DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Project Monitoring Division


Region/District Implemented Projects
DPWH CY 2019 Infrastructure Program
As of May 31, 2019

RESULT OF BIDDING

Contract For On-going Projects


APPROPRIATION ABC Awarded Amount VARIANCE
Amount
Programmed
DISTRICT Amount
(P'000) Orig. Revised
Amount Amount Amount Amount Amount
Contract ID (%) Contract Contract Contractor Project Engineer
(P'000) (P'000) (P'000) (P'000) (P'000)
Duration (cd) Duration (cd)

PANG 3RD
Construction of Flood Control Structure along Banila River, Brgy. Capulaan, JHI
89 Balungao, Pangasinan 30,000.00 30,000.00 29,400.00 27,964.03 27,964.03 1,435.970 4.88% 170 Construction Hipolito F. Melchor Jr.
19AI0132 and Supply
Construction of Flood Control Structure along Banila River, Brgy. Poblacion, Villar General
92 Balungao, Pangasinan 30,000.00 30,000.00 29,400.00 27,941.75 27,941.75 1,458.252 4.96% 170 Construction Hipolito F. Melchor Jr.
19AI0004 and Supplies
Construction of Flood Control Structure along Banila River, Brgy. Pugaro, Balungao,
93 30,000.00 30,000.00 29,400.00 - 29,400.000 100.00% 170
19AI0240 Pangasinan
Construction of Flood Control Structure along Banila River, Brgy. Rajal-Angayan
19AI0167 94 40,000.00 40,000.00 39,200.00 - 39,200.000 100.00% 181
Norte, Balungao, Pangasinan
Construction of Flood Control Structure along Banila River, Brgy. San Aurelio I, BET
95 Balungao, Pangasinan 40,000.00 40,000.00 39,200.00 37,514.32 37,514.32 1,685.681 4.30% 181 Construction Hipolito F. Melchor Jr.
19AI0131 and Supply
Construction of Flood Control Structure along Banila River, Brgy. San Aurelio III,
19AI0127 96 20,000.00 20,000.00 19,600.00 18,614.12 18,614.12 985.880 5.03% 159 MKM Marketing Hipolito F. Melchor Jr.
Balungao, Pangasinan
Construction of Flood Control Structure along Lagasit River, San Joaquin, Balungao,
103 Pangasinan 10,000.00 10,000.00 9,800.00 9,318.00 9,318.00 481.999 4.92% 110 MKM Marketing Hipolito F. Melchor Jr.
19AI0005
Construction of Flood Control Structure along Banila River, Brgy. San Leon,
19AI0141 112 20,000.00 20,000.00 19,600.00 18,605.96 18,605.96 994.044 5.07% 159 MKM Marketing Jennycyl C. Ginez
Balungao, Pangasinan
Construction of Flood Control Structure along Lagasit River, Brgy. San Julian,
19AI0129 114 14,286.00 14,286.00 14,000.28 13,293.35 13,293.35 706.929 5.05% 131 MKM Marketing Hipolito F. Melchor Jr.
Balungao, Pangasinan
234,286.00
Construction of Multi-Purpose Building (Senior Citizens Building) Brgy. Poblacion,
19AI0319 129 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00% 95
Balungao, Pangasinan
19AI0192 131 Construction of Multi-Purpose Building at Balungao, Pangasinan 9,400.00 9,400.00 9,306.00 - 9,306.000 100.00% 170
12,400.00
19AI0310 167 Concreting of road, Brgy Pugaro - Poblacion line Balungao, Pangasinan 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
19AI0175 208 Concreting of Roads, Balungao, Pangasinan 5,500.00 5,500.00 5,445.00 - 5,445.000 100.00%
10,500.00
TOTAL 257,186.00 257,186.00 252,271.28 153,251.52 153,251.52 99,019.76 39.25%
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Project Monitoring Division
Region/District Implemented Projects
DPWH CY 2019 Infrastructure Program
As of May 31, 2019

RESULT OF BIDDING

Contract For On-going Projects


APPROPRIATION ABC Awarded Amount VARIANCE
Amount
Programmed
DISTRICT Amount
(P'000) Orig. Revised
PROJECT Amount Amount Amount Amount Amount
Contract ID Contract Amount (%) Contract Contract Contractor Project Engineer Remarks
TITLE (P'000) (P'000) (P'000) (P'000) (P'000)
Duration (cd) Duration (cd)

FLOOD CONTROL
Construction of Flood Control Structure along Banila River, Brgy.
JHI
Capulaan, Balungao, Pangasinan
1 30,000.00 30,000.00 29,400.00 27,964.03 27,964.03 1,435.970 4.88% 170 Construction Hipolito F. Melchor Jr.
and Supply
19AI0132
Construction of Flood Control Structure along Banila River, Brgy. Villar General
2 Poblacion, Balungao, Pangasinan 30,000.00 30,000.00 29,400.00 27,941.75 27,941.75 1,458.252 4.96% 170 Construction Hipolito F. Melchor Jr.
19AI0004 and Supplies
Construction of Flood Control Structure along Banila River, Brgy.
Pugaro, Balungao, Pangasinan
3 30,000.00 30,000.00 29,400.00 - 29,400.000 100.00% 170
19AI0240
Construction of Flood Control Structure along Banila River, Brgy.
Rajal-Angayan Norte, Balungao, Pangasinan
4 40,000.00 40,000.00 39,200.00 - 39,200.000 100.00% 181
19AI0167
Construction of Flood Control Structure along Banila River, Brgy.
BET
San Aurelio I, Balungao, Pangasinan
5 40,000.00 40,000.00 39,200.00 37,514.32 37,514.32 1,685.681 4.30% 181 Construction Hipolito F. Melchor Jr.
and Supply
19AI0131
Construction of Flood Control Structure along Banila River, Brgy.
San Aurelio III, Balungao, Pangasinan
6 20,000.00 20,000.00 19,600.00 18,614.12 18,614.12 985.880 5.03% 159 MKM Marketing Hipolito F. Melchor Jr.
19AI0127
Construction of Flood Control Structure along Lagasit River, Brgy.
San Marcelino, Balungao, Pangasinan
7 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
19AI0239
Construction of Flood Control Structure along Lagasit River, Brgy.
19AI0005 8 10,000.00 10,000.00 9,800.00 9,318.00 9,318.00 481.999 4.92% 110 MKM Marketing Hipolito F. Melchor Jr.
San Joaquin, Balungao, Pangasinan
Construction of Flood Control Structure along Banila River, Brgy.
San Leon, Balungao, Pangasinan
9 20,000.00 20,000.00 19,600.00 18,605.96 18,605.96 994.044 5.07% 159 MKM Marketing Jennycyl C. Ginez
19AI0141
Construction of Flood Control Structure along Lagasit River, Brgy.
San Julian, Balungao, Pangasinan
10 14,286.00 14,286.00 14,000.28 13,293.35 13,293.35 706.929 5.05% 131 MKM Marketing Hipolito F. Melchor Jr.
19AI0129
244,286.00
BUILDINGS
Construction of Multi-Purpose Building (Senior Citizens
Building) Brgy. Poblacion, Balungao, Pangasinan
129 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00% 95
19AI0319
Construction of Multi-Purpose Building at Balungao,
131 Pangasinan 9,400.00 9,400.00 9,306.00 - 9,306.000 100.00% 170
19AI0192
12,400.00
ROADS
Concreting of road, Brgy Pugaro - Poblacion line Balungao,
167 Pangasinan 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
19AI0310
Concreting of Roads, Balungao, Pangasinan
19AI0175 208 5,500.00 5,500.00 5,445.00 - 5,445.000 100.00%

p 10,500.00
TOTAL 267,186.00 267,186.00 262,071.28 153,251.52 153,251.52 108,819.76 41.52%
PROJECT DATE
TARGET DATE OF
PROJECT TITLE CONTRACTOR CONTRACT COST
IMPLEMENTING OFFICE
DURATION STARTED COMPLETION
Villar General
Construction of Flood Control Structure along Banila
1 19AI0004 Construction & PHP 27,941,748.12 170 July 3, 2019 December 19, 2019
River, Brgy. Poblacion, Balungao, Pangasinan
Supplies
Construction of Flood Control Structure along Lagasit
2 19AI0005 MKM Marketing PHP 9,318,000.58 110 July 3, 2019 October 20, 2019
River, Brgy. San Joaquin, Balungao, Pangasinan
Construction of Flood Control Structure along Banila
3 19AI0127 MKM Marketing PHP 18,614,120.24 159 July 3, 2019 December 8, 2019
River, Brgy. San Aurelio III, Balungao, Pangasinan
Construction of Flood Control Structure along Lagasit
4 19AI0129 MKM Marketing PHP 13,293,350.81 131 July 3, 2019 November 10, 2019
River, Brgy. San Julian, Balungao, Pangasinan
Construction of Flood Control Structure along Banila BET Construction
5 19AI0131 PHP 37,514,391.16 181 July 3, 2019 December 30, 2019
River, Brgy. San Aurelio I, Balungao, Pangasinan and Supply
Construction of Flood Control Structure along Banila JHI Construction
6 19AI0132 PHP 27,964,029.55 170 July 3, 2019 December 19, 2019
River, Brgy. Capulaan, Balungao, Pangasinan and Supply
DPWH,
Construction of Flood Control Structure along Banila
7 19AI0141 MKM Marketing PHP 18,605,956.48 PANGASINAN 159 July 3, 2019 December 8, 2019
River, Brgy. San Leon, Balungao, Pangasinan 3RD DEO,
TUMANA,
Construction of Flood Control Structure along Banila Villar General
8 19AI0167 ROSALES,
River, Brgy. Rajal-Angayan Norte, Balungao, Pangasinan Construction & PHP 37,236,326.01 181 July 3, 2019 December 30, 2019
Supplies PANGASINAN

Construction of Multi-Purpose Building at Balungao, Red Matrix Builders PHP


9 19AI0192 9,072,678.08 170 July 3, 2019 December 19, 2019
Pangasinan and Trading

Villar General
Construction of Flood Control Structure along Lagasit
10 19AI0239 Construction & PHP 9,327,550.36 110 July 3, 2019 October 20, 2019
River, Brgy. San Marcelino, Balungao, Pangasinan Supplies
Villar General
Construction of Flood Control Structure along Banila
11 19AI0240 Construction & PHP 27,997,132.32 170 July 3, 2019 December 19, 2019
River, Brgy. Pugaro, Balungao, Pangasinan Supplies
Villar General
Concreting of road, Brgy Pugaro - Poblacion line
12 19AI0310 Construction & PHP 4,851,000.00 60 July 4, 2019 September 1, 2019
Balungao, Pangasinan
Supplies
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Project Monitoring Division
Region/District Implemented Projects
DPWH CY 2019 Infrastructure Program
As of May 31, 2019

RESULT OF BIDDING

Contract For On-going Projects


APPROPRIATION ABC Awarded Amount VARIANCE
Amount
Programmed
DISTRICT Amount
(P'000) Orig. Revised
Amount Amount Amount Amount Amount
Contract ID (%) Contract Contract Contractor Project Engineer
(P'000) (P'000) (P'000) (P'000) (P'000)
Duration (cd) Duration (cd)

PANG 3RD
Jct. Tayug-San Quintin Road Aquino-Dela
leading to Amazing Sunflower Cruz
120 Farm, Brgy. Panganiban, Tayug, 20,000.00 20,000.00 19,600.00 18,627,952.31 18,627,952.31 (18,608,352.310) -94940.57% 99 Engineering Hipolito Melchor Jr.
Pangasinan and
19AI0031 Construction
Construction of Sto. Nino Multi-
Purpose Building (Covered Court), AMP
51 2,000.00 2,000.00 1,980.00 1,960.26 1,960.26 19.741 1.00% 85 Zaldy M. del Valle
Sto. Nino, Sto. Tomas, Pangasinan Construction
19AI0110
Construction of Multi-Purpose R.F. Flores
132 Building at Natividad, Pangasinan 4,600.00 4,600.00 4,516.24 4,440.18 4,440.18 76.055 1.68% 110 Hipolito Melchor Jr.
19AI0191 Construction
Construction/Rehabilitation/Improv
Oriental Sales
ement of Santa Maria - San Jose Wilson U.
124 10,000.00 10,000.00 9,800.00 9,603.02 9,603.02 196.980 2.01% 70 Center and
Quintin Road, Santa Maria, Manongsong
Contractor
19AI0265 Pangasinan
Rehabilitation of the Damage
T.N. Ramos
Drainage Canal " Pas-Ngaw" along
Construction
197 the Main Irrigation Canal at Zone 6 2,000.00 2,000.00 1,980.00 1,940.00 1,940.00 40.000 2.02% 45 Jennycyl C. Ginez
and Dev't
Brgy. Calepaan, Asingan,
Corp.
19AI0272 Pangasinan
Construction of Bank Protection, Villar General
162 Brgy. La Paz, Umingan, 50,000.00 50,000.00 49,000.00 47,932.17 47,932.17 1,067.8273 2.18% 192 Construction Reynald N. Barrera
19AI0163 Pangasinan and Supply
Construction of Multi-Purpose Georavin
190 Building, Asingan, Pangansinan 5,000.00 5,000.00 4,950.00 4,827.42 4,827.42 122.584 2.48% 120 Construction Jennycyl C. Ginez
19AI0279 and Supplies
Construction of Multi-Purpose C.L. Morales
187 Building at Brgy. Guiling, Rosales, 2,000.00 2,000.00 1,980.00 1,930.39 1,930.39 49.611 2.51% 85 Construction Reynald N. Barrera
19AI0250 Pangasinan and Trading
Construction of Multi-Purpose UCORE
188 Building at Poblacion, Umingan, 2,000.00 2,000.00 1,980.00 1,930.37 1,930.37 49.634 2.51% 85 Construction Eugenio Flores
19AI0249 Pangasinan and Dev't Corp
Construction of Multi-Purpose
Villar General
Building Domanpot Community
189 3,000.00 3,000.00 2,970.00 2,892.20 2,892.20 77.805 2.62% 95 Construction Jennycyl C. Ginez
School, Brgy. Domanpot Asingan
and Supply
19AI0247 Pangasinan
Construction of Multi-Purpose UCORE
186 Building at Brgy. Alac, San Quintin, 2,000.00 2,000.00 1,980.00 1,927.92 1,927.92 52.084 2.63% 85 Construction Reynald N. Barrera
19AI0251 Pangasinan and Dev't Corp
Concreting of Road, San Juan, Tierra de
205 Umingan, Pangansinan 2,000.00 2,000.00 1,980.00 1,926.36 1,926.36 53.639 2.71% 45 Ferrand Realty Reynald N. Barrera
19AI0157 Dev't. Corp
Concreting of Road, Pemienta, Tierra de
204 Umingan, Pangansinan 2,000.00 2,000.00 1,980.00 1,925.88 1,925.88 54.121 2.73% 45 Ferrand Realty Reynald N. Barrera
19AI0155 Dev't. Corp
Concreting of Road, Pangangaan, Tierra de
203 Umingan, Pangansinan 2,000.00 2,000.00 1,980.00 1,925.49 1,925.49 54.505 2.75% 45 Ferrand Realty Reynald N. Barrera
19AI0158 Dev't. Corp
Construction of Nibaliw Multi- BET
41 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,924.56 1,924.56 55.443 2.80% 85 Construction Manuel C. Novencido Jr.
19AI0101 Nibaliw, Bautista, Pangasinan and Supply
Concreting of Road, Maseil-seil, Tierra de
202 Umingan, Pangansinan 2,000.00 2,000.00 1,980.00 1,924.02 1,924.02 55.975 2.83% 45 Ferrand Realty Reynald N. Barrera
19AI0156 Dev't. Corp
Construction of Unzad Drainage W.M. Salayog
System, Unzad, Villasis, Construction
57 2,000.00 2,000.00 1,980.00 1,923.51 1,923.51 56.491 2.85% 51 Manuel C. Novencido Jr.
Pangasinan and General
19AI0118 Mdse
Construction of Asan Sur Multi- W.M. Salayog
Purpose Building (Covered Court), Construction Jose Wilson U.
26 2,000.00 2,000.00 1,980.00 1,921.15 1,921.15 58.851 2.97% 85
Asan Sur, Sison, Pangasinan and. Gen. Manongsong
19AI0006 Mdse.
Carmen Jct-Manat Rd - K0172 +
000 - K0173 + 000, K0174 + 000 - AMP
1 22,406.00 22,406.00 21,957.88 21,299.14 21,299.14 658.737 3.00% 63 Zaldy M. del Valle
K0174 + 300, K0175 + 000 - Construction
19AI0145 K0175 + 848
Construction of Linmansangan
W.M. Salayog
Elementary School Multi-Purpose
Construction
34 Building (Covered Court), Brgy. 2,000.00 2,000.00 1,980.00 1,919.61 1,919.61 60.387 3.05% 85 Jayson C. Bascos
and Gen.
Linmansangan, Binalonan,
Mdse.
19AI0053 Pangasinan
Construction of Casampagaan
St. Almer
Multi-Purpose Building (Covered
32 2,000.00 2,000.00 1,980.00 1,918.64 1,918.64 61.358 3.10% 85 Construction Jayson C. Bascos
Court), Casampagaan, Laoac,
and Enterprise
19AI0007 Pangasinan
Labayug-Inmalog Road leading to
BET
Antong Falls, Brgy. Labayug, Jose Wilson U.
20 30,000.00 30,000.00 29,400.00 28,488.51 28,488.51 911.492 3.10% 200 Construction
Sison, Pangasinan Manongsong
19AI0033 and Supply
Construction of Vacante Multi- Zota Trading
54 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,918.23 1,918.23 61.769 3.12% 85 and Manuel C. Novencido Jr.
19AI0113 Vacante, Bautista, Pangasinan Construction
Constructionof Artacho Multi- Zota Trading
55 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,918.23 1,918.23 61.769 3.12% 85 and Manuel C. Novencido Jr.
19AI0114 Artacho, Bautista, Pangasinan Construction
Construction of Sta. Maria Multi- Mightyway
49 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,918.04 1,918.04 61.963 3.13% 85 Construction Jayson C. Bascos
19AI0034 Sta. Maria, Binalonan, Pangasinan and Supply
Construction of Bactad East Multi-
Zota Trading
27 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,917.64 1,917.64 62.363 3.15% 85 and Jayson C. Bascos
Bactad, Urdaneta City, Pangasinan Construction
19AI0047
Construction of Cacandongan
Safeway
Multi-Purpose Building (Covered
31 2,000.00 2,000.00 1,980.00 1,917.63 1,917.63 62.366 3.15% 85 Construction Manuel C. Novencido Jr.
Court), Cacandongan, Bautista,
and Supply
19AI0051 Pangasinan
Rehabilitation of Pinalpal Dam, Jose Wilson U.
58 Inmalog, Sison, Pangasinan 3,000.00 3,000.00 2,970.00 2,876.37 2,876.37 93.632 3.15% 70 DMGR Builders
19AI0116 Manongsong
Construction of Puelay Multi- Safeway
47 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,917.55 1,917.55 62.447 3.15% 85 Construction Jayson C. Bascos
19AI0107 Puelay, Villasis, Pangasinan and Supply
Maraboc Br. (B01962LZ) along Mightyway
Mangaldan-Manaoag-Binalonan Rd Jose Wilson U.
7 8,300.00 8,300.00 8,134.00 7,875.35 7,875.35 258.654 3.18% 83 Construction
Manongsong
19AI0014 and Supply
Construction of Vacante
Zota Trading
Elementary School Multi-Purpose
53 2,000.00 2,000.00 1,980.00 1,917.04 1,917.04 62.965 3.18% 85 and Jayson C. Bascos
Building, Vacante, Binalonan,
Construction
19AI0112 Pangasinan
Construction of Nandacan Multi- Zota Trading
40 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,916.66 1,916.66 63.336 3.20% 85 and Manuel C. Novencido Jr.
19AI0100 Nandacan, Bautista, Pangasinan Construction
Construction of Badipa Elementary
Mightyway
School Multi-Purpose Building
28 2,000.00 2,000.00 1,980.00 1,916.66 1,916.66 63.338 3.20% 85 Construction Jayson C. Bascos
(Covered Court), Badipa, Urdaneta
and Supply
19AI0048 City, Pangasinan
Construction of Artacho National
Mightyway
High School Multi-Purpose Building Jose Wilson U.
25 2,500.00 2,500.00 2,475.00 2,395.81 2,395.81 79.193 3.20% 90 Construction
(Administrative Building), Artacho, Manongsong
and Supply
19AI0046 Sison, Pangasinan
Rosario Br. (B04491LZ) along Mightyway
Jose Wilson U.
8 Manila North Rd 2,000.00 2,000.00 1,960.00 1,897.27 1,897.27 62.731 3.20% 60 Construction
Manongsong
19AI0016 and Supply
Construction of Unzad Multi- W.M. Salayog
Purpose Building (Covered Court), Construction
52 3,000.00 3,000.00 2,970.00 2,874.71 2,874.71 95.294 3.21% 105 Jayson C. Bascos
Unzad, Villasis, Pangasinan and Gen.
19AI0111 Mdse.
Construction of Anonas Elementary
W.M. Salayog
School Multi-Purpose Building
Construction
23 (Main Activity Center), Anonas, 2,000.00 2,000.00 1,980.00 1,916.46 1,916.46 63.543 3.21% 85 Jayson C. Bascos
and. Gen.
Urdaneta City, Pangasinan
Mdse.
19AI0094
Construction of Artacho Multi- Safeway
Jose Wilson U.
24 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,916.45 1,916.45 63.551 3.21% 85 Construction
Manongsong
19AI0045 Artacho, Sison, Pangasinan and Supply
Construction of Poblacion Norte
St. Almers
Multi-Purpose Building (Covered Jose Wilson U.
43 2,000.00 2,000.00 1,980.00 1,916.22 1,916.22 63.776 3.22% 85 Construction
Court), Poblacion, Sison, Manongsong
and Enterprises
19AI0103 Pangasinan
Construction of Poponto Multi- BET
45 Purpose Building (Covered Court), 2,500.00 2,500.00 2,475.00 2,395.25 2,395.25 79.749 3.22% 95 Construction Manuel C. Novencido Jr.
19AI0105 Poponto, Bautista, Pangasinan and Supply
Construction of BJMP Multi-
St. Almers
Purpose Building (Social Hall),
30 2,000.00 2,000.00 1,980.00 1,916.05 1,916.05 63.955 3.23% 85 Construction Jayson C. Bascos
Anonas, Urdaneta City, Pangasinan
Inc.
19AI0050
Construction of Multi-Purpose
BET
Building (Administrative District
35 6,000.00 6,000.00 5,940.00 5,748.09 5,748.09 191.905 3.23% 150 Construction Jayson C. Bascos
Office), Anonas, Urdaneta City,
and Supply
19AI0054 Pangasinan
Don Teofilo Sison Br. (B01961LZ) Mightyway
along Mangaldan-Manaoag- Jose Wilson U.
6 5,000.00 5,000.00 4,900.00 4,740.75 4,740.75 159.251 3.25% 75 Construction
Binalonan Rd Manongsong
19AI0013 and Supply
Construction of Sagunto Multi- Safeway
Jose Wilson U.
48 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,915.63 1,915.63 64.369 3.25% 85 Construction
Manongsong
19AI0108 Sagunto, Sison, Pangasinan and Supply
Construction of Primicias Multi- Safeway
46 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 1,915.63 1,915.63 64.370 3.25% 85 Construction Manuel C. Novencido Jr.
19AI0106 Primicias, Bautista, Pangasinan and Supply
Construction of Poblacion Central
Mightyway
Multi-Purpose Building (Covered Jose Wilson U.
42 2,000.00 2,000.00 1,980.00 1,915.63 1,915.63 64.371 3.25% 85 Construction
Court), Poblacion, Sison, Manongsong
and Supply
19AI0102 Pangasinan
Construction of Poblacion West
Mightyway
Multi-Purpose Building (Covered
44 2,000.00 2,000.00 1,980.00 1,914.75 1,914.75 65.249 3.30% 85 Construction Manuel C. Novencido Jr.
Court), Poblacion, Bautista,
and Supply
19AI0104 Pangasinan
Construction of Binmeckeg Multi- Mightyway
Purpose Building (Covered Court), Jose Wilson U.
29 2,000.00 2,000.00 1,980.00 1,914.66 1,914.66 65.343 3.30% 85 Construction
Binmeckeg, Sison, Pangasinan Manongsong
19AI0049 and Supply
San Aurelio Br. 1 (B00883LZ)
along Bakit-Bakit Jct-Umingan Rd Roadtech
81 19,000.00 19,000.00 18,620.00 17,975.85 17,975.85 644.150 3.46% 190 Reynald N. Barrera
(Phase II) Construction
19AI0017
Construction of Sta. Maria Multi- W.M. Salayog
Purpose Building (Multi-Purpose Construction
50 2,000.00 2,000.00 1,980.00 1,910.47 1,910.47 69.529 3.51% 85 Jayson C. Bascos
Hall), Sta. Maria, Binalonan, and Gen.
19AI0109 Pangasinan Mdse.
Construction of Flood Control
BET
Structure along Banila River, Brgy.
95 40,000.00 40,000.00 39,200.00 37,514.32 37,514.32 1,685.681 4.30% 181 Construction Hipolito F. Melchor Jr.
San Aurelio I, Balungao,
and Supply
19AI0131 Pangasinan
Construction of Flood Control
Zota Trading
Structure along Tagamusing River,
18 30,000.00 30,000.00 29,400.00 28,077.10 28,077.10 1,322.896 4.50% 170 and Manuel C. Novencido Jr.
Brgy. Sumabnit, Binalonan,
Construction
19AI0003 Pangasinan
Binalonan-Asingan-Santa Maria Rd Rivbros
- K0207 + 000 - K0208 + 200 Construction Jose Wilson U.
74 30,000.00 30,000.00 29,400.00 28,072.46 28,072.46 1,327.537 4.52% 150
Factors and Manongsong
19AI0030 Developers
Concreting of Road, Bonifacio, San A.P. Tagarino
199 Manuel, Pangansinan 5,000.00 5,000.00 4,950.00 4,725.75 4,725.75 224.254 4.53% 60 Eng'g. Const'n Zaldy M. del Valle
19AI0150 and Services
Concreting of Road, Flores, San A.P. Tagarino
200 Manuel, Pangansinan 5,000.00 5,000.00 4,950.00 4,725.62 4,725.62 224.381 4.53% 60 Eng'g. Const'n Zaldy M. del Valle
19AI0154 and Services
Construction/Rehabilitation/Improv
Oriental Sales
ement of Asingan - Urdaneta Jose Wilson U.
122 15,000.00 15,000.00 14,700.00 14,008.84 14,008.84 691.156 4.70% 75 Center and
Road, Asingan Section, Pangasinan Manongsong
Contractor
19AI0123
Construction of Flood Control A.P. Tagarino
Structure along Mitura River, Brgy. Eng'g and
104 5,000.00 5,000.00 4,900.00 4,667.07 4,667.07 232.935 4.75% 83 Zaldy M. del Valle
Guiset Sur, San Manuel, Construction
19AI0165 Pangasinan Services
Construction of Flood Control JHI
89 Structure along Banila River, Brgy. 30,000.00 30,000.00 29,400.00 27,964.03 27,964.03 1,435.970 4.88% 170 Construction Hipolito F. Melchor Jr.
19AI0132 Capulaan, Balungao, Pangasinan and Supply
Construction of La Paz Bridge,
Katha Builders
126 from San Quintin to Umingan, 40,000.00 40,000.00 39,600.00 37,660.77 37,660.77 1,939.234 4.90% 190 Reynald N. Barrera
and Supplies
19AI0211 Pangasinan
Tumana Br. (B00736LZ) along
A.T. Dumlao
80 Pangasinan-Nueva Vizcaya Rd 9,150.00 9,150.00 8,967.00 8,527.62 8,527.62 439.383 4.90% 84 Construction Manuel C. Novencido Jr.
19AI0020 Inc.
Carayungan Br. (B00878LZ) along A.T. Dumlao
78 Bakit-Bakit Jct-Umingan Rd 13,410.00 13,410.00 13,141.80 12,497.85 12,497.85 643.948 4.90% 118 Construction Manuel C. Novencido Jr.
19AI0012 Inc.
Construction of Flood Control
103 Structure along Lagasit River, San 10,000.00 10,000.00 9,800.00 9,318.00 9,318.00 481.999 4.92% 110 MKM Marketing Hipolito F. Melchor Jr.
19AI0005 Joaquin, Balungao, Pangasinan
Construction of Flood Control
R.A. Matias
Structure along Agno River, Brgy.
109 20,000.00 20,000.00 19,600.00 18,634.98 18,634.98 965.015 4.92% 159 Construction Hipolito F. Melchor Jr.
Agno, Tayug, Pangasinan
and Developers
19AI0035
Access Road leading to Depalo Aquino-Dela
Falls, San Quintin, Pangasinan Cruz
119 20,000.00 20,000.00 19,600.00 18,633.78 18,633.78 966.215 4.93% 99 Engineering Reynald N. Barrera
and
19AI0032 Construction
Construction/Rehabilitation/Improv Aquino-Dela
ement of Asingan - Villasis Road, Cruz
Jose Wilson U.
123 Asingan Section, Pangasinan 25,000.00 25,000.00 24,500.00 23,292.05 23,292.05 1,207.950 4.93% 138 Engineering
Manongsong
and
19AI0124 Construction
Construction of Flood Control Villar General
92 Structure along Banila River, Brgy. 30,000.00 30,000.00 29,400.00 27,941.75 27,941.75 1,458.252 4.96% 170 Construction Hipolito F. Melchor Jr.
19AI0004 Poblacion, Balungao, Pangasinan and Supplies
Pangasinan-Nueva Ecija Rd - W.J.P.
71 K0185 + (-395) - K0185 + 000 7,850.00 7,850.00 7,693.00 7,310.41 7,310.41 382.592 4.97% 78 Construction Manuel C. Novencido Jr.
19AI0010 and Supply
Construction of Flood Control
R.F. Flores
111 Structure along Banila River, Brgy. 10,000.00 10,000.00 9,800.00 9,312.61 9,312.61 487.391 4.97% 110 Hipolito F. Melchor Jr.
Construction
19AI0133 Lauren, Umingan, Pangasinan
Bakit-Bakit Jct-Umingan Rd - Aquino-Dela
K0178 + 455 - K0180 + 000 Cruz
73 35,662.00 35,662.00 34,948.76 33,209.87 33,209.87 1,738.888 4.98% 177 Engineering Reynald N. Barrera
and
19AI0028 Construction
Construction of Flood Control A.C. Soliven
Structure along Lagasit River, Construction
113 20,000.00 20,000.00 19,600.00 18,623.47 18,623.47 976.525 4.98% 159 Reynald N. Barrera
Brgy. Baligayan, San Quintin, and Gen.
19AI0135 Pangasinan Mdse.
Construction of Flood Control
MCB
Structure along Cabulandayan
97 10,000.00 10,000.00 9,800.00 9,309.21 9,309.21 490.790 5.01% 110 Construction Hipolito F. Melchor Jr.
River, Brgy. Barangobong,
and Supply
19AI0037 Natividad, Pangasinan
Construction of Flood Control APP
110 Structure along Banila River, Brgy. 10,000.00 10,000.00 9,800.00 9,308.69 9,308.69 491.311 5.01% 110 Construction Hipolito F. Melchor Jr.
19AI0128 Esperanza, Umingan, Pangasinan and Supplies
Construction of Flood Control
Structure along Banila River, Brgy.
96 20,000.00 20,000.00 19,600.00 18,614.12 18,614.12 985.880 5.03% 159 MKM Marketing Hipolito F. Melchor Jr.
San Aurelio III, Balungao,
19AI0127 Pangasinan
Urdaneta Jct-Dagupan-Lingayen
BET
Rd - K0182 + (-204) - K0182 +
2 36,630.00 36,630.00 35,897.40 34,084.98 34,084.98 1,812.424 5.05% 201 Construction Jayson C. Bascos
000, K0183 + 000 - K0184 + 171
and Supply
19AI0001
Construction of Flood Control
Structure along Lagasit River,
114 Brgy. San Julian, Balungao, 14,286.00 14,286.00 14,000.28 13,293.35 13,293.35 706.929 5.05% 131 MKM Marketing Hipolito F. Melchor Jr.
Pangasinan
19AI0129
Construction of Flood Control
Mightyway
Structure along Angalacan River, Jose Wilson U.
15 25,000.00 25,000.00 24,500.00 23,262.68 23,262.68 1,237.317 5.05% 164 Construction
Brgy. Malasin, Pozorrubio, Manongsong
and Supply
19AI0136 Pangasinan
Construction of Flood Control
112 Structure along Banila River, Brgy. 20,000.00 20,000.00 19,600.00 18,605.96 18,605.96 994.044 5.07% 159 MKM Marketing Jennycyl C. Ginez
19AI0141 San Leon, Balungao, Pangasinan
Manila North Rd - K0181 + 730,
5 K0184 + 630 15,200.00 15,200.00 14,896.00 14,136.45 14,136.45 759.554 5.10% 90 Jasa Builders Jayson C. Bascos
19AI0039
Construction of Flood Control W.M. Salayog
12 Structure along Aloragat River, 30,000.00 30,000.00 29,400.00 27,900.68 27,900.68 1,499.323 5.10% 170 Construction Jayson C. Bascos
19AI0143 Brgy. Panaga, Laoac, Pangasinan and Ge. Mdse.
Construction of Flood Control
Safeway
Structure along Tagamusing River,
19 30,000.00 30,000.00 29,400.00 27,885.98 27,885.98 1,514.023 5.15% 170 Construction Manuel C. Novencido Jr.
Brgy. Yatyat, Laoac, Pangasinan
and Supply
19AI0009
Construction of Flood Control Zota Trading
13 Structure along Aloragat River, 30,602.00 30,602.00 29,989.96 28,442.53 28,442.53 1,547.433 5.16% 171 and Jayson C. Bascos
19AI0144 Brgy. Turko, Laoac, Pangasinan Construction
Construction of Flood Control W.M. Salayog
Jose Wilson U.
9 Structure along Bued River, Brgy. 23,142.00 23,142.00 22,679.16 21,504.78 21,504.78 1,174.384 5.18% 163 Construction
Manongsong
19AI0130 Cabaritan, Sison, Pangasinan and Gen. Mdse
Construction of Flood Control
A.C. Soliven
Structures along Banila River,
108 20,000.00 20,000.00 19,600.00 18,580.81 18,580.81 1,019.187 5.20% 159 Construction Hipolito F. Melchor Jr.
Brgy. Decreto, Umingan,
and Gen. Mdse
19AI0036 Pangasinan
Construction of Flood Control
BET
Structure along Aloragat River,
11 35,000.00 35,000.00 34,300.00 32,516.26 32,516.26 1,783.738 5.20% 176 Construction Jayson C. Bascos
Brgy. Calaoagan, Laoac,
and Supply
19AI0142 Pangasinan
Construction of Flood Control
BET
Structure along Tagamusing River,
17 50,000.00 50,000.00 49,000.00 46,442.16 46,442.16 2,557.836 5.22% 192 Construction Jayson C. Bascos
Brgy. Pinmaludpod, Urdaneta City,
and Supply
19AI0126 Pangasinan
Construction of Flood Control
Safeway
Structure along Angalacan River, Jose Wilson U.
14 30,000.00 30,000.00 29,400.00 27,828.48 27,828.48 1,571.515 5.35% 170 Construction
Brgy. Dilan, Pozorrubio, Manongsong
and Supply
19AI0134 Pangasinan
Agno River Basin Flood Control
Project- Rehabilitation of Alcala- St. Almers
10 Bautista Earthdike (Left Dike), 30,000.00 30,000.00 29,400.00 27,816.81 27,816.81 1,583.186 5.38% 170 Construction Manuel C. Novencido Jr.
Phase III, Alcala-Bautista, and Enterprises
19AI0137 Pangasinan
Sn Nicolas-Natividad-Sn Quintin- Oriental Sales
Umingan-Guimba Rd - K0226 +
69 20,847.00 20,847.00 20,430.06 19,306.41 19,306.41 1,123.653 5.50% 60 Center and Reynald N. Barrera
000 - K0228 + 000 Contractor
19AI0023
Construction of Flood Control
Mightyway
Structure along Tagamusing River,
16 20,000.00 20,000.00 19,600.00 18,499.25 18,499.25 1,100.747 5.62% 159 Construction Manuel C. Novencido Jr.
Brgy. Casantiagoan, Laoac,
and Supply
19AI0008 Pangasinan
San Aurelio Br. 2 (B00882LZ)
C.T. Leoncio
77 along Bakit-Bakit Jct-Umingan Rd 30,000.00 30,000.00 39,400.00 27,954.94 27,954.94 11,445.055 29.05% 205 Construction Manuel C. Novencido Jr.
19AI0018 and Trading
Tayug-San Quintin Road, Aquino-Dela
Pangasinan Cruz
75 43,000.00 43,000.00 42,140.00 4,033.20 4,033.20 38,106.805 90.43% 213 Engineering Hipolito Melchor Jr.
and
19AI0042 Construction
Carmen Jct-Manat Rd - K0176 +
3 870 - K0178 + 000, K0184 + 140 - 31,640.00 31,640.00 31,007.20 - 31,007.200 100.00% 156
19AI0029 K0184 + 345
Mangaldan-Manaoag-Binalonan Rd
19AI0024 4 23,000.00 23,000.00 22,540.00 - 22,540.000 100.00% 114
- K0191 + 011 - K0192 + 050
Construction of Agat-Dungon
19AI0305 21 50,000.00 50,000.00 49,000.00 - 49,000.000 100.00% 270
Bypass Road, Sison, Pangasinan
Construction of Concrete
Footbridge, San Vicente-
22 2,500.00 2,500.00 2,475.00 - 2,475.000 100.00% 75
Cayambanan, Urdaneta City,
19AI0304 Pangasinan
Construction of Cauringan Multi-
33 Purpose Building (Covered Court), 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0052 Cauringan, Sison, Pangasinan
Construction of Multi-Purpose
Building (Covered Court), Gracia
36 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 115
Village, Brgy. Nancayasan,
19AI0315 Urdaneta City, Pangasinan
Construction of Multi-Purpose
37 Building, Brgy. Caramutan, Villasis, 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 120
19AI0317 Pangasinan
Construction of Multi-Purpose
38 Building, Brgy. San Pedro 3, 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 120
19AI0316 Alcala, Pangasinan
Construction of Multi-Purpose Hall
39 in Lanapin Elementary School in 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00% 95
19AI0311 Urdaneta City, Pangasinan
Concreting of Road, Barangay
19AI0257 59 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
Anis, Laoac, Pangasinan
Concreting of Road, Barangay
19AI0258 60 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
Bantugan, Pozorrubio, Pangasinan
Concreting of Road, Barangay
61 Cabuloan, Urdaneta City, 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
19AI0259 Pangasinan
Concreting of Road, Barangay
19AI0260 62 10,000.00 10,000.00 9,900.00 - 9,900.000 100.00% 120
Nambagatan, Laoac, Pangasinan
Concreting of Road, Barangay
63 Pogo-Barangay Diaz, Bautista, 15,000.00 15,000.00 14,850.00 - 14,850.000 100.00% 150
19AI0261 Pangasinan
Concreting of Road, Barangay
19AI0262 64 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
Tabuyoc, Binalonan, Pangasinan
Concreting of Zone 4-5 Barangay
65 Consolacion, Urdaneta City, 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
19AI0263 Pangasinan
Bakit-Bakit Jct-Umingan Rd -
K0180+ 000 - K0181 + 000,
K0182 + 000 - K0183 + 320,
K0188 + 645 - K0189 + 200,
66 K0200 + 266 - K0200 + 331, 45,000.00 45,000.00 44,100.00 - 44,100.000 100.00% 90 Manuel C. Novencido Jr.
K0200 + 346 - K0200 + 491,
K0200 + 521 - K0200 + 887,
K0201 + 700 - K0202 + 482,
19AI0025 K0204 + 000 - K0204 + 204
Pangasinan-Nueva Ecija Rd -
67 K0178 + 373 - K0180 + 000, 24,864.00 24,864.00 24,366.72 - 24,366.720 100.00% 60
19AI0026 K0182+ 000 - K0182 + 960
Binalonan-Asingan-Santa Maria Rd
- K0194 + 042 - K0194 + 317,
K0195 + 025 - K0195 + 099,
K0195 + 480 - K0195 + 905,
68 K0196 + 020 - K0196 + 125, 12,391.00 12,391.00 12,143.18 - 12,143.180 100.00% 45
K0196 + 184 - K0196 + 340,
K0196 + 485 - K0196 + 600
19AI0027
Pangasinan-Nueva Vizcaya Rd -
K0176 + (-368) - K0176 + (-178),
70 K0181 + 000 - K0183 + 500, 82,807.00 82,807.00 81,150.86 - 81,150.860 100.00% 447
K0191 + 368 - K0192 + 189
19AI0002
Pangasinan - Nueva Vizcaya Rd -
19AI0166 72 3,000.00 3,000.00 2,940.00 - 2,940.000 100.00% 96
K0204 + 000
19AI0040 76 Manila North Rd - K0171 + 150 11,300.00 11,300.00 11,074.00 - 11,074.000 100.00% 75
Construction of Flood Control
Structure along Agno & allied river,
82 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
Brgy. Barangobong-Magallanes,
19AI0149 Tayug, Pangasinan
Construction of Flood Control
83 Structure along Agno River, Brgy. 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
19AI0245 Callitang, Sta. Maria, Pangasinan
Construction of Flood Control
84 Structure along Agno River, Brgy. 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
19AI0244 Carmen, Rosales, Pangasinan
Construction of Flood Control
85 Structure along Agno River, Brgy. 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
19AI0243 Cauplasan, Sta. Maria, Pangasinan
Construction of Flood Control
86 Structure along Agno River, Brgy. 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
19AI0241 Rizal, Rosales, Pangasinan
Construction of Flood Control
87 Structure along Agno River, Brgy. 20,000.00 20,000.00 19,600.00 - 19,600.000 100.00% 159
19AI0254 Samon, Sta. Maria, Pangasinan
Construction of Flood Control
88 Structure along Ambayaoan River, 5,000.00 5,000.00 4,900.00 - 4,900.000 100.00% 83
19AI0139 Brgy. Fianza, San Nicolas
Construction of Flood Control
Structure along Banila River, Brgy.
90 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
Don Justo Abalos, Umingan,
19AI0140 Pangasinan
Construction of Flood Control
91 Structure along Banila River, Brgy. 20,000.00 20,000.00 19,600.00 - 19,600.000 100.00% 159
19AI0148 Papallasen, Umingan, Pangasinan
Construction of Flood Control
93 Structure along Banila River, Brgy. 30,000.00 30,000.00 29,400.00 - 29,400.000 100.00% 170
19AI0240 Pugaro, Balungao, Pangasinan
Construction of Flood Control
Structure along Banila River, Brgy.
94 40,000.00 40,000.00 39,200.00 - 39,200.000 100.00% 181
Rajal-Angayan Norte, Balungao,
19AI0167 Pangasinan
Construction of Flood Control
Structure along Depalo River,
98 20,000.00 20,000.00 19,600.00 - 19,600.000 100.00% 159
Brgy. Bantog, San Quintin,
19AI0246 Pangasinan
Construction of Flood Control
Structure along Lagasit River,
99 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
Brgy. Casanicolasan, Rosales,
19AI0242 Pangasinan
Construction of Flood Control
Structure along Lagasit River,
100 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
Brgy. San Marcelino, Balungao,
19AI0239 Pangasinan
Construction of Flood Control
Structure along Lagasit River,
101 25,000.00 25,000.00 24,500.00 - 24,500.000 100.00% 164
Brgy. San Pablo-Sta. Cruz, Sta.
19AI0038 Maria, Pangasinan
Construction of Flood Control
Structure along Lagasit River,
102 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
Brgy. Sta. Cruz, Sta. Maria,
19AI0253 Pangasinan
Construction of Flood Control
Structure along Sabangan River,
105 30,000.00 30,000.00 29,400.00 - 29,400.000 100.00% 170
Brgy. Bensican - San Isidro, San
19AI0159 Nicolas, Pangasinan
Construction of Flood Control
Structure along Totonoguen River,
106 20,000.00 20,000.00 19,600.00 - 19,600.000 100.00% 159
Brgy. San Pedro, Rosales,
19AI0256 Pangasinan
Construction of Flood Control
107 Structure along Viray River, Brgy. 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
19AI0267 Batchelor, Natividad, Pangasinan
Construction of Flood Control
115 Structure along Mitura River, Brgy. 15,000.00 15,000.00 14,700.00 - 14,700.000 100.00% 135 0
19AI0138 Coldit, Asingan, Pangasinan
Construction of Flood Control
Structure along Mitura River, Brgy.
116 20,000.00 20,000.00 19,600.00 - 19,600.000 100.00% 159 0
Toboy and Sobol, Pangasinan
19AI0159
Construction of Flood Control
Structure along Sabangan River,
117 30,000.00 30,000.00 29,400.00 - 29,400.000 100.00% 170 0
Brgy. Malilion-Bensican, San
19AI0160 Nicolas, Pangasinan
Construction of Flood Control
Structure along Viray River, Brgy.
118 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110 0
San Miguel - Cacandungan,
19AI0161 Natividad, Pangasinan
Construction of Department of
121 Energy Luzon Field Office Building, 40,000.00 40,000.00 39,600.00 - 39,600.000 100.00% 240 #N/A
19AI0043 Rosales, Pangasinan
Construction/Rehabilitation/Improv
125 ement of Tayug - Natividad Road, 15,000.00 15,000.00 14,700.00 - 14,700.000 100.00% 120
19AI0266 Tayug, Pangasinan
Construction of Covered Court,
127 Purok 6, Sto. Domingo, Tayug, 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00% 95
19AI0314 Pangasinan
Construction of MPB (Covered
128 Gymnasium), Tramo, Siblot, San 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00% 95
19AI0313 Nicolas, Pangasinan
Construction of Multi-Purpose
Building (Senior Citizens Building,)
129 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00% 95
Brgy. Poblacion, Balungao,
19AI0319 Pangasinan
Construction of Multi-Purpose
19AI0190 130 9,000.00 9,000.00 8,910.00 - 8,910.000 100.00% 150
Building at Asingan, Pangasinan
Construction of Multi-Purpose
19AI0192 131 9,400.00 9,400.00 9,306.00 - 9,306.000 100.00% 170
Building at Balungao, Pangasinan
Construction of Multi-Purpose
19AI0208 133 8,400.00 8,400.00 8,316.00 - 8,316.000 100.00% 145
Building at Sta. Maria, Pangasinan
Construction of Multi-Purpose
19AI0219 134 18,600.00 18,600.00 18,414.00 - 18,414.000 100.00% 200
Building at Umingan, Pangasinan
Construction of Multi-purpose
135 Building with Riprapping, Brgy. 1,000.00 1,000.00 1,000.00 - 1,000.000 100.00% 60
19AI0289 Saleng, Tayug, Pangasinan
Construction of Multi-purpose
136 Building, Barangay A, Tayug, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0290 Pangasinan
Construction of Multi-purpose
137 Building, Barangay Amaronan, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0312 Umingan, Pangasinan
Construction of Multi-purpose
138 Building, Barangay C, Tayug, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0288 Pangasinan
Construction of Multi-purpose
139 Building, Barangay D, Tayug, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0292 Pangasinan
Construction of Multi-purpose
140 Building, Brgy. Amistad, Tayug, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0283 Pangasinan
Construction of Multi-purpose
141 Building, Brgy. Bobonan, Asingan, 1,000.00 1,000.00 1,000.00 - 1,000.000 100.00% 60
19AI0286 Pangasinan
Construction of Multi-purpose
142 Building, Brgy. Domanpot, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0302 Asingan, Pangasinan
Construction of Multi-purpose
143 Building, Brgy. San Vicente East, 1,000.00 1,000.00 1,000.00 - 1,000.000 100.00% 60
19AI0284 Asingan, Pangasinan
Construction of Multi-purpose
144 Building, Brgy. Sto. Domingo, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0287 Tayug, Pangasinan
Construction of Multi-purpose
145 Building, Brgy. Toboy, Asingan, 1,000.00 1,000.00 1,000.00 - 1,000.000 100.00% 60
19AI0318 Pangasinan
Construction of Multi-purpose
146 Building, Brgy. Zamora, Tayug, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
19AI0291 Pangasinan
Construction of School
Perimeter/Fence, Papallasen
147 1,000.00 1,000.00 1,000.00 - 1,000.000 100.00% 60
Elementary School, Umingan,
19AI0303 Pangasinan
Construction/Improvement of
148 Multi-Purpose Building at Asingan, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 89
19AI0194 Pangasinan
Construction/Improvement of
149 Multi-Purpose Building at Rosales, 3,000.00 3,000.00 1,980.00 - 1,980.000 100.00% 45
19AI0181 Pangasinan
Construction/Improvement of
150 Multi-Purpose Building at San 3,500.00 3,500.00 3,465.00 - 3,465.000 100.00% 100
19AI0231 Nicolas, Pangasinan
Construction/Improvement of
151 Multi-Purpose Building at San 4,000.00 4,000.00 3,960.00 - 3,960.000 100.00% 105
19AI0234 Quintin, Pangasinan
Construction/Improvement of
152 Multi-Purpose Building at Sta. 5,200.00 5,200.00 5,148.00 - 5,148.000 100.00% 115
19AI0222 Maria, Pangasinan
Construction/Improvement of
153 Multi-Purpose Building at Tayug, 4,000.00 4,000.00 3,960.00 - 3,960.000 100.00% 105
19AI0209 Pangasinan
Construction/Improvement of
154 Multi-Purpose Building at 7,000.00 7,000.00 6,930.00 - 6,930.000 100.00% 135
19AI0210 Umingan, Pangasinan
Construction/Rehabilitation of
155 Multi-Purpose Building (Open 1,300.00 1,300.00 1,287.00 - 1,287.000 100.00% 60
19AI0180 Court) at Sta. Maria, Pangasinan
Construction/Rehabilitation of
156 Multi-Purpose Building (Open 2,500.00 2,500.00 2,475.00 - 2,475.000 100.00% 90
19AI0189 Court) at Umingan, Pangasinan
Improvement of Multi-purpose
157 Building, Carmay East, Rosales, 10,000.00 10,000.00 9,900.00 - 9,900.000 100.00% 145
19AI0320 Pangasinan
Construction/Improvement of
158 Drainage Canal at Asingan, 1,000.00 1,000.00 990.00 - 990.000 100.00% 45
19AI0224 Pangasinan
Construction/Improvement of
159 Drainage Canal at San Nicolas, 4,500.00 4,500.00 4,455.00 - 4,455.000 100.00% 96
19AI0225 Pangasinan
Construction/Improvement of
160 Drainage Canal at San Quintin, 1,000.00 1,000.00 990.00 - 990.000 100.00% 45
19AI0230 Pangasinan
Construction/Improvement of
161 Drainage Canal at Sta. Maria, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 60
19AI0227 Pangasinan
Construction of Dike with
Protection Works along Agno
163 50,000.00 50,000.00 49,000.00 - 49,000.000 100.00% 192
River, Brgy. San Rafael, San
19AI0146 Nicolas, Pangasinan
Construction of Dike with
Protection Works along Sabangan
164 River, Brgy. San Rafael West-San 50,000.00 50,000.00 49,000.00 - 49,000.000 100.00% 192
Rafael Centro, San Nicolas,
19AI0147 Pangasinan
Construction of Dike with
Protection Works along Sabangan
165 50,000.00 50,000.00 49,000.00 - 49,000.000 100.00% 192 Hipolito F. Melchor J.r
River, San Rafael Centro, San
19AI0255 Nicolas, Pangasinan
Construction of Flood Control
19AI0200 166 1,000.00 1,000.00 990.00 - 990.000 100.00% 60
Structure at Umingan, Pangasinan
Concreting of road, Brgy Pugaro -
167 Poblacion line Balungao, 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
19AI0310 Pangasinan
Concreting of Road , Brgy.
19AI0307 168 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 45
Legaspi, Tayug, Pangasinan
Concreting of Road , Brgy. Narra,
19AI0306 169 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00% 45
San Manuel, Pangasinan
Concreting of Road , Brgy. Saleng,
19AI0308 170 1,000.00 1,000.00 990.00 - 990.000 100.00% 45
Tayug, Pangasinan
Concreting of Roads at Rosales,
19AI0276 171 16,000.00 16,000.00 15,840.00 - 15,840.000 100.00% 150
Pangasinan
Concreting of Roads at Umingan,
19AI0277 172 18,000.00 18,000.00 17,820.00 - 17,820.000 100.00% 240
Pangasinan
Construction / Rehabilitation of
173 road, Brgy Namagbagan, Sta 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
19AI0309 Maria, Pangasinan
Construction/Improvement of
174 Bridges at San Nicolas, Pangasinan 2,500.00 2,500.00 2,475.00 - 2,475.000 100.00% 75
19AI0274
Construction/Improvement of
175 Bridges at San Quintin, Pangasinan 2,500.00 2,500.00 2,475.00 - 2,475.000 100.00% 75
19AI0275
Construction/Improvement of
19AI0229 176 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 45
Bridges at Tayug, Pangasinan
Construction/Improvement of
19AI0273 177 4,500.00 4,500.00 4,455.00 - 4,455.000 100.00% 100
Bridges at Umingan, Pangasinan
Construction/Improvement of
178 Water System, Natividad, 1,000.00 1,000.00 1,000.00 - 1,000.000 100.00% 45
19AI0188 Pangasinan
Construction/Improvement of
179 Water System, San Nicolas, 1,000.00 1,000.00 1,000.00 - 1,000.000 100.00% 45
19AI0187 Pangasinan
Construction (Completion) of 2
Storey 4 Classroom Building -
180 Bongolan Memorial National High 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 85
School, San Jose Urdaneta City,
19AI0248 Pangasinan
Concreting of Road, Asan Norte,
19AI0264 181 5,000.00 5,000.00 4,950.00 - 4,950.000 100.00% 60
Sison, Pangasinan
Construction of Pedestrian
Overpass at Palacpalac Elementary
182 17,000.00 17,000.00 16,830.00 - 16,830.000 100.00% 175 Manuel C. Novencido Jr.
School, Pozzorubio, Pangasinan
19AI0252
Construction of Flood Control
Structure along Banila River, Brgy.
183 20,000.00 20,000.00 19,600.00 - 19,600.000 100.00% 159
Sinabaan-Flores, Umingan,
19AI0238 Pangasinan
Construction of Flood Control
Structure along Dipalo River, Brgy.
184 50,000.00 50,000.00 49,000.00 - 49,000.000 100.00% 192
Bantog-Casantamarian, San
19AI0282 Quintin, Pangasinan
Construction of Flood Control
Structure along Totonoguen River,
185 10,000.00 10,000.00 9,800.00 - 9,800.000 100.00% 110
Brgy. Bakit-Bakit, Rosales,
19AI0237 Pangasinan
Construction/Rehabilitation of
192 Multi-Purpose Building, Rosales, 8,200.00 8,200.00 8,118.00 - 8,118.000 100.00% 145
19AI0218 Pangasinan
Construction/Rehabilitation of
193 Multi-Purpose Building, San 16,600.00 16,600.00 16,434.00 - 16,434.000 100.00% 180
19AI0220 Nicolas, Pangasinan
Construction/Rehabilitation of
194 Multi-Purpose Building, San 8,200.00 8,200.00 8,118.00 - 8,118.000 100.00% 145
19AI0221 Quintin, Pangasinan
Construction/Rehabilitation of
195 Multi-Purpose Building, Tayug, 17,000.00 17,000.00 16,830.00 - 16,830.000 100.00%
19AI0233 Pangasinan
Construction of Flood Control
196 Structure at San Quintin, 1,000.00 1,000.00 990.00 - 990.000 100.00% 60
19AI0199 Pangasinan
Concreting of Barangay Road in
198 Barangay Sta. Rosa, Sta. Maria, 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 45
19AO0278 Pangasinan
Concreting of Road, Fulgosino,
19AI0152 201 2,000.00 2,000.00 1,980.00 - 1,980.000 100.00% 45
Umingan, Pangansinan
Concreting of Roads Sta. Maria
19AI0184 206 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00% 60
Pangasinan
Concreting of Roads, Asingan,
19AI0170 207 3,000.00 3,000.00 2,970.00 - 2,970.000 100.00%
Pangasinan
Concreting of Roads, Balungao,
19AI0175 208 5,500.00 5,500.00 5,445.00 - 5,445.000 100.00%
Pangasinan
Concreting of Roads, Natividad,
19AI0172 209 9,000.00 9,000.00 8,910.00 - 8,910.000 100.00%
Pangasinan
Concreting of Roads, San Nicolas,
19AI0168 210 12,500.00 12,500.00 12,375.00 - 12,375.000 100.00%
Pangasinan
Concreting of Roads, San Quintin,
19AI0196 211 8,500.00 8,500.00 8,415.00 - 8,415.000 100.00%
Pangasinan
Concreting of Roads, Tayug,
19AI0171 212 4,000.00 4,000.00 3,960.00 - 3,960.000 100.00%
Pangasinan
Rehabilitation of Imbalbalatong
Multi-Purpose Building (Barangay
56 1,000.00 1,000.00 - - #DIV/0!
Hall), Imbalbalatong, Pozorrubio,
Pangasinan
Matablang Br. (B00879LZ) along A.T. Dumlao
79 Bakit-Bakit Jct-Umingan Rd 10,848.00 10,848.00 10,110.12 10,110.12 (10,110.119) #DIV/0! 95 Construction Manuel C. Novencido Jr.
19AI0015 Inc.
Construction of Multi-Purpose
191 50,000.00 50,000.00 - - #DIV/0! Reynald N. Barrera
Building, Rosales, Pangansinan
TOTAL 2,610,835.00 2,610,835.00 2,512,784.50 19,713,778.38 19,713,778.38 (17,200,993.88) -684.54%

Above 50M 20,000.00 20,000.00 19,600.00 18,623.47 18,623.47 976.53 4.98%


50M and below 2,590,835.00 2,590,835.00 2,493,184.50 19,695,154.90 19,695,154.90 (17,201,970.41) -689.96%
LABEL
INDIVIDUAL REPORT
As of April 30, 2019

PDE PRE-CONSTRUCTION RESULT OF BIDDING CONSTRUCTION FINANCIAL STATUS

For Not Yet Started Projects For On-going Projects For Completed Projects
Number of Projects Number of Projects APPROPRIATION ABC Awarded Amount VARIANCE No. of Projects STATUS

Date Awarded
Contract ID Project Name Planned Actual No. Name of Projects Municipality

