ADANI GROUP OHS MIS REPORT Report no : AGOHS/01/15

LAGGING AND LEADING INDICATOR


Period : August 2015
1 2 3 4 5 6 7 8 1 1 2 3 4 5 6 7 8 9 10 11 12 2 1 2 3 4 5 6 7 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 4 1 2 3 4 5 6 7 8 9 5 1 2 3 4 5 6 7 8 9 10 6 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 8 1 2
± 500 kV ,
En ter M on th Na me HV DC M ohi nd rg AWL- A da ni A g ri Fresh Li mite d
25 00TR
MW -

G
THERMAL POWER ( GENERATION) SOLAR GENERATION T irod a- HV DC ANSMISSION M und ra- a rh- PORT BUSINESS PMC- PORT ADANI WILMER-Refineries ADANI WILMER-Crushing Unit Adani Agri Logistics Limited (AALL) AALL - MP Adani GAS BUSINESS
Mundra Avant ha KTV- Medhaadra Cast er DEPOTS (A A FL)

NIN
HV DC S ami
Meas urement TOTAL M un dra K orad i- Te rmin al
Termi na l sw itch in g
Mu ndr a - M oh in der B hi wan i, Tiro da-
D/C Ako la
TOTAL
V isakh apa
TOTAL
Mundra Mundra Mundra
Mundra
Mundra Surajpur / Tune Dhamra
TOTAL
Krisnapattn Gummidi
KTV- KTV-
Kadi Karan Mundra
TOTAL
Saoner, Neemuc M undra –
TOTAL
95 Under Kaitha M ot Moga Navi
Coi mbatore Bangal ore Chennai FD Hugali FD
TOTAL

N
MUNDRA TIRORA KAWAI UDUPI DAHEJ PENCH BITTA AGEL(TN) Koradi-III Akola Z er da Akol a- Sta tio n, De hga m g arh & X - Y Wa rora Mundra Hazira Dahej Tuna Dhamra Goa ARD Hazira Dahej Tuna Dhamra Ennore (railway Kakinanda Kodingi Tut ic ori Vidisha Shujalpur Chindwara j- Caster
am, Nellore Mangalore Haldia Alwar Bundi
Points Mother Mumbai FD Satna Hoshgabad Harda Vidisha Ujjain Satna Rampur Sainj Rohru Ahmedabad Vadodara

PLA
Li ne-2 Au ran gab M un dra
S tati on, Stati on
(O&M ) E le ct rode El ectrod e (O &M)
I - A kola I I tna m LNG CT#4 CT#5 8&9 ROB (railway) (Railwa ) ( railway) poondi- yur-Port n- port Nagar Refinery Nagpur Mantralayam h Oil Unit Cast er C & FA her Depot Depot Depot
FD Depot FD Depot Depot Depot
1 ACCIDENT FREE PERIOD NA XX ad (O&M )
M oh ind er ( O&M )
Li ne &Dh ano d XX XX y) XX Port XX Oil U nit XX XX
garh
A CCIDE NT FR EE PERIO D (O &M ) a( O&M )
NA XX (O& M) XX XX XX XX XX XX
2 ( BE ST)
3 MAN HOURS WORKED NA 0 0 0 0 0 0 0
4 FIRST AID INJURY NA 0 0 0 0 0 0 0
LAGGING INDICATOR

R EPO RTABL E LO ST T IME


5 IN JURY NA 0 0 0 0 0 0 0
6 FATAL NA 0 0 0 0 0 0 0
7 FIRE INCIDENT NA 0 0 0 0 0 0 0
8 VEHICLE-ROAD INCIDENT NA 0 0 0 0 0 0 0
9 DANGEROUS OCCURANCE NA 0 0 0 0 0 0 0
10 PROPERTY DAMAGE COST NA 0 0 0 0 0 0 0
11 LEAK-SPILL INCIDENT NA 0 0 0 0 0 0 0
12 MAN DAYS LOST NA 0 0 0 0 0 0 0
13 NEARMISS INCIDENT NA 0 0 0 0 0 0 0
14 SAFETY INDUCTION NA 0 0 0 0 0 0 0
15 TOOL BOX TALK (NOS) NA 0 0 0 0 0 0 0
16 TBT- PARTICIPANT NOS. NA 0 0 0 0 0 0 0
SA FE T Y T RAIN ING PLAN
17 PR OG RAM ( YE AR)
0 0 0 0 0 0 0

