Você está na página 1de 9

Steel Structure Assesment and Repair

Date Conduct 5-Jul-18 RB 809


Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
1 A frame 3 unit, top 1. Erect support 18 unit
silo 1 unit, counter
weigh 1 unit.

√ √ √ √
2 A frame Base no.2 1. Patching 6mm steel
plate 900mm length

√ √ √
3 Counter weight Base 1. To support & replace
frame damage base pole &
frame.

√ √ √
4 Side walk way, 1. Side walk way to
staircase, support change staircase,
angle and handrail. support angle complete
handrail 4000mm x
800mm

√ √ √ √

Page 1 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 RB 809
Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
5 A frame lower side 1. Patching 6mm steel
horizontal channel plate.

√ √ √
6 A frame highest side Patching 6mm steel
horizontal channel plate.

√ √ √
7 A frame highest side 1. Patching 6mm steel
horizontal support plate.
frame

√ √ √
8 A frame middle side 1. Patching 6mm plate
base pole c channel both leg front and back
900mm length

√ √ √

Page 2 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 RB 809
Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
9 A frame middle side 1. remove & replace
zig zag angle support. angle

√ √ √
10 A frame middle side 1. Replace angle iron &
horizontal support c channel.
frame

√ √ √
11 Head drum platfrom 1. To fabricate new
platfrorm with same
level c/w staircase.

√ √ √

Page 3 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 FEEDING
Team Member
No
Area Before After

1 RBS807 Reject Belt

2 X frame top level

3 WS802 washing
screen platrom motor
side.

4 WS802 washing
screen platrom
counter weight side

Page 4 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 FEEDING
Team Member
No
Area Before After

5 DDS double deck


screen I beam front
side

6 Outlet chute to Mill


silo

7 WS802 outlet chute

8 Inspection chute
staircase

Page 5 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 FEEDING
Team Member
No
Area Before After

9 Inspection chute
platform

10 DDS double deck


screen inlet chute

11 RB804 head drum


platform

12 RB804 head drum


platform

Page 6 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 FEEDING
Team Member
No
Area Before After

13 WS802 motor base

14 DDS double deck


motor drive

15 DDS double deck


motor drive

Page 7 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 RB804
Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
1 A frame highest side 1. Patching 6mm plate
both leg from bottom to
top.

√ √ √ √
2 Top horizontal beam 1. Extend new channel
and attach with existing
conveyor frame.

√ √ √ √
3 Side walk way angle 1. Remove & replace
frame angle iron for support
walk way.

√ √ √
4 Conveyor frame left 1. To replace side angle.
side intake portion.

√ √ √ √

Page 8 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 HOPPER
Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
1 FH801B feeding 1. Replace 4 unit pole
hopper and cross frame.

√ √ √
2 VE801 Vibrating 1. To normalise position
Extractor of rear belt skirt.

√ √ √
2

Page 9 of 9

Você também pode gostar