Date Bid Out


Actual Completion Date

Completed

Completed

Completed
OBLIGATION DISBURSEMENT

On-going

On-going

Date NTP

On-going

Slippage
NYS

NYS

NYS
(%) Fund Souce Remarks Contractor Project Engineer Project Inspector Project Facilitator Date Started Original Expiry Date Revised Expiry Date

PANG 3RD PANG 3RD


Carmen Jct-Manat Rd - K0176 + 000 - K0176 + 500
1 6,554.00 1 1 1 February 1, 2018 February 27, 2018 March 15, 2018 March 19, 2018 March 26, 2018 6,554.00 6,422.92 6,165.00 6,165.00 257.919 4.02% 1 100.00% 100.00% 0.00% 6,165.00 6,165,000.53 6,165,000.53 6,554.0 6,554.0 1 Carmen Jct-Manat Rd - K0176 + 000 - K0176 + 500 GAA 2018 Awaiting for NTP - March 26, 2018 84 Alphin Trading & Construction Menio Abarabar Cynthia Domalanta Karl March 26, 2018 June 17, 2018 June 17, 2018 Sto. Tomas/Alcala
18AI0023

2 19,750.00 1 1 1 February 1, 2018 February 20, 2018 March 14, 2018 March 15, 2018 March 22, 2018 19,750.00 19,335.00 18,383.37 18,383.37 951.629 4.92% 1 60.00% 62.19% 2.19% 18,383.37 18,383,371.35 2,757,505.70 11,850.0 12,282.5 2 GAA 2018 Awaiting for NTP - March 22, 2018 228 468 BET Construction and Supply Jayson S. Bascos Cynthia Domalanta Karl March 22, 2018 November 4, 2018 July 2, 2019 Urdaneta
18AI0028
18AI0076 3 Manila North Rd - K0171 + 798 - K0172 + 000 4,985.00 1 1 1 November 22, 2017 December 13, 2018 February 15, 2018 February 20, 2018 February 27, 2018 4,985.00 3,960.00 3,771.90 3,771.90 188.104 4.75% 1 100.00% 100.00% 0.00% 3,771.90 3,771,896.24 1,363,301.46 4,985.0 4,985.0 3 Manila North Rd - K0171 + 798 - K0172 + 000 GAA 2018 NTP =February 27, 2018 90 120 Mightyway C/S Manuel Novencido Jr. Cynthia Domalanta Jean Paul February 27, 2018 May 27, 2018 June 26, 2018 June 26, 2018 Villasis
4 15,105.00 1 1 1 February 1, 2018 February 20, 2018 March 14, 2018 March 15, 2018 March 22, 2018 15,105.00 6,276.90 5,944.61 5,944.61 332.292 5.29% 1 100.00% 100.00% 0.00% 5,944.61 6,102,594.34 3,973,093.02 15,105.0 15,105.0 4 GAA 2018 Awaiting for NTP - March 22, 2018 180 270 BET Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Jeff Serna March 22, 2018 September 17, 2018 December 16, 2018 December 15, 2018 Binalonan
18AI0026

18AI0027 5 21,325.00 1 1 1 February 1, 2018 February 20, 2018 March 14, 2018 March 15, 2018 March 22, 2018 21,325.00 18,931.45 17,980.84 17,980.84 950.613 5.02% 1 100.00% 100.00% 0.00% 17,980.84 19,398,500.00 8,330,562.15 21,325.0 21,325.0 5 Binalonan-Asingan-Santa Maria Rd, incl. ROW - K0193 + 041 - K0193 + 932 GAA 2018 Awaiting for NTP - March 22, 2018 228 378 MCB Construction and Supply Manuel Novencido Jr. Cynthia Domalanta Karl March 22, 2018 November 4, 2018 April 3, 2019 April 3, 2019 Binalonan
Cauringan Br. (B04492LZ) along Manila North Rd
18AI0077 6 17,000.00 1 1 1 December 7, 2017 December 27, 2017 February 19, 2018 February 22, 2018 March 1, 2018 17,000.00 16,660.00 16,246.33 16,246.33 413.670 2.48% 1 100.00% 100.00% 0.00% 16,246.33 16,660,000.00 13,327,792.79 17,000.0 17,000.0 6 Cauringan Br. (B04492LZ) along Manila North Rd GAA 2018 NTP -March 1, 2018 173 279 BET Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Jeff Serna March 1, 2018 August 20, 2018 December 4, 2018 December 4, 2018 Sison

7 75,000.00 1 1 1 February 15, 2018 March 6, 2018 March 20, 2018 March 21, 2018 March 28, 2018 75,000.00 62,974.10 61,109.36 61,109.36 1,864.737 2.96% 1 42.00% 43.00% 1.00% 61,109.36 62,974,100.00 22,620,263.22 31,500.0 32,250.0 7 C.P. Primicias Br. (B01597LZ) along Binalonan-Asingan-Santa Maria Rd incl. ROW GAA 2018 Bid Out -March 6, 2018 350 440 Jose Wilson Manongsong Cynthia Domalanta Jeff Serna March 28, 2018 March 12, 2019 June 11, 2019 Binalonan
18AI0078

18AI0079 8 48,000.00 1 1 1 December 5, 2017 December 26, 2017 February 19, 2018 February 22, 2018 March 1, 2018 48,000.00 46,990.00 45,593.67 45,593.67 1,396.329 2.97% 1 63.00% 65.83% 2.83% 45,593.67 47,040,000.00 18,732,486.19 30,240.0 31,598.4 8 Don Teofilo Sison Br. (B01961LZ) along Mangaldan-Manaoag-Binalonan Rd GAA 2018 NTP -March 1, 2018 330 480 BET Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Jeff Serna March 1, 2018 January 24, 2019 June 23, 2019 Laoac

18AI0080 9 12,000.00 1 1 1 December 7, 2017 December 27, 2017 February 15, 2018 February 20, 2018 February 27, 2018 12,000.00 11,760.00 11,467.67 11,467.67 292.333 2.49% 1 100.00% 100.00% 0.00% 11,467.67 11,760,000.00 11,172,000.12 12,000.0 12,000.0 9 Maraboc Br. (B01962LZ) along Mangaldan-Manaoag-Binalonan Rd GAA 2018 NTP =February 27, 2018 130 335 BET Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Jeff Serna February 27, 2018 July 6, 2018 January 27, 2019 January 27, 2019 Laoac

18AI0081 10 56,121.00 1 1 1 February 20, 2018 March 6, 2018 March 20, 2018 March 21, 2018 March 28, 2018 56,121.00 54,156.77 51,443.20 51,443.20 2,713.570 5.01% 1 87.00% 89.00% 2.00% 51,443.20 54,156,765.00 23,761,734.82 48,825.3 49,947.7 10 GAA 2018 Bid Out - March 6, 2018 210 450 BET Construction and Supply Jayson S. Bascos Cynthia Domalanta Karl March 28, 2018 October 23, 2018 June 20, 2019 Urdaneta

11 75,000.00 1 1 1 February 20, 2018 March 6, 2018 March 20, 2018 March 21, 2018 March 28, 2018 75,000.00 72,376.00 68,748.78 68,748.78 3,627.215 5.01% 1 82.00% 83.00% 1.00% 68,748.78 70,848,784.80 10,312,317.72 61,500.0 62,250.0 11 GAA 2018 Bid Out - March 6, 2018 232 453 BET Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Christine March 28, 2018 November 14, 2018 June 23, 2019 Sison
18AI0082

12 10,000.00 1 1 1 November 3, 2017 November 22, 2017 January 30, 2018 January 31, 2018 February 7, 2018 10,000.00 9,800.00 9,315.58 9,315.58 484.425 4.94% 1 100.00% 100.00% 0.00% 9,315.58 9,315,573.27 8,849,794.61 10,000.0 10,000.0 12 GAA 2018 NTP 131 191 Safeway Construction Zaldy Del Valle Cynthia Domalanta Jeff Serna February 7, 2018 June 17, 2018 August 16, 2018 August 16, 2018 Pozzorubio
18AI0083

13 20,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,742.03 18,742.03 857.972 4.38% 1 100.00% 100.00% 0.00% 18,742.03 18,742,028.35 8,246,486.18 20,000.0 20,000.0 13 GAA 2018 NTP 162 342 BET Construction and Supply Manuel Novencido Jr. Cynthia Domalanta Jean Paul February 7, 2018 July 18, 2018 January 14, 2019 January 14, 2019 Bautista
18AI0084

14 30,000.00 1 1 1 November 3, 2017 November 22, 2017 January 30, 2018 January 31, 2018 February 7, 2018 30,000.00 29,400.00 27,975.99 27,975.99 1,424.008 4.84% 1 100.00% 100.00% 0.00% 27,975.99 27,975,989.48 26,577,190.01 30,000.0 30,000.0 14 GAA 2018 NTP 187 322 BET Construction and Supply Menio Abarabar Cynthia Domalanta Jeff Serna February 7, 2018 August 12, 2018 December 25, 2018 December 25, 2018 Binalonan
18AI0085

15 20,000.00 1 1 1 November 21, 2017 December 12, 2017 February 19, 2018 February 22, 2018 March 1, 2018 20,000.00 19,600.00 19,041.47 19,041.47 558.532 2.85% 1 100.00% 100.00% 0.00% 19,041.47 19,041,466.67 15,308,738.40 20,000.0 20,000.0 15 GAA 2018 NTP- March 1, 2018 162 432 MCB Construction and Supply Manuel Novencido Jr. Cynthia Domalanta Jeff Serna March 1, 2018 August 9, 2018 May 6, 2019 May 6, 2019 Laoac
18AI0086

16 20,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,625.89 18,625.89 974.111 4.97% 1 100.00% 100.00% 0.00% 18,625.89 18,625,888.11 18,625,888.11 20,000.0 20,000.0 16 GAA 2018 NTP 162 222 MCB Construction and Supply Manuel Novencido Jr. Cynthia Domalanta Jeff Serna February 7, 2018 July 18, 2018 September 16, 2018 September 16, 2018 Laoac
18AI0087

17 20,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,701.84 18,701.84 898.163 4.58% 1 100.00% 100.00% 0.00% 18,701.84 18,701,836.52 2,805,275.48 20,000.0 20,000.0 17 GAA 2018 NTP 162 432 BET Construction and Supply Jayson S. Bascos Cynthia Domalanta Karl February 7, 2018 July 18, 2018 April 14, 2019 April 14, 2019 Urdaneta
18AI0088

18 20,000.00 1 1 1 November 21, 2017 December 12, 2017 February 19, 2018 February 22, 2018 March 1, 2018 20,000.00 19,600.00 18,701.84 18,701.84 898.159 4.58% 1 100.00% 100.00% 0.00% 18,701.84 18,701,840.88 14,439,965.58 20,000.0 20,000.0 18 GAA 2018 NTP- March 1, 2018 162 422 BET Construction and Supply Manuel Novencido Jr. Cynthia Domalanta Jeff Serna March 1, 2018 August 9, 2018 April 26, 2019 April 26, 2019 Laoac
18AI0089

19 10,000.00 1 1 1 November 3, 2017 November 22, 2017 January 30, 2018 January 31, 2018 February 7, 2018 10,000.00 9,800.00 9,336.85 9,336.85 463.147 4.73% 1 77.21% 100.00% 22.79% 9,336.85 9,336,849.86 8,870,007.19 7,721.0 10,000.0 19 GAA 2018 NTP 131 319 Safeway Construction Jayson S. Bascos Cynthia Domalanta Jeff Serna February 7, 2018 June 17, 2018 December 22, 2018 November 15, 2018 Binalonan
18AI0090

20 20,000.00 1 1 1 February 9, 2017 February 28, 2018 March 19, 2018 March 20, 2018 March 27, 2018 20,000.00 19,600.00 18,623.92 18,623.92 976.080 4.98% 1 100.00% 100.00% 0.00% 18,623.92 18,623,920.00 17,692,724.00 20,000.0 20,000.0 20 GAA 2018 Awaiting for NTP - March 27, 2018 162 207 EGB Construction Manuel Novencido Jr. Cynthia Domalanta Jean Paul March 27, 2018 September 4, 2018 October 19, 2018 October 19, 2018 Villasis
18AI0044

21 30,000.00 1 1 1 November 21, 2017 December 12, 2017 February 19, 2018 February 22, 2018 March 1, 2018 30,000.00 29,400.00 28,707.80 28,707.80 692.196 2.35% 1 100.00% 100.00% 0.00% 28,707.80 28,707,804.12 28,707,804.12 30,000.0 30,000.0 21 GAA 2018 NTP- March 1, 2018 187 277 BET Construction and Supply Manuel Novencido Jr. Cynthia Domalanta Jean Paul March 1, 2018 September 3, 2018 December 2, 2018 December 2, 2018 Villasis
18AI0091

22 20,000.00 1 1 1 November 21, 2017 December 12, 2017 February 19, 2018 February 22, 2018 March 1, 2018 20,000.00 19,600.00 18,625.90 18,625.90 974.100 4.97% 1 100.00% 100.00% 0.00% 18,625.90 18,625,899.31 13,043,870.20 20,000.0 20,000.0 22 GAA 2018 NTP -March 1, 2018 162 252 MCB Construction and Supply Manuel Novencido Jr. Cynthia Domalanta Jean Paul March 1, 2018 August 9, 2018 November 7, 2018 November 7, 2018 Villasis
18AI0092

23 15,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 15,000.00 14,700.00 14,134.12 14,134.12 565.885 3.85% 1 100.00% 100.00% 0.00% 14,134.12 14,134,115.04 14,134,115.04 15,000.0 15,000.0 23 GAA 2018 NTP 154 244 MCB Construction and Supply Manuel Novencido Jr. Cynthia Domalanta Jean Paul February 7, 2018 July 10, 2018 October 8, 2018 October 8, 2018 Villasis
18AI0093

24 20,000.00 1 1 1 November 3, 2017 November 22, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,615.75 18,615.75 984.253 5.02% 1 100.00% 100.00% 0.00% 18,615.75 18,615,746.63 18,615,746.63 20,000.0 20,000.0 24 GAA 2018 NTP 162 222 MCB Construction and Supply Menio Abarabar Cynthia Domalanta Jeff Serna February 7, 2018 July 18, 2018 September 16, 2018 September 15, 2018 Binalonan
18AI0094

25 20,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,625.84 18,625.84 974.162 4.97% 1 84.00% 89.00% 5.00% 18,625.84 18,625,838.15 12,114,995.53 16,800.0 17,800.0 25 GAA 2018 NTP 162 507 BET Construction and Supply Jayson S. Bascos Cynthia Domalanta Karl February 7, 2018 July 18, 2018 June 28, 2019 Urdaneta
18AI0095

26 20,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,700.46 18,700.46 899.537 4.59% 1 84.00% 89.00% 5.00% 18,700.46 18,700,463.34 7,483,293.76 16,800.0 17,800.0 26 GAA 2018 NTP 162 507 MCB Construction and Supply Jayson S. Bascos Cynthia Domalanta Karl February 7, 2018 July 18, 2018 June 28, 2019 Urdaneta
18AI0096

27 20,000.00 1 1 1 February 7, 2018 February 27, 2018 March 19, 2018 March 20, 2018 March 27, 2018 20,000.00 19,600.00 18,820.53 18,820.53 779.467 3.98% 1 100.00% 100.00% 0.00% 18,820.53 18,820,533.33 18,820,533.33 20,000.0 20,000.0 27 GAA 2018 Awaiting for NTP - March 27, 2018 162 252 EGB Construction Manuel Novencido Jr. Cynthia Domalanta Jeff Serna March 27, 2018 September 4, 2018 December 3, 2018 December 3, 2018 Alcala
18AI0039

28 20,000.00 1 1 1 February 7, 2018 February 27, 2018 March 15, 2018 March 19, 2018 March 26, 2018 20,000.00 19,600.00 18,819.71 18,819.71 780.294 3.98% 1 100.00% 100.00% 0.00% 18,819.71 18,819,704.99 18,819,704.99 20,000.0 20,000.0 28 GAA 2018 Awaiting for NTP - March 26, 2018 162 252 EGB Construction Manuel Novencido Jr. Cynthia Domalanta Jeff Serna March 26, 2018 September 3, 2018 December 2, 2018 December 2, 2018 Alcala
18AI0037

29 100,000.00 1 1 1 February 12, 2018 March 5, 2018 March 20, 2018 March 21, 2018 March 28, 2018 100,000.00 96,500.00 91,625.34 91,625.34 4,874.659 5.05% 1 53.00% 54.50% 1.50% 91,625.34 96,500,000.00 37,665,000.86 53,000.0 54,500.0 29 GAA 2018 Bid Out- March 5, 2018 441 604 BET Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Christine March 28, 2018 June 11, 2019 November 21, 2019 Sison
18AI0048

18AI0097 30 1,000.00 1 1 1 September 29, 2017 October 23, 2017 February 19, 2018 February 22, 2018 March 1, 2018 1,000.00 1,000.00 969.04 969.04 30.959 3.10% 1 100.00% 100.00% 100.00% 969.04 969,040.97 - 1,000.0 1,000.0 30 GAA 2018 NTP -March 1, 2018 60 Zota Trading and Construction Zaldy del Valle Cynthia Domalanta Jean Paul March 1, 2018 April 29, 2018 April 29, 2018 Bautista

18AI0098 31 2,000.00 1 1 1 November 23, 2017 December 14, 2017 February 15, 2018 February 20, 2018 February 27, 2018 2,000.00 1,980.00 1,922.37 1,922.37 57.627 2.91% 1 100.00% 100.00% 0.00% 1,922.37 1,922,372.80 1,826,254.16 2,000.0 2,000.0 31 GAA 2018 NTP =February 27, 2018 85 115 Mightyway C/S Jayson S. Bascos Cynthia Domalanta Jean Paul February 27, 2018 May 22, 2018 June 21, 2018 June 21, 2018 Villasis

32 2,500.00 1 1 1 December 7, 2017 December 27, 2017 February 15, 2018 February 20, 2018 February 27, 2018 2,500.00 2,475.00 2,400.77 2,400.77 74.228 3.00% 1 100.00% 100.00% 0.00% 2,400.77 2,400,772.41 - 2,500.0 2,500.0 32 GAA 2018 NTP =February 27, 2018 95 185 Mightyway C/S Florida Reinoso Cynthia Domalanta Karl February 27, 2018 June 1, 2018 August 30, 2018 August 30, 2018 Urdaneta
18AI0099

33 1,000.00 1 1 1 September 29, 2017 October 23, 2017 February 19, 2018 February 22, 2018 March 1, 2018 1,000.00 1,000.00 968.41 968.41 31.591 3.16% 1 100.00% 100.00% 0.00% 968.41 968,408.88 968,408.88 1,000.0 1,000.0 33 Construction of Balaoag Health Center, Brgy. Balacag, Pozorrubio, Pangasinan GAA 2018 NTP -March 1, 2018 60 300 Safeway Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Jeff Serna March 1, 2018 April 29, 2018 December 25, 2018 November 15, 2018 Pozzorubio
18AI0100
34 1,000.00 1 1 1 February 7, 2018 February 27, 2018 March 15, 2018 March 19, 2018 March 26, 2018 1,000.00 1,000.00 970.01 970.01 29.991 3.00% 1 100.00% 100.00% 0.00% 970.01 970,009.48 970,009.48 1,000.0 1,000.0 34 Construction of Barangay Hall, Brgy. Baluyot, Bautista, Pangasinan GAA 2018 Awaiting for NTP - March 26, 2018 60 Zaldy del Valle Cynthia Domalanta Jean Paul March 26, 2018 May 24, 2018 May 24, 2018 Bautista
18AI0035

18AI0101 35 1,000.00 1 1 1 October 30, 2017 November 20, 2017 March 26, 2018 March 27, 2018 April 3, 2018 977.49 977.49 (977.493) #DIV/0! 1 100.00% 100.00% 0.00% 977.49 977,493.04 822,023.36 1,000.0 1,000.0 35 Construction of Barangay Hall, Brgy. San Juan, Alcala, Pangasinan GAA 2018 Bid Out - November 20, 2017 60 Zaldy Del Valle Cynthia Domalanta Jeff Serna April 3, 2018 June 1, 2018 June 1, 2018 Alcala

18AI0102 36 1,000.00 1 1 1 November 23, 2017 December 14, 2017 February 19, 2018 February 22, 2018 March 1, 2018 1,000.00 1,000.00 973.61 973.61 26.389 2.64% 1 100.00% 100.00% 0.00% 973.61 973,610.93 924,930.38 1,000.0 1,000.0 36 Construction of Barangay Hall, Brgy. San Pedro Ili, Alcala, Pangasinan GAA 2018 NTP- March 1, 2018 60 Zaldy del Valle Cynthia Domalanta Jeff Serna March 1, 2018 April 29, 2018 May 15,2018 Alcala

18AI0050 37 6,500.00 1 1 1 February 12, 2018 June 20, 2018 June 25, 2018 June 26, 2018 July 3, 2018 6,500.00 6,229.80 6,229.80 (6,229.800) #DIV/0! 1 100.00% 100.00% 0.00% 6,229.80 6,229,799.65 - 6,500.0 6,500.0 37 Construction of Covered Court, Brgy. Anonas, Urdaneta City, Pangasinan GAA 2018 Bid Out- March 5, 2018 150 300 BET Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Karl July 3, 2018 November 29, 2018 April 28, 2019 April 28, 2019 Urdaneta

18AI0103 38 1,000.00 1 1 1 September 26, 2017 October 23, 2017 February 19, 2018 February 22, 2018 March 1, 2018 1,000.00 1,000.00 970.65 970.65 29.351 2.94% 1 100.00% 100.00% 0.00% 970.65 970,648.79 970,648.79 1,000.0 1,000.0 38 GAA 2018 NTP- March 1, 2018 60 2-R Construction and Supply Zaldy del Valle Cynthia Domalanta Jeff Serna March 1, 2018 April 29, 2018 April 29, 2018 Alcala

39 2,500.00 1 1 1 February 5, 2018 February 26, 2018 March 15, 2018 March 19, 2018 March 26, 2018 2,500.00 2,475.00 2,400.77 2,400.77 74.233 3.00% 1 100.00% 100.00% 0.00% 2,400.77 2,400,766.96 2,280,728.61 2,500.0 2,500.0 39 Construction of Multi-Purpose Hall (Open Court), Brgy. Lipay, Villasis, Pangasinan GAA 2018 Awaiting for NTP - March 26, 2018 95 Safeway Construction and Supply Jayson S. Bascos Cynthia Domalanta Jean Paul March 26, 2018 June 28, 2018 June 28, 2018 Villasis
18AI0031

18AI0104 40 2,000.00 1 1 1 December 12, 2017 January 2, 2018 February 15, 2018 February 20, 2018 February 27, 2018 2,000.00 1,980.00 1,940.33 1,940.33 39.666 2.00% 1 100.00% 100.00% 0.00% 1,940.33 1,940,334.23 1,843,317.52 2,000.0 2,000.0 40 Construction of Multi-Purpose Hall, Brgy. Botigue, Laoac, Pangasinan GAA 2018 NTP =February 27, 2018 85 145 Mightyway C/S Jayson S. Bascos Cynthia Domalanta Jeff Serna February 27, 2018 May 22, 2018 July 21, 2018 July 21, 2018 Laoac

41 1,000.00 1 1 1 December 12, 2017 January 2, 2018 February 19, 2018 February 22, 2018 March 1, 2018 1,000.00 1,000.00 974.03 974.03 25.974 2.60% 1 100.00% 100.00% 0.00% 974.03 974,026.36 974,026.36 1,000.0 1,000.0 41 Construction of Senior Citizen Building, Brgy. Pindangan East, Alcala, Pangasinan GAA 2018 60 90 2R Construction and Supply Zaldy del Valle Cynthia Domalanta Jeff Serna March 1, 2018 April 29, 2018 May 29, 2018 May 29, 2018 Alcala
18AI0105
18AI0106 42 3,000.00 1 1 1 October 30, 2017 November 20, 2017 February 19, 2018 February 22, 2018 March 1, 2018 3,000.00 2,970.00 2,858.10 2,858.10 111.905 3.77% 1 100.00% 100.00% 0.00% 2,858.10 2,858,095.42 2,132,663.91 3,000.0 3,000.0 42 Concreting of Barangay Lebueg-Alarcio Cabilaoan West Road, Laoac, Pangasinan GAA 2018 NTP -March 1, 2018 70 160 MCB Construction and Supply Jayson S. Bascos Cynthia Domalanta Jeff Serna March 1, 2018 May 9, 2018 August 7, 2018 July 31, 2018 Laoac

18AI0107 43 3,000.00 1 1 1 October 11, 2017 November 6, 2017 February 15, 2018 February 20, 2018 February 27, 2018 3,000.00 2,970.00 2,831.09 2,831.09 138.906 4.68% 1 100.00% 100.00% 0.00% 2,831.09 2,831,094.29 2,689,539.58 3,000.0 3,000.0 43 GAA 2018 NTP =February 27, 2018 90 2R Construction and Supply Zaldy del Valle Cynthia Domalanta Jeff Serna February 27, 2018 May 27, 2018 May 27, 2018 Alcala

18AI0108 44 12,500.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 12,500.00 12,375.00 11,759.93 11,759.93 615.066 4.97% 1 100.00% 100.00% 0.00% 11,759.93 11,759,933.69 5,674,168.01 12,500.0 12,500.0 44 Concreting of Road, Brgy. Baluyot to Brgy. Cabuan, Bautista, Pangasinan GAA 2018 NTP 150 180 BET Construction and Supply Menio Abarabar Cynthia Domalanta Jean Paul February 7, 2018 July 6, 2018 August 5, 2018 August 5, 2018 Bautista
Concreting of Road, Brgy. Diaz, Bautista, Pangasinan August 28, 2018
18AI0109 45 10,000.00 1 1 1 October 30, 2017 November 20, 2017 February 19, 2018 February 23, 2018 March 2, 2018 10,000.00 9,900.00 9,401.30 9,401.30 498.700 5.04% 1 100.00% 100.00% 0.00% 9,401.30 9,401,300.50 1,410,195.08 10,000.0 10,000.0 45 Concreting of Road, Brgy. Diaz, Bautista, Pangasinan GAA 2018 NTP - March 2, 2018 150 180 Safeway Construction and Supply Menio Abarabar Cynthia Domalanta Jean Paul March 2, 2018 July 29, 2018 August 28, 2018 Bautista

18AI0110 46 2,500.00 1 1 1 October 20, 2017 November 9, 2017 February 15, 2018 February 20, 2018 February 27, 2018 2,500.00 2,475.00 2,369.80 2,369.80 105.205 4.25% 1 100.00% 100.00% 0.00% 2,369.80 2,369,795.21 2,126,544.00 2,500.0 2,500.0 46 Concreting of Road, Brgy. Talogtog to Brgy. Inmaduyan, Laoac, Pangasinan GAA 2018 NTP =February 27, 2018 60 210 MCB Construction and Supply Jayson S. Bascos Cynthia Domalanta Jeff Serna February 27, 2018 April 27, 2018 September 24, 2018 September 24, 2018 Laoac
Concreting of Road, Brgy. Vacante, Bautista, Pangasinan August 20, 2018
18AI0111 47 10,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 10,000.00 9,900.00 9,424.66 9,424.66 475.343 4.80% 1 100.00% 100.00% 0.00% 9,424.66 9,424,656.98 6,597,259.90 10,000.0 10,000.0 47 Concreting of Road, Brgy. Vacante, Bautista, Pangasinan GAA 2018 NTP 120 195 Zota Trading and Construction Menio Abarabar Cynthia Domalanta Jean Paul February 7, 2018 June 6, 2018 August 20, 2018 Bautista

18AI0112 48 2,500.00 1 1 1 October 11, 2017 November 6, 2017 February 15, 2018 February 20, 2018 February 27, 2018 2,500.00 2,475.00 2,348.58 2,348.58 126.419 5.11% 1 100.00% 100.00% 0.00% 2,348.58 2,348,580.55 2,348,580.55 2,500.0 2,500.0 48 Concreting of Road, Sitio Primicias, Brgy. Bersamin, Alcala, Pangasinan GAA 2018 NTP =February 27, 2018 60 90 MCB Construction and Supply Zaldy del Valle Cynthia Domalanta Jeff Serna February 27, 2018 April 27, 2018 May 27, 2018 Alcala

49 2,000.00 1 1 1 October 20, 2017 November 9, 2017 February 15, 2018 February 20, 2018 February 27, 2018 2,000.00 1,980.00 1,893.51 1,893.51 86.490 4.37% 1 100.00% 100.00% 0.00% 1,893.51 1,893,509.95 - 2,000.0 2,000.0 49 Concreting of Tramo Road, Bry. Dilan, Pozorrubio, Pangasinan GAA 2018 NTP =February 27, 2018 45 150 MCB Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Jeff Serna February 27, 2018 April 12, 2018 July 27, 2018 July 27, 2018 Pozzorubio
18AI0113

50 2,000.00 1 1 1 December 7, 2017 December 27, 2017 February 19, 2018 February 23, 2018 March 2, 2018 2,000.00 1,960.00 1,901.20 1,901.20 58.800 3.00% 1 100.00% 100.00% 0.00% 1,901.20 1,543,586.76 1,543,586.76 2,000.0 2,000.0 50 Rehabilitation of Malasin Bridge, Brgy. Malasin, Pozorrubio, Pangasinan GAA 2018 NTP-March 2, 2018 90 180 Mightyway C/S Jose Wilson Manongsong Cynthia Domalanta Jeff Serna March 2, 2018 May 30, 2018 August 29, 2018 August 29, 2018 Pozzorubio
18AI0114
51 48,022.00 1 1 1 February 5, 2018 February 26, 2018 March 15, 2018 March 19, 2018 March 26, 2018 48,022.00 47,061.56 44,705.25 44,705.25 2,356.305 5.01% 1 90.00% 100.00% 10.00% 44,705.25 47,061,560.00 44,708,482.00 43,219.8 48,022.0 51 Pangasinan-Nueva Vizcaya Road - K0176 + (-126) - K0179 + 990 GAA 2018 Awaiting NTP - March 26, 2018 261 291 Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky March 26, 2018 December 11, 2018 December 11, 2018 Rosales and Sta. Maria
18AI0030

52 44,682.00 1 1 1 January 25, 2018 February 14, 2018 March 14, 2018 March 15, 2018 March 22, 2018 44,682.00 42,463.41 40,339.71 40,339.71 2,123.697 5.00% 1 85.14% 88.20% 3.06% 40,339.71 41,269,351.00 33,471,971.49 38,042.3 39,409.5 52 GAA 2018 Awaiting for NTP - March 22, 2018 234 486 Marben Nicolas Kenneth Nalapo Carren/Neil/Rocky March 22, 2018 November 10, 2018 July 20, 2019 Balungao
18AI0017

53 26,400.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 26,400.00 23,780.80 22,913.47 22,913.47 867.326 3.65% 1 100.00% 100.00% 0.00% 22,913.47 22,913,372.65 22,913,372.65 26,400.0 26,400.0 53 GAA 2018 NTP 120 150 WJP Construction and Supply Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 June 6, 2018 July 6, 2018 July 6, 2018 Rosales
18AI0115

54 57,968.00 1 1 1 February 12, 2018 March 5, 2018 March 20, 2018 March 21, 2018 March 28, 2018 57,968.00 55,359.12 52,624.51 52,624.51 2,734.615 4.94% 1 91.00% 93.00% 2.00% 52,624.51 55,939,120.00 43,173,360.01 52,750.9 53,910.2 54 GAA 2018 216 455 Hipolito F. Melchor Kenneth Nalapo Felix March 28, 2018 October 29, 2018 June 25, 2019 Asingan and Sta. Maria
18AI0049
55 75,550.00 1 1 1 February 7, 2018 March 6, 2018 March 20, 2018 March 21, 2018 March 28, 2018 75,550.00 69,791.70 66,296.09 66,296.09 3,495.611 5.01% 1 81.24% 100.00% 18.76% 66,296.09 66,296,087.77 55,708,602.51 61,376.8 75,550.0 55 GAA 2018 Bid Out - March 6 , 2018 396 426 Manuel Novencido Jr. Kenneth Nalapo Mike March 28, 2018 April 27, 2019 May 27, 2019 May 27, 2019 Sta. Maria
18AI0053
Tayug-San Quintin Road, incl. Bridge, Pangasinan

56 100,000.00 1 1 1 February 15, 2018 March 6, 2018 March 20, 2018 March 21, 2018 March 28, 2018 100,000.00 96,500.00 91,669.70 91,669.70 4,830.300 5.01% 1 89.00% 92.00% 3.00% 91,669.70 96,500,000.00 58,383,427.62 89,000.0 92,000.0 56 Tayug-San Quintin Road, incl. Bridge, Pangasinan GAA 2018 345 465 Victoria Bernabe Kenneth Nalapo Jhomille March 28, 2018 March 7, 2019 July 5, 2019 Tayug and Sta. Maria

18AI0052

57 32,069.00 1 1 1 January 24, 2018 February 12, 2018 February 20, 2018 February 26, 2018 March 5, 2018 32,069.00 25,558.12 24,277.08 24,277.08 1,281.045 5.01% 1 100.00% 100.00% 0.00% 24,277.08 24,277,075.02 20,896,537.65 32,069.0 32,069.0 57 Binalonan-Asingan-Santa Maria Rd, incl ROW - K0194 + 623 - K0196 + 040, GAA 2018 NTP - March 5, 2018 225 315 Alphin Trading and Construction Hipolito F. Melchor Kenneth Nalapo Mike March 5, 2018 October 15, 2018 January 13, 2019 January 13, 2019 Asingan
18AI0007

18AI0116 58 3,000.00 1 1 1 September 27, 2017 October 25, 2017 February 19, 2018 February 22, 2018 March 1, 2018 3,000.00 2,940.00 2,851.65 2,851.65 88.351 3.01% 1 100.00% 100.00% 0.00% 2,851.65 2,940,000.00 - 3,000.0 3,000.0 58 Acosta Br. (B00746LZ) along Pangasinan-Nueva Vizcaya Rd (Phase II) GAA 2018 NTP- March 1, 2018 90 300 JHI Construction and Supply Reynald N. Barrera Kenneth Nalapo Jhomille March 1, 2018 May 29, 2018 December 25, 2018 December 25, 2018 Tayug

18AI0117 59 7,000.00 1 1 1 September 27, 2017 October 25, 2017 January 30, 2018 January 31, 2018 February 7, 2018 7,000.00 6,860.00 6,660.00 6,660.00 200.005 2.92% 1 100.00% 100.00% 0.00% 6,660.00 6,659,995.22 6,659,995.22 7,000.0 7,000.0 59 Barangobong Br. (B00739LZ) along Pangasinan-Nueva Vizcaya Rd (Phase II) GAA 2018 NTP 150 Hipolito F. Melchor Kenneth Nalapo Jhomille February 7, 2018 July 6, 2018 June 15, 2018 Tayug

60 15,000.00 1 1 1 December 5, 2017 December 26, 2017 February 15, 2018 February 20, 2018 February 27, 2018 15,000.00 14,450.00 13,849.87 13,849.87 600.134 4.15% 1 100.00% 100.00% 0.00% 13,849.87 14,450,000.00 7,470,650.00 15,000.0 15,000.0 60 Toboy Br. 2 (B01620LZ) along Binalonan-Asingan-Santa Maria Rd incl. ROW GAA 2018 NTP =February 27, 2018 165 270 Jose Wilson Manongsong Kenneth Nalapo Mike February 27, 2018 August 10, 2018 November 23, 2018 November 23, 2018 Asingan

18AI0118
61 6,000.00 1 1 1 September 27, 2017 October 25, 2017 January 30, 2018 January 31, 2018 February 7, 2018 6,000.00 5,880.00 5,732.68 5,732.68 147.317 2.51% 1 100.00% 100.00% 0.00% 5,732.68 5,732,682.50 5,732,682.50 6,000.0 6,000.0 61 Udiao Br. (B00751LZ) along Pangasinan-Nueva Ecija Rd (Phase II) GAA 2018 NTP 150 Hipolito F. Melchor Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 6, 2018 March 30, 2018 Rosales
18AI0119

18AI0120 62 15,000.00 1 1 1 December 5, 2017 December 26, 2017 February 20, 2018 February 26, 2018 March 5, 2018 15,000.00 14,650.00 14,214.55 14,214.55 435.450 2.97% 1 89.00% 90.50% 1.50% 14,214.55 14,649,999.36 - 13,350.0 13,575.0 62 Udiao Br. 1 (B04494LZ) along Bakit-Bakit Jct-Umingan Rd (Phase II) incl. ROW GAA 2018 NTP - March 5, 2018 165 509 MKM Marketing Hipolito F. Melchor Kenneth Nalapo Jhomille March 5, 2018 August 16, 2018 July 26, 2019 Rosales

18AI0022 63 15,000.00 1 1 1 January 26, 2018 February 16, 2018 March 14, 2018 March 15, 2018 March 22, 2018 15,000.00 14,700.00 13,964.32 13,964.32 735.677 5.00% 1 100.00% 100.00% 0.00% 13,964.32 13,964,323.30 11,809,749.96 15,000.0 15,000.0 63 Construction of Bank Protection, Brgy. Bakit-Bakit, Rosales, Pangasinan GAA 2018 Awaiting for NTP - March 22, 2018 154 402 Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky March 22, 2018 August 22, 2018 April 27, 2019 March 15, 2019 Rosales

18AI0121 64 29,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 29,000.00 28,420.00 27,788.21 27,788.21 631.789 2.22% 1 90.00% 100.00% 10.00% 27,788.21 27,788,206.14 27,788,206.14 26,100.0 29,000.0 64 Construction of Bank Protection, Brgy. Pugaro - Poblacion, Balungao, Pangasinan GAA 2018 NTP 184 Hipolito F. Melchor Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 August 9, 2018 June 15, 2018 Balungao

18AI0122 65 20,000.00 1 1 1 November 23, 2017 December 14, 2017 February 19, 2018 February 23, 2018 March 2, 2018 20,000.00 19,600.00 19,203.53 19,203.53 396.465 2.02% 1 90.00% 100.00% 10.00% 19,203.53 19,203,534.51 19,203,534.51 18,000.0 20,000.0 65 Construction of Bank Protection, Brgy. Salpad, San Nicolas, Pangasinan GAA 2018 NTP - March 2, 2018 162 Hipolito F. Melchor Kenneth Nalapo Melchor March 2, 2018 August 10, 2018 July 15, 2018 San Nicolas

18AI0123 66 10,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 10,000.00 9,800.00 9,309.36 9,309.36 490.640 5.01% 1 100.00% 100.00% 0.00% 9,309.36 9,309,359.80 7,819,862.23 10,000.0 10,000.0 66 Construction of Bank Protection, Brgy. Station District, Rosales, Pangasinan GAA 2018 NTP 131 331 2R Construction and Supply Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 June 17, 2018 January 3, 2019 January 3, 2019 Rosales

18AI0020 67 10,000.00 1 1 1 January 26, 2018 February 16, 2018 March 14, 2018 March 15, 2018 March 22, 2018 10,000.00 9,800.00 9,309.76 9,309.76 490.243 5.00% 1 100.00% 100.00% 0.00% 9,309.76 9,309,757.24 3,281,449.89 10,000.0 10,000.0 67 Construction of Bank Protection, Brgy. Zone V, Rosales, Pangasinan GAA 2018 Awaiting for NTP - March 22, 2018 131 301 Damico Builder and Supplies Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky March 22, 2018 July 30, 2018 January 16, 2019 January 16, 2019 Rosales

68 20,000.00 1 1 1 December 5, 2017 December 26, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,603.61 18,603.61 996.386 5.08% 1 88.00% 90.00% 2.00% 18,603.61 18,603,614.26 12,934,288.21 17,600.0 18,000.0 68 GAA 2018 NTP 162 502 Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 18, 2018 June 23, 2019 Rosales
18AI0124

18AI0125 69 23,000.00 1 1 1 November 23, 2017 December 14, 2017 February 19, 2018 February 23, 2018 March 2, 2018 23,000.00 22,540.00 21,457.28 21,457.28 1,082.721 4.80% 1 100.00% 100.00% 0.00% 21,457.28 21,457,279.50 17,809,541.69 23,000.0 23,000.0 69 GAA 2018 NTP-March 2, 2018 166 196 Hipolito F. Melchor Kenneth Nalapo Silver March 2, 2018 August 14, 2018 September 13, 2018 September 13, 2018 San Quintin

18AI0126 70 20,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 19,149.32 19,149.32 450.678 2.30% 1 98.00% 100.00% 2.00% 19,149.32 19,149,321.10 19,149,321.10 19,600.0 20,000.0 70 GAA 2018 NTP 162 Hipolito F. Melchor Kenneth Nalapo Silver February 7, 2018 July 18, 2018 July 15, 2018 San Quintin

18AI0127 71 15,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 15,000.00 14,700.00 13,992.50 13,992.50 707.503 4.81% 1 100.00% 100.00% 0.00% 13,992.50 14,700,000.00 13,965,000.00 15,000.0 15,000.0 71 GAA 2018 NTP 154 Hipolito F. Melchor Kenneth Nalapo Silver February 7, 2018 July 10, 2018 July 10, 2018 Natividad

72 10,000.00 1 1 1 November 22, 2017 December 13, 2017 March 13, 2018 March 14, 2018 March 21, 2018 10,000.00 9,800.00 9,584.40 9,584.40 215.602 2.20% 1 100.00% 100.00% 0.00% 9,584.40 9,584,396.91 8,059,519.36 10,000.0 10,000.0 72 GAA 2018 Awaiting for NTP - March 21, 2018 131 251 JHI Construction and Supply Jennycyl Ginez Kenneth Nalapo Mike March 21, 2018 July 29, 2018 November 26, 2018 November 26, 2018 Sta. Maria
18AI0128

18AI0129 73 20,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 19,204.02 19,204.02 395.979 2.02% 1 100.00% 100.00% 0.00% 19,204.02 19,204,020.15 19,204,020.15 20,000.0 20,000.0 73 GAA 2018 NTP 162 223 Hipolito F. Melchor Kenneth Nalapo Melchor February 7, 2018 July 18, 2018 September 17, 2018 September 17, 2018 San Nicolas

18AI0130 74 10,000.00 1 1 1 December 7, 2017 December 27, 2017 February 15, 2018 February 20, 2018 February 27, 2018 10,000.00 9,800.00 9,304.65 9,304.65 495.353 5.05% 1 100.00% 100.00% 0.00% 9,304.65 9,304,647.46 7,038,547.46 10,000.0 10,000.0 74 GAA 2018 NTP =February 27, 2018 131 191 Arcinue Commercial Corp Felipa Gatchalon Kenneth Nalapo Alfredo/Lex February 27, 2018 July 7, 2018 September 5, 2018 September 5, 2018 Umingan

18AI0021 75 15,000.00 1 1 1 January 26, 2018 February 16, 2018 March 14, 2018 March 15, 2018 March 22, 2018 15,000.00 14,700.00 13,977.64 13,977.64 722.359 4.91% 1 100.00% 100.00% 0.00% 13,977.64 13,977,640.52 13,977,640.52 15,000.0 15,000.0 75 GAA 2018 Awaiting for NTP - March 22, 2018 154 184 Menio Abarabar Kenneth Nalapo Alfredo/Lex March 22, 2018 August 22, 2018 September 21, 2018 July 31, 2018 Umingan

18AI0131 76 25,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 25,000.00 24,500.00 23,929.66 23,929.66 570.336 2.33% 1 100.00% 100.00% 0.00% 23,929.66 23,929,663.92 23,929,663.92 25,000.0 25,000.0 76 GAA 2018 NTP 173 218 Hipolito F. Melchor Kenneth Nalapo Silver February 7, 2018 July 29, 2018 September 12, 2018 September 12, 2018 Natividad

18AI0132 77 15,000.00 1 1 1 November 29, 2017 December 20, 2017 February 15, 2018 February 20, 2018 February 27, 2018 15,000.00 14,700.00 14,357.89 14,357.89 342.112 2.33% 1 100.00% 100.00% 0.00% 14,357.89 14,357,887.79 13,639,993.40 15,000.0 15,000.0 77 Construction/Extension of Bank Protection, Brgy. Libsong, Sta. Maria, Pangasinan GAA 2018 NTP =February 27, 2018 154 JHI Construction and Supply Jennycyl Ginez Kenneth Nalapo Mike February 27, 2018 July 30, 2018 July 31, 2018 Sta. Maria

78 20,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,660.28 18,660.28 939.721 4.79% 1 100.00% 100.00% 0.00% 18,660.28 18,660,277.94 17,727,263.99 20,000.0 20,000.0 78 GAA 2018 NTP 162 192 Hipolito F. Melchor Kenneth Nalapo Melchor February 7, 2018 July 18, 2018 August 17, 2018 August 17, 2018 San Nicolas
18AI0133

18AI0134 79 15,000.00 1 1 1 December 5, 2017 December 26, 2017 January 30, 2018 January 31, 2018 February 7, 2018 15,000.00 14,700.00 14,038.50 14,038.50 661.499 4.50% 1 100.00% 100.00% 0.00% 14,038.50 14,038,495.59 14,038,495.59 15,000.0 15,000.0 79 GAA 2018 NTP 154 184 Jennycyl Ginez Kenneth Nalapo Mike February 7, 2018 July 10, 2018 August 9, 2018 August 9, 2018 Sta. Maria

18AI0135 80 15,000.00 1 1 1 December 7, 2017 December 27, 2017 February 15, 2018 February 20, 2018 February 27, 2018 15,000.00 14,700.00 14,046.08 14,046.08 653.919 4.45% 1 100.00% 100.00% 0.00% 14,046.08 14,046,080.89 13,343,776.83 15,000.0 15,000.0 80 GAA 2018 NTP =February 27, 2018 154 AMP Construction Jennycyl Ginez Kenneth Nalapo Mike February 27, 2018 July 30, 2018 July 31,2018 Sta. Maria

18AI0136 81 10,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 10,000.00 9,800.00 9,591.98 9,591.98 208.018 2.12% 1 98.00% 100.00% 2.00% 9,591.98 9,591,980.55 9,591,980.55 9,800.0 10,000.0 81 GAA 2018 NTP 131 161 Hipolito F. Melchor Kenneth Nalapo Melchor February 7, 2018 June 17, 2018 July 17, 2018 July 15, 2018 San Nicolas

18AI0137 82 15,000.00 1 1 1 November 22, 2017 December 13, 2017 January 30, 2018 January 31, 2018 February 7, 2018 15,000.00 14,700.00 14,404.81 14,404.81 295.192 2.01% 1 85.00% 100.00% 15.00% 14,404.81 14,404
18AI0143 88 20,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,654.26 18,654.26 945.740 4.83% 1 100.00% 100.00% 0.00% 18,654.26 19,600,000.00 13,180,611.45 20,000.0 20,000.0 88 GAA 2018 NTP 162 192 Felipa Gatchalon Kenneth Nalapo Silver February 7, 2018 July 18, 2018 August 17, 2018 August 17, 2018 Natividad

18AI0144 89 10,000.00 1 1 1 November 22, 2017 December 13, 2017 January 30, 2018 January 31, 2018 February 7, 2018 10,000.00 9,800.00 9,422.38 9,422.38 377.616 3.85% 1 100.00% 100.00% 0.00% 9,422.38 9,422,384.03 9,422,384.03 10,000.0 10,000.0 89 GAA 2018 NTP 131 161 2R Construction and Supply Felipa Gatchalon Kenneth Nalapo Silver February 7, 2018 June 17, 2018 July 17, 2018 July 17, 2018 Natividad

18AI0145 90 10,000.00 1 1 1 November 22, 2017 December 13, 2017 January 30, 2018 January 31, 2018 February 7, 2018 10,000.00 9,800.00 9,553.71 9,553.71 246.285 2.51% 1 100.00% 100.00% 0.00% 9,553.71 9,553,714.60 9,076,027.01 10,000.0 10,000.0 90 GAA 2018 NTP 131 281 AMP Construction Jennycyl Ginez Kenneth Nalapo Mike February 7, 2018 June 17, 2018 November 14, 2018 November 14, 2018 Sta. Maria

91 25,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 25,000.00 24,500.00 23,273.94 23,273.94 1,226.057 5.00% 1 100.00% 100.00% 0.00% 23,273.94 23,273,942.95 23,273,942.20 25,000.0 25,000.0 91 GAA 2018 NTP 173 233 Hipolito F. Melchor Kenneth Nalapo Jhomille February 7, 2018 July 29, 2018 September 27, 2018 September 27, 2018 Tayug
18AI0146

92 10,000.00 1 1 1 December 7, 2017 December 27, 2017 February 15, 2018 February 20, 2018 February 27, 2018 10,000.00 9,800.00 9,308.93 9,308.93 491.068 5.01% 1 100.00% 100.00% 0.00% 9,308.93 9,308,931.82 7,340,090.74 10,000.0 10,000.0 92 GAA 2018 NTP =February 27, 2018 131 221 AMP Construction Jennycyl Ginez Kenneth Nalapo Mike February 27, 2018 July 7, 2018 October 5, 2018 September 30, 2018 Sta. Maria
18AI0147

93 24,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 24,000.00 23,520.00 22,400.26 22,400.26 1,119.740 4.76% 1 100.00% 100.00% 0.00% 22,400.26 22,400,259.94 22,400,259.94 24,000.0 24,000.0 93 GAA 2018 NTP 170 Hipolito F. Melchor Kenneth Nalapo Jhomille February 7, 2018 July 26, 2018 July 15, 2018 Tayug
18AI0148

18AI0149 94 25,000.00 1 1 1 November 22, 2017 December 13, 2017 February 19, 2018 February 23, 2018 March 2, 2018 25,000.00 24,500.00 23,963.82 23,963.82 536.175 2.19% 1 100.00% 100.00% 0.00% 23,963.82 23,963,824.00 23,963,824.00 25,000.0 25,000.0 94 GAA 2018 NTP-March 2, 2018 173 Hipolito F. Melchor Kenneth Nalapo Jhomille March 2, 2018 August 21, 2018 July 15, 2018 Tayug

18AI0150 95 20,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,617.95 18,617.95 982.048 5.01% 1 100.00% 100.00% 0.00% 18,617.95 18,617,952.16 18,617,952.16 20,000.0 20,000.0 95 GAA 2018 NTP 162 WJP Construction and Supply Hipolito F. Melchor Kenneth Nalapo Jhomille February 7, 2018 July 18, 2018 July 15, 2018 Tayug

18AI0151 96 10,000.00 1 1 1 November 23, 2017 December 14, 2017 February 15, 2018 February 20, 2018 February 27, 2018 10,000.00 9,800.00 9,597.64 9,597.64 202.365 2.06% 1 100.00% 100.00% 0.00% 9,597.64 9,597,635.50 9,117,753.72 10,000.0 10,000.0 96 GAA 2018 NTP =February 27, 2018 131 161 Arcinue Commercial Corp Felipa Gatchalon Kenneth Nalapo Alfredo/Lex February 27, 2018 July 7, 2018 August 6, 2018 July 31, 2018 Umingan

18AI0152 97 20,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 19,155.47 19,155.47 444.529 2.27% 1 80.00% 100.00% 20.00% 19,155.47 19,155,471.23 19,155,471.23 16,000.0 20,000.0 97 GAA 2018 NTP 162 Hipolito F. Melchor Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 18, 2018 June 15, 2018 Balungao

18AI0153 98 10,000.00 1 1 1 January 26, 2018 February 19, 2018 March 13, 2018 March 14, 2018 March 21, 2018 10,000.00 9,800.00 9,309.67 9,309.67 490.329 5.00% 1 95.00% 100.00% 5.00% 9,309.67 9,309,669.82 9,309,669.82 9,500.0 10,000.0 98 GAA 2018 NTP 131 WJP Construction and Supply Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky March 21, 2018 July 29, 2018 July 15, 2018 Rosales

99 20,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 19,204.48 19,204.48 395.518 2.02% 1 70.00% 100.00% 30.00% 19,204.48 19,600,000.00 18,639,775.88 14,000.0 20,000.0 99 GAA 2018 NTP 162 Hipolito F. Melchor Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 18, 2018 March 30, 2018 Balungao
18AI0154

100 24,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 24,000.00 23,520.00 23,044.35 23,044.35 475.648 2.02% 1 70.00% 100.00% 30.00% 23,044.35 23,520,000.00 23,520,000.00 16,800.0 24,000.0 100 GAA 2018 NTP 170 Hipolito F. Melchor Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 26, 2018 March 30, 2018 Balungao
18AI0155

18AI0156 101 20,000.00 1 1 1 November 22, 2017 December 13, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 19,012.34 19,012.34 587.655 3.00% 1 80.00% 100.00% 20.00% 19,012.34 19,012,344.76 18,061,719.92 16,000.0 20,000.0 101 GAA 2018 NTP 162 Hipolito F. Melchor Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 18, 2018 June 15, 2018 Balungao

18AI0157 102 20,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,870.09 18,870.09 729.912 3.72% 1 95.00% 100.00% 5.00% 18,870.09 18,767,712.63 18,767,712.63 19,000.0 20,000.0 102 GAA 2018 NTP 162 WJP Construction and Supply Felipa Gatchalon Kenneth Nalapo Alfredo/Lex February 7, 2018 July 18, 2018 June 30, 2018 Umingan

103 20,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 20,000.00 19,600.00 18,620.43 18,620.43 979.573 5.00% 1 100.00% 100.00% 0.00% 18,620.43 18,620,426.70 15,669,703.25 20,000.0 20,000.0 103 GAA 2018 NTP 162 442 AMP Construction Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 18, 2018 April 24, 2019 April 24, 2019 Rosales
18AI0158

104 24,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 24,000.00 23,520.00 22,304.50 22,304.50 1,215.497 5.17% 1 85.00% 87.00% 2.00% 22,304.50 22,304,502.77 19,110,613.20 20,400.0 20,880.0 104 GAA 2018 NTP 170 510 Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 26, 2018 July 1, 2019 Rosales
18AI0159

105 15,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 15,000.00 14,700.00 14,112.16 14,112.16 587.845 4.00% 1 100.00% 100.00% 0.00% 14,112.16 14,112,155.46 11,833,043.71 15,000.0 15,000.0 105 GAA 2018 NTP 154 Felipa Gatchalon Kenneth Nalapo Silver February 7, 2018 July 10, 2018 July 10, 2018 Natividad
18AI0160

106 60,000.00 1 1 1 February 12, 2018 March 5, 2018 March 26, 2018 March 27, 2018 April 3, 2018 55,016.65 55,016.65 (55,016.645) #DIV/0! 1 88.00% 92.00% 4.00% 55,016.65 57,900,000.00 37,349,292.71 52,800.0 55,200.0 106 GAA 2018 Bid Out - March 5, 2018 360 480 Victoria Bernabe Kenneth Nalapo Jhomille April 3, 2018 March 28, 2019 July 26, 2019 Tayug
18AI0047

18AI0015 107 40,000.00 1 1 1 January 24, 2018 February 12, 2018 February 20, 2018 February 26, 2018 March 5, 2018 40,000.00 39,200.00 37,237.98 37,237.98 1,962.022 5.01% 1 100.00% 100.00% 0.00% 37,237.98 37,237,977.80 5,585,696.67 40,000.0 40,000.0 107 Access Road leading to Depalo Falls, San Quintin, Pangasinan GAA 2018 NTP- March 5, 2018 252 352 ALCEL Construction Marben Nicolas Kenneth Nalapo Silver March 5, 2018 November 11, 2018 February 19, 2019 February 19, 2019 San Quintin

18AI0073 108 30,000.00 1 1 1 March 8, 2018 March 28, 2018 April 11, 2018 April 12, 2018 April 19, 2018 30,000.00 27,783.13 27,783.13 (27,783.128) #DIV/0! 1 100.00% 100.00% 0.00% 27,783.13 29,400,000.00 25,101,004.26 30,000.0 30,000.0 108 GAA 2018 Scheduled for Bidding - March 28, 2018 150 405 Jennycyl Ginez Kenneth Nalapo Silver April 19, 2018 September 15, 2018 May 28, 2019 Natividad

109 50,000.00 1 1 1 March 12, 2018 April 2, 2018 April 11, 2018 April 12, 2018 April 19, 2018 50,000.00 46,544.56 46,544.56 (46,544.559) #DIV/0! 1 85.00% 89.00% 4.00% 46,544.56 46,544,558.51 34,405,737.68 42,500.0 44,500.0 109 GAA 2018 Scheduled for Bidding - April 2, 2018 300 420 Hipolito F. Melchor Kenneth Nalapo Felix April 19, 2018 February 12, 2019 June 12, 2019 Sta. Maria and San Quintin
18AI0074
110 20,000.00 1 1 1 February 9, 2018 March 28, 2018 April 11, 2018 April 12, 2018 April 19, 2018 20,000.00 18,710.24 18,710.24 (18,710.243) #DIV/0! 1 100.00% 100.00% 0.00% 18,710.24 18,710,242.83 17,774,730.69 20,000.0 20,000.0 110 GAA 2018 For Bidding - March 28, 2018 180 245 Jennycyl Ginez Kenneth Nalapo Mike April 19, 2018 October 15, 2018 December 19, 2018 December 19, 2018 Sta. Maria
18AI0042

111 20,000.00 1 1 1 May 8, 2018 May 21, 2018 May 23, 2018 May 23, 2018 May 30, 2018 20,000.00 19,600.00 18,813.34 18,813.34 786.665 4.01% 1 100.00% 100.00% 0.00% 18,813.34 19,600,000.00 16,592,779.57 20,000.0 20,000.0 111 GAA 2018 For Bidding -April 26, 2018 180 BET Construction and Supply Hipolito F. Melchor Melchor May 30, 2018 November 25, 2018 'November 25, 2018 San Nicolas
18AI0196

112 6,000.00 1 1 1 February 26, 2018 March 19, 2018 March 26, 2018 March 27, 2018 April 3, 2018 5,743.07 5,743.07 (5,743.067) #DIV/0! 1 100.00% 100.00% 0.00% 5,743.07 5,743,067.26 4,843,128.62 6,000.0 6,000.0 112 Construction of Multipurpose Building in Sta. Maria, Pangasinan GAA 2018 Scheduled for Bidding - March 19, 2018 160 190 Jennycyl Ginez Kenneth Nalapo Mike April 3, 2018 September 9, 2018 October 9, 2018 October9, 2018 Sta. Maria
18AI0070

18AI0062 113 5,000.00 1 1 1 February 22, 2018 June 20, 2018 June 25, 2018 June 26, 2018 July 3, 2018 5,000.00 4,950.00 4,800.96 4,800.96 149.045 3.01% 1 100.00% 100.00% 0.00% 4,800.96 4,800,955.03 4,560,907.28 5,000.0 5,000.0 113 Construction of Multi-Purpose Building, Natividad, Pangasinan GAA 2018 For Bidding June 6, 2018 150 L.P. Locquiao CS Hipolito F. Melchor Kenneth Nalapo Silver July 3, 2018 November 29, 2018 November 29, 2018 Natividad

