Wage Rate
Year Index % Increase
(May/June)
2067/68 2010/11 238.6
2068/69 2011/12 290.7 21.83
2069/70 2012/13 317.1 9.08
2070/71 2013/14 356.9 12.55
2071/72 2014/15 383.6 7.48
2072/73 2015/16 406.6 5.99
2073/74 2016/17 464 14.11
2074/75 2017/18 489.6 5.51
Rate as per NRB wage Rate Index (WI) Rate as per NRB wage Rate Index (WI)
Approved Rate Approved Rate
Professional / Staff
for F/Y 2067/68 FY 2068/69 FY 2069/70 FY 2070/71 for F/Y 2071/72 FY 2072/73 FY 2073/74 FY 2074/75
21.83% 9.08% 12.55% 5.99 14.11 5.51
Highway, Transport, Bridge Engineer,
Structure Engineer, Procurument Specialist,
2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Civil Engineer/Office Engineer, Road Safety
Specialist
Engineering Geologist 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Hydrologist 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Environmental Engineer 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Road/Highway Engineer 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Economist 2000 2436.60 2657.84 2991.40 2990 3169.10 3616.26 3815.52
Social Development / Resettlement Specialist 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Draft person / CAD Operator 900 1096.47 1196.03 1346.13 1340 1420.27 1620.67 1709.96
Support Staff / Chainman / Labours /
300 365.49 398.68 448.71 440 466.36 532.16 561.48
Runner / Peon / Helper
Environmentalist / Forestry Specialist /
Ecologist / Environmental Engineering (Team 3000 3654.90 3986.76 4487.10 4480 4748.35 5418.34 5716.90
Leader)
Socio - Economist 2000 2436.60 2657.84 2991.40 2990 3169.10 3616.26 3815.52
Technical Assiatance (Physio-Chemical) 1595 1943.19 2119.63 2385.64 2380 2522.56 2878.50 3037.10
Technical Assiatance (Biological) 1595 1943.19 2119.63 2385.64 2380 2522.56 2878.50 3037.10
Technical Assiatance (Social - Economic) 1595 1943.19 2119.63 2385.64 2380 2522.56 2878.50 3037.10
Account / Admin Staff 966 1176.88 1283.74 1444.85 1440 1526.26 1741.61 1837.57
Computer Operator 966 1176.88 1283.74 1444.85 1440 1526.26 1741.61 1837.57
5334
5334
5334
5334
5334
3815
5334
1709
561
5716
3815
3037
3037
3037
1837
1837
Provincial Government
Ministry of Physical Infrastructure Development
Transport Infrastructure Directorate
Infrastructure Development Office
Morang, Province No.1
Rate Analysis For
Initial Environmental Examination (IEE) of Road (Unit = km for L > 10 km & calculation for 17 km road)
(FY: 2075/76)
md per km for 17 km
Desk Field Report Total without Rates /
S. N. Particulars Units Travel Time without without Total Manday
Study work Prepration travel time manday
travel time travel time
A Key Staff
Environmentalist / Forestry
a days 7 3 2 14 23 2.30 35.88 38.88 5716
Specialist / Ecologist (Team Leader)
222238.08
107533.44
82570.32
74249.28
76910.40
11902.80
575404.32
42275.04
42275.04
42275.04
14328.60
20060.04
20060.04
24504.48
205778.28
781182.60
78,118.26
39,059.13
39,059.13
937,419.12
121,864.49
1,059,283.61
Provincial Government
Ministry of Physical Infrastructure Development
Transport Infrastructure Directorate
Infrastructure Development Office
Morang, Province No.1
Rate Analysis For
Initial Environmental Examination (IEE) of Road (Unit = km for L > 10 km & calculation for 19 km road)
(FY: 2075/76)
md per km for 19 km
Desk Field Report Total without Rates /
S. N. Particulars Units Travel Time without without Total Manday
Study work Prepration travel time manday
travel time travel time
A Key Staff
Environmentalist / Forestry
a days 7 3 2 14 23 2.30 39.56 42.56 5716
Specialist / Ecologist (Team Leader)
243272.96
116921.28
89397.84
80223.36
83624.80
13123.60
626563.84
45676.48
45676.48
45676.48
15798.20
22117.48
22117.48
27017.76
224080.36
850644.20
85,064.42
42,532.21
42,532.21
1,020,773.04
132,700.50
1,153,473.54