Você está na página 1de 38

CALCULO DE MUROS DE GRAVEDAD

UBICACION : CIUDADELA LA PLAYA

FECHA: NOVIEMBRE/92

DATOS
 qa = 10 t/m2 H = ###
 fc = 210 Kg/cm2 B = ###          2
b = ### Ph = Ka.Pes.H /2 =
b' = ###
Ka = ### Mv =   Ph  H/3   =
Pes= ###
Peh= ###
FSD=  0.60 We/Ph =
­ ­­­­­ ­­­­­­ ­ ­­­­­­­ ­ ­­­­ ­­­­­­­ ­ FSV=    Me/Mv    =
|   P E S O | B.P |    MOMENTOS |
| ­­­­­ ­­­­­­ | ­­­­­­­ | ­­­­ ­­­­­­­ | MR =   Me ­ Mv   =
|  W1 = 3.080  | 0.533 | 1.643  |  X =    MR/We    =
|  W2 = 2.310  | 0.950 | 2.195  |  e =   B/2 ­ X   =
|  W3 = 3.080  | 1.367 | 4.209  | B/3=    B/3      =
|  W4 = 2.380  | 1.633 | 3.887  | B/6=    B/6      =
| ­­­­­ ­­­­­­ | ­­­­­­­ | ­­­­ ­­­­­­­ |
|  We = ### | |  Me = 11.934  |   Si e< B/6  q1= We/B (1+6e/B) < qa
­ ­­­­­ ­­­­­­ ­ ­­­­­­­ ­ ­­­­ ­­­­­­­ ­ Si e>B/6  q2=2We/(3L(b/2­e))< qa
 q =  q1  o  q2  =
R esta en el tercio medio central

SE ACEPTA EL CALCULO :

Si    FSD >= 1,5
Si    FSD >= 1,5
Si     qa >= q1 o q2

 A  = 3.85
3.471 

4.049 

1.876 
2.947 

7.885 
0.727 
0.223 
0.633 
0.317 

 (1+6e/B) < qa
3L(b/2­e))< qa
9.738 
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012

0.20
α= 0 º

W3

4.00
Ph = Ka.Pes.H2 /2 = 7.897  W4 Relleno
W1
Mv =   Ph  H/3   = 13.688 

/ / / / / W2
FSD=  0.60 We/Ph = 1.567 

1.20
FSV=    Me/Mv    = 2.940 
  P E S O B.P    MOMENTOS W5

0.30
 W1 = 2.352  1.150  2.705  MR =   Me ­ Mv   = 26.555 
 W2 = 1.764  1.350  2.381   X =    MR/We    = 1.288 
 W3 = 1.301  1.450  1.886   e =   B/2 ­ X   = 0.237  1.05 0.50 1.50
 W4 = ### 2.300  29.922  B/3=    B/3      = 1.017  51.80 cm
 W5 = 2.196  1.525  3.349  B/6=    B/6      = 0.508 
DATOS:
 We = ###  Me = 40.243   Si e< B/6  q1= We/B (1+6e/B) < qa ƴs = 1.77 t/m3
Si e>B/6  q2=2We/(3L(b/2­e))< qa Ka = 0.33
 q =  q1  o  q2  = 9.918  Suelo Tipo II
R esta en el tercio medio central 3.605 
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si    FSD >= 1.50 O.K Peh = 2.40 Kg/cm3
Si    FSV >= 1.50 O.K
Si     qa >= q1 o q2
q1 O.K
q2 O.K
/ / / / / W2

1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO W5

0.30
Kp = 10 Ka = 3.300
Pp1= Kp H x Pes = 7.009
Pp2= Kp Hd x Pes = 8.762

Pp = (Pp1+Pp2)/2 Hd 2.366 0.10

FSD = 0,60 We /(PH-Pp) 2.237

Si    FSD >= 1.50 O.K M = Hd2 (Pp1+2 Pp2)/6 = 0.368


b = K2 (Mv/B)^0,5 = 10.00 cm
1.05
/
/

0.30
DISEÑO DEL DEDO /
/
7.745 t/m2
M = L2 (q1+2 q2)/6 = 5.068 t-m / m 9.918 t/m2
Mu = 1,40 M = 7.095 t-m / m

As min = 14/fy b d = 8.333 cm2 / m As = 0,30 Mu / d = 8.514 cm2 / m Poner As calculo