18AI0055 114 1,000.00 1 1 1 February 20, 2018 March 13, 2018 March 26, 2018 March 27, 2018 April 3, 2018 1,000.00 1,000.00 970.81 970.81 29.193 2.92% 1 100.00% 100.00% 0.00% 970.81 970,806.80 970,806.80 1,000.0 1,000.0 115 GAA 2018 Bid Out - March 13, 2018 60 90 R.G. Diaz Builders & Trading Hipolito F. Melchor Kenneth Nalapo Melchor April 3, 2018 June 1, 2018 July 1, 2018 June 30, 2018 San Nicolas

18AI0072 115 1,000.00 1 1 1 February 27, 2018 March 19, 2018 March 26, 2018 March 27, 2018 April 3, 2018 1,000.00 1,000.00 979.46 979.46 20.539 2.05% 1 55.00% 50.00% -5.00% 979.46 979,461.21 - 550.0 500.0 116 GAA 2018 Scheduled for Bidding - March 19, 2018 60 120 Zaldy del Valle Kenneth Nalapo Jeff Serna April 3, 2018 June 1, 2018 July 31, 2018 San Manuel

116 4,000.00 1 1 1 February 22, 2018 March 14, 2018 March 26, 2018 March 27, 2018 April 3, 2018 4,000.00 3,960.00 3,799.20 3,799.20 160.799 4.06% 1 100.00% 100.00% 0.00% 3,799.20 3,799,201.37 2,469,480.89 4,000.0 4,000.0 117 Construction/Improvement of Multi-Purpose Building, Tayug, Pangasinan GAA 2018 For Bidding - March 14, 2018 115 309 Hipolito F. Melchor Kenneth Nalapo Jhomille April 3, 2018 July 26, 2018 February 5, 2019 February 5, 2019 Tayug
18AI0063

18AI0161 117 2,000.00 1 1 1 November 17, 2017 December 8, 2017 February 19, 2018 February 23, 2018 March 2, 2018 2,000.00 1,980.00 1,930.43 1,930.43 49.566 2.50% 1 100.00% 100.00% 0.00% 1,930.43 1,930,430.91 1,833,909.36 2,000.0 2,000.0 118 Construction of Drainage Canal, Brgy. Carmen West, Rosales, Pangasinan GAA 2018 NTP-March 2, 2018 75 225 2-R Construction and Supply Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky March 2, 2018 May 15, 2018 October 12, 2018 October 12, 2018 Rosales

18AI0014 118 10,000.00 1 1 1 January 24, 2018 February 12, 2018 February 20, 2018 February 26, 2018 March 5, 2018 10,000.00 9,800.00 9,309.54 9,309.54 490.465 5.00% 1 100.00% 100.00% 0.00% 9,309.54 9,309,535.31 7,879,590.68 10,000.0 10,000.0 119 Construction of Protection Dike at San Vicente, Sta. Maria, Pangasinan GAA 2018 NTP - March 5, 2018 131 371 Jennycyl Ginez Kenneth Nalapo Mike March 5, 2018 July 13, 2018 March 10, 2019 March 10, 2019 Sta. Maria
Concreting of Amistad-Agno Road, Tayug, Pangasinan
18AI0162 119 2,500.00 1 1 1 November 23, 2017 December 14, 2017 February 19, 2018 February 23, 2018 March 2, 2018 2,500.00 2,475.00 2,356.67 2,356.67 118.328 4.78% 1 100.00% 100.00% 0.00% 2,356.67 2,356,671.70 2,356,671.33 2,500.0 2,500.0 120 Concreting of Amistad-Agno Road, Tayug, Pangasinan GAA 2018 NTP-March 2, 2018 60 90 Hipolito F. Melchor Kenneth Nalapo Jhomille March 2, 2018 April 30, 2018 May 30, 2018 June 15, 2018 Tayug
Concreting of Bantog-Alac Road, San Quintin, Pangasinan
120 4,000.00 1 1 1 December 7, 2017 December 27, 2017 February 19, 2018 February 23, 2018 March 2, 2018 4,000.00 3,960.00 3,769.47 3,769.47 190.534 4.81% 1 100.00% 100.00% 0.00% 3,769.47 3,769,451.87 3,769,451.87 4,000.0 4,000.0 121 Concreting of Bantog-Alac Road, San Quintin, Pangasinan GAA 2018 NTP-March 2, 2018 99 129 Victoria Bernabe Kenneth Nalapo Silver March 2, 2018 June 8, 2018 July 8, 2018 July 8, 2018 San Quintin
18AI0163
Concreting of Bantog-Baro Road, Asingan, Pangasinan
18AI0164 121 3,500.00 1 1 1 November 22, 2017 December 13, 2017 March 19, 2018 March 20, 2018 March 27, 2018 3,500.00 3,465.00 3,292.97 3,292.97 172.030 4.96% 1 100.00% 100.00% 0.00% 3,292.97 3,292,969.60 3,292,948.44 3,500.0 3,500.0 122 Concreting of Bantog-Baro Road, Asingan, Pangasinan GAA 2018 Bid Out - December 13, 2017 90 Felipa Gatchalon Kenneth Nalapo Mike March 27, 2018 June 24, 2018 June 24, 2018 Asingan

18AI0165 122 2,000.00 1 1 1 November 23, 2017 December 14, 2017 February 19, 2018 February 23, 2018 March 2, 2018 2,000.00 1,980.00 1,920.55 1,920.55 59.452 3.00% 1 100.00% 100.00% 0.00% 1,920.55 1,920,547.85 1,920,547.85 2,000.0 2,000.0 123 Concreting of Cabangaran-Baracbac Road, Umingan, Pangasinan GAA 2018 NTP - March 2, 2018 45 R.F Flores Construction Jennycyl Ginez Kenneth Nalapo Alfredo/Lex March 2, 2018 April 15, 2018 March 15,2018 Umingan
Concreting of Cabaruan-Casilan Road, Umingan, Pangasinan
18AI0166 123 2,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,000.00 1,980.00 1,920.41 1,920.41 59.594 3.01% 1 100.00% 100.00% 0.00% 1,920.41 1,920,405.65 1,920,405.65 2,000.0 2,000.0 124 Concreting of Cabaruan-Casilan Road, Umingan, Pangasinan GAA 2018 NTP 60 RF Flores Construction Jennycyl Ginez Kenneth Nalapo Alfredo/Lex February 7, 2018 April 7, 2018 March 30, 2018 Umingan

18AI0167 124 2,000.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,000.00 1,980.00 1,920.41 1,920.41 59.594 3.01% 1 100.00% 100.00% 0.00% 1,920.41 1,920,405.65 1,920,405.65 2,000.0 2,000.0 125 Concreting of Carayungan Sur-Carosalesan Road, Umingan, Pangasinan GAA 2018 NTP 60 RF Flores Construction Jennycyl Ginez Kenneth Nalapo Alfredo/Lex February 7, 2018 April 7, 2018 March 30, 2018 Umingan

18AI0010 125 5,500.00 1 1 1 January 24, 2018 February 12, 2018 February 20, 2018 February 26, 2018 March 5, 2018 5,500.00 5,445.00 5,174.98 5,174.98 270.022 4.96% 1 100.00% 100.00% 0.00% 5,174.98 5,174,977.58 5,174,977.58 5,500.0 5,500.0 126 Concreting of Carosucan Norte-Sanchez-Baro Road, Asingan, Pangasinan GAA 2018 NTP - March 5, 2018 105 Felipa Gatchalon Kenneth Nalapo Mike March 5, 2018 June 17, 2018 June 17, 2018 Asingan

18AI0168 126 3,200.00 1 1 1 November 17, 2017 December 8, 2017 January 30, 2018 January 31, 2018 February 7, 2018 3,200.00 3,168.00 3,088.71 3,088.71 79.295 2.50% 1 100.00% 100.00% 0.00% 3,088.71 3,088,690.42 3,088,690.42 3,200.0 3,200.0 127 Concreting of Mantacdang-Labuan Road, San Quintin, Pangasinan GAA 2018 NTP 75 Jennycyl Ginez Kenneth Nalapo Silver February 7, 2018 April 22, 2018 March 30, 2018 San Quintin
Concreting of Road, Brgy. Macalong, Asingan, Pangasinan
18AI0011 127 2,000.00 1 1 1 January 24, 2018 February 12, 2018 February 20, 2018 February 26, 2018 March 5, 2018 2,000.00 1,980.00 1,881.55 1,881.55 98.454 4.97% 1 100.00% 100.00% 0.00% 1,881.55 1,881,545.90 1,881,545.90 2,000.0 2,000.0 128 Concreting of Road, Brgy. Macalong, Asingan, Pangasinan GAA 2018 NTP-March 5, 2018 45 Felipa Gatchalon Kenneth Nalapo Mike March 5, 2018 April 18, 2018 April 18, 2018 Asingan
Concreting of Roads at Ariston East, Asingan, Pangasinan
18AI0169 128 2,000.00 1 1 1 December 7, 2017 December 27, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,000.00 1,980.00 1,881.00 1,881.00 99.005 5.00% 1 100.00% 100.00% 0.00% 1,881.00 1,880,955.30 1,880,955.30 2,000.0 2,000.0 129 Concreting of Roads at Ariston East, Asingan, Pangasinan GAA 2018 NTP 45 Felipa Gatchalon Kenneth Nalapo Mike February 7, 2018 March 23, 2018 March 23, 2018 Asingan

18AI0170 129 2,000.00 1 1 1 November 22, 2017 December 13, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,000.00 1,980.00 1,919.97 1,919.97 60.026 3.03% 1 100.00% 100.00% 0.00% 1,919.97 1,919,974.40 1,919,974.40 2,000.0 2,000.0 130 Concreting of Roads at Cabalaoangan Sur, Rosales, Pangasinan GAA 2018 NTP 45 WJP Construction and Supply Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 March 23, 2018 March 15, 2018 Rosales

18AI0171 130 2,000.00 1 1 1 December 5, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,000.00 1,980.00 1,940.34 1,940.34 39.658 2.00% 1 100.00% 100.00% 0.00% 1,940.34 1,940,342.32 1,940,342.32 2,000.0 2,000.0 131 Concreting of Roads at Caboluan-Pataquid, Sta. Maria, Pangasinan GAA 2018 NTP 45 WJP Construction and Supply Jennycyl Ginez Kenneth Nalapo Mike February 7, 2018 March 23, 2018 March 23, 2018 Sta. Maria
18AI0012 131 Concreting of Roads at Lauren, Umingan, Pangasinan 2,000.00 1 1 1 January 24, 2018 February 12, 2018 February 20, 2018 February 26, 2018 March 5, 2018 2,000.00 1,980.00 1,881.14 1,881.14 98.860 4.99% 1 100.00% 100.00% 0.00% 1,881.14 1,881,139.67 1,881,139.67 2,000.0 2,000.0 132 Concreting of Roads at Lauren, Umingan, Pangasinan GAA 2018 NTP - March 5, 2018 45 R.F Flores Construction Jennycyl Ginez Kenneth Nalapo Alfredo/Lex March 5, 2018 April 18, 2018 April 18, 2018 Umingan
18AI0172 132 Concreting of Roads at San Isidro, Rosales, Pangasinan 2,000.00 1 1 1 December 5, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,000.00 1,980.00 1,940.40 1,940.40 39.597 2.00% 1 100.00% 100.00% 0.00% 1,940.40 1,940,402.90 1,940,402.90 2,000.0 2,000.0 133 Concreting of Roads at San Isidro, Rosales, Pangasinan GAA 2018 NTP 60 WJP Construction and Supply Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 April 7, 2018 February 28, 2018 Rosales
18AI0008 133 2,000.00 1 1 1 January 24, 2018 February 12, 2018 February 20, 2018 February 26, 2018 March 5, 2018 2,000.00 1,980.00 1,919.89 1,919.89 60.113 3.04% 1 100.00% 100.00% 0.00% 1,919.89 1,919,886.69 1,919,886.69 2,000.0 2,000.0 134 Concreting of Roads at San Pablo-Dalayap, Sta. Maria, Pangasinan GAA 2018 Bid Out 45 APP Construction and Supplies Jennycyl Ginez Kenneth Nalapo Mike March 5, 2018 April 18, 2018 April 18, 2018 Sta. Maria
Concreting of Roads at Silag-Luna, Natividad, Pangasinan
134 2,000.00 1 1 1 November 29, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,000.00 1,980.00 1,920.35 1,920.35 59.650 3.01% 1 100.00% 100.00% 0.00% 1,920.35 1,920,349.70 1,920,349.70 2,000.0 2,000.0 135 Concreting of Roads at Silag-Luna, Natividad, Pangasinan GAA 2018 NTP 45 Hipolito F. Melchor Kenneth Nalapo Silver February 7, 2018 March 23, 2018 March 23, 2018 Natividad
18AI0173
Concreting of San Andres-Sta. Rosa, Umingan, Pangasinan
18AI0009 135 3,300.00 1 1 1 January 24, 2018 February 12, 2018 February 20, 2018 February 26, 2018 March 5, 2018 3,300.00 3,267.00 3,101.73 3,101.73 165.268 5.06% 1 100.00% 100.00% 0.00% 3,101.73 3,101,732.03 3,101,732.03 3,300.0 3,300.0 136 Concreting of San Andres-Sta. Rosa, Umingan, Pangasinan GAA 2018 NTP - March 5, 2018 90 120 Menio Abarabar Kenneth Nalapo Alfredo/Lex March 5, 2018 June 2, 2018 July 2, 2018 July 2, 2018 Umingan

18AI0174 136 2,000.00 1 1 1 December 7, 2017 December 27, 2017 March 19, 2018 March 20, 2018 March 27, 2018 2,000.00 1,980.00 1,950.27 1,950.27 29.730 1.50% 1 100.00% 100.00% 0.00% 1,950.27 1,950,270.00 1,950,270.00 2,000.0 2,000.0 137 Construction of Cabalaoangan-San Pedro Bridge, San Quintin, Pangasinan GAA 2018 Bid Out - December 27, 2017 90 180 Jennycyl Ginez Kenneth Nalapo Silver March 27, 2018 June 24, 2018 September 22, 2018 September 22, 2018 San Quintin

137 3,000.00 1 1 1 September 26, 2017 October 23, 2017 February 19, 2018 February 22, 2018 March 1, 2018 3,000.00 2,970.00 2,878.13 2,878.13 91.867 3.09% 1 100.00% 100.00% 0.00% 2,878.13 2,878,133.25 2,878,133.25 3,000.0 3,000.0 138 GAA 2018 NTP- March 1, 2018 90 150 Florida Reinoso Kenneth Nalapo Karl March 1, 2018 May 29, 2018 July 28, 2018 May 29, 2018 Urdaneta
18AI0175

18AI0025 138 3,000.00 1 1 1 February 1, 2018 February 20, 2018 March 14, 2018 March 15, 2018 March 22, 2018 3,000.00 2,970.00 2,910.40 2,910.40 59.600 2.01% 1 100.00% 100.00% 0.00% 2,910.40 2,969,531.61 2,969,531.61 3,000.0 3,000.0 139 GAA 2018 Awaiting for NTP - March 22, 2018 100 130 Jose Wilson Manongsong Cynthia Domalanta Karl March 22, 2018 June 29, 2018 July 29, 2018 July 29, 2018 Urdaneta

18AI0061 139 3,000.00 1 1 1 February 22, 2018 March 14, 2018 March 26, 2018 March 27, 2018 April 3, 2018 3,000.00 2,970.00 2,909.42 2,909.42 60.576 2.04% 1 100.00% 100.00% 0.00% 2,909.42 2,909,423.97 2,146,489.19 3,000.0 3,000.0 140 GAA 2018 For Bidding - March 14, 2018 150 289 Menio Abarabar Cynthia Domalanta Jeff Serna April 3, 2018 August 30, 2018 January 16, 2019 January 15, 2019 Binalonan

18AI0029 140 2,000.00 1 1 1 February 28, 2018 March 19, 2018 April 11, 2018 April 12, 2018 April 19, 2018 2,000.00 1,980.00 1,940.26 1,940.26 39.738 2.01% 1 100.00% 100.00% 0.00% 1,940.26 1,940,262.26 1,940,262.26 2,000.0 2,000.0 141 GAA 2018 Scheduled for Bidding - March 19, 2018 60 120 Alphin Trading & Construction Jose Wilson Manongsong Cynthia Domalanta Karl April 19, 2018 June 17, 2018 August 16, 2018 August 16, 2108 Urdaneta

141 2,000.00 1 1 1 February 9, 2018 February 28, 2018 March 19, 2018 March 20, 2018 March 27, 2018 2,000.00 1,980.00 1,909.17 1,909.17 70.834 3.58% 1 100.00% 100.00% 0.00% 1,909.17 1,909,165.56 1,909,165.56 2,000.0 2,000.0 142 GAA 2018 Awaiting for NTP - March 27, 2018 60 150 BET Construction and Supply Jose Wilson Manongsong Cynthia Domalanta Karl March 27, 2018 May 25, 2018 August 23, 2018 August 23, 2018 Urdaneta
18AI0046

18AI0068 142 30,000.00 1 1 1 February 20, 2018 March 15, 2018 March 26, 2018 March 27, 2018 April 3, 2018 30,000.00 29,700.00 27,979.61 27,979.61 1,720.392 5.79% 1 100.00% 100.00% 0.00% 27,979.61 27,929,562.70 26,533,084.56 30,000.0 30,000.0 143 Construction/Upgrading of Cabalaoangan-Zone I Road, Rosales, Pangasinan GAA 2018 For Bidding - March 15, 2018 192 312 WJP Construction and Supply Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky April 3, 2018 October 11, 2018 February 8, 2019 December 15, 2018 Rosales

18AI0038 143 15,000.00 1 1 1 February 7, 2018 February 28, 2018 March 15, 2018 March 19, 2018 March 26, 2018 15,000.00 14,850.00 14,251.05 14,251.05 598.951 4.03% 1 100.00% 100.00% 0.00% 14,251.05 14,251,049.38 12,205,945.81 15,000.0 15,000.0 144 GAA 2018 Awaiting NTP - March 26, 2018 190 280 Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky March 26, 2018 October 1, 2018 December 30, 2018 December 30, 2018 Rosales

18AI0045 144 10,000.00 1 1 1 February 9, 2018 February 28, 2018 March 20, 2018 March 21, 2018 March 28, 2018 10,000.00 9,900.00 9,409.95 9,409.95 490.050 4.95% 1 100.00% 100.00% 0.00% 9,409.95 9,409,950.00 8,939,152.50 10,000.0 10,000.0 145 Improvement/Concreting of Guiling Road, Rosales, Pangasinan GAA 2018 Bid Out - February 28, 2018 120 150 Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky March 28, 2018 July 25, 2018 August 24, 2018 August 24, 2018 Rosales

18AI0041 145 10,000.00 1 1 1 February 9, 2018 February 28, 2018 March 19, 2018 March 20, 2018 March 27, 2018 10,000.00 9,900.00 9,395.10 9,395.10 504.900 5.10% 1 100.00% 100.00% 0.00% 9,395.10 9,394,839.11 8,924,834.56 10,000.0 10,000.0 146 Improvement/Concreting of Pasngaw Road, Casanicolasan, Rosales, Pangasinan GAA 2018 Awaiting for NTP - March 27, 2018 120 285 Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky March 27, 2018 July 24, 2018 January 5, 2019 January 5, 2019 Rosales

18AI0058 146 10,000.00 1 1 1 February 20, 2018 March 13, 2018 March 26, 2018 March 27, 2018 April 3, 2018 10,000.00 9,900.00 9,312.08 9,312.08 587.916 5.94% 1 100.00% 100.00% 0.00% 9,312.08 9,312,084.03 8,015,630.85 10,000.0 10,000.0 147 Improvement/Concreting of Salvacion-San Vicente Road, Rosales, Pangasinan GAA 2018 Bid Out - March 13, 2018 120 270 Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky April 3, 2018 July 31, 2018 December 28, 2018 December 28, 2018 Rosales

18AI0060 147 45,000.00 1 1 1 February 22, 2018 March 16, 2018 March 26, 2018 March 27, 2018 April 3, 2018 45,000.00 44,550.00 42,335.67 42,335.67 2,214.334 4.97% 1 100.00% 100.00% 0.00% 42,335.67 42,335,572.36 36,260,358.92 45,000.0 45,000.0 148 Improvement/Concreting of Tumana-San Bartolome Road, Rosales, Pangasinan GAA 2018 For Bidding - March 16, 2018 150 375 EGB Construction Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky April 3, 2018 January 27, 2019 April 12, 2019 April 12, 2019 Rosales

18AI0176 148 10,000.00 1 1 1 September 29, 2017 October 23, 2017 January 30, 2018 January 31, 2018 February 7, 2018 10,000.00 9,900.00 9,444.17 9,444.17 9,444.16 455.826 4.60% 1 80.00% 100.00% 20.00% 9,444.17 9,444,174.40 7,554,032.62 8,000.0 10,000.0 149 Road Concreting at Barangay San Aurelio 2nd, Balungao, Pangasinan GAA 2018 NTP 165 Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky February 7, 2018 July 21, 2018 March 15, 2018 Balungao

18AI0036 149 1,000.00 1 1 1 February 7, 2018 February 27, 2018 March 19, 2018 March 20, 2018 March 27, 2018 1,000.00 1,000.00 975.77 975.77 24.233 2.42% 1 100.00% 100.00% 0.00% 975.77 975,767.04 975,767.04 1,000.0 1,000.0 150 Construction of MPB, Brgy. Cabalaongan Sur, Rosales, Pangasinan GAA 2018 Awaiting for NTP - March 27, 2018 60 ALCEL Construction Manuel Novencido Jr. Kenneth Nalapo Carren/Neil/Rocky March 27, 2018 May 25, 2018 May 25, 2018 Rosales

18AI0056 150 1,000.00 1 1 1 February 20, 2018 March 13, 2018 March 26, 2018 March 27, 2018 April 3, 2018 1,000.00 1,000.00 980.00 980.00 20.000 2.00% 1 100.00% 100.00% 0.00% 980.00 980,000.00 - 1,000.0 1,000.0 151 Construction of Multipurpose Building in San Nicolas, Pangasinan GAA 2018 Bid Out - March 13, 2018 60 180 Hipolito F. Melchor Kenneth Nalapo Melchor April 3, 2018 June 1, 2018 September 29, 2018 September 29, 2018 San Nicolas
Construction of Multipurpose Building in Tayug, Pangasinan
18AI0051 151 1,000.00 1 1 1 February 12, 2018 March 5, 2018 March 26, 2018 March 27, 2018 April 3, 2018 1,000.00 1,000.00 974.95 974.95 25.055 2.51% 1 100.00% 100.00% 0.00% 974.95 974,945.41 974,945.41 1,000.0 1,000.0 152 Construction of Multipurpose Building in Tayug, Pangasinan GAA 2018 For Bidding- March 5 , 2018 60 120 APP Construction and Supplies Hipolito F. Melchor Kenneth Nalapo Jhomille April 3, 2018 June 1, 2018 July 31, 2018 July 31, 2018 Tayug

18AI0043 152 2,000.00 1 1 1 February 9, 2018 February 28, 2018 March 19, 2018 March 20, 2018 March 27, 2018 2,000.00 1,980.00 1,920.79 1,920.79 59.209 2.99% 1 95.00% 100.00% 5.00% 1,920.79 1,920,790.72 1,711,424.53 1,900.0 2,000.0 153 Construction of Multipurpose Building in Umingan, Pangasinan GAA 2018 Awaiting for NTP - March 27, 2018 120 APP Construction and Supplies Menio Abarabar Kenneth Nalapo Alfredo/Lex March 27, 2018 July 24, 2018 July 15, 2018 Umingan

18AI0066 153 13,000.00 1 1 1 February 23, 2018 March 15, 2018 March 26, 2018 March 27, 2018 April 3, 2018 13,000.00 12,870.00 12,612.10 12,612.10 257.897 2.00% 1 80.00% 100.00% 20.00% 12,612.10 12,612,103.13 10,311,440.82 10,400.0 13,000.0 154 Construction of Multipurpose Building, Balungao, Pangasinan GAA 2018 Bid Out - March 5, 2018 210 Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky April 3, 2018 October 29, 2018 October 29, 2018 Balungao

154 10,000.00 1 1 1 February 28, 2018 March 19, 2018 March 26, 2018 March 27, 2018 April 3, 2018 10,000.00 9,900.00 9,800.38 9,800.38 99.615 1.01% 1 85.00% 100.00% 15.00% 9,800.98 9,800,384.64 8,293,279.19 8,500.0 10,000.0 155 Construction of Multi-Purpose Building, Brgy. Carmay East, Rosales, Pangasinan GAA 2018 For Bidding - March 19, 2018 180 210 Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky April 3, 2018 September 29, 2018 October 29, 2018 October 29, 2018
18AI0034

155 5,000.00 1 1 1 February 5, 2018 February 26, 2018 March 15, 2018 March 19, 2018 March 26, 2018 5,000.00 4,950.00 4,849.70 4,849.70 100.299 2.03% 1 100.00% 100.00% 0.00% 4,849.70 4,849,701.04 4,849,701.04 5,000.0 5,000.0 156 Construction of Multipurpose Building, Brgy. Lumayaw, San Quintin, Pangasinan GAA 2018 Awaiting for NTP - March 26, 2018 120 150 RPParayno Construction Victoria Bernabe Kenneth Nalapo Silver March 26, 2018 July 23, 2018 August 22, 2018 August 22, 2018 San Quintin
18AI0032

156 5,000.00 1 1 1 February 5, 2018 February 26, 2018 March 15, 2018 March 19, 2018 March 26, 2018 5,000.00 4,950.00 4,803.43 4,803.43 146.570 2.96% 1 100.00% 100.00% 0.00% 4,803.43 4,803,429.76 4,563,258.27 5,000.0 5,000.0 157 Construction of Multipurpose Building, Brgy. Trenchera, Tayug, Pangasinan GAA 2018 Awaiting for NTP - March 26, 2018 120 WJP Construction & Supply Hipolito F. Melchor Kenneth Nalapo Jhomille March 26, 2018 July 23, 2018 July 23, 2018 Tayug
18AI0033
Construction of Multipurpose Building, Rosales, Pangasinan
18AI0067 157 5,000.00 1 1 1 February 23, 2018 March 15, 2018 March 26, 2018 March 27, 2018 April 3, 2018 5,000.00 4,950.00 4,803.51 4,803.51 146.491 2.96% 1 75.00% 100.00% 25.00% 4,803.51 4,803,508.79 4,563,333.35 3,750.0 5,000.0 158 Construction of Multipurpose Building, Rosales, Pangasinan GAA 2018 For Bidding- March 15, 2018 150 210 WJP Construction & Supply Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky April 3, 2018 August 30, 2018 October 29, 2018 October 29, 2018 Rosales

18AI0177 158 5,000.00 1 1 1 October 30, 2017 November 20, 2017 February 19, 2018 February 23, 2018 March 2, 2018 5,000.00 4,950.00 4,803.26 4,803.26 146.740 2.96% 1 100.00% 100.00% 0.00% 4,803.26 4,803,259.67 4,563,096.69 5,000.0 5,000.0 159 Construction of Multipurpose Building, Sta. Maria, Pangasinan GAA 2018 NTP-March 2, 2018 120 2-R Construction and Supply Jennycyl Ginez Kenneth Nalapo Mike March 2, 2018 June 29, 2018 June 29, 2018 Sta. Maria

18AI0071 159 3,000.00 1 1 1 February 27, 2018 March 19, 2018 March 26, 2018 March 27, 2018 April 3, 2018 3,000.00 2,970.00 2,909.23 2,909.23 60.770 2.05% 1 100.00% 100.00% 0.00% 2,909.23 2,909,230.35 2,610,381.43 3,000.0 3,000.0 160 GAA 2018 For Bidding - March 19, 2018 150 180 Jennycyl Ginez Kenneth Nalapo Carren/Neil/Rocky April 3, 2018 August 30, 2018 September 29, 2018 September 29, 2018 Rosales

160 3,000.00 1 1 1 February 26, 2018 March 19, 2018 March 26, 2018 March 27, 2018 April 3, 2018 3,000.00 2,970.00 2,909.12 2,909.12 60.876 2.05% 1 0.50% 0.50% 0.00% 2,909.12 2,909,423.97 - 15.0 15.0 161 GAA 2018 For Bidding- March 19, 2018 150 210 Felipa Gatchalon Kenneth Nalapo Felix April 3, 2018 August 30, 2018 October 29, 2018 Asingan
18AI0069

18AI0334 161 3,000.00 1 1 1 September 14, 2018 2,908.12 2,908.12 (2,908.121) #DIV/0! 1 100.00% 100.00% 0.00% 2,908,120.91 2,762,714.86 3,000.0 3,000.0 162 GAA 2018 Under PDE 250 R.F. Jennycyl Ginez Silver October 22, 2018 February 13, 2018 February 13, 2019 Natividad

18AI0178 162 5,000.00 1 1 1 November 22, 2017 December 13, 2017 January 30, 2018 January 31, 2018 February 7, 2018 5,000.00 4,950.00 4,799.74 4,799.74 150.257 3.04% 1 100.00% 100.00% 0.00% 4,799.74 4,799,742.86 4,799,742.86 5,000.0 5,000.0 163 Concreting of Road, Brgy. Alo-O Carosalesan, Umingan, Pangasinan GAA 2018 NTP 115 WJP Construction and Supply Menio Abarabar Kenneth Nalapo Alfredo/Lex February 7, 2018 June 1, 2018 April 15, 2018 Umingan
Concreting of Roads at Carriedo, Tayug, Pangasinan
163 3,000.00 1 1 1 February 20, 2018 March 13, 2018 March 26, 2018 March 27, 2018 April 3, 2018 3,000.00 2,970.00 2,822.79 2,822.79 147.206 4.96% 1 100.00% 100.00% 0.00% 2,822.79 2,822,793.81 2,822,793.81 3,000.0 3,000.0 164 Concreting of Roads at Carriedo, Tayug, Pangasinan GAA 2018 Bid Out - March 13, 2018 75 135 JHI Construction and Supply Hipolito F. Melchor Kenneth Nalapo Jhomille April 3, 2018 June 16, 2018 August 15, 2018 August 15,2018 Tayug
18AI0057

164 3,000.00 1 1 1 February 1, 2018 March 13, 2018 March 26, 2018 March 27, 2018 April 3, 2018 3,000.00 2,970.00 2,903.71 2,903.71 66.294 2.23% 1 100.00% 100.00% 0.00% 2,903.71 2,903,699.19 2,903,699.19 3,000.0 3,000.0 165 Concreting of Road, Brgy. Baligayan, San Quintin, Pangasinan GAA 2018 Bid Out - March 13, 2018 75 105 Victoria Bernabe Kenneth Nalapo Silver April 3, 2018 June 16, 2018 July 16, 2018 July 15,2018 San Quintin
18AI0179
18AI0180 165 Concreting of Road, Brgy. Bantug, Umingan, Pangasinan 2,000.00 1 1 1 December 5, 2017 December 20, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,000.00 1,980.00 1,940.31 1,940.31 39.687 2.00% 1 100.00% 100.00% 0.00% 1,940.31 1,940,312.76 1,940,312.76 2,000.0 2,000.0 166 Concreting of Road, Brgy. Bantug, Umingan, Pangasinan GAA 2018 NTP 45 WJP Construction and Supply Menio Abarabar Kenneth Nalapo Alfredo/Lex February 7, 2018 March 23, 2018 March 15, 2018 Umingan
Concreting of Road, Brgy. Cadiz, Umingan, Pangasinan
18AI0181 166 3,000.00 1 1 1 November 17, 2017 December 8, 2017 February 19, 2018 February 23, 2018 March 2, 2018 3,000.00 2,970.00 2,895.76 2,895.76 74.237 2.50% 1 80.00% 100.00% 20.00% 2,895.76 2,895,763.30 2,895,763.30 2,400.0 3,000.0 167 Concreting of Road, Brgy. Cadiz, Umingan, Pangasinan GAA 2018 NTP=March 2, 2018 90 Jennycyl Ginez Kenneth Nalapo Alfredo/Lex March 2, 2018 May 30, 2018 March 30, 2018 Umingan

18AI0182 167 3,600.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 3,600.00 3,564.00 3,383.36 3,383.36 180.644 5.07% 1 100.00% 100.00% 0.00% 3,383.36 3,383,356.07 3,383,356.07 3,600.0 3,600.0 168 Concreting of Road, Brgy. Carosucan Sur, Asingan, Pangasinan GAA 2018 NTP 75 Felipa Gatchalon Kenneth Nalapo Mike February 7, 2018 April 22, 2018 April 22, 2018 Asingan

18AI0183 168 2,000.00 1 1 1 November 23, 2017 December 14, 2017 February 19, 2018 February 23, 2018 March 2, 2018 2,000.00 1,980.00 1,920.59 1,920.59 59.406 3.00% 1 100.00% 100.00% 0.00% 1,920.59 1,920,594.35 1,920,594.35 2,000.0 2,000.0 169 Concreting of Road, Brgy. Digap Fulgosino, Umingan, Pangasinan GAA 2018 NTP -March 2, 2018 45 R. Flores Construction Jennycyl Ginez Kenneth Nalapo Alfredo/Lex March 2, 2018 April 15, 2018 April 15, 2018 Umingan
Concreting of Road, Brgy. Don Justo, Umingan, Pangasinan
18AI0184 169 2,000.00 1 1 1 November 23, 2017 December 14, 2017 February 19, 2018 February 23, 2018 March 2, 2018 2,000.00 1,980.00 1,920.16 1,920.16 59.838 3.02% 1 100.00% 100.00% 0.00% 1,920.16 1,920,162.18 1,920,162.18 2,000.0 2,000.0 170 Concreting of Road, Brgy. Don Justo, Umingan, Pangasinan GAA 2018 NTP = March 2, 2018 45 R. Flores Construction Jennycyl Ginez Kenneth Nalapo Alfredo/Lex March 2, 2018 April 15, 2018 April 15, 2018 Umingan
Concreting of Road, Brgy. Dupac, Asingan, Pangasinan
170 2,400.00 1 1 1 November 23, 2017 December 14, 2017 January 30, 2018 January 31, 2018 February 7, 2018 2,400.00 2,376.00 2,258.40 2,258.40 117.596 4.95% 1 100.00% 100.00% 0.00% 2,258.40 2,258,361.45 2,258,361.45
18AI0185
31,500.00 295,365.17 2,371,822.24
Monitoring Engineer Chief, Construction Section District Engineer 2,371,822,240.85
2,371,822,240.85
708,417.88
1,749,035.09
2,457,452.97
LABEL
2,403,977.58
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation Program
Network Development Program
Bridge Program
.
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods 1,695,559.70
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

CONVERGENCE AND SPECIAL SUPPORT PROGRAM


Construction/ Improvement of Access Roads leading to Declared Tourism Destinations `
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

LOCAL PROGRAM
National Building Program
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Local Infrastructure Program

REGIONWIDE (START OF SUPPORT TO OPERATION)

PANG 3RD
OO1
74,326.0 3.0
378,084.0 9.0
198,000.0 9.0
OO2
451,000.0 27.0
763,121.0 35.0
Convergence
230,000.0 4.0

Local Program

220,000.0 10.0
284,000.0 87.0
- 2,598,531.0 184
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Project Monitoring Division
Region/District Implemented Projects
DPWH CY 2017 Infrastructure Program
As of August 31, 2018

PDE PRE-CONSTRUCTION RESULT OF BIDDING CONSTRUCTION FINANCIAL STATUS


Awarded Contract For Not Yet Started Projects For On-going Projects
TotalNumber of Projects Number of Projects APPROPRIATION ABC VARIANCE No. of Projects STATUS
Programmed Amount Amount
No. of
DISTRICT Amount Planned Actual No. Name of Projects

Completed

Completed

Completed
Orig. Revised

Date NTP
Active

On-going

On-going

On-going
Awarded
OBLIGATION DISBURSEMENT

Contract
Advertis

Approve

Slippage
Bidding
Pre-Bid
(P'000) Actual Original
Amount Amount Amount Amount Amount Sched Contract Contract Project Date

Date

Date

Date

Date
Proj

NYS

NYS

NYS
ed
(%) Accomp Fund Souce Remarks Contractor Expiry

d
(P'000) (P'000) (P'000) (P'000) (P'000) Accomp (%) Duration Duration Engineer Started
(%) Date
(cd) (cd)
Contract ID
PANG 3RD PANG Preventive
3RD Maintenance based on
Pavement Management System/
Carmen Jct-Manat Rd - K0179 + 712 - K0179 + Completed as of Highway Development and BET Construction&
16AI0252 1 3,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/3/2017 1 2/13/2017 1 2/23/2017 1 3/2/2017 3,000.00 2,940.00 2,865.84 2,865.84 74.165 2.52% 1 100.00% 100.00% 0.00% 2,865.84 3,000.0 3,000.0 1 completed 30 34 Bernabe 02-Mar-17 31-Mar-17
973 October 15,2017 Preventive Maintenance
Management-4 based onJct-
(HDM-4 Carmen Supply
Manat Rd -Management
Pavement K0179 + 712System/
- K0179 +
Villasis-Malasiqui-Sn Carlos Rd - K0177 + 128 - Highway
973 Development and
K0178 + 128, K0174 + -153 - K0174 + -067, Completed as of Management-4 (HDM-4 Villasis- BET Construction&
17AI0161 2 33,080.00 1 1 1 1 5/9/2017 1 5/16/2017 1 6/6/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 33,080.00 32,418.40 30,797.38 30,797.38 1,621.018 5.00% 1 100.00% 100.00% 0.00% 33,080.0 33,080.0 2 135 Menio 10-Jul-17 21-Nov-17
K0174 + 555 - K0175 + 000, K0175 + 520 - October 15,2017 Malasiqui-Sn Carlos Rd - K0177 + 128 Supply
K0176 + 000 - K0178 + 128, K0174 + -153 - K0174
+ -067, K0174 + 555 - K0175 + 000,
Binalonan-Asingan-Sta. Maria Road
Binalonan-Asingan-Santa Maria Rd - K0193 + 011 Completed as of K0175 + 520 - Reconstruction/
K0176 + 000 BET Construction&
17AI0028 3 7,343.00 1 1 1 1 2/9/2017 1 2/16/2017 1 2/28/2017 1 3/15/2017 1 3/24/2017 1 4/3/2017 7,343.00 7,196.14 6,891.06 6,891.06 305.080 4.24% 1 100.00% 100.00% 0.00% 6,891.06 7,343.0 7,343.0 3 Rehabilitation/
K0193+011 - K0193+046; K0193+046 46 Bernabe 03-Apr-17 18-May-17
- K0193 + 046, K0193 + 046 - K0193 + 932 October 15,2017 Upgrading of Damaged Paved National Supply
- K0193+932
Roads including drainage based on
Pavement Management System/
Villasis-Malasiqui-Sn Carlos Rd - K0180 + 241 - Completed as of
17AI0141 4 27,694.00 1 1 1 1 4/20/2017 1 4/27/2017 1 5/9/2017 1 5/23/2017 1 6/2/2017 1 6/11/2017 27,694.00 27,140.12 26,054.51 26,054.51 1,085.608 4.00% 1 100.00% 100.00% 0.00% 26,054.51 27,694.0 27,694.0 4 Highway Development and 129 TJ Velasco Reinoso 11-Jun-17 17-Oct-17
K0181 + 000, K0181 + 000 - K0181 + 148 October 15,2017
Management - 4 (HDM-4) Villasis-
Malasiqui-Sn Carlos Rd - K0180 + 241
Manila North Rd - K0189 + 873 - K0191 + 450, Completed as of - K0181North
Manila + 000, K0181
Road + 000 - K0181
K0189+873 -
17AI0142 5 37,427.00 1 1 1 1 4/20/2017 1 4/27/2017 1 5/9/2017 1 5/26/2017 1 6/5/2017 1 6/12/2017 37,427.00 36,678.46 34,863.58 34,863.58 1,814.876 4.95% 1 100.00% 100.00% 0.00% 34,863.58 37,427.0 37,427.0 5 + 148 129 TJ Velasco Piano 12-Jun-17 18-Oct-17
K0199 + 300 - K0199 + 950 October 15,2017 K0191+450; K0199+300 - K0199+950

Manila North Rd - K0177 + 816 - K0178 + 298, Manila North Rd - K0177 + 816 -
Completed as of
17AI0137 6 K0179 + 057 - K0179 + 913, K0180 + 035 - 27,129.00 1 1 1 1 4/18/2017 1 4/25/2017 1 5/8/2017 1 5/26/2017 1 6/5/2017 1 6/12/2017 27,129.00 26,586.42 25,518.12 25,518.12 1,068.295 4.02% 1 100.00% 100.00% 0.00% 25,518.12 27,129.0 27,129.0 6 K0178 + 298, K0179 + 057 - K0179 + 180 TJ Velasco Manongsong 12-Jun-17 08-Dec-17
October 15,2017
K0180 + 178 913, K0180 + 035 - K0180 + 178
Manila North Rd including RROW - K0172 + 000 - Completed as of Manila North Road K0172+000 - BET Construction &
17AI0018 7 11,000.00 1 1 1 1 1/19/2017 1 1/26/2017 1 2/8/2017 1 3/6/2017 1 3/15/2017 1 3/22/2017 11,000.00 7,180.00 6,828.97 6,828.97 351.026 4.89% 1 100.00% 100.00% 0.00% 6,828.97 11,000.0 11,000.0 7 90 Novencido 22-Mar-17 19-Jun-17
K0172 + 552 October 15,2017 K0172+552 Supply
Binalonan-Asingan-Santa Maria Road - K0190 + Binalonan-Asingan-Sta.Maria Road
Completed as of BET Construction &
17AI0016 8 (-247) - K0190 + (-117), K0190 + 607 - K0190 + 10,528.00 1 1 1 1 1/17/2017 1 1/24/2017 1 2/6/2017 1 3/6/2017 1 3/15/2017 1 3/22/2017 10,528.00 4,933.44 4,746.50 4,746.50 186.939 3.79% 1 100.00% 100.00% 0.00% 4,746.50 10,528.0 10,528.0 8 K0190+(-247) - K0190+(-117) 90 Manongsong 22-Mar-17 19-Jun-17
October 15,2017 Supply
707 ;K0190+607 - K0190+707
Completed as of Villasis By-Pass Road incl ROW
17AI0096 9 Villasis By-Pass Road incl. ROW, Pangasinan 49,500.00 1 1 1 1 3/28/2017 1 4/4/2017 1 4/19/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 49,500.00 45,570.00 43,647.58 43,647.58 1,922.420 4.22% 1 100.00% 100.00% 0.00% 4,746.50 49,500.0 49,500.0 9 318 Alcel Construction Novencido 11-May-17 24-Mar-18
October 15,2017 Pangasinan
Bacag Br. (B00724LZ) along Manila North Rd Completed as of Bacag Br. (B00724LZ) along Manila
17AI0019 10 25,000.00 1 1 1 1 1/19/2017 1 1/26/2017 1 2/22/2017 1 3/21/2017 1 3/31/2017 1 4/10/2017 25,000.00 23,561.90 22,855.04 22,855.04 706.857 3.00% 1 100.00% 100.00% 0.00% 22,855.04 25,000.0 25,000.0 10 245 Aqiino-dela Cruz E/C Menio 10-Apr-17 10-Dec-17
(Phase II) October 15,2017 North Rd (Phase II)
Mitura Br. (B00726LZ) along Manila North Rd Completed as of Mitura Br. (B00726LZ) along Manila Aqiino-dela Cruz
16AI0263 11 26,500.00 1 1 1 1 12/15/2016 1 12/22/2016 1 1/13/2017 1 2/24/2017 1 3/6/2017 1 3/13/2017 26,500.00 25,870.00 25,190.43 25,190.43 679.566 2.63% 1 100.00% 100.00% 0.00% 25,190.43 26,500.0 26,500.0 11 259 Manongsong 13-Mar-17 26-Nov-17
(Phase II) October 15,2017 North Rd (Phase II) E/C
Bobonan Br. (B00733LZ) along Manila North Rd Completed as of Bobonan Br. (B00733LZ) along Manila Aqiino-dela Cruz
17AI0017 12 14,750.00 1 1 1 1 1/17/2017 1 1/24/2017 1 2/6/2017 1 2/28/2017 1 3/10/2017 1 3/20/2017 14,750.00 14,455.00 13,731.91 13,731.91 723.090 5.00% 1 100.00% 100.00% 0.00% 13,731.91 14,750.0 14,750.0 12 165 Manongsong 20-Mar-17 31-Aug-17
(Phase II) October 15,2017 North Rd (Phase II) E/C
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control-
Flood Control-Heightening of Villasis- AC Soliven
Heightening of Villasis-Alcala Earthdike-Phase 1, Completed as of
17AI0005 13 45,600.00 1 1 1 1 1/4/2017 1 1/11/2017 1 1/30/2017 1 2/24/2017 1 3/6/2017 1 3/13/2017 45,600.00 44,688.00 43,009.20 43,009.20 1,678.801 3.76% 1 100.00% 100.00% 0.00% 43,009.20 6,451.38 45,600.0 45,600.0 13 Alcala Earthdike-Phase 1, Agno River 170 Construction and Novencido 13-Mar-17 29-Aug-17
Agno River Control, Brgy. Gualsic, Alcala, October 15,2017
Control, Brgy. Gualsic, Alcala, Gen Mdse
Pangasinan
Pangasinan 5th LD
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control- Flood Control-Heightening of Villasis- AC Soliven
Completed as of
17AI0003 14 Heightening of Villasis-Alcala Earthdike, Agno 30,000.00 1 1 1 1 1/4/2017 1 1/11/2017 1 2/3/2017 1 2/24/2017 1 3/6/2017 1 3/13/2017 30,000.00 29,400.00 27,928.38 27,928.38 1,471.618 5.01% 1 100.00% 100.00% 0.00% 27,928.82 18,382.80 30,000.0 30,000.0 14 Alcala Earthdike, Agno River Control, completed 163 Construction and Novencido 13-Mar-17 22-Aug-17
October 15,2017
River Control, Brgy. Curareng, Alcala, Pangasinan Brgy. Curareng, Alcala, Pangasinan Gen Mdse
5th LD
Agno River Basin Flood Control
Agno River Basin Flood Control Project-
Project- Rehabilitation of Alcala-
Rehabilitation of Alcala-Bautista Earthdike (Left Completed as of BET Construction &
17AI0002 15 50,000.00 1 1 1 1 1/4/2017 1 1/11/2017 1 2/3/2017 1 2/28/2017 1 3/10/2017 1 3/20/2017 50,000.00 49,000.00 46,602.43 46,602.43 2,397.567 4.89% 1 100.00% 100.00% 0.00% 46,602.43 50,000.0 50,000.0 15 Bautista Earthdike (Left Dike) (with 184 Flores 20-Mar-17 19-Sep-17
Dike) (with exception) , Phase II, Alcala-Bautista, October 15,2017 Supply
exception) , Phase II, Alcala-Bautista,
Pangasinan
Pangasinan 5th LD
Rehabilitation of Alcala-Bautista
Rehabilitation of Alcala-Bautista Earthdike (Right
Earthdike (Right Dike) (with
Dike) (with exception), Agno River Basin Flood Completed as of BET Construction &
17AI0001 16 50,000.00 1 1 1 1 1/4/2017 1 1/11/2017 1 2/3/2017 1 2/28/2017 1 3/10/2017 1 3/20/2017 50,000.00 49,000.00 46,809.79 46,809.79 2,190.205 4.47% 1 100.00% 100.00% 0.00% 46,809.79 50,000.0 50,000.0 16 exception), Agno River Basin Flood 184 Flores 20-Mar-17 19-Sep-17
Control Project, Phase II, Alcala-Bautista, October 15,2017 Supply
Control Project, Phase II, Alcala-
Pangasinan
Bautista, Pangasinan 5th LD
Rehabilitation of Agno River Basin Flood Control Rehabilitation of Agno River Basin
Completed as of BET Construction &
17AI0023 17 Project - Phase II, Brgy. Vacante, Bautista, 20,000.00 1 1 1 1 1/26/2017 1 2/2/2017 1 2/14/2017 1 3/6/2017 1 3/15/2017 1 3/22/2017 20,000.00 19,600.00 18,751.92 18,751.92 848.079 4.33% 1 100.00% 100.00% 0.00% 18,751.92 20,000.0 20,000.0 17 Flood Control Project - Phase II, Brgy. 152 Piano 22-Mar-17 20-Aug-17
October 15,2017 Supply
Pangasinan Vacante, Bautista, Pangasinan 5th LD
Construction/Extension of Bank
Construction/Extension of Bank Protection, Agno
Completed as of Protection, Agno River Basin Flood
17AI0004 18 River Basin Flood Control Project - Phase II, 20,000.00 1 1 1 1 1/4/2017 1 1/11/2017 1 2/3/2017 1 2/28/2017 1 3/10/2017 1 3/20/2017 20,000.00 19,600.00 18,705.34 18,705.34 894.664 4.56% 1 100.00% 100.00% 0.00% 18,705.34 20,000.0 20,000.0 18 152 MCB C/S Piano 20-Mar-17 18-Aug-17
October 15,2017 Control Project - Phase II, Brgy.
Brgy. Nibaliw, Bautista, Pangasinan
Nibaliw, Bautista, Pangasinan 5th LD
Agno River Basin Flood Control
Agno River Basin Flood Control Project-
Project-Construction of Slope
Construction of Slope Protection Works along Completed as of BET Construction &
17AI0031 19 50,000.00 1 1 1 1 1/24/2017 1 3/3/2017 1 3/20/2017 1 3/24/2017 1 3/31/2017 1 4/10/2017 50,000.00 49,000.00 46,739.70 46,739.70 2,260.303 4.61% 1 80.37% 100.00% 19.63% 46,739.70 40,185.0 50,000.0 19 Protection Works along Agno River, 184 Piano 10-Apr-17 10-Oct-17
Agno River, Vacante-Pogo-Diaz Section, Bautista, October 15,2017 Supply
Vacante-Pogo-Diaz Section, Bautista,
Pangasinan
Pangasinan 5th LD
Construction of 1-Unit 4 Classroom
Construction of 1-Unit 4 Classroom School
Completed as of School Building at Pasileng Elementary
17AI0133 20 Building at Pasileng Elementary School, Brgy. 3,100.00 1 1 1 1 4/11/2017 1 4/18/2017 1 5/3/2017 1 5/10/2017 1 5/19/2017 1 5/29/2017 3,100.00 3,069.00 2,973.86 2,973.86 95.139 3.10% 1 100.00% 100.00% 0.00% 2,973.86 3,100.0 3,100.0 20 105 Mightyway C/S Bascos 29-May-17 10-Sep-17
October 15,2017 School, Brgy. Pasileng, Binalonan,
Pasileng, Binalonan, Pangasinan
Pangasinan
Repair/Improvement of One (1) Unit,
Repair/Improvement of One (1) Unit, Six (6) CL
Completed as of Six (6) CL SB at San Blas Elementary
17AI0088 21 SB at San Blas Elementary School, Brgy. San 2,400.00 1 1 1 1 3/27/2017 1 4/3/2017 1 4/18/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 2,400.00 2,376.00 2,347.53 2,347.53 28.470 1.20% 1 100.00% 100.00% 0.00% 2,347.53 2,400.0 2,400.0 21 120 Safeway Construction Bascos 11-May-17 07-Sep-17
October 15,2017 School, Brgy. San Blas, Villasis,
Blas, Villasis, Pangasinan
Pangasinan
Repair/Improvement of Pindangan
Repair/Improvement of Pindangan National High
Completed as of National High School Multi-Purpose BET Construction &
17AI0143 22 School Multi-Purpose Building, Brgy. Pindangan, 2,700.00 1 1 1 1 4/26/2017 1 5/3/2017 1 5/15/2017 1 5/25/2017 1 6/2/2017 1 6/11/2017 2,700.00 2,673.00 2,619.57 2,619.57 53.430 2.00% 1 100.00% 100.00% 0.00% 2,619.57 2,700.0 2,700.0 22 90 Bascos 11-Jun-17 08-Sep-17
October 15,2017 Building, Brgy. Pindangan, Alcala, Supply
Alcala, Pangasinan
Pangasinan
Construction of Multi-Purpose Gym w/
Construction of Multi-Purpose Gym w/ Stage at
Completed as of Stage at Baluyot National High BET Construction &
17AI0051 23 Baluyot National High School , Brgy. Baluyot, 2,000.00 1 1 1 1 3/10/2017 1 3/17/2017 1 3/30/2017 1 4/19/2017 1 4/28/2017 1 5/8/2017 2,000.00 1,980.00 1,905.21 1,905.21 74.789 3.78% 1 100.00% 100.00% 0.00% 1,905.21 2,000.0 2,000.0 23 75 Flores 08-May-17 21-Jul-17
October 15,2017 School , Brgy. Baluyot, Bautista, Supply
Bautista, Pangasinan
Pangasinan
Construction of Multi-Purpose Hall at Nibaliw Sur Construction of Multi-Purpose Hall at
Completed as of BET Construction &
17AI0106 24 Elementary School , Brgy. Nibaliw Sur, Bautista, 2,000.00 1 1 1 1 3/31/2017 1 4/7/2017 1 4/20/2017 1 4/15/2017 1 5/4/2017 1 5/11/2017 2,000.00 1,980.00 1,948.71 1,948.71 31.294 1.58% 1 100.00% 100.00% 0.00% 1,948.71 2,000.0 2,000.0 24 Nibaliw Sur Elementary School , Brgy. 75 Bascos 11-May-17 24-Jul-17
October 15,2017 Supply
Pangasinan Nibaliw Sur, Bautista, Pangasinan

Construction of Multi-Purpose Covered Court AT Construction of Multi-Purpose Covered


Completed as of BET Construction &
17AI0109 25 Diaz Elementary School , Brgy. Diaz, Bautista, 2,000.00 1 1 1 1 3/31/2017 1 4/7/2017 1 5/31/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 2,000.00 1,980.00 1,919.56 1,919.56 60.435 3.05% 1 100.00% 100.00% 0.00% 1,919.56 2,000.0 2,000.0 25 Court AT Diaz Elementary School , 75 Bascos 10-Jul-17 22-Sep-17
October 15,2017 Supply
Pangasinan Brgy. Diaz, Bautista, Pangasinan

Construction of 2 Units Multi-Purpose


Construction of 2 Units Multi-Purpose Bluilding
Completed as of Bluilding (Day Care and Health BET Construction &
17AI0108 26 (Day Care and Health Centers), Brgy. Poblacion 2,000.00 1 1 1 1 3/31/2017 1 4/7/2017 1 4/20/2017 1 5/26/2017 1 6/5/2017 1 6/12/2017 2,000.00 1,980.00 1,932.67 1,932.67 47.331 2.39% 1 100.00% 100.00% 0.00% 1,932.67 2,000.0 2,000.0 26 75 Bascos 12-Jun-17 25-Aug-17
October 15,2017 Centers), Brgy. Poblacion West, Alcala, Supply
West, Alcala, Pangasinan
Pangasinan
Concreting of Brgy.Sumabnit Road,
Concreting of Brgy.Sumabnit Road, Brgy. Completed as of
17AI0159 27 6,400.00 1 1 1 1 5/5/2017 1 5/12/2017 1 5/24/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 6,400.00 6,336.00 6,085.86 6,085.86 250.137 3.95% 1 100.00% 100.00% 0.00% 6,400.0 6,400.0 27 Brgy. Sumambit, Binalonan, Mightyway C/S Bascos
Sumambit, Binalonan, Pangasinan October 15,2017
Pangasinan
Concreting of Brgy.Bued Road, Brgy. Bued, Completed as of Concreting of Brgy.Bued Road, Brgy.
17AI0160 28 2,300.00 1 1 1 1 5/5/2017 1 5/12/2017 1 5/24/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 2,300.00 2,277.00 2,185.92 2,185.92 91.080 4.00% 1 100.00% 100.00% 0.00% 2,300.0 2,300.0 28 Safeway Construction Bascos
Binalonan, Pangasinan October 15,2017 Bued, Binalonan, Pangasinan
Concreting of Sugcong Road, Brgy. Sugcong, Completed as of Concreting of Sugcong Road, Brgy. Scheduled for Bidding
17AI0211 29 4,300.00 1 1 1 1 7/12/2017 1 7/19/2017 1 7/31/2017 1 8/18/2017 1 8/25/2017 1 8/29/2017 4,300.00 4,040.89 4,040.89 (4,040.887) 1 100.00% 100.00% 0.00% 4,040.89 4,300.0 4,300.0 29
Urdaneta, Pangasinan October 15,2017 Sugcong, Urdaneta, Pangasinan 7/21/2017
Rehabilitation of Nancasayan-Palina Rd, Rehabilitation of Nancasayan-Palina
Completed as of Scheduled for Bidding
17AI0235 30 Sto.Domingo Section, Brgy. Sto. Domingo, 4,000.00 1 1 1 1 7/12/2017 1 7/19/2017 1 7/31/2017 1 9/19/2017 1 9/28/2017 1 9/29/2017 4,000.00 3,960.00 3,758.14 3,758.14 201.860 5.10% 1 100.00% 100.00% 0.00% 3,758.14 4,000.0 4,000.0 30 Rd, Sto.Domingo Section, Brgy. Sto.
October 15,2017 7/21/2018
Urdaneta, Pangasinan Domingo, Urdaneta, Pangasinan
Concreting of Sitio Baong and
Concreting of Sitio Baong and Namalutan, Brgy. Completed as of
17AI0126 31 2,000.00 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 2,000.00 1,980.00 1,880.98 1,880.98 99.024 5.00% 1 100.00% 100.00% 0.00% 1,880.98 2,000.0 2,000.0 31 Namalutan, Brgy. Canarvacanan, 45 WJP C/S Bascos 21-May-17 04-Jul-17
Canarvacanan, Alcala, Pangasinan October 15,2017
Alcala, Pangasinan

Concreting of San Pedro III Road, Brgy. San Completed as of Concreting of San Pedro III Road,
17AI0125 32 2,000.00 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 2,000.00 1,980.00 1,880.98 1,880.98 99.023 5.00% 1 100.00% 100.00% 0.00% 1,880.98 2,000.0 2,000.0 32 completed 45 WJP C/S Bascos 21-May-17 04-Jul-17
Pedro Ili, Alcala, Pangasinan October 15,2017 Brgy. San Pedro Ili, Alcala, Pangasinan

