Você está na página 1de 8

JADWAL TRAINING ISC SAFETY SCHOOL 2019

Management System

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

Awareness ISO 45001:2018 (Sistem Management Kesehatan dan Keselamatan


1 5 juta 2 hari 7-8 11-12 11-12 8-9 6-7 12-13 8-9 12-13 9-10 7-8 11-12 9-10
Kerja)

2 Internal Audit ISO 45001:2018 5 juta 2 hari 10-11 13-14 13-14 10-11 8-9 19-20 10-11 14-15 11-12 9 - 10 12-13 11-12

3 ISO 45001:2018 Lead Auditor IRCA Certified 16 juta 5 hari 7-11 11-15 11-15 8-12 6-10 17-21 8-12 12-16 9-13 7 - 11 11-15 9-13

4 Penyusunan Standar Operasional Prosedur (SOP) ISO 45001 5,5 juta 2 hari 9-10 7-8 13-14 8-9 15-16 19-20 10-11 15-16 9-10 7-8 14-15 10-11

5 Awareness ISO 14001:2015 (Sistem Management Lingkungan) 5 juta 2 hari 10-11 12-13 18-19 9-10 6-7 19-20 8-9 13-14 9-10 9 - 10 13-14 11-12

6 Internal Audit ISO 14001:2015 5 juta 2 hari 7-8 11-12 13-14 11-12 13-14 17-18 10-11 15-16 11-12 11 - 12 14-15 12-13

7 ISO 14001:2015 Lead Auditor IRCA Certified 16 juta 5 hari 7-11 11-15 11-15 8-12 13-17 17-21 8-12 12-16 9-13 7 - 11 11-15 9-13

8 Penyusunan Standar Operasional Prosedur (SOP) ISO 14001 5,5 juta 2 hari 9-10 7-8 13-14 8-9 15-16 19-20 10-11 15-16 9-10 7-8 14-15 10-11

9 Awareness ISO 50001:2011 (Sistem Management Energi) 5 juta 2 hari 7-8 6-7 4-5 8-9 13-14 19-20 8-9 12-13 9-10 7-8 11-12 10-11

10 Internal Audit ISO 50001:2011 5 juta 2 hari 10-11 14-15 11-12 10-11 15-16 17-18 10-11 14-15 11-12 9 - 10 12-13 12-13

11 ISO 50001:2011 Lead Auditor IRCA Certified 16 juta 5 hari 7-11 11-15 11-15 8-12 13-17 17-21 8-12 12-16 9-13 7 - 11 11-15 9-13

12 Penyusunan Standar Operasional Prosedur (SOP) ISO 50001 5,5 juta 2 hari 9-10 7-8 13-14 8-9 15-16 19-20 10-11 15-16 9-10 7-8 14-15 10-11

13 Awareness ISO 22000:2018 (Sistem Management Keamanan Pangan) 5 juta 2 hari 7-8 6-7 4-5 1-2 6-7 17-18 1-2 7-8 2-3 8-9 6-7 2-3

14 Internal Audit ISO 22000:2018 (Sistem Management Keamanan Pangan) 5 juta 2 hari 10-11 13-14 13-14 10-11 8-9 19-20 10-11 14-15 11-12 9 - 10 12-13 11-12

15 ISO 22000:2018 Lead Auditor IRCA Certified 16 juta 5 hari 7-11 11-15 11-15 8-12 13-17 17-21 8-12 12-16 9-13 7 - 11 11-15 9-13

16 Penyusunan Standar Operasional Prosedur (SOP) ISO 22000 5,5 juta 2 hari 9-10 7-8 13-14 8-9 15-16 19-20 10-11 15-16 9-10 7-8 14-15 10-11

17 Awareness Integrated QHSE Management System 5 juta 2 hari 9-10 7-8 11-12 8-9 6-7 17-18 8-9 14-15 12-13 9 - 10 12-13 12-13

18 Internal Audit Integrated QHSE Management System 5 juta 2 hari 10-11 13-14 13-14 10-11 8-9 19-20 10-11 14-15 11-12 9 - 10 12-13 11-12

19 Penyusunan Standar Operasional Prosedur (SOP) QHSE Management System 5,5 juta 2 hari 10-11 6-7 13-14 9-10 13-14 17-18 10-11 13-14 9-10 10 - 11 11-12 11-12

20 Standar Mengenai Audit berdasarkan ISO 19011 5 juta 2 hari 7-8 6-7 4-5 8-9 13-14 19-20 8-9 12-13 9-10 7-8 11-12 10-11

Sistem Manajemen Keselamatan Perkeretaapian Berdasarkan PERMENHUB No


21 5 juta 2 hari 7-8 11-12 11-12 8-9 6-7 12-13 8-9 12-13 9-10 7-8 11-12 9-10
69 Tahun 2018
Sistem Manajemen K3 Pertambangan Berdasarkan PERMEN ESDM No.38
22 5 juta 2 hari 7-8 11-12 11-12 8-9 6-7 12-13 8-9 12-13 9-10 7-8 11-12 9-10
Tahun 2014

23 Awareness Sistem Manajemen Pengamanan PERKAPOLRI No. 24 Tahun 2007 5 juta 2 hari 7-8 11-12 11-12 8-9 6-7 12-13 8-9 12-13 9-10 7-8 11-12 9-10
Internal Audit Sistem Manajemen Pengamanan PERKAPOLRI No. 24 Tahun
24 5 juta 2 hari 7-8 11-12 13-14 11-12 13-14 17-18 10-11 15-16 11-12 11 - 12 14-15 12-13
2007
Basic and Advance Safety

