This document is an inspection test record for a submarine cable. It lists 12 inspection items to verify aspects of the cable's construction, installation, identification, cleaning, and documentation. Upon completion, the inspector, verifier, and acceptor must sign off, with space to include any additional comments. The inspection aims to ensure the cable was installed properly according to drawings and specifications.
This document is an inspection test record for a submarine cable. It lists 12 inspection items to verify aspects of the cable's construction, installation, identification, cleaning, and documentation. Upon completion, the inspector, verifier, and acceptor must sign off, with space to include any additional comments. The inspection aims to ensure the cable was installed properly according to drawings and specifications.
This document is an inspection test record for a submarine cable. It lists 12 inspection items to verify aspects of the cable's construction, installation, identification, cleaning, and documentation. Upon completion, the inspector, verifier, and acceptor must sign off, with space to include any additional comments. The inspection aims to ensure the cable was installed properly according to drawings and specifications.
Project No. Project Title Facilities INFORMATION Tag no. System / Sub System no. Amperes Bus bar Rating Frequency Location Manufacturer Ref. Drawing nos. Type Voltage INSPECTION / TEST OK N/A P/L No. Documents required: a) Bus duct installation/layout drawing 1 b) Bus duct installation details from manufacturer c) Key single line diagram Verify to ensure that all construction / installation activities have been 2 completed. Verify Earthing links/bonding are properly installed and secured in 3 every Bus duct joint connection as per installation drawings. Verify any mechanical damage to the bus duct sections, joints or end 4 terminations. Check and confirm bus-duct installations including supports are as per 5 layout drawing and manufacturer instructions. Bus-duct properly insulated, supported and identified (As per Vendor's 6 Drawing). Bus bars and connecting links are tightened to vendor’s specified 7 torque values. Mark all the bolts after tightening. 8 Verify and confirm phase identification is correct, warning labels fitted. 9 Check and confirm all related red line markings are completed. 10 Record any defects/shortcomings in the system punch-list. Verify no dust inside Enclosure /Cabinet / Panel and insulation surfaces 11 are clean. Verify Instruments & its Accessories /Electrical equipment/Panel 12 externally clean. COMMENT(S) AND ADDITIONAL INFORMATION