Concreting of Diaz-Pogo Barangay Road, Brgy. Completed as of Concreting of Diaz-Pogo Barangay


17AI0124 33 6,750.00 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/10/2017 1 5/19/2017 1 5/29/2017 6,750.00 6,682.50 6,348.38 6,348.38 334.125 5.00% 1 100.00% 100.00% 0.00% 6,348.38 6,750.0 6,750.0 33 90 Mightyway C/S Ginez 29-May-17 26-Aug-17
Diaz, Bautista, Pangasinan October 15,2017 Road, Brgy. Diaz, Bautista, Pangasinan

Concreting of Barangay Road, Sitio


Concreting of Barangay Road, Sitio Namulaan Completed as of
17AI0123 34 3,000.00 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/10/2017 1 5/19/2017 1 5/29/2017 3,000.00 2,970.00 2,821.50 2,821.50 148.500 5.00% 1 100.00% 100.00% 0.00% 2,821.50 3,000.0 3,000.0 34 Namulaan Sur, Brgy. Diaz, Bautista, 60 Mightyway C/S Bascos 29-May-17 27-Jul-17
Sur, Brgy. Diaz, Bautista, Pangasinan October 15,2017
Pangasinan
Rehabilitation of Vacante-Diaz Road
Rehabilitation of Vacante-Diaz Road Dike, Brgy. Completed as of BET Construction
16AI0269 35 3,050.00 1 1 1 1 12/27/2016 1 1/3/2017 1 1/17/2017 1 2/13/2017 1 2/23/2017 1 3/2/2017 3,050.00 3,980.00 2,893.71 2,893.71 1,086.295 27.29% 1 100.00% 100.00% 0.00% 2,893.71 3,050.0 3,050.0 35 Dike, Brgy. Vacante, Bautista, completed 70 Bascos 02-Mar-17 10-May-17
Vacante, Bautista, Pangasinan October 15,2017 and Supply
Pangasinan
Bakit-Bakit Jct-Umingan Rd K0179 +
Bakit-Bakit Jct-Umingan Rd - K0179 + 382 -
Completed as of 382 - K0180 + 000; K0188 + 637 -
17AI0022 36 K0180 + 000, K0188 + 637 - K0189 + 000, 15,000.00 1 1 1 1 1/20/2017 1 1/27/2017 1 2/9/2017 1 3/9/2017 1 3/17/2017 1 3/27/2017 15,000.00 14,700.00 14,001.72 14,001.72 698.285 4.75% 1 100.00% 100.00% 0.00% 14,001.72 15,000.0 15,000.0 36 73 Alphin T/C 27-Mar-17 07-Jun-17
October 15,2017 K0189 + 000; K0202+513 -
K0202 + 513 - K0203 + 538
K0203+538
Oriental Sales
Pangasinan-Nueva Vizcaya Road - K0172 + 000 - Completed as of Pangasinan-Nueva Vizcaya Road
16AI0253 37 19,864.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/6/2017 1 1/31/2017 1 2/9/2017 1 2/16/2017 19,864.00 19,466.72 18,698.30 18,698.30 768.421 3.95% 1 100.00% 100.00% 0.00% 18,875.66 18,875.66 19,864.0 19,864.0 37 completed 76 Center and 16-Feb-17 02-May-17
K0173 + 195 October 15,2017 K0172+000 - K0173+195
Contractor
Sn Nicolas-Natividad-Sn Quintin-
Sn Nicolas-Natividad-Sn Quintin-Umingan-Guimba
Umingan-Guimba Rd K0205 + 431 -
Rd - K0205 + 431 - K0205 + 675, K0212 + 313 - Completed as of
17AI0104 38 12,000.00 1 1 1 1 3/29/2017 1 4/5/2017 1 4/20/2017 1 5/25/2017 1 6/2/2017 1 6/11/2017 12,000.00 11,760.00 11,171.66 11,171.66 588.343 5.00% 1 100.00% 100.00% 0.00% 11,171.66 12,000.0 12,000.0 38 K0205 + 675; K0212 + 313 - K0212 + 63 2-R C/S 11-Jun-17 12-Aug-17
K0212 + 812, K0213 + 897 - K0213 + 1000, October 15,2017
812; K0213 + 897 - K0213 + 1000;
K0214 + 433 - K0215 + 037
K0214 + 433 - K0215 + 037
Bakit-Bakit Jct-Umingan Rd
Bakit-Bakit Jct-Umingan Rd - K0189 + 200 -
Completed as of K0189+200 - K0189+600; K0197+700 Aquino-dela Cruz
16AI0267 39 K0189 + 600, K0197 + 700 - K0198 + 300, 29,536.00 1 1 1 1 12/15/2016 1 12/22/2016 1 1/9/2017 1 3/24/2017 1 3/31/2017 1 4/9/2017 29,536.00 28,945.28 27,844.33 27,844.33 1,100.947 3.80% 1 100.00% 100.00% 0.00% 27,844.33 29,536.0 29,536.0 39 192 Flores 09-Apr-17 17-Oct-17
October 15,2017 - K0198+300; K0200+000 - E/C
K0200 + 000 - K0200 + 137
K0200+137

Bakit-Bakit Jct-Umingan Rd - K0181 + 067, Completed as of Bakit-Bakit Jct-Umingan Road


17AI0070 40 11,884.00 1 1 1 1 3/22/2017 1 3/29/2017 1 4/11/2017 1 5/25/2017 1 6/2/2017 1 6/11/2017 11,884.00 11,646.32 11,066.88 11,066.88 579.443 4.98% 1 100.00% 100.00% 0.00% 11,066.88 11,884.0 11,884.0 40 96 JHI C/S Hipolito 11-Jun-17 14-Sep-17
K0202 + 265 - K0203 + 120 October 15,2017 K0181+067; K0202+265 - K0203+120
Completed as of Manila North Rd K0170 + 458 -
17AI0103 41 Manila North Rd - K0170 + 458 - K0171 + 120 6,782.00 1 1 1 1 3/29/2017 1 4/5/2017 1 5/5/2017 1 5/25/2017 1 6/5/2017 1 6/12/2017 6,782.00 6,646.36 6,307.40 6,307.40 338.964 5.10% 1 100.00% 100.00% 0.00% 6,307.40 6,782.0 6,782.0 41 60 WJP C/S Novencido 12-Jun-17 10-Aug-17
October 15,2017 K0171 + 120
Pangasinan-Nueva Vizcaya Rd - K0175 + 000 - Completed as of Pangasinan-Nueva Vizcaya Rd K0175
17AI0021 42 6,574.00 1 1 1 1 1/19/2017 1 1/26/2017 1 2/8/2017 1 3/21/2017 1 3/31/2017 1 4/10/2017 6,574.00 6,442.52 6,128.55 6,128.55 313.965 4.87% 1 100.00% 100.00% 0.00% 6,128.55 6,574.0 6,574.0 42 72 Alphin T/C Tandoc 10-Apr-17 20-Jun-17
K0175 + 669 October 15,2017 + 000 - K0175 + 669
Pangasinan-Nueva Ecija Road
Pangasinan-Nueva Ecija Rd - K0180 + 417 - Completed as of
17AI0030 43 49,500.00 1 1 1 1 2/10/2017 1 2/17/2017 1 3/2/2017 1 3/15/2017 1 3/24/2017 1 4/3/2017 49,500.00 49,500.00 46,372.49 46,372.49 3,127.512 6.32% 1 100.00% 100.00% 0.00% 46,372.49 49,500.0 49,500.0 43 K0180+417 - K0181+745; K0183+929 300 APB Construction Hipolito 03-Apr-17 27-Jan-18
K0181 + 745, K0183 + 929 - K0184 + 062 October 15,2017
- K0184+062
Binalonan-Asingan-Sta. Maria Road Oriental Sales
Binalonan-Asingan-Santa Maria Rd - K0195 + 042 Completed as of
17AI0102 44 49,040.00 1 1 1 1 3/29/2017 1 4/5/2017 1 4/20/2017 1 5/25/2017 1 6/2/2017 1 6/11/2017 49,040.00 45,059.20 43,143.96 43,143.96 1,915.236 4.25% 1 100.00% 100.00% 0.00% 43,143.96 49,040.0 49,040.0 44 K0195+042 - K0196+040; K0196+850 162 Center and Hipolito 11-Jun-17 19-Nov-17
- K0196 + 040, K0196 + 850 - K0197 + 750 October 15,2017
- K0197+750 Contractor
Pangasinan-Nueva Ecija Road - K0186 + 003 - Completed as of Pangasinan-Nueva Ecija Road
17AI0040 45 10,167.00 1 1 1 1 3/10/2017 1 3/17/2017 1 5/3/2017 1 5/25/2017 1 6/2/2017 1 6/11/2017 10,167.00 9,963.00 9,520.23 9,520.23 442.767 4.44% 1 100.00% 100.00% 0.00% 9,520.23 10,167.0 10,167.0 45 162 Arcinue Commercial Hipolito 11-Jun-17 19-Nov-17
K0186 + 496 October 15,2017 K0186+003 - K0186+496
Primicias Br. 1 (B00838LZ) along San
Primicias Br. 1 (B00838LZ) along Sn Nicolas- Completed as of
17AI0020 46 7,500.00 1 1 1 1 1/19/2017 1 1/26/2017 1 3/17/2017 1 3/24/2017 1 3/31/2017 1 4/9/2017 7,500.00 7,350.00 7,104.58 7,104.58 245.417 3.34% 1 100.00% 100.00% 0.00% 7,104.58 7,500.0 7,500.0 46 Nicolas-Natividad-San Quintin- 150 Alphin T/C Hipolito 09-Apr-17 05-Sep-17
Natividad-Sn Quintin-Umingan-Guimba Rd October 15,2017
Umingan -Guimba Road
Mitura Br. (B01622LZ) along Binalonan-Asingan- Completed as of Mitura Br. (B01622LZ) along
16AI0264 47 32,000.00 1 1 1 1 3/20/2017 1 3/27/2017 1 4/10/2017 1 4/25/2017 1 5/4/2017 1 5/12/2017 32,000.00 31,360.00 30,105.04 30,105.04 1,254.963 4.00% 1 100.00% 100.00% 0.00% 30,105.04 32,000.0 32,000.0 47 309 Aquino-dela Cruz E/C Hipolito 12-May-17 16-Mar-18
Santa Maria Rd October 15,2017 Binalonan-Asingan-Sta. Maria Road
Primicias Br. 2 (B01948LZ) along San
Primicias Br. 2 (B00841LZ) along Sn Nicolas- Completed as of
17AI0060 48 6,000.00 1 1 1 1 3/15/2017 1 3/22/2017 1 4/5/2017 1 4/24/2017 1 5/3/2017 1 5/11/2017 6,000.00 5,880.00 5,644.66 5,644.66 235.341 4.00% 1 100.00% 100.00% 0.00% 5,644.66 6,000.0 6,000.0 48 Nicolas-Natividad-san Quintin- 144 Alphin T/C Hipolito 11-May-17 01-Oct-17
Natividad-Sn Quintin-Umingan-Guimba Rd October 15,2017
Umingan-Guimba Road
Agbayani Br. 3 (B01952LZ) along San
Agbayani Br. 3 (B01952LZ) along Sn Nicolas- Completed as of
17AI0015 49 7,500.00 1 1 1 1 1/17/2017 1 1/24/2017 1 3/3/2017 1 3/24/2017 1 3/31/2017 1 4/9/2017 7,500.00 7,223.23 6,933.77 6,933.77 289.465 4.01% 1 100.00% 100.00% 0.00% 6,933.77 7,500.0 7,500.0 49 Nicolas-Natividad-san Quintin- 150 JHI C/S Hipolito 09-Apr-17 05-Sep-17
Natividad-Sn Quintin-Umingan-Guimba Rd October 15,2017
Umingan-Guimba Road
Rodriguez Br. (B00876LZ) along Bakit-Bakit Jct- Completed as of Rodriguez Br. (B00876LZ) along Bakit- Scheduled for Bidding
17AI0152 50 8,000.00 1 1 1 1 7/12/2017 1 7/19/2017 1 7/31/2017 1 8/18/2017 1 8/25/2017 1 8/29/2017 8,000.00 7,329.04 6,962.55 6,962.55 366.495 5.00% 1 100.00% 100.00% 0.00% 6,962.55 8,000.0 8,000.0 50 29-Aug-17
Umingan Rd October 15,2017 Bakit Jct-Umingan Rd 7/21/2017
San Aurelio Br. 1 (B00883LZ) along Bakit-Bakit Completed as of San Aurelio Br. 1 (B00883LZ) along
17AI0101 51 18,000.00 1 1 1 1 3/28/2017 1 4/4/2017 1 4/19/2017 1 5/26/2017 1 6/5/2017 1 6/12/2017 18,000.00 17,640.00 17,132.71 17,132.71 507.287 2.88% 1 100.00% 100.00% 0.00% 17,132.71 18,000.0 18,000.0 51 182 Kenwood C/E Hipolito 12-Jun-17 10-Dec-17
Jct-Umingan Rd October 15,2017 Bakit-Bakit Jct-Umingan Rd
Udiao Br. 1 (B04494LZ) along Bakit-Bakit Jct- Completed as of Udiao Br. 1 (B04494LZ) along Bakit-
17AI0100 52 18,000.00 1 1 1 1 3/28/2017 1 4/4/2017 1 4/19/2017 1 5/26/2017 1 6/5/2017 1 6/12/2017 18,000.00 17,640.00 17,147.51 17,147.51 492.495 2.79% 1 100.00% 100.00% 0.00% 17,147.51 18,000.0 18,000.0 52 182 Kenwood C/E Hipolito 12-Jun-17 10-Dec-17
Umingan Rd October 15,2017 Bakit Jct-Umingan Rd
Udiao Br. (B00751LZ) along Pangasinan-Nueva Completed as of Udiao Br. (B00751LZ) along Kenwood C/E /
17AI0069 53 18,000.00 1 1 1 1 3/20/2017 1 3/27/2017 1 4/10/2017 1 4/25/2017 1 5/4/2017 1 5/12/2017 18,000.00 17,640.00 16,934.38 16,934.38 705.621 4.00% 1 100.00% 100.00% 0.00% 16,934.38 18,000.0 18,000.0 53 182 Bascos 12-May-17 09-Nov-17
Ecija Rd October 15,2017 Pangasinan-Nueva Ecija Rd WJP C/S (JV)
Barangobong Br. (B00739LZ) along Pangasinan- Completed as of Barangobong Br. (B00739LZ) along
16AI0265 54 18,500.00 1 1 1 1 3/20/2017 1 3/27/2017 1 4/10/2017 1 4/25/2017 1 5/4/2017 1 5/12/2017 18,500.00 18,130.00 16,332.24 16,332.24 1,797.759 9.92% 1 100.00% 100.00% 0.00% 16,332.24 18,500.0 18,500.0 54 259 Aquino-dela Cruz E/C Hipolito 12-May-17 25-Jan-18
Nueva Vizcaya Rd October 15,2017 Pangasinan-Nueva Vizcaya Rd
Cariño Br. (B00741LZ) along Pangasinan-Nueva Completed as of Cariño Br. (B00741LZ) along Scheduled for Bidding
17AI0105 55 8,000.00 1 1 1 1 7/12/2017 1 7/19/2017 1 7/31/2017 1 8/18/2017 1 8/25/2017 1 8/29/2017 8,000.00 7,721.18 7,447.93 7,447.93 273.242 3.54% 1 100.00% 100.00% 0.00% 7,447.93 8,000.0 8,000.0 55 150 29-Aug-17 25-Jan-18
Vizcaya Rd October 15,2017 Pangasinan-Nueva Vizcaya Rd 7/21/2017
Bitong Br. (B00744LZ) along Pangasinan-Nueva Completed as of Bitong Br. (B00744LZ) along
17AI0063 56 18,000.00 1 1 1 1 3/17/2017 1 3/24/2017 1 4/6/2017 1 4/24/2017 1 5/3/2017 1 5/11/2017 18,000.00 16,002.68 15,362.44 15,362.44 640.236 4.00% 1 100.00% 100.00% 0.00% 15,362.44 18,000.0 18,000.0 56 182 Aquino-dela Cruz E/C Hipolito 11-May-17 08-Nov-17
Vizcaya Rd October 15,2017 Pangasinan-Nueva Vizcaya Rd
Acosta Br. (B00746LZ) along Pangasinan-Nueva Completed as of Acosta Br. (B00746LZ) along Aquino-dela Cruz
16AI0266 57 20,000.00 1 1 1 1 3/17/2017 1 3/24/2017 1 4/6/2017 1 4/24/2017 1 5/3/2017 1 5/11/2017 20,000.00 19,600.00 18,814.44 18,814.44 785.562 4.01% 1 100.00% 100.00% 0.00% 18,814.44 20,000.0 20,000.0 57 200 Barrera 11-May-17 26-Nov-17
Vizcaya Rd October 15,2017 Pangasinan-Nueva Vizcaya Rd E/C / JHI C/S (JV)
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control Villar General
Completed as of Flood Control Project-Construction of
16AI0255 58 Project-Construction of Bank Protection, Brgy. 20,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/16/2017 1 3/1/2017 1 3/10/2017 1 3/20/2017 20,000.00 19,600.00 18,970.68 18,970.68 629.315 3.21% 1 100.00% 100.00% 0.00% 18,970.68 20,000.0 20,000.0 58 completed 152 Construction and Hipolito 20-Mar-17 18-Aug-17
October 15,2017 Bank Protection, Brgy. San Leon,
San Leon, Balungao, Pangasinan Supply
Balungao, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control Villar General
Completed as of Flood Control Project-Construction of
16AI0256 59 Project-Construction of Bank Protection, Brgy. 20,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/16/2017 1 2/21/2017 1 3/2/2017 1 3/9/2017 20,000.00 19,600.00 18,971.51 18,971.51 628.492 3.21% 1 100.00% 100.00% 0.00% 18,971.51 20,000.0 20,000.0 59 completed 152 Construction and Hipolito 09-Mar-17 07-Aug-17
October 15,2017 Bank Protection, Brgy. San Aurelio III,
San Aurelio III, Balungao, Pangasinan Supply
Balungao, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of JHI Construction
16AI0257 60 Project-Construction of Bank Protection, Brgy. 5,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/17/2017 1 2/21/2017 1 3/2/2017 1 3/9/2017 5,000.00 4,900.00 4,754.50 4,754.50 145.500 2.97% 1 100.00% 100.00% 0.00% 4,754.50 5,000.0 5,000.0 60 completed 80 Hipolito 09-Mar-17 27-May-17
October 15,2017 Bank Protection, Brgy. San Joaquin, and Supply
San Joaquin, Balungao, Pangasinan
Balungao, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of Aquino-dela Cruz
16AI0258 61 Project-Construction of Bank Protection, Brgy. 15,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/17/2017 1 2/21/2017 1 3/2/2017 1 3/9/2017 15,000.00 14,700.00 14,229.48 14,229.48 470.515 3.20% 1 100.00% 100.00% 0.00% 14,229.48 15,000.0 15,000.0 61 completed 129 Hipolito 09-Mar-17 15-Jul-17
October 15,2017 Bank Protection, Brgy. San Julian, E/C
San Julian, Balungao, Pangasinan
Balungao, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control RA Matias
Completed as of Flood Control Project-Construction of
17AI0009 62 Project-Construction of Bank Protection, Brgy. 10,000.00 1 1 1 1 1/6/2017 1 1/13/2017 1 1/26/2017 1 2/17/2017 1 2/27/2017 1 3/6/2017 10,000.00 9,800.00 9,507.10 9,507.10 292.897 2.99% 1 100.00% 100.00% 0.00% 9,507.10 9,507.10 10,000.0 10,000.0 62 completed 102 Construction & Hipolito 06-Mar-17 15-Jun-17
October 15,2017 Bank Protection, Brgy. Capulaan,
Capulaan, Balungao, Pangasinan Supply
Balungao, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control RA Matias
Completed as of Flood Control Project-Construction of
16AI0259 63 Project-Construction of Bank Protection, Brgy. 10,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/20/2017 1 3/6/2017 1 3/13/2017 1 3/20/2017 10,000.00 9,800.00 9,504.86 9,504.86 295.138 3.01% 1 100.00% 100.00% 0.00% 9,504.86 10,000.0 10,000.0 63 completed 102 Construction & Hipolito 20-Mar-17 29-Jun-17
October 15,2017 Bank Protection, Brgy. Mauban,
Mauban, Balungao, Pangasinan Supply
Balungao, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control RA Matias
Completed as of Flood Control Project-Construction of
16AI0260 64 Project-Construction of Bank Protection, Brgy. 10,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/2/2017 1 3/6/2017 1 3/13/2017 1 3/20/2017 10,000.00 9,800.00 9,506.45 9,506.45 293.548 3.00% 1 100.00% 100.00% 0.00% 9,506.45 10,000.0 10,000.0 64 completed 102 Construction & Hipolito 20-Mar-17 29-Jun-17
October 15,2017 Bank Protection, Brgy. Rajal,
Rajal, Balungao, Pangasinan Supply
Balungao, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of
17AI0012 65 Project-Construction of Bank Protection, Brgy. 15,000.00 1 1 1 1 1/6/2017 1 1/13/2017 1 2/2/2017 1 3/9/2017 1 3/17/2017 1 3/27/2017 15,000.00 14,700.00 13,964.89 13,964.89 735.107 5.00% 1 100.00% 100.00% 0.00% 13,964.89 9,078.70 15,000.0 15,000.0 65 completed 102 WJP C/S Hipolito 27-Mar-17 06-Jul-17
October 15,2017 Bank Protection, Brgy. Libsong, Sta.
Libsong, Sta. Maria, Pangasinan
Maria, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control AC Soliven
Completed as of Flood Control Project-Construction of
17AI0011 66 Project-Construction of Bank Protection, Brgy.Sta 15,000.00 1 1 1 1 1/6/2017 1 1/13/2017 1 1/27/2017 1 3/21/2017 1 3/31/2017 1 4/10/2017 15,000.00 14,700.00 14,037.30 14,037.30 662.698 4.51% 1 100.00% 100.00% 0.00% 14,037.30 15,000.0 15,000.0 66 129 Construction & Gen Tandoc 10-Apr-17 16-Aug-17
October 15,2017 Bank Protection, Brgy.Sta Cruz, Sta.
Cruz, Sta. Maria, Pangasinan Mdse
Maria, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of JHI Construction &
17AI0010 67 Project-Construction of Bank Protection, Brgy. 15,000.00 1 1 1 1 1/6/2016 1 1/13/2017 1 1/26/2017 1 3/9/2017 1 3/17/2017 1 3/27/2017 15,000.00 14,700.00 14,368.03 14,368.03 331.972 2.26% 1 100.00% 100.00% 0.00% 14,368.03 15,000.0 15,000.0 67 129 Tandoc 27-Mar-17 02-Aug-17
October 15,2017 Bank Protection, Brgy. San Pablo, Sta. Supply
San Pablo, Sta. Maria, Pangasinan
Maria, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of
16AI0261 68 Project-Construction of Bank Protection, Brgy. 15,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/24/2017 1 3/23/2017 1 3/31/2017 1 4/10/2017 15,000.00 14,700.00 13,994.64 13,994.64 705.359 4.80% 1 100.00% 100.00% 0.00% 13,994.64 15,000.0 15,000.0 68 129 Rogenox C/S Corp Hipolito 10-Apr-17 16-Aug-17
October 15,2017 Bank Protection, Brgy. Baligayan, San
Baligayan, San Quintin, Pangasinan
Quintin, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control AC Soliven
Completed as of Flood Control Project-Construction of
16AI0254 69 Project-Construction of Bank Protection, Brgy. 20,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/27/2017 1 3/9/2017 1 3/17/2017 1 3/27/2017 20,000.00 19,600.00 18,714.37 18,714.37 885.630 4.52% 1 100.00% 100.00% 0.00% 18,714.37 20,000.0 20,000.0 69 completed 152 Construction & Gen Hipolito 27-Mar-17 25-Aug-17
October 15,2017 Bank Protection, Brgy. Libertad-
Libertad-Burgos, Tayug, Pangasinan Mdse
Burgos, Tayug, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control AC Soliven
Completed as of Flood Control Project-Construction of
17AI0013 70 Project-Construction of Bank Protection, Brgy. 20,000.00 1 1 1 1 1/9/2017 1 1/16/2017 1 1/30/2017 1 3/30/2017 1 4/7/2017 1 4/16/2017 20,000.00 19,600.00 18,591.24 18,591.24 1,008.758 5.15% 1 100.00% 100.00% 0.00% 18,591.24 20,000.0 20,000.0 70 152 Construction & Gen Hipolito 16-Apr-17 14-Sep-17
October 15,2017 Bank Protection, Brgy. Barangobong,
Barangobong, Tayug, Pangasinan Mdse
Tayug, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of JHI Construction &
17AI0007 71 Project-Construction of Bank Protectio at Sitio 5,000.00 1 1 1 1 1/5/2017 1 1/12/2017 1 1/24/2017 1 3/9/2017 1 3/17/2017 1 3/27/2017 5,000.00 4,900.00 4,790.80 4,790.80 109.197 2.23% 1 100.00% 100.00% 0.00% 4,778.83 5,000.0 5,000.0 71 completed 80 Tandoc 27-Mar-17 14-Jun-17
October 15,2017 Bank Protection at Sitio Puyao, Brgy. Supply
Puyao, Brgy. Fianza, San Nicolas, Pangasinan
Fianza, San Nicolas, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of
17AI0014 72 Project-Construction of Bank Protection, Brgy. 5,000.00 1 1 1 1 1/9/2017 1 1/16/2017 1 1/30/2017 1 3/21/2017 1 3/31/2017 1 4/10/2017 5,000.00 4,900.00 4,672.79 4,672.79 227.213 4.64% 1 100.00% 100.00% 0.00% 4,672.79 5,000.0 5,000.0 72 80 AMP Construction Hipolito 10-Apr-17 28-Jun-17
October 15,2017 Bank Protection, Brgy. Camangaan,
Camangaan, San Nicolas, Pangasinan
San Nicolas, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of JHI Construction &
17AI0008 73 Project-Construction of Bank Protection, Brgy. 5,000.00 1 1 1 1 1/5/2017 1 1/12/2017 1 1/24/2017 1 3/9/2017 1 3/17/2017 1 3/27/2017 5,000.00 4,900.00 4,777.87 4,777.87 122.132 2.49% 1 100.00% 100.00% 0.00% 4,777.87 5,000.0 5,000.0 73 80 Tandoc 27-Mar-17 14-Jun-17
October 15,2017 Bank Protection, Brgy. Malilion, San Supply
Malilion, San Nicolas, Pangasinan
Nicolas, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Completed as of Flood Control Project-Construction of JHI Construction &
17AI0006 74 Project-Construction of Bank Protection, Brgy. 5,000.00 1 1 1 1 1/5/2017 1 1/12/2017 1 1/24/2017 1 3/9/2017 1 3/17/2017 1 3/27/2017 5,000.00 4,900.00 4,776.84 4,776.84 123.160 2.51% 1 100.00% 100.00% 0.00% 4,776.84 5,000.0 5,000.0 74 completed 80 Tandoc 27-Mar-17 14-Jun-17
October 15,2017 Bank Protection, Brgy. San Salingcob, Supply
San Salingcob, San Nicolas, Pangasinan
San Nicolas, Pangasinan
Agno River Basin and Allied Rivers
Agno River Basin and Allied Rivers Flood Control
Flood Control Project-Raising of grade
Project-Raising of grade of Dike(excavation of AC Soliven
Completed as of of Dike(excavation of river channel
16AI0262 75 river channel with the spoils to be formed into 20,000.00 1 1 1 1 12/14/2016 1 12/21/2016 1 1/10/2017 1 3/21/2017 1 3/31/2017 1 4/10/2017 20,000.00 19,600.00 18,714.42 18,714.42 885.576 4.52% 1 100.00% 100.00% 0.00% 18,714.42 20,000.0 20,000.0 75 completed 152 Construction & Gen Hipolito 10-Apr-17 08-Sep-17
October 15,2017 with the spoils to be formed into dike),
dike), Brgy. Casantamariaan-Bantog, San Mdse
Brgy. Casantamariaan-Bantog, San
Quintin, Pangasinan
Quintin, Pangasinan

Agno River Basin and Allied Rivers


Agno River Basin and Allied Rivers Flood Control
Flood Control Project-Raising of grade
Project-Raising of grade of Dike(excavation of
Completed as of of Dike(excavation of river channel
17AI0029 76 river channel with the spoils to be formed into 20,000.00 1 1 1 1 2/9/2017 1 2/16/2017 1 2/28/2017 1 3/23/2017 1 3/31/2017 1 4/10/2017 20,000.00 19,600.00 18,647.76 18,647.76 952.241 4.86% 1 100.00% 100.00% 0.00% 18,647.76 20,000.0 20,000.0 76 152 Rogenox C/S corp Hipolito 10-Apr-17 08-Sep-17
October 15,2017 with the spoils to be formed into dike),
dike), Brgy. Casantamariaan-Nangapugan, San
Brgy. Casantamariaan-Nangapugan,
Quintin, Pangasinan
San Quintin, Pangasinan

Construction of Dike Protection Works,


Construction of Dike Protection Works, Banila
Completed as of Banila River Control Project, Scheduled for Bidding
17AI0182 77 River Control Project, Casaratan, San Nicolas, 20,000.00 1 1 1 1 6/13/2017 1 6/20/2017 1 8/23/2017 1 1 9/15/2017 1 09/18/2017 20,000.00 19,600.00 18,625.18 18,625.18 974.820 4.97% 1 100.00% 100.00% 0.00% 20,000.0 20,000.0 77
October 15,2017 Casaratan, San Nicolas, Pangasinan, 7/3/2017
Pangasinan, Sta. 0+000 - Sta. 1+098
Sta. 0+000 - Sta. 1+098
Construction of Dike with Protection Works, Construction of Dike with Protection
Completed as of
17AI0154 78 Ambayaoan RCP @ Poblacion, San Nicolas, 20,000.00 1 1 1 1 5/3/2017 1 5/10/2017 1 6/20/2017 1 6/30/2017 1 7/10/2017 1 7/17/2017 20,000.00 19,600.00 18,671.97 18,671.97 928.033 4.73% 1 100.00% 100.00% 0.00% 20,000.0 20,000.0 78 Works, Ambayaoan RCP @ Poblacion, Bid Out 6/20/17
October 15,2017
Pangasinan San Nicolas, Pangasinan
Restoration of Dike with Protection Works, Restoration of Dike with Protection
Completed as of
17AI0155 79 Ambayaoan RCP @ Barangay San Rafael, San 15,000.0 1 1 1 1 5/3/2017 1 5/10/2017 1 6/8/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 15,000.00 14,700.00 13,968.42 13,968.42 731.575 4.98% 1 100.00% 100.00% 0.00% 15,000.0 15,000.0 79 Works, Ambayaoan RCP @ Barangay Bid Out 6/3/17
October 15,2017
Nicolas, Pangasinan San Rafael, San Nicolas, Pangasinan
Rehabilitation of Dike with Protection Works, Rehabilitation of Dike with Protection
Completed as of
17AI0157 80 Ambayaoan RCP @ Barangay Lungao, San 5,000.0 1 1 1 1 5/3/2017 1 5/10/2017 1 6/9/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 5,000.00 4,900.00 4,662.44 4,662.44 237.564 4.85% 1 100.00% 100.00% 0.00% 5,000.0 5,000.0 80 Works, Ambayaoan RCP @ Barangay Bid Out 6/5/17
October 15,2017
Nicolas, Pangasinan Lungao, San Nicolas, Pangasinan
Construction of Dike with Protection Works, Construction of Dike with Protection
Completed as of
17AI0156 81 Sabangan RCP @ San Rafael Centro, San Nicolas, 10,000.0 1 1 1 1 5/3/2017 1 5/10/2017 1 6/9/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 10,000.00 9,800.00 9,309.56 9,309.56 490.437 5.00% 1 100.00% 100.00% 0.00% 10,000.0 10,000.0 81 Works, Sabangan RCP @ San Rafael Bid Out 6/4/17
October 15,2017
Pangasinan Centro, San Nicolas, Pangasinan
Peralta Road to Mabini San Andres
Peralta Road to Mabini San Andres Barangay
Barangay Road leading to Mt.
Road leading to Mt. Balungao Hot and Cold Completed as of Aquino-dela Cruz
17AI0039 82 26,000.0 1 1 1 1 3/10/2017 1 3/17/2017 1 4/3/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 26,000.00 25,480.00 24,205.61 24,205.61 1,274.390 5.00% 1 100.00% 100.00% 0.00% 24,205.61 26,000.0 26,000.0 82 Balungao Hot and Cold Springs and 180 Ramos 10-Jul-17 05-Jan-18
Springs and Balungao Hilltop Adventure, October 15,2017 E/C
Balungao Hilltop Adventure, Balungao,
Balungao, Pangasinan
Pangasinan 6th LD
Improvement/Repair/Rehabilitation of
Improvement/Repair/Rehabilitation of Tayug-Sta. Completed as of
17AI0095 83 12,385.0 1 1 1 1 3/28/2017 1 4/4/2017 1 4/19/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 12,385.00 12,137.30 11,530.36 11,530.36 606.940 5.00% 1 100.00% 100.00% 0.00% 11,530.36 12,385.0 12,385.0 83 Tayug-Sta. Maria Bypass Road, 120 WJP C/S Hipolito 11-May-17 07-Sep-17
Maria Bypass Road, Pangasinan October 15,2017
Pangasinan
Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of Scheduled for Bidding
17AI0203 84 4,000.0 1 1 1 1 6/30/2017 1 7/7/2017 1 7/27/2017 1 8/18/2017 1 8/25/2017 1 8/29/2017 4,000.00 3,960.00 3,856.32 3,856.32 103.680 2.62% 1 100.00% 100.00% 0.00% 3,856.32 4,000.0 4,000.0 84 Purpose Building, San Quintin,
Building, San Quintin, Pangasinan October 15,2017 7/21/2017
Pangasinan
Construction/Improvement of Multi Purpose Completed as of Construction/Improvement of Multi Scheduled for Bidding
17AI0210 85 6,000.0 1 1 1 1 7/12/2017 1 7/19/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 6,000.00 5,940.00 5,761.73 5,761.73 178.273 3.00% 1 100.00% 100.00% 0.00% 5,761.73 6,000.0 6,000.0 85
Building, Tayug, Pangasinan October 15,2017 Purpose Building, Tayug, Pangasinan 7/21/2017
Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of Scheduled for Bidding
17AI0184 86 2,700.0 1 1 1 1 6/14/2017 1 6/21/2017 1 7/4/2017 1 8/22/2017 1 9/1/2017 1 9/4/2017 2,700.00 2,673.00 2,592.76 2,592.76 80.240 3.00% 1 100.00% 100.00% 0.00% 2,592.76 2,700.0 2,700.0 86 Purpose Building, San Nicolas,
Building, San Nicolas, Pangasinan October 15,2017 7/4/2017
Pangasinan
Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of Scheduled for Bidding
17AI0269 87 2,000.0 1 1 1 1 9/26/2017 1 10/3/2017 1 10/23/2017 1 1 1 2,000.00 1,928.60 1,928.60 (1,928.602) 1 100.00% 100.00% 0.00% 1,928.60 2,000.0 2,000.0 87 Purpose Building, Asingan, Pangasinan
Building, Asingan, Pangasinan October 15,2017 7/21/2017

Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of Scheduled for Bidding
17AI0183 88 1,500.0 1 1 1 1 6/14/2017 1 6/21/2017 1 7/4/2017 1 8/1/2017 1 8/11/2017 1 8/14/2017 1,500.00 1,485.00 1,440.43 1,440.43 44.570 3.00% 1 100.00% 100.00% 0.00% 1,440.43 1,500.0 1,500.0 88 Purpose Building, Balungao,
Building, Balungao, Pangasinan October 15,2017 7/4/2017
Pangasinan
Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of Scheduled for Bidding
17AI0192 89 1,200.0 1 1 1 1 6/20/2017 1 6/28/2017 1 7/11/2017 1 8/17/2017 1 8/25/2017 1 8/29/2017 1,200.00 1,188.00 1,152.34 1,152.34 35.658 3.00% 1 100.00% 100.00% 0.00% 1,152.34 1,200.0 1,200.0 89 Purpose Building, Natividad,
Building, Natividad, Pangasinan October 15,2017 Pangasinan 7/11/2017

Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of
17AI0176 90 1,200.0 1 1 1 1 6/7/2017 1 6/14/2017 1 6/27/2017 1 6/30/2017 1 7/10/2017 1 7/17/2017 1,200.00 1,188.00 1,152.29 1,152.29 35.707 3.01% 1 100.00% 100.00% 0.00% 1,152.29 1,200.0 1,200.0 90 Purpose Building, Rosales, Pangasinan Bid Out June 27, 2017
Building, Rosales, Pangasinan October 15,2017

Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of scheduled for bidding
17AI0209 91 600.0 1 1 1 1 7/12/2017 1 N/A 1 7/31/2017 1 8/18/2017 1 8/25/2017 1 8/29/2017 600.00 600 586.88 586.88 13.125 2.19% 1 100.00% 100.00% 0.00% 586.88 600.0 600.0 91 Purpose Building, San Manuel,
Building, San Manuel, Pangasinan October 15,2017 on July 21, 2017
Pangasinan
Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of scheduled for bidding
92 3,300.0 1 1 1 1 8/25/2017 1 9/1/2017 1 9/19/2017 1 9/27/2017 1 10/6/2017 1 10/9/2017 3,300.00 3,267.00 3,176.91 3,176.91 90.090 2.76% 1 100.00% 100.00% 0.00% 3,176.91 3,300.0 3,300.0 92 Purpose Building, Umingan,
Building, Umingan, Pangasinan October 15,2017 on July 21, 2017
Pangasinan
Construction/Improvement of Multi
Construction/Improvement of Multi Purpose Completed as of scheduled for bidding
17AI0175 93 1,200.0 1 1 1 1 6/7/2017 1 6/14/2017 1 6/27/2017 1 6/30/2017 1 7/10/2017 1 7/17/2017 1,200.00 1,188.00 1,152.34 1,152.34 35.663 3.00% 1 100.00% 100.00% 0.00% 1,152.34 1,200.0 1,200.0 93 Purpose Building, Sta. Maria,
Building, Sta. Maria, Pangasinan October 15,2017 6/27/17
Pangasinan
Completed as of Concreting of Roads, Asingan, scheduled for bidding
17AI0172 94 Concreting of Roads, Asingan, Pangasinan 1,500.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 1,500.00 1,447.80 1,447.80 1,447.80 - 1 100.00% 100.00% 0.00% 1,447.80 1,500.0 1,500.0 94
October 15,2017 Pangasinan on June 27, 2017
Completed as of Concreting of Roads, Balungao, scheduled for bidding
17AI0171 95 Concreting of Roads, Balungao, Pangasinan 1,500.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 1,500.00 1,485.00 1,447.74 1,447.74 37.256 1 100.00% 100.00% 0.00% 1,447.74 1,500.0 1,500.0 95
October 15,2017 Pangasinan on June 27, 2017
Completed as of Concreting of Roads, Natividad, scheduled for bidding
17AI0181 96 Concreting of Roads, Natividad, Pangasinan 1,000.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 1,000.00 990.00 965.18 965.18 24.823 1 100.00% 100.00% 0.00% 965.18 1,000.0 1,000.0 96
October 15,2017 Pangasinan on July 3, 2017
Completed as of Concreting of Roads, Rosales, scheduled for bidding
17AI0174 97 Concreting of Roads, Rosales, Pangasinan 2,000.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 2,000.00 1,980.00 1,910.91 1,910.91 69.087 1 100.00% 100.00% 0.00% 1,910.91 2,000.0 2,000.0 97
October 15,2017 Pangasinan on June 27, 2017
Completed as of Concreting of Roads, San Manuel, scheduled for bidding
98 Concreting of Roads, San Manuel, Pangasinan 1,000.0 1 1 1 1 7/12/2017 1 N/A 1 7/31/2017 1 8/18/2017 1 8/25/2017 1 8/29/2017 1,000.00 990 941.67 941.67 48.327 4.88% 1 100.00% 100.00% 0.00% 941.67 1,000.0 1,000.0 98
October 15,2017 Pangasinan on June 27, 2017
Concreting of Bridge, Cabalaoangan-San Pedro, Completed as of Concreting of Bridge, Cabalaoangan- Scheduled for Bidding
99 3,000.0 1 1 1 1 7/18/2017 1 7/25/2017 1 8/22/2017 1 9/19/2017 1 9/28/2017 1 9/29/2017 3,000.00 2,940.00 2,866.24 2,866.24 73.760 2.51% 1 100.00% 100.00% 0.00% 2,866.24 3,000.0 3,000.0 107
San Quintin, Pangasinan October 15,2017 San Pedro, San Quintin, Pangasinan on July 25, 2017
Completed as of Concreting of Roads, San Nicolas, scheduled for bidding
17AI0169 100 Concreting of Roads, San Nicolas, Pangasinan 2,000.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 2,000.00 1,960.00 1,910.91 1,910.91 49.087 1 100.00% 100.00% 0.00% 1,910.91 2,000.0 2,000.0 99
October 15,2017 Pangasinan on June 27, 2017
Agno River Basin and Allied River
Agno River Basin and Allied River Flood Control
Completed as of Flood Control Project, Construction of
17AI0061 101 Project, Construction of River Bank Control 20,000.0 1 1 1 1 3/15/2017 1 3/22/2017 1 4/5/2017 1 4/21/2017 1 4/28/2017 1 5/8/2017 20,000.00 19,600.00 18,617.53 18,617.53 982.470 5.01% 1 100.00% 100.00% 0.00% 18,617.53 20,000.0 20,000.0 108 152 Villar Gen. C/S Hipolito 08-May-17 06-Oct-17
October 15,2017 River Bank Control Works, Barangay
Works, Barangay Angayan, Balungao, Pangasinan
Angayan, Balungao, Pangasinan
Completed as of Concreting of Roads, San Quintin, scheduled for bidding
17AI0179 102 Concreting of Roads, San Quintin, Pangasinan 1,500.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 1,500.00 1,485.00 1,447.80 1,447.80 37.201 1 100.00% 100.00% 0.00% 1,447.80 1,500.0 1,500.0 100
October 15,2017 Pangasinan on July 3, 2017
Construction of 2-Storey 4-Classroom
Construction of 2-Storey 4-Classroom Building,
Completed as of Building, Bongolan Memorial National
17AI0110 103 Bongolan Memorial National High Schoool, San 3,000.0 1 1 1 1 3/31/2017 1 4/7/2017 1 4/20/2017 1 5/26/2017 1 6/5/2017 1 6/12/2017 3,000.00 2870 2,783.39 2,783.39 86.610 3.02% 1 100.00% 100.00% 0.00% 2,783.39 3,000.0 3,000.0 111 115 TJ Velasco Reinoso 12-Jun-17 04-Oct-17
October 15,2017 High Schoool, San Jose, Urdaneta City
Jose, Urdaneta City

Completed as of Concreting of Roads, Sta. Maria, scheduled for bidding


17AI0170 104 Concreting of Roads, Sta. Maria, Pangasinan 1,500.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 1,500.00 1,485.00 1,447.80 1,447.80 37.201 1 100.00% 100.00% 0.00% 1,447.80 1,500.0 1,500.0 101
October 15,2017 Pangasinan on June 27, 2017
Construction of Multi-Purpose Building at Completed as of Construction of Multi-Purpose Building
17AI0134 105 5,000.0 1 1 1 1 1 1 5/3/2017 1 5/23/2017 1 6/2/2017 1 6/11/2017 5,000.00 4850 4,704.31 4,704.31 145.690 3.00% 1 100.00% 100.00% 0.00% 4,704.31 5,000.0 5,000.0 114 120 Villar Gen. C/S Flores 11-Jun-17 08-Oct-17
Balungao, Balungao, Pangasinan October 15,2017 at Balungao, Balungao, Pangasinan
Completed as of Concreting of Roads, Tayug, scheduled for bidding
17AI0173 106 Concreting of Roads, Tayug, Pangasinan 1,500.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 1,500.00 1,485.00 1,447.80 1,447.80 37.201 1 100.00% 100.00% 0.00% 1,447.80 1,500.0 1,500.0 102
October 15,2017 Pangasinan on June 27, 2017
Construction of Multi-Purpose Building at Rosales, Completed as of Construction of Multi-Purpose Building
17AI0136 107 5,000.0 1 1 1 1 4/18/2017 1 4/25/2017 1 5/8/2017 1 5/23/2017 1 6/2/2017 1 6/11/2017 5,000.00 4800 4,655.98 4,655.98 144.025 3.00% 1 100.00% 100.00% 0.00% 4,655.98 5,000.0 5,000.0 117 120 WJP C/S Bascos 11-Jun-17 08-Oct-17
Rosales, Pangasinan October 15,2017 at Rosales, Rosales, Pangasinan
Completed as of Concreting of Roads, Umingan, scheduled for bidding
17AI0180 108 Concreting of Roads, Umingan, Pangasinan 3,800.0 1 1 1 1 9/20/2017 1 9/27/2017 1 10/9/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 3,800.00 3,762.00 3,667.05 3,667.05 94.948 1 100.00% 100.00% 0.00% 3,667.05 3,800.0 3,800.0 103
October 15,2017 Pangasinan on July 3, 2017
Construction of Multi-Purpose Building
Construction of Multi-Purpose Building at Public at Public Plaza in Poblacion West,
Completed as of
17AI0111 109 Plaza in Poblacion West, Umingan, Pangasinan, 5,000.0 1 1 1 1 4/3/2017 1 4/10/2017 1 4/24/2017 1 5/25/2017 1 6/2/2017 1 6/11/2017 5,000.00 4950 4,801.42 4,801.42 148.576 3.00% 1 100.00% 100.00% 0.00% 4,801.42 5,000.0 5,000.0 118 Umingan, Pangasinan, Brgy. Poblacion 120 AMP Construction Flores 11-Jun-17 08-Oct-17
October 15,2017
Brgy. Poblacion West, Umingan, Pangasinan West, Umingan, Pangasinan

Concreting of Roads, Panganiban-


Silag, Tayug, Pangasinan
Concreting of Roads, Panganiban-Silag, Tayug, Completed as of
17AI0131 110 2,000.0 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 2,000.00 1,980.00 1,880.99 1,880.99 99.005 5.00% 1 100.00% 100.00% 0.00% 1,880.99 2,000.0 2,000.0 104 completed 45 JHI C/S Barrera 21-May-17 04-Jul-17
Pangasinan October 15,2017

Concreting of Roads, Diaz, Umingan,


Pangasinan
Completed as of
17AI0091 111 Concreting of Roads, Diaz, Umingan, Pangasinan 2,000.0 1 1 1 1 3/27/2017 1 4/3/2017 1 4/18/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 2,000.00 1,960.00 1,880.99 1,880.99 79.005 4.03% 1 100.00% 100.00% 0.00% 1,880.99 2,000.0 2,000.0 105 45 AMP Construction Barrera 11-May-17 24-Jun-17
October 15,2017

Concreting of Roads, Ricos, Umingan,


Pangasinan
Completed as of
17AI0129 112 Concreting of Roads, Ricos, Umingan, Pangasinan 2,000.0 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 2,000.00 1,980.00 1,880.97 1,880.97 99.027 5.00% 1 100.00% 100.00% 0.00% 1,880.97 2,000.0 2,000.0 106 45 WJP C/S Barrera 21-May-17 04-Jul-17
October 15,2017

Agno River Basin and Allied River


Agno River Basin and Allied River Flood Control
Flood Control Project, Construction of
Project, Construction of Dike with Protection Completed as of
17AI0062 113 20,000.0 1 1 1 1 3/15/2017 1 3/22/2017 1 4/5/2017 1 4/21/2017 1 4/28/2017 1 5/8/2017 20,000.00 19,600.00 18,592.70 18,592.70 1,007.299 5.14% 1 100.00% 100.00% 0.00% 18,592.70 20,000.0 20,000.0 109 Dike with Protection Works using 152 Villar Gen. C/S Hipolito 08-May-17 06-Oct-17
Works using Gabions and Mattresses, Barangay October 15,2017
Gabions and Mattresses, Barangay
Bantog, San Quintin, Pangasinan
Bantog, San Quintin, Pangasinan
Agno River Basin and Allied River
Agno River Basin and Allied River Flood Control
Flood Control Project,
Project, Construction/Extension of Dike with Construction/Extension of Dike with
Completed as of
17AI0027 114 Protection Works using Mattresses, Barangay 20,000.0 1 1 1 1 2/9/2017 1 2/16/2017 1 2/28/2017 1 3/15/2017 1 3/24/2017 1 4/3/2017 20,000.00 19,600.00 18,639.56 18,639.56 960.439 4.90% 1 100.00% 100.00% 0.00% 18,639.56 20,000.0 20,000.0 110 completed 152 WJP C/S Hipolito 03-Apr-17 01-Sep-17
October 15,2017 Protection Works using Mattresses,
Cacandungan-San Maximo, Natividad, Barangay Cacandungan-San Maximo,
Pangasinan
Natividad, Pangasinan
Construction of Rain Wateer Collector
Construction of Rain Wateer Collector System at
System at 6th Legislative District (San
6th Legislative District (San Bartolome ES,
Completed as of Bartolome ES, Camanggaan ES, GAA FY 2017
17AI0214 115 Camanggaan ES, Rabago ES, Don Ireneo Guieb 1,584.0 1 1 1 1 7/18/2017 1 7/25/2017 1 8/7/2017 1 9/8/2017 1 9/18/2017 1 9/19/2017 1,584.00 1,584.00 1,536.15 1,536.15 47.850 3.02% 1 100.00% 100.00% 0.00% 1,536.15 1,584.0 1,584.0 19-Sep-17
October 15,2017 Rabago ES, Don Ireneo Guieb ES, (RA 10924)
ES, Capulaan ES, San Raymundo ES,
Capulaan ES, San Raymundo ES,
Namagbagan ES, Samon ES)
Namagbagan ES, Samon ES)
Construction of Rain Wateer Collector
Construction of Rain Wateer Collector System at
System at 5th Legislative District
5th Legislative District (Nibaliw ES, Bersamin ES,
Completed as of (Nibaliw ES, Bersamin ES, San Pedro- GAA FY 2017
17AI0215 116 San Pedro-Ili Apartado ES, San Blas ES, Calegu 1,782.0 1 1 1 1 7/18/2017 1 7/25/2017 1 8/7/2017 1 9/11/2017 1 9/28/2017 1 9/22/2017 1,782.00 1,782.00 1,728.70 1,728.70 53.300 2.99% 1 100.00% 100.00% 0.00% 1,728.70 1,782.0 1,782.0 22-Sep-17
October 15,2017 Ili Apartado ES, San Blas ES, Calegu (RA 10924)
ES, Pasileng ES, Asan Sur ES, Inoman ES, Bila
ES, Pasileng ES, Asan Sur ES, Inoman
ES)
ES, Bila ES)
Concreting of Road, Barangay Dilan Paurido, Completed as of Concreting of Road, Barangay Dilan
17AI0122 117 4,000.0 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 4,000.00 3960 3,761.93 3,761.93 198.066 5.00% 1 100.00% 100.00% 0.00% 3,761.93 4,000.0 4,000.0 112 75 3K Builders Bascos 21-May-17 03-Aug-17
Urdaneta, Pangasinan October 15,2017 Paurido, Urdaneta, Pangasinan
Construction of Multi-Purpose Building
Construction of Multi-Purpose Building at Toboy, Completed as of
17AI0093 118 3,000.0 1 1 1 1 3/27/2017 1 4/3/2017 1 4/18/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 3,000.00 2,940.00 2,851.79 2,851.79 88.209 3.00% 1 100.00% 100.00% 0.00% 2,851.79 3,000.0 3,000.0 113 at Toboy, Toboy, Asingan, Pangasinan 90 3K Builders Ginez 11-May-17 08-Aug-17
Toboy, Asingan, Pangasinan October 15,2017

Construction of Multi-Purpose Building at Sta. Completed as of Construction of Multi-Purpose Building


17AI0068 119 5,000.0 1 1 1 1 3/20/2017 1 3/27/2017 1 4/10/2017 1 4/21/2017 1 4/28/2017 1 5/8/2017 5,000.00 4,950.00 4,751.96 4,751.96 198.040 4.00% 1 100.00% 100.00% 0.00% 4,751.96 5,000.0 5,000.0 115 120 AMP Construction Gatchalon 08-May-17 04-Sep-17
Maria, Sta. Maria, Pangasinan October 15,2017 at Sta. Maria, Sta. Maria, Pangasinan
Construction of Multi-Purpose Building
Construction of Multi-Purpose Building at San Completed as of RP PARAYNO
17AI0035 120 5,000.0 1 1 1 1 3/7/2017 1 3/14/2017 1 3/27/2017 1 3/30/2017 1 4/7/2017 1 4/16/2017 5,000.00 4,950.00 4,801.74 4,801.74 148.265 3.00% 1 100.00% 100.00% 0.00% 4,801.74 5,000.0 5,000.0 116 at San Quintin, San Quintin, 120 Flores 16-Apr-17 13-Aug-17
Quintin, San Quintin, Pangasinan October 15,2017 CONSTRUCTION
Pangasinan
Rehabilitation of Rural Health Unit I,
Rehabilitation of Rural Health Unit I, Poblacion Completed as of Scheduled for Bidding
17AI0217 121 1,000.0 1 1 1 1 9/8/2017 1 9/15/2017 1 9/27/2017 1 10/12/2017 1 10/13/2017 1 10/18/2017 1,000.00 976.03 976.03 976.03 - 0.00% 1 100.00% 100.00% 0.00% 976.03 1,000.0 1,000.0 119 Poblacion West, Umingan, Pangasinan 18-Oct-17
West, Umingan, Pangasinan October 15,2017 on July 25, 2017

Concreting of Road at Sitio Palac-Palac


Concreting of Road at Sitio Palac-Palac Road, Completed as of
17AI0130 122 2,000.0 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 2,000.00 1,980.00 1,880.98 1,880.98 99.016 5.00% 1 100.00% 100.00% 0.00% 1,880.98 2,000.0 2,000.0 120 Road, Diaz, Umingan, Pangasinan 45 WJP C/S Barrera 21-May-17 04-Jul-17
Diaz, Umingan, Pangasinan October 15,2017

Concreting of Road at Sitio Lipay


Concreting of Road at Sitio Lipay Road, Completed as of
17AI0121 123 2,000.0 1 1 1 1 4/4/2017 1 4/11/2017 1 4/25/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 2,000.00 1,980.00 1,880.97 1,880.97 99.028 5.00% 1 100.00% 100.00% 0.00% 1,880.97 2,000.0 2,000.0 121 Road, Cabalitian, Umingan, 45 AMP Construction Barrera 21-May-17 04-Jul-17
Cabalitian, Umingan, Pangasinan October 15,2017
Pangasinan
Concreting of Road at Buenavista-San
Concreting of Road at Buenavista-San Quintin Completed as of
17AI0094 124 2,000.0 1 1 1 1 3/27/2017 1 4/3/2017 1 4/18/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 2,000.00 1,980.00 1,881.00 1,881.00 99.003 5.00% 1 100.00% 100.00% 0.00% 1,881.00 2,000.0 2,000.0 122 Quintin Road, Buenavista, Umingan, 45 AMP Construction Barrera 11-May-17 24-Jun-17
Road, Buenavista, Umingan, Pangasinan October 15,2017
Pangasinan
Concreting of Road at Mandactang-
Concreting of Road at Mandactang-Buenavista Completed as of
17AI0158 125 2,000.0 1 1 1 1 5/5/2017 1 5/12/2017 1 5/24/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 2,000.00 1,980.00 1,880.97 1,880.97 99.028 5.00% 1 100.00% 100.00% 0.00% 2,000.0 2,000.0 123 Buenavista Road, Buenavista, 45 AMP Construction Barrera 10-Jul-17 23-Aug-17
Road, Buenavista, Umingan, Pangasinan October 15,2017
Umingan, Pangasinan
Concreting of Road at Umingan Road, Umingan, Completed as of Concreting of Road at Umingan Road,
17AI0128 126 2,000.0 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 2,000.00 1,980.00 1,880.98 1,880.98 99.022 5.00% 1 100.00% 100.00% 0.00% 1,880.98 2,000.0 2,000.0 124 45 AMP Construction Barrera 21-May-17 04-Jul-17
Pangasinan October 15,2017 Umingan, Pangasinan
Concreting of Road at Cabuludayan-
Concreting of Road at Cabuludayan-Arzadon Completed as of
17AI0071 127 2,500.0 1 1 1 1 3/22/2017 1 3/29/2017 1 4/11/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 2,500.00 2,450.00 2,351.20 2,351.20 98.799 4.03% 1 100.00% 100.00% 0.00% 2,351.20 2,500.0 2,500.0 125 Arzadon Road, San Manuel, 75 3K Builders Barrera 11-May-17 24-Jul-17
Road, San Manuel, Pangasinan October 15,2017
Pangasinan
Concreting of Road at Narra Road, San Manuel, Completed as of Concreting of Road at Narra Road, San
17AI0092 128 2,500.0 1 1 1 1 3/27/2017 1 4/3/2017 1 4/18/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 2,500.00 2,450.00 2,351.10 2,351.10 98.901 4.04% 1 100.00% 100.00% 0.00% 2,351.10 2,500.0 2,500.0 126 45 3K Builders Barrera 11-May-17 24-Jun-17
Pangasinan October 15,2017 Manuel, Pangasinan
Concreting of Road, Barangay San
Concreting of Road, Barangay San Joaquin to Completed as of
17AI0127 129 2,000.0 1 1 1 1 4/7/2017 1 4/17/2017 1 5/2/2017 1 5/5/2017 1 5/12/2017 1 5/21/2017 2,000.00 1,980.00 1,880.99 1,880.99 99.007 5.00% 1 100.00% 100.00% 0.00% 1,880.99 2,000.0 2,000.0 127 Joaquin to Barangay San Leon, 45 Villar Gen. C/S Barrera 21-May-17 04-Jul-17
Barangay San Leon, Balungao, Pangasinan October 15,2017
Balungao, Pangasinan
Concreting of Road, Barangay Pilar,
Concreting of Road, Barangay Pilar, Pilar Completed as of
17AI0072 130 3,000.0 1 1 1 1 3/22/2017 1 3/29/2017 1 4/11/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 3,000.00 2,940.00 2,821.50 2,821.50 118.505 4.03% 1 100.00% 100.00% 0.00% 2,821.50 3,000.0 3,000.0 128 Pilar Nabagbagan Road, Sta. Maria, completed 45 WJP C/S Barrera 11-May-17 24-Jun-17
Nabagbagan Road, Sta. Maria, Pangasinan October 15,2017
Pangasinan
Construction of Canals at Calepaan,
Construction of Canals at Calepaan, Asingan, Completed as of
17AI0132 131 2,000.0 1 1 1 1 4/11/2017 1 4/18/2017 1 5/3/2017 1 5/23/2017 1 6/2/2017 1 6/11/2017 2,000.00 1,980.00 1,880.81 1,880.81 99.19 5.01% 1 100.00% 100.00% 0.00% 1,880.81 2,000.0 2,000.0 129 Asingan, Calepaan, Asingan, 45 2-R C/S Barrera 11-Jun-17 25-Jul-17
Calepaan, Asingan, Pangasinan October 15,2017
Pangasinan
1,508,149.00 131 131 0 0 130 1 0 131 131 131 131 131 131 1,508,149.00 1,456,415.04 1,398,566.18 1,398,566.18 57,848.86 3.97% 131.00 - - 99.35 100.00 0.65 1,253,643.2 62,295.6 1498334 1508149
99.35 100.00
DPWH CY 2016 PROJECTS
as of January 15, 2018

D ISTRICT: Pangasinan 3rd District Engineer ing Office


REGION: Region 1

PRECONSTRUCTION RESULT OF BIDDING CONSTRUCTION

Number of Projects VARIANCE No. of Projects STATUS

Date Advertised

APPROPRIAT
PROGRAMMED

Date Awarded
Date Bidding
IMPLEMENTING OFFICE No. of Projects Physical target

Awarded

Contract
AMOUNT (P'000)

Completed

Amount

Amount

Completed
On-Going

Approved

Date NTP
Con tract

On-going
Pre-Bid

ABC
Sched

ION
Actual Accomp.

