ISSUED FOR CONSTRUCTION
DESCRIPTION
A29-A-DAT-VE-607659
DATE
31/MAY/16
REV.
NO.
00
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
ISSUED FOR
00 31/May/2016 YY.Gu CH.Yang YZ.Cui B.Anders
OPERATIONS
CONSTRUCTION
________
Rev Date Description Prep Chk Appv’d PM SAPMT
DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,
REVISION CERTIFICATE
(DCC)NO. 10-01525-0004--001_
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.
B.ANDERS
YY.GU
1. General
These data sheets contain Architectural, HVAC, Electrical, Telecommunications / Security,
Plumbing, Civil / Structural, Fire Protection and Fire Detection information that may be conveyed
from the owner to the project design team or from the project design team leaders to the team
design members. This data may be provided by the owner or developed by the project design
ISSUED FOR CONSTRUCTION
The floor level definition used in this document identifies the building levels starting at grade as
First Floor, Second Floor, Third Floor, etc. Ground Floor is not used.
Building Code: Saudi Aramco Building Code, SAES-M-100
International Building Code (IBC) 2009 edition.
Elevation:
Finished Grade: - 100.000 m
Floor Elevation (First Floor): - 100.300 m
Floor Elevation (Second Floor): - N/A m
Floor Elevation (Third Floor): - N/A m
Special Requirements:
Description Yes No
Blast Resistant Construction
10-01525-0004
JO/EWO
Windows Permitted
Floor Drains Permitted
Furniture/Furnishings
Landscaping
DATE
31/MAY/16
Interior Design
Parking at Building
# of cars 3
REV.
NO.
00
Handicapped Parking
Signage/Graphics
DISCIPLINE
ENGINEER
Monorail Crane _______ tons capacity
________________
Existing Colours or Textures
to Be Matched
DATE ___________
Existing Siding/Roofing Profiles
PROJECT
ENGINEER
to Be Matched
________________
Designed for Future Expansion
Visual Access to Control Room
DATE ___________
Total Occupancy None
CERTIFIED
General Comments:
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
(DCC)NO. __10-01525-0004--001___
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.
2. Architectural
B.ANDERS
CERT
Substation
ENG’G
YY.GU
Code Reference
Building Classification IBC 2009
(SAES-M-100)
Occupancy Classification Group F-2 Section 306.2
Required 91.2m
Maximum Travel
DESCRIPTION
Table 1016.1
Distance
ACTUAL <23m
Required 1 or 2
No. Of Exits Table 1021.1
Refer to Floor
ACTUAL Plan
Fire Fire
Electrical Area
External: - Exclusion Internal: - Exclusion
Classification
Zone Zone
DATE
31/MAY/16
REV.
NO.
00
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
(DCC)NO. __10-01525-0004--001___
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.
Mechanical Room
Switchgear Room
PSA/SAS Room
Telecom Room
Room Name &
Battery Room
Function
ENG’G
Air Lock
YY.GU
Element
Definitions
Carpet
Chemical Resistant
ISSUED FOR CONSTRUCTION
Seamless Monolithic
DESCRIPTION
Bulletin Boards
Chalk/Marker Boards
CMU Masonry
DATE
Exposed Concrete
31/MAY/16
¾” Plywood Backboard
Modular Office Partition
REV.
NO.
ENGINEER
CONSTRUCTION
AGENCY Painted
________________ Gypsum Board
DATE ___________
Acoustical Tile
Plaster
OPERATIONS
________
DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
(DCC)NO. __10-01525-0004--001___
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.
YY.GU
Painted
Insulated
DESCRIPTION
Roll-up
Canopy
Other ________________
DATE
31/MAY/16
OPERATIONS
________
DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
(DCC)NO. __10-01525-0004--001___
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.
YY.GU
Air Conditioning: No
Cooling Medium: Chilled Water DX _________________
System: Packaged Split _________________
Condenser: Water Cooled Air Cooled
Corrosion Resistant Coil Coating: Air Handler Condenser
ISSUED FOR CONSTRUCTION
31/MAY/16
DISCIPLINE
Special Ventilation System Requirements:
ENGINEER
For Whole Building: - Yes No
________________
________________
Interior Electrical Light: - Incandescent Lamp Fluorescent Lamp Other ____________
DATE ___________ Special Grounding Yes
Interior Wiring Yes
OPERATIONS
________
Exterior Wiring Yes
DATE ___________
Exterior Lighting: - Yes No
Other Requirements
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
(DCC)NO. __10-01525-0004--001___
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.
5. Communication
B.ANDERS
CERT
YY.GU
Other
Communication Requirements: -
Telephone Yes No
Closed Circuit TV Yes No
Other
ISSUED FOR CONSTRUCTION
31/MAY/16
DATE ___________
7. Plumbing
OPERATIONS 7.1 Plumbing Codes
________
(DCC)NO. __10-01525-0004--001___
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.
(In the absence of any locally adopted plumbing code, building plumbing system will be designed
B.ANDERS
in accordance with) the latest edition of the International Plumbing Code (IPC) 2009 and SAES-M-
CERT
YY.GU
31/MAY/16
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
(DCC)NO. __10-01525-0004--001___
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.
8. Notes
B.ANDERS
CERT
YY.GU
A29-R-ARC-VA-120521 Elevations
DESCRIPTION
A29-R-ARC-VA-120522 Sections
A29-R-ARC-VB-120523 Wall Sections
A29-R-SCH-VA-120525 Door & Finishing Schedule
A00-S-GAP-VA-453004 Final Grading & Drainage Overall Plot Plan
A29-K-HVA-VA-015130 Equipment Layout For SS-329
A29-P-EDT-VA-238354 13.8kV Substation Layout (SS-329)
A29-B-FPS-VA-237773 SS-329 Fire Extinguisher Location Plan
10-01525-0004
JO/EWO
DATE
31/MAY/16
REV.
NO.
00
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,
OF THIS DRAWING IS COVERED, FOR ALL
(DCC)NO. __10-01525-0004--001___
PROJECT SPECIFICATION DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.