Você está na página 1de 4

HAZARD

IDENTIFICATION &
RISK ASSESSMENT
PROJECT: BINZAGR NDC 119012 CONTRACTOR NAME: NESMA TRADING CO. LTD.
HIRA NO. ADD SEQUENCE
LOCATION: KAEC RABIGH
NUMBER
JOB DESCRIPTION

DIESEL TANK STORAGE


Name: FARID ALI CHEAITO Position: Project Manager Signature Date:
Name: ALLAN SIASON Position: Safety Supervisor Signature Date:

P.P.E REQUIREMENTS PLANT, EQUIPMENT & TOOLS FOR TAGGING & SIGNS PERMITS/INSTRUCTION
“Check ” JOB “Check ” “Check ”
“Check ”
Air Purifying Persons
Safety Harness Ladder Excavator MSDSs
Respirator Working Above
Confined Space Instruction
Static Line Hand Tools Winch Barrier Mesh
Harness Manual
Tinted Safety Extension
Gloves - PVC Shovel Flagging HV Access
Glasses Leads
Clear Safety Welding Floor/Roof
Gloves – Rubber Backhoe Personal Locks
Glasses Machine Opening
Gloves -Leather Power Personal
Goggles Compactor Hot Work
Riggers Source Danger Tags
Out of Service
Face Shield Gloves - Welder Drill Crane Isolation
Tags

Page 1 of 4
Cotton Information
Sun Screen Grinder EWP Excavation
gloves Tags
Hearing Fire
Dust Musk Fans Barricade Confined Space
Protection Extinguisher
Suspended
Safety Helmet Safety Shoes Fire Blanket Scissor Lift Warning Signs Personnel
Platform
Skills/Competencies/Authorisations
“Check ”
Articulating Boom Crane Type and Asbestos
Dozer Grader
Lift Capacity: Removalist
Heavy Rigid
Scissor Lift Excavator Scraper
Vehicle
Concrete Placing Forklift Type and Front End
Rigger Articulated Vehicle
Boom Capacity: Loader
Personnel Hoist Boom Truck Backhoe Scaffolder Boat

RISK SCORE CALCULATOR


Use The Risk Score Calculator To Determine The Level Of Risk Of Each Hazard
LOW 1 TO SEVERITY Hierarchy of Controls
PROBABILITY

6 1 2 3 4 5
Can the product or process be Substituted
for a less hazardous alternative?
Can the hazard be Engineered away with
MEDIUM 8 TO 2 4 6 8 10 guards or barriers?
12 3 6 9 12 15
Can Administration Controls be adopted
ie procedures, job rotation etc

HIGH 15 TO 4 8 12 16 20 Can Personal Protective Equipment &


Clothing be worn to safe guard against
25 5 10 15 20 25 hazards?

Page 2 of 4
Risk Rank Risk Rank
BEFORE AFTER
JOB STEP POTENTIAL HAZARD
HAZARD CONTROL METHOD
STEP DESCRI List the potential hazards that RESPONSIBLE

PROBABILITY

PROBABILITY
RISK RESULT

RISK RESULT
List the control measures required to eliminate or

SEVERITY

SEVERITY
NO. PTION could cause injury/damage when PERSON
minimise the risk of injury
the task step is performed

1 Diesel Tank Storage Flammable liquids present a 4 5 H Elimination - The handling and use of diesel and 1 4 L Mechanical Supervisor,
on Site serious fire risk under the right Mechanic
petrol must be avoided where possible.
conditions. Diesel fuels may also
pose a risk to health and safety if  Contact with skin, eyes and the inhalation
ingested, inhaled or absorbed
of vapours must be avoided.
through the skin.
 Work must be suspended and the
equipment turned off in the event of a
fuel leak, no matter how small.
 Naked flames must not be used in areas
where such fuels are in use or stored.
 Equipment to be refuelled must be
turned off and allowed to cool. All
refuelling should preferably take place
prior to operating machinery for the first
time that day.
 Diesel must be stored in a suitable
location, preferably outdoors, and away

Page 3 of 4
Risk Rank Risk Rank
BEFORE AFTER
JOB STEP POTENTIAL HAZARD
HAZARD CONTROL METHOD
STEP DESCRI List the potential hazards that RESPONSIBLE

PROBABILITY

PROBABILITY
RISK RESULT

RISK RESULT
List the control measures required to eliminate or

SEVERITY

SEVERITY
NO. PTION could cause injury/damage when PERSON
minimise the risk of injury
the task step is performed

from sources of heat and naked flames.

Admin –There must be a full MSDS available for


diesel at all times and the provisions contained
within adhered to in so far as are reasonably
practicable.

PPE - When refuelling equipment or decanting


diesel or petrol suitable gloves and protective
clothing must be worn. In the event that fuel
contaminates clothing the clothing must be
removed immediately and laundered.
Eliminate - Diesel storage shall be bunded.
Secondary containment shall be designed and
Mechanical Supervisor,
2 Environmental Diesel Spillage on the ground 4 4 M built to contain 110% of the storage volume. 1 4 L
Mechanic
 Oil spill kit should be available.

Page 4 of 4

Você também pode gostar