NYS

Date

NYS
Amount (P'000) (%) Accomp Slippage
(%)
(%)

68,396.36 1 40 8/9/2016 1 8/16/2016 1 8/31/2016 1 10/3/2016 1 10/13/2016 1 10/25/2016 68,396.36 67,412.40 67,000.00 67,000.00 412.40 0.61% 1 100.00% 100.00% 0.00%

2 units 4 storey 20 CL Juan G. Macaraeg NHS, Binalonan,


3 Pangasinan 1 1

15AI0435 10,417.13 1 6 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 10,417.13 10,365.05 10,085.51 10,085.51 279.54 2.70% 1 100.00% 100.00% 0.00%
20 EUGENIO P. PEREZ NHS, Pozorrubio, pangasinan 1 1

68,396.36 1 40 5/5/2016 1 5/12/2016 1 6/27/2016 1 8/11/2016 1 8/19/2016 1 8/28/2016 68,396.36 67,754.38 66,670.63 66,670.63 1,083.75 1.60% 1 100.00% 100.00% 0.00%

2 units 4 storey 20 CL Benigno V. Aldana NHS, Pozorrubio,


4 Pangasinan 1 1

15AI0436 14,897.52 1 8 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 14,897.52 14,823.03 14,402.97 14,402.97 420.06 2.83% 1 100.00% 100.00% 0.00%
21 GUILING-COLILING NHS, Rosales, pangasinan 1 1

93,308.67 1 60 5/5/2016 1 5/12/2016 1 5/24/2016 1 7/7/2016 1 7/18/2016 1 7/26/2016 93,308.67 92,392.13 90,544.18 90,544.18 1,847.94 2.00% 1 100.00% 100.00% 0.00%

5 3 units 4 storey 20 CL Rosales NHS, Rosales, pangasinan 1 1

15AI0437 14,897.52 1 8 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 14,897.52 14,823.03 14,365.76 14,365.76 457.27 3.08% 1 100.00% 100.00% 0.00%
ROBERT B. ESTRELLA MEMORIAL NHS, Rosales,
22 pangasinan 1 1

31,102.89 1 20 8/11/2016 1 8/18/2016 1 9/2/2016 1 9/26/2016 1 10/7/2016 1 10/9/2016 31,102.89 30,797.38 30,164.46 29,870.90 632.92 2.06% 1 100.00% 100.00% 0.00%

4 storey 20 CL Don Ramon E Costales MNHS Villasis,


7 Pangasinan 1 1

15AI0438 10,417.13 1 6 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 10,417.13 10,365.05 10,105.87 10,105.87 259.18 2.50% 1 100.00% 100.00% 0.00%
23 SAN LUIS NHS, Rosales, Pangasinan 1 1

24,047.22 1 16 8/8/2016 1 8/15/2016 1 8/30/2016 1 9/26/2016 1 10/7/2016 1 10/9/2016 24,047.22 23,776.99 22,825.00 951.99 4.00% 1 100.00% 100.00% 0.00%

4 storey 16CL Don Ramon E Costales MNHS Villasis,


8 Pangasinan 1 1

15AI0441 6,432.00 1 4 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 6,432.00 6,399.84 6,233.47 6,233.47 166.37 2.60% 1 100.00% 100.00% 0.00%
25 MALICO NHS, San Nicolas, Pangasinan 1 1

34,198.18 1 20 8/9/2016 1 8/16/2016 1 8/31/2016 1 9/26/2016 1 10/7/2016 1 10/9/2016 34,198.18 33,706.20 32,696.56 32,696.56 1,009.64 3.00% 1 100.00% 100.00% 0.00%

1 Construction of Classrooms-Urdaneta NHS 4 storey 20 CL 1 1

15AI0442 15,121.33 1 9 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 15,121.33 15,045.72 14,626.14 14,626.14 419.58 2.79% 1 100.00% 100.00% 0.00%
26 SAN FELIPE IS, San Nicolas, Pangasinan 1 1

17AI0048 10,985.00 1 8 3/9/2017 1 3/16/2017 1 3/31/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 10,985.00 10,630.83 10,349.76 10,349.76 281.06 2.64% 1 100.00% 100.00% 0.00%
Balungao C/S Balungao, Pangasinan 1 1

15AI0443 14,897.52 1 8 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 14,897.52 14,823.03 14,480.82 14,480.82 342.21 2.31% 1 100.00% 100.00% 0.00%
27 SAN NICOLAS NHS, San Nicolas, pangasinan 1 1

17AI0098 14,897.52 1 8 3/28/2017 1 4/4/2017 1 4/19/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 14,897.52 14,598.54 14,160.45 14,160.45 438.10 3.00% 1 100.00% 100.00% 0.00%
Natividad NHS Natividad, Pangasinan 1 1

15AI0444 6,382.00 1 4 3/3/2016 1 3/10/2016 1 7/18/2016 1 8/11/2016 1 8/19/2016 1 8/28/2016 6,382.00 6,350.09 6,157.47 6,157.47 192.62 3.03% 1 100.00% 100.00% 0.00%
28 LUMAYAO IS, San Quintin, Pangasinan 1 1

17AI0097 6,473.00 1 4 3/28/2017 1 4/4/2017 1 4/19/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 6,473.00 6,258.27 6,069.95 6,069.95 188.32 3.01% 1 100.00% 100.00% 0.00%
Natividad C/S, Natividad, Pangasinan 1 1

15AI0439 30,242.66 1 18 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 30,242.66 30,091.44 29,441.67 29,441.67 649.77 2.16% 1 100.00% 100.00% 0.00%

29 STA. MARIA EAST IS, Sta. Maria, pangasinan 1 1

17AI0099 10,985.00 1 8 3/28/2017 1 4/4/2017 1 4/19/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 10,985.00 10,725.15 10,403.30 10,403.30 321.85 3.00% 1 100.00% 100.00% 0.00%
Natividad C/S, Natividad, Pangasinan 1 1

16AI0104 18,222.27 1 12 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 18,222.27 18,131.16 17,631.06 17,631.06 500.09 2.76% 1 100.00% 100.00% 0.00%
30 ANTONIO P. VILLAR NHS, Sto. Tomas, Pangasinan 1 1
17AI0078 6,382.00 1 4 3/23/2017 1 3/30/2017 1 4/12/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 6,382.00 66,168.80 5,903.13 5,903.13 60,265.67 91.08% 1 100.00% 100.00% 0.00%
Carmay E/S, Rosales 1 1

16AI0004 10,417.13 1 6 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 10,417.13 10,365.05 10,081.00 10,081.00 284.05 2.74% 1 100.00% 100.00% 0.00%

31 SAN ANTONIO NHS, Sto. Tomas, Pangasinan 1 1

17AI0147 2,226.51 1 2 4/27/2017 1 5/4/2017 1 5/16/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 2,215.38 2,148.91 66.47 3.00% 1 100.00% 100.00% 0.00%
Flores IS San Manuel, Pangasinan 1 1

16AI0008 6,382.00 1 4 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 6,382.00 6,350.09 6,179.45 6,179.45 170.64 2.69% 1 100.00% 100.00% 0.00%
32 BANTAY INSIK IS, Sison, pangasinan 1 1

17AI0148 10,417.13 1 6 4/27/2017 1 5/4/2017 1 5/16/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 10,162.96 9,857.47 305.49 3.01% 1 100.00% 100.00% 0.00%
Flores IS San Manuel, Pangasinan 1 1

16AI0030 15,121.33 1 9 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 15,121.33 15,045.72 14,638.57 14,638.57 407.15 2.71% 1 100.00% 100.00% 0.00%

33 DON VALENTIN TORRES IS, Sison, pangasinan 1 1

17AI0146 15,121.33 1 9 4/27/2017 1 5/4/2017 1 5/16/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 14,820.11 14,432.29 387.83 2.62% 1 100.00% 100.00% 0.00%
Mataas na Paaralang Juan C. Laya San Manuel,
Pangasinan 1 1

16AI0037 26,702.47 1 16 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 26,702.47 26,568.96 25,891.27 25,891.93 677.69 2.55% 1 100.00% 100.00% 0.00%
34 SISON CENTRAL IS, Sison, pangasinan 1 1

17AI0145 1,113.25 1 1 4/27/2017 1 5/4/2017 1 5/16/2017 1 6/23/2017 1 7/3/2017 1 7/10/2017 1,107.69 1,074.45 33.23 3.00% 1 100.00% 100.00% 0.00%
Mataas na Paaralang Juan C. Laya San Manuel,
Pangasinan 1 1

16AI0032 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/6/2016 6,382.00 6,350.09 6,189.98 6,189.98 160.11 2.52% 1 100.00% 100.00% 0.00%
35 FLORES NHS, Umingan, pangasinan 1 1

17AI0050 6,382.00 1 4 3/9/2017 1 3/16/2017 1 3/31/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 6,382.00 6,200.09 6,014.05 6,014.05 186.04 3.00% 1 100.00% 100.00% 0.00%
San Isidro NHS, San Nicolas 1 1

16AI0029 14,897.52 1 8 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 14,897.52 14,823.03 14,422.78 14,422.78 400.25 2.70% 1 100.00% 100.00% 0.00%

36 AMAMPEREZ AGRO-INDUSTRIAL HS, Villasis, Pangasinan 1 1

17AI0049 8,296.00 1 6 3/9/2017 1 3/16/2017 1 3/31/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 8,296.00 8,104.52 7,860.45 7,860.45 244.07 3.01% 1 100.00% 100.00% 0.00%
San Rafael ES, San Nicolas, Pangasinan 1 1

16AI0021 6,382.00 1 4 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 6,382.00 6,350.09 6,203.32 6,203.32 146.77 2.31% 1 100.00% 100.00% 0.00%
37 BARANGOBONG NHS, Villasis, pangasinan 1 1

17AI0082 30,242.66 1 18 3/24/2017 1 3/31/2017 1 4/17/2017 1 4/24/2017 1 5/3/2017 1 5/10/2017 30,242.66 29,640.23 28,749.56 28,749.56 890.66 3.00% 1 100.00% 100.00% 0.00%
San Quintin NHS San Quintin 1 1

16AI0031 14,897.52 1 8 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 14,897.52 14,823.03 14,415.39 6/19/1939 407.64 2.75% 1 100.00% 100.00% 0.00%
38 UNZAD NHS, Villasis, Pangasinan 1 1

17AI0089 30,242.66 1 18 3/27/2017 1 4/3/2017 1 4/18/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 30,242.66 29,640.23 28,750.48 28,750.48 889.75 3.00% 1 100.00% 100.00% 0.00%
San Quintin NHS San Quintin 1 1

16AI0023 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,199.25 6,191.04 150.84 2.38% 1 100.00% 100.00% 0.00%
39 CALEPAAN COMM. SCH.Asingan, Pangasinan 1 1

17AI0079 12,898.00 1 10 3/23/2017 1 3/30/2017 1 4/12/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 12,898.00 12,619.02 12,240.43 12,240.43 378.59 3.00% 1 100.00% 100.00% 0.00%
Cabalaoangan ES, San Quintin 1 1

16AI0036 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,191.04 6,191.04 159.05 2.50% 1 100.00% 100.00% 0.00%
40 SOBOL ES, Asingan, Pangasinan 1 1

17AI0047 10,985.00 1 8 3/9/2017 1 3/16/2017 1 3/31/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 10,985.00 10,780.08 10,414.62 10,414.62 365.45 3.39% 1 100.00% 100.00% 0.00%
Sisenado V. Tecson ES, San Quintin 1 1

16AI0033 1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/15/2016 1 6/24/2016 1 7/3/2016 1,833.00 1,823.84 1,778.76 1,778.76 45.07 2.47% 1 100.00% 100.00% 0.00%
41 CAPULAAN ES, Balungao, Pangasinan 1 1

17AI0046 21,970.00 1 16 3/9/2017 1 3/16/2017 1 3/31/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 21,970.00 21,560.15 20,912.62 20,912.62 647.53 3.00% 1 100.00% 100.00% 0.00%

Eastern Pangasinan Agricultural College Sta. Maria 1 1

6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,174.54 6,174.54 175.55 2.76% 1 100.00% 100.00% 0.00%
42 KITA-KITA ES, Balungao, Pangasinan 1 1

17AI0042 2,226.51 1 1 3/8/2017 1 3/15/2017 1 3/30/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 2,226.51 2,215.38 2,148.16 2,148.16 67.22 3.03% 1 100.00% 100.00% 0.00%

Eastern Pangasinan Agricultural College Sta. Maria 1 1

1,110.00 1 1 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/14/2016 1 6/23/2016 1 6/30/2016 1,110.00 1,104.45 1,076.29 1,076.29 28.16 2.55% 1 100.00% 100.00% 0.00%
43 SAN AURELIO 3RD ES, Balungao, Pangasinan 1 1

17ai0090 6,382.00 1 4 3/27/2017 1 4/3/2017 1 4/18/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 6,382.00 6,168.18 5,983.13 5,983.13 185.05 3.00% 1 100.00% 100.00% 0.00%
Sta. Cruz IS, Sta. Maria, Pangasinan 1 1

16AI0057 1,958.00 1 2 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 1,958.00 1,948.21 1,903.44 1,903.44 44.77 2.30% 1 100.00% 100.00% 0.00%
44 SAN MARCELINO ES, Balungao, Pangasinan 1 1

16AI0058 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 6,382.00 6,350.09 6,159.76 6,159.76 190.33 3.00% 1 100.00% 100.00% 0.00%
45 SUMABNIT NHS, Binalonan, Pangasinan 1 1

16AI0040 1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/15/2016 1 6/24/2016 1 7/3/2016 1,833.00 1,823.84 1,780.32 1,780.32 43.52 2.39% 1 100.00% 100.00% 0.00%
46 ACOP ES, Rosales, Pangasinan 1 1

6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,191.11 6,191.11 158.98 2.50% 1 100.00% 100.00% 0.00%
47 CABALAOANGAN ES, Rosales, Pangasinan 1 1

1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/14/2016 1 6/23/2016 1 6/30/2016 1,833.00 1,823.84 1,780.32 1,780.32 43.52 2.39% 1 100.00% 100.00% 0.00%
48 CAMANGAAN ES, Rosales, Pangasinan 1 1

1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/15/2016 1 6/24/2016 1 7/3/2016 1,833.00 1,823.84 1,782.26 1,782.26 41.57 2.28% 1 100.00% 100.00% 0.00%
49 CAPITAN TOMAS PINE ES, Rosales, Pangasinan 1 1
6th District

15AI0421 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,191.34 6,191.34 158.75 2.50% 1 100.00% 100.00% 0.00%
50 CARMEN ES, Rosales, Pangasinan 1 1

16AI0026 1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/15/2016 1 6/24/2016 1 7/3/2016 1,833.00 1,823.84 1,778.23 1,778.23 45.61 2.50% 1 100.00% 100.00% 0.00%
51 RABAGO ES, Rosales, Pangasinan 1 1

15AI0339 1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/14/2016 1 6/23/2016 1 6/30/2016 1,833.00 1,823.84 1,778.23 1,778.23 45.61 2.50% 1 100.00% 100.00% 0.00%
52 RIZAL ES, Rosales, Pangasinan 1 1

15AI0338 J UAN C. LAYA MEMORIAL SCHOOL, San Manuel, 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,191.34 6,191.34 158.75 2.50% 1 100.00% 100.00% 0.00%
53 Pangasinan 1 1

16ai0056 1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/14/2016 1 6/23/2016 1 6/30/2016 1,833.00 1,823.84 1,778.18 1,778.18 45.66 2.50% 1 100.00% 100.00% 0.00%
54 LAPALO ES, San Manuel, Pangasinan 1 1

15AI0356 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,191.34 6,191.34 158.75 2.50% 1 100.00% 100.00% 0.00%
55 SAN BONIFACIO ES, San Manuel, Pangasinan 1 1

15AI0410 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,177.17 6,177.17 172.92 2.72% 1 100.00% 100.00% 0.00%
56 EAST CENTRAL ES, San Nicolas, Pangasinan 1 1

16AI0039 1,873.00 1 2 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/20/2016 1 6/29/2016 1 7/6/2016 1,873.00 1,863.64 1,844.90 1,884.90 18.73 1.01% 1 100.00% 100.00% 0.00%
57 PUYAO ES, San Nicolas, Pangasinan 1 1

15AI0411 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,177.17 6,177.17 172.92 2.72% 1 100.00% 100.00% 0.00%
58 STO. TOMAS NHS, San Nicolas, pangasinan 1 1

15AI0357 1,110.00 1 1 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/14/2016 1 6/23/2016 1 6/30/2016 1,110.00 1,104.45 1,076.84 1,076.84 27.61 2.50% 1 100.00% 100.00% 0.00%

59 DON LUIS DOMINGO SR. ES, San Quintin, Pangasinan 1 1

16AI0020 1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/15/2016 1 6/24/2016 1 7/3/2016 1,833.00 1,823.84 1,778.23 1,778.23 45.60 2.50% 1 100.00% 100.00% 0.00%
60 GONZALO ES, San Quintin, Pangasinan 1 1

15AI0377 1,110.00 1 1 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/14/2016 1 6/23/2016 1 6/30/2016 1,110.00 1,104.45 1,079.06 1,079.06 25.39 2.30% 1 100.00% 100.00% 0.00%
61 PUGOT ES, Sta. Maria, Pangasinan 1 1

15AI0378 3,705.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 3,705.00 3,686.48 3,608.98 3,608.98 77.50 2.10% 1 100.00% 100.00% 0.00%
62 SAN PABLO ES, Sta. Maria, Pangasinan 1 1

15AI0389 2,668.00 1 3 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 2,668.00 2,654.66 2,594.32 2,594.32 60.34 2.27% 1 100.00% 100.00% 0.00%
63 STA. ROSA ES, Sta. Maria, Pangasinan 1 1

15AI0379 1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/15/2016 1 6/24/2016 1 7/3/2016 1,833.00 1,823.84 1,788.09 1,788.09 35.75 1.96% 1 100.00% 100.00% 0.00%
64 EVANGELISTA ES, Tayug, pangasinan 1 1

15AI0382 2,668.00 1 3 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 2,668.00 2,654.66 2,594.32 2,594.32 60.34 2.27% 1 100.00% 100.00% 0.00%
65 LEGASPI ES, Tayug, Pangasinan 1 1
15AI0380 1,110.00 1 1 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/15/2016 1 6/24/2016 1 7/3/2016 1,110.00 1,104.45 1,078.27 1,078.27 26.18 2.37% 1 100.00% 100.00% 0.00%
66 STO. DOMINGO ES, Tayug, pangasinan 1 1

15AI0381 2,668.00 1 3 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 2,668.00 2,654.66 2,598.56 2,598.56 56.10 2.11% 1 100.00% 100.00% 0.00%
67 BANTUG ES, Umingan, pangasinan 1 1

15AI0385 2,668.00 1 3 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 2,668.00 2,654.66 2,594.41 2,594.41 60.25 2.27% 1 100.00% 100.00% 0.00%
68 BARACBAC ES, Umingan, pangasinan 1 1

15AI0391 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,175.55 6,175.55 174.54 2.75% 1 100.00% 100.00% 0.00%
69 BARACBAC NHS, Umingan, Pangasinan 1 1

15AI0403 1,110.00 1 1 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 1,110.00 1,104.45 1,078.20 1,078.20 26.25 2.38% 1 100.00% 100.00% 0.00%
70 CAROSALESAN ES, Umingan, Pangasinan 1 1

15AI0407 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,190.00 6,190.00 160.09 2.52% 1 100.00% 100.00% 0.00%

71 DECRETO COMMUNITY SCHOOL, Umingan, Pangasinan 1 1

15AI0384 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,190.00 6,190.00 160.09 2.52% 1 100.00% 100.00% 0.00%
72 DON MONTANO ES, Umingan, Pangasinan 1 1

15AI0386 1,833.00 1 2 2/29/2016 1 3/7/2016 1 3/21/2016 1 6/15/2016 1 6/24/2016 1 7/3/2016 1,833.00 1,823.84 1,782.26 1,782.26 41.57 2.28% 1 100.00% 100.00% 0.00%
73 PAPALLASEN ES, Umingan, Pangasinan 1 1
Batch 1

8,314.97 1 6 2/23/2016 1 3/1/2016 1 3/15/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 8,314.97 8,123.39 8,104.62 8,104.62 18.77 0.23% 1 100.00% 100.00% 0.00%

Const'n. of senior H/S Classroom-Don Alipio Fernandez Sr


1 I/S Urdaneta City, pangasinan 1 1

6,390.00 1 4 2/23/2016 1 3/1/2016 1 3/15/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 6,390.00 6,208.05 6,028.01 6,028.01 180.04 2.90% 1 100.00% 100.00% 0.00%

Const'n. of senior H/S Classroom-San Jose Leet E/S


2 Urdaneta City, Pangasinan 1 1
Batch 8

2,418.00 1 1 3/10/2016 1 3/17/2016 1 3/29/2016 1 6/20/2016 1 6/29/2016 1 7/6/2016 2,418.00 2,405.91 2,349.69 2,349.60 56.22 2.34% 1 100.00% 100.00% 0.00%

Const'n. of TechVoc Angela Valdez Ramos NHS Asingan,


1 Pangasinan 1 1

2,418.00 1 1 5/19/2016 1 5/26/2016 1 6/7/2016 1 6/24/2016 1 7/4/2016 1 7/11/2016 2,418.00 2,405.91 2,345.73 2,345.73 60.18 2.50% 1 100.00% 100.00% 0.00%

2 Const'n. of Techvoc- bantay Insik IS Sison, Pangasinan 1 1


Batch 9 - -

26,702.47 1 16 5/11/2016 1 5/18/2016 1 5/30/2016 1 8/22/2016 1 9/1/2016 1 9/8/2016 26,702.47 26,418.96 25,692.43 25,629.43 726.53 2.75% 1 100.00% 100.00% 0.00%
1 4 storey 16 CL Luciano Mila NHS Asingan 1 1

22,152.34 1 12 5/12/2016 1 5/19/2016 1 5/31/2016 1 8/22/2016 1 9/1/2016 1 9/8/2016 22,152.34 21,891.58 21,289.55 21,289.55 602.03 2.75% 1 100.00% 100.00% 0.00%
2 4 storey 12 CL Luciano Milan NHS Asingan 1 1

62,205.78 1 40 5/5/2016 1 5/12/2016 1 5/24/2016 1 7/7/2016 1 7/18/2016 1 7/26/2016 62,205.78 61,594.75 60,362.85 60,362.85 1,231.90 2.00% 1 100.00% 100.00% 0.00%

6 2 unit 4 storey 20Cl Tayug NHS, tayug, pangasinan 1 1

13,913.51 1 8 5/12/2016 1 5/19/2016 1 5/31/2016 1 6/20/2016 1 6/29/2016 1 7/6/2016 13,913.51 13,693.94 12,518.31 12,518.31 1,175.63 8.59% 1 100.00% 100.00% 0.00%

4 storey 8 CL Don Ramon E Costales MNHS, Villasis,


9 Pangasinan 1 1
Batch 10

2,418.00 1 1 5/11/2016 1 5/18/2016 1 5/30/2016 1 7/28/2016 1 8/8/2016 1 8/16/2016 2,418.00 2,405.91 2,351.42 2,351.42 54.49 2.26% 1 100.00% 100.00% 0.00%
1 Techvoc Senior H/S Tayug NHS 1 1
Batch 11
Batch 12

2,418.00 1 1 7/14/2016 1 7/21/2016 1 8/3/2016 1 9/27/2016 1 10/7/2016 1 10/17/2016 2,418.00 2,393.82 2,338.90 2,338.90 54.92 2.29% 1 100.00% 100.00% 0.00%
Const'n. of Techvoc San Isidro NHS, San Nicolas,
Pangasinan 1 1

2,418.00 1 1 7/14/2016 1 7/21/2016 1 8/3/2016 1 9/27/2016 1 10/7/2016 1 11/14/2016 2,418.00 2,393.82 2,338.90 2,338.90 54.92 2.29% 1 100.00% 100.00% 0.00%

Const'n. of techvoc Panganiban NHS, Tayug, Pangasinan 1 1


Batch 13

15,121.33 1 9 9/18/2017 1 9/15/2017 1 9/27/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 19,155.16 18,603.96 18,603.96 1 100.00% 100.00% 0.00%
Narciso R. Ramos E/S SPED Center Asingan 1 1
17AI0084 2,132.47 1 2 3/24/2017 1 3/31/2017 1 4/17/2017 1 4/24/2017 1 5/3/2017 1 5/10/2017 2,132.47 2,111.14 2,047.80 2,047.80 63.35 3.00% 1 100.00% 100.00% 0.00%
Li seng Giap E/S, Rosales 1 1

17AI0144 18,222.27 1 12 4/27/2017 1 5/4/2017 1 1 1 1 12/18/2017 15,746.21 15,746.21 (15,746.21) 1 100.00% 100.00% 0.00%
Flores IS San Manuel, Pangasinan 1 1

17AI0151 40,067.95 1 28 4/27/2017 1 5/4/2017 1 1 1 1 12/18/2017 34,782.54 34,782.54 (34,782.54) 1 100.00% 100.00% 0.00%
Mataas na Paaralang Juan C. Laya San Manuel,
Pangasinan 1 1

17AI0043 1,221.00 1 1 3/8/2017 1 3/15/2017 1 3/30/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 1,221.00 1,214.90 1,176.43 1,176.43 38.46 3.17% 1 100.00% 100.00% 0.00%
Cabayawasan ES, San Manuel, Pangasinan 1 1
17AI0041 1,221.00 1 1 3/8/2017 1 3/15/2017 1 3/30/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 1,221.00 1,214.90 1,178.45 1,178.45 36.45 3.00% 1 100.00% 100.00% 0.00%
Kulangew ES, San Nicolas 1 1
1 6 9/18/2017 1 9/15/2017 1 9/27/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 10,730.76 10,413.71 10,413.71 317.05 1 100.00% 100.00% 0.00%
Toboy NHS Asingan 1 1
17AI0083 Toboy NHS Asingan 2,226.51 1 2 3/24/2017 1 3/31/2017 1 4/17/2017 1 4/24/2017 1 5/3/2017 1 5/10/2017 2,226.51 2,204.24 2,138.05 2,138.05 66.19 3.00% 1 100.00% 100.00% 0.00%
1 1
6,473.00 1 4 9/8/2017 1 9/15/2017 1 9/27/2017 1 10/11/2017 1 10/13/2017 1 10/18/2017 8,259.06 8,020.00 8,020.00 239.06 1 100.00% 100.00% 0.00%
Domanpot ES Asingan 1 1
10,985.00 1 8 1 1 1 1 1 9/19/2017 11,166.12 11,166.12 (11,166.12) 1 100.00% 100.00% 0.00%
Domanpot ES Asingan 1 1
17AI0077 6,382.00 1 4 3/23/2017 1 3/30/2017 1 4/12/2017 1 4/25/2017 1 5/4/2017 1 5/11/2017 6,382.00 6,168.18 5,983.12 5,983.12 185.06 3.00% 1 100.00% 100.00% 0.00%
Panganiban NHS Tayug 1 1
17AI0045 1,938.61 1 2 3/8/2017 1 3/15/2017 1 3/30/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 1,938.61 1,928.91 1,861.63 1,861.63 67.28 3.49% 1 100.00% 100.00% 0.00%
Pangangaan ES, Umingan 1 1
17AI0044 San Pablo ES, Umingan 1,938.61 1 2 3/8/2017 1 3/15/2017 1 3/30/2017 1 3/31/2017 1 4/10/2017 1 4/18/2017 1,938.61 1,928.91 1,861.62 1,861.62 67.30 3.49% 1 100.00% 100.00% 0.00%
1 1

###17AI0081 6,382.00 1 4 3/24/2017 1 3/31/2017 1 4/17/2017 1 4/24/2017 1 5/3/2017 1 5/10/2017 6,382.00 6,168.18 5,983.12 5,983.12 185.06 3.00% 1 100.00% 100.00% 0.00%
Maseil Seil Alo-O NHS, Umingan 1 1

Batch 7

15AI0419 30,242.66 1 18 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 30,242.66 30,091.44 29,263.34 29,263.34 828.11 2.75% 1 100.00% 100.00% 0.00%
5th 1 ANGELA VALDEZ NHS,Asingan, pangasinan 1 1

15AI0420 21,383.01 1 15 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 21,383.01 21,276.10 20,638.51 20,638.51 637.59 3.00% 1 100.00% 100.00% 0.00%
2 BAUTISTA NHS, Bautista, pangasinan 1 1

16AI0038 15,121.33 1 9 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 15,121.33 15,045.62 14,594.97 14,594.97 450.65 3.00% 1 100.00% 100.00% 0.00%
3 BAUTISTA NHS, Bautista, pangasinan 1 1

15AI0413 6,382.00 1 4 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,175.70 6,175.70 174.39 2.75% 1 100.00% 100.00% 0.00%

4 SAN MACARIO NHS, Natividad, pangasinan 1 1

15AI0412 6,382.00 1 4 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,172.22 6,172.22 177.87 2.80% 1 100.00% 100.00% 0.00%
5 DALUMPINAS NHS, San Nicolas, Pangasinan 1 1

15AI0409 26,702.47 1 16 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 26,702.47 26,568.96 25,932.39 25,932.39 636.57 2.40% 1 100.00% 100.00% 0.00%
6 UMINGAN CENTRAL NHS, Umingan 1 1
16AI0025 14,897.52 1 8 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 14,897.52 14,823.03 14,378.48 14,378.48 444.55 3.00% 1 100.00% 100.00% 0.00%
7 PIAZ NHS, Villasis 1 1

15AI0429 15,121.33 1 9 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 15,121.33 15,045.72 14,728.53 14,728.53 317.19 2.11% 1 100.00% 100.00% 0.00%
8 ARBOLEDA NHS, Alcala, Pangasinan 1 1

15AI0430 31,102.89 1 20 3/2/2016 1 3/9/2016 1 3/22/2016 1 5/13/2016 1 5/19/2016 1 5/26/2016 31,102.89 30,947.38 30,172.50 30,172.50 774.87 2.50% 1 100.00% 100.00% 0.00%
9 CIPRIANO P. PRIMICIAS NHS, Alcala, Pangasinan 1 1

15AI0431 21,383.01 1 15 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 21,383.01 21,276.10 20,686.45 20,686.45 589.65 2.77% 1 100.00% 100.00% 0.00%
10 BALUNGAO NHS, Balungao, Pangasinan 1 1

15AI0423 14,897.52 1 8 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 14,897.52 14,823.03 14,412.05 14,412.05 410.98 2.77% 1 100.00% 100.00% 0.00%
11 SAN AURELIO NHS, balungao, Pangasinan 1 1

15AI0422 6,382.00 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 6/17/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,172.22 6,172.22 177.87 2.80% 1 100.00% 100.00% 0.00%
12 SAN LEON NHS, balungao, Pangasinan 1 1

15AI0425 8,296.00 1 6 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/25/2016 1 6/1/2016 8,296.00 8,254.52 8,006.95 8,006.95 247.57 3.00% 1 100.00% 100.00% 0.00%
13 SAN FELIPE NHS,Binalonan, Pangasinan 1 1

15AI0427 6,319.34 1 4 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/25/2016 1 6/1/2016 6,319.34 6,287.74 6,099.10 6,099.10 188.64 3.00% 1 100.00% 100.00% 0.00%
14 CABARUAN NHS, Urdaneta City 1 1

15AI0428 6,319.34 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 6,319.34 6,287.74 6,110.05 6,110.05 177.70 2.83% 1 100.00% 100.00% 0.00%
15 CAMABU NHS, Urdaneta City 1 1

15AI0432 6,319.34 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 6,319.34 6,287.74 6,125.77 6,125.77 161.97 2.58% 1 100.00% 100.00% 0.00%
16 CATABLAN INTEGRATED SCHOOL, Urdaneta City 1 1

15AI0426 6,319.34 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 6,319.34 6,287.74 6,099.10 6,099.10 188.64 3.00% 1 100.00% 100.00% 0.00%
17 NANCALOBASAAN NHS, Urdaneta City 1 1

15AI0433 6,319.34 1 4 3/3/2016 1 3/10/2016 1 3/23/2016 1 5/16/2016 1 5/25/2016 1 6/1/2016 6,319.34 6,287.74 6,099.09 6,099.09 188.65 3.00% 1 100.00% 100.00% 0.00%
18 PEDRO T. ORATA NHS, Urdaneta City 1 1

15AI0434 14,897.52 1 8 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 14,897.52 14,823.03 14,402.97 14,402.97 420.06 2.83% 1 100.00% 100.00% 0.00%
19 SAN MIGUEL NHS, Natividad, Pangasinan 1 1

15AI0440 6,382.00 1 4 3/2/2016 1 3/9/2016 1 3/22/2016 1 6/16/2016 1 6/24/2016 1 7/3/2016 6,382.00 6,350.09 6,178.99 6,178.99 171.10 2.69% 1 100.00% 100.00% 0.00%
24 CACABUGAOAN NHS, San Nicolas, Pangasinan 1 1
TOTAL 1,433,089.02 120.00 914.00 119.00 - 1.00 120.00 120.00 120.00 120.00 120.00 120.00 1,253,682.92 1,329,679.06 1,288,792.55 1,293,156.48 31,977.34 2.40% 122.00 - - 100.00 100.00 -
DISTRICT: Pangasinan 3rd District Engineering Office
REGION: Region 1
PRECONSTRUCTION RESULT OF BIDDING CONSTRUCTION For On-going Projects

Number of Projects VARIANCE No. of Projects STATUS DISBURSEMENT

APPROPRIATION

Awarded Amount

Contract Amount
Physical Orig.
PROGRAMMED No. of Revised
IMPLEMENTING OFFICE target Contrac
Contract Revised Expiry

ABC
Date Advertised
AMOUNT (P'000) Projects t Contractor Project Engineer Project Facilitator Date Started Original Expiry Date Remarks MUNICIPALITY

Date Awarded

Date Contract
(unit)

Date Bidding
Duration Date

Completed

Completed
Duratio

On-Going

Approved

Date NTP

On-going
(cd)

Pre-Bid
Sched Actual n (cd)

NYS

NYS
Amount (P'000) (%) Accomp Accomp. Slippage OBLIGATION DISBURSEMENT VARIANCE
(%) (%)

18AI0269 Construction of BHS, Artacho BHS, Bautista, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,152,136.56 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 1,188,000.00 75 135 Mightyway CS Jayson C. Bascos JEAN PAUL 09-Aug-18 22-Oct-18 22-Dec-18 Completed BAUTISTA 1,188,000.00 1,188,000.00

18AI0270 Construction of BHS, Baluyot BHS, Bautista, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,152,336.13 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 1,188,000.00 75 135 Safeway CS Jayson C. Bascos JEAN PAUL 09-Aug-18 22-Oct-18 22-Dec-18 Completed BAUTISTA 1,188,000.00 1,188,000.00

18AI0271 Construction of BHS, Diaz BHS, Bautista, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,151,642.52 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,180,000.000 1,180,000.00 75 135 WM Salayog CGM Jayson C. Bascos JEAN PAUL 09-Aug-18 22-Oct-18 22-Dec-18 Completed BAUTISTA 1,188,000.00 1,188,000.00

18AI0272 Construction of BHS, Nibaliw Norte BHS, Bautista, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,151,442.09 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 1,188,000.00 75 135 WM Salayog CGM Jayson C. Bascos JEAN PAUL 09-Aug-18 22-Oct-18 22-Dec-18 Completed BAUTISTA 1,188,000.00 1,188,000.00

18AI0273 Construction of BHS, Poponto BHS, Bautista, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,200,000.00 1,188,000.00 1,152,336.13 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 1,188,000.00 75 135 Safeway CS Jayson C. Bascos JEAN PAUL 08-Aug-18 21-Oct-18 21-Dec-18 Completed BAUTISTA 1,188,000.00 1,188,000.00

18AI0274 Construction of BHS, Villanueva BHS, Bautista, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,200,000.00 1,188,000.00 1,152,136.52 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 1,188,000.00 75 135 Mightyway CS Jayson C. Bascos JEAN PAUL 08-Aug-18 21-Oct-18 21-Dec-18 Completed BAUTISTA 1,188,000.00 1,188,000.00

FOR TERMINATION due to


18AI0275 Construction of BHS, Anonas BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,151,363.18 1,151,363.18 36,636.82 3.08% 1 3.00% 7.00% 4.00% 1,151,363.180 1,151,363.180 - 75 270 MCB CS Jayson C. Bascos KARL / JEFF 09-Aug-18 22-Oct-18 06-May-19 non-availability of site URDANETA 34,540.90 80,595.42 1,151,363.18
location

18AI0276 Construction of BHS, Casantaan BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,200,000.00 1,188,000.00 1,151,363.18 1,151,363.18 36,636.82 3.08% 1 42.35% 45.51% 3.16% 1,151,363.180 1,151,363.180 - 75 270 BET CS Jayson C. Bascos KARL / JEFF 08-Aug-18 21-Oct-18 05-May-19 On-going URDANETA 487,602.31 523,985.38 1,151,363.18

18AI0277 Construction of BHS, Catablan BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,151,363.18 1,151,363.18 36,636.82 3.08% 1 100.00% 100.00% 0.00% 1,151,363.180 591,986.740 559,376.44 75 135 MCB CS Jayson C. Bascos KARL / JEFF 09-Aug-18 22-Oct-18 22-Dec-18 Completed URDANETA 1,151,363.18 1,151,363.18 591,986.74 559,376.44

18AI0278 Construction of BHS, Macalong BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,149,668.17 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 590,154.900 597,845.10 75 155 BET CS Jayson C. Bascos KARL / JEFF 09-Aug-18 22-Oct-18 11-Jan-19 Completed URDANETA 1,188,000.00 1,188,000.00 590,154.90 597,845.10

18AI0279 Construction of BHS, Nancamaliran East BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,151,936.13 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 1,007,045.620 180,954.38 75 155 ZOTA TC Jayson C. Bascos KARL / JEFF 09-Aug-18 22-Oct-18 11-Jan-19 Completed URDANETA 1,188,000.00 1,188,000.00 1,007,045.62 180,954.38

18AI0280 Construction of BHS, Oltuma BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,151,661.05 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 417,173.470 770,826.53 75 155 ZOTA TC Jayson C. Bascos KARL / JEFF 09-Aug-18 22-Oct-18 11-Jan-19 Completed URDANETA 1,188,000.00 1,188,000.00 417,173.47 770,826.53

18AI0281 Construction of BHS, Palina East BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 31, 2018 1 August 6, 2018 1 August 9, 2018 1,200,000.00 1,188,000.00 1,152,436.13 1,188,000.00 - 0.00% 1 100.00% 100.00% 0.00% 1,188,000.000 464,948.120 723,051.88 75 155 WM Salayog CGM Jayson C. Bascos KARL / JEFF 09-Aug-18 22-Oct-18 11-Jan-19 Completed URDANETA 1,188,000.00 1,188,000.00 464,948.12 723,051.88

18AI0282 Construction of BHS, Pinmaludpod BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,200,000.00 1,188,000.00 1,152,442.09 1,152,442.09 35,557.91 2.99% 1 100.00% 100.00% 0.00% 1,152,442.090 466,726.020 685,716.07 75 135 Mightyway CS Jayson C. Bascos KARL / JEFF 08-Aug-18 21-Oct-18 21-Dec-18 Completed URDANETA 1,152,442.09 1,152,442.09 466,726.02 685,716.07

18AI0283 Construction of BHS, Sto. Domingo BHS, Urdaneta City, Pangasinan 1,200.00 1 1 1 1 June 8, 2018 1 June 15, 2018 1 June 28, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,200,000.00 1,188,000.00 1,151,185.53 1,151,185.53 36,814.47 3.10% 1 100.00% 100.00% 0.00% 1,151,185.530 1,093,626.240 57,559.29 75 135 BET CS Jayson C. Bascos KARL / JEFF 08-Aug-18 21-Oct-18 21-Dec-18 Completed URDANETA 1,151,185.53 1,151,185.53 1,093,626.24 57,559.29

Construction of BHS, Toboy BHS, Asingan, Pangasinan 1,240.00 Rivbros Constn Factor & ASINGAN 1,190,134.01 1,190,134.01 1,068,954.58 121,179.43
18AI0284 1 1 1 1 July 13, 2018 1 July 20, 2018 1 August 02, 2018 1 August 22, 2018 1 August 24, 2018 1 August 29, 2018 1,240,000.00 1,227,600.00 1,190,134.01 1,190,134.01 37,465.99 3.05% 1 100.00% 100.00% 0.00% 1,190,134.010 1,068,954.580 121,179.43 75 Jayson C. Bascos KING 29-Aug-18 11-Nov-18 Completed
Devt

18AI0285 Construction of BHS, Angayan Sur BHS, Balungao, Pangasinan 1,225.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,225,000.00 1,212,750.00 1,181,704.94 1,181,704.94 31,045.06 2.56% 1 100.00% 100.00% 0.00% 1,181,704.940 1,000,778.790 180,926.15 75 MKM MKtg. Jennycyl Ginez R. RAQUEDAN 08-Aug-18 21-Oct-18 Completed BALUNGAO 1,181,704.94 1,181,704.94 1,000,778.79 180,926.15

18AI0286 Construction of BHS, Pugaro BHS, Balungao, Pangasinan 1,240.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,195,713.82 1,195,713.82 31,886.18 2.60% 1 100.00% 100.00% 0.00% 1,195,713.820 512,522.180 683,191.64 75 150 MKM MKtg. Jennycyl Ginez R. RAQUEDAN 08-Aug-18 21-Oct-18 05-Jan-19 Completed BALUNGAO 1,195,713.82 1,195,713.82 512,522.18 683,191.64

18AI0287 Construction of BHS, San Aurelio 3rd BHS, Balungao, Pangasinan 1,240.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,195,713.82 1,195,713.82 31,886.18 2.60% 1 100.00% 100.00% 0.00% 1,195,713.820 1,013,225.930 182,487.89 75 MKM MKtg. Jennycyl Ginez R. RAQUEDAN 08-Aug-18 21-Oct-18 Completed BALUNGAO 1,195,713.82 1,195,713.82 1,013,225.93 182,487.89

18AI0288 Construction of BHS, San Raymundo BHS, Balungao, Pangasinan 1,500.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,500,000.00 1,485,000.00 1,446,361.42 1,446,361.42 38,638.58 2.60% 1 96.00% 100.00% 4.00% 1,446,361.420 1,222,203.870 224,157.55 75 105 MKM MKtg. Jennycyl Ginez R. RAQUEDAN 08-Aug-18 21-Oct-18 21-Nov-18 Completed BALUNGAO 1,388,506.96 1,446,361.42 1,222,203.87 224,157.55

Construction of BHS, San Eugenio BHS, Natividad, Pangasinan 1,240.00 Ucore Constn & Devt. NATIVIDAD 1,195,156.36 1,195,156.36 1,003,967.26 191,189.10
18AI0289 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 09, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,195,156.36 1,195,156.36 32,443.64 2.64% 1 100.00% 100.00% 0.00% 1,195,156.360 1,003,967.260 191,189.10 75 Hipolito F. Melchor, Jr. SILVER 08-Aug-18 21-Oct-18 Completed
Corp.

18AI0290 Construction of BHS, Carmay East BHS, Rosales, Pangasinan 1,500.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,500,000.00 1,485,000.00 1,455,290.04 1,485,000.00 - 0.00% 1 96.00% 100.00% 4.00% 1,485,000.000 1,485,000.000 - 75 105 MKM MKtg. Manuel C. Novencido, Jr. R. RAQUEDAN 08-Aug-18 21-Oct-18 21-Nov-18 Completed ROSALES 1,425,600.00 1,485,000.00 1,485,000.00 -

Construction of BHS, Palakipak BHS, Rosales, Pangasinan 1,240.00 Rivbros Constn Factor & ROSALES 1,178,496.00 1,227,600.00 1,227,600.00 -
18AI0291 1 1 1 1 July 19, 2018 1 July 26, 2018 1 August 08, 2018 1 August 24, 2018 1 August 31, 2018 1 September 5, 2018 1,240,000.00 1,227,600.00 1,190,449.03 1,227,600.00 - 0.00% 1 96.00% 100.00% 4.00% 1,227,600.000 1,227,600.000 - 75 Manuel C. Novencido, Jr. R. RAQUEDAN 05-Sep-18 18-Nov-18 Completed
Devt

18AI0292 Construction of BHS, Pangaoan BHS, Rosales, Pangasinan 1,500.00 1 1 1 1 July 13, 2018 1 July 20, 2018 1 August 02, 2018 1 August 22, 2018 1 August 24, 2018 1 August 29, 2018 1,500,000.00 1,485,000.00 1,454,582.50 1,485,000.00 - 0.00% 1 96.00% 100.00% 4.00% 1,485,000.000 1,485,000.000 - 85 R.F. FLORES Constn. Manuel C. Novencido, Jr. R. RAQUEDAN 29-Aug-18 21-Nov-18 Completed ROSALES 1,425,600.00 1,485,000.00 1,485,000.00 -

18AI0293 Construction of BHS, Bensican BHS, San Nicolas, Pangasinan 1,240.00 1 1 1 1 July 13, 2018 1 July 20, 2018 1 August 02, 2018 1 August 15, 2018 1 August 20, 2018 1 August 24, 2018 1,240,000.00 1,227,600.00 1,198,772.17 1,198,772.17 28,827.83 2.35% 1 100.00% 100.00% 0.00% 1,198,772.170 1,198,772.170 - 75 R.F. FLORES Constn. Hipolito F. Melchor, Jr. MELCHOR 24-Aug-18 06-Nov-18 Completed SAN NICOLAS 1,198,772.17 1,198,772.17 1,198,772.17 -

18AI0294 Construction of BHS, Cabuloan BHS, San Nicolas, Pangasinan 1,240.00 1 1 1 1 July 13, 2018 1 July 20, 2018 1 August 02, 2018 1 August 15, 2018 1 August 20, 2018 1 August 24, 2018 1,240,000.00 1,227,600.00 1,198,772.17 1,198,772.17 28,827.83 2.35% 1 100.00% 100.00% 0.00% 1,198,772.170 1,198,772.170 - 75 R.F. FLORES Constn. Hipolito F. Melchor, Jr. MELCHOR 24-Aug-18 06-Nov-18 Completed SAN NICOLAS 1,198,772.17 1,198,772.17 1,198,772.17 -

18AI0295 Construction of BHS, San Felipe East BHS, San Nicolas, Pangasinan 1,240.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,195,713.82 1,227,600.00 - 0.00% 1 100.00% 100.00% 0.00% 1,227,600.000 1,227,600.000 - 75 MKM MKtg. Hipolito F. Melchor, Jr. MELCHOR 08-Aug-18 21-Oct-18 Completed SAN NICOLAS 1,227,600.00 1,227,600.00 1,166,220.00 61,380.00

Construction of BHS, Ungib BHS, San Quintin, Pangasinan 1,240.00 Ucore Constn & Devt. SAN QUINTIN 1,195,156.36 1,195,156.36 1,003,967.26 191,189.10
18AI0296 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 09, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,195,156.36 1,195,156.36 32,443.64 2.64% 1 100.00% 100.00% 0.00% 1,195,156.360 1,003,967.260 191,189.10 75 Hipolito F. Melchor, Jr. SILVER 08-Aug-18 21-Oct-18 Completed
Corp.

18AI0297 Construction of BHS, Callitang BHS, Sta. Maria, Pangasinan 1,240.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,196,877.92 1,196,877.92 30,722.08 2.50% 1 100.00% 100.00% 0.00% 1,196,877.920 1,065,221.350 131,656.57 75 RG Diaz BT Hipolito F. Melchor, Jr. MIKE 08-Aug-18 21-Oct-18 Completed STA. MARIA 1,196,877.92 1,196,877.92 1,065,221.35 131,656.57

Construction of BHS, Cauplasan BHS, Sta. Maria, Pangasinan 1,240.00 Ucore Constn & Devt. STA. MARIA 1,195,156.36 1,195,156.36 1,003,967.26 191,189.10
18AI0298 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 09, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,195,156.36 1,195,156.36 32,443.64 2.64% 1 100.00% 100.00% 0.00% 1,195,156.360 1,003,967.260 191,189.10 75 Hipolito F. Melchor, Jr. MIKE 08-Aug-18 21-Oct-18 Completed
Corp.

18AI0299 Construction of BHS, San Alejandro BHS, Sta. Maria, Pangasinan 1,240.00 1 1 1 1 July 19, 2018 1 July 26, 2018 1 August 08, 2018 1 August 24, 2018 1 August 31, 2018 1 September 5, 2018 1,240,000.00 1,227,600.00 1,198,772.17 1,198,772.17 28,827.83 2.35% 1 100.00% 100.00% 0.00% 1,198,772.170 1,067,506.620 131,265.55 75 R.F. FLORES Constn. Hipolito F. Melchor, Jr. MIKE 05-Sep-18 18-Nov-18 Completed STA. MARIA 1,198,772.17 1,198,772.17 1,067,506.62 131,265.55

18AI0300 Construction of BHS, Sta. Rosa BHS, Sta. Maria, Pangasinan 1,240.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,195,713.82 1,227,600.00 - 0.00% 1 100.00% 100.00% 0.00% 1,227,600.000 1,227,600.000 - 75 MKM MKtg. Hipolito F. Melchor, Jr. MIKE 08-Aug-18 21-Oct-18 Completed STA. MARIA 1,227,600.00 1,227,600.00 1,227,600.00 -

18AI0301 Construction of BHS, Paitan BHS, Sta. Maria, Pangasinan 1,240.00 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 02, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,240,000.00 1,227,600.00 1,195,940.42 1,195,940.42 31,659.58 2.58% 1 100.00% 100.00% 0.00% 1,195,940.420 100,883.370 1,095,057.05 75 511 BUILDERS Hipolito F. Melchor, Jr. MIKE 08-Aug-18 21-Oct-18 Completed STA. MARIA 1,195,940.42 1,195,940.42 1,005,883.37 190,057.05

18AI0302 Construction of BHS, Barangobong BHS, Tayug, Panagsinan 1,240.00 1 1 1 1 July 13, 2018 1 July 20, 2018 1 August 02, 2018 1 August 22, 2018 1 August 24, 2018 1 August 29, 2018 1,240,000.00 1,227,600.00 1,196,859.42 1,196,859.42 30,740.58 2.50% 1 100.00% 100.00% 0.00% 1,196,859.420 1,074,141.920 122,717.50 75 Lincee Gen. Constn & GM Hipolito F. Melchor, Jr. JOMILLE 29-Aug-18 11-Nov-18 - Completed TAYUG 1,196,859.42 1,196,859.42 1,074,141.92 122,717.50

18AI0303 Construction of BHS, Legaspi BHS, Tayug, Pangasinan 1,240.00 1 1 1 1 July 13, 2018 1 July 20, 2018 1 August 02, 2018 1 August 22, 2018 1 August 24, 2018 1 August 29, 2018 1,240,000.00 1,227,600.00 1,196,859.42 1,196,859.42 30,740.58 2.50% 1 100.00% 100.00% 0.00% 1,196,859.420 846,843.310 350,016.11 75 Lincee Gen. Constn & GM Hipolito F. Melchor, Jr. JOMILLE 29-Aug-18 11-Nov-18 - Completed TAYUG 1,196,859.42 1,196,859.42 846,843.31 350,016.11

Construction of BHS, Annam BHS, Umingan, Pangasinan 1,225.00 Ucore Constn & Devt. UMINGAN 1,180,753.43 1,180,753.43 991,832.90 188,920.53
18AI0304 1 1 1 1 June 11, 2018 1 June 18, 2018 1 July 09, 2018 1 July 30, 2018 1 August 3, 2018 1 August 8, 2018 1,225,000.00 1,212,750.00 1,180,753.43 1,180,753.43 31,996.57 2.64% 1 100.00% 100.00% 0.00% 1,180,753.430 991,832.900 188,920.53 75 Reynald N. Barrera ALFREDO 08-Aug-18 21-Oct-18 Completed
Corp.

18AI0305 Construction of RHU, Alcala RHU II, Alcala, Pangasinan 10,900.00 1 1 1 1 August 03, 2018 1 August 10, 2018 1 August 23, 2018 1 ### 1 ### 1 September 24, 2018 10,900,000.00 10,791,000.00 10,483,416.00 10,483,416.00 307,584.00 2.85% 1 100.00% 100.00% 0.00% 10,483,416.000 7,033,744.930 3,449,671.07 150 WM Salayog CGM Zaldy M. Del Valle ASHLEY 24-Sep-18 20-Feb-19 Completed ALCALA 10,483,416.00 10,483,416.00 7,033,744.93 3,449,671.07

18AI0306 Construction of RHU, Villasis RHU II, Villasis, Pangasinan 10,900.00 1 1 1 1 August 03, 2018 1 August 10, 2018 1 August 23, 2018 1 ### 1 ### 1 September 28, 2018 10,900,000.00 10,791,000.00 10,482,010.17 10,482,010.17 308,989.83 2.86% 1 63.50% 64.00% 0.50% 10,482,010.170 5,241,001.050 5,241,009.12 150 240 ZOTA TC Jayson C. Bascos JEAN PAUL 28-Sep-18 24-Feb-19 26-May-19 On-going VILLASIS 6,656,076.46 6,708,486.51 5,241,001.05

18AI0307 Construction of RHU, Pozorrubio RHU II, Pozorrubio, Pangasinan 10,900.00 1 1 1 1 August 03, 2018 1 August 10, 2018 1 August 23, 2018 1 ### 1 ### 1 September 28, 2018 10,900,000.00 10,791,000.00 10,483,416.00 10,791,000.00 - 0.00% 1 90.00% 100.00% 10.00% 10,791,000.000 10,791,000.000 - 150 210 Mightyway CS Joe Manongsong CHRISTINE 28-Sep-18 24-Feb-19 25-Apr-19 Completed POZORRUBIO 9,711,900.00 10,791,000.00 8,137,416.19 2,653,583.81

Rivbros Constn Factor &


18AI0308 Construction of BHS, Malico BHS, San Nicolas, Pangasinan 1,500.00 1 1 1 1 July 19, 2018 1 July 26, 2018 1 August 08, 2018 1 August 24, 2018 1 August 31, 2018 1 September 5, 2018 1,500,000.00 1,485,000.00 1,190,449.03 1,439,409.65 45,590.35 3.07% 1 100.00% 100.00% 0.00% 1,439,409.650 1,439,409.650 - 85 Hipolito F. Melchor, Jr. MELCHOR 05-Sep-18 28-Nov-18 Completed SAN NICOLAS 1,439,409.65 1,439,409.65 1,291,979.87 147,429.78
Devt

18AI0321 Completion of RHU, Natividad RHU, Natividad, Pangasinan 1,500.00 1 1 1 1 July 20, 2018 1 July 27, 2018 1 August 09, 2018 1 August 24, 2018 1 August 31, 2018 1 September 5, 2018 1,500,000.00 1,485,000.00 1,447,738.78 1,447,738.78 37,261.22 2.51% 1 100.00% 100.00% 0.00% 1,447,738.780 1,447,738.78 75 R.F. FLORES Constn. Hipolito F. Melchor, Jr. SILVER 05-Sep-18 18-Nov-18 Completed NATIVIDAD 1,447,738.78 1,447,738.78

18AI0323 Renovation of Main Building at Urdaneta City, Cabuloan RHU II 2,000.00 1 1 1 1 August 31, 2018 1 ### 1 September 20, 2018 1 October 3, 2018 1 October 12, 2018 1 October 15, 2018 2,000,000.00 1,980,000.00 1,920,590.90 1,920,590.90 59,409.10 3.00% 1 100.00% 100.00% 0.00% 1,920,590.900 1,920,590.90 60 210 Mightyway CS Jayson C. Bascos JEFF October 15, 2018 December 13, 2018 13-May-19 Completed URDANETA 1,920,590.90 1,920,590.90

Rehabilitation / Renovation of Main Building, Binalonan RHU, Binalonan,


18AI0324 2,500.00 1 1 1 1 August 03, 2018 1 August 10, 2018 1 August 23, 2018 1 ### 1 ### 1 September 24, 2018 2,500,000.00 2,475,000.00 2,400,218.71 2,400,218.71 74,781.29 3.02% 1 100.00% 100.00% 0.00% 2,400,218.710 2,400,218.71 105 225 Mightyway CS Jayson C. Bascos ASHLEY September 24, 2018 January 06, 2019 07-May-19 Completed BINALONAN 2,400,218.71 2,400,218.71
Pangasinan

Construction of BHS, Sitio Tacnien, Sto. Domingo, San Manuel 1,240.00 For Fund Reversion due to SAN MANUEL - -
1 1 1 1 1,227,600.000 1,227,600.00
no buildable space

338 TOTAL 86,230.00 44.00 44.00 43.00 - 1.00 43.00 43.00 43.00 43.00 43.00 43.00 84,990,000.00 84,140,100.00 81,533,741.60 82,613,605.58 1,526,494.42 40.00 3.00 1.00 91.63% 93.38% 1.74% 75,702,230.25 77,141,936.36
339 .
#REF!