As inferior Seleccionar uno de ellos


ɵ = 12 mm S= 13 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
Nota: Máximo S de refuerzo = altura efectiva (d) = 25 cm

8.673 t/m2
1.50
DISEÑO DEL TALON \
\

0.30
\
\

As min = 14/fy b d = 8.333 cm2 / m M = q L2 / 2 - L2 (q1+2 q2) / 6 = 4.537 t-m / m


Mu = 1,40 M = 6.352 t-m / m 3.605 t/m2
As Superior 6.710 t/m2

As = 0,30 Mu / d = 7.623 cm2 / m Poner As min


Seleccionar uno de ellos
ɵ = 12 mm S= 14 cm
ɵ = 14 mm S= 18 cm
ɵ = 16 mm S= 24 cm
DISEÑO DE LA PANTALLA
0.20
H M Mu d As ɵ S
FRANJA As min As a colocar
(m) ( t-m /m ) 1,4 M ( m) cm2/m (mm) ( cm )

1 = H/3
1 1.63 0.4242 0.594 0.25 0.7126 8.33 8.33 18 31

1.63
2 3.27 3.3935 4.751 0.35 4.0722 11.67 11.67 16 60
3 4.90 11.4531 16.034 0.45 10.69 15.00 15.00 16 60

4.00

2 = H/3
1.63
3 = H/3
1.63
1.20
/ / / / / PH = Kh x Pes x h

0.30
1.05 0.50 1.50
Asumir este
0.30

valor
PH = Kh x Pes x h
CALCULO DE MUROS DE GRAVEDAD
UBICACION : PUENTE SAN MIGUEL
FECHA: MAYO/2012

0.50
4.00
Ph = Ka.Pes.H2 /2 = 7.897 

4.40

4.40
Mv =   Ph  H/3   = 13.688 

FSD=  0.60 We/Ph = 1.567 

1.20
FSV=    Me/Mv    = 2.940 
  P E S O B.P    MOMENTOS

0.30
 W1 = 2.352  1.150  2.705  MR =   Me ­ Mv   = 26.555 
 W2 = 1.764  1.350  2.381   X =    MR/We    = 1.288 
 W3 = 1.301  1.450  1.886   e =   B/2 ­ X   = 0.237 
 W4 = ### 2.300  29.922  B/3=    B/3      = 1.017 
 W5 = 2.196  1.525  3.349  B/6=    B/6      = 0.508 
DATOS:
 We = ###  Me = 40.243   Si e< B/6  q1= We/B (1+6e/B) < qa ƴs = = 1.77 t/m3
Si e>B/6  q2=2We/(3L(b/2­e))< qa Ka = 0.33
 q =  q1  o  q2  = 9.918  Suelo Tipo II
R esta en el tercio medio central 3.605 
qa = 10 T/m2
SE ACEPTA EL CALCULO : f'c = 210 Kg/cm2
fy = 4200 Kg/cm2
Si    FSD >= 1.50 O.K Peh = 2.40 Kg/cm3
Si    FSV >= 1.50 O.K
Si     qa >= q1 o q2
q1 O.K
q2 O.K
/ /

1.20
DIMENSIONES DEL DIENTE NO ES NECESARIO

0.30
Kp = 10 Ka = 3.300
Pp1= Kp H x Pes = 7.009
Pp2= Kp Hd x Pes = 8.762

Pp = (Pp1+Pp2)/2 Hd 2.366

FSD = 0,60 We /(PH-Pp) 2.237

Si    FSD >= 1.50 O.K M = Hd2 (Pp1+2 Pp2)/6 = 0.368


b = K2 (Mv/B)^0,5 = 10.00 cm
1.05

0.30
DISEÑO DEL DEDO

M = L2 (q1+2 q2)/6 = 5.068 t-m / m 9.918 t/m2


Mu = 1,40 M = 7.095 t-m / m

As min = 14/fy b d = 8.333 cm2 / m As = 0,30 Mu / d = 8.514 cm2 / m Poner As calculo

As inferior Seleccionar uno de ellos


ɵ = 12 mm S= 13
ɵ = 14 mm S= 18
ɵ = 16 mm S= 24
Nota: Máximo S de refuerzo = altura efectiva (d) = 25
1.50
DISEÑO DEL TALON \
\

0.30
\
\

As min = 14/fy b d = 8.333 cm2 / m M = q L2 / 2 - L2 (q1+2 q2) / 6 = 4.537 t-m / m


