling in all types of soil
a Single spade stroke 5/- M
(minimum75 mm deep)
b Double spade "V" shaped 7/- M
stroke(100 mm deep)
6 Excavation for trial pit or trial
trench or other investigation
work including 200 m lead
and all lift with dressing etc.
complete
a In all kind of soil 54/- Cu.m
Soft/loose/hard /dense soils,
moorum & moorum mixed
with boulders and mud.
b In Soft/ disintegrated/ 110/- Cu.m
weathered rock.
c In hard rock. 590/- Cu.m
7 Extra rate for excavation for 8% of Item No. Cu.m
trial pit or trial trench or 6 (a) to 6 (c)
other investigation work
including 200 m lead and all
lift with dressing etc.
complete. When depth is
more than 1.5 times the
specified top width.
8% of Item No.
Extra rate for wet excavation 6 (a) to 6 (c) Cu.m
8
for trial pit or trial trench or
other investigation work
including 200 m lead and all
lift with dressing etc.
complete. Below sub-soil
water level.
9 Boring holes with auger in all
types of soil up to 5 m depth
below ground level including
collecting samples etc.
complete.
A For 200 mm dia. 332/- M
B For 250 mm dia 434/- M
C For 300 mm dia 511/- M
10 Sand (Including Royalty 750/- Cu.m As per SOR 2016-
charges) 17, Water
Resource Dept.
Govt. of
Maharashtra
Sand (Excluding Royalty 608.66/- Cu.m As per SOR 2016-
charges) 17, Water
Resource Dept.
Govt. of
Maharashtra
11 Coarse Sand 1100/- Cu.m `As per SOR 2012-
13,
Nagpur&Amravati
Region,
Maharashtra
Jeevan
Pradhikaran.