Você está na página 1de 48

FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 1 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 2 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 3 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.A

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 230000/√3 115 1155 Subtractive
Core X
X2-X3 230000/√3 66.4 2000 Additive
Y1-Y3 230000/√3 115 1155 Subtractive
Core Y
Y2-Y3 230000/√3 66.4 2000 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3 1155
Core X
X2-X3 2000
Y1-Y3 1155
Core Y
Y2-Y3 2000

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 4 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.B

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 5 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.B

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 6 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.B

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 7 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.B

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 8 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.C

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 9 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.C

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 10 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.C

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 11 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE010 Ph.C

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 12 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.A

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 13 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.A

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 14 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.A

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 15 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.A

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 16 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.B

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 17 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.B

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 18 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.B

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 19 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.B

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 20 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.C

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 21 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.C

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 22 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.C

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 23 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 11ADA10CE020 Ph.C

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 24 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.A

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 25 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.A

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 26 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.A

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 27 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.A

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 28 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.B

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 29 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.B

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 30 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.B

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 31 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.B

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 32 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.C

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 33 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.C

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 34 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.C

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 35 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE010 Ph.C

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 36 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.A

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 37 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.A

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 38 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.A

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 39 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.A

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 40 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.B

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 41 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.B

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 42 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.B

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 43 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.B

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 44 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.C

INDIVIDUAL TEST ITEM

DATE OF RESULT
No. INDIVIDUAL TEST
TEST PASS FAIL
1 Visual check.
2 Insulation resistance measurement.
3 Ratio and Polarity test.
4 Resistance of Secondary winding measurement.

INSTRUMENT

DATE OF DATE OF
No. INSTRUMENT MANUFACTURER TYPE/MODEL SERIAL NO.
CALIBRATION EXPRIRE

NOTE:

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 45 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.C

Technical data
Manufacture Nominal system voltage kV
Type Max. system voltage kV
Year of manufacture Rated ratio
Total weigh kg Rated burden VA
Rated frequency Hz Accuracy class
Insulation level BIL kV Serail no.
Standard EGAT Serial no.

NAME PLATE

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 46 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.C

1. Visual check.

- Equipment checked against specification sheet. Satisfy Un-Satisfy


- Correct and compleate installation checked. Satisfy Un-Satisfy
- Nameplate checked. Satisfy Un-Satisfy
- Insulator checked. Satisfy Un-Satisfy
- No oil leakege checked. Satisfy Un-Satisfy
- Oil level checked. Satisfy Un-Satisfy
- Secondary wiring complate checked. Satisfy Un-Satisfy
- Ground connection checked.

Remark :

2. Insulation resistance measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Test Connection Applied Voltage Resistance


Energize Ground ( Vdc ) at 1 minute
HV LV ( All core ) + Ground
LV ( core X ) HV + LV ( remainder core ) + Ground
LV ( core Y ) HV + LV ( remainder core ) + Ground

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 47 of 48
FIELD INSPECTION AND TEST REPORT

230kV VOLTAGE TRANSFORMER INDIVIDUAL TEST REPORT

ERECTION SITE: Bang Pakong Combined Cycle (Units 1-2 Replacement) LOCATION: 230kV GIS Building
CONTRACT NO.: PANEL NO.:
CUSTOMER: Electricity Generating Authority of Thailand DEVICE NO.: 12ADA10CE020 Ph.C

3. Ratio and Polarity test.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding Ratio Test


Core Terminals Rated Ratio Primary Secondary % Current Phase Dev. Polarity Check
No. Primary Secondary Ratio (A) (A) error
X1-X3 Subtractive
Core X
X2-X3 Additive
Y1-Y3 Subtractive
Core Y
Y2-Y3 Additive

4. Resistance of Secondary winding measurement.


Instrument : Date of test : :
Manufact : Ambient Temperature : °C
Model : Humidity : %
Serial No. :
Cal Date :

Secondary Winding
Winding Resistance ( Ω ) Remark
Core No. Terminals Rated Ratio
X1-X3
Core X
X2-X3
Y1-Y3
Core Y
Y2-Y3

Responsibility Tested by Confirm by Witnessed by


Company Collective Engineering Black & Veatch Electricity Generating Authority of Thailand

Signature

Name
Date

Page 48 of 48

Você também pode gostar