Mu = 1,40 M = 6.352 t-m / m
As Superior 6.710 t/m2

As = 0,30 Mu / d = 7.623 cm2 / m Poner As min


Seleccionar uno de ellos
ɵ = 12 mm S= 14
ɵ = 14 mm S= 18
ɵ = 16 mm S= 24
DISEÑO DE LA PANTALLA

H M Mu d As ɵ S
FRANJA As min As a colocar
(m) ( t-m /m ) 1,4 M ( m) cm2/m (mm) ( cm )

1 = H/3
1 1.63 0.4242 0.594 0.25 0.7126 8.33 8.33 18 31
2 3.27 3.3935 4.751 0.35 4.0722 11.67 11.67 16 60
3 4.90 11.4531 16.034 0.45 10.69 15.00 15.00 16 60

4.00

2 = H/3
3 = H/3
1.20

0.30
0.20
α=

W3

Agua

W4 Relleno
4.40

W1

W2

W5

1.05 0.50 1.50


51.80 cm
/ / / W2

W5

Asumir este

0.30
valor

1.05
/
/
/
/
7.745 t/m2

cm
cm
cm
cm

8.673 t/m2
1.50

3.605 t/m2

cm
cm
cm

0.20
1.63
1.63
1.63

/ / / / / PH = Kh x Pes x h

1.05 0.50 1.50


PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m No carrilles = 1 U
ANCHO TOTAL = 5.00m (Ancho de via+Veredas)
FECHA = ABR 2015

H/24>=0.3m = 0.33m 3/8 hv= 0.58m

### 0.60m

hv=1.10(0.15+L/18)= ###
###
###
0.4m
###

###
###

###

###

2.40m 0.90m 1.70m

5.00m

3.90m - ### ### - ### ###


H/2-2H/3 H/8 - H/10 B/3
Dato
Asumir
H/12=
###
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL = 5.00m (Ancho de via+Veredas)
FECHA = MARZO 2015

DATOS:
ɣhormigón = 2.40 T/m3
ɣm = 1.80 T/m3 ɸ = 30°

a) MUERTA INFRAESTRUCTURA
0.30m 0.60m

###
P5

P6 ###
P4
0.4m

P7
###

P8

P3
###

P2
###

P1

A
2.40m 0.90m 1.70m

5.00m
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL = 5.00m (Ancho de via+Veredas)
FECHA = MARZO 2015

DATOS:
ɣh.a = 2.40 T/m3
ɣh.s = 2.20 T/m3
N de vigas = 2 U

b) CARGA MUERTA SUPER-ESTRUCTURA (D)


Posición para determina

b=1.30m 1.20m

1.250m S=2.500m
0.700m
0

###
0

0.750m

0.850m ### ### ### 1.70m

1.050m 2.100m

Ancho del tablero = 5.000m Ok

Element Superestructura Volumen WS YA MDSA


Capa de rodadura 0.175m3 0.385T/m 1.575m 0.606T-m
Aceras 0.363m3 0.870T/m 1.675m 1.457T-m
Tablero (Losa) 0.667m3 1.601T/m 1.435m 2.297T-m
Volados 0.391m3 0.938T/m 1.435m 1.347T-m
Vigas 1.056m3 2.534T/m 0.660m 1.673T-m
Cartelas 0.040m3 0.096T/m 1.287m 0.124T-m
6.425T/m 7.504T-m
Diafragmas Espesor Volumen P
Diafragma de apoyo 0.250m 0.688m3 6.60Ton
Diafragma central 0.250m 0.483m3 2.32Ton
8.92Ton

D = 16.30Ton
XA = 2.000m
MAD= 32.61T-m

c) CARGA VIVA SUPER-ESTRUCTURA (L)

Cortante: Momento:
Fr= P (1 + (a+b)/s) = 1.80 P Fr = S/1.80 P

Rd=5.00 T
Rt=7.50 T

Rt=7.50 T

4.00m 4.00m

14.00m

RL = 24.60Ton
XA = 2.000m
MAL= 49.20T-m

d) FLOTACION (B)

