Você está na página 1de 2

SAUDI ARAMCO ID/PID - 18-May-05 -REV 0 (Standards Cutoff -March 2013) Rev 7 30-Apr-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Battery Room HVAC Requirements SAIC-K-4046 30-Apr-13 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

SAES-K-002
A1 Air shall not be recycled from battery rooms
Para 6.36.4
The bottom of the ventilation air inlet into the battery room shall not SAES-K-002
A2
be higher than 150 mm above the floor. Para 6.46.5
Air outlet of the battery room shall be located in the ceiling or its SAES-K-002
A3
upper edge flush with the ceiling if it is located in a wall. Para 6.46.5
Air inlets and outlets shall be located to provide effective cross SAES-K-002
A4
ventilation over the batteries Para 6.46.5
SAES-K-002
A5 No false ceilings are allowed in battery rooms
Para 6.46.6

Pockets for collection of flammable gas within battery room ceilings


shall be avoided. However, if not possible, then means shall be
provided to withdraw any collected flammable gas from the highest
point within each ceiling pocket.
SAES-K-002
A6 Note: If not possible, then means shall be provided to withdraw any
Para 6.46.7
collected flammable gas from the highest point within this ceiling
pocket Provisions shall be made for sufficient diffusion and ventilation
of the gases from the battery to prevent the accumulation of an
explosive mixture.(NFPA 70, Article 680.9 (A))

The Battery Room of the Passively Cooled Communication Shelters


SAES-K-003
A7 shall be provided with a separate passive cooling system to maintain
Para 6.3.17.4.1
a 3733°C maximum indoor air temperature.

The Battery Room shall not have any ventilation opening that would SAES-K-003
A8
compromise the effectiveness of the passive cooling system Para 6.3.17.4.2

Approved fire / smoke or fire-smoke dampers shall be provided as NFPA-90A


A9 required and installed in conformance with the conditions of their Para 4.3.9
listings Para 4.3.10

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-002 -- Air Conditioning Systems for Essential Operating Facilities 31 May, 2004 15 August 2012
2-SAES-K-003 -- Air Conditioning Systems for Communication BuildingsFacilities and Data Centers 31 May, 2004 19 December
2010
3-NFPA-90A -- Standard for the Installation of Air-Conditioning and Ventilating Systems 2009 edition

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative

Page 1 of 2
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2

Você também pode gostar