ELEMENT 5.19.3
JOB SAFETY PRACTICES
Carry out the induction and Daily Conduct tool box/induction Provide safety induction and tool box in
02 tool box talks at direct sunlight/ noise well ventilated room and prevent from
o If the employee is new from nearby noise and direct sunlight.
comer, shall be sent to
activity/equipment. Competent person only should give
HSE Office for induction.
o Carry out tool box talk on (Environmental conditions - safety induction and tool box talk
every day before heat, noise) (supervisor who received safety tool box
commencement of the Lack of knowledge by the training)
task - 15 minutes. instructor If the instructor known only English, ask the
Language barriers participants who knows their language and
Major/ Medium / Minor ask them to translate (Multilingual Safety
Induction and Tool Box Talk should be given
Accident.
to employees)
Heat Illnesses
Fire
Property Damage
03 Using power hand tools and hand Usage of defective power Visual inspection of activity area and
tools for the job (hammer, and hand tools tools should be done before
spanner etc.) Use of single insulted commencement of work.
o Selecting & using Damaged/cracked tools shall
electrical cable.
appropriate power/ hand immediately be reported to supervisor.
tools according to the Use of electrical plug Verification/ Inspection of tools as per
activity without earthing pin. the tools list.
o Inspection of the tools for Missing of safe guards Check for inspection "color code’’ of the
defects, insulation and Using un-insulated or not current month before use in case of
ergonomic conditions. power tools.
voltage rated tools.
Major / Medium / Minor Competent person shall only use
powered hand tools.
Accident e.g. Electric Shock,
Use insulated/ voltage rated tools only
Electrocution, Cut Injury while involving with live equipment.
The mentioned hazards may Always use power tools with double
lead to Major/Medium/Minor insulated power cable and three pin plug
accident. (plug with earthing pin)
04 Transporting and unloading of Unknown location by Driver to make sure delivery loads are
panel, fire hydrant, pipes driver inspected before entering site. Vehicles
o Get permission from Improper/unsecured with unsecured loads will be denied
authorized department stacking of load on back of access disciplinary action will be applied
(safety documents) and truck/ trailer - fall of on driver.
security guard for material or collapse truck Load inspected before removing
entering the boom truck/ Movement and positioning securing devices for stored energy.
pick up van of articulated vehicles in Constant supervision at offloading area.
o Guiding the boom truck/ congested area and Isolate the offloading area.
Pick up van. Reversing crane on to the No personal nearby while un-tying the
o Parking in unloading area articulated vehicle - load or do not stand on the top of load
(boom truck outriggers collision Signal must be appointed and guide the
extend and make stable) Climbing on the trailer and signal while crane and trailer moving.
o Barricading the area Removal of materials from Signal man should be in secured place.
Selecting & using appropriate the truck - fall of Maintain the speed limit not exceeding
equipment for unloading & material/person 20km/hr. Do not drive at designated
shifting materials from unloading
Driver/ Operator not areas
location to work location area.
competent Obtain lifting permit from authorized
Man and vehicle department for the activity
intersection Crane and its operator must be certified
Oversized cabins projecting by third party.
from trailer bed Steps provision must be available on
Weight of load not known, trailer or ladder must be available in
Poor ground condition, place and load must be offload step by
Incorrect use and defective step.
lifting equipment, Heavy Appropriate signs /symbol marked or
wind - turn over, collapse/ warning light shall be provided at edge
materials falling/fall on of projecting from the trailer bed.
person
o Welding the Pipes if required Occupational illness due to system for removing the fume and
Threading the pipes arc welding fume. Arc maintain proper ventilation.
fever, eye. Welding PPE must be used. (shield,
Ignition source - welding & filter mask, shoe, clothing, gloves etc., )
cutting, electric line. Use cut resistant gloves to prevent cut
Fire or explosion due to injury by sharp edges.
mishandling or unaware Use welding shield (shade number
about cutting operation according to welder eye power 12-14)
with oxy-acetylene to prevent eye injury due to arc
cylinder flash/flying particles.
Defective hose, torch, Fire blanket or canopy must be used
pressure gauge. Back fire while welding/grinding above the roof
due to missing of flash to prevent fire due to spark flash on the
back arrestor heat proof sheet and metal plate
open the valve exceeding underneath welding area.
the limit. Cylinder under Provide fire watcher and who must
pressure - store under ensure after 30 minutes of process, no
direct sunlight. Fall of remaining heat sources.
cylinders - without trolley Cylinders must be kept in trolley with
or chain chain.
Electric shock due to Keep hoses away from sharp edges and
defective cable abrasive surfaces. Do not allow hot
/equipment metal or spatter to fall on hoses. Handle
Missing of safe guard cylinders carefully. Store in upright
Cut injury due to sharp position and secured to prevent them
edge falling.
Slip, trip and fall due to Always turn the gas supply off at the
poor housekeeping or cylinder when job is finished. Maintain
work near access all equipment in good condition. Clamp
the work piece, do not hold it by hand.
Page 5 of 16 Rev.2 [08-April-2019] Projects Business Unit
PROJECT NAME:
ELEMENT 5.19.3
JOB SAFETY PRACTICES
Incompetent person Shut off the blow pipe when not in use.
involving in the activity Work in a safe location away from other
Manual handling by people.
pushing to bend and Clean thoroughly to eliminate all
transporting cylinders by flammable substances. Use appropriate
manually cleaning agent and then water or steam.
Threading oil leakage - Check out and vent out all hollow
pollution and ignition source spaces.
leads to fire Use correct lighting up procedure.
