Escolar Documentos
Profissional Documentos
Cultura Documentos
In SAP R/3 system modular data is classified as master data and transaction data where the master data
is defined as the individual module objects. PP Masters data must be used before use of transactions.
SAP PP (Production Planning) encompass all activities like Material Requirement Planning (MRP), Bills of
Material (BOM), Routings, Automatic material requisitions based on MRP, capacity planning, etc.
All the details of manufacturing process can be record and track, e.g. planned costs, actual costs and
material flows.
Production Planning module is fully integrated with other SAP Modules such as sales and distribution
(SD), Material Management (MM), FICO (Financial Accounting and Controlling), Plant Maintenance (PM)
and Logistics Executions (LE).
Material Master is the master record of company’s main source of material-specific data. This
information is arranged in several pages or views such as –
Basic Data 1
Classification
Sales Organization
Genera Plant Data / Storage
Sales Text
Purchasing
Quality Management
Accounting
Logistics >> Material Management >> Material Master >> Material >> Create (General)
MM01 – Create Material Master
MM02 – Change Material
MM03 – View Material Master
https://www.saponlinetutorials.com/define-material-master-record-create-material-codes/
Enter ‘tcode’ means ‘transaction code’ MM01 in the SAP command field and press enter
Basic Data1 :- Update all the required data such as material group, unit of measure, item category.
Accounting views:- Update all the required data such as valuation class, price control, moving price.
After entering all the details, click on save icon the material.
https://www.saponlinetutorials.com/how-to-create-bills-of-material-bom-in-sap/
SAP Menu>> Logistics >> Production -> Master Data > Bills of Material > Bill of Material > Material BOM
> Create
‘tcode’- CS01
Step 1: Enter tcode CS01 in the SAP command field and press enter to continue.
Step 3: If already BOM exists for a material, then the system automatically gives a message to the user
that a second alternate bills of material (BOM) is being created.
Double click on item 010 and you can find the item details and you can change the quantity in item data.
After entering all of the components and quantities data, click on “save” button to save the configured
bills of material (BOM) data.