SA FE T Y T RAIN ING
MTD 0 0 0 0 0 0 0
18 PR OG RAM
E M PL OYE E T RAIN ED PLAN
19 ( ATT E ND ANCE ) ( UN ITS) ( YE AR)
0 0 0 0 0 0 0
E M PL OYE E T RAIN ED
20 ( ATT E ND ANCE ) ( UN ITS) MTD 0 0 0 0 0 0 0
SA FE T Y CO MM ITT E E PLAN
21 M E ET ING S ( YE AR) 0 0 0 0 0 0 0
SA FE T Y CO MM ITT E E
MTD 0 0 0 0 0 0 0
22 M E ET ING S
PLAN
23 SAFETY PTW AUDIT ( YE AR)
0 0 0 0 0 0 0
24 SAFETY PTW AUDIT MTD 0 0 0 0 0 0 0
PLAN
25 SELF ASSESSMENT AUDIT ( YE AR)
0 0 0 0 0 0 0

SELF ASSESSMENT AUDIT MTD 0 0 0 0 0 0 0


LEADING INDICATOR

26
PLAN (YE
27 PLANT SAFETY INSPECTION AR)
0 0 0 0 0 0 0

28 PLANT SAFETY INSPECTION MTD 0 0 0 0 0 0 0


SA FE T Y- ITE M / PLAN
0 0 0 0 0 0 0
29 E Q UIPME N T IN SPE CT ION ( YE AR)
SA FE T Y- ITE M /
MTD 0 0 0 0 0 0 0
30 E Q UIPME N T IN SPE CT ION
SA FE T Y PRO MO T ION AL PLAN
0 0 0 0 0 0 0
31 CA MPA IGN ( YE AR)
SA FE T Y PRO MO T ION AL
MTD 0 0 0 0 0 0 0
32 CA MPA IGN
PLAN
EMERGENCY MOCK DRILL 0 0 0 0 0 0 0
33 ( YE AR)

EMERGENCY MOCK DRILL MTD 0 0 0 0 0 0 0


34
IN DU STR IA L HYG IEN E
PLAN
M ON IT ORIN G ( NO ISE, 0 0 0 0 0 0 0
( YE AR)
35 D UST,G AS)

IN DU STR IA L HYG IEN E


M ON IT ORIN G ( NO ISE, MTD 0 0 0 0 0 0 0
36 D UST,G AS)
SA FE T Y N OT IF ICAT IO N
37 R AISED MTD 0 0 0 0 0 0 0

SA FE T Y N OT IF ICAT IO N
MTD 0 0 0 0 0 0 0
38 CL OSE D
SA FE T Y N OT IF ICAT IO N
39 O PE N YTD 0 0 0 0 0 0 0
SA FE T Y N OT IF ICAT IO N
40 O PE N > 90 DAYS
MTD 0 0 0 0 0 0 0
CUMULTIVE
1 MAN HOURS WORKED 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 FIRST AID INJURY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R EPO RTABL E LO ST T IME
3 IN JURY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 FATAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 VEHICLE-ROAD INCIDENT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6 MAN DAYS LOST 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SUMMARY

7 FR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
8 IR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
9 SR #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Abbreviations :
FAI - First Aid Injury
FATA L - Fa tal I nj ury
R I-LT -Re por tabl e Lost Tim e In ju ry (ab sence o f mo re tha n 48 h rs. fro m wor k after th e accid ent)
M DL - Ma n da ys l ost du e to Re por tabl e Lost Tim e In ju ry an d fatal inci de nt (1 fata l= 60 00 ma n-d ays )
SR : SE V ER IT Y Ra te
F R: FR EQUE NCY R at e
I R: All Incident Injury Rat e c alculat ed per 1000 Person employed
Note: Reporting Site to maintain backup data, proof of evidence like reports, attendance sheet etc. to support the data reported in MIS for audit purpose.
3 9 1 2 3 10 11 AA
MINI NG
Adani GAS BUSINESS REAL ESTATE BUSINESS BUSINES Grand
TOTAL TOTAL S
Ahmedaba Parsa TOTAL
Faridabad d Mumbai Gurgaon Kant e
X XX XX

X XX XX
0 0 0
0 0 0

0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Definitions

Sr.
Term/ Abbreviation
No.

