Escolar Documentos
Profissional Documentos
Cultura Documentos
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 1 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 2 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A
1. Visual check.
Remark :
Signature
Name
Date
Page 3 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3 1155
Core X
X2-X3 2000
Y1-Y3 1155
Core Y
Y2-Y3 2000
Signature
Name
Date
Page 4 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.B
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 5 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.B
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 6 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.B
1. Visual check.
Remark :
Signature
Name
Date
Page 7 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.B
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 8 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.C
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 9 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.C
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 10 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.C
1. Visual check.
Remark :
Signature
Name
Date
Page 11 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.C
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 12 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.A
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 13 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.A
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 14 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.A
1. Visual check.
Remark :
Signature
Name
Date
Page 15 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.A
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 16 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.B
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 17 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.B
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 18 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.B
1. Visual check.
Remark :
Signature
Name
Date
Page 19 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.B
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 20 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.C
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 21 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.C
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 22 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.C
1. Visual check.
Remark :
Signature
Name
Date
Page 23 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.C
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 24 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.A
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 25 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.A
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 26 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.A
1. Visual check.
Remark :
Signature
Name
Date
Page 27 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.A
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 28 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.B
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 29 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.B
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 30 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.B
1. Visual check.
Remark :
Signature
Name
Date
Page 31 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.B
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 32 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.C
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 33 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.C
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 34 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.C
1. Visual check.
Remark :
Signature
Name
Date
Page 35 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.C
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 36 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.A
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 37 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.A
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 38 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.A
1. Visual check.
Remark :
Signature
Name
Date
Page 39 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.A
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 40 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.B
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 41 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.B
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 42 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.B
1. Visual check.
Remark :
Signature
Name
Date
Page 43 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.B
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 44 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.C
DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.
INSTRUMENT
DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE
NOTE:
Signature
Name
Date
Page 45 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.C
Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.
NAME PLATE
Signature
Name
Date
Page 46 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.C
1. Visual check.
Remark :
Signature
Name
Date
Page 47 of 48
FIELD INSPECTION AND TEST REPORT
ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.C
Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3
Signature
Name
Date
Page 48 of 48