ɣagua = 1.00 T/m3

### 0.60m
h' =
###

P5
###

P6
P4
0.4m
###
0.4m
P7

###
P8

0.145m P3

###

###
P2

###
P1

A
2.40m 0.90m 1.70m

5.00m

Element Volumen W XA MBA


Cimiento 3.000m3 3.000T/m 2.500m 7.500T-m
Sobrecimiento 1.440m3 1.440T/m 2.000m 2.880T-m
0.534m3 0.534T/m 2.497m 1.334T-m
4.974T/m 11.714T-m

MBA= 11.71T-m

e) VIENTO (W)

e.1) Carga Muerta

Coef. Vient = 0.059 T/m2

Longitud 21.400m
Altura = 1.800m

WD = 0.455Ton

Viento W YA MWDA
Viga+tablero+acera 0.455T/m 6.850m 3.114T-m
3.114T-m

e.2) Carga Viva


WL = 2.712Ton YA = 9.630m

MWLA = 26.117T-m

f) FUERZA LONGITUDINAL (LF)

No carril = 1 U
% C. viva = 5%

FL = 0.135Ton YA = 9.630m

MFLA = 1.296T-m

g) EMPUJE DE TIERRAS (Et)

h' = 0.600m
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3

E = 1/2 ɣs Ka H (H+2 h') = 21.06Ton

H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 2.773m

MEtA = 58.406T-m

h) FUERZA DE SISMO (EQ)

h.1) Infraestructura (I)

Datos: Obtenidos de a) Carga Muerta

Carga (P) = 51.17Ton


MYA = 180.693T/m

EQI = (0.04 - 0.06) P = 0.04 P = 2.05Ton

Y = MYA / P = 3.53m

MEQIA = 7.228T-m

h.2) Super-estructura (S)

Datos: Obtenidos de b) Carga Muerta Super-estructura

WS = 6.425T/m
MDSA = 7.504T-m
D = 16.30Ton

Peso de Super-estrcutura = 163.04Ton

EQS = (0.04 - 0.06) P = 0.04 P = 1.30Ton


Y = MYA / P = 1.17m

YS = ( H - hviga) + Y = 7.42m

MEQSA = 9.676T-m
Posición para determinar Factor de Rueda

1.20m 1.80m a=0.70m

00m 2.500m
###
###
###

###
###

0m ### ### ###

0m 2.100m

2.539T/m 3.644T/m
= 1.39 P
###
Nivel aguas freáticas
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES

RESUMEN DE SOLICITACIONES
No TIPO SIMBOLO SENTIDO CARGA SIMBOLO
1 Muerta Superestructura D 16.304Ton MAD
2 Viva Superestructura L 24.601Ton MAL
3 Flotación B 4.974Ton MBA
4 Viento D WD 0.455Ton MWDA
5 Viento L WL 2.712Ton MWLA
6 Fuerza Longitud. LF 0.135Ton MFAL
7 Empuje de tierra Et 21.060Ton MEtA
8 Sismo Infraestructura EQI 2.047Ton MEQIA
9 Sismo Superestructura EQS 1.304Ton MEQSA
10 Muerta Infraestructura P 51.170Ton MPXA

ANALISIS DE ESTABILIDAD

FUERZAS RESIST
No
COMBINACION D L B WD
1 GI: Estribo sin cargas 4.974Ton
2 GI: Estribo con cargas 16.304Ton 24.601Ton 4.974Ton
3 GII: Estribo cargado 125% 16.304Ton 4.974Ton 0.455Ton
4 GIII: Estribo cargado (0.3WD) 125 16.304Ton 24.601Ton 4.974Ton 0.136Ton
5 GVII: Estribo cargado 133% 16.304Ton 4.974Ton

MOMENTOS RESIS
No
COMBINACION D L B WD
1 GI: Estribo sin cargas 11.714T-m
2 GI: Estribo con cargas 32.608T-m 49.202T-m 11.714T-m
3 GII: Estribo cargado 125% 32.608T-m 11.714T-m 3.114T-m
4 GIII: Estribo cargado (0.3WD) 125 32.608T-m 49.202T-m 11.714T-m 0.934T-m
5 GVII: Estribo cargado 133% 32.608T-m 11.714T-m

a entre este rango


No COMBINACION a L/1.5≥ ≥L/3 L
1 GI: Estribo sin cargas 2.03m OK OK 5.00m
2 GI: Estribo con cargas 2.02m OK OK 5.00m
3 GII: Estribo cargado 125% 1.97m OK OK 5.00m
4 GIII: Estribo cargado (0.3WD) 125 1.69m OK OK 5.00m
5 GVII: Estribo cargado 133% 1.75m OK OK 5.00m