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec
1 Safety leadership 5 juta 2 hari 7-8 6-7 4-5 1-2 6-7 17-18 9-10 8-9 2-3 1-2 5-6 11-12

2 Safety Culture 6 juta 2 hari 10-11 11-12 14-15 4-5 8-9 19-20 11-12 5-6 10-11 4-5 13-14 9-10

3 Awareness SMK3 5 juta 2 hari 10-11 11-12 14-15 4-5 8-9 19-20 11-12 5-6 10-11 4-5 13-14 9-10

4 Contractor Safety Management System 5 juta 2 hari 9-10 7-8 4-5 8-9 6-7 17-18 9-10 7-8 4-5 3-4 4-5 12-13

5 Risk Management 5 juta 2 hari 8-9 6-7 5-6 9-10 8-9 19-20 11-12 5-6 2-3 4-5 6-7 10-11

6 Fire Risk Assessment 5 juta 2 hari 7-8 7-8 4-5 1-2 6-7 19-20 9-10 6-7 2-3 4-5 7-8 9-10

7 Safety Risk Management 5 juta 2 hari 10-11 11-12 4-5 4-5 8-9 17-18 11-12 7-8 4-5 3-4 4-5 11-12

8 Accident Reporting, Investigation and Analysis 5 juta 2 hari 9-10 6-7 4-5 8-9 13-14 17-18 9-10 6-7 9-10 1-2 5-6 10-11

9 Hazard Identification Risk Assessment and Risk Control(HIRARC) 5 juta 2 hari 7-8 13-14 4-5 9-10 6-7 12-13 11-12 8-9 2-3 4-5 6-7 9-10

10 Advance Fire Fighting 5 juta 2 hari 8-9 11-12 5-6 1-2 8-9 12-13 9-10 7-8 2-3 3-4 7-8 9-10

11 Basic Safety Training 5 juta 2 hari 7-8 7-8 11-12 4-5 6-7 17-18 11-12 5-6 4-5 3-4 4-5 10-11

12 Basic Safety Inspection 5 juta 2 hari 10-11 14-15 4-5 8-9 6-7 17-18 9-10 8-9 3-4 4-5 5-6 10-11

13 Defensive Driving 5 juta 2 hari 10-11 12-13 4-5 9-10 8-9 19-20 11-12 6-7 6-7 3-4 6-7 11-12

14 Awareness HSE Regulation 5 juta 2 hari 7-8 13-14 11-12 1-2 6-7 19-20 9-10 5-6 2-3 4-5 7-8 12-13

15 Chemical Handling 5 juta 2 hari 10-11 6-7 11-12 4-5 8-9 17-18 11-12 7-8 2-3 1-2 6-7 11-12

16 Behaviour Based Safety/BBS 5 juta 2 hari 9-10 7-8 4-5 8-9 6-7 17-18 9-10 8-9 4-5 3-4 5-6 12-13

17 Dasar-Dasar Food Safety 5 juta 2 hari 8-9 11-12 4-5 9-10 8-9 12-13 11-12 6-7 3-4 1-2 4-5 11-12

18 Awareness ISO 31000:2018 (Risk Management) 5 juta 2 hari 10-11 13-14 11-12 8-9 15-16 17-18 9-10 5-6 9-10 9 - 10 7-8 12-13

19 Awareness ISO 26000 (Social Responsibility) 5 juta 2 hari 8-9 11-12 11-12 9-10 15-16 19-20 11-12 7-8 9-10 11 - 12 4-5 11-12

20 Keselamatan dan Kesehatan Kerja Laboratorium 5 juta 2 hari 7-8 6-7 4-5 1-2 6-7 17-18 1-2 7-8 2-3 8-9 6-7 2-3

21 Food Safety System Certifation 5 juta 2 hari 7-8 7-8 4-5 1-2 6-7 19-20 9-10 6-7 2-3 4-5 7-8 9-10

22 Hazard Analysis Critical Control Point (HACCP) 5 juta 2 hari 10-11 7-8 4-5 4-5 20-21 19-20 3-4 8-9 9-10 9 - 10 7-8 3-4

23 Hygiene Sanitasi Makanan 5 juta 2 hari 10-11 13-14 11-12 4-5 15-16 17-18 1-2 5-6 4-5 7-8 5-6 3-4

24 Electrical Safety-Kelistrikan 5 juta 2 hari 9-10 7-8 11-12 1-2 8-9 12-13 3-4 7-8 2-3 8-9 6-7 5-6

25 Emergency Management ‐ Preparedness, Response and Recovery (ERP) 5 juta 2 hari 8-9 6-7 14-15 8-9 13-14 17-18 4-5 1-2 3-4 9 - 10 7-8 4-5