1 First Aid Injury (FAI)

2 Fire

3
FR- Frequency Rate

4 Incident Rate (IR)

Reportable Lost Time Injury


5
Case (R-LTI)

Accident (R-LTI) Free


6
Period in Days

7 MDL: Man days Lost

8 Near Miss

9 Property Damage Cost

10 SR: SEVERITY Rate

11 Vehicle Related Accidents

12 SAFETY NOTIFICATION
13 SELF ACCESSMENT AUDIT

SAFETY TRAINING
14 ATTENDANCE (UNIT)
PLAN/MTD

SAFETY TRAINING PROGRAM


15
PLAN/MTD

SAFETY COMMITTEE
16 MEETINGS
PLAN/MTD

SAFETY PTW AUDIT


17
PLAN/MTD

INDUSTRIAL HYGIENE
18 MONITORING
PLAN/MTD

PLANT SAFETY INSPECTION


19
PLAN/MTD

SAFETY- ITEM / EQUIPMENT


20 INSPECTION
PLAN/MTD

EMERGENCY MOCK DRILL


21
PLAN/MTD
SAFETY PROMOTIONAL
22 CAMPAIGN
PLAN/MTD

Note:
Definitions

Definition

Work related Injury that requires one time treatment and subsequent observation (for
example minor scratches, burns, cuts, which do not ordinarily require medical care) and has
no loss of workdays.
All fires regardless of size and whether the fire was extinguished using extinguishing
medium or self-extinguished shall be reported as fires. Fire includes unintentional fire of any
magnitude including Grass fires in the plant areas, electric arc, fire with no visible flame e.g.
fire in oil soaked insulation, pyrophoric fires, smoldering fire in coke/sulphur piles or other
self ignitable materials etc.

Frequency Rate - Frequency rate of accident per million man-hours worked, calculated for
only for Reportable injury incident including fatal incident per million man-hours worked
(106). (Includes total of RLTA and Fatal)
Number of All Injury incident rate calculated per 1000 person employed. Include First aid,
RLTI and Fatal cases. ( Includes First aid, RLTA and Fatal)
Work related injury which results in a person being unfit for work for a period of 48 hours or
more immediately following the occurrence of the occupational injury, (as per the Indian
Factories Act,1948) “The period of 48 hours” includes rest days, weekend days, leave days,
public holidays or days after ceasing employment.
Days between last Reportable lost time Injury case to the next Reportable lost time injury
can continues till next Reportable lost time injury occur.
Accident free Period (Best): From the site inception date any past best Reportable
accident free period in terms of days.

Man Days Lost - Work days lost due to work related reportable incident - all days between
day of incident and the person reported back on duty are counted as lost days which include
off days also.
Man days lost due to Reportable Lost Time Injury and fatal incident (1 fatal=6000 man days)
A ‘Near Miss’ is an unplanned incident not resulted in injury, which under slightly different
circumstances could have resulted in injury or harm.
Includes cost of damaged equipment/plant/product due to various type of incident and can
be quantified in terms of cost. It includes both insured and uninsured damage cost.
Calculated based on Man days lost due to reportable injury per million man-hours worked,
consider all man days lost due to reportable incident and fatal incident.
Accident involving surface transport vehicle (other than rail) and occurring both on-site and
off-site during working hours and related to work. (e.g. travel by company provided transport
to and from place of work etc.).
Safety notification means - safety issues (safety defect- Hazard) identified or arising out of
various safety activity like mock drill, plant inspection, equipment inspection, incident
investigation, suggestion, hazard reporting, near miss reporting, Non compliance and
Government Inspector remarks (citation) issued etc. it has major two category Regulatory
and Non Regulatory as BP (Best Practices)- the word notification came from SAP
Is internal, self assessment as per OHS -20 procedure using audit tool, done by respective
element / component owner of the procedure to access the level of implementation and rate
the each question.
Plan: At the minimum Procedure owner require to do assessment every Quarter and Safety
department does the independent assessment every six month. The plan is number of
procedure applicable to site X* 6 (4 self assessment by Owner plus+ 2 self assessment by
safety department per year. After assessment owner and safety department report the
status to site head with score and resource requirement if any.
MTD:
Plan: Safety training unit required as per yearly plan, prepared after safety training need
identification as per OHS-05 procedure for the site. It is measured in terms of Unit ( Unit =
Number of training topic required multiplied by number of employee required to attend)
Plan: The number of safety training topic identified as required during the year after safety
training need identification as per OHS-05 procedure for the site.
MTD: Number of training classes conducted during the month adhering the plan
Plan: Number of safety committee meeting planned as per the OHS-02 B requirement which
include central safety committee meeting and the Departmental safety meetings required.
MTD: Safety committee and department safety meetings conducted during the month.