1 GI: (D + L + E + B + SF + CF) 100% L=0, SF=0, CF=0


2 GI: (D + L + E + B + SF + CF) 100% SF=0, CF=0
3 GII: (D + E + B + SF + W) 125% SF=0
4 GII: (D + L + E + B + SF + CF + 0.3 W) 125% SF=0, CF=0
5 GVII: (D + E + B + SF + EQ) 133% SF=0
ANTON CHILLANES

MOMENTO
32.608T-m
49.202T-m
11.714T-m
3.114T-m
26.117T-m
1.296T-m
58.406T-m
7.228T-m
9.676T-m
164.032T-m

FUERZAS RESISTENTES (Ton)


WL LF Et EQI EQS P nΣF
21.060Ton 51.170Ton 46.195Ton
21.060Ton 51.170Ton 87.101Ton
21.060Ton 51.170Ton 62.500Ton
2.712Ton 0.135Ton 21.060Ton 51.170Ton 87.101Ton
21.060Ton 2.047Ton 1.304Ton 51.170Ton 62.500Ton

MOMENTOS RESISTENTES (T-M)


WL LF Et EQI EQS P nΣM
58.406T-m 164.032T-m 152.32T-m
58.406T-m 164.032T-m 234.13T-m
58.406T-m 164.032T-m 184.93T-m
26.117T-m 1.296T-m 58.406T-m 164.032T-m 234.13T-m
58.406T-m 7.228T-m 9.676T-m 164.032T-m 184.93T-m

CUMPLIMIENTO
Ϭmáx Ϭmin FV FD FV FD OBSERVACION
14.42T/m2 4.06T/m2 2.608 1.097 OK Poner espolon Base estribo
27.51T/m2 7.33T/m2 4.009 2.068 OK OK
16.31T/m2 3.69T/m2 3.006 1.452 OK Poner espolon
27.45T/m2 0.42T/m2 2.699 1.811 OK OK
17.81T/m2 0.98T/m2 2.456 1.280 OK Poner espolon Base estribo

31.77784273
nΣF
21.060Ton
21.060Ton
21.515Ton
24.043Ton
24.411Ton

nΣM
58.406T-m
58.406T-m
61.520T-m
86.753T-m
75.310T-m
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL = 5.00m (Ancho de via+Veredas)
FECHA = MARZO 2015

DISEÑO DE LA PANTALLA

DATOS:
h' = 0.600m f'c = 280 Kg/cm2 fy = 4200 Kg/cm2
ɸ = 30° Ka = Tan2 (45-ɸ/2) Kp = 1/Ka
ɣm = 1.80 T/m3 Ka = 0.333 Kp = 3
Rec = ###
E = 1/2 ɣs Ka H (H+2 h') = 18.14Ton

H ( H + 3 h' )
Y = 3 ( H + 2 h' ) = 2.571m

0.30m 0.60m

h' =
1ɸ16mm@25cm 1ɸ16mm@25c

Hv = H viga
###

###
(4)
###

###
0.4m

(3)
###

0.45

0.629m
###

1ɸ14mm@12.5cm
###

(2)
###

0.694m
1ɸ18mm@12.5cm
###

1ɸ14mm@10cm
1ɸ25mm@25cm (1)
###

1ɸ16mm@20cm
###

2.40m 0.90m 1.70m


5.00m

ARMADURA EN LA PANTALLA
H Y M Mu d K As
FRANJA ϼ
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
1 7.20m 2.571m 46.656T-m 74.650T-m 0.830m 10.836m 0.0031 25.92cm2
2 4.00m 1.49m 9.280T-m 14.848T-m 0.624m 3.819m 0.0011 6.75cm2
3 3.00m 1.14m 4.320T-m 6.912T-m 0.559m 2.212m 0.0006 3.49cm2
4 1.55m 0.63m 0.805T-m 1.288T-m 0.230m 2.434m 0.0007 1.58cm2

ARMADURA DE DISTRIBUCION (LADO SIN RELLENO)


H Y M Mu d K ϼ norma As
EJE
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
Lado relleno 0.900m 0.000m 0.0016 14.40cm2

ARMADURA DE DISTRIBUCION
H Y M Mu d K ϼ norma As
EJE
(m) (m) ( t-m /m ) 1.60 M ( m) (Kg/cm2) cm2/m
2 lados 0.668m 0.000m 0.0012 10.80cm2