Prepared By: Checked By


Submitted By:
REYNALD N. BARRERA IMELDA S. TANDOC
Engineer II JONATHAN B. RAMOS GERARDO T. DE GUZMAN
Engineer III Engineer II
Monitoring Engineer Chief Construction Section District Engineer
OIC-Chief Planning &Ddesign section
INDIVIDUAL REPORT
As of MAY 31, 2019

PDE PRE-CONSTRUCTION RESULT OF BIDDING CONSTRUCTION FINANCIAL STATUS

Contract For Not Yet Started Projects For On-going Projects For Completed Projects
Number of Projects Number of Projects APPROPRIATION ABC Awarded Amount VARIANCE No. of Projects STATUS
Amount
Total No.
Programmed
of No. of

Date Awarded
Contract ID Project Name Amount

Date Contract
Planned Actual No. Name of Projects

Date Bid Out


Active Classroom Actual Completion Date

Completed

Completed

Completed
Unit Actual (Completed)

Advertised
OBLIGATION DISBURSEMENT

On-going

On-going

Approved

Date NTP

On-going

Slippage
Proj Sched Actual Orig. Revised Revised Plan Unit Plan
Amount Amount Amount Amount Amount Reasons why Negative (lane

Date
NYS

NYS

NYS
(%) Accomp Accomp Fund Souce Remarks Contract Contract Contractor Project Engineer Project Inspector Date Started Original Expiry Date Revised Expiry Date Contract Scope of Work Physical (km, lm, Physical REMARKS Municipality
(P'000) (P'000) (P'000) (P'000) (P'000) Slippage (-5% above) km, lm, Physical
(%) (%) Duration (cd) Duration (cd) Amount Targets pr) Targets Unit
sq.m) Target

BATCH 1 BATCH 1
Construction of One (1) Storey Three (3) Classroom Construction of One (1) Storey Three (3) Classroom School Building with Toilet
1 School Building with Toilet Umingan Central Elementary 4,028,555.60 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 4,028,555.60 4,018,458.97 3,904,227.74 3,904,227.74 1 100.00% 100.00% 0.00% 3,904,227.74 4,018,787.21 3,904,227.7 3,904,227.7 1 Umingan Central Elementary School, Umingan, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 95 130 DMGR Builders Reynald Barrera Kenneth Nalapo June 20, 2018 September 22, 2018 October 27, 2018 CL October 15, 2018 COMPLETED Umingan
18AI0236 School, Umingan, Pangasinan 3,904,227.74 3,904,227.74 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
2 Building with Toilet San Andres Elementary School, 2,957,051.97 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,957,051.97 2,949,640.81 2,865,738.94 2,865,738.94 1 100.00% 100.00% 0.00% 2,865,738.94 2,865,738.94 2,865,738.9 2,865,738.9 2 San Andres Elementary School, Balungao, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 R.S. Rodriguez CS Jennycyl Ginez Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 CL October 12, 2018 COMPLETED Balungao
Balungao, Pangasinan
18AI0237 2,865,738.94 2,865,738.94 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
3 Building with Toilet Sanipit Elementary School, San 2,957,051.97 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,957,051.97 2,949,640.81 2,865,820.88 2,865,820.88 1 100.00% 100.00% 0.00% 2,865,820.88 2,806,368.30 2,865,820.9 2,865,820.9 3 Sanipit Elementary School, San Nicolas, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 DMGR Builders Hipolito Melchor Jr. Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 CL October 12, 2018 COMPLETED San Nicolas
18AI0238 Nicolas, Pangasinan 2,865,820.88 2,865,820.88 1
Construction of One (1) Three (3) Classroom School Construction of One (1) Three (3) Classroom School Building with Toilet East
4 Building with Toilet East Central School at San Nicolas, 4,028,555.60 1 3 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 4,028,555.60 4,018,458.97 3,904,227.74 3,904,227.74 1 100.00% 100.00% 0.00% 3,904,227.74 4,018,484.21 3,904,227.7 3,904,227.7 4 Central School at San Nicolas, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 DMGR Builders Hipolito Melchor Jr. Kenneth Nalapo June 20, 2018 September 12, 2018 CL September 12, 2018 COMPLETED San Nicolas
Pangasinan
18AI0239 3,904,227.74 3,904,227.74 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
Jeusmach Builders
5 Building with Toilet Salpad Elementary School at San 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,710,841.06 2,710,841.06 1 100.00% 100.00% 0.00% 2,710,841.06 2,575,299.01 2,710,841.1 2,710,841.1 5 Salpad Elementary School at San Nicolas, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 Hipolito Melchor Jr. Kenneth Nalapo June 20, 2018 September 12, 2018 CL September 12, 2018 COMPLETED San Nicolas
Nicolas, Pangasinan Construction and Supply
18AI0240 2,710,841.06 2,710,841.06 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
6 Building with Toilet Cristobal Rodrigo Elementary School, 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,702,861.29 2,702,861.29 1 100.00% 100.00% 0.00% 2,702,861.29 2,650,462.80 2,702,861.3 2,702,861.3 6 Cristobal Rodrigo Elementary School, San Nicolas, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 100 CMMs Construction Ent. Hipolito Melchor Jr. Kenneth Nalapo June 20, 2018 September 12, 2018 September 27, 2018 CL September 27, 2018 COMPLETED San Nicolas
18AI0241 San Nicolas, Pangasinan 2,702,861.29 2,702,861.29 1
Construction of One (1) Storey Three (3) Classroom Construction of One (1) Storey Three (3) Classroom School Building with Toilet
School Building with Toilet San Quintin Central School, San Quintin Central School, San Quintin Central School, San Quintin,
7 San Quintin Central School, San Quintin, Pangasinan 4,028,555.60 1 3 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 4,028,555.60 4,018,458.97 3,904,227.74 3,904,227.74 1 100.00% 100.00% 0.00% 3,904,227.74 4,018,484.21 3,904,227.7 3,904,227.7 7 Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 95 DMGR Builders Victoria Bernabe Kenneth Nalapo June 20, 2018 September 22, 2018 CL September 22, 2018 COMPLETED San Quintin
18AI0242 3,904,227.74 3,904,227.74 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
Building with Toilet Bal-loy Elementary School, Sta. Maria, Bal-loy Elementary School, Sta. Maria, Pangasinan CL October 12, 2018 COMPLETED
8
Pangasinan
2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,711,678.67 2,711,678.67 1 100.00% 100.00% 0.00% 2,711,678.67 2,348,876.20 2,711,678.7 2,711,678.7 8 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 A.M. Salong Construction Jennycyl Ginez Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 Sta. Maria
18AI0243 2,711,678.67 2,711,678.67 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
9 Building with Toilet Dalayap Elementary School, Sta. 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,711,678.67 2,711,678.67 1 88.00% 90.50% 2.50% 2,711,678.67 1,690,125.78 2,386,277.2 2,454,069.2 9 Dalayap Elementary School, Sta. Maria, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 355 A.M. Salong Construction Jennycyl Ginez Kenneth Nalapo June 20, 2018 September 12, 2018 June 9, 2019 CL On-going Sta. Maria
18AI0244 Maria, Pangasinan 2,386,277.23 2,454,069.20
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
10 Building with Toilet Rizal Elementary School, Rosales, 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,711,203.57 2,711,203.57 1 100.00% 100.00% 0.00% 2,711,203.57 2,789,485.74 2,711,203.6 2,711,203.6 10 Rizal Elementary School, Rosales, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 130 J Bernardo CS Jennycyl Ginez Kenneth Nalapo June 20, 2018 September 12, 2018 October 27, 2018 CL October 27, 2018 COMPLETED Rosales
18AI0245 Pangasinan 2,711,203.57 2,711,203.57 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
11 Building with Toilet Rizal Elementary School, Natividad, 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,717,420.90 2,717,420.90 1 100.00% 100.00% 0.00% 2,717,420.90 2,650,462.80 2,717,420.9 2,717,420.9 11 Rizal Elementary School, Natividad, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 R.F. Flores Construction Hipolito Melchor Jr. Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 CL October 12, 2018 COMPLETED Natividad
18AI0246 Pangasinan 2,717,420.90 2,717,420.90 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
12 Building with Toilet Pugot Elementary Schoolm Sta. Maria, 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,703,531.29 2,703,531.29 1 100.00% 100.00% 0.00% 2,703,531.29 2,568,354.73 2,703,531.3 2,703,531.3 12 Pugot Elementary Schoolm Sta. Maria, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 R.G. Diaz BT Jennycyl Ginez Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 CL October 12, 2018 COMPLETED Sta. Maria
18AI0247 Pangasinan 2,703,531.29 2,703,531.29 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
13 Building with Toilet San Francisco Elementary School, Sta. 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,703,203.17 2,703,203.17 1 100.00% 100.00% 0.00% 2,703,203.17 2,643,820.04 2,703,203.2 2,703,203.2 13 San Francisco Elementary School, Sta. Maria, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 R.G. Diaz BT Jennycyl Ginez Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 CL October 12, 2018 COMPLETED Sta. Maria
18AI0248 Maria, Pangasinan 2,703,203.17 2,703,203.17 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
Building with Toilet San Aurelio 3d Elementary School, San Aurelio 3d Elementary School, Balungao, Pangasinan CL October 12, 2018 COMPLETED
14
Balungao, Pangasinan
2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,719,878.26 2,719,878.26 1 100.00% 100.00% 0.00% 2,719,878.26 1,595,763.12 2,719,878.3 2,719,878.3 14 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 Red Matrix BT Jennycyl Ginez Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 Balungao
18AI0249 2,719,878.26 2,719,878.26 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
15 Building with Toilet Annam Elementary School, Umingan, 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,704,056.29 2,704,056.29 1 100.00% 100.00% 0.00% 2,704,056.29 2,295,802.44 2,704,056.3 2,704,056.3 15 Annam Elementary School, Umingan, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 130 R.G. Diaz BT Reynald Barrera Kenneth Nalapo June 20, 2018 September 12, 2018 October 27, 2018 CL October 27, 2018 COMPLETED Umingan
Pangasinan
18AI0250 2,704,056.29 2,704,056.29 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
Building with Toilet Prado Elementary School, Umingan, Prado Elementary School, Umingan, Pangasinan CL December 15, 2018 COMPLETED
16
Pangasinan
2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,717,420.90 2,717,420.90 1 100.00% 100.00% 0.00% 2,717,420.90 2,343,567.11 2,717,420.9 2,717,420.9 16 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 205 R.F. Flores Construction Reynald Barrera Kenneth Nalapo June 20, 2018 September 12, 2018 January 10, 2019 Umingan
18AI0251 2,717,420.90 2,717,420.90 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
Building with Toilet Zamora Elementary School, Tayug, Zamora Elementary School, Tayug, Pangasinan
17 Pangasinan 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,710,703.57 2,710,703.57 1 100.00% 100.00% 0.00% 2,710,703.57 2,367,475.82 2,710,703.6 2,710,703.6 17 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 APP C/S Hipolito Melchor Jr. Kenneth Nalapo June 20, 2018 September 12, 2018 CL September 12, 2018 COMPLETED Tayug
18AI0252 2,710,703.57 2,710,703.57 1
Construction of One (1) Storey Three (3) Classroom Construction of One (1) Storey Three (3) Classroom School Building with Toilet
18 School Building with Toilet La Paz Elementary School, 4,028,555.60 1 3 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 4,028,555.60 4,018,458.97 3,904,929.22 3,904,929.22 1 100.00% 100.00% 0.00% 3,904,929.22 3,817,560.00 3,904,929.2 3,904,929.2 18 La Paz Elementary School, Umingan, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 95 155 R.F. Flores Construction Reynald Barrera Kenneth Nalapo June 20, 2018 September 22, 2018 November 21, 2018 CL October 12, 2018 COMPLETED Umingan
Umingan, Pangasinan
18AI0253 3,904,929.22 3,904,929.22 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
Building with Toilet Papallasen Elementary School, Papallasen Elementary School, Umingan, Pangasinan CL October 12, 2018 COMPLETED
19
Umingan, Pangasinan
2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,710,822.84 2,710,822.84 1 100.00% 100.00% 0.00% 2,710,822.84 2,789,960.84 2,710,822.8 2,710,822.8 19 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 JHI C/S Reynald Barrera Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 Umingan
18AI0254 2,710,822.84 2,710,822.84 1
Construction of One (1) Storey Three (3) Classroom Construction of One (1) Storey Three (3) Classroom School Building with Toilet
20 School Building with Toilet Pemienta Elementary School, 4,028,555.60 1 3 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 4,028,555.60 4,018,458.97 3,904,929.22 3,904,929.22 1 100.00% 100.00% 0.00% 3,904,929.22 3,904,929.22 3,904,929.2 3,904,929.2 20 Pemienta Elementary School, Umingan, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 95 R.F. Flores Construction Reynald Barrera Kenneth Nalapo June 20, 2018 September 22, 2018 CL September 22, 2018 COMPLETED Umingan
18AI0255 Umingan, Pangasinan 3,904,929.22 3,904,929.22 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
21 Building with Toilet Concepcion Elementary School, 3,057,674.38 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 3,057,674.38 3,050,011.03 2,967,555.15 2,967,555.15 1 100.00% 100.00% 0.00% 2,967,555.15 2,440,024.15 2,967,555.2 2,967,555.2 21 Concepcion Elementary School, Umingan, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 511 Builders Reynald Barrera Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 CL October 12, 2018 COMPLETED Umingan
18AI0256 Umingan, Pangasinan 2,967,555.15 2,967,555.15 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
22 Building with Toilet Diket Elementary School, Umingan, 3,057,674.38 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 3,057,674.38 3,050,011.03 2,968,418.80 2,968,418.80 1 100.00% 100.00% 0.00% 2,968,418.80 2,819,997.86 2,968,418.8 2,968,418.8 22 Diket Elementary School, Umingan, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 R.F. Flores Construction Reynald Barrera Kenneth Nalapo June 20, 2018 September 12, 2018 CL September 12, 2018 COMPLETED Umingan
18AI0257 Pangasinan 2,968,418.80 2,968,418.80 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
23 Building with Toilet Gonzales Elementary School, 2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,710,703.57 2,710,703.57 1 100.00% 100.00% 0.00% 2,710,703.57 2,343,567.11 2,710,703.6 2,710,703.6 23 Gonzales Elementary School, Umingan, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 APP C/S Reynald Barrera Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 CL October 12, 2018 COMPLETED Umingan
18AI0258 Umingan, Pangasinan 2,710,703.57 2,710,703.57 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
Building with Toilet Cabalitian Elementary School, Cabalitian Elementary School, Umingan, Pangasinan CL September 12, 2018 COMPLETED
24
Umingan, Pangasinan
2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,710,703.57 2,710,703.57 1 100.00% 100.00% 0.00% 2,710,703.57 2,276,991.00 2,710,703.6 2,710,703.6 24 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 APP C/S Reynald Barrera Kenneth Nalapo June 20, 2018 September 12, 2018 Umingan
18AI0259 2,710,703.57 2,710,703.57 1
Construction of One (1) Storey Two (2) Classroom School Construction of One (1) Storey Two (2) Classroom School Building with Toilet
Building with Toilet Cabuloan Elementary School, Sta. Cabuloan Elementary School, Sta. Maria, Pangasinan CL October 12, 2018 COMPLETED
25
Maria, Pangasinan
2,796,953.22 1 2 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 2,796,953.22 2,789,943.31 2,711,678.67 2,711,678.67 1 100.00% 100.00% 0.00% 2,711,678.67 2,348,866.13 2,711,678.7 2,711,678.7 25 2018 BEFF Batch 1 Bid Out - June 7, 2018 85 115 A.M. Salong Construction Jennycyl Ginez Kenneth Nalapo June 20, 2018 September 12, 2018 October 12, 2018 Sta. Maria
18AI0260 2,711,678.67 2,711,678.67 1
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building Labit BET Construction and Jose Wilson
26 Building Labit Elementary School, Urdaneta City, 9,970,594.94 1 4 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 9,970,594.94 9,945,605.98 9,622,559.50 9,622,559.50 1 100.00% 100.00% 0.00% 9,622,559.50 6,526,389.55 9,622,559.5 9,622,559.5 26 Elementary School, Urdaneta City, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 140 201 Cynthia Domalanta June 20, 2018 November 6, 2018 January 6, 2019 CL January 06, 2019 COMPLETED Urdaneta
18AI0261 Supply Manongsong 9,622,559.50 9,622,559.50
Pangasinan
Construction of Four (4) Storey Sixteen (16) Classroom Construction of Four (4) Storey Sixteen (16) Classroom School Building
Jose Wilson CL March 31, 2019 COMPLETED
27 School Building Lananpin National High School, Urdaneta 41,712,042.44 1 16 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 41,712,042.44 41,607,500.98 40,251,938.47 40,251,938.47 1 100.00% 100.00% 0.00% 40,251,938.47 30,592,548.72 40,251,938.5 40,251,938.5 27 Lananpin National High School, Urdaneta City, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 240 298 JG Garcia CS
Manongsong
Cynthia Domalanta June 20, 2018 February 14, 2019 April 13, 2019 Urdaneta
18AI0262 City, Pangasinan 40,251,938.47 40,251,938.47
Construction of Four (4) Storey Eight (8) Classroom Construction of Four (4) Storey Eight (8) Classroom School Building (2 ICT, 2
BET Construction and Jose Wilson CL On-going
28 School Building (2 ICT, 2 SCL) Urdaneta City National 22,748,546.75 1 8 1 1 May 18, 2018 June 7, 2018 June 13, 2018 June 14, 2018 June 20, 2018 22,748,546.75 22,691,532.85 21,938,665.60 21,938,665.60 1 62.00% 70.00% 8.00% 21,938,665.60 5,779,836.33 13,601,972.7 15,357,065.9 28 SCL) Urdaneta City National High School, Urdaneta City, Pangasinan 2018 BEFF Batch 1 Bid Out - June 7, 2018 225 380 Cynthia Domalanta June 20, 2018 January 30, 2019 July 4, 2019 Urdaneta
High School, Urdaneta City, Pangasinan Supply Manongsong
18AI0263 13,601,972.67 15,357,065.92
BATCH 2 FOR
COMPLETION BATCH 2 - COMPLETION 146,371,625.3 121,721,281.0 94.08% 95.33% 1.25% 137,709,530.9 139,532,416.1 BATCH 2 - COMPLETION 137,709,530.92 139,532,416.14
Completion of Two (2) Storey Four (4) Classroom School Completion of Two (2) Storey Four (4) Classroom School Building at Calaocan
Building at Calaocan Elementary School, San Nicolas, Elementary School, San Nicolas, Pangasinan
Pangasinan 2,371,700.00 1 4 1 1 October 25, 2018 October 26, 2018 October 29, 2018 2,439,212.92 2,371,700.00 2,371,700.00 1 100.00% 100.00% 0.00% 2,371,700.00 2,371,700.0 2,371,700.0 28 2018 BEFF Batch 2 45 Aquino - Dela Cruz EC Hipolito Melchor Jr. Cynthia Domalanta October 29, 2018 December 12, 2018 CL December 12, 2018 COMPLETED San Nicolas
18AI0361 1 2,371,700.00 2,371,700.00 1
Completion of Two (2) Storey Four (4) Classroom School Completion of Two (2) Storey Four (4) Classroom School Building at Flores
Building at Flores Elementary School, Umingan, Elementary School, Umingan, Pangasinan
Pangasinan 2,053,000.00 1 4 1 1 October 25, 2018 October 26, 2018 October 29, 2018 2,107,751.41 2,053,000.00 2,053,000.00 1 100.00% 100.00% 0.00% 2,053,000.00 2,053,000.0 2,053,000.0 28 2018 BEFF Batch 2 30 160 JHI CS Eugenio Flores Cynthia Domalanta October 29, 2018 November 27, 2018 April 6, 2019 CL COMPLETED Umingan
18AI0362 2 2,053,000.00 2,053,000.00
Completion of Four (4) Storey Eight (8) Classroom School Completion of Four (4) Storey Eight (8) Classroom School Building at Laoac
Building at Laoac National High School (Buiilding 1), Laoac National High School (Buiilding 1), Laoac Pangasinan
Pangasinan 2,935,000.00 1 8 1 1 October 25, 2018 October 26, 2018 October 29, 2018 3,042,269.16 2,935,000.00 2,935,000.00 1 8.50% 15.00% 6.50% 2,935,000.00 249,475.0 440,250.0 28 2018 BEFF Batch 2 50 245 BET CS Jayson Bascos Cynthia Domalanta October 29, 2018 December 17, 2018 June 30, 2019 CL On-going Laoac
18AI0363 3 249,475.00 440,250.00
Completion of Four (4) Storey Eight (8) Classroom School Completion of Four (4) Storey Eight (8) Classroom School Building at Laoac
Building at Laoac National High School (Buiilding 2), Laoac National High School (Buiilding 2), Laoac Pangasinan
Pangasinan 2,935,000.00 1 8 1 1 October 25, 2018 October 26, 2018 October 29, 2018 3,027,057.82 2,935,000.00 2,935,000.00 1 8.67% 15.00% 6.33% 2,935,000.00 254,464.5 440,250.0 28 2018 BEFF Batch 2 50 245 BET CS Jayson Bascos Cynthia Domalanta October 29, 2018 December 17, 2018 June 30, 2019 CL On-going Laoac
18AI0364 4 254,464.50 440,250.00
Completion of Two (2) Storey Four (4) Classroom School Completion of Two (2) Storey Four (4) Classroom School Building at Carriedo
Building at Carriedo Elementary School, Tayug, Elementary School, Tayug, Pangasinan
Pangasinan 2,369,000.00 1 4 1 1 October 25, 2018 October 26, 2018 October 29, 2018 2,439,212.92 2,369,000.00 2,369,000.00 1 100.00% 100.00% 0.00% 2,369,000.00 2,369,000.0 2,369,000.0 28 2018 BEFF Batch 2 45 RA Matias CS Hipolito Melchor Jr. Cynthia Domalanta October 29, 2018 December 12, 2018 CL December 12, 2018 COMPLETED Tayug
18AI0365 5 2,369,000.00 2,369,000.00
Completion of Four (4) Storey Eight (8) Classroom School Completion of Four (4) Storey Eight (8) Classroom School Building at San Juan
Building at San Juan National High School, San Manuel, National High School, San Manuel, Pangasinan
Pangasinan 2,906,700.00 1 8 1 1 October 25, 2018 October 26, 2018 October 29, 2018 3,027,051.81 2,906,700.00 2,906,700.00 1 100.00% 100.00% 0.00% 2,906,700.00 2,906,700.00 2,906,700.0 2,906,700.0 28 2018 BEFF Batch 2 50 Aquino - Dela Cruz EC Zaldy del Valle Cynthia Domalanta October 29, 2018 December 17, 2018 CL December 17, 2018 COMPLETED San Manuel
18AI0366 6 2,906,700.00 2,906,700.00
Completion of Four (4) Storey Eight (8) Classroom School Completion of Four (4) Storey Eight (8) Classroom School Building at San
Building at San Isidro National High School, San Nicolas, Isidro National High School, San Nicolas, Pangasinan
Pangasinan 2,941,600.00 1 8 1 1 October 25, 2018 October 26, 2018 October 29, 2018 3,042,269.16 2,941,600.00 2,941,600.00 1 100.00% 100.00% 0.00% 2,941,600.00 2,941,600.0 2,941,600.0 28 2018 BEFF Batch 2 50 Aquino - Dela Cruz EC Hipolito Melchor Jr. Cynthia Domalanta October 29, 2018 December 17, 2018 CL December 17, 2018 COMPLETED San Nicolas
18AI0367 7 2,941,600.00 2,941,600.00
Completion of One (1) Sorey Two (2) Classroom School Completion of One (1) Sorey Two (2) Classroom School Building with Toilet
Building with Toilet Attached at San Vicente Elementary Attached at San Vicente Elementary School, Sta. Maria, Pangasinan
School, Sta. Maria, Pangasinan 725,600.00 1 2 1 1 October 25, 2018 October 26, 2018 October 29, 2018 870,726.20 725,600.00 725,600.00 1 100.00% 100.00% 0.00% 725,600.00 725,600.0 725,600.0 28 2018 BEFF Batch 2 25 Rogenox CSC Hipolito Melchor Jr. Cynthia Domalanta October 29, 2018 November 22, 2018 CL November 22, 2018 COMPLETED Sta Maria
18AI0368 8 725,600.00 725,600.00 1
BATCH 3 BATCH 3 19,237,600.0 11,314,600.0 72.11% 74.06% 1.96% 13,871,539.5 14,248,100.0 13,871,539.50 14,248,100.00
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building at Agat
Building at Agat Elementary School, Sison, Pangasinan Elementary School, Sison, Pangasinan Jose Wilson
11,288,905.93 1 4 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 11,288,905.93 11,047,316.81 11,047,316.81 1 83.35% 86.61% 3.26% 11,047,316.81 6,023,359.95 9,207,938.6 9,568,081.1 2018 BEFF Batch 3 150 210 Mightyway CS November 21, 2018 April 19, 2019 June 18, 2019 CL On-going Sison
Manongsong
18AI0337 1 9,207,938.56 9,568,081.09
Construction og Two (2) Storey Six (6) Classroom School Construction og Two (2) Storey Six (6) Classroom School Building at Labit
Building at Labit Elementary School, Villasis, Pangasinan Elementary School, Villasis, Pangasinan
15,697,651.73 1 8 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 15,697,651.73 15,187,671.58 15,187,671.58 1 34.00% 36.50% 2.50% 15,187,671.58 2,278,150.74 5,163,808.3 5,543,500.1 2018 BEFF Batch 3 170 230 Zota TC Jayson Bascos November 21, 2018 May 9, 2019 July 8, 2019 CL On-going Villasis
18AI0338 2 5,163,808.34 5,543,500.13
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building at
Building at Pinmilapil National High School, Sison, Pinmilapil National High School, Sison, Pangasinan Jose Wilson
Pangasinan 11,288,905.93 1 4 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 11,288,905.93 11,030,269.79 11,030,269.79 1 42.50% 44.20% 1.70% 11,030,269.79 4,196,109.79 4,687,864.7 4,875,379.2 2018 BEFF Batch 3 150 210 Mightyway CS November 21, 2018 April 19, 2019 June 18, 2019 CL On-going Sison
Manongsong
18AI0339 3 4,687,864.66 4,875,379.25
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building at
Building at Sanchez-Cabalitian Elementary School, Sanchez-Cabalitian Elementary School, Asingan, Pangasinan
Asingan, Pangasinan 11,288,905.93 1 4 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 11,288,905.93 10,950,794.99 10,950,794.99 1 55.00% 60.00% 5.00% 10,950,794.99 5,396,180.47 6,022,937.2 6,570,477.0 2018 BEFF Batch 3 150 240 RF Flores Construction Jennycyl Ginez November 21, 2018 April 19, 2019 July 18, 2019 CL On-going Asingan
18AI0340 4 6,022,937.24 6,570,476.99
Consutruction of Two (2) Storey (6) Classroom School Consutruction of Two (2) Storey (6) Classroom School Building at Toboy
Building at Toboy Elementary School, Asingan, Elementary School, Asingan, Pangasinan
Pangasinan 18,653,251.73 1 6 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 18,653,251.73 17,989,384.38 17,989,384.38 1 95.00% 97.00% 2.00% 17,989,384.38 15,529,617.71 17,089,915.2 17,449,702.8 2018 BEFF Batch 3 200 Rivbros CFD Jennycyl Ginez November 21, 2018 June 8, 2019 CL On-going Asingan
18AI0341 5 17,089,915.16 17,449,702.85
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building at Don Luis
Building at Don Luis Domingo Sr. Elementary School, San Domingo Sr. Elementary School, San Quintin, Pangasinan
Quintin, Pangasinan 13,438,105.93 1 4 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 13,438,105.93 13,115,796.60 13,115,796.60 1 89.60% 90.00% 0.40% 13,115,796.60 10,535,730.23 11,751,753.8 11,804,216.9 2018 BEFF Batch 3 175 205 DMGR Builders Hipolito Melchor Jr. November 21, 2018 May 14, 2019 June 13, 2019 CL On-going San Quintin
18AI0342 6 11,751,753.75 11,804,216.94
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building at Ungib
Building at Ungib Elementary School, San Quintin, Elementary School, San Quintin, Pangasinan St. Timothy Const'n
Pangasinan 13,438,105.93 1 4 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 13,438,105.93 13,008,649.06 13,008,649.06 1 63.45% 89.00% 25.55% 13,008,649.06 6,931,586.81 8,253,987.8 11,577,697.7 2018 BEFF Batch 3 175 235 Hipolito Melchor Jr. November 21, 2018 May 14, 2019 July 13, 2019 CL On-going San Quintin
Corp.
18AI0343 7 8,253,987.83 11,577,697.66
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building at
Building at Cabuloan Elementary School, Sta. Maria, Cabuloan Elementary School, Sta. Maria, Pangasinan
Pangasinan 13,438,105.93 1 4 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 13,438,105.93 13,007,522.49 13,007,522.49 1 45.00% 50.00% 5.00% 13,007,522.49 4,699,433.89 5,853,385.1 6,503,761.2 2018 BEFF Batch 3 175 265 GMO Const'n Jennycyl Ginez November 21, 2018 May 14, 2019 August 12, 2019 CL On-going Sta. Maria
18AI0344 8 5,853,385.12 6,503,761.25
Construction of Two (2) Units Unique Workshop at Construction of Two (2) Units Unique Workshop at Eastern Pangasinan
Eastern Pangasinan Agricultural College, Sta. Maria, Agricultural College, Sta. Maria, Pangasinan
Pangasinan 10,580,585.53 1 4 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 10,580,585.53 10,247,678.11 10,247,678.11 1 65.00% 70.00% 5.00% 10,247,678.11 4,182,676.49 6,660,990.8 7,173,374.7 2018 BEFF Batch 3 115 205 GMO Const'n Jennycyl Ginez November 21, 2018 March 15, 2019 June 13, 2019 CL On-going Sta. Maria
18AI0345 9 6,660,990.77 7,173,374.68
Construction of Four (4) Storey Sixteen (16) Classroom Construction of Four (4) Storey Sixteen (16) Classroom School Building (2
School Building (2 Science Laboratory, 2 Computer Room Science Laboratory, 2 Computer Room Layout, & 4 Regular Workshop) at Jose Wilson
Layout, & 4 Regular Workshop) at Luciano Milan National 44,857,123.72 1 16 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 44,857,123.72 43,507,679.66 43,507,679.66 1 58.00% 67.00% 9.00% 43,507,679.66 6,526,151.95 25,234,454.2 29,150,145.4 Luciano Milan National High School, Asingan, Pangasinan 2018 BEFF Batch 3 240 J. G. Garcia CS November 21, 2018 July 18, 2019 CL On-going Asingan
Manongsong
18AI0346 10 High School, Asingan, Pangasinan 25,234,454.20 29,150,145.37
Construction of Four (4) Storey Eight (8) Classroom Construction of Four (4) Storey Eight (8) Classroom School Building (2 Science
School Building (2 Science Laboratory, & 4 Regular Laboratory, & 4 Regular Workshop) at Luciano Milan National High School, Jose Wilson
22,528,061.86 1 8 1 October 24, 2018 November 7, 2018 November 14, 2018 November 14, 2018 November 21, 2018 22,528,061.86 21,837,004.41 21,837,004.41 1 59.00% 62.50% 3.50% 21,837,004.41 3,275,550.66 12,883,832.6 13,648,127.8 2018 BEFF Batch 3 210 J. G. Garcia CS November 21, 2018 June 18, 2019 CL On-going Asingan
Workshop) at Luciano Milan National High School, Asingan, Pangasinan Manongsong
18AI0347 11 Asingan, Pangasinan 12,883,832.60 13,648,127.76
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building at
Building at Camangaan Elementary School, Rosales, Camangaan Elementary School, Rosales, Pangasinan
13,438,105.93 1 4 1 October 31, 2018 November 19, 2018 November 20, 2018 November 20, 2018 November 27, 2018 13,438,105.93 13,035,537.20 13,035,537.20 1 15.00% 20.00% 5.00% 13,035,537.20 1,955,330.58 1,955,330.6 2,607,107.4 2018 BEFF Batch 3 175 313 Rivbros CFD Jennycyl Ginez November 27, 2018 May 20, 2019 October 5, 2019 CL On-going Rosales
Pangasinan
18AI0358 12 1,955,330.58 2,607,107.44
Construction of Four (4) Storey Sixteen (16) Classroom Construction of Four (4) Storey Sixteen (16) Classroom School Building (2
School Building (2 Science Laboratory, 2 Computer Room Science Laboratory, 2 Computer Room Layout, & Regular Workshop) at Alpha & Omega Gen. Jose Wilson
44,857,123.72 1 16 1 October 31, 2018 November 19, 2018 November 20, 2018 November 20, 2018 November 27, 2018 44,857,123.72 43,288,396.48 43,288,396.48 1 40.00% 41.20% 1.20% 43,288,396.48 16,494,379.31 17,315,358.6 17,834,819.3 2018 BEFF Batch 3 240 November 27, 2018 July 24, 2019 CL On-going Asingan
Layout, & Regular Workshop) at Ariston-Bantug National Ariston-Bantug National High School, Asingan, Pangasinan CDC Manongsong
18AI0359 13 High School, Asingan, Pangasinan 17,315,358.59 17,834,819.35
BATCH 5 237,253,701.6 134,784,414.4 55.67% 60.82% 5.15% 132,081,557.4 144,306,390.7 132,081,557.42 144,306,390.75
Construction of Three (3) Storey (6) Classroom School Construction of Three (3) Storey (6) Classroom School Building at Laoac
Building at Laoac Elementary School, Alcala, Pangasinan Elementary School, Alcala, Pangasinan
18,301,603.84 1 6 1 October 31, 2018 November 19, 2018 December 5, 2018 December 5, 2018 December 12, 2018 18,393,571.70 17,948,333.22 17,948,333.22 1 58.65% 60.00% 1.35% 17,948,333.22 7,741,564.58 10,526,697.4 10,768,999.9 2018 BEFF Batch 5 185 216 JBernardo CS Zaldy Del Valle December 12, 2018 June 14, 2019 July 15, 2019 CL On-going Alcala
18AI0353 1 10,526,697.43 10,768,999.93
Construction of Two (2) Storey (6) Classroom School Construction of Two (2) Storey (6) Classroom School Building at Cabu - Cala
Building at Cabu - Cala Elementary School, Laoac, Elementary School, Laoac, Pangasinan St. Matthew Gen.
14,840,045.73 1 6 1 October 31, 2018 November 19, 2018 December 5, 2018 December 5, 2018 December 12, 2018 14,914,618.82 14,365,490.96 14,365,490.96 1 84.67% 89.32% 4.65% 14,365,490.96 8,837,330.31 12,163,261.2 12,831,256.5 2018 BEFF Batch 5 170 200 Jayson Bascos December 12, 2018 May 30, 2019 June 29, 2019 CL On-going Laoac
Pangasinan Contractior & Devt. Corp.
18AI0351 2 12,163,261.20 12,831,256.53
Construction of Two (2) Storey (6) Classroom School Construction of Two (2) Storey (6) Classroom School Building at Rosario
Building at Rosario Elementary School, Pozorrubio, Elementary School, Pozorrubio, Pangasinan Jose Wilson
14,840,045.73 1 6 1 October 31, 2018 November 19, 2018 December 5, 2018 December 5, 2018 December 12, 2018 14,914,618.82 14,484,958.45 14,484,958.45 1 43.52% 46.87% 3.35% 14,484,958.45 5,275,192.44 6,303,853.9 6,789,100.0 2018 BEFF Batch 5 170 200 JBernardo CS December 12, 2018 May 30, 2019 June 29, 2019 CL On-going Pozorrubio
Pangasinan Manongsong
18AI0349 3 6,303,853.92 6,789,100.03
Construction of Two (2) Ten (10) Classroom School Construction of Two (2) Ten (10) Classroom School Building at Imbalbalatong
Building at Imbalbalatong Elementary School, Pozorrubio, Elementary School, Pozorrubio, Pangasinan Jose Wilson
26,626,918.93 1 10 1 October 31, 2018 November 19, 2018 December 5, 2018 December 5, 2018 December 12, 2018 24,750,672.29 23,838,268.02 23,838,268.02 1 32.30% 35.35% 3.05% 23,838,268.02 3,637,616.88 7,699,760.6 8,426,827.7 2018 BEFF Batch 5 205 BET CS December 12, 2018 July 4, 2019 CL On-going Pozorrubio
Pangasinan Manongsong
18AI0355 4 7,699,760.57 8,426,827.75
Construction of Two (2) Storey (6) Classroom School Construction of Two (2) Storey (6) Classroom School Building at Sugcong
Building at Sugcong Elementary School, Pozorrubio, Elementary School, Pozorrubio, Pangasinan Jose Wilson
14,840,045.73 1 6 1 October 31, 2018 November 19, 2018 December 5, 2018 December 5, 2018 December 12, 2018 14,914,618.82 14,381,769.80 14,381,769.80 1 73.68% 80.31% 6.63% 14,381,769.80 7,622,669.39 10,596,488.0 11,549,999.3 2018 BEFF Batch 5 170 200 AMP Constn December 12, 2018 May 30, 2019 June 29, 2019 CL On-going Pozorrubio
Pangasinan Manongsong
18AI0350 5 10,596,487.99 11,549,999.33
Construction of Two (2) Eight (8) Classroom School Construction of Two (2) Eight (8) Classroom School Building at Puelay
Building at Puelay Elementary School, Villasis, Pangasinan Elementary School, Villasis, Pangasinan
22,438,636.97 1 8 1 October 31, 2018 November 19, 2018 December 5, 2018 December 5, 2018 December 12, 2018 22,551,393.94 21,854,236.90 21,854,236.90 1 34.00% 36.50% 2.50% 21,854,236.90 56,378.48 7,430,440.5 7,976,796.5 2018 BEFF Batch 5 220 280 AMP Constn Manuel Novencido December 12, 2018 July 19, 2019 September 17, 2019 CL On-going Villasis
18AI0357 6 7,430,440.55 7,976,796.47
Construction of Two (2) Storey Four (4) Classroom School Construction of Two (2) Storey Four (4) Classroom School Building at Villasis I
Building at Villasis I Cnetral School CPED Center, Villasis, Cnetral School CPED Center, Villasis, Pangasinan
12,182,736.37 1 4 1 October 31, 2018 November 19, 2018 December 5, 2018 December 5, 2018 December 12, 2018 12,243,956.19 11,786,754.46 11,786,754.46 1 21.21% 22.22% 1.01% 11,786,754.46 1,798,623.06 2,499,970.6 2,619,016.8 2018 BEFF Batch 5 150 210 ZOTA TC Manuel Novencido December 12, 2018 May 10, 2019 July 9, 2019 CL On-going Villasis
Pangasinan
18AI0354 7 2,499,970.62 2,619,016.84
Construction of Two (2) Storey (6) Classroom School Construction of Two (2) Storey (6) Classroom School Building at San Blas
Building at San Blas Elementary School, Villasis, Elementary School, Villasis, Pangasinan
14,840,045.73 1 6 1 October 31, 2018 November 19, 2018 December 5, 2018 December 5, 2018 December 12, 2018 14,914,618.82 14,380,079.62 14,380,079.62 1 34.00% 36.50% 2.50% 14,380,079.62 2,192,820.35 4,889,227.1 5,248,729.1 2018 BEFF Batch 5 170 230 Mightyway CS Manuel Novencido December 12, 2018 May 30, 2019 July 29, 2019 CL On-going Villasis
Pangasinan
18AI0352 8 4,889,227.07 5,248,729.06
554,295,285.18 57 266 36 0 0 57 533,366,340.50 535,902,818.28 938,765,745.13 32 25 0 67.05% 70.56% 3.51% #VALUE! 629,434,955.02 662,384,539.70 1
Batch 2 19,237,600.00
Construction 516,665,218.28

133,039,891.4 1,489,050,333.2 46.69% 49.77% 3.08% 62,109,699.3 66,210,725.9

Remaining 394,943,937.26
Completed 121,721,281.02
DISTRICT: Pangasinan 3rd District Engineering Office
REGION: Region 1
RESULT OF BIDDING CONSTRUCTION FINANCIAL STATUS For On-going Projects

VARIANCE No. of Projects STATUS

Contract Amount
Physic
Physic al Orig.
No. of al target Revised
IMPLEMENTING OFFICE Contrac
Projects target (B) - Contract Project Project Original Expiry Revised Expiry MUNICIPALITY
t Contractor Date Started Remarks
Duration Engineer Facilitator Date Date

Completed
(CL) TechVo Duratio

On-going
c Sched Actual (cd)
n (cd)

NYS
Amount (P'000) (%) Accomp Accomp. Slippage OBLIGATION DISBURSEMENT BALANCE
(%) (%)

1 BATCH 1
2 Domanpot Elementary School (Buffer Fund) 440,980.00 353,630.00 44.50 1 100.00% 100.00% 0.00% MIKE 9/19/2017 9/18/2017 2/15/2018 Completed 440,980.00 440,980.00
3 Rosales NHS (Buffer Fund) 3,933,980.00 1 100.00% 100.00% - ROGENOX Rodolfo Raquedan Completed 3,933,980.00 3,933,980.00
4 Batch 6
5 Domanpot Elementary School (Buffer Fund) 2,021,000.00 - 0.00 1 100.00% 100.00% 0.00% MIKE 10/18/2017 10/15/2017 5/31/2018 Completed 2,021,000.00 2,021,000.00
6 Narciso V. Ramos Elem. School SPED Center (Buffer Fund) 4,378,000.00 830.00 0.02 1 100.00% 100.00% 0.00% MIKE 10/18/2017 10/17/2017 5/30/2018 Completed 4,378,000.00 4,378,000.00
7 Toboy National High School (Buffer Fund) 2,694,660.00 - 0.00 1 100.00% 100.00% 0.00% MIKE 10/16/2017 10/15/2017 5/5/2018 Completed 2,694,660.00 2,694,660.00
Batch 7
Construction of One (1) Storey Two (2) Classroom School Building
17AI0249 with Toilet Attached at Lananpin National High School, Urdaneta 1 2 2,754,331.12 - 0.00 1 100.00% 100.00% 0.00% 2,754,331.12 2,754,331.12 - 85 135 BET CS JOE KARL 12/1/2017 2/23/2018 4/14/2018 Completed Urdaneta City
1 City, Pangasinan 2,754,331.12 2,754,331.12
17AI0250 Construction of Unique Workshop (7 x 22.5) Urdaneta City National 1 1 3,428,126.31 - 0.00 1 100.00% 100.00% 0.00% 3,428,126.31 3,428,126.31 - 120 180 BET CS JOE KARL 12/1/2017 3/30/2018 5/29/2018 Completed Urdaneta City
2 High School at Urdaneta City, Pangasinan 3,428,126.31 3,428,126.31
Construction of One (1) Storey Three (3) Classroom School Building
17AI0281 with Toilet Attached at Camantiles Elementary School, Urdaneta City, 1 3 3,942,145.35 - 0.00 1 100.00% 100.00% 0.00% 3,942,145.35 3,942,145.35 - 95 145 BET CS FLORY KARL 11/22/2017 2/24/2018 4/15/2018 Completed Urdaneta City
3 Pangasinan 3,942,145.35 3,942,145.35
Construction of One (1) Storey Three (3) Classroom School Building
17AI0282 with Toilet Attached at Palina East National High School, Urdaneta 1 3 3,942,145.35 - 0.00 1 100.00% 100.00% 0.00% 3,942,145.35 3,942,145.35 95 145 BET CS FLORY KARL 11/22/2017 2/24/2018 4/15/2018 Completed Urdaneta City
4 City, Pangasinan 3,942,145.35 3,942,145.35
Construction and One (1) Storey Two (2) Classroom School Building
17AI0283 with Toilet attached at Vicente Taaca Memorial School at Urdaneta 1 2 2,624,743.04 - 0.00 1 100.00% 100.00% 0.00% 2,624,743.04 2,624,743.04 - 85 135 ZOTA TC FLORY KARL 11/22/2017 2/14/2018 4/5/2018 Completed Urdaneta City
5 City, Pangasinan 2,624,743.04 2,624,743.04
Construction and One (1) Storey Two (2) Classroom School Building
17AI0284 with Toilet attached at Cayambanan Elementary School, Urdaneta 1 2 2,695,140.41 - 0.00 1 100.00% 100.00% 0.00% 2,695,140.41 2,695,140.41 - 85 115 MIGHTYWAY JOE KARL 12/18/2017 3/12/2018 4/11/2018 Completed Urdaneta City
6 City, Pangasinan 2,695,140.41 2,695,140.41
Construction and One (1) Storey Two (2) Classroom School Building
17AI0285 with Toilet attached at Pinmaludpod Elementary School, Urdaneta 1 2 2,754,331.12 - 0.00 1 100.00% 100.00% 0.00% 2,754,331.12 2,754,331.12 - 85 135 ZOTA TC FLORY KARL 11/22/2017 2/14/2018 4/5/2018 Completed Urdaneta City
7 City, Pangasinan 2,754,331.12 2,754,331.12
Construction and One (1) Storey Two (2) Classroom School Building
17AI0286 with Toilet attached at Bolaoen Elementary School, Urdaneta City, 1 2 2,624,743.04 - 0.00 1 100.00% 100.00% 0.00% 2,624,743.04 2,624,743.04 - 85 ZOTA TC JOE KARL 11/22/2017 2/14/2018 - Completed Urdaneta City
8 Pangasinan 2,624,743.04 2,624,743.04
Construction and One (1) Storey Two (2) Classroom School Building
17AI0287 with Toilet attached at Camanang Elementary School at Urdaneta 1 2 2,624,743.04 - 0.00 1 100.00% 100.00% 0.00% 2,624,743.04 2,624,743.04 - 85 Safeway CS FLORY KARL 11/22/2017 2/14/2018 - Completed Urdaneta City
9 City, Pangasinan 2,624,743.04 2,624,743.04
Construction and One (1) Storey Two (2) Classroom School Building
17AI0288 with Toilet attached at Florentino B. Goce Community School at 1 2 2,624,743.04 - 0.00 1 100.00% 100.00% 0.00% 2,624,743.04 2,624,743.04 - 85 135 Safeway CS FLORY KARL 11/22/2017 2/14/2018 4/5/2018 Completed Urdaneta City
10 Urdaneta City, Pangasinan 2,624,743.04 2,624,743.04
Construction and One (1) Storey Two (2) Classroom School Building
17AI0289 with Toilet attached at Urdaneta I Central School at Urdaneta City, 1 2 2,665,290.41 - 0.00 1 100.00% 100.00% 0.00% 2,665,290.41 2,665,290.41 - 85 BET CS JOE KARL 11/22/2017 2/14/2018 - Completed Urdaneta City
11 Pangasinan 2,665,290.41 2,665,290.41
Construction and One (1) Storey Two (2) Classroom School Building
17AI0290 with Toilet attached at Anonas Elementary School at Urdaneta City, 1 2 2,784,181.12 - 0.00 1 100.00% 100.00% 0.00% 2,784,181.12 2,784,181.12 - 85 135 2R CS FLORY KARL 11/22/2017 2/14/2018 4/5/2018 Completed Urdaneta City
12 Pangasinan 2,784,181.12 2,784,181.12
Construction of One (1) Storey Two (2) Classroom School Building
17AI0291 with Toilet Attached Manan Elementary School at Urdaneta City, 1 2 2,754,331.12 - 0.00 1 100.00% 100.00% 0.00% 2,754,331.12 2,754,331.12 - 85 115 ZOTA TC FLORY KARL 11/22/2017 2/14/2018 3/16/2018 Completed Urdaneta City
13 Pangasinan 2,754,331.12 2,754,331.12
Construction of One (1) Storey Two (2) Classroom School Building
17AI0292 with Toilet Attached Nanbacuran Elementary School at Urdaneta 1 2 2,665,290.41 - 0.00 1 100.00% 100.00% 0.00% 2,665,290.41 2,226,200.56 439,089.85 85 115 CASIPIT CS FLORY KARL 11/22/2017 2/14/2018 3/16/2018 Completed Urdaneta City
14 City, Pangasinan 2,665,290.41 2,665,290.41
Construction of One (1) Storey Two (2) Classroom School Building
17AI0293 with Toilet Attached at Cabuloan National High School at Urdaneta 1 2 2,624,743.04 - 0.00 1 100.00% 100.00% 0.00% 2,624,743.04 2,624,743.04 - 85 135 BET CS FLORY KARL 11/22/2017 2/14/2018 4/5/2018 Completed Urdaneta City
15 City, Pangasinan 2,624,743.04 2,624,743.04
Construction of One (1) Storey Two (2) Classroom School Building
17AI0294 with Toilet Attached at Casabula National High School at Urdaneta 1 2 2,639,668.04 - 0.00 1 100.00% 100.00% 0.00% 2,639,668.04 2,639,668.04 - 85 135 Safeway CS JOE KARL 11/28/2017 2/20/2018 4/11/2018 Completed Urdaneta City
16 City, Pangasinan 2,639,668.04 2,639,668.04
Construction of One (1) Storey Two (2) Classroom School Building
17AI0295 with Toilet Attached at Labit National High School at Urdaneta City, 1 2 2,680,215.41 - 0.00 1 100.00% 100.00% 0.00% 2,680,215.40 2,680,215.40 - 85 135 MCB CS FLORY KARL 11/22/2017 2/14/2018 4/5/2018 Completed Urdaneta City
17 Pangasinan 2,680,215.41 2,680,215.41
Construction of One (1) Storey Two (2) Classroom School Building
17AI0296 with Toilet Attached at Urdaneta I Central School at Urdaneta City, 1 2 2,665,290.41 - 0.00 1 100.00% 100.00% 0.00% 2,665,290.40 2,665,290.40 - 85 165 MCB CS JOE KARL 11/22/2017 2/14/2018 5/5/2018 Completed Urdaneta City
18 Pangasinan 2,665,290.41 2,665,290.41
Construction of One (1) Storey Two (2) Classroom School Building
17AI0229 with Toilet Attached at Bersamin Elementary School, Alcala, 1 2 2,639,668.04 - 0.00 1 100.00% 100.00% 0.00% 2,639,668.04 2,639,668.04 - 85 115 WJP CS ZALDY Ashley 12/1/2017 2/23/2018 3/25/2018 Completed Alcala
19 Pangasinan 2,639,668.04 2,639,668.04
17AI0228 Construction of One (1) Storey Two (2) Classroom School Building 1 2 2,654,593.04 - 0.00 1 100.00% 100.00% 0.00% 2,654,593.04 2,654,593.04 - 85 WJP ZALDY Ashley 12/1/2017 2/23/2018 - Completed Alcala
20 with Toilet Attached Laoac Elementary School, Alcala, Pangasinan 2,654,593.04 2,654,593.04
Construction of One (1) Storey Two (2) Classroom School Building
17AI0227 with Toilet Attached at Pindangan National High School, Alcala, 1 2 2,630,527.19 - 0.00 1 100.00% 100.00% 0.00% 2,630,527.19 2,630,527.19 - 85 115 2R CS ZALDY Ashley 12/1/2017 2/23/2018 3/25/2018 Completed Alcala
21 Pangasinan 2,630,527.19 2,630,527.19

17AI0237 Construction of One (1) Storey Two (2) Classroom School Building 1 2 2,639,668.04 - 0.00 1 100.00% 100.00% 0.00% 2,639,668.04 2,639,668.04 - 85 135 BET CS ZALDY Jean Paul 12/1/2017 2/23/2018 4/14/2018 Completed Bautista
22 with Toilet attached at Pogo Elementary School, Bautista, Pangasinan 2,639,668.04 2,639,668.04
17AI0241 Construction of Unique Workshop (7 x 22.5) Juan G. Macaraeg 1 1 3,296,547.66 - 0.00 1 100.00% 100.00% 0.00% 3,296,547.66 3,296,547.66 - 120 160 AMP Const'n. ZALDY Alfredo 12/1/2017 3/30/2018 5/9/2018 Completed Binalonan
23 National High School at Binalonan, Pangasinan 3,296,547.66 3,296,547.66
17AI0242 Construction of Unique Workshop (7 x 22.5) San Felipe National 1 1 3,213,710.45 - 0.00 1 100.00% 100.00% 0.00% 3,213,710.45 3,213,710.45 - 120 150 Safeway CS ZALDY Alfredo 12/1/2017 3/30/2018 4/29/2018 Completed Binalonan
24 High School at Binalonan, Pangasinan 3,213,710.45 3,213,710.45

17AI0240 Construction of One (1) Storey Two (2) Classroom School Building at 1 2 2,740,859.32 - 0.00 1 100.00% 100.00% 0.00% 2,740,859.32 2,740,859.32 - 85 145 Safeway CS ZALDY Alfredo 12/1/2017 2/23/2018 4/24/2018 Completed Binalonan
25 Calixto A. Bautista Elementary School at Binalonan, Pangasinanol 2,740,859.32 2,740,859.32
Construction of One (1) Storey Two (2) Classroom School Building
17AI0239 with Toilet Attched at Sta. Catalina Elementary School at Binalonan, 1 2 2,990,843.75 8,833.12 0.29 1 100.00% 100.00% 0.00% 2,990,843.75 2,990,843.75 - 85 115 AMP Const'n. ZALDY Alfredo 12/1/2017 2/23/2018 3/25/2018 Completed Binalonan
26 Pangasinan 2,990,843.75 2,990,843.75
Construction of One (1) Storey Two (2) Classroom School Building
17AI0238 with Toilet Attached at Batasan National High School, Binalonan, 1 2 2,680,215.41 - 0.00 1 100.00% 100.00% 0.00% 2,680,215.41 2,680,215.41 - 85 115 Technowood CE ZALDY Alfredo 12/1/2017 2/23/2018 3/25/2018 Completed Binalonan
27 Pangasinan 2,680,215.41 2,680,215.41
Construction of One (1) Storey Two (2) Classroom School Building
17AI0246 with Toilet Attached at Don Rufino Tabayoyong Central School, 1 2 2,814,290.54 - 0.00 1 100.00% 100.00% 0.00% 2,814,290.54 2,814,290.54 - 90 120 2R CS JAYSON KARL 12/1/2017 2/28/2018 3/30/2018 Completed Laoac
28 Laoac, Pangasinan 2,814,290.54 2,814,290.54
Construction of One (1) Storey Two (2) Classroom School Building
17AI0247 with Toilet Attached at Nanbagatan Elementray School at Laoac, 1 2 2,874,249.71 - 0.00 1 100.00% 100.00% 0.00% 2,874,249.71 2,874,249.71 - 90 120 2R CS JAYSON Joselito 12/1/2017 2/28/2018 3/30/2018 Completed Laoac
29 Pangasinan 2,874,249.71 2,874,249.71
Construction of One (1) Storey Two (2) Classroom School Building
17AI0251 with Toilet Attached at Don Maximo G. Gombio Panaga - Tabao 1 2 2,630,527.19 - 0.00 1 100.00% 100.00% 0.00% 2,630,527.19 2,630,527.19 - 85 115 2R CS JAYSON KARL 12/1/2017 2/23/2018 3/25/2018 Completed Laoac
30 Integrated School at Laoac, Pangasinan 2,630,527.19 2,630,527.19
Construction of One (1) Storey Two (2) Classroom School Building
17AI0232 with Toilet attached at Dilan Integrated School, Pozorrubio, 1 2 2,654,593.04 - 0.00 1 100.00% 100.00% 0.00% 2,654,593.04 2,654,593.04 - 85 115 2R CS ZALDY Jocelyn 12/1/2017 2/23/2018 3/25/2018 Completed Pozorrubio
31 Pangasinan 2,654,593.04 2,654,593.04
Construction of One (1) Storey Three (3) Classroom School Building RPParayno
17AI0231 with Toilet Attached at Inoman Elementary School, Pozorrubio, 1 3 3,882,942.29 - 0.00 1 100.00% 100.00% 0.00% 3,882,942.29 3,882,942.29 - 95 125 ZALDY Jocelyn 12/1/2017 3/5/2018 4/4/2018 Completed Pozorrubio
Constn.
32 Pangasinan 3,882,942.29 3,882,942.29
Construction of One (1) Storey Three (3) Classroom School Building RPParayno
17AI0299 with Toilet Attached at Don Benito Elementary School, Pozorrubio, 1 3 3,825,742.62 - 0.00 1 100.00% 100.00% 0.00% 3,825,742.62 3,825,742.62 - 95 125 ZALDY Jocelyn 12/1/2017 3/5/2018 4/4/2018 Completed Pozorrubio
Constn.
33 Pangasinan 3,825,742.62 3,825,742.62
Construction of One (1) Storey Three (3) Classroom School Building RPParayno
17AI0230 with Toilet Attached at Don Benito Elementary School, Pozorrubio, 1 3 3,825,742.62 - 0.00 1 100.00% 100.00% 0.00% 3,825,742.62 3,825,742.62 - 95 155 ZALDY Jocelyn 12/1/2017 3/5/2018 5/4/2018 Completed Pozorrubio
Constn.
34 Pangasinan 3,825,742.62 3,825,742.62
Construction of One (1) Storey Two (2) Classroom School Building
17AI0226 with Toilet attached Salvacion Elementary School, Sto. Tomas, 1 2 2,654,592.14 - 0.00 1 100.00% 100.00% 0.00% 2,654,592.14 2,654,592.14 - 85 MKM Mktg. ZALDY Karl 12/1/2017 2/23/2018 - Completed SANTO TOMAS
35 Pangasinan 2,654,592.14 2,654,592.14
Construction of One (1) Storey Two (2) Classroom School Building
17AI0234 with Toilet attached at Pinalpal Elementary School, Sison, 1 2 2,624,743.04 - 0.00 1 100.00% 100.00% 0.00% 2,624,743.04 2,624,743.04 85 541 BET CS JOE Jocelyn 12/1/2017 2/23/2018 5/25/2019 Completed Sison
44 Pangasinan 2,624,743.04 2,624,743.04
17AI0225 Construction of One (1) Storey Two (2) Classroom School Building 1 2 2,639,667.14 - 0.00 1 100.00% 100.00% 0.00% 2,639,667.14 2,639,667.14 - 85 115 Safeway CS JAYSON Jean Paul 12/1/2017 2/23/2018 3/25/2018 Completed Villasis
36 with Toilet attached, Lipay Elementary School, Villasis, Pangasinan 2,639,667.14 2,639,667.14
Construction of One (1) Storey Four (4) Classroom School Building
17AI0224 with Toilet attached Capulaan Elementary School, Villasis, 1 4 4,946,997.23 - 0.00 1 100.00% 100.00% 0.00% 4,946,997.23 4,946,997.23 - 105 120 Safeway CS JAYSON Jean Paul 11/28/2017 3/12/2018 3/27/2018 Completed Villasis
37 Pangasinan 4,946,997.23 4,946,997.23
Batch 12
Construction of Two (2) Storey Six (6) Classroom School Building at Rogenox CS SAN NICOLAS
17AI0309 1 6 12,484,563.74 332,812.16 2.60 1 100.00% 100.00% 0.00% 12,484,563.74 11,860,335.55 624,228.19 180 210
Corp.
JONG Melchor Pacos 12/18/2017 6/15/2018 7/15/2018 Completed
38 West Central School, San Nicolas, Pangasinan 12,484,563.74 12,484,563.74

