N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
1.Generalization
PSJ150 automatic pressurized intermittent batch pre-expander is newly designed and made
by our company according to the latest international and domestic marketing requirements,
used for first and second expansion. This type of EPS machine is an automatic expanding
delumpling, screw conveyor and etc making an fully automatic cycle foam system. It is an
Expanded EPS beads through aging under normal pressure can be provided for EPS
molding machine to make different shapes of packing products as well as different sized
blocks. They are ideal packing materials for household appliance, gauges, instruments,
chinaware, glassware and all sorts of valuable and fragile things. Blocks can be used in
house construction, cars, ships, refrigerators etc, because they are good material of sound
Main features:
3. Using a 2.2kw motor for filling and discharging makes the filling and discharging
4. The applying of screw conveyer for filling and electronic weighting scale relieves
5. The chamber is totally closed which ensures high thermal efficiency and steam saving
2
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
and excels consistent pre-expander in energy saving with 50 percent of energy using.
6. With electronic weighing system and level sensor to control material position, so as to
7. With fluidized bed drier, we can carry out automatic cycle of drying, sieving,
8. The electronic appliances, pneumatic components and valves are all international and
domestic famous brand which ensures good performance, stability, reliability and long
life.
3
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
ф1500(internal diameter)
1 Expansion chamber mm
×2480(height)
2 Effective volume m3 3
4
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
Secondary
efficiency
7
12 g/l 600Kg/h
First foaming
15 g/l 900 kg/h
efficiency 20 g/l 1200 kg/h
30 g/l 1500 kg/h
10 weight T 5
Note: 1.With the constant development and improvement of machine technique, machine
structure and accessories may have some difference from that on operating
2.If you found the annex not match with the packing list in machine acceptance or there
are questions about operation, please contact with the QC department of our company.
You should send us main specifications and serial number and so on.
5
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
4. Running Machine
1. Be sure to check the spindle speed reducer is full of the gear oil or not before starting.
saturated steam is very important, since if steam pipe too long and too thin, boiler pressure
not enough, aqueous vapor will occur. If unsaturated steam enter expansion chamber, EPS
material will have more water content and easy to form lump, and the expanded density
cannot be even. So for better expansion, the diameter of steam pipe inlet should be over
3. Compressed air should be purified, no water and no dust, working pressure 0.6-0.8Mpa, In
batch pre-expander, compressed air is used for controlling valves and air cylinders,
cleaning chamber and pipes. Centers of solenoid valve are highly sensitive, they are easy to
be block when meeting dirty air and valves burnt from overloading. So compressed air
should be filtered through 40um filter before entering machine to make sure of normal
working.
6
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
4. EPS material should be dried no-powder material within period of validity. If material
exceed time of validity, patent in material escaped out, then they cannot be expanded to the
desired density. Powder is easy to block filling port and steam holes of expansion chamber,
5. Supplied power 3 phase 4 lines, 50HZ, 380V, connected load 26kW. Machine should be
1. Supply power 380V, connected load 26kW. Electric box has a wire hole at the bottom for
connecting power supplier. Its shell should be well earth connected. When power supplied,
be sure that indicating light on control panel is on. Check rotating direction of motors, such
as screw conveyor motor, backpressure filling motor, main shaft motor, discharging motor,
drying motor, transporting motor, delumping motor and vibration motor. Check motors
2. Check positions of level sensor, discharge gate sensor, light sensor. Check whether their
3. Check pressure gauge switch, turn the pin with hand to see if PLC input light on and wire
connection is correct.
1. Check oil lubricator, keeping enough 10# engine oil (must use light oil) in it.
7
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
2. Check steam pipe and compressed air pipe. Fill compressed air in machine, open all
solenoid valves with touch screen. Check whether NO, NC valves are compliant with
piping diagram.
3. Adjust steam pressure relief valve, making its outlet pressure 0.12Mpa. Open steam valve
via touch screen, check whether valve outlet pressure is steady. When pressure comply
4. Adjust compressed air pressure gauge upper limit to 0.75Mpa, lower limit to 0.45Mpa,
6. operating instruction
Check piping system, level sensors, weighing system and steam proportional valve system
2. Turn on Power, startup main shaft motor through touch screen, close discharge gate and
3. Switch to “single step” picture, decide EPS raw material volume according to Parameter
Reference Table. Enter values of raw material volume, fast discharge, slow discharge and
6. Filling and filling port clean, filling time should be lasting until all material in loader are
8. Discharge and clean: discharging time is set until all material in chamber poured out.
Bottom clean: after discharging, fill compressed air from chamber bottom to blow out
9. Windows clean start from begin ‘heating’ and end until finish ‘bottom cleaning’, it is
11. When first clean discharging gate, transporting motor, vibration motor and delumping
motor start to run (drying motor starts when expander main agitator run). To get to know
Measuring EPS density with electronic scale, if density has great tolerance, try the following
solutions:
When expanded density is adjusted near the desired density, turn to “auto” and run automatic
expanding.
12.You can select manual, single step, semi-auto and auto on touch panel. Usually manual is
for testing actions of all valves, motors and level sensors. Single step and semi-auto are for
9
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
7. Touch screen
10
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
11
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
12
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
8.Electrical diagrams
9.Machine Maintenance
1. Clear all material in expansion chamber and in fluidized bed drier before every shift ends.
2. Cut off power supply of screw conveyor, electronic scale, fluidized bed drier and
preexpander.
4. Everyday before working, check chamber to remove lumps and other objects, and check
agitating rods.
5. Everyday before working, check air filter and oil lubricator. Remove water in filter and add
oil (light engine oil) in lubricator if necessary, usually add to 2/3 of the cup.
6. Check vent port and trap to remove blocks. Make sure water flow out of drain port when
working.
7. Often check actions of pressure gauge, temperature gauge, current gauge, volt gauge and
8. Often check all valves and pipes, especially copper tube of safety valve and pressure gauge
switch. Before machine delivery, safety valve is set to 0.5Mpa, usually users needn’t adjust
again, but every week manually test it in case of malfunction. Pressure of expansion
chamber is controlled by pressure gauge switch, while copper tube is the connection
13
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
between chamber and pressure gauge switch. So once copper tube blocked, pressure gauge
switch cannot display chamber pressure correctly and cannot control pressure correctly,
easy to cause chamber breakage. In view of the importance of copper tube, try to protect it
9. Check electronic scale periodically, if it’s not precise, ask professional person to adjust or
repair it.
11. Often check sealing of Φ80 butterfly valve on filling port and vent port. Remove sealing
12. Keep windows clean and no dust, otherwise, sensitivity of level sensor will be influenced.
cooling, avoiding lumps in chamber. Open discharge gate manually, drive material out with
2. When using the preexpander, make sure that compressed air working pressure more than
0.5Mpa (5kg). All valves are controlled by compressed air, especially the discharge gate.
Discharge gate is locked by air cylinder, air pressure decrease will cause gate open. To run
3. Before reparation, main power must be cut off. After repairing, remember to take all tools
and accessories out of machine, since they tend to break steam plate and plough plate in
chamber.
14
N KL OPERATING INSTRUCTION
PSJ150 Batch Pre-expander
4. When producing, prevent objects (small stones or iron chips) from entering in chamber
5. In producing, often check sensitivity of pressure gauge switch, repair or change in time
D. compressed air pressure lower than set value of pressure gauge switch.
E. Expansion chamber pressure higher than set value of pressure gauge switch.
15