DISEÑO DEL DEDO

E = 1/2 ɣs Ka H (H+2 h') = 21.06Ton

Para GI: Cargado nΣM = 234.128T-m


nΣM = 58.406T-m
nΣF = 87.101T-m

Mr = Me - Mv = 175.722T-m
X = Mr/nΣF = 2.017m
e = B/2 - X = 0.483m
Si e<B/6  q1= n?F/B (1+6e/B) < qa = 27.51T/m2
Si e>B/6  q2=2n?F/(3L(b/2­e))< qa = 7.33T/m2

1ɸ22mm@10cm
###

2.40m 0.90m 1.70m

5.00m
7.33

###

###

###
7.33

###

###

###
M = L2 (q1+2 q2)/6 = 36.44T-m/m

ARMADURA DEL DEDO (CONTACTO CON AGUA)


M Mu d K As As min ɵ S calculo
ϼ As colocar
( t-m / m ) 1.60 M ( m) (Kg/cm ) 2
cm2/m (mm) ( cm )
36.444T-m 58.310T-m 0.530m 20.758m 0.0061 32.55cm2 17.67 32.55 22mm 12cm

DISEÑO DEL TALON

12.96T/m2

###
2.40m 0.90m 1.70m
1ɸ16mm@10cm
5.00m
7.33

###

###

###

M = q L2 / 2 - L2 (q1+2 q2) / 6

ARMADURA DEL TALON (CONTACTO CON RELLENO)


M Mu d K As As min ɵ S calculo
ϼ As colocar
( t-m / m ) 1.60 M ( m) (Kg/cm ) 2
cm2/m (mm) ( cm )
6.909T-m 11.055T-m 0.530m 3.936m 0.0011 5.91cm2 17.67 17.67 16mm 11cm
ARMADURA DE DISTRIBUCION

d K ϼ norma As As min ɵ S calculo S asumido As colocado


As colocar
( m) (Kg/cm )
2
cm2/m (mm) ( cm ) ( cm ) ( cm
0.600m 0.000m 0.0012 7.20cm2 7.20 12mm 16cm 15cm 7.540

1ɸ22mm@10cm

1ɸ12mm@15cm 1ɸ16mm@10cm
### ###
ANTALLA
As min ɵ S calculo S asumido As colocado
As colocar
(mm) ( cm ) ( cm ) ( cm2 )
27.67 27.67 14mm 6cm 12.5cm 52.308 OK 47.11%
20.78 20.78 18mm 12cm 12.5cm 20.358 REDISTIBUIR
18.63 18.63 25mm 26cm 25cm 19.635 OK
7.67 7.67 16mm 26cm 25cm 8.042 OK

LADO SIN RELLENO)


As min ɵ S calculo S asumido As colocado
As colocar
(mm) ( cm ) ( cm ) ( cm2 )
0.00 14.40 14mm 11cm 10cm 15.394 OK 6.46%

RIBUCION
As min ɵ S calculo S asumido As colocado
As colocar
(mm) ( cm ) ( cm ) ( cm2 )
0.00 10.80 16mm 19cm 20cm 10.053 REDISTIBUIR -7.43%
A)
S calculo S asumido As colocado
( cm ) ( cm ) ( cm2 )
12cm 10cm 38.013 OK 14.37%

ɸ16mm@10cm

ENO)
S calculo S asumido As colocado
( cm ) ( cm ) ( cm2 )
11cm 10cm 20.106 OK 12.13%
As colocado
( cm2 )
7.540 OK 4.51%
PROYECTO: PUENTE LA ANGELICA, SOBRE ATIO, CANTON CHILLANES
LONGITUD = 22.00m
ANCHO TOTAL = 5.00m (Ancho de via+Veredas)
FECHA = MARZO 2015

ARMADO DEL ESTRIBO

0.30m 0.60m

1ɸ16mm@25cm 1ɸ16mm@25c

###
###
0.4m
###

0.600m
1ɸ16mm@20cm
1ɸ14mm@12.5cm
###

0.600m
1ɸ18mm@12.5cm
###

1ɸ14mm@10cm
1ɸ25mm@25cm

1ɸ22mm@10cm
###

1ɸ12mm@15cm 1ɸ16mm@10cm

2.40m 0.90m 1.70m

5.00m

Você também pode gostar