26 Safe Working at Confined Space 5 juta 2 hari 7-8 12-13 12-13 9-10 8-9 12-13 1-2 6-7 2-3 9 - 10 4-5 2-3

27 Basic First Aid 5 juta 2 hari 10-11 13-14 4-5 1-2 6-7 12-13 3-4 5-6 2-3 8-9 5-6 5-6

28 Basic Fire Fighting 5 juta 2 hari 10-11 7-8 11-12 4-5 6-7 17-18 4-5 7-8 4-5 11 - 12 7-8 4-5

29 Fire Warden 5 juta 2 hari 8-9 7-8 13-14 8-9 8-9 19-20 1-2 7-8 4-5 8-9 6-7 3-4

30 Hazard Operability Study (HAZOP) 5 juta 2 hari 7-8 11-12 4-5 9-10 20-21 17-18 3-4 5-6 16-17 7-8 4-5 2-3

31 Basic Scaffolding 5 juta 2 hari 10-11 6-7 11-12 1-2 20-21 19-20 4-5 7-8 16-17 11 - 12 5-6 3-4

32 Lock‐Out/ Tag‐Out and Work Permit 5 juta 2 hari 10-11 11-12 11-12 4-5 22-23 17-18 1-2 8-9 4-5 9 - 10 6-7 4-5

33 Motorcycle Safety Riding 5 juta 2 hari 10-11 6-7 11-12 8-9 20-21 12-13 3-4 6-7 6-7 10 -11 7-8 2-3

34 Floor warden 5 juta 2 hari 10-11 7-8 11-12 9-10 8-9 17-18 4-5 1-2 4-5 8-9 4-5 3-4

35 Medical Evacuation 5 juta 1 hari 9 14 5 19 9 13 11 9 6 4 8 6


36 Lifting Rigging 5 juta 2 hari 9-10 12-13 4-5 1-2 20-21 19-20 1-2 8-9 16-17 8-9 5-6 4-5

37 SIGNALMAN dan RIGGER U/ OPERATOR ALAT ANGKAT-ANGKUT 5 juta 1 hari 11 1 8 2 23 20 3 6 18 9 6 5

38 Basic safety Inspector 5 juta 2 hari 7-8 7-8 4-5 4-5 20-21 17-18 3-4 8-9 2-3 11 - 12 7-8 3-4

39 Warehouse Safety 5 juta 2 hari 10-11 6-7 11-12 8-9 13-14 12-13 4-5 6-7 3-4 9 - 10 4-5 2-3

40 Disaster Management Plan 5 juta 2 hari 9-10 6-7 13-14 1-2 15-16 17-18 1-2 1-2 4-5 8-9 5-6 4-5

41 Teknik Instalasi dan System Proteksi Listrik 5 juta 3 hari 7-9 12-14 11-13 10-12 6-8 17-19 3-5 7-9 2-4 9 - 11 5-7 5-7

42 Ergonomi 5 juta 2 hari 10-11 6-7 11-12 8-9 20-21 12-13 3-4 6-7 6-7 10 -11 7-8 2-3

SERTIFIKASI KEMNAKER RI

Bidang SMK3, Kelembagaan K3

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Ahli K3 Umum 9 juta 12 hari 14-26 11-23 8-22 X 8-20 9-21 11-23 9-21

2 Auditor SMK3 6 juta 4 hari 10-14 11-14 11-14 8-11 X 17-20 15-18 13-16 16-19 7 - 10 11-14 16-19

Bidang Lingkungan Kerja

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Ahli K3 Kimia 11 juta 12 hari 14-26 11-23 8-22 X 8-20 9-21 11-23 9-21

2 Petugas K3 Kimia 8,5 juta 6 hari 21-26 18-23 18-23 22-27 X 24-29 15-20 26-31 16-21 14-19 11-16 16-21

3 Tenaga Kerja Bangunan Tinggi tingkat 2 5,5 juta 3 hari 14-16 12-14 25-27 22-24 X 24-26 29-31 13-15 23-25 21 - 23 19-21 26-28

4 Tenaga Kerja Pada Ketinggian tingkat 1 6 juta 3 hari 14-16 25-27 18-20 23-25 X 24-26 29-31 13-15 23-25 28 - 30 20-22 26-28

5 Tenaga Kerja Pada Ketinggian tingkat 2 6,5 juta 4 hari 14-17 18-21 18-21 22-25 X 24-27 22-25 13-16 23-26 21 - 24 18-21 17-20

6 Tenaga Kerja Pada Ketinggian tingkat 3 7 juta 4 hari 14-17 18-21 18-21 15-18 X 24-26 22-25 13-16 23-26 15 - 18 19-22 16-19

7 Confine Space Utama 7,750 juta 5 hari 21-25 11-15 11-15 22-26 X 17-21 22-26 19-23 16-20 8 - 12 18-22 16-20

8 Confined Space Rescue 7 juta 4 hari 21-24 6-9 18-21 22-25 X 17-20 22-25 20-23 17-20 16 - 19 19-22 16-19

9 Confined Space Madya 6,750 juta 3 hari 21-23 25-27 25-27 22-24 X 17-19 22-24 21-23 18-20 21 - 23 20-22 16-18

10 Ahli Muda K3 Lingkungan Kerja 10,5 juta 5 hari 14-18 25-29 25-29 15-19 X 17-21 8-12 13-17 23-27 28 - 1 Nov 19-23 9-13

11 Ahli Madya K3 Lingkungan Kerja 11 juta 5 hari 14-18 18-22 18-22 23-27 X 17-21 8-12 20-24 16-20 21 - 25 11-15 9-13

12 Ahli Utama K3 Lingkungan Kerja 11,5 juta 5 hari 14-18 11-15 11-15 15-19 X 17-21 8-12 27-31 9-13 14 - 18 12-16 9-13

Bidang Kesehatan Kerja

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Petugas P3K 5 juta 3 hari 21-23 18-20 18-20 22-24 X 24-26 15-17 20-22 16-18 15-17 12-14 16-18