17AI0389 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,579,990.76 2,084,454.25 17.87 1 100.00% 100.00% 0.00% 9,579,990.76 5,914,977.64 3,665,013.12 160 280 JHI CS JONG Melchor Pacos 12/18/2017 5/26/2018 9/23/2018 Completed SAN NICOLAS
39 East Central School, San Nicolas, Pangasinan 9,579,990.76 9,579,990.76

Rogenox CS SAN NICOLAS


17AI0342 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 11,033,406.85 294,891.27 2.60 1 100.00% 100.00% 0.00% 11,033,406.85 10,481,736.51 551,670.34 185 245 JONG Melchor Pacos 12/18/2017 6/20/2018 8/19/2018 Completed
Corp.
40 with Micropile Malilion Elementary School, San Nicolas, Pangasinan 11,033,406.85 11,033,406.85
Construction of Two (2) Storey Four (4) Classroom School Building Rogenox CS
17AI0339 (with Micropile) at Talingkapor Elementary School, San Nicolas, 1 4 11,594,793.98 1.03 0.00 1 100.00% 100.00% 0.00% 11,532,235.84 9,246,917.88 2,285,317.96 185 280 JONG Melchor Pacos 12/18/2017 6/20/2018 9/23/2018 Completed SAN NICOLAS
Corp.
41 Pangasinan 11,594,793.98 11,594,793.98
Construction of Two (2) Storey Four (4) Classroom School Building RPParayno
17AI0338 (with Micropile) at Carayacan Elementary School, San Quintin, 1 4 15,558,727.60 7.02 0.00 1 100.00% 100.00% 0.00% 15,558,727.60 15,558,727.60 - 205 295 VICKY Silver 12/18/2017 7/10/2018 10/8/2018 Completed SAN QUINTIN
Const.
42 Pangasinan 15,558,727.60 15,558,727.60
Construction of Two (2) Storey Four (4) Classroom School Building, RPParayno SAN QUINTIN
17AI0341 1 4 9,865,847.05 67.43 0.00 1 100.00% 100.00% 0.00% 9,865,847.05 9,865,847.05 - 160 220 VICKY Silver 12/18/2017 5/26/2018 7/25/2018 Completed
43 Gonzalo Elementary School, San Quintin, Pangasinan Const. 9,865,847.05 9,865,847.05
Construction of Two (2) Storey Four (4) Classroom School Building Rogenox CS SAN QUINTIN
17AI0343 1 4 9,604,536.42 2,020,108.59 17.38 1 100.00% 100.00% 0.00% 9,604,536.42 8,068,144.45 1,536,391.97 160 220 VICKY Silver 12/21/2017 5/29/2018 7/28/2018 Completed
44 Lagasit Elementary School, San Quintin, Pangasinan Corp. 9,604,536.42 9,604,536.42
Construction of Two (2) Storey Four (4) Classroom School Building at Rogenox CS SAN QUINTIN
17AI0340 1 4 9,547,602.14 258,612.34 2.64 1 100.00% 100.00% 0.00% 9,547,602.14 7,877,052.32 1,670,549.82 160 190 VICKY Silver 12/18/2017 5/26/2018 6/25/2018 Completed
45 San Pedro Elementary School, San Quintin, Pangasinan Corp. 9,547,602.14 9,547,602.14
Construction of Two (2) Storey Eight (8) Classroom School Building Rogenox CS
17AI0382 (with Micropile) at San Quintin Central School, San Quintin, 1 8 22,024,261.71 0.89 0.00 1 100.00% 100.00% 0.00% 22,024,261.71 18,500,208.19 3,524,053.52 220 370 VICKY Silver 12/18/2017 7/25/2018 12/22/2018 Completed SAN QUINTIN
Corp.
46 Pangasinan 22,024,261.71 22,024,261.71
Construction of Two (2) Storey Four (4) Classroom School Building RPParayno
17AI0344 with Micropile Sisenando V. Tecson Elementary School, San Quintin, 1 4 11,873,427.28 - 0.00 1 100.00% 100.00% 0.00% 11,873,427.28 11,873,427.28 - 185 245 VICKY Silver 12/18/2017 6/20/2018 8/19/2018 Completed SAN QUINTIN
Const.
47 Pangasinan 11,873,427.28 11,873,427.28
17AI0315 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,536,574.20 254,715.28 2.60 1 100.00% 100.00% 0.00% 9,536,574.20 9,536,574.20 - 145 295 JHI CS JONG MIKE 12/14/2017 5/7/2018 10/4/2018 Completed STA. MARIA
48 West Central Elementary School, Sta. Maria, Pangasinan 9,536,574.20 9,536,574.20
17ai0358 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 9,836,062.47 2.01 0.00 1 100.00% 100.00% 0.00% 9,836,062.47 9,344,259.35 491,803.12 165 315 R.A. Matias CD JONG Jomille Mingrajal 12/18/2017 5/31/2018 10/28/2018 Completed TAYUG
49 (with Micropile) at Carriedo Elementary School, Tayug, Pangasinan 9,836,062.47 9,836,062.47

Construction of Four (4) Storey Twenty (20) Classroom School


R.A. Matias CD/ BAUTISTA
17AI0405 Building (2 Regular Workshop, 2 Science Laboratory, 2 Computer 1 1 44,814,557.17 506,947.29 1.12 1 86.50% 90.00% 3.50% 44,814,557.17 29,178,460.95 15,636,096.22 255 535 ZALDY Jean Paul 12/18/2017 8/29/2018 6/5/2019 On-going
Laboratory and 8 Classrooms) Bautista National High School at Kenwood CE (JV)
60 Bautista, Pangasinan 38,764,591.95 40,333,101.45
Construction of Two (2) Storey Eight (8) Classroom School Building at Arcinue Comm. SAN QUINTIN
17AI0357 1 8 18,558,819.60 124,563.34 0.67 1 100.00% 100.00% 0.00% 18,558,819.60 17,630,878.62 927,940.98 195 285 VICKY Silver 12/18/2017 6/30/2018 9/28/2018 Completed
50 Lagasit National High School, San Quintin, Pangasinan Corp. 18,558,819.60 18,558,819.60

Construction of Four (4) Storey Sixteen (16) Classroom School


Rogenox CS SAN QUINTIN
17AI0337 Building (4 Regular Workshop and 2 Science Laboratory and 2 1 1 39,717,939.26 680,863.44 1.69 1 100.00% 100.00% 0.00% 39,717,939.26 32,610,876.24 7,107,063.02 235 355 VICKY Silver 12/27/2017 8/18/2018 12/16/2018 Completed
Computer Laboratory) at San Quintin National High School at San Corp.
51 Quintin, Pangasinan 39,717,939.26 39,717,939.26
17AI0310 Construction of Three (3) Storey Six (6) Classroom School Building at 1 6 14,716,343.10 411,106.18 2.72 1 100.00% 100.00% 0.00% 14,716,343.10 13,980,525.94 735,817.16 165 225 AMP Const. JONG Melchor Pacos 12/12/2017 5/25/2018 7/24/2018 Completed SAN NICOLAS
52 San Rafael National High School, San Nicolas, Pangasinan 14,716,343.10 14,716,343.10

17AI0384 Construction of Two (2) Storey Six (6) Classroom School Building at 1 6 12,488,124.15 269,551.75 2.11 1 100.00% 100.00% 0.00% 12,488,124.15 10,794,044.05 1,694,080.10 170 260 WJP CS JONG Melchor Pacos 12/18/2017 6/5/2018 9/3/2018 Completed SAN NICOLAS
53 Sto. Tomas National High School, San Nicolas, Pangasinan 12,488,124.15 12,488,124.15
Construction of Four (4) Storey Sixteen (16) Classroom School Rogenox CS
17AI0336 Building (6 Regular Workshop and 2 Science Laboratory) at Tayug 1 1 39,763,329.98 754,872.72 1.86 1 100.00% 100.00% 0.00% 39,763,329.98 29,574,908.50 10,188,421.48 245 505 JONG Jomille Mingrajal 12/21/2017 8/22/2018 5/9/2019 Completed TAYUG
Corp.
65 National High School at Tayug, Pangasinan 39,763,329.98 39,763,329.98
Construction of Four (4) Storey Eight (8) Classroom School Building Alpha Omega
17AI0424 (2 Science Laboratory and 2 Computer Laboratory) Lumayao 1 1 21,878,803.84 2.10 0.00 1 100.00% 100.00% 0.00% 21,878,803.84 21,878,803.84 - 215 Gen. Contractor & VICKY Silver 12/21/2017 7/23/2018 - Completed SAN QUINTIN
54 Integrated School at San Quintin, Pangasinan Dev. Corp. 21,878,803.84 21,878,803.84
Batch 13 #DIV/0! #DIV/0! #DIV/0! #DIV/0!

17AI0376 Construction of Two (2) Storey Six (6) Classroom School Building 1 6 14,546,274.58 5.18 0.00 1 98.71% 100.00% 1.29% 14,546,274.58 11,921,460.11 2,624,814.47 200 321 AMP Const. ZALDY Ashley 12/18/2017 7/5/2018 11/3/2018 Completed ALCALA
55 (with Micropile) Alcala Central School, Alcala, Pangasinan 14,358,627.64 14,546,274.58
Construction of Four (4) Storey Twenty (20) Classroom School
17AI0378 Building (with Micropile) Pozorrubio Central School at Pozorrubio, 1 20 50,588,221.26 1,566,214.43 3.00 1 100.00% 100.00% 0.00% 50,588,221.26 50,588,221.26 - 335 423 BET CS JOE Jocelyn 12/18/2017 11/17/2018 2/13/2019 Completed Pozorrubio
56 Pangasinan 50,588,221.26 50,588,221.26

17AI0398 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,577,412.15 2,369,281.76 19.83 1 100.00% 100.00% 0.00% 9,577,412.15 8,061,474.92 1,515,937.23 165 317 2R CS JOE Jocelyn 12/28/2017 6/10/2018 11/9/2018 Completed SISON
57 Artacho Elementary School, Sison, Pangasinan 9,577,412.15 9,577,412.15
17AI0318 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,836,061.35 2.33 0.00 1 100.00% 100.00% 0.00% 9,836,061.35 9,344,258.28 491,803.07 160 222 2R CS JOE Jocelyn 12/12/2017 5/20/2018 7/21/2018 Completed SISON
58 Esperanza Integrated School, Sison Pangasinan 9,836,061.35 9,836,061.35

17AI0416 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 11,946,690.19 3.72 0.00 1 68.52% 70.00% 1.48% 11,946,690.19 1,737,938.20 10,208,751.99 185 557 2R CS JOE Joselito 12/19/2017 6/21/2018 6/28/2019 On-going SISON
72 with Micropile at Pinalpal Elementary School, Sison, Pangasinan 8,185,872.12 8,362,683.13
Construction of Two (2) Storey Ten (10) Classroom School Building
17AI0431 (with Micropile) (Building 2) Piaz Elementary School, Villasis, 1 4 25,380,035.54 524,257.24 2.02 1 100.00% 100.00% 0.00% 25,380,035.54 21,547,650.16 3,832,385.38 245 336 Alcel Const. MANNY Jean Paul 12/27/2017 8/28/2018 11/27/2018 Completed VILLASIS
59 Pangasinan 25,380,035.54 25,380,035.54
Construction of Two (2) Storey Ten (10) Classroom School Building
17AI0388 (with Micropile) (Building 1) at Piaz Elementary School, Villasis, 1 10 25,467,249.26 437,043.52 1.69 1 100.00% 100.00% 0.00% 25,467,249.26 21,573,917.33 3,893,331.93 245 336 Alcel Const. MANNY Jean Paul 12/18/2017 8/19/2018 11/18/2018 Completed VILLASIS
60 Pangasinan 25,467,249.26 25,467,249.26

RPParayno VILLASIS
17AI0439 Construction of Two (2) Storey Four (4) Classroom School Building 1 10 12,604,664.96 952,586.03 7.03 1 100.00% 100.00% 0.00% 12,604,664.96 12,604,664.96 - 180 240 MANNY Jean Paul 12/19/2017 6/16/2018 8/15/2018 Completed
Const.
61 with Micropile at Caramutan Elementary School, Villasis, Pangasinan 12,604,664.96 12,604,664.96
Construction of Three(3)-storey Six(6)-Classroom School Building
17AI0319 with Micropile (2 Regular Workshop and 1 Computer Laboratory) 1 1 17,658,712.85 492,408.40 2.71 1 100.00% 100.00% 0.00% 17,658,712.85 16,775,777.21 882,935.64 190 250 AMP Const. ZALDY Karl 12/12/2017 6/19/2018 8/18/2018 Completed SANTO TOMAS
62 Antonio P. Villar National High School at Sto. Tomas, Panagsinan 17,658,712.85 17,658,712.85
Construction of Three(3)-storey Six(6)-Classroom School Building (2
17AI0323 Science Laboratory and 1 Computer Laboratory) Antonio P. Villar 1 1 15,037,890.90 8.38 0.00 1 100.00% 100.00% 0.00% 15,037,890.90 14,285,996.35 751,894.55 155 215 AMP Const. ZALDY Karl 12/12/2017 5/15/2018 7/14/2018 Completed SANTO TOMAS
63 National High School at Sto. Tomas, Pangasinan 15,037,890.90 15,037,890.90
Construction of Four (4) Storey Eight (8) Classroom School Building Aquino delaCruz
17AI0462 (with Micropile) (2 Regular Workshop and 2 Classrooms) Arboleda 1 1 21,894,371.32 0.74 0.00 1 100.00% 100.00% 0.00% 21,894,371.32 21,894,371.32 - 225 285 ZALDY Ashley 12/19/2017 7/31/2018 9/29/2018 Completed ALCALA
EC
64 National High School at Alcala, Pangasinan 21,894,371.32 21,894,371.32
Construction of Four (4) Storey Eight (8) Classroom School Building AMP Const./WJP
17AI0425 (2 Science Laboratory and 2 Computer Laboratory) at Arboleda 1 1 18,386,495.12 394,654.98 2.10 1 100.00% 100.00% 0.00% 18,386,495.12 17,467,170.36 919,324.76 190 330 ZALDY Ashley 12/19/2017 6/26/2018 11/13/2018 Completed ALCALA
CS (JV)
65 National High School at Alcala, Pangasinan 18,386,495.12 18,386,495.12
Construction of Four (4) Storey Eight (8) Classroom School Building Aquino delaCruz
17AI0418 (2 Science Laboratory and 2 Computer Laboratory) at Artacho 1 1 18,781,146.81 3.29 0.00 1 97.00% 98.65% 1.65% 18,781,146.81 7,687,454.40 11,093,692.41 240 541 JOE Jocelyn 12/19/2017 8/15/2018 6/12/2019 On-going SISON
EC
80 National High School at Sison, Pangasinan 18,217,712.41 18,527,601.33

Construction of Four (4) Storey Twelve (12) Classroom School


Aquino delaCruz SISON
17AI0402 Building (2 Science Laboratory, 2 Computer Laboratory and 4 1 1 33,555,158.12 0.09 0.00 1 90.23% 93.00% 2.77% 33,555,158.12 11,872,989.23 21,682,168.89 210 532 JOE Jocelyn 12/18/2017 7/15/2018 6/2/2019 On-going
Classrooms) at Alejandro F. Oligan High School (Asan Sur NHS), EC/2R (JV)
81 Sison, Pangasinan 30,276,819.17 31,206,297.05
Construction of Three(3)-storey Six(6)-Classroom School Building (2
17AI0320 Science Laboratory and 2 Classroom), Baluyot National High School 1 1 14,928,670.39 109,228.89 0.73 1 100.00% 100.00% 0.00% 15,037,508.41 13,639,449.55 1,398,058.86 155 365 BET CS MANNY Jean Paul 12/14/2017 5/17/2018 12/13/2018 Completed BAUTISTA
66 at Bautista, Pangasinan 14,928,670.39 14,928,670.39
Construction of Three (3) Storey Six (6) Classroom School Building (1
17AI0356 Regular Workshop and 2 Computer Laboratory) at Baluyot National 1 1 15,037,888.41 10.87 0.00 1 100.00% 100.00% 0.00% 14,928,670.39 10,330,429.46 4,598,240.93 155 365 BET CS MANNY Jean Paul 12/18/2017 5/21/2018 12/17/2018 Completed BAUTISTA
67 High School, Bautista, Pangasinan 15,037,888.41 15,037,888.41
Construction of Four (4) Storey Eight (8) Classroom School Building 2 Aquino delaCruz
17AI0434 Science Laboratory, 2 Computer Laboratory) at Barangobong 1 1 18,781,149.42 0.68 0.00 1 100.00% 100.00% 0.00% 18,781,149.42 15,945,197.43 2,835,951.99 190 281 EC / 3K MANNY Jean Paul 12/19/2017 6/26/2018 9/25/2018 Completed VILLASIS
68 National High School, Villasis, Panasinan BUILDERS (JV) 18,781,149.42 18,781,149.42
Construction of Four (4) Storey Sixteen (16) Classroom School
17AI0442 Building (8 regular Workshop) at Benigno V. Aldana National High 1 1 39,827,967.66 570,835.04 1.41 1 95.24% 96.00% 0.76% 39,827,967.66 28,621,754.52 11,206,213.14 230 541 Kenwood CE JOE Jocelyn 12/19/2017 8/5/2018 6/12/2019 On-going Pozorrubio
85 School, Pozorrubio, Pangasinan 37,932,156.40 38,234,848.95

Construction of Four (4) Storey Sixteen (16) Classroom School


17AI0444 Building (2 Science Laboratory, 4 Computer Laboratory, and 4 1 1 46,107,666.72 12.60 0.00 1 93.00% 94.75% 1.75% 46,107,666.72 32,259,609.21 13,848,057.51 280 559 Kenwood CE JOE Jocelyn 12/19/2017 9/24/2018 6/30/2019 On-going Pozorrubio
Classrooms) at Benigno V. Aldana National High School, Pozorrubio,
86 Pangasinan 42,880,130.05 43,687,014.22

Construction of Four (4) Storey Sixteen (16) Classroom School


17AI0440 Building (1 Regular Workshop, 2 Science Laboratory, 2 Computer 1 1 38,562,493.25 0.24 0.00 1 100.00% 100.00% 0.00% 38,562,493.25 36,634,368.59 1,928,124.66 225 290 AMP Const. ZALDY Ashley 12/19/2017 7/31/2018 10/4/2018 Completed ALCALA
Laboratory and 6 Classrooms) at Bersamin Agro - Industrial High
69 School, Alcala, Pangasinan 38,562,493.25 38,562,493.25
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0447 (2 Science Laboratory, 2 Computer Labaratory) (with Miropile) at 1 1 21,427,856.24 570,990.82 2.60 1 92.56% 94.00% 1.44% 21,427,856.24 8,046,030.63 13,381,825.61 230 535 AMP Const. JOE Jocelyn 12/19/2017 8/5/2018 6/6/2019 On-going Pozorrubio
88 Bobonan National High School, Pozorrubio, Pangasinan 19,833,623.74 20,142,184.87
Construction of Four (4) Storey Twelve (12) Classroom School
17AI0381 Building (2 Science Lab, 2 Computer Lab and 4 Classrooms) at 1 1 33,712,240.50 928,454.35 2.68 1 70.00% 70.20% 0.20% 33,712,240.50 11,383,317.86 22,328,922.64 215 546 AMP Const. JAYSON Jean Paul 12/18/2017 7/20/2018 6/16/2019 On-going VILLASIS
89 Capulaan National High School, Villasis, Pangasinan 23,598,568.35 23,665,992.83

Construction of Four (4) Storey Twenty (20) Classroom School


17AI0427 Building (with Micropile) (4 Regular Workshop, 2 Science Laboratory, 1 1 50,584,088.35 1,510,647.34 2.90 1 100.00% 100.00% 0.00% 50,584,088.35 30,954,262.21 19,629,826.14 330 510 BET CS ZALDY Ashley 12/28/2017 11/22/2018 5/21/2019 Completed ALCALA
2 Computer Laboratory and 4 Classrooms) Cipriano P. Primicias
90 National High School at Alcala, Pangasinan 50,584,088.35 50,584,088.35
Construction of Three (3) Storey Six (6) Classroom School Building (3
17AI0354 Regular Workshop) at Cipriano P. Primicias National High School at 1 1 14,667,949.15 399,800.13 2.65 1 100.00% 100.00% 0.00% 14,667,949.15 13,934,551.69 733,397.46 160 250 MCB CS ZALDY Ashley 12/21/2017 5/29/2018 8/27/2018 Completed ALCALA
70 Alcala, Pangasinan 14,667,949.15 14,667,949.15

17AI0360 Construction of Two (2) Storey Four (4) Classroom School Buildingat 1 4 8,714,919.71 260,877.54 2.91 1 100.00% 100.00% 0.00% 8,714,919.71 8,714,919.71 - 130 160 DMGR Builders ZALDY Ashley 12/18/2017 4/26/2018 5/26/2018 Completed ALCALA
71 at Cipriano P. Primicias National High School, Alcala, Pangasinan 8,714,919.71 8,714,919.71
Construction of Four (4) Storey Eight (8) Classroom School Building Aquino delaCruz
17AI0433 (1 Regular Workshop and 6 Classrooms) at Caloscaoayan National 1 1 17,423,188.78 363,384.95 2.04 1 100.00% 100.00% 0.00% 17,423,188.78 14,659,342.17 2,763,846.61 185 260 MANNY Jean Paul 12/19/2017 6/21/2018 9/4/2018 Completed BAUTISTA
EC
72 High School, Bautista, Pangasinan 17,423,188.78 17,423,188.78
Construction of Four (4) Storey Eight (8) Classroom School Building Aquino delaCruz
17AI0419 (2 - ICT Laboratory, 2 Science Laboratory) at Caloscaoayan National 1 1 18,405,131.81 390,943.29 2.08 1 100.00% 100.00% 0.00% 18,405,131.81 15,580,188.04 2,824,943.77 240 300 MANNY Jean Paul 12/19/2017 8/15/2018 10/14/2018 Completed BAUTISTA
EC
73 High School, Bautista, Pangasinan 18,405,131.81 18,405,131.81
Construction of Three (3) Storey Six (6) Classroom School Building (1
Regular Workshop and 2 Computer Laboratory - Bldg. 1) at Don VILLASIS
17AI0361 1 1 14,914,474.76 123,424.52 0.82 1 100.00% 100.00% 0.00% 14,914,478.70 14,168,754.76 745,723.94 155 230 AMP Const. JAYSON Jean Paul 12/18/2017 5/21/2018 8/4/2018 Completed
Ramon E. Costales Memorial National High School, Villasis,
74 Pangasinan 14,914,474.76 14,914,474.76
Construction of Three (3) Storey Six (6) Classroom School Building (3
17AI0359 Regular Workshop) at Don Ramon E. Costales Memorial National 1 1 14,614,478.70 423,420.58 2.82 1 100.00% 100.00% 0.00% 14,914,474.76 14,168,751.02 745,723.74 160 235 AMP Const. JAYSON Jean Paul 12/18/2017 5/26/2018 8/9/2018 Completed VILLASIS
75 High School, Villasis, Pangasinan 14,614,478.70 14,614,478.70
Construction of Three (3) Storey Six (6) Classroom School Building (1
Regular Workshop and 2 Computer Laboratory - Bldg. 2) at Don VILLASIS
17AI0355 1 1 17,940,476.00 210,645.24 1.16 1 100.00% 100.00% 0.00% 17,640,476.00 16,758,452.20 882,023.80 190 250 AMP Const. JAYSON Jean Paul 12/18/2017 6/25/2018 8/24/2018 Completed
Ramon E. Costales Memorial National High School, Villasis,
76 Pangasinan 17,940,476.00 17,940,476.00
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0435 (2 Science Laboratory and 2 Computer Laboratory) at Eugenio P. 1 1 18,283,557.97 497,592.13 2.65 1 100.00% 100.00% 0.00% 18,283,557.97 15,689,412.10 2,594,145.87 190 301 AMP Const. JOE Jocelyn 12/19/2017 6/26/2018 10/15/2018 Completed Pozorrubio
77 Perez National High School, Pozorrubio, Pangasinan 18,283,557.97 18,283,557.97

Construction of Two (2) Storey Four (4) Classroom School Building


17AI0407 1 4 11,531,132.28 325,677.24 2.75 1 100.00% 100.00% 0.00% 11,531,132.28 9,797,024.90 1,734,107.38 185 335 ZOTA TC JOE Jocelyn 12/18/2017 6/20/2018 11/17/2018 Completed SISON
(with Micropile) Labayug National High School, Sison, Pangasinan
78 11,531,132.28 11,531,132.28
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0423 (4 Regular Workshop) Laoac National High School at Laoac, 1 1 18,781,137.33 12.77 0.00 1 74.00% 75.50% 1.50% 18,793,737.33 9,778,103.65 9,015,633.68 190 535 BET CS JAYSON JEFF 12/28/2017 7/5/2018 6/15/2019 On-going LAOAC
100 Pangasinan 13,898,041.62 14,179,758.68
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0448 (2 Science Laboratory, 2 Computer Labaratory) at at Laoac National 1 1 18,781,140.44 9.66 0.00 1 72.00% 73.50% 1.50% 18,768,540.44 11,367,760.14 7,400,780.30 190 535 BET CS JAYSON JEFF 12/28/2017 7/5/2018 6/15/2019 On-going LAOAC
101 High School, Laoac, Pangasinan 13,522,421.12 13,804,138.22
Construction of Two (2) Storey Four (4) Classroom School Building Aquino delaCruz LAOAC
17AI0386 1 4 11,966,591.53 2.38 0.00 1 100.00% 100.00% 0.00% 11,966,591.53 11,368,261.95 598,329.58 185 305 JAYSON JEFF 12/18/2017 6/20/2018 10/18/2018 Completed
(on Micropile) at Laoac National High School, Laoac, Pangasinan EC
79 11,966,591.53 11,966,591.53
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0446 (2 Science Laboratory, 2 ICT) at Nama National High School, 1 1 18,246,670.00 564,330.10 3.00 1 91.00% 93.00% 2.00% 18,246,670.00 9,549,381.67 8,697,288.33 190 534 BET CS JOE Jocelyn 12/19/2017 6/26/2018 6/5/2019 On-going Pozorrubio
103 Pozorrubio, Pangasinan 16,604,469.70 16,969,403.10
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0465 (4 Regular Workshop) Nama National High School, Pozorrubio, 1 1 18,246,670.00 564,330.10 3.00 1 88.00% 91.50% 3.50% 18,246,670.00 9,755,643.23 8,491,026.77 180 534 BET CS JOE Jocelyn 12/19/2017 6/16/2018 6/5/2019 On-going Pozorrubio
104 Pangasinan 16,057,069.60 16,695,703.05
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0449 (2 Science Laboratory and 2 ICT) at Palguyod National High School, 1 1 18,321,397.68 489,602.42 2.60 1 97.25% 98.75% 1.50% 18,231,397.68 12,115,608.54 6,115,789.14 190 546 AMP Const. JOE Jocelyn 12/19/2017 6/26/2018 6/17/2019 On-going Pozorrubio
105 Pozorrubio, Pangasinan 17,817,559.24 18,092,380.21
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0460 (with Micropile) (2 Science Laboratory and 2 ICT Laboratory) at Piaz, 1 1 21,291,903.40 602,468.66 2.75 1 100.00% 100.00% 0.00% 21,291,903.40 7,916,657.94 13,375,245.46 220 280 BET CS MANNY Jean Paul 12/19/2017 7/26/2018 9/24/2018 Completed VILLASIS
80 National High School at Villasis, Pangasinan 21,291,903.40 21,291,903.40
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0420 (2 Science Laboratory and 2 Computer Laboratory) at San Felipe 1 1 18,796,074.31 0.79 0.00 1 100.00% 100.00% 0.00% 18,796,074.31 18,796,074.31 - 240 270 AMP Const. ZALDY Alfredo 12/19/2017 8/15/2018 9/14/2018 Completed BINALONAN
81 National High School at Binalonan, Pangasinan 18,796,074.31 18,796,074.31
Construction of Four (4) Storey Twelve (12) Classroom School
17AI0400 Building (2 Science Lab, 2 Computer Lab and 4 Classrooms) at San 1 1 33,722,522.45 918,172.40 2.65 1 100.00% 100.00% 0.00% 33,722,522.45 32,036,396.33 1,686,126.12 215 320 AMP Const. ZALDY Ashley 12/18/2017 7/20/2018 11/2/2018 Completed ALCALA
82 Pedro Apartado National High School, Alcala, Pangasinan 33,722,522.45 33,722,522.45

17AI0459 Construction of Four (4) Storey Eight (8) Classroom School Building 1 1 21,954,049.50 22.56 0.00 1 100.00% 100.00% 0.00% 21,954,049.50 21,954,049.50 - 230 290 AMP Const. ZALDY Alfredo 12/19/2017 8/5/2018 10/4/2018 Completed BINALONAN
(with Micropile) (2 Science Laboratory and 2 Computer Laboratory)
83 at Sta. Maria National High School at Binalonan, Pangasinan 21,954,049.50 21,954,049.50
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0461 (2 Science Laboratory and 2 ICT Laboratory) Unzad National High 1 1 18,796,071.20 3.90 0.00 1 100.00% 100.00% 0.00% 18,796,071.20 15,788,690.90 3,007,380.30 190 370 BET CS MANNY Jean Paul 12/19/2017 6/26/2018 12/23/2018 Completed VILLASIS
84 School at Villasis, Pangasinan 18,796,071.20 18,796,071.20
Construction of Three (3) Storey Six (6) Classroom School Building (2
17AI0429 Regular Workshop and 1 Science Laboratory) San Antonio National 1 1 14,644,324.54 393,574.74 2.62 1 100.00% 100.00% 0.00% 14,644,324.54 13,912,108.31 732,216.23 155 215 AMP Const. ZALDY Karl 12/19/2017 5/22/2018 7/21/2018 Completed SANTO TOMAS
85 High School at Sto. Tomas, Pangasinan 14,644,324.54 14,644,324.54
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0463 (2 Sience Laboratory and 2 Computer Laboratory) at Esperanza 1 1 18,217,600.04 563,549.24 3.00 1 83.00% 85.00% 2.00% 18,217,600.04 12,661,346.30 5,556,253.74 190 534 BET CS JOE Jocelyn 12/19/2017 6/26/2018 6/5/2019 On-going SISON
112 Integrated School at Sison, Pangasinan 15,120,608.03 15,484,960.03
Construction of Two (2) Storey Eight (8) Classroom School Building (2
17AI0404 Science Laboratory and 2 Computer Laboratory) Bantay Insik 1 1 18,578,897.77 10.17 0.00 1 100.00% 100.00% 0.00% 18,578,897.77 15,637,214.73 2,941,683.04 175 322 Alcel Const. JOE Jocelyn 12/21/2017 6/13/2018 11/7/2018 Completed SISON
86 Integrated School, at Sison, Pangasinan 18,578,897.77 18,578,897.77
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0422 (2 Science Laboratory and 2 Computer Laboratory) Don Valentin 1 1 18,535,038.50 587,587.05 3.07 1 100.00% 100.00% 0.00% 18,535,038.50 13,901,017.71 4,634,020.79 190 355 BET CS JOE Jocelyn 12/21/2017 6/28/2018 12/10/2018 Completed SISON
87 Torres Integrated School at Sison, Pangasinan 18,535,038.50 18,535,038.50
Construction of Four (4) Storey Twelve (12) Classroom School
17AI0464 Building (2 Workshop, 1 Science Lab, 1 ICT Lab and 4 Classroom) 1 1 35,110,880.25 449.60 0.00 1 100.00% 100.00% 0.00% 35,110,880.25 27,833,559.38 7,277,320.87 270 393 BET CS JOE Jocelyn 12/19/2017 9/14/2018 1/15/2019 Completed SISON
88 Dungon IS, Sison, Pangasinan 35,110,880.25 35,110,880.25
Construction of Four (4) Storey Eight (8) Sclassroom School Building
17AI0325 with Micropile San Vicente West Integrated School at Asingan, 1 8 20,703,397.60 571,379.98 2.69 1 100.00% 100.00% 0.00% 20,703,397.60 19,668,227.72 1,035,169.88 220 340 AMP Const. FELIPA KING 12/14/2017 7/21/2018 11/18/2018 Completed ASINGAN
89 Pangasinan 20,703,397.60 20,703,397.60

17AI0353 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,564,285.70 271,778.78 2.76 1 93.67% 100.00% 6.33% 9,564,285.70 8,029,379.46 1,534,906.24 160 250 Villar GCS CYL Rodolfo Raquedan 12/18/2017 5/26/2018 8/24/2018 Completed BALUNGAO
90 Balungao Central Elementary School, Balungao, Pangasinan 8,958,866.42 9,564,285.70

17AI0313 Construction of Two(2)-storey Four(4)-Classroom School Building at 1 4 9,564,285.70 271,778.78 2.76 1 98.51% 100.00% 1.49% 9,564,285.70 8,029,379.46 1,534,906.24 160 250 Villar GCS CYL Rodolfo Raquedan 12/12/2017 5/20/2018 8/18/2018 Completed BALUNGAO
91 Mauban Elementary School, balungao, Pangasinan 9,421,586.56 9,564,285.70

17AI0327 Construction of Two(2)-storey Four(4)-Classroom School Building at 1 4 9,536,560.93 254,728.55 2.60 1 100.00% 100.00% 0.00% 9,536,560.93 9,536,560.93 - 145 MKM Marketing JONG Rodolfo Raquedan 12/14/2017 5/7/2018 - Completed BALUNGAO
92 San Joaquin Elementary School, Balungao, Pangasinan 9,536,560.93 9,536,560.93
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0350 (with Micropile) at Canarem Elementary School, Natividad, 1 4 10,940,023.06 298,725.06 2.66 1 100.00% 100.00% 0.00% 10,940,023.06 10,940,023.06 - 185 275 RG Tabin CS JONG Silver 12/18/2017 6/20/2018 9/18/2018 Completed NATIVIDAD
93 Pangasinan 10,940,023.06 10,940,023.06
Construction of Two (2) Storey Four (4) Classroom School Building Rogenox CS NATIVIDAD
17AI0392 1 4 9,674,711.32 1,623,736.80 14.37 1 100.00% 100.00% 0.00% 9,674,711.32 9,674,711.32 - 160 JONG Silver 12/18/2017 5/26/2018 - Completed
94 Salud Elementary School, Natividad, Pangasinan Corp. 9,674,711.32 9,674,711.32
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0373 (with Micropile) San Eugenio Elementary School, Natividad, 1 4 9,591,010.40 1,647,737.72 14.66 1 100.00% 100.00% 0.00% 9,591,010.40 9,111,459.88 479,550.52 145 205 2R CS JONG Silver 12/18/2017 5/11/2018 7/10/2018 Completed NATIVIDAD
95 Pangasinan 9,591,010.40 9,591,010.40
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0346 (with Micropile) at San Miguel Elementary School, Natividad, 1 4 11,022,611.40 236,036.72 2.10 1 100.00% 100.00% 0.00% 11,022,611.40 10,471,480.83 551,130.57 185 275 2R CS JONG Silver 12/18/2017 6/20/2018 9/18/2018 Completed NATIVIDAD
96 Pangasinan 11,022,611.40 11,022,611.40
17AI0417 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 11,293,936.26 241,697.02 2.10 1 100.00% 100.00% 0.00% 11,293,936.26 10,729,239.45 564,696.81 185 260 2R CS JONG Silver 12/19/2017 6/21/2018 9/4/2018 Completed NATIVIDAD
97 with Micropile at Silag Elementary School, Natividad, Pangasinan 11,293,936.26 11,293,936.26

17AI0374 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 9,963,817.95 273,068.42 2.67 1 100.00% 100.00% 0.00% 9,963,817.95 9,465,627.05 498,190.90 165 300 AMP Const. CYL Rodolfo Raquedan 12/18/2017 5/31/2018 10/13/2018 Completed ROSALES
98 Carmen Elementary School Rosales, Pangasinan 9,963,817.95 9,963,817.95
17AI0312 Construction of Two(2)-storey Four(4)-Classroom School Building at 1 4 9,791,289.48 - 0.00 1 94.13% 100.00% 5.87% 9,791,289.48 9,791,289.48 - 145 310 MKM Marketing CYL Rodolfo Raquedan 12/12/2017 5/5/2018 10/17/2018 Completed ROSALES
99 Palakipak Elementary School, Rosales, Pangasinan 9,216,540.79 9,791,289.48

17AI0348 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 11,248,127.54 302,430.74 2.62 1 100.00% 100.00% 0.00% 11,248,127.54 10,685,721.16 562,406.38 185 320 2R CS CYL Rodolfo Raquedan 12/18/2017 6/20/2018 11/2/2018 Completed ROSALES
100 (with Micropile) at Rabago Elementary School, Rosales, Pangasinan 11,248,127.54 11,248,127.54

17AI0395 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 9,547,671.79 2,325,755.49 19.59 1 92.75% 100.00% 7.25% 9,547,671.79 9,070,288.20 477,383.59 160 260 AMP Const. CYL Rodolfo Raquedan 12/18/2017 5/26/2018 9/3/2018 Completed ROSALES
101 San Isidro Elementary School, Rosales, Pangasinan 8,855,465.59 9,547,671.79

17AI0372 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 9,615,023.95 206,115.53 2.10 1 100.00% 100.00% 0.00% 9,615,023.95 9,134,272.75 480,751.20 160 250 WJP CS CYL Rodolfo Raquedan 12/18/2017 5/26/2018 8/24/2018 Completed ROSALES
102 Balincanaway Elementary School, Rosales, Pangasinan 9,615,023.95 9,615,023.95

17AI0329 Construction of Two(2)-storey Four(4)-Classroom School Building at 1 4 9,821,139.48 - 0.00 1 100.00% 100.00% 0.00% 9,821,139.48 9,821,139.48 - 160 190 MKM Marketing CYL Rodolfo Raquedan 12/14/2017 5/22/2018 6/21/2018 Completed ROSALES
103 Li Seng Giap Elementary School, Rosales, Pangasinan 9,821,139.48 9,821,139.48

17AI0314 Construction of Two(2)-storey Six(6)-Classroom School Building at 1 6 12,461,718.65 355,657.25 2.77 1 100.00% 100.00% 0.00% 12,461,718.65 10,563,054.11 1,898,664.54 180 315 WJP CS CYL Rodolfo Raquedan 12/12/2017 6/9/2018 10/22/2018 Completed ROSALES
104 Rosales North Central School, Rosales, Pangasinan 12,461,718.65 12,461,718.65

17AI0432 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,585,221.88 2,009,573.13 17.33 1 100.00% 100.00% 0.00% 9,585,221.88 7,654,468.31 1,930,753.57 145 295 WJP CS CYL Rodolfo Raquedan 12/19/2017 5/12/2018 10/9/2018 Completed ROSALES
105 San Luis Elementary School, Rosales, Pangasinan 9,585,221.88 9,585,221.88

17AI0328 Construction of Two(2)-storey Four(4)-Classroom School Building at 1 4 9,791,289.48 - 0.00 1 100.00% 100.00% 0.00% 9,791,289.48 9,791,289.48 - 145 205 2R CS CYL Rodolfo Raquedan 12/14/2017 5/7/2018 7/6/2018 Completed ROSALES
106 San Pedro West Elementary School, Rosales, Pangasinan 9,791,289.48 9,791,289.48
Construction of Two (2) Storey Four (4) Classroom School Building at Aquino delaCruz SAN NICOLAS
17AI0441 1 4 10,547,953.83 223,002.88 2.07 1 100.00% 100.00% 0.00% 10,547,953.83 10,020,556.14 527,397.69 165 225 JONG Melchor Pacos 12/19/2017 6/1/2018 7/31/2018 Completed
107 San Jose Elementary School, San Nicolas, Pangasinan EC 10,547,953.83 10,547,953.83
Construction of Two (2) Storey Four (4) Classroom School Building at Aquino delaCruz SAN NICOLAS
17AI0390 1 4 9,634,813.00 2,029,631.80 17.40 1 100.00% 100.00% 0.00% 9,634,813.00 9,153,072.35 481,740.65 160 220 JONG Melchor Pacos 12/18/2017 5/26/2018 7/25/2018 Completed
108 San Roque ANP Pilot School, San Nicolas, Pangasinan EC 9,634,813.00 9,634,813.00
Construction of Two (2) Storey Four (4) Classroom School Building Aquino delaCruz
17AI0403 (with Micropile) at Sto. Tomas Elementary School, San Nicolas, 1 4 11,065,080.57 233,367.55 2.07 1 100.00% 100.00% 0.00% 11,065,080.57 10,511,826.54 553,254.03 185 245 JONG Melchor Pacos 12/18/2017 6/20/2018 8/19/2018 Completed SAN NICOLAS
EC
109 Pangasinan 11,065,080.57 11,065,080.57
Construction of Two (2) Storey Four (4) Classroom School Building Aquino delaCruz
17AI0371 (with Micropile) Cacabugaoan Elementary School, San Nicolas, 1 4 11,002,485.57 236,262.55 2.10 1 100.00% 100.00% 0.00% 11,002,485.57 10,452,361.29 550,124.28 185 245 JONG Melchor Pacos 12/18/2017 6/20/2018 8/19/2018 Completed SAN NICOLAS
EC
110 Pangasinan 11,002,485.57 11,002,485.57
Construction of Two (2) Storey Four (4) Classroom School Building Aquino delaCruz
17AI0396 (with Micropile) Calaoacan Elementary School, San Nicolas, 1 4 9,806,214.29 0.19 0.00 1 100.00% 100.00% 0.00% 9,806,214.29 9,315,903.58 490,310.71 160 220 JONG Melchor Pacos 12/18/2017 5/26/2018 7/25/2018 Completed SAN NICOLAS
EC
111 Pangasinan 9,806,214.29 9,806,214.29

17AI0351 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,564,285.70 271,778.78 2.76 1 100.00% 100.00% 0.00% 9,564,285.70 9,564,285.70 - 160 250 AMP Const. JONG MIKE 12/18/2017 5/26/2018 8/24/2018 Completed STA. MARIA
112 Bantug - Capandanan Elementary School, Sta. Maria. Pangasinan 9,564,285.70 9,564,285.70
17AI0316 Construction of Two(2)-storey Four(4)-Classroom School Building at 1 4 9,580,090.49 255,973.99 2.60 1 100.00% 100.00% 0.00% 9,580,090.49 9,101,085.97 479,004.52 160 220 MKM Marketing JONG MIKE 12/12/2017 5/20/2018 7/19/2018 Completed STA. MARIA
113 Pataquid Elementary School, Sta. Maria, Pangasinan 9,580,090.49 9,580,090.49
Construction of Two (2) Storey Four (4) Classroom School Building Rogenox CS STA. MARIA
17AI0394 1 4 11,664,390.31 54.70 0.00 1 100.00% 100.00% 0.00% 11,664,390.31 9,798,087.94 1,866,302.37 185 305 JONG MIKE 12/18/2017 6/20/2018 10/18/2018 Completed
114 (with Micropile) Samon Elementary School, Sta. Maria, Pangasinan Corp. 11,664,390.31 11,664,390.31
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0347 (with Micropile) at Barangobong Elementary School, Tayug, 1 4 10,935,785.65 302,962.47 2.70 1 100.00% 100.00% 0.00% 10,935,785.65 10,388,996.37 546,789.28 185 245 R.A. Matias CD JONG Jomille Mingrajal 12/18/2017 6/20/2018 8/19/2018 Completed Tayug
115 Pangasinan 10,935,785.65 10,935,785.65
17AI0375 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 10,935,785.65 302,962.47 2.70 1 100.00% 100.00% 0.00% 10,935,785.65 10,374,384.01 561,401.64 185 305 R.A. Matias CD JONG Jomille Mingrajal 12/18/2017 6/20/2018 10/18/2018 Completed Tayug
116 (with Micropile) Magallanes Elementary School, Tayug, Pangasinan 10,935,785.65 10,935,785.65

Construction of Two (2) Storey Four (4) Classroom School Building


17AI0436 (with Micropile) at Doña Nena Elementary School, Umingan, 1 4 11,361,119.85 303,325.16 2.60 1 100.00% 100.00% 0.00% 11,361,119.85 10,793,063.86 568,055.99 185 245 Alphin TC EUGENE Alfredo Acosta 12/19/2017 6/21/2018 8/20/2018 Completed UMINGAN
117 Pangasinan 11,361,119.85 11,361,119.85

Construction of Two (2) Storey Four (4) Classroom School Building


17AI0379 (with Micropile) Evangelista Elementary School, Umingan, 1 4 11,152,888.58 298,169.90 2.60 1 100.00% 100.00% 0.00% 11,152,888.58 10,595,244.15 557,644.43 185 245 Alphin TC EUGENE Alfredo Acosta 12/18/2017 6/20/2018 8/19/2018 Completed UMINGAN
118 Pangasinan 11,152,888.58 11,152,888.58

17AI0443 1 4 9,580,290.00 255,774.48 2.60 1 100.00% 100.00% 0.00% 9,580,290.00 8,526,458.10 1,053,831.90 160 310 JHI CS EUGENE Alfredo Acosta 12/19/2017 5/27/2018 10/24/2018 Completed UMINGAN
Construction of Two (2) Storey Four (4) Classroom School Building at
119 Flores Elementary School, Umingan, Pangasinan 9,580,290.00 9,580,290.00
17AI0401 Construction of Two (2) Storey Four (4) Classroom School Building 1 4 11,594,794.05 0.96 0.00 1 100.00% 100.00% 0.00% 11,594,794.05 8,696,112.83 2,898,681.22 185 305 MCB CS JONG Alfredo Acosta 12/18/2017 6/20/2018 10/18/2018 Completed UMINGAN
120 (with Micropile) at La Paz Elementary School, Umingan, Pangasinan 11,594,794.05 11,594,794.05

17AI0438 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,551,115.76 255,098.72 2.60 1 100.00% 100.00% 0.00% 9,551,115.76 8,658,086.43 893,029.33 160 250 AMP Const. EUGENE Alfredo Acosta 12/19/2017 5/27/2018 8/25/2018 Completed UMINGAN
121 Bantug Elementary School, Umingan, Pangasinan 9,551,115.76 9,551,115.76

AC SOLIVEN ROSALES
17AI0437 Construction of Two (2) Storey Four (4) Classroom School Building at 1 4 9,595,133.40 1,855,925.08 16.21 1 100.00% 100.00% 0.00% 9,595,133.40 6,750,246.38 2,844,887.02 160 295
CGM
CYL Rodolfo Raquedan 12/19/2017 5/27/2018 10/9/2018 Completed
122 Sitio Baong Elementary School, Rosales, Pangasinan 9,595,133.40 9,595,133.40

17AI0393 Construction of Two (2) Storey Six (6) Classroom School Building 1 6 12,611,129.63 3,327,452.75 20.88 1 100.00% 100.00% 0.00% 12,611,129.63 12,611,129.63 - 175 355 2R CS FELIPA KING 12/21/2017 6/13/2018 12/10/2018 Completed Asingan
123 Ariston - Batog National High School, Asingan, Pangasinan 12,611,129.63 12,611,129.63
17AI0326 Construction of Two(2)-storey Six(6)-Classroom School Building at 1 6 13,540,076.21 0.31 0.00 1 84.00% 90.00% 6.00% 13,540,076.21 6,581,603.58 6,958,472.63 180 545 JHI CS EUGENE Alfredo Acosta 12/12/2017 6/9/2018 6/9/2019 On-going UMINGAN
151 Baracbac National High School, Umingan, Pangasinan 11,373,664.02 12,186,068.59

Aquino delaCruz UMINGAN


17AI0387 Construction of Two (2) Storey Six (6) Classroom School Building (on 1 6 14,795,247.25 402,686.90 2.65 1 89.00% 95.00% 6.00% 14,795,247.25 7,767,504.82 7,027,742.43 200 536
EC
EUGENE Alfredo Acosta 12/18/2017 7/5/2018 6/6/2019 On-going
152 Micropile) at Cabalitian National High School, Umingan, Pangasinan 13,167,770.05 14,055,484.89
Construction of Two(2)-storey Six(6)-Classroom School Building with
17AI0322 Micropile Foundation Carosucan Norte National High School, 1 6 14,784,924.42 413,009.73 2.72 1 100.00% 100.00% 0.00% 14,784,924.42 14,045,678.20 739,246.22 200 320 AMP Const. FELIPA KING 12/14/2017 7/1/2018 10/29/2018 Completed ASINGAN
124 Asingan, Pangasinan 14,784,924.42 14,784,924.42
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0399 (with Micropile) at Carosucan Sur National High School, Asingan, 1 4 11,851,056.23 322,584.12 2.65 1 100.00% 100.00% 0.00% 11,851,056.23 11,258,503.42 592,552.81 185 328 RG Tabin CS FELIPA KING 12/18/2017 6/20/2018 11/10/2018 Completed Asingan
125 Pangasinan 11,851,056.23 11,851,056.23

Construction of Four (4) Storey Sixteen (16) Classroom School


Rogenox CS STA. MARIA
17AI0345 Buiding (4 Regular Workshop, 2 Science Laboratory and 2 Computer 1 1 41,445,868.95 4,661,810.37 10.11 1 100.00% 100.00% 0.00% 40,445,868.95 34,818,647.50 5,627,221.45 235 355 JONG MIKE 12/18/2017 8/9/2018 12/7/2018 Completed
Laboratory) at Eastern Pangasinan Agricultural College at Sta. Maria, Corp.
126 Pangasinan 41,445,868.95 41,445,868.95

17AI0445 Construction of Four (4) Storey Eight (8) Classroom School Building 1 1 18,307,896.40 473,253.70 2.52 1 100.00% 100.00% 0.00% 18,307,896.40 17,392,501.58 915,394.82 185 335 AMP Const. CYL Rodolfo Raquedan 12/19/2017 6/21/2018 11/18/2018 Completed ROSALES
(1 Regular Workshop. 1 Science Laboratory, 2 Computer Laboratory)
127 at Guiling-Coliling National High School, Rosales, Pangasinan 18,307,896.40 18,307,896.40

Construction of Four (4) Storey Sixteen (16) Classroom School


17AI0352 Buiding (3 Regular Workshop, 2 Science Laboratory and 2 ICT 1 1 39,890,733.06 508,069.64 1.26 1 100.00% 100.00% 0.00% 39,890,733.06 33,508,215.79 6,382,517.27 230 290 AMP Const. JONG Alfredo Acosta 12/21/2017 8/7/2018 10/6/2018 Completed UMINGAN
Laboratory and 2 CL) at La Paz National High School at Umingan,
128 Pangasinan 39,890,733.06 39,890,733.06

Construction of Four (4) Storey Eight (8) Classroom School Building


17AI0430 (1 Regular Workshop, 1 Science Laboratory, 1 Computer Laboratory 1 1 18,464,066.65 376,783.45 2.00 1 100.00% 100.00% 0.00% 18,464,066.65 12,047,803.49 6,416,263.16 190 340 BET CS MENIO Alfredo Acosta 12/19/2017 6/26/2018 11/23/2018 Completed UMINGAN
and 2 Classrooms) Maseil-seil Alo-o National High School at
129 Umingan, Pangasinan 18,464,066.65 18,464,066.65

17AI0453 Construction of Four (4) Storey Eight (8) Classroom School Building 1 1 18,322,095.80 473,979.30 2.52 1 100.00% 100.00% 0.00% 18,322,095.80 15,818,137.04 2,503,958.76 185 275 AMP Const. JONG Silver 12/19/2017 6/21/2018 9/19/2018 Completed NATIVIDAD
(1 Regular Workshop, 1 Science Laboratory and 2 Computer
130 Laboratory) at Natividad National High School, Natividad, Pangasinan 18,322,095.80 18,322,095.80
17AI0391 1 6 12,412,917.22 2,785,016.93 18.32 1 100.00% 100.00% 0.00% 12,412,917.22 11,792,271.36 620,645.86 170 230 MCB CS EUGENE Alfredo Acosta 12/18/2017 6/5/2018 8/4/2018 Completed UMINGAN
Construction of Two (2) Storey Six (6) Classroom School Building at
131 Prado National High School, Umingan, Pangasinan 12,412,917.22 12,412,917.22
Construction of Three(3)-storey Nine(9) Classroom School Building
17AI0311 (Building 1) Rajal-Angayan National High School at balungao, 1 9 26,884,752.84 0.40 0.00 1 100.00% 100.00% 0.00% 26,886,312.09 22,697,399.63 4,188,912.46 205 325 BET CS CYL Rodolfo Raquedan 12/14/2017 7/6/2018 11/3/2018 Completed BALUNGAO
132 Pangasinan 26,884,752.84 26,884,752.84

CONSTRUCTION OF THREE (3) STOREY NINE (9) CLASSROOM


17AI0324 SCHOOL BUILDING (BUILDING 2) AT RAJAL – ANGAYAN NATIONAL 1 9 26,884,753.09 0.15 0.00 1 100.00% 100.00% 0.00% 26,883,193.84 25,539,034.15 1,344,159.69 200 230 BET CS CYL Rodolfo Raquedan 12/18/2017 7/5/2018 8/4/2018 Completed Balungao
133 HIGH SCHOOL, BALUNGAO, PANGASINAN 26,884,753.09 26,884,753.09
Construction of Two (2) Storey Six (6) Classroom School Building Rogenox CS NATIVIDAD
17AI0421 1 6 12,567,340.23 2,946,619.39 18.99 1 100.00% 100.00% 0.00% 12,567,340.23 12,567,340.23 - 170 JONG Silver 12/19/2017 6/6/2018 - Completed
134 Salud - San Eugenio National High School, Natividad, Pangasinan Corp. 12,567,340.23 12,567,340.23
Construction of Two(2) Storey Four(4) Classroom School Building
17AI0428 with Micropile at San Juan National High School, San Manuel, 1 4 11,616,953.59 316,173.68 2.65 1 100.00% 100.00% 0.00% 11,616,953.59 11,036,105.91 580,847.68 185 240 MKM Marketing ZALDY Alfredo 12/19/2017 6/21/2018 8/15/2018 Completed SAN MANUEL
135 Pangasinan 11,616,953.59 11,616,953.59

Construction of Four (4) Storey Sixteen (16) Classroom School


Rogenox CS SAN NICOLAS
17AI0383 Building (2 Regular Workshop, 2 Science Laboratory, 2 Computer 1 1 39,836,207.16 562,595.54 1.39 1 100.00% 100.00% 0.00% 39,836,207.16 27,685,031.55 12,151,175.61 235 355 JONG Melchor Pacos 12/18/2017 8/9/2018 12/7/2018 Completed
Laboratory and 4 Classrooms) at San Nicolas National High School, Corp.
136 San Nicolas, Pangasinan 39,836,207.16 39,836,207.16
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0406 (2 Science Laboratory and 2 Computer Laboratory) Sta. Maria 1 1 18,401,901.87 498,648.23 2.64 1 100.00% 100.00% 0.00% 18,401,901.87 15,600,818.25 2,801,083.62 195 345 Alcel Const. JONG Melchor Pacos 12/18/2017 6/30/2018 11/27/2018 Completed SAN NICOLAS
137 National High School at San Nicolas, Pangasinan 18,401,901.87 18,401,901.87
17AI0321 Construction of Two(2)-storey Four(4)-Classroom School Building, 1 4 10,110,831.62 291,347.41 2.80 1 100.00% 100.00% 0.00% 10,110,831.62 10,110,831.62 - 160 280 2R CS ZALDY Alfredo 12/12/2017 5/20/2018 9/17/2018 Completed SAN MANUEL
138 Sto. Domingo National High School, San Manuel, Pangasinan 10,110,831.62 10,110,831.62
Construction of Four (4) Storey; Eight (8) Classroom School Building Rogenox CS
17AI0385 (2 Computer Laboratory and 4 Classrooms) Tayug National High 1 1 21,968,996.57 0.49 0.00 1 100.00% 100.00% 0.00% 21,968,996.57 16,257,430.99 5,711,565.58 230 440 JONG Jomille Mingrajal 12/18/2017 8/4/2018 3/2/2019 Completed TAYUG
Corp.
139 School, at Tayug, Pangasinan 21,968,996.57 21,968,996.57
Alcel Const/
17AI0317 Construction of Four(4)-storey Eight(8)-Classroom School Building at 1 8 18,468,851.14 371,998.96 1.97 1 84.00% 90.00% 6.00% 18,468,851.14 12,813,351.54 5,655,499.60 195 548 Vyragus Const. EUGENE Alfredo Acosta 12/14/2017 6/26/2018 6/14/2019 On-going UMINGAN
169 Umingan Central National High School, Umingan, Pangasinan (JV) 15,513,834.96 16,621,966.03

Construction of Four (4) Storey Sixteen (16) Classroom School


Rogenox CS UMINGAN
17AI0380 Building (4 Regular Workshop, 2 Science Laboratory and 2 Computer 1 1 45,502,367.84 679,936.48 1.47 1 100.00% 100.00% 0.00% 45,502,367.84 38,221,988.99 7,280,378.85 305 425 EUGENE Alfredo Acosta 12/18/2017 10/18/2018 2/15/2019 Completed
Laboratory) Umingan Central National High School at Umingan, Corp.
140 Pangasinan 45,502,367.84 45,502,367.84
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0397 (with Micropile) Don Robert B. Estrella, Sr. National High School, San 1 4 11,287,261.09 307,533.92 2.65 1 100.00% 100.00% 0.00% 11,287,261.09 11,287,261.09 - 185 275 2R CS ZALDY Alfredo 12/18/2017 6/20/2018 9/18/2018 Completed SAN MANUEL
141 Manuel, Pangasinan 11,287,261.09 11,287,261.09

Construction of Four (4) Storey Sixteen (16) Classroom School


Rogenox CS STA. MARIA
17AI0349 Buiding (4 Regular Workshop, 2 Science Laboratory and 2 Computer 1 1 39,842,838.66 555,964.04 1.38 1 100.00% 100.00% 0.00% 39,842,838.66 33,864,410.37 5,978,428.29 235 355 JONG MIKE 12/18/2017 8/9/2018 12/7/2018 Completed
Laboratory) at Sta. Maria East Integrated School at Sta. Maria, Corp.
142 Pangasinan 39,842,838.66 39,842,838.66

Construction of Four (4) Storey Eight (8) Classroom School Building Alcel Const/
17AI0426 (1 Regular Workshop, 1 Science Laboratory, 1 Computer Laboratory 1 1 18,335,550.50 490,374.60 2.60 1 100.00% 100.00% 0.00% 18,335,550.50 15,579,232.50 2,756,318.00 190 340 Vyragus Const. JONG Melchor Pacos 12/20/2017 6/27/2018 11/24/2018 Completed SAN NICOLAS
and 2 Classrooms) San Felipe Integrated School at San Nicolas, (JV)
143 Pangasinan 18,335,550.50 18,335,550.50

Batch 14 #DIV/0! #DIV/0! #DIV/0!