Purge the hose before lighting the
blowpipe to remove potentially
explosive gas mixtures.
Use spark igniter and ignite the gas
quickly after turning it on. Ensure
Blowpipe is fitted with spring-loaded
non-return valves to prevent backflow
of gas into hoses. Use correct gas
pressure and nozzle size for the job. In
particular, acetylene pressure must not
exceed 15 psi and oxygen pressure must
not exceed 50 psi.
Fit flashback arresters onto the
regulator on both fuel and oxygen
supply. Regularly check all connections
& equipment for faults and leaks.
Safe guard must be available and it
must be fitted as per manufacturer and
grinding blade RPM must be more the
grinding machine RPM.
06 Fire Alarm Detector and fire Using of defective power Obtain work permit from authorized
fighting pipe installation tools issuer.
o Select the Tool/equipment Inhaling dust during drilling Use filter mask, goggles, helmet, safety
for the activity Closed room (confined shoe, cover all, ear plug and cut
o Select the appropriate PPE space) lack of ventilation resistant gloves while involving with
for the Job Fall from height while drilling and fixing conduit.
o Fixing the Alarm detector working on scaffold/ ladder Ladder must be secured or buddy
and Fire fighting Pipes on / edge of the wall due to system in place. Ladder must be
the ceiling or wall as per uninspected, work inspected and color coded for
drawing with the help of without safety harness or inspection. defective ladder must be
ladder or scaffold and tools not hooking/ inadequate tagged with "do not use" and removed
anchorage point from the place.
incompetent person Scaffolding must be erected and
involving in the activity inspected by competent person only.
Slip, trip and fall due to Each employee should ensure before
cable lying on access. climbing the scaffold the scaffolding
Manual handling inspected and tag in place. if the tag is
Page 8 of 16 Rev.2 [08-April-2019] Projects Business Unit
PROJECT NAME:
ELEMENT 5.19.3
JOB SAFETY PRACTICES
Slip, trip and fall - poor Ensure that there are no obstacles or
housekeeping or materials open pits on the way
scattered on the access. Visual inspection of activity area and
Cut/ major injury due to tools should be done before
without safe guard of commencement of work.
cutting bending, grinding If damage/crack immediately report to
equipments) or supervisor.
incompetent person Verification/ Inspection of tools as per
involving. the tools list.
Sprain/strain due to Use proper electrical connection, naked
manual pushing, pulling, plug-in are strictly prohibited. Do not
twisting have any unauthorized joints on
Failure of hydraulic or extension codes. Competent electrician
damaged wheel only should give connection for power
tool and equipments.
Use only color coded power tools, this
can be done by competent person only.
Do not leave the cable at ground or
open to the traffic.
Temporary power sources shall be
grounded and with standard
connections.
Manual handling procedure must be
followed. Adequate interval and rest by
changing the worker should be given for
those who involving. while pushing or
pulling call summon for assistance or ask
the operator to lift and adjust the panel.
08 Cable pulling Defective hand tools Visual inspection of activity area and
tools should be done before
commencement of work.
Page 11 of 16 Rev.2 [08-April-2019] Projects Business Unit
PROJECT NAME:
ELEMENT 5.19.3
JOB SAFETY PRACTICES
o Select the tools/equipments Fall from height while If damage/crack immediately report to
for the activity. working on scaffold/ supervisor.
o Select the appropriate PPE ladder / edge of the wall Verification/ Inspection of tools as per
for the Job the tools list.
due to uninspected, work
o Ensure the routing cable Do not keep hands and finger in trap
from cable drum to location without safety harness or
point
o Use ladder or scaffold if not hooking/ inadequate Smoothen the sharp edges, Provide
required anchorage point suitable cotton packing to avoid
o Stand on the cable ladders if Sprain/ Strain due to damage due to sharp edges.
required cable pulling underneath Operatives to be trained in manual
Pull the cable handling techniques
the tiles
cut injury due to Ensure adequate manpower for the job
Working area should be maintain neat
inappropriate tools for
and tidy
cable sleeve removal
Establish suitable communication
Slip trip and fall due to during pulling work
poor placing of cable Manual handling procedure must be
followed. Adequate interval and rest by
changing the worker should be given
for those who involving. while pulling
call summon for assistance. Ladder
must be secured or buddy system in
place. Ladder must be inspected and
color coded for inspection. defective
ladder must be tagged with "do not
use" and removed from the place.
Scaffolding must be erected and
inspected by competent person only.
Each employee should ensure before
climbing the scaffold the scaffolding
inspected and tag in place. if the tag is
09 Cable Termination Damage / injury to the All lifting tools & tackles/ slings shall
property or person due to be inspected visually for safe use
o Selecting & using appropriate the use of defective tools These shall again be verified before
equipment for termination Cut injury or penetration start of job to ensure safety
o Mark the cable for cutting due to sharp edges of
and remove the sleeves Supervisor shall ensure that no
bared wires.
o Make gladding and compress other person is standing in the
Physical injuries due to
and install. working area
slips, trips and fall
Keep working platform clear of debris
Short circuit on wiring
or liquid spills. If a spill can’t be cleaned
connection that will cause
immediately, cordon the area and keep
of electrocution.
sign to warn others of the potential
Fall of workers if using
hazard.
platform (scaffold)
Keep tools and equipment in a safe side
and not scattered on the platform.
Use insulated terminal screw while
removing the wire connection
Ensure that the power supply is
shutting off before will proceed to
disconnect the wire