2 Hyperkes Paramedis 5 juta 5 hari 21-25 18-22 11-15 22-26 X 24-28 15-19 19-23 23-27 21-25 18-22 16-20

Bidang Listrik, Kebakaran dan Konstruksi Bangunan

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Ahli K3 Listrik 12,5 juta 12 hari 11-23 8-22 X 17-29 19-31 7 - 19 9-21

2 Teknisi Listrik 7 juta 5 hari 21-25 18-22 18-22 15-20 X 24-28 15-19 26-30 16-20 14 - 18 18-22 16-20

3 Teknisi Lift 5 juta 4 hari 21-24 20-23 18-21 15-18 X 17-20 22-25 26-29 23-26 14 - 17 19-22 17-20
4 Ahli Muda K3 Konstruksi 7 juta 5 hari 21-25 18-22 11-15 8-12 X 17-21 8-12 19-23 16-20 14-18 18-22 9-13

5 Ahli Madya Konstruksi 9,5 juta 8 hari 21-29 18-26 11-19 15-24 X 17-25 8-16 19-27 16-24 7 - 15 18-26 9-17

6 Basic scaffolding 5,5 juta 4 hari 14-17 20-23 18-21 8-11 X 24-27 22-25 20-23 23-26 22-25 20-23 16-19

7 K3 Supervisi Perancah 7 juta 5 hari 21-25 18-22 11-15 8-12 X 24-28 8-12 19-23 23-27 21-25 19-23 9-13

Kebakaran kls A (Ahli Ahli K3 Spesialis penanggulangan Kebakaran sebagai


8 7,5 juta 5 hari 23-28 20-25 27-1 Apr 17-23 X X 18-22 25-29 19-23 16-21 18-22 19-23
penanggung jawab teknis)
9 Kebakaran kls B (Koordinator unit Penanggulangan Kebakaran) 7 juta 6 hari 17-23 14-20 21-27 11-16 X X 11-17 19-24 12-18 10-16 10-25 12-18

10 Kebakaran kls C (Regu Penanggulangan Kebakaran) 7 juta 5 hari 17-22 14-19 21-26 11-15 X X 11-16 19-23 12-17 10-15 14-19 12-17

11 Kebakaran kls D (Petugas Peran Kebakaran) 4,5 juta 3 hari 14-16 11-13 18-20 8-10 X 17-19 8-10 14-16 9-11 7-9 11-13 9-11

12 Paket Kebakaran DB 9,5 juta 8 hari 14-22 11-19 18-26 8-16 X X 8-16 14-23 9-17 7-15 11-19 9-17

13 Paket Kebakaran DC 9 juta 7 hari 14-21 11-18 18-25 8-15 X X 8-15 14-22 9-16 7-14 11-18 9-16

14 Paket Kebakaran BA 10 juta 10 hari 17-28 14-25 21-1 Apr 11-23 X X 11-22 19-29 12-23 16-21 14-25 12-23

15 Paket Kebakaran DBA 12,5 juta 13 hari 14-28 18-1 Apr X X 8-22 14-29 7 - 21 9-23

Bidang Alat Angkat-Angkut dan Pesawat Uap dan bejana tekan

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Operator Crane Kls I 6 juta 6 hari 14-19 18-23 25-30 22-27 X 24-29 22-27 26-31 16-21 14 - 19 25-30 16-21

2 Operator Crane Kls II 5 juta 5 hari 14-18 18-22 25-29 22-26 X 24-28 22-26 26-30 16-20 22 - 25 26-30 16-20

3 Operator Crane Kls III 4 juta 4 hari 14-17 18-21 25-28 22-25 X 24-27 22-25 26-29 16-19 22-24 27-30 16-19

4 Operator Forklift 4 juta 3 hari 16-18 21-23 25-27 22-24 X 24-26 22-24 26-28 23-25 28 - 30 25-27 26-28

5 Operator Boiler Kls I 7,5 juta 6 hari 21-26 18-23 25-30 22-27 X 24-29 22-27 26-31 23-28 14 - 19 25-30 16-21

6 Operator Boiler Kls II 6 juta 4 hari 21-24 11-14 25-28 22-25 X 24-27 22-25 26-29 16-19 28 - 31 27-30 16-19

7 Juru Las SMAW atau GTAW Kelas 3 16 juta 4 Hari 21-24 18-21 25-28 22-25 X 17-20 15-18 26-29 16-19 21 - 24 18-21 16-19

8 Juru Las SMAW atau GTAW Kelas 2 16,5 juta 4 Hari 21-24 18-21 25-28 22-25 X 17-20 15-18 26-29 16-19 21 - 24 18-21 16-19

9 Juru Las SMAW atau GTAW Kelas 1 17,5 juta 5 Hari 21-25 18-22 25-29 8-12 X 17-21 15-19 26-30 16-20 21-25 18-22 16-20

10 Operator loader 5 juta 4 hari 14-17 20-23 25-28 22-25 X 17-20 22-25 20-23 23-26 28 - 31 26-29 17-20

11 Operator Escavator 5 juta 4 hari 16-19 20-23 25-28 22-25 X 24-27 22-25 20-23 23-26 28 - 31 25-28 16-19

12 Operator Gondola 5 juta 4 hari 23-26 20-23 25-28 23-26 X 24-27 22-25 20-23 18-21 28 - 31 26-29 16-19

13 Operator Rigger (Juru Ikat) 5 juta 3 hari 14-16 25-27 25-27 24-26 X 24-26 22-24 26-28 17-19 22 - 24 25-27 26-28

14 Operator Tanur Kelas 1 6,5 juta 5 hari 14-18 6-10 25-29 22-26 X 24-28 22-26 26-30 16-20 21 - 25 25-29 16-20

15 Operator Tanur Kelas 2 5 juta 4 hari 14-17 6-9 25-28 23-26 X 24-27 22-25 26-29 16-19 14 - 17 26-29 16-19

20 Operator Dongkrak Menaknik, Takel dan Mesin Pancang 5,5 juta 3 hari 14-16 25-27 25-27 24-26 X 24-26 22-24 26-28 17-19 22 - 24 25-27 26-28