Plan: PTW audit Planned as per the frequency suggested under OHS-12 and carried out by
team of personnel to audit running work under PTW, as defined under OHS-12 to verify PTW
procedure effectiveness and to identify.
1) Procedure step non compliance, wrt OHS-12 and 12A, 12B, 12C, 12D, 12E, 12F, 12G,
12,H.
2) Precaution Non Compliance - wrt JSA-RA.
3) Work Method non compliance wrt PTW and JSA-RA.
4) PPE non Compliance wrt PTW and JSA-RA.
5) Training and competency non compliance wrt- PTW and JSA-RA. plus other non compliance
incidental to area, equipment used.
6) Document completeness wrt signature, dates, validity, etc.
MTD: Number of PTW audit conducted during the month.
Plan: The work environment monitoring Plan as per OHS -15 procedure requirement for
number of identified exposure parameters as per procedure(Noise, gas, Dust, Chemicals,
Temperature, Humidity etc.) at predefined frequency by responsible person.
MTD: Number of Monitoring done during the month as per plan above.
Plan: Number of inspection Planed for year to carryout Plant areas Safety inspection by
internal teams as per OHS-06 Procedure. Includes safety and housekeeping aspect using the
checklist
MTD: Plant safety inspection completed during the reporting month as per plan.
Plan: Number of item/Eq. inspection planned for year for All identified safety and
emergency equipment as per the suggested frequency and added in the inspection tracking
calendar as per OHS-06 procedure.
MTD: Item/Equipment inspection completed during the reporting month as per plan.
Plan: Mock drills planned in advance for different applicable scenario as per EPRP prepared
for site for the year considering procedure, site requirement and legal requirement.
MTD: Mock drill conducted Total during the reporting Month
Plan: Safety Promotional campaign for Employee Involvement planned for site for the year in advance as
per procedure OHS-02, and other like Safety, Fire day celebration or competitions if any.
MTD: Safety Promotional Campaign organized and conducted during the reporting Month

Reporting Site to maintain backup data, proof of evidence like reports, attendance sheet etc. to support the dat
purpose.
Ref. OHS
Subject
PROCEDURE No

Incident Reporting,
OHS-04
Investigation and Follow-up

Incident Reporting,
OHS-04 Investigation and Follow-up
OHS-10 Fire Prevention and Protection
system Management

Incident Reporting,
OHS-04
Investigation and Follow-up

Incident Reporting,
OHS-04
Investigation and Follow-up

Incident Reporting,
OHS-04
Investigation and Follow-up

Incident Reporting,
OHS-04
Investigation and Follow-up

Incident Reporting,
OHS-04
Investigation and Follow-up

OHS-02 A Hazard - Near Miss Reporting

Incident Reporting,
OHS-04
Investigation and Follow-up
Incident Reporting,
OHS-04
Investigation and Follow-up
Incident Reporting,
OHS-04 OHS-17 Investigation and Follow-up
Motor Vehicle Safety

OHS Policy and Plan


OHS-01 OHS-20
Program Evaluation
OHS-20 Program Evaluation

OHS-05 Induction and Training

OHS-05 Induction and Training

OHS-02 B Safety Committee

OHS-12 (12A to
12H) Permit to Work System
Hot Work, Confined Space, Work
at Height, Excavation Trenching,
Radiation safety, Electrical
safety, Lockout-Tag out, Crane
and rigging

OHS-15 (15A Industrial Hygiene and all its


to15 I) sub procedures

OHS-06 Planned Safety Inspection

OHS-06 Planned Safety Inspection

Emergency Preparedness and


OHS-09
Response Plan
OHS-02 Employee Involvement Program
OHS-02C Safety Ambassador
OHS-02G Safety Mela
OHS-02H Safety Kumbh and,
OHS-02I Safety Virus

sheet etc. to support the data reported in MIS for audit