DOLPHIN PROJECT

Contract No 1CD0795A

UPSTREAM AND COMPRESSION


DOLPHIN FACILITIES
Energy Ltd
FWS Ref.: 6444

Document No RLP-1081-PDS-09405

Area: RAS LAFFAN TREATMENT PLANT

Discipline: Process

Document Type: Datasheet

Commitment Number: UCE01-01

HYDRAULIC SEAL 2nd SULPHUR CONDENSER


108-1X9530-A/B & 108-2X9530-A/B

B02 4/18/2003 Issue for Bid FAN SIN MCZ


A01 3/7/2003 Issue for Approval GZO FAN MCZ
REV. Issue Date Description Prepared Verified Approved DEL Approval

© This document is the property of Dolphin Energy Ltd. No part of this document may be reproduced or transmitted in any form or by any means, or used
for any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.

427878054.xls
DOLPHIN PROJECT No RLP-1081-PDS-09405 Rev. B022 of 6
UPSTREAM AND COMPRESSION FACILITIES Page

CHANGE RECORD PAGE

Revision Description
A01 Issue for approval
B02 Issue for bid

427878054.xls
DOLPHIN PROJECT No RLP-1081-PDS-09405 Rev. B023 of 6
UPSTREAM AND COMPRESSION FACILITIES Page

Rev

1 ITEM
2 PROCESS SPECIFICATION
3 108-1X9530-A/B & 108-2X9530-A/B
4 HYDRAULIC SEAL
5

6 NUMBER OF ITEMS 4
7 SERVICE HYDRAULIC SEAL 2nd
8 SULPHUR CONDENSER
9 OPERATING DESIGN
10 Pressure bar g. bar g.
11 B02 TUBES 0.44 5.0
12 B02 JACKET 3.5 6.0/FV (4)
13 Temperature °C °C
14 B02 TUBES 165 200
15 B02 JACKET 148 170
See drawing on sheet 4/5
16

17 TUBES JACKET
18 B02 Materials (6) CS CS
19 Filter Material SS
20 Corrosion allow. 3 mm 3 mm
21 Fluid : LIQUID SULPHUR
22 Density at T : 1770 kg/m³
23 B02 Corrosive compound (5) (6)
24 B02 Insulation Yes Type (7)
25 Lining No
26 Lower TL elevation above ground:
27 minimum for piping
28 B02 Painting -
29 Length See Drawing mm
30 Diameter See Drawing mm
31 (Horizontal/Vertical) Vertical
32

33 NOZZLE DATA
34 REF. Nb Ø SERVICE
35 A 1 6"x8" Sulphur Inlet
36

37 F 1 6"x8" Sulphur Outlet


38

39 E1-3 3 3/4" Vents (with plugs)


40 D 1 16"x18" Drain (with blind flange 18")
41

42 H1 1 6"x8" Inspection (with blind flange)


43 H2 1 6"x8" Inspection (with blind flange)
44 H3 1 16"x18" Sight Door (with cover 18")
45

46 STI1-2 2 3/4" LP steam inlets


47 B02 STI3 1 3/4" Cond. inlet (from sulphur pipe)
48

49 STO1 1 3/4" Steam condensate outlet


50 STO2-3 2 3/4" Steam condensate outlets
51

52 UC1 1 6"x8" Filter connection


53

54

55

56

57

58

59

60

61

65

66

67

68

69

70

71

72

73

74

427878054.xls
DOLPHIN PROJECT No RLP-1081-PDS-09405 Rev. B024 of 6
UPSTREAM AND COMPRESSION FACILITIES Page

FICATION

SEAL

heet 4/5

427878054.xls
DOLPHIN PROJECT No RLP-1081-PDS-09405 Rev. B025 of 6
UPSTREAM AND COMPRESSION FACILITIES Page

Rev

1 ITEM
2 PROCESS SPECIFICATION
3 108-1X9530-A/B & 108-2X9530-A/B
4 HYDRAULIC SEAL
5

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

427878054.xls
DOLPHIN PROJECT No RLP-1081-PDS-09405 Rev. B026 of 6
UPSTREAM AND COMPRESSION FACILITIES Page

Rev

1 ITEM
2 PROCESS SPECIFICATION
3 108-1X9530-A/B & 108-2X9530-A/B
4 HYDRAULIC SEAL
5

8 GENERAL NOTES
9

10 B02 A. Deleted.
11

12

13 NOTES
14

15 1. Inspection door to be opened frequently during the unit normal operation to ensure that liquid sulphur
16 B02 is flowing freely. Vendor to define arrangement in order to guarantee an easy opening.
17 B02 Inspection door to be at the same elevation for all the seals.
18

19 2. Height of seal to be confirmed during Detailed Engineering Step after the selection of the Combustion
20 Air Blower.
21

22 B02 3. Deleted.
23

24 B02 4. Jacket to be designed also for Full Vacuum at 175°C.


25

26 B02 5. Corrosive compounds: H2S (max H2S content in liquid sulphur 300 ppm wt.).
27

28 B02 6. Equipment design and material selection must take into account:
29

30 B02 Toxic service Yes (H2S)


31 B02 Lethal service Yes (H2S)
32 B02 H2S partial pressure 0.002 bara (*)
33

34 B02 (*) H2S partial pressure has been calculated at design pressure.
35

36 B02 CO2 absent.


37

38 B02 7. Insulation to be provided (60 mm) for heat conservation.


39

40 B02 8. Butt weldings fully radiographed. Fillet weldings fully dye penetrant examined.