16 Operator Pengerak Mula Kelas 1 5,5 juta 4 hari 21-24 20-23 25-28 22-25 X 24-27 22-25 26-29 16-19 14 - 17 25-28 16-19

17 Operator Pengerak Mula Kelas 2 4 juta 3 hari 21-23 25-27 25-27 24-26 X 24-26 22-24 26-28 17-19 21 - 23 25-27 26-28

18 Operator Mesin Produksi dan Perkakas Kelas 1 6,5 juta 5 hari 14-18 18-22 25-29 22-26 X 24-28 22-26 26-30 16-20 14-18 25-29 16-20

19 Operator Mesin Produksi dan Perkakas Kelas 2 5 juta 4 hari 14-17 18-21 25-28 23-26 X 24-27 22-25 26-29 17-20 22 - 25 26-29 16-19

20 Operator Conveyor (Pita transport) 5 juta 3 hari 14-16 25-27 25-27 24-26 X 24-26 22-24 26-28 17-19 22 - 24 25-27 26-28
21 Ahli K3 Pesawat Angkat Angkut 18 juta 24 hari 14-Jan 02-Feb 12 Mar - 09-Apr X 8 Jul - 3 Aug 16 Sep - 12 Okt 11 Nov - 7 Des

22 Teknisi atau Petugas Pemeriksa Penguji Pesawat Angkat Angkut 9,5 juta 9 hari 21-30 18-27 18-27 22 April-2 Mei X 17-26 15-24 12-22 16-25 14-23 18-27 9-18

23 Teknisi atau Petugas Pemeriksa Penguji Bejana Tekan dan Tangki Timbun 9,5 juta 9 hari 21-30 18-27 18-27 22 April-2 Mei X 17-26 15-24 12-22 16-25 14-23 18-27 9-18

24 Ahli Pesawat Tenaga Produksi 18 juta 25 hari 14-Jan 04-Feb 12 Mar - 10-Apr X 8 Jul - 5 Aug 16 Sep - 14 Okt 11 Nov - 9 Des

25 Teknisi atau Petugas Pemeriksa Penguji Pesawat Tenaga dan Produksi 9,5 juta 9 hari 21-30 18-27 18-27 22 April-2 Mei X 17-26 15-24 12-22 16-25 14-23 18-27 9-18

26 Ahli K3 Pesawat Uap Bejana Tekan 18 juta 24 hari 14-Jan 02-Feb 12 Mar - 09-Apr X 8 Jul - 3 Aug 16 Sep - 12 Okt 11 Nov - 7 Des

27 Teknisi atau Petugas Pemeriksa Penguji Pesawat Uap 9,5 juta 9 hari 21-30 18-27 18-27 22 April-2 Mei X 17-26 15-24 12-22 16-25 14-23 18-27 9-18

Bidang Offshore-British safety council-Lakespra

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 BOSIET 5 juta 1 hari SETIAP MINGGU KE-2 DAN KE-4 DI HARI KAMIS

2 HUET 3 juta 1 hari SETIAP MINGGU KE-2 DAN KE-4 DI HARI KAMIS

3 Basic Sea Survival 2,25 juta 1 hari SETIAP MINGGU KE-2 DAN KE-4 DI HARI KAMIS

4 HUET and Sea Survival 3,5 juta 1 hari SETIAP MINGGU KE-2 DAN KE-4 DI HARI KAMIS

5 Basic First Aid 3 juta 1 hari SETIAP MINGGU KE-2 DAN KE-4 DI HARI KAMIS

6 Basic Fire Fighting 3 juta 1 hari SETIAP MINGGU KE-2 DAN KE-4 DI HARI KAMIS

Sertifikasi BNSP K3 dan Oil and Gas Industri

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Operator Gas Tester 7,5 juta 3 hari 14-16 11-13 20-22 8-10 16-18 11-13

