Memo: No.________/PMU/RTE&VTSP/2006.
Dated Quetta the______ August, 2006.
Kindly refer to your office letter No. 7-23/-E-SO (D)/3121-22, Dated 24.6.2006
on the subject cited above.
As per your desire the undersigned personally visited the site and discussed
progress of the work with supervisor of civil work contractor. The undersigned was informed that
currently the work has been suspended due to some disputes among the contractor and C&W
Department regarding enhancement of rates/premium. Since, no representative of C&W
Department was available on the site; hence, details of disputes could not be obtained.
Memorandum No._______PMU/GPIU/2018.
Dated Quetta the _______ September, 2018.
The PC-I of the proposed scheme entitled” Provision of Equipment, Furniture and
other facilities to Government Polytechnic Institute for Boys Uthal District Lasbela” is being
submitted for your kind information, perusal and further process please.
C.C.
Memorandum No._______PMU/GPIU/2018.
Dated Quetta the _______ November, 2018.
Kindly refer to the PDWP meeting held on 27 th: November, 2018 under the
chairmanship of ACS (Development), Government of Balochistan, P&D Department. As per
decision of the PDWP, a new and separate PC-I entitled “Provision of Equipment, Furniture and
other facilities to Government Polytechnic Institute for Boys at Uthal” is being submitted for
your kind information and perusal please.
C.C.
1. The ACS (Development), Government of Balochistan, P&D Department.
2. The Chief of Section (C, H&T), Government of Balochistan, P&D Department.
3. The Director of Technical Education, Balochistan Quetta.
MOST URGENT
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ June, 2019.
Kindly refer to the subject cited above and to inform you that a Demand Note for
provision of electricity to the GPI, Uthal amounting to Rs. 18.110 Million was issued by your
good office vide Case ID:0101114773 and Application No. 0002677098, Dated 20 th: October,
2018 (copy enclosed).
Since, the entire cost could not be deposited within due date, viz., November 19,
2018 due to non-availability of funds, therefore, it is requested that a revised Demand Note may
please be issued at the earliest, so that we could proceed further in the matter. Your early
response in the matter would highly be appreciated.
C.C.
1. The Secretary, Government of Balochistan, Education Department (C, H&T)
2. The Director of Technical Education, Balochistan Quetta.
To:-
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ June, 2019.
Kindly refer to the subject cited above and to inform you that this office intends to
procure one number Toyota Hiace Van. The required specification of the vehicle is given below,
and you being authorized 3S dealer of M/S Indus Motor Co., Ltd. are requested to submit
quotation, so that we could proceed further in the matter.
Vehicle Specification:- Toyota Hiace 15 seater van Mid Roof, 2 wheel Drive, Model 2019,
Japan Assembled, 2.5L petrol engine, , Dual AC, 4 Cylinders in-line, 5-Speed, Manual
transmission, with one spare wheel, set of rear view door mirror, set of tool kit and as per
manufacturer standard specification for Pakistan
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ June, 2019.
It has now been confirmed that an amount of Rs, 2.50 Million was paid to you by
the office of the Executive Engineer-II, Provincial B&R, District Lasbela at Uthal vide Cheque
No. B886257, Dated 26.06.2018 (copy enclosed). It is, therefore, requested that amount already
paid may please be adjusted while issuing revised Demand Note.
Your early response and co-operation in this regard would highly be appreciated.
C.C.
1. The Secretary, Government of Balochistan, Education Department (C, H&T)
2. The Director of Technical Education, Balochistan Quetta.
To:-
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ June, 2019.
This has the reference of your quotation bearing No.TQM/Sales/0115, Dated 3 rd:
June, 2019 in respect of subject vehicle. Your quotation amounting to Rs. 5.125 Million is hereby
accepted and you are now required to supply one number Toyota-Hiace Van as per specification
contained in the quotation.
In this connection a crossed cheque bearing No. 88279, Dated 26 th: June, 2019
amounting to Rs. 5,125,000/- in favor of M/S Indus Motor Co. Ltd is enclosed for your kind
information and further process please. Kindly acknowledge receipt.
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ June, 2019.
It is worth mentioning that the available funds would stand lapsed after closing of
current Financial Year, viz., 30th: June, 2019. Therefore, in order to avoid crucial time loss and
elapsed of funds, it is once again requested that Demand Note may please be provided at the
earliest, so that we could proceed further in the matter. Your early response and co-operation in
this regard would highly be appreciated.
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ June, 2019.
Kindly refer to the subject cited above and to enclose cheque No.92703, Dated
th
26 : June, 2019 debit-able to our official account (AP-68), amounting to Rs. 14.831 Million (Rs.
Fourteen Million, Eight Hundred and Thirty one Thousands Only).
Tanweer Ahmad,
Project Implementation Officer.
To:- The Manager,
Muslim Commercial Bank,
Chowk Marriabad Alamdar Road, Quetta.
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ June, 2019.
Kindly refer to the subject cited above and to enclose cheque No. 092733, Dated
th
27 : June, 2019, amounting to RS. 14.931 Million (Rs. Fourteen Million, Nine Hundred and
Thirty one Thousands Only) in favor of Muzaffar Ali, Word Data Processor of this office bearing
Account No. 0138002010015732.
FOR
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ July, 2019.
It is worth mentioning that academic activities are suffering badly due to non-
availability of electricity. It is, therefore, once again requested that the matter may please be
given due attention and Demand Note may please be issued at the earliest, so that we could
proceed further in the matter. Your early response and co-operation in this regard would highly
be appreciated.
Memorandum No._______PMU/GPIU/2019.
Dated Quetta the _______ July, 2019.
1. Your kind response through your office letter bearing No. M (S&BD)/2916/2019,
th
Dated 5 : July, 2019 in connection with the subject matter is highly appreciated. Furthermore, it
is to inform you that with the approval and concurrence of the competent authority, now the
subject scheme is being executed by this office, therefore, it is requested that in future all the
correspondence may please directly be made with the undersigned, so that issues pertaining to
subject scheme could timely be addressed and resolved. Please note our postal/e-mail address
given at the bottom of our letterhead and envelop.
2. This is to confirm you that a suitable piece of land measuring 30x20x12 facing
road side, within the premises of the institute has already been earmarked for construction of one
number general distribution sub-station. The sub-station would be constructed by the provincial
B&R, District Lasbela at Uthal as per approved standard specifications of K-Electric, and the
same shall be handed over to K-Electric free of cost.