Escolar Documentos
Profissional Documentos
Cultura Documentos
Installation Instruction
Installation Instruction Number:
Released Date: 14-mar-2017
5414618
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions
Introduction
• This document provides sulfur tolerance kit installation instructions that will convert
the QSG12 CM2350 G110 to the QSG12 CM2350 G113.
• To complete installation of the sulfur tolerance kit, see Service Bulletin, Engine Fuel
Sulfur Tolerance Kit Installation Overview, 4388715
(/qs3/pubsys2/xml/en/bulletin/4388715.html).
Note : This guideline is intended to be universal across the engine platforms
outlined above. The illustrations in this procedure may not exactly match the
engine being serviced.
Table 1, Associated Service Manual
Service Model Name Bulletin Number Remarks
QSG12 CM2350 G110 4367323 Standard Engine
Sulfur Tolerance Kit
QSG12 CM2350 G113 5467252
Engine
Parts Required
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions Página 2 de 9
Note : Not all components listed in Table 3 will be required for every coolant
thermostat housing configuration.
Table 3, Contents of Sulfur Tolerance Kit, Parts Number 5447210
Figure
Part Part
1, Item Quantit
Descri Numbe TH2774 TH2785 TH2786 TH2787
Numbe y
ption r
r
Housin
g, 369770
1 1 X
Thermo 9
stat
Tube,
369832
2 Water 1 X X X
6
Bypass
Connec
tion, 369832
3 1 X
Water 0
Bypass
Hose, 369231
None 1 X
Plain 0
Clamp,
304348
None Spring 2 X X X
7
Hose
Screw,
Hex 390063
None 3 X
Flange 1
Head
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions Página 3 de 9
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions Página 4 de 9
Installation Instructions
Preparatory Steps
WARNING
Batteries can emit explosive gases. To reduce the possibility of personal injury,
always ventilate the compartment before servicing the batteries. To reduce the
possibility of arcing, remove the negative (-) battery cable first and attach the
negative (-) battery cable last.
Remove
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions Página 5 de 9
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions Página 6 de 9
Aftertreatment System
Engine Dataplate
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions Página 7 de 9
Install
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions Página 8 de 9
Engine Dataplate
Finishing Steps
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019
QSG12 CM2350 G113 Sulfur Tolerance Kit Installation Instructions Página 9 de 9
WARNING
Batteries can emit explosive gases. To reduce the possibility of personal injury,
always ventilate the compartment before servicing the batteries. To reduce the
possibility of arcing, remove the negative (-) battery cable first and attach the
negative (-) battery cable last.
Document History
Date Details
2017-2-15 Module Created
2017-4-27 none
https://quickserve.cummins.com/qs3/pubsys2/xml/en/install_inst/5414618.html 6/26/2019