2 Confined Space 8,5 juta 3 hari 6-8 9-11 17-19 21-23 7-9 17-19

3 First Aid Migas 7,5 juta 3 hari 21-23 11-13 13-17 15-17 16-19 18-20

4 Operator K3 Migas 8 juta 4 hari 11-14 8-11 17-20 19-22 14 - 17 17-20

5 Ahli K3 Muda 7,5 juta 3 hari 14-16 11-13 20-22 15-17 9-11 13-15

6 Ahli K3 Madya 7,5 juta 3 hari 11-13 8-10 17-19 19-21 16 - 18 16-19

7 Ahli K3 Utama 8,5 juta 3 hari 21-23 11-15 13-15 15-17 9-11 11-13

8 Pengawas K3 Migas 9,5 juta 5 hari 18-22 22-26 17-21 19-23 7-11 9-13

9 Accident Investigation 7,5 juta 3 hari 9-11 6-8 4-6 8-10 13-15 17-19 9-11 6-8 9-11 1-3 5-7 10-12

10 Fire Safety Manager 8 juta 4 hari 21-24 18-21 13-16 8-11 9-12 12-15

11 Auditor K3 7,5 juta 3 hari 18-20 9-11 24-26 14-16 16 - 18 18-20

12 Pengawas Utama K3 Migas 13,5 juta 6 hari 11-16 20-25 19-24 18-23

13 HAZOPs 7,5 juta 3 hari 21-23 25-27 18-20 22-24 20-22 17-19 8-10 13-15 16-18 17 - 19 11-13 16-18

14 Petugas Penanganan Bahaya Gas H2S 8,5 juta 14-16 14-16 11-13 20-22 8-10 16-18 11-13

15 Operator Scaffolding 8 juta 3 hari 6-8 23-25 17-19 20-22 7-9 18-20

16 Perancang Scaffolding 9 juta 3 hari 14-16 18-20 13-15 10-12 25-27 18-20

17 Pengawas Scaffolding 12 juta 3 hari 6-8 22-24 17-19 20-22 14 - 16 18-20

18 Teknisi and Maintenance Scaffolding 9 juta 3 hari 16-18 20-22 20-22 17-19 25-27 19-21
19 Quality Control Scaffolding 9 juta 3 hari 16-18 18-20 16-18 24-26 20-22 21 - 23 17-19

20 Pedestal Crane s/d 25 Ton 5,5 juta 1 hari 23 13 22 22 15 19 15 15 26 8 12 23

21 Pedestal Crane s/d 50 Ton 5,5 juta 1 hari 23 13 22 23 15 19 15 15 26 9 20 23

22 Pedestal Crane di atas 50 Ton 5,5 juta 1 hari 23 13 22 24 15 19 15 15 26 10 18 23

23 Mobile Crane s/d 25 Ton 8,5 juta 3 hari 11-13 16-18 17-19 13-15 8 - 10 18-20

24 Mobile Crane s/d 50 Ton 8,5 juta 3 hari 11-13 16-18 17-19 13-15 8 - 10 18-20

25 Mobile Crane di atas 50 Ton 8,5 juta 3 hari 11-13 16-18 17-19 13-15 8 - 10 18-20

26 Overhead Crane s/d 25 Ton 8,5 juta 3 hari 11-13 16-18 17-19 13-15 8 - 10 18-20

27 Overhead Crane s/d 50 Ton 8,5 juta 3 hari 11-13 16-18 17-19 13-15 8 - 10 18-20

28 Overhead Crane di atas 50 Ton 8,5 juta 3 hari 11-13 16-18 17-19 13-15 8 - 10 18-20

29 Operator Forklift 8 juta 3 hari 14-16 25-27 20-22 17-19 24-26 20-22

30 Rigging 8,5 juta 3 hari 18-20 16-18 24-26 19-21 17 - 19 18-20

31 Operator Boiler Kelas Satu 8,5 juta 4 hari 14-17 25-28 13-16 16-19 17-21 11-14

32 Operator Boiler Kelas Dua 9 juta 4 hari 18-21 22-25 17-20 13-16 9 - 12 9-12

33 Pengawas Operasi Boiler 12 juta 5 hari 14-18 25-29 13-17 15-19 16-20 11-15

34 Teknisi Perawatan Mekanik 9 juta 4 hari 18-21 15-18 24-27 19-22 7 - 10 10-13

35 Supervisor Perawatan Mekanik 12 juta 6 hari 21-26 11-16 13-18 15-20 16-21 18-23

36 Driller 12 juta 5 hari 14-18 8-12 15-19 7-11

37 Tool Pusher 12 juta 6 hari 18-23 20-25 19-24 11-16

38 Operator Perawatan Sumur 12 juta 4 hari 25-28 17-20 16-19 16-19

39 Pengawas Perawatan Sumur 12 juta 4 hari 21-24 22-25 9-12 7 - 10

40 Pipe Fitter 12 juta 4 hari 6-9 1-5 17-20 20-23 16 - 19 16-19

41 Operasi Produksi 12 juta 4 hari 14-17 25-28 20-23 9-12 23-26 11-14

42 Pengawas Operasi Produksi 12 juta 5 hari 11-15 8-12 17-21 19-23 14 - 18 16-20

43 Pengukur Isi Tangki Minyak Bumi dan Hasil Olahan 12 juta 4 hari 21-24 9-12 9-12 16 - 19

44 Loading Master 12 juta 5 hari 11-15 22-26 24-28 19-23 15 - 19 9-13

45 Inspektur Crane 14 juta 6 hari 7-12 18-23 13-18 8-13 16-21 18-23

46 Operator Uji Lab Minyak 9 juta 4 hari 25-28 17-20 9-12 9 - 12 11-14 9-12

47 Operator Uji Lab Gas Bumi 9 juta 4 hari 11-14 20-23 13-16 12-15

48 Operator Uji Lab Petrokimia 9 juta 4 hari 14-17 23-26 15-18 9 - 12

49 Operator Uji Lab Pelumas 9 juta 4 hari 18-21 20-23 13-16 19-22

50 Operator Uji Lab BBM 9 juta 4 hari 25-28 17-20 9-12 17-20

51 Pengndali Limbah Padat B3 9 juta 5 hari 7-11 25-29 20-23 8-12 16-20 18-23

52 Pengendali Limbah Cair 9 juta 5 hari 7-11 25-29 20-23 8-12 16-20 18-23

53 Operator Pengambilan Contoh Minyak dan Gas Bumi 9 juta 4 hari 11-14 23-26 17-20 13-16 7 - 10 16-19
54 Operator Pengambilan Contoh BBM, BBN, dan Pelumas 9 juta 4 hari 11-14 23-26 17-20 13-16 7 - 10 16-19

