Você está na página 1de 6

SAP MM/WM/IM CONSULTANT

SUMMARY:

 SAP functional MM, WM and IM consultant with 7 years experience including four
full life cycle implementation
 Worked on all phases of ASAP Methodology of implementation that includes Project
Preparation, Business Blue Print, Realization, Final Preparation, Go Live and Support
 Customization and Configuration of Processes and performed a complete GAP
analysis to identify problems and inconsistencies with the business requirements
specification and the existing system.
 Proficient in configuration of the Enterprise Structure by interfacing with other
modules by defining Plant, Purchase Organizations, Purchase Group, Storage Locations,
warehouse
 Good knowledge of SAP FI and SD modules
 Expertise in integration MM/WM with PP, SD, FI, CO and QM modules.
 Experience in storage unit management and knowledge in handling unit management
applications of WM.
 Extensive Experience in Data Uploads via LSMW
 Used EDI interface enhancement component for R/3 systems with IDoc structures
 Worked extensively on RICEFS
 Extreme expertise in configuration and maintenance of Master Data in Material
Master, Vendor Master, Info Records, BOM, Variant Configuration, Account
Determination, Source List and Vendor Evaluation.
 Expertise in working with Purchase Orders, Purchase Requisitions, RFQ, Stock
Purchases, Consumable Purchases, Release Procedures, and Pricing Conditions.
 Proficient in carrying out special functions like Subcontracting, Third Party, Vendor
Consignment and Stock Transport Orders.
 Expertise in creating Goods Receipt, Goods Issue, Movements Type, Logistics
Invoice Verification, Credit Memos, Subsequent Settlement, Invoice Planning and
Automatic Invoice Settlements (ERS).
 Efficient in planning material by using Consumption Based Planning like forecasting,
lot size procedures.
 Efficient in Posting, Blocking, Releasing Invoice, Physical Inventory and Transfer
Posting.
 Expertise in implementing Split Valuation and Inventory Control and Management. .
 Monitor warehouse stock movements, configuration of RF Queues, used Mobile Data
Entry (MDE) for Goods Receipt/Goods Issue, position and removal of stock using Put
away and Picking up Strategies. Managing materials with Shelf Life Expiration Date
(SLED).
 Experience in preparation of documentation that includes areas of course design,
evaluation, training materials and providing training for business and end users in SAP
MM/WM
 Good knowledge in SAP testing
 Strong communication, analytical, inter personal and client relationship skills with a
high learning acumen to adopt new tools and technologies with ease and integrate these
skill sets into the project implementation life cycle.

- 1-
EDUCATION

 MBA in Operation Management from UMKC, Kansas City, MO, USA (2006)
 Undergraduate in Electronics and Instrumentation Engineering from Dibrugarh
University, Assam, India (1997)
________________________________________
TECHNICAL SKILLS
ERP: SAP R/3 (version 4.6a, 4.6b, 4.6c, 4.7) ECC 5.0
SAP modules: MM, WM
Software: MS Project, MS Excel, SAP Solution Manager
DBMS:: MS Access, SQL
Tools: Mercury Quality Center, UML, Visio, QTP
Programming Language: C/C++ Programming
Office Tools: MS EXCEL, ACCESS, POWERPOINT, WORD

PROFESSIONAL EXPERIENCE
________________________________________

November 2007 till date


Environment: ECC 6 MM/IM/LE/WM Functional Consultant
Client: Johnson Controls, Holland, MI
Description: Johnson Controls Inc (JCI) is the worlds leading manufacturer of automotive
batteries. JCI develops and produce seating systems, instrument panels and cockpits, door
systems, overhead systems, automotive electronics and electronic energy management
systems.
Duties performed:
 Worked on all phases of ASAP Methodology of implementation that includes Project
Preparation, Business Blue Print, Realization Documentation, Final Preparation,
Customization and Configuration Processes and perform a complete GAP analysis to
identify problems and inconsistencies with the business requirements specification and
the existing system.
 Responsible for configuration of MM/WM modules and integration with PP, SD and
FICO modules.
 Performed validation and uploading of master data like Material master and Vendor
master.
 Defined product divisions and material groups and assigned them to Industry sector,
Material types and set their corresponding number ranges.
 Configured purchasing documents and defined number ranges for various purchasing
documents, picking orders, goods movement doc.
 Configured Release Procedure with/without classification maintained it for release
conditions and release strategy and set it for purchasing documents.
 Released Purchase Orders which included Automatic PO generation.
Managed Special Stocks such as Subcontracting, Third Party
 Worked on Goods Receipts, goods issue, scrapping and returns, cycle count and
recount, physical inventory update, goods issue and reversal
 Created outline agreements that included value contract and quantity contract for
different vendors
 Established the whole procurement cycle from automatic creation of Requisitions to
invoice verification

