Você está na página 1de 3

Professional Training and Consultation

ASME B31.3 Process Piping


3rd upto 5th December 2005, Dammam, Saudi Arabia

ASME B31.3 PROCESS PIPING COURSE


Daily Exam 2 (Open Book)
Solution

1. Go to Table A-1B (Page 205)

Correct answer: c

2. Go to Table A-1 (Page 164)

Correct answer: c

3. Ref: B 31. 3, Table 331.1.1, Page 69

Correct answer: d

4. 12” Sch 80 pipe, thk = 17.45 mm


12” Sch 160 pipe, thk = 33.32 mm
A 106 Gr B is “Curve B” material.

Ref. Fig. 323.2.2A,

Combination of – 10oc and 17.45 mm is above curve B


(Refer Table 323.2.2A for correct reading)

Combination of – 10oc and 33.32 is below curve B


12” Sch 80 No impact test
12” Sch 160 Require impact test

Correct answer: b

PD
5. tm = 2( SE  Py )  C s = 20000 psi, E = 0.85

D= 168.28 mm, Y=0.4

360 x 168.28
= 2 2000 x 0.85  360 x 0.4   2

8th Floor, Al-Subeaei Towers, King Abdulaziz cor. Prince Faisal Bin Fahd Streets, Al-Khobar, Saudi Arabia
● TEL (966) 3 887 6633 ● FAX (966) 3 887 6565 ● info@gotoitc.com ● www.gotoitc.com
Professional Training and Consultation
ASME B31.3 Process Piping
3rd upto 5th December 2005, Dammam, Saudi Arabia
= 1.77+2
= 3.77

3.77
tord =  4.30 mm.
0.875

Thk of 6 ” Sch 40 = 7.11 . . . safe

Correct answer: a

6. Material A
16  17.5  9.5
Average of 3 =  14.33 Ok .
3
____
Value of 1 is 9.5 ft lb < 10 ft lb not Ok .

Material B
15  14  10
Average of 3 =  13.0 _____
Ok .
3
Value of 1 is 10 ft lb_____ Ok .

Correct answer: c

7. Nett Expansion for 350°F} = Exp. up to 350°F – exp. up to 100°F


= 3.2- 0.34 = 2.86

For 150 feet, Total Expansion = 1.5x2.86=4.29” ≈ 4.3”

Nett expansion for -50°F = ( Exp. up to – 50°F)-(Exp. up to 100°F)


= - 1.24 – 0.34
= - 1.58. Negative sign means it is actually
contraction

For 150 feet, Total Contraction = 1.5x1.58 = 2.37” ≈ 2.4”

Correct answer: b

8th Floor, Al-Subeaei Towers, King Abdulaziz cor. Prince Faisal Bin Fahd Streets, Al-Khobar, Saudi Arabia
● TEL (966) 3 887 6633 ● FAX (966) 3 887 6565 ● info@gotoitc.com ● www.gotoitc.com
Professional Training and Consultation
ASME B31.3 Process Piping
3 upto 5 December 2005, Dammam, Saudi Arabia
rd th

3P
8. tm = dg
16 SE
+C

3 x 200
= 200
16 x 18,000 x 1
+0

= 9.12 mm say 10 mm

Correct answer: b

9. P No. 4 Hardness required 225 HB max.


P No. 5 Hardness required 241 HB max.
P No. 3 Hardness required 225 HB max.

Correct answer: d

10. First go to Table A-1 (Page 156). Given material is represented by


curve B. Now go to Table 323.2.2A (Page 49). For thickness of 0.75”,
read 15°F under Column Curve B.

Correct answer: b