55 Operator Pengambilan Contoh Limbah, Udara dan Air 9 juta 4 hari 11-14 23-26 17-20 13-16 7 - 10 16-19

Enviroment Training

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Dasar-Dasar AMDAL (Analisis Mengenai Dampak Lingkungan) 5 juta 2 hari 7-8 20-21 11-12 9-10 6-7 17-18 8-9 8-9 9-10 14 - 15 11-12 9-10

2 Implementasi dan Pembuatan Laporan AMDAL/ UKL-UPL 6 juta 2 hari 9-10 21-22 13-14 10-11 8-9 19-20 8-9 8-9 9-10 10 - 11 12-13 10-11

3 Environmental Assessment 5 juta 2 hari 10-11 6-7 11-12 11-12 6-7 17-18 8-9 13-14 11-12 18 - 19 13-14 11-12

4 Pengelolaan Sampling dan Teknik Sampling Kualitas Lingkungan 5 juta 2 hari 7-8 11-12 18-19 8-9 6-7 19-20 10-11 14-15 9-10 16 - 17 14-15 12-13

5 Pengelolaan Sampling dan Teknik Sampling Makanan 5 juta 2 hari 9-10 12-13 18-19 9-10 8-9 24-25 10-11 15-16 9-10 16 - 17 11-12 10-11

6 Pengelolaan Sampling dan Penanganan Sample (Bagi Petugas Pengambil Sample) 5 juta 2 hari 10-11 13-14 18-19 10-11 6-7 24-25 10-11 13-14 11-12 10 - 11 12-13 9-10

7 Pengendalian Hama dan Binatang Pengganggu (Pest control) 5 juta 2 hari 7-8 11-12 20-21 11-12 8-9 26-27 11-12 14-15 16-17 14 - 15 14-15 10-11

8 Total Coliform Training 5 juta 2 hari 10-11 7-8 14-15 9-10 8-9 17-18 11-12 13-14 18-19 14 - 15 12-13 10-11

9 Uji Mikrobiologi Air 5 juta 2 hari 7-8 11-12 18-19 10-11 6-7 17-18 11-12 14-15 11-12 16 - 17 13-14 11-12

10 Defensive Driving Truck B3 7 juta 1 hari 9 8 5 9 7 18 8 15 13 11 11 10

11 Pengelolaan Limbah B3 5 juta 2 hari 10-11 18-19 11-12 8-9 8-9 19-20 9-10 13-14 9-10 11 - 12 14-15 11-12

12 Pengolahan Air Bersih (Water Treatment) 5 juta 2 hari 10-11 13-14 25-26 9-10 6-7 17-18 9-10 14-15 9-10 14 - 15 11-12 9-10

13 Pengolahan Limbah Cair Industri (Waste Water Treatment) 5 juta 2 hari 8-9 6-7 25-26 10-11 8-9 19-20 9-10 15-16 18-19 16 - 17 12-13 10-11

14 Instalasi Pengolahan Air Limbah (IPAL) 5 juta 2 hari 8-9 14-15 27-28 11-12 6-7 17-18 9-10 13-14 11-12 18 - 19 13-14 11-12

Awareness PROPER (Program Penilaian Peningkatan Kinerja Perusahaan dalam


15 5 juta 2 hari 7-8 7-8 18-19 8-9 13-14 17-18 17-18 14-15 16-17 10 - 11 14-15 9-10
Pengelolaan Lingkungan)
16 PROPER Hijau dan Emas 5,5 juta 2 hari 9-10 6-7 20-21 9-10 6-7 19-20 17-18 15-16 16-17 17 - 18 11-12 10-11

17 Pengendalian Pencemaran Udara 5,5 juta 2 hari 8-9 7-8 28-29 10-11 6-7 17-18 17-18 13-14 9-10 18 - 19 12-13 11-12

18 Corporate Social Responsibility (CSR) (ISO 26000:2010) 5 juta 2 hari 7-8 6-7 25-26 11-12 13-14 17-18 10-11 14-15 2-3 7-8 13-14 9-10

Peraturan Perundangan Perlindungan dan Pengelolaan Lingkungan Hidup (PPLH)


21 5 juta 2 hari 7-8 7-8 13-14 10-11 15-16 19-20 8-9 14-15 16-17 14 - 15 12-13 9-10
dan Tatacara Pemenuhannya
22 Evaluasi Kinerja Lingkungan berdasarkan ISO 14031 5 juta 2 hari 9-10 6-7 18-19 11-12 13-14 17-18 8-9 15-16 9-10 9 - 10 14-15 11-12

23 Keselamatan dan Kesehatan Kerja Lingkungan 5 juta 2 hari 10-11 12-13 18-19 8-9 15-16 19-20 8-9 13-14 11-12 11 - 12 11-12 10-11

24 Pengawas Operator Incinerator 5,5 juta 2 hari 14-15 13-14 18-19 9-10 13-14 17-18 16-17 14-15 16-17 17 - 18 13-14 11-12

25 Penanganan Tumpahan Bahan Kimia (Chemical Hazardous Handling ) 5,5 juta 2 hari 16-17 11-12 21-22 10-11 15-16 19-20 16-17 15-16 18-19 15 - 16 11-12 9-10

26 Material Safety Data Sheet (MSDS) B3 5 juta 2 hari 16-17 6-7 25-26 11-12 13-14 17-18 18-19 13-14 16-17 18 - 19 13-14 12-13