- 2-
 Proficient in working on Warehouse structure customization, Basic Stock
Management, Automatic and Manual creation of Storage Bins, define and manage
storage areas and storage bins for different types of storage
 Implementing Warehouse Management (WM): Planning, design, development,
configuration, warehouse capacity planning.
 Customized material master data in warehouse management views.
Configured movement cycles, cycle counting in WM.
Configured control parameters for TR/TO.
 Configured different Picking and put away strategies like stock removal, stock
placement, fixed bin storage, next empty bin, addition to existing stocks and bulk storage.

Defined picking strategies such as LIFO and FIFO.


 Define interface to IM-Assign WM movement type references to IM movement types
 Worked on enhancements and interfaces to support the Direct and Indirect materials
Purchasing, Inter/Intra company logistics process, Subcontracting and vendor
consignment, return to vendor processes.
 Implemented Split Valuation for different types of stocks.
Configured put away and stock removal strategies like Manual Stock Placement, fixed
bin Storage, next bin empty, addition to existing stocks and bulk storage.

 Configured logistics execution which includes shipping point, packing and


transportation.
 Test scenarios for unit testing and co-ordinate and participated in integration testing
activities.
As a part of the Integration Team Tester, was involved in performing User Acceptance
Testing (UAT) to validate the business scenarios.
Involved in performing Acceptance testing to determine that the system, as upgraded and
fixed meets the users requirements

2005 Jan – 2006 June


Environment: ECC 5.0 Sap MM/IM/WM consultant
Client: McCormick
McCormick is world's largest spice company that also produces seasonings, flavors and other
food products for the entire food industry - from food service and food processing businesses
to retail outlets. McCormick is the global leader in the manufacture, marketing and
distribution of spices, seasonings and flavors to the entire food industry. Customers range
from retail outlets and food service providers to food processing businesses

Duties Performed:

 Organizational Data Configuration: Created plants, storage locations, purchasing


organizations and groups. Assigned plants, purchase organizations to company code, and
plants to purchasing organization.
 Configured Pricing Procedures with associated Condition Types, Condition tables and
Access Sequences. Created Condition Records.
 Configured Warehouse Management settings with various storage types, sections and
storage bins.
 Configured Release procedures for external and internal purchasing documents like
purchase requisition, purchase order, service entry sheet and service acceptance.
 Configured automatic posting, set tolerance limit, block invoice, release invoice, and
tax jurisdiction in invoice verification.
- 3-
 Configured Good Movements, Movement Types and Warehouse Structure along with
definition of the Put away and Pick strategies.
 Configured Warehouse Management settings with various storage types, sections and
storage bins.
 Configured Good Movements, Movement Types and Warehouse Structure along with
definition of the Put away and Pick strategies.
 Configured automatic and manual Transfer Requirement and Transfer Order creation
to handle goods receipt, goods issue and customer returns.
 Prepared the Functional Specifications for Configuration changes and built custom
transactions and custom reports
 Master data management like Material Master ,Vendor master and Bin Master
 Worked on Goods Receipts, goods issue, scrapping and returns, cycle count and
recount, physical inventory update, goods issue and reversal for customer prototype,
packing materials, testing parts and engineering samples.
 Worked with Batch Management, approval of Batches, Batch creation, Batch search
strategy, Batch determination for movements
 Worked on RICEFS
 Preparing and conducting of MM team meetings and cross-functional integration
meetings
 Test scenarios for unit testing and co-ordinate and participated in integration testing
activities using Mercury Quality Center
 Involved in performing Acceptance testing to determine that the system, as upgraded
and fixed meets the user’s requirements.
 Regular training for the key users and end users on SAP functionality's and navigation
through screens. Prepared documents and end user manual for training.
 Go-Live and Production Support: Involved in Production Support for end users by
noting down the problems and giving solutions by involving in configuration changes, to
enhance the efficiency of the development team.

Polaris Software Labs Ltd, Gurgaon


SAP MM Configuration Consultant
2003 Aug-2004 December
Environment: ECC 4.7 SAPMM/IM Functional Consultant

Carrier Aircon manufactures of air-conditions for residential and commercial purpose shifted
its manufacturing plant from Bangalore to Gurgaon. New plants are created and related
configurations are done to smoothly undertake the shifting process. The modules involved
are MM, PP, QM, and SD with country version India (CIN)
Duties Performed:
 Configuration for plant, storage location, purchasing organization , purchasing group
and their relations
 Configuring Shipping point, shipment type and shipping conditions
 Configured Release procedures for external and internal purchasing documents like
purchase requisition, purchase order, service entry sheet and service acceptance
 Configured automatic posting, tolerance limit, block invoice, release invoice, and tax
jurisdiction in invoice verification created continuous physical and annual inventory
documents with automatic zero stock check display
 Configuring the system for free goods determination and material determination
 Worked on issues related to Goods receipt / Goods issue.
 Managed special stocks and issues related to third party and vendor consignments.
- 4-
 Extended support for annual physical inventory counting of the warehouse managed
and non - warehouse managed plants
 Inventory Management Process including Goods Receipt, Damaged
Goods/Discrepancy Goods Receipt from Production, Storage Location to Storage
Location Transfer, Goods Issue.
 Created outline agreements that included value contract and quantity contract for
different vendors.
 Provided functional design specifications and tested the custom movement types.
 Worked extensively on Logistics Invoice Verification, automatic invoice settlements
using Evaluated Receipt Settlements (ERS).
 Assisted in inventory management and solved issues related to invoice blocks.
 Assisted in maintaining invoice verification tolerance limits and framework orders.
 Resolved issues on processing Stock transport orders in inter company and intra
company scenarios
 Generated test scripts and test data for integration testing of implemented modules.
 Documented end user manuals and training material.
 Responsibilities included production support in MM /WM modules to the user
specific problems and issues depending on the business process procedures.

Abhishek Industries Limited


September 2001 – July 2003
Environment: ECC 4.6 C SAP MM/IM Functional Consultant
Abhishek Industries Ltd in Punjab, India is a manufacturing company which manufactures
terry towels, paper, yarn and chemicals in India. It exports most of its terry towels to USA
major client being Wal-Mart.
Around 3 years’ functional knowledge and experience in customizing and implementation of
MATERIALS MANAGEMENT (SAP MM) R/3 module (4.7 version).
Duties Performed:
 Worked on all phases of ASAP Methodology of implementation that includes Project
 Preparation, Business Blue Print, Realization Documentation and Final Preparation
 Customization and Configuration Processes and performed a complete GAP analysis
to identify problems and inconsistencies with the business requirements specification and
the existing system.
 Configured plant, storage location, purchasing organization, purchasing group and
their relations
 Configured the pricing procedures using condition tables, condition types and access
sequence
 Configured the release procedure
 Extensively used LSMW to upload legacy data
 Created master data like material master and vendor master
 Configured document types for purchasing
 Configuring the output determination procedures and the output types for printouts as
well as EDI output
 MM sub-modules implemented: Forecast Based Planning, Purchasing, and Vendor
 Evaluation and Physical Inventory.
 Worked on issues related to Goods receipt / Goods issue.
 Managed special stocks and issues related to third party and vendor consignments.
 Resolved issues on processing Stock transport orders in inter company and intra
company scenarios.
 Design and implement inventory management emphasis on MRP.
- 5-
 Provided functional design specifications and tested the custom transaction for
outbound delivery process.
 Worked extensively on Logistics Invoice Verification (LIV), automatic invoice
settlements using Evaluated Receipt Settlements (ERS).
 Assisted in inventory management and solved issues related to invoice blocks.
 Assisted in maintaining invoice verification tolerance limits and framework orders.
 Have done integration of SAP MM with SD, PP , FI and QM modules
 Responsibilities included production support in MM modules to the user specific
problems and issues depending on the business process procedures.
 Worked on purchase orders, Non GR based invoice verification, various account
assignment categories, Service Entry sheet based invoice verification
 Mapping the process like procurement of stock material, procurement of non-stock,
goods receipt, goods issue, goods return, physical inventory, Subcontracting, stock
transfer and transfer posting
 Material and Vendor master data collection, validation and uploading
 Generated test scripts and test data for integration testing of implemented modules.
 Involved in User training and documentation of the procurement process
 Developed testing team processes for task assignment, script reviews, management
tools including status reporting & resource progress.
 Responsible for Unit testing the configuration and involved in integration testing
support for testing preparation & test execution.
 Documented end user manuals and training material
 Involved in Production Support and Performance Tuning Activities

- 6-

Você também pode gostar