27 Manajemen Reuse, Reduce, Recycle (3R) 5 juta 2 hari 17-18 13-14 21-22 8-9 15-16 19-20 18-19 14-15 9-10 16 - 17 14-15 10-11

28 Prosedur Perizinan Izin Lingkungan 5 juta 2 hari 17-18 7-8 18-19 9-10 13-14 17-18 18-19 15-16 11-12 11 - 12 11-12 12-13

Energy Training

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Manajemen dan Audit Energi Industri 7 juta 3 hari 7-9 6-8 4-6 8-10 13-15 17-19 3-5 5-7 2-4 2-4 4-6 2-4

2 Manajemen Energi Bangunan Gedung 7 juta 3 hari 7-9 7-9 4-6 9-11 13-15 19-21 3-5 5-7 3-5 2-4 5-7 3-5

3 Manajemen Energi Industri 7 juta 3 hari 7-9 11-13 4-6 10-12 15-17 17-19 3-5 5-7 3-5 3-5 4-6 4-6
4 Manajer Energi Industri Berdasarkan SKKNI-BNSP 15 juta 4 hari 9-12 12-15 11-14 9-12 13-16 17-21 9-12 5-8 2-5 7 - 10 4-7 3-6

5 Manajer Energi Bangunan Gedung Berdasarkan SKKNI- BNSP 15 juta 4 hari 8-11 11-14 11-14 8-11 13-16 17-21 9-12 5-8 2-5 7 - 10 5-8 3-6

6 Auditor Energi Industri Berdasarkan SKKNI-BNSP 16,5 juta 4 hari 7-10 6-9 11-14 9-12 13-16 17-21 9-12 5-8 2-5 9 - 12 4-7 3-6

7 Auditor Energi Bangunan Gedung Berdasarkan SKKNI- BNSP 16,5 juta 4 hari 7-10 11-14 11-14 8-11 13-16 17-21 9-12 5-8 2-5 9 - 12 5-8 3-6

Mechanical and Electrical Training

No. Training List *Price MD Jan Feb Mar Apr Mei Jun Jul Agu Sep Oct Nov Dec

1 Basic Mechanical and Electrical 6 juta 3 hari 3-5 6-8 4-6 10-12 13-15 17-20 1-3 6-8 2-4 2-4 5-7 2-4

2 Boiler System Control Engineering 8,5 juta 4 hari 7-10 6-9 11-14 9-12 14-17 18-21 2-5 5-8 2-5 8 - 11 4-7 2-5

3 Boiler Technology for Indonesia Low Rank Coal 8,5 juta 2 hari 3-4 7-8 4-5 1-2 20-21 17-18 3-4 1-2 4-5 10 - 11 6-7 3-4

4 Boiler Coal Pulvirizer Fires and Explosion 5,5 juta 2 hari 7-8 11-12 4-5 4-5 22-23 19-20 3-4 7-8 2-3 7-8 4-5 3-4

5 Coal Stockpile Management 7,5 juta 3 hari 7-9 6-8 4-6 24-26 13-15 17-19 3-5 7-9 9-11 3-5 6-8 4-6

6 Coal-Fired Powerplant Performance 8 juta 3 hari 7-9 11-13 4-6 22-24 15-17 19-21 2-4 5-7 9-11 7-9 4-6 3-5

7 Combustion Analysis and Optimization 7 juta 3 hari 3-5 12-14 4-6 16-18 20-22 17-19 2-4 6-8 2-4 10 - 12 5-7 3-5

8 Oil Lubricant Analysis 5,5 juta 3 hari 7-9 11-13 4-6 15-17 22-24 19-21 1-3 7-9 2-4 7-9 6-8 4-6

9 Powerplant Scalling and Corossion 5,5 juta 2 hari 10-11 6-7 4-5 4-5 13-14 17-18 11-12 1-2 9-10 3-4 4-5 2-3

10 Pompa Air Tenaga Surya 2,5 juta 1 hari 7 1 8 2 7 17 10 7 5 7 5 3

11 PJU Tenaga Surya 2 juta 1 hari 4 4 8 4 7 17 10 7 11 8 7 3

12 Pembangkit Listrik Tenaga Surya Basic 5,5 juta 2 hari 7-8 7-8 4-5 1-2 22-23 19-20 10-11 7-8 10-11 2-3 4-5 3-4

13 Pembangkit Listrik Tenaga Surya Tingkat Lanjut 4,5 juta 2 hari 3-4 6-7 4-5 4-5 13-14 17-18 10-11 7-8 9-10 4-5 6-7 3-4

14 Analisis Heat Rate Pembangkit Listrik Tenaga Uap 7 juta 3 hari 3-5 6-8 4-6 23-25 15-17 19-21 8-10 5-7 2-4 7-9 4-6 5-7

15 Basic Electrical Safety for Non Electrician 5 juta 2 hari 7-8 7-8 4-5 4-5 20-21 17-18 11-12 5-6 9-10 7-8 5-6 4-5

16 Three-Phase Electrical Motor Maintenance 7 juta 3 hari 7-9 11-13 4-6 16-18 22-24 19-21 10-12 8-10 2-4 9 - 11 6-8 2-4

17 Hazardous Area Clasification (HAC) 6 juta 2 hari 7-8 14-15 4-5 1-2 13-14 17-18 10-11 6-7 4-5 11 - 12 4-5 5-6

Você também pode gostar