Construction of Two (2) Storey Four (4) Classroom School Building
17AI0612 with Micropile at San Juan Elementary School, San Manuel, 1 4 9,580,306.46 255,758.02 2.60 1 100.00% 100.00% 0.00% 9,580,306.46 9,580,306.46 - 160 250 2R CS ZALDY Alfredo 12/27/2017 6/4/2018 9/2/2018 Completed SAN MANUEL
144 Pangasinan 9,580,306.46 9,580,306.46
Construction of Two (2) Storey Four (4) Classroom School Building at SAN MANUEL
17AI0611 Silsilay Elementary School, San Manuel, Pangasinan 1 4 9,776,362.31 2.17 0.00 1 100.00% 100.00% 0.00% 9,776,362.31 8,233,103.02 1,543,259.29 160 250 2R CS ZALDY Alfredo 12/27/2017 6/4/2018 9/2/2018 Completed
145 9,776,362.31 9,776,362.31
Construction of Two (2) Storey Four (4) Classroom School Building Aquino delaCruz
17AI0590 San isidro Elementary School, San Nicolas, Pangasinan 1 4 9,639,333.00 196,731.48 2.00 1 100.00% 100.00% 0.00% 9,639,333.00 9,157,366.35 481,966.65 160 220 JONG Melchor Pacos 12/27/2017 6/4/2018 8/3/2018 Completed SAN NICOLAS
146 EC 9,639,333.00 9,639,333.00
Construction of Two (2) Storey Four (4) Classroom School Building at ASINGAN
17AI0573 Calepaan Community School, Asingan, Pangasinan 1 4 9,880,839.47 0.01 0.00 1 100.00% 100.00% 0.00% 9,880,839.47 9,386,797.50 494,041.97 160 250 R.A. Matias CD FELIPA KING 12/28/2017 6/5/2018 9/3/2018 Completed
147 9,880,839.47 9,880,839.47
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0566 (with Micropile) Carusocan East Elementary School, Asingan, 1 4 9,776,363.65 0.83 0.00 1 100.00% 100.00% 0.00% 9,776,363.65 9,287,545.47 488,818.18 160 250 RG Tabin CS FELIPA KING 12/21/2017 5/29/2018 8/27/2018 Completed ASINGAN
148 Pangasinan 9,776,363.65 9,776,363.65
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0568 (with Micropile) at Carosucan Norte Elementary School, Asingan, 1 4 11,842,586.14 316,129.21 2.60 1 100.00% 100.00% 0.00% 11,842,586.14 11,250,456.83 592,129.31 185 305 RG Tabin CS FELIPA KING 12/21/2017 6/23/2018 10/21/2018 Completed ASINGAN
149 Pangasinan 11,842,586.14 11,842,586.14
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0567 (with Micropile) at Carosucan Sur Elementary School, Asingan, 1 4 11,235,696.89 299,936.59 2.60 1 100.00% 100.00% 0.00% 11,235,696.89 10,673,912.05 561,784.84 185 335 RG Tabin CS FELIPA KING 12/21/2017 6/23/2018 11/20/2018 Completed ASINGAN
150 Pangasinan 11,235,696.89 11,235,696.89
Construction of Two (2) Storey Four (4) Classroom School Building
Aquino delaCruz ASINGAN
17AI0585 (with Micropile) at Domanpot Elementary School, Asingan, 1 4 11,869,105.58 304,534.77 2.50 1 100.00% 100.00% 0.00% 11,869,105.58 11,274,295.73 594,809.85 185 290 FELIPA KING 12/27/2017 6/29/2018 10/12/2018 Completed
Pangasinan EC
151 11,869,105.58 11,869,105.58
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0584 (with Micropile) at Narciso R. Ramos Elementary School SPED 1 4 11,898,518.97 275,121.38 2.26 1 100.00% 100.00% 0.00% 11,898,518.97 11,898,518.97 - 185 275 RF Flores Const. FELIPA KING 12/27/2017 6/29/2018 9/27/2018 Completed ASINGAN
152 Center, Asingan, Pangasinan 11,898,518.97 11,898,518.97
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0613 Nagsaag Elementary School, San Manuel, Pangasinan 1 4 9,606,906.46 244,083.02 2.48 1 100.00% 100.00% 0.00% 9,606,906.46 9,606,906.46 - 160 220 2R CS ZALDY Alfredo 12/27/2017 6/4/2018 8/3/2018 Completed SAN MANUEL
153 9,606,906.46 9,606,906.46
Construction of Two (2) Storey Four (4) Classroom School Building Rivbros Const.
17AI0595 1 4 11,813,165.22 315,700.13 2.60 1 100.00% 100.00% 0.00% 11,813,165.22 11,813,165.22 - 185 305 FELIPA KING 12/27/2017 6/29/2018 10/27/2018 Completed ASINGAN
(with Micropile) Sobol Elementary School, Asingan, Pangasinan Factors and Dev't
154 11,813,165.22 11,813,165.22
Construction of Two (2) Storey Four (4) Classroom School Building at Rivbros Const.
17AI0549 1 4 9,580,202.15 255,862.33 2.60 1 100.00% 100.00% 0.00% 9,580,202.15 9,101,192.04 479,010.11 160 250 FELIPA KING 12/21/2017 5/29/2018 8/27/2018 Completed ASINGAN
Teofilo Gante Elementary School, Asingan, Pangasinan Factors and Dev't
155 9,580,202.15 9,580,202.15
Construction of Two (2) Storey Four (4) Classroom School Building
(with Micropile) Ariston Este Elementary School, Asingan, Rivbros Const. ASINGAN
17AI0571 1 4 11,813,165.22 315,700.13 2.60 1 100.00% 100.00% 0.00% 11,813,165.22 11,813,165.22 - 185 305 FELIPA KING 12/21/2017 6/23/2018 10/21/2018 Completed
Pangasinan Factors and Dev't
156 11,813,165.22 11,813,165.22
Construction of Two (2) Storey Four (4) Classroom School Building
(with Micropile) at Ariston Bantug Elementary School, Asingan, Rivbros Const. ASINGAN
17AI0561 1 4 11,871,476.91 317,088.44 2.60 1 100.00% 100.00% 0.00% 11,871,476.91 11,871,476.91 - 185 305 FELIPA KING 12/21/2017 6/23/2018 10/21/2018 Completed
Pangasinan Factors and Dev't
157 11,871,476.91 11,871,476.91
Construction of Two (2) Storey Four (4) Classroom School Building at Rivbros Const. ASINGAN
17AI0548 Asingan North Central School, Asingan, Pangasinan 1 4 9,550,984.91 255,229.57 2.60 1 100.00% 100.00% 0.00% 9,550,984.91 9,073,435.66 477,549.25 160 190 FELIPA KING 12/21/2017 5/29/2018 6/28/2018 Completed
Factors and Dev't
158 9,550,984.91 9,550,984.91
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0661 (with Micropile) Tacnien Elementary School, San Manuel, 1 4 11,810,876.62 317,988.73 2.62 1 100.00% 100.00% 0.00% 11,810,876.62 11,220,332.79 590,543.83 185 275 RG Tabin CS ZALDY Alfredo 12/28/2017 6/30/2018 9/28/2018 Completed SAN MANUEL
159 Pangasinan 11,810,876.62 11,810,876.62
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0555 1 4 9,539,003.01 252,286.47 2.58 1 100.00% 100.00% 0.00% 9,539,003.01 9,539,003.01 - 185 275 RF Flores Const. FELIPA KING 12/21/2017 6/23/2018 9/21/2018 Completed ASINGAN
160 Don H. Velasco Community School, Asingan, Pangasinan 9,539,003.01 9,539,003.01
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0592 (with Micropile) Don Teodorico Bauzon Elementary School, Asingan, 1 4 11,825,895.90 302,969.45 2.50 1 100.00% 100.00% 0.00% 11,825,895.90 6,560,415.75 5,265,480.15 185 305 CL Morales CT FELIPA KING 12/27/2017 6/29/2018 10/27/2018 Completed ASINGAN
161 Pangasinan 11,825,895.90 11,825,895.90
Construction of Two (2) Storey Four (4) Classroom School Building Rivbros Const. ASINGAN
17AI0569 (with Micropile) Palaris Elementary School, Asingan, Pangasinan 1 4 11,238,742.12 6.00 0.00 1 100.00% 100.00% 0.00% 11,238,742.12 10,676,805.01 561,937.11 180 270 FELIPA KING 12/21/2017 6/18/2018 9/16/2018 Completed
Factors and Dev't
162 11,238,742.12 11,238,742.12
Construction of Three (3) Storey Six (6) Classroom School Building at ASINGAN
17AI0640 San Vicente Este Elementary School, Asingan, Pangasinan 1 6 14,971,131.11 1,797,342.26 10.72 1 100.00% 100.00% 0.00% 14,971,131.11 14,222,574.55 748,556.56 160 250 AMP Const. FELIPA KING 12/28/2017 6/5/2018 9/3/2018 Completed
163 14,971,131.11 14,971,131.11
Construction of One (1) Storey Three (3) Classroom School Building
17AI0537 with Toilet Cabacaraan Elementary School at San Manuel, 1 3 4,058,742.20 0.48 0.00 1 100.00% 100.00% 0.00% 4,058,742.20 4,058,742.20 - 95 115 RG Tabin CS ZALDY Alfredo 12/21/2017 3/25/2018 4/14/2018 Completed SAN MANUEL
164 Pangasinan 4,058,742.20 4,058,742.20

Construction of One (1) Storey Three (3) Classroom School Building


17AI0538 1 3 4,058,739.11 3.57 0.00 1 100.00% 100.00% 0.00% 4,058,739.11 4,058,739.11 - 95 145 2R CS ZALDY Alfredo 12/28/2017 4/1/2018 5/21/2018 Completed SAN MANUEL
with Toilet Cabaritan Elementary School at San Manuel, Pangasinan
165 4,058,739.11 4,058,739.11
Construction of Two (2) Storey Eight (8) Classroom School Building Aquino delaCruz BALUNGAO
17AI0617 Balungao Central Elementary School, Balungao, Pangasinan 1 8 18,653,523.80 9.14 0.00 1 100.00% 100.00% 0.00% 18,653,523.80 15,738,949.73 2,914,574.07 195 300 CYL Rodolfo Raquedan 12/27/2017 7/9/2018 10/22/2018 Completed
EC
166 18,653,523.80 18,653,523.80

Construction of Two (2) Storey Four (4) Classroom School Building at BALUNGAO
17AI0572 Capulaan Elementary School, Balungao, Pangasinan 1 4 9,562,220.15 258,919.33 2.64 1 100.00% 100.00% 0.00% 9,562,220.15 9,084,109.14 478,111.01 160 250 Villar GCS CYL Rodolfo Raquedan 12/21/2017 5/29/2018 8/27/2018 Completed
167 9,562,220.15 9,562,220.15
Construction of One (1) Storey Two (2) Classroom School Building
17AI0525 (with Toilet attached) at Sobol Elementary School, San Nicolas, 1 2 2,747,475.52 42,467.79 1.52 1 100.00% 100.00% 0.00% 2,747,475.52 2,747,475.52 - 85 115 2R CS JONG Melchor Pacos 12/20/2017 3/14/2018 4/13/2018 Completed SAN NICOLAS
168 Pangasinan 2,747,475.52 2,747,475.52
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0563 1 4 9,776,359.31 5.17 0.00 1 100.00% 100.00% 0.00% 9,776,359.31 8,261,898.77 1,514,460.54 160 250 Villar GCS JONG Rodolfo Raquedan 12/21/2017 5/29/2018 8/27/2018 Completed BALUNGAO
169 Esmeralda Elementary School, Balungao, Pangasinan 9,776,359.31 9,776,359.31
Construction of Two (2) Storey Four (4) Classroom School Building at BALUNGAO
17AI0632 Ereneo L. Guieb, Sr. Elementary School, Balungao, Pangasinan 1 4 9,776,359.31 5.17 0.00 1 100.00% 100.00% 0.00% 9,776,359.31 7,172,126.77 2,604,232.54 160 265 Villar GCS CYL Rodolfo Raquedan 12/27/2017 6/4/2018 9/17/2018 Completed
170 9,776,359.31 9,776,359.31
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0546 1 4 9,776,355.95 8.53 0.00 1 100.00% 100.00% 0.00% 9,776,355.95 9,776,355.95 - 160 250 2R CS JONG Melchor Pacos 12/21/2017 5/29/2018 8/27/2018 Completed SAN NICOLAS
171 Camindoroan Elementary School, San Nicolas, Pangasinan 9,776,355.95 9,776,355.95
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0565 1 4 9,776,359.31 5.17 0.00 1 100.00% 100.00% 0.00% 9,776,364.48 8,260,528.97 1,515,835.51 160 250 Villar GCS JONG Rodolfo Raquedan 12/21/2017 5/29/2018 8/27/2018 Completed BALUNGAO
172 Mabini Elementary School, Balungao, Pangasinan 9,776,359.31 9,776,359.31
Construction of One (1) Storey Two (2) Classroom School Building
with Toilet attached at San Vicente Elementary School, Sta. Maria, Rogenox CS STA. MARIA
17AI0510 1 2 2,789,942.34 0.97 0.00 1 100.00% 100.00% 0.00% 2,789,942.34 2,789,942.34 - 85 313
Corp.
JONG MIKE 12/27/2017 3/21/2018 11/4/2018 Completed
173 Pangasinan 2,789,942.34 2,789,942.34

Construction of Two (2) Storey Four (4) Classroom School Building at


17AI0552 Rajal - Angayan Elementary School, Balungao, Pangasinan 1 4 9,564,285.70 271,778.78 2.76 1 84.32% 100.00% 15.68% 9,564,285.70 9,086,071.41 478,214.29 160 250 Villar GCS CYL Rodolfo Raquedan 12/21/2017 5/29/2018 8/27/2018 Completed BALUNGAO
174 8,064,605.70 9,564,285.70
Construction of One (1) Storey Two (2) Classroom School Building
17AI0511 (with Toilet attached) Gonzales Elementary School at Umingan, 1 2 2,789,943.31 - 0.00 1 100.00% 100.00% 0.00% 2,789,943.31 2,789,943.31 - 85 130 2R CS CYL Alfredo Acosta 12/20/2017 3/14/2018 4/28/2018 Completed UMINGAN
Pangasinan 2,789,943.31 2,789,943.31
175
Construction of Two (2) Storey Six (6) Classroom School Building San BALUNGAO
17AI0616 Aurelio Elementary School, Balungao, Pangasinan 1 6 12,817,375.43 0.47 0.00 1 100.00% 100.00% 0.00% 12,817,375.43 9,800,070.95 3,017,304.48 180 300 MKM Marketing CYL Rodolfo Raquedan 12/27/2017 6/24/2018 10/22/2018 Completed
176 12,817,375.43 12,817,375.43
Construction of One (1) Storey Two (2) Classroom School Building
17AI0506 (with Toilet attached) San Narciso Norte Elementary School at 1 2 2,789,927.38 15.93 0.00 1 100.00% 100.00% 0.00% 2,789,927.38 2,789,927.38 - 85 RF Flores Const. JONG Silver 12/20/2017 3/14/2018 - Completed NATIVIDAD
177 Natividad, Pangasinan 2,789,927.38 2,789,927.38

Construction of One (1) Storey Three (3) Classroom School Building


17AI0539 with Toilet Ricos Elementary School at Umingan, Pangasinan 1 3 4,058,736.85 5.83 0.00 1 100.00% 100.00% 0.00% 4,058,736.85 4,058,736.85 - 95 140 2R CS EUGENE Alfredo Acosta 12/21/2017 3/25/2018 5/9/2018 Completed UMINGAN
178 4,058,736.85 4,058,736.85
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0556 Villa Jose Elementary School, San Nicolas, Pangasinan 1 4 9,776,363.83 0.65 0.00 1 100.00% 100.00% 0.00% 9,776,363.83 8,260,481.16 1,515,882.67 160 250 RF Flores Const. JONG Melchor Pacos 12/27/2017 6/4/2018 9/2/2018 Completed SAN NICOLAS
179 9,776,363.83 9,776,363.83
Construction of One (1) Storey Two (2) Classroom School Building
17AI0507 (with Toilet attached) at San Julian Elementary School at Balungao, 1 2 2,717,309.36 72,633.95 2.60 1 100.00% 100.00% 0.00% 2,717,309.16 2,717,309.16 - 85 MKM Marketing JONG Rodolfo Raquedan 12/21/2017 3/15/2018 - Completed BALUNGAO
Pangasinan 2,717,309.36 2,717,309.36
180
Construction of Two (2) Storey Six (6) Classroom School Building at BALUNGAO
17AI0620 San Leon Elementary School, Balungao, Pangasinan 1 6 12,541,149.26 321,001.64 2.50 1 100.00% 100.00% 0.00% 12,541,149.26 10,550,481.30 1,990,667.96 180 285 Villar GCS CYL Rodolfo Raquedan 12/27/2017 6/24/2018 10/7/2018 Completed
181 12,541,149.26 12,541,149.26

Construction of Two (2) Storey Four (4) Classroom School Building at BALUNGAO
17AI0564 San Raymundo Elementary School, Balungao, Pangasinan 1 4 9,562,220.15 258,919.33 2.64 1 83.08% 100.00% 16.92% 9,562,220.15 9,084,109.14 478,111.01 160 220 Villar GCS JONG Rodolfo Raquedan 12/21/2017 5/29/2018 7/28/2018 Completed
182 7,944,292.50 9,562,220.15
Construction of Two (2) Storey Four (4) Classroom School Building at BALUNGAO
17AI0551 Don Francisco Toliao Elementary School, Balungao, Pangasinan 1 4 9,776,359.31 5.17 0.00 1 100.00% 100.00% 0.00% 9,776,359.31 8,276,868.30 1,499,491.01 160 250 Villar GCS JONG Rodolfo Raquedan 12/21/2017 5/29/2018 8/27/2018 Completed
183 9,776,359.31 9,776,359.31
Construction of One (1) Storey Two (2) Classroom School Building
17AI0505 (with Toilet attached) Barangobong Elementary School at Natividad, 1 2 2,869,542.43 0.88 0.00 1 100.00% 100.00% 0.00% 2,869,542.43 2,869,542.43 - 90 RF Flores Const. JONG Silver 12/20/2017 3/19/2018 - Completed NATIVIDAD
184 Pangasinan 2,869,542.43 2,869,542.43
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0554 (with Micropile) at Calapugan Elementary School, Natividad, 1 4 11,860,462.86 253,477.49 2.09 1 100.00% 100.00% 0.00% 11,860,462.86 11,267,439.72 593,023.14 185 260 2R CS JONG Silver 12/21/2017 6/23/2018 9/6/2018 Completed NATIVIDAD
185 Pangasinan 11,860,462.86 11,860,462.86
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0504 Eulogio Arciaga Elementary School, Natividad, Pangasinan 1 4 9,621,550.13 199,589.15 2.03 1 100.00% 100.00% 0.00% 9,621,550.13 9,140,472.62 481,077.51 160 265 2R CS JONG Silver 12/20/2017 5/28/2018 9/10/2018 Completed NATIVIDAD
186 9,621,550.13 9,621,550.13
Construction of Two (2) Storey Four (4) Classroom School Building at NATIVIDAD
17AI0550 Luna Elementary School, Natividad, Pangasinan 1 4 9,635,508.03 200,556.45 2.04 1 100.00% 100.00% 0.00% 9,635,508.03 9,153,732.63 481,775.40 160 265 2R CS JONG Silver 12/21/2017 5/29/2018 9/11/2018 Completed
187 9,635,508.03 9,635,508.03
Construction of Two (2) Storey Eight (8) Classroom School Building
17AI0615 Natividad Elementary School, Natividad, Pangasinan 1 8 18,713,226.50 6.44 0.00 1 100.00% 100.00% 0.00% 18,713,226.50 15,718,441.95 2,994,784.55 195 255 AMP Const. JONG Silver 12/27/2017 7/9/2018 9/7/2018 Completed NATIVIDAD
188 18,713,226.50 18,713,226.50
Construction of Two (2) Storey Four (4) Classroom School Building at NATIVIDAD
17AI0503 San Jose Elementary School, Natividad, Pangasinan 1 4 9,556,523.46 279,541.02 2.84 1 100.00% 100.00% 0.00% 9,703,223.46 9,225,397.29 477,826.17 160 220 Phesco Inc. JONG Silver 12/20/2017 5/28/2018 7/27/2018 Completed
189 9,556,523.46 9,556,523.46
Construction of One (1) Storey Two (2) Classroom School Building
17AI0517 (with Toilet attached) at Cabangaran Elementary School, Umingan, 1 2 2,789,940.81 2.50 0.00 1 100.00% 100.00% 0.00% 2,789,940.81 2,789,940.81 - 85 145 DMGR Builders EUGENE Alfredo Acosta 12/20/2017 3/14/2018 5/13/2018 Completed UMINGAN
190
Pangasinan 2,789,940.81 2,789,940.81
Construction of Two (2) Storey Four (4) Classroom School Building at Rogenox CS
17AI0502 San Macario Sur Elementary School, Natividad, Pangasinan 1 2 9,580,784.79 255,279.69 2.60 1 100.00% 100.00% 0.00% 9,726,764.48 8,194,974.60 1,531,789.88 160 250 JONG Silver 12/20/2017 5/28/2018 8/26/2018 Completed NATIVIDAD
191 Corp. 9,580,784.79 9,580,784.79
Construction of One (1) Storey Two (2) Classroom School Building
17AI0593 with Toilet Attached San Macario Sur Elementary School at 1 2 2,869,543.24 0.07 0.00 1 100.00% 100.00% 0.00% 2,869,543.24 2,869,543.24 - 90 120 RF Flores Const. JONG Silver 12/27/2017 3/26/2018 4/25/2018 Completed NATIVIDAD
192 Natividad, Pangasinan 2,869,543.24 2,869,543.24
Construction of Two (2) Storey Four (4) Classroom School Building at Rogenox CS
17AI0629 1 4 9,579,890.19 256,174.29 2.60 1 100.00% 100.00% 0.00% 9,726,590.19 8,194,124.73 1,532,465.46 160 220 JONG Silver 12/27/2017 6/4/2018 8/3/2018 Completed NATIVIDAD
193 San Narciso Sur Elementary School, Natividad, Pangasinan Corp. 9,579,890.19 9,579,890.19
Construction of Two (2) Storey Four (4) Classroom School Building Aquino delaCruz ROSALES
17AI0509 Cabalaoangan Elementary School, Rosales, Pangasinan 1 4 9,776,364.31 0.17 0.00 1 100.00% 100.00% 0.00% 9,776,364.31 9,287,546.09 488,818.22 160 265 CYL Rodolfo Raquedan 12/20/2017 5/28/2018 9/10/2018 Completed
194 EC 9,776,364.31 9,776,364.31
Construction of Two (2) Storey Four (4) Classroom School Building at SAN NICOLAS
17AI0547 San Rafael Elementary School, San Nicolas, Pangasinan 1 4 9,776,362.74 1.74 0.00 1 100.00% 100.00% 0.00% 9,776,357.74 9,287,544.60 488,813.14 160 250 RG Tabin CS JONG Melchor Pacos 12/21/2017 5/29/2018 8/27/2018 Completed
195 9,776,362.74 9,776,362.74
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0512 Guiling-Coliling Elementary School, Rosales, Pangasinan 1 4 9,539,023.46 282,116.02 2.87 1 100.00% 100.00% 0.00% 9,539,023.46 7,989,537.84 1,549,485.62 160 280 AMP Const. CYL Rodolfo Raquedan 12/20/2017 5/28/2018 9/25/2018 Completed ROSALES
196 9,539,023.46 9,539,023.46
Construction of Two (2) Storey Four (4) Classroom School Building at RPParayno
17AI0577 1 4 9,836,054.55 9.93 0.00 1 100.00% 100.00% 0.00% 9,836,054.55 9,836,054.55 - 160 280 VICKY Silver 12/27/2017 6/4/2018 10/2/2018 Completed SAN QUINTIN
197 Baligayan Elementary School, San Quintin, Pangasinan Const. 9,836,054.55 9,836,054.55

Construction of One (1) Storey Three (3) Classroom School Building ROSALES
17AI0596 with Toilet Pangaoan Elementary School, Rosales Pangasinan 1 3 3,864,803.81 74,055.16 1.88 1 100.00% 100.00% 0.00% 3,864,803.81 3,864,803.81 - 95 125 APP CS CYL Rodolfo Raquedan 12/27/2017 3/31/2018 4/30/2018 Completed
198 3,864,803.81 3,864,803.81
Construction of Two (2) Storey Four (4) Classroom School Building at ROSALES
17AI0630 Rosales South Central School, Rosales, Pangasinan 1 4 9,836,064.03 0.45 0.00 1 100.00% 100.00% 0.00% 9,836,064.03 9,344,260.83 491,803.20 160 265 2R CS CYL Rodolfo Raquedan 12/27/2017 6/4/2018 9/17/2018 Completed
199 9,836,064.03 9,836,064.03
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0660 (with Micropile) San Bartolome Elementary School, Rosales, 1 4 11,819,993.70 308,871.65 2.55 1 100.00% 100.00% 0.00% 11,819,993.70 11,228,994.01 590,999.69 185 320 2R CS CYL Rodolfo Raquedan 12/28/2017 6/30/2018 11/12/2018 Completed ROSALES
200 Pangasinan 11,819,993.70 11,819,993.70
Construction of One (1) Storey Two (2) Classroom School Building
17AI0533 (with Toilet Attached) at Carosalesan Elementary School, Umingan, 1 2 2,794,886.56 74,656.75 2.60 1 100.00% 100.00% 0.00% 2,794,886.56 2,794,886.56 - 90 DMGR Builders MENIO Alfredo Acosta 12/21/2017 3/20/2018 - Completed UMINGAN
Pangasinan 2,794,886.56 2,794,886.56
201
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0594 (with Micropile) Tomana Elementary School SPED Center, Rosales, 1 4 11,792,786.60 321,153.75 2.65 1 100.00% 100.00% 0.00% 11,792,786.60 11,792,786.60 - 185 320 JHI CS REYNALD Rodolfo Raquedan 12/27/2017 6/29/2018 11/11/2018 Completed ROSALES
202 Pangasinan 11,792,786.60 11,792,786.60
Construction of Two (2) Storey Four (4) Classroom School Building ROSALES
17AI0513 Acop Elementary School, Rosales, Pangasinan 1 4 9,776,361.55 2.93 0.00 1 100.00% 100.00% 0.00% 9,776,361.55 9,287,543.47 488,818.08 160 295 WJP CS REYNALD Rodolfo Raquedan 12/20/2017 5/28/2018 10/10/2018 Completed
203 9,776,361.55 9,776,361.55
Construction of Two (2) Storey Four (4) Classroom School Building at RPParayno SAN QUINTIN
17AI0580 Severo L. Castulo Elementary School, San Quintin, Pangasinan 1 4 9,821,111.05 28.43 0.00 1 100.00% 100.00% 0.00% 9,821,111.05 9,821,111.05 - 160 220 VICKY Silver 12/27/2017 6/4/2018 8/3/2018 Completed
204 Const. 9,821,111.05 9,821,111.05
Construction of Two(2) Storey Four (4) Classroom School Building at
17AI0559 Calanutan Elementary School, Rosales, Pangasinan 1 4 9,615,023.95 206,115.53 2.10 1 100.00% 100.00% 0.00% 9,615,023.95 9,134,272.75 480,751.20 160 295 WJP CS REYNALD Rodolfo Raquedan 12/21/2017 5/29/2018 10/11/2018 Completed ROSALES
205 9,615,023.95 9,615,023.95
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0570 1 4 9,615,023.95 206,115.53 2.10 1 100.00% 100.00% 0.00% 9,615,023.95 9,134,272.75 480,751.20 160 295 WJP CS REYNALD Rodolfo Raquedan 12/21/2017 5/29/2018 10/11/2018 Completed ROSALES
206 Capitan Tomas Pine Elementary School, Rosales, Pangasinan 9,615,023.95 9,615,023.95
Construction of Two (2) Storey Four (4) Classroom School Building ROSALES
17AI0601 Carmay Elementary School, Rosales, Pangasinan 1 4 9,677,015.19 258,549.29 2.60 1 100.00% 100.00% 0.00% 9,823,715.19 8,788,564.80 1,035,150.39 160 295 Alphin TC CYL Rodolfo Raquedan 12/27/2017 6/4/2018 10/17/2018 Completed
207 9,677,015.19 9,677,015.19

Construction of Two (2) Storey Four (4) Classroom School Building at ROSALES
17AI0558 Casanicolasan Elementary School, Rosales, Pangasinan 1 4 9,776,363.87 0.61 0.00 1 100.00% 100.00% 0.00% 9,776,363.87 9,287,545.68 488,818.19 160 250 2R CS CYL Rodolfo Raquedan 12/21/2017 5/29/2018 8/27/2018 Completed
208 9,776,363.87 9,776,363.87
Construction of One (1) Storey Two (2) Classroom School Building
17AI0519 (with Toilet attached) at Calilitian Elementary School at Umingan, 1 2 2,737,424.89 52,518.42 1.88 1 100.00% 100.00% 0.00% 2,737,424.89 2,737,424.89 - 85 115 RF Flores Const. EUGENE Alfredo Acosta 12/20/2017 3/14/2018 4/13/2018 Completed UMINGAN
Pangasinan 2,737,424.89 2,737,424.89
209
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0560 1 4 9,776,361.55 2.93 0.00 1 100.00% 100.00% 0.00% 9,776,361.55 9,776,361.55 - 160 280 WJP CS REYNALD Rodolfo Raquedan 12/21/2017 5/29/2018 9/26/2018 Completed ROSALES
210 Salvacion Elementary School, Rosales, Pangasinan 9,776,361.55 9,776,361.55
Construction of Two (2) Storey Four (4) Classroom School Building at TAYUG
17AI0608 Evangelista Elementary School, Tayug, Pangasinan 1 4 9,776,360.27 4.21 0.00 1 100.00% 100.00% 0.00% 9,776,360.27 8,307,477.96 1,468,882.31 160 220 AC Soliven CGM JONG Jomille Mingrajal 12/27/2017 6/4/2018 8/3/2018 Completed
211 9,776,360.27 9,776,360.27
Construction of One (1) Storey Two (2) Classroom School Building
17AI0587 with Toilet Attached San Antonio Elementary School at Rosales, 1 2 2,789,942.90 0.41 0.00 1 100.00% 100.00% 0.00% 2,789,942.90 2,789,942.90 - 85 115 WJP CS REYNALD Rodolfo Raquedan 12/27/2017 3/21/2018 4/20/2018 Completed ROSALES
212
Pangasinan 2,789,942.90 2,789,942.90

Construction of Two (2) Storey Four (4) Classroom School Building


17AI0665 San Pedro East Elementary School, Rosales, Pangasinan 1 4 9,776,361.04 3.44 0.00 1 100.00% 100.00% 0.00% 9,776,361.04 8,309,064.07 1,467,296.97 160 220 511 Builders CYL Rodolfo Raquedan 12/28/2017 6/5/2018 8/4/2018 Completed ROSALES
213 9,776,361.04 9,776,361.04

Construction of Two (2) Storey Four (4) Classroom School Building at


17AI0631 San Vicente Elementary School, Rosales, Pangasinan 1 4 9,776,361.92 2.56 0.00 1 100.00% 100.00% 0.00% 9,776,361.92 9,287,543.82 488,818.10 160 190 WJP CS REYNALD Rodolfo Raquedan 12/27/2017 6/4/2018 7/4/2018 Completed ROSALES
214 9,776,361.92 9,776,361.92
Construction of One (1) Storey Two (2) Classroom School Building
17AI0532 (with Toilet Attached) at Mantacdang Elementary School, San 1 2 2,789,938.32 4.99 0.00 1 100.00% 100.00% 0.00% 2,789,938.32 2,789,938.32 - 85 205 APP CS VICKY Silver 12/20/2017 3/14/2018 7/12/2018 Completed SAN QUINTIN
215 Quintin, Pangasinan 2,789,938.32 2,789,938.32
Construction of One (1) Storey Two (2) Classroom School
17AI0521 Building(with Toilet attached) at An-Anonas elementary School, San 1 2 2,789,940.52 2.78 0.00 1 100.00% 100.00% 0.00% 2,789,940.52 2,789,940.52 - 85 175 2R CS ZALDY Alfredo 12/20/2017 3/14/2018 6/12/2018 Completed SAN MANUEL
216 Manuel, Pangasinan 2,789,940.52 2,789,940.52
Construction of One (1) Storey Two (2) Classroom School Building
17AI0522 (with Toilet attached) at Bomboaya Elementary School, San Manuel, 1 2 2,789,940.52 2.78 0.00 1 100.00% 100.00% 0.00% 2,789,940.52 2,789,940.52 - 85 115 2R CS ZALDY Alfredo 12/20/2017 3/14/2018 4/13/2018 Completed SAN MANUEL
217 Pangasinan 2,789,940.52 2,789,940.52
Construction of One (1) Storey Two (2) Classroom School Building
17AI0523 (with Toilet attached) at Laclac Chayao School, San Manuel, 1 2 2,789,921.67 21.63 0.00 1 100.00% 100.00% 0.00% 2,789,921.67 2,789,921.67 - 85 175 RA Matias CD ZALDY Alfredo 12/20/2017 3/14/2018 6/12/2018 Completed SAN MANUEL
218 Pangasinan 2,789,921.67 2,789,921.67
Construction of One (1) Storey Two (2) Classroom School Building
17AI0524 (with Toilet attached) at San Antonio Elementary School, San 1 2 2,789,940.52 2.78 0.00 1 100.00% 100.00% 0.00% 2,789,940.52 2,789,940.52 - 85 115 2R CS ZALDY Alfredo 12/20/2017 3/14/2018 4/13/2018 Completed SAN MANUEL
219 Manuel, Pangasinan 2,789,940.52 2,789,940.52
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0562 1 4 9,776,363.95 0.53 0.00 1 100.00% 100.00% 0.00% 9,776,363.95 9,776,363.95 - 160 190 2R CS ZALDY Alfredo 12/21/2017 5/29/2018 6/28/2018 Completed SAN MANUEL
220 Florencio P. Guzon Elementary School, San Manuel, Pangasinan 9,776,363.95 9,776,363.95
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0666 (with Micropile) Bulangit Elementary School, San Nicolas, 1 4 11,664,441.00 4.01 0.00 1 100.00% 100.00% 0.00% 11,664,441.00 9,832,066.56 1,832,374.44 185 305 WJP CS JONG Melchor Pacos 12/28/2017 6/30/2018 10/28/2018 Completed SAN NICOLAS
221 Pangasinan 11,664,441.00 11,664,441.00
Construction of One (1) Storey Two (2) Classroom School Building
17AI0501 (with Toilet attached) at Cabayawasan Elementary School at San 1 2 2,949,637.51 3.30 0.00 1 100.00% 100.00% 0.00% 2,949,637.51 2,418,720.59 530,916.92 85 175 2R CS JONG Melchor Pacos 12/20/2017 3/14/2018 6/12/2018 Completed SAN NICOLAS
222 Nicolas, Pangasinan 2,949,637.51 2,949,637.51
Construction of Two (2) Storey Four (4) Classroom School Building at SAN NICOLAS
17AI0647 San Felipe Integrated School, San Nicolas, Pangasinan 1 4 9,724,941.15 210,623.33 2.12 1 100.00% 100.00% 0.00% 9,724,941.15 7,280,565.29 2,444,375.86 160 250 Alcel Const JONG Melchor Pacos 12/28/2017 6/5/2018 9/3/2018 Completed
223 9,724,941.15 9,724,941.15
Construction of Two (2) Storey Ten(10) Classroom School Building at Rogenox CS
17AI0636 Tayug South Central Elementary School, Tayug, Pangasinan 1 4 21,253,007.02 2.07 0.00 1 100.00% 100.00% 0.00% 21,253,007.02 21,253,007.02 - 200 290 JONG Jomille Mingrajal 12/28/2017 7/15/2018 10/13/2018 Completed TAYUG
224 Corp. 21,253,007.02 21,253,007.02
Construction of Two (2) Storey Four (4) Classroom School Building at Rogenox CS SAN NICOLAS
17AI0574 Cabitnongan Elementary School, San Nicolas, Pangasinan 1 4 9,776,357.20 7.28 0.00 1 100.00% 100.00% 0.00% 9,776,357.20 9,287,539.34 488,817.86 160 250 JONG Melchor Pacos 12/21/2017 5/29/2018 8/27/2018 Completed
225 Corp. 9,776,357.20 9,776,357.20
Construction of One (1) Storey Two (2) Classroom School Building
with Toilet Attached Cabitnongan Elementary School at San Nicolas, Rogenox CS SAN NICOLAS
17AI0589 1 2 2,789,942.34 0.97 0.00 1 100.00% 100.00% 0.00% 2,789,942.34 2,789,942.34 - 85 175
Corp.
JONG Melchor Pacos 12/28/2017 3/22/2018 6/20/2018 Completed
226 Pangasinan 2,789,942.34 2,789,942.34
Construction of Two (2) Storey Four (4) Classroom School Building at Aquino delaCruz
17AI0557 Dalumpinas Elementary School, San Nicolas, Pangasinan 1 4 9,776,364.31 0.17 0.00 1 100.00% 100.00% 0.00% 9,776,364.31 9,287,546.09 488,818.22 160 250 JONG Melchor Pacos 12/21/2017 5/29/2018 8/27/2018 Completed SAN NICOLAS
227 EC 9,776,364.31 9,776,364.31
Construction of Two (2) Storey Six (6) Classroom School Building at Aquino delaCruz SAN NICOLAS
17AI0646 Malico Elementary School, San Nicolas, Pangasinan 1 6 12,847,225.26 0.64 0.00 1 100.00% 100.00% 0.00% 12,847,225.26 6,811,427.47 6,035,797.79 180 300 JONG Melchor Pacos 12/28/2017 6/25/2018 10/23/2018 Completed
228 EC 12,847,225.26 12,847,225.26
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0582 Resurrection Elementary School, Umingan Pangasinan 1 4 9,776,362.78 1.70 0.00 1 95.00% 98.00% 3.00% 9,776,362.78 6,760,996.89 3,015,365.89 160 550 Alcel Const EUGENE Alfredo Acosta 12/27/2017 6/4/2018 6/29/2019 On-going UMINGAN
260 9,287,544.64 9,580,835.52
Construction of One (1) Storey Two (2) Classroom School Building
CDJ Builders and
17AI0530 (with Toilet Attached) at Nining Elementary School, San Nicolas, 1 2 2,780,763.95 9,179.36 0.33 1 100.00% 100.00% 0.00% 2,780,763.95 2,641,725.75 139,038.20 85 145 JONG Melchor Pacos 12/20/2017 3/14/2018 5/13/2018 Completed SAN NICOLAS
CS
229 Pangasinan 2,780,763.95 2,780,763.95
Construction of Two (2) Storey Four (4) Classroom School Building at Rogenox CS SAN NICOLAS
17AI0625
Pastoran Elementary School, San Nicolas, Pangasinan
1 4 9,776,362.20 2.28 0.00 1 100.00% 100.00% 0.00% 9,776,362.20 5,556,188.95 4,220,173.25 160 280
Corp.
JONG Melchor Pacos 12/28/2017 6/5/2018 10/3/2018 Completed
9,776,362.20 9,776,362.20
230
Construction of Two (2) Storey Four (4) Classroom School Building at RPParayno SAN NICOLAS
17AI0624 1 4 9,821,136.87 2.61 0.00 1 100.00% 100.00% 0.00% 9,821,136.87 4,361,534.53 5,459,602.34 160 280 JONG Melchor Pacos 12/27/2017 6/4/2018 10/2/2018 Completed
9,821,136.87 9,821,136.87
231 Puyao Elementary School, San Nicolas, Pangsinan Const.

Construction of Two (2) Storey Four (4) Classroom School Building at SAN NICOLAS
17AI0576
San Antonio East Elementary School, San Nicolas, Pangasinan
1 4 9,776,360.66 3.82 0.00 1 100.00% 100.00% 0.00% 9,776,360.66 8,303,888.21 1,472,472.45 160 220 Alphin TC JONG Melchor Pacos 12/27/2017 6/4/2018 8/3/2018 Completed
232 9,776,360.66 9,776,360.66
Construction of Two (2) Storey Four (4) Classroom School Building at SAN NICOLAS
17AI0545 1 4 9,776,360.66 3.82 0.00 1 100.00% 100.00% 0.00% 9,776,360.66 8,254,810.87 1,521,549.79 160 220 Alphin TC JONG Melchor Pacos 12/21/2017 5/29/2018 7/28/2018 Completed
San Antonio West Elementary School, San Nicolas, Pangasinan
233 9,776,360.66 9,776,360.66
Construction of One (1) Storey Three (3) Classroom School Building CDJ Builders and UMINGAN
17AI0541 1 3 3,927,031.85 91,427.12 2.28 1 100.00% 100.00% 0.00% 3,927,031.85 3,730,680.26 196,351.59 95 215 EUGENE Alfredo Acosta 12/21/2017 3/25/2018 7/23/2018 Completed
with Toilet San Juan Elementary School at Umingan, Pangasinan CS
234 3,927,031.85 3,927,031.85
Construction of Two (2) Storey Eight (8) Classroom School Building Rogenox CS SAN NICOLAS
17AI0642 1 8 18,698,305.51 2.43 0.00 1 100.00% 100.00% 0.00% 18,698,305.51 17,763,390.23 934,915.28 195 285 JONG Melchor Pacos 12/28/2017 7/10/2018 10/8/2018 Completed
at Sta. Maria Elementary School, San Nicolas, Pangasinan Corp.
235 18,698,305.51 18,698,305.51
Construction of Two (2) Storey Four (4) Classroom School Building at RPParayno SAN QUINTIN
17AI0575 1 4 9,776,354.75 9.73 0.00 1 100.00% 100.00% 0.00% 9,776,354.75 9,776,354.75 - 160 280 VICKY Silver 12/27/2017 6/4/2018 10/2/2018 Completed
Teofilo C. Quintin Elementary School, San Quintin, Pangasinan Const.
236 9,776,354.75 9,776,354.75
Construction of Two (2) Storey Four (4) Classroom School Building RPParayno
17AI0602 1 4 9,836,063.20 1.28 0.00 1 100.00% 100.00% 0.00% 9,836,063.20 9,836,063.20 - 160 180 VICKY Silver 12/27/2017 6/4/2018 6/24/2018 Completed SAN QUINTIN
237 Bolintaguen Elementary School, San Quintin, Pangasinan Const. 9,836,063.20 9,836,063.20
Construction of Two (2) Storey Twelve (12) Classroom School
Arcinue Com. SAN QUINTIN
17AI0657 Building at Cabalaoangan Elementary School, San Quintin, 1 12 23,797,537.84 635,336.06 2.60 1 100.00% 100.00% 0.00% 23,797,537.84 22,607,660.95 1,189,876.89 220 250 VICKY Silver 12/28/2017 8/4/2018 9/3/2018 Completed
Pangasinan Corp.
238 23,797,537.84 23,797,537.84
Construction of Two (2) Storey Four (4) Classroom School Building
(with Micropile) at Lumayao Integrated School, San Quintin, Ucore Const. & SAN QUINTIN
17AI0627 1 4 11,866,323.52 307,316.83 2.52 1 100.00% 100.00% 0.00% 11,866,323.52 11,866,323.52 - 185 VICKY Silver 12/27/2017 6/29/2018 - Completed
Pangasinan Dev. Corp.
239 11,866,323.52 11,866,323.52
Construction of Two (2) Storey Four (4) Classroom School Building at SAN QUINTIN
17AI0626 Mantacdang Elementary School, San Quintin, Pangasinan 1 4 9,706,920.60 198,793.88 2.01 1 100.00% 100.00% 0.00% 9,706,920.60 9,221,574.57 485,346.03 160 190 2R CS VICKY Silver 12/27/2017 6/4/2018 7/4/2018 Completed
240 9,706,920.60 9,706,920.60
Construction of One (1) Storey Two (2) Classroom School Building
17AI0588 with Toilet Attached Ungib Elementary School at San Quintin, 1 2 2,869,541.86 1.45 0.00 1 100.00% 100.00% 0.00% 2,869,541.86 2,869,541.86 - 90 165 2R CS JONG Silver 12/27/2017 3/26/2018 6/9/2018 Completed SAN QUINTIN
241 Pangasinan 2,869,541.86 2,869,541.86
Construction of Two (2) Storey Four (4) Classroom School Building at Rogenox CS
17AI0628 Callitang Elementary School, Sta. Maria, Pangasinan 1 4 9,791,288.74 0.74 0.00 1 100.00% 100.00% 0.00% 9,791,288.74 9,301,724.30 489,564.44 160 220 JONG MIKE 12/27/2017 6/4/2018 8/3/2018 Completed STA. MARIA
242 Corp. 9,791,288.74 9,791,288.74
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0610 1 4 9,776,363.25 1.23 0.00 1 100.00% 100.00% 0.00% 9,776,363.25 9,287,545.09 488,818.16 160 250 RA Matias CD JONG MIKE 12/27/2017 6/4/2018 9/2/2018 Completed STA. MARIA
Namagbagan Elementary School, Sta. Maria, Pangasinan
243 9,776,363.25 9,776,363.25
Construction of Two (2) Storey Four (4) Classroom School Building at STA. MARIA
17AI0542 San Francisco Elementary School, Sta. Maria, Pangasinan 1 4 9,776,355.95 8.53 0.00 1 100.00% 100.00% 0.00% 9,776,355.95 9,287,538.15 488,817.80 160 270 2R CS JONG MIKE 12/21/2017 5/29/2018 9/16/2018 Completed
244 9,776,355.95 9,776,355.95

Construction of Two (2) Storey Four (4) Classroom School Building at UMINGAN
17AI0581 San Vicente Elementary School, Umingan, Pangasinan 1 4 9,574,327.71 261,736.77 2.66 1 100.00% 100.00% 0.00% 9,574,327.71 4,308,447.47 5,265,880.24 160 220 MCB CS EUGENE Alfredo Acosta 12/27/2017 6/4/2018 8/3/2018 Completed
245 9,574,327.71 9,574,327.71

Construction of Three (3) Storey Twelve (12) Classroom School Rogenox CS STA. MARIA
17AI0668 Building Sta. Maria East Integrated School at Sta. Maria, Pangasinan 1 12 31,297,361.45 836,356.56 2.60 1 100.00% 100.00% 0.00% 31,297,361.45 26,598,548.72 4,698,812.73 210 353 JONG MIKE 12/28/2017 7/25/2018 12/15/2018 Completed
Corp.
246 31,297,361.45 31,297,361.45
Construction of Two (2) Storey Four (4) Classroom School Building at STA. MARIA
17AI0544 Sta. Rosa Elementary School, Sta. Maria, Pangasinan 1 4 9,776,360.61 3.87 0.00 1 100.00% 100.00% 0.00% 9,776,360.61 9,776,360.61 - 160 220 MKM Marketing JONG MIKE 12/21/2017 5/29/2018 7/28/2018 Completed
247 9,776,360.61 9,776,360.61
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0515 1 4 9,776,362.69 1.79 0.00 1 100.00% 100.00% 0.00% 9,776,362.69 8,270,733.20 1,505,629.49 160 220 2R CS JONG Jomille Mingrajal 12/27/2017 6/4/2018 8/3/2018 Completed TAYUG
248 Agno Elementary School, Tayug, Pangasinan 9,776,362.69 9,776,362.69
Construction of Two (2) Storey Four (4) Classroom School Building at TAYUG
17AI0526 Legaspi Elementary School, Tayug, Pangasinan 1 4 9,776,362.69 1.79 0.00 1 100.00% 100.00% 0.00% 9,776,362.69 9,287,544.56 488,818.13 160 250 Malta CS JONG Jomille Mingrajal 12/21/2017 5/29/2018 8/27/2018 Completed
249 9,776,362.69 9,776,362.69
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0600 Libertad Elementary School, Tayug, Pangasinan 1 4 9,725,678.45 110,386.03 1.12 1 100.00% 100.00% 0.00% 9,725,678.45 8,247,359.40 1,478,319.05 160 220 AC Soliven CGM JONG Jomille Mingrajal 12/28/2017 6/5/2018 8/4/2018 Completed TAYUG
250 9,725,678.45 9,725,678.45
Construction of Two (2) Storey Six (6) Classroom School Building TAYUG
17AI0614 Tayug Central Elementary School, Tayug, Pangasinan 1 6 12,857,173.60 2.30 0.00 1 100.00% 100.00% 0.00% 12,857,173.60 12,857,173.60 - 180 270 JHI CS JONG Jomille Mingrajal 12/27/2017 6/24/2018 9/22/2018 Completed
251 12,857,173.60 12,857,173.60
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0663 (with Micropile) Celestino L. Clariza Elementary School, Umingan, 1 4 11,869,205.58 888,470.22 6.96 1 100.00% 100.00% 0.00% 11,869,205.58 8,842,558.16 3,026,647.42 185 245 Alcel Const EUGENE Alfredo Acosta 12/28/2017 6/30/2018 8/29/2018 Completed UMINGAN
252
Pangasinan 11,869,205.58 11,869,205.58
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0623 Tayug South Central Elementary School, Tayug, Pangasinan 1 4 9,836,060.61 3.87 0.00 1 100.00% 100.00% 0.00% 9,836,060.61 9,836,060.61 - 160 250 MKM Marketing JONG Jomille Mingrajal 12/27/2017 6/4/2018 9/2/2018 Completed TAYUG
253 9,836,060.61 9,836,060.61
Construction of Two (2) Storey Four (4) Classroom School Building at Rogenox CS TAYUG
17AI0553 Trenchera Elementary School, Tayug, Pangasinan 1 4 9,580,192.40 255,872.08 2.60 1 100.00% 100.00% 0.00% 9,580,192.40 9,101,182.78 479,009.62 160 280 JONG Jomille Mingrajal 12/27/2017 6/4/2018 10/2/2018 Completed
254 Corp. 9,580,192.40 9,580,192.40
Construction of Two (2) Storey Four (4) Classroom School Building C. Rogenox CS
17AI0599 Lichauco Elementary School, Tayug, Pangasinan 1 4 9,578,890.19 257,174.29 2.61 1 100.00% 100.00% 0.00% 9,578,890.19 9,099,945.68 478,944.51 160 280 JONG Jomille Mingrajal 12/27/2017 6/4/2018 10/2/2018 Completed TAYUG
255 Corp. 9,578,890.19 9,578,890.19
Construction of Two (2) Storey Four (4) Classroom School Building at TAYUG
17AI0609 Lawak Elementary School, Tayug, Pangasinan 1 4 9,776,355.95 8.53 0.00 1 100.00% 100.00% 0.00% 9,776,355.95 9,776,355.95 - 160 250 2R CS JONG Jomille Mingrajal 12/27/2017 6/4/2018 9/2/2018 Completed
256 9,776,355.95 9,776,355.95
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0583 Panganiban Elementary School, Tayug, Pangasinan 1 4 9,776,357.78 6.70 0.00 1 100.00% 100.00% 0.00% 9,776,357.78 8,057,848.63 1,718,509.15 160 299 Alcel Const JONG Jomille Mingrajal 12/27/2017 6/4/2018 10/21/2018 Completed TAYUG
257 9,776,357.78 9,776,357.78
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0606 1 4 9,776,363.70 0.78 0.00 1 100.00% 100.00% 0.00% 9,776,363.70 9,776,363.70 - 160 220 AMP Const. JONG Jomille Mingrajal 12/27/2017 6/4/2018 8/3/2018 Completed TAYUG
258 Saleng Elementary School, Tayug, Pangasinan 9,776,363.70 9,776,363.70
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0607 Sto. Domingo Elementary School, Tayug, Pangasinan 1 4 9,776,355.95 8.53 0.00 1 100.00% 100.00% 0.00% 9,776,355.95 9,776,355.95 - 160 220 2R CS JONG Jomille Mingrajal 12/27/2017 6/4/2018 8/3/2018 Completed TAYUG
259 9,776,355.95 9,776,355.95
Construction of Two (2) Storey Four (4) Classroom School Building TAYUG
17AI0598 Toketek Elementary School, Tayug, Pangasinan 1 4 9,575,166.98 245,972.50 2.50 1 100.00% 100.00% 0.00% 9,575,166.98 6,892,046.66 2,683,120.32 160 220 2R CS JONG Jomille Mingrajal 12/27/2017 6/4/2018 8/3/2018 Completed
260 9,575,166.98 9,575,166.98
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0605 1 4 9,776,363.25 1.23 0.00 1 100.00% 100.00% 0.00% 9,776,363.25 9,287,545.09 488,818.16 160 220 RA Matias CD JONG Alfredo Acosta 12/27/2017 6/4/2018 8/3/2018 Completed UMINGAN
261 San Leon Elementary School Umingan, Pangasinan 9,776,363.25 9,776,363.25
Construction of Two (2) Storey Four (4) Classroom School Building at CDJ Builders and
17AI0641 1 4 9,650,474.33 185,590.15 1.89 1 89.00% 90.00% 1.00% 9,650,474.33 9,167,950.61 482,523.72 160 535 EUGENE Alfredo Acosta 12/28/2017 6/5/2018 6/15/2019 On-going UMINGAN
294 Calitlitan Elementary School, Umingan, Pangasinan CS 8,588,922.15 8,685,426.90
Construction of One (1) Storey Three (3) Classroom School Building
with Toilet Attached Esperanza Elementary School, Umingan, RG Diaz Builders UMINGAN
17AI0591 1 3 3,938,851.04 7.93 0.00 1 100.00% 100.00% 0.00% 3,938,851.04 3,741,908.49 196,942.55 95 140 EUGENE Alfredo Acosta 12/27/2017 3/31/2018 5/15/2018 Completed
Pangasinan & Trading
262 3,938,851.04 3,938,851.04
Construction of One (1) Storey Two (2) Classroom School Building
17AI0518 (with Toilet attached) at Sta. Maria Elementary School, Umingan, 1 2 2,717,419.77 72,523.54 2.60 1 100.00% 100.00% 0.00% 2,717,419.77 2,038,064.83 679,354.94 85 115 511 Builders EUGENE Alfredo Acosta 12/20/2017 3/14/2018 4/13/2018 Completed UMINGAN
Pangasinan 2,717,419.77 2,717,419.77
263
Construction of One (1) Storey Two (2) Classroom School Building
17AI0508 with Toilet attached Mantacdang Elementary School at Umingan, 1 2 2,747,475.52 42,467.79 1.52 1 100.00% 100.00% 0.00% 2,747,475.52 2,747,475.52 - 85 130 2R CS EUGENE Alfredo Acosta 12/28/2017 3/22/2018 5/6/2018 Completed UMINGAN
264
Pangasinan 2,747,475.52 2,747,475.52
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0578 Umingan Central Elementary School, Umingan Pangasinan (Building 1 4 9,776,363.00 1.48 0.00 1 100.00% 100.00% 0.00% 9,552,527.78 9,074,901.39 477,626.39 160 280 Alcel Const EUGENE Alfredo Acosta 12/27/2017 6/4/2018 10/2/2018 Completed UMINGAN
265 2) 9,776,363.00 9,776,363.00
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0604 Umingan Central Elemntary School, Umingan, Pangasinan 1 4 9,776,363.00 59,701.48 0.61 1 100.00% 100.00% 0.00% 9,776,363.00 9,287,544.85 488,818.15 160 280 Alcel Const EUGENE Alfredo Acosta 12/27/2017 6/4/2018 10/2/2018 Completed UMINGAN
266 9,776,363.00 9,776,363.00
Construction of Two (2) Storey Four (4) Classroom School Building at
17AI0621 1 4 9,594,784.30 256,205.18 2.60 1 100.00% 100.00% 0.00% 9,594,784.30 8,371,449.30 1,223,335.00 160 280 JHI CS EUGENE Alfredo Acosta 12/27/2017 6/4/2018 10/2/2018 Completed UMINGAN
267 Baracbac Elementary School, Umingan, Pangasinan 9,594,784.30 9,594,784.30
Construction of Two (2) Storey Four (4) Classroom School Building at UMINGAN
17AI0619 Cadiz Elementary School, Umingan, Pangasinan 1 4 9,588,408.75 217,805.73 2.22 1 100.00% 100.00% 0.00% 9,588,408.75 8,054,263.35 1,534,145.40 160 280 Alcel Const EUGENE Alfredo Acosta 12/27/2017 6/4/2018 10/2/2018 Completed
268 9,588,408.75 9,588,408.75
Construction of Two (2) Storey Four (4) Classroom School Building at UMINGAN
17AI0656 Diaz Elementary School, Umingan, Pangasinan 1 4 9,788,938.36 212,418.78 2.12 1 100.00% 100.00% 0.00% 9,788,938.36 9,788,938.36 - 160 220 RF Flores Const. EUGENE Alfredo Acosta 12/28/2017 6/5/2018 8/4/2018 Completed
269 9,788,938.36 9,788,938.36
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0603 Don Alberto Vergara Elementary School, Umingan, Pangasinan 1 4 9,776,363.64 0.84 0.00 1 100.00% 100.00% 0.00% 9,776,363.64 9,287,545.46 488,818.18 160 280 MCB CS MENIO Alfredo Acosta 12/27/2017 6/4/2018 10/2/2018 Completed UMINGAN
270 9,776,363.64 9,776,363.64
Construction of Two (2) Storey Eight (8) Classroom School Building at Aquino delaCruz
17AI0644 Don Montano Elementary School, Umingan, Pangasinan 1 8 18,638,607.50 0.44 0.00 1 100.00% 100.00% 0.00% 18,638,607.50 15,656,430.30 2,982,177.20 195 360 MENIO Alfredo Acosta 12/28/2017 7/10/2018 12/22/2018 Completed UMINGAN
EC
271 18,638,607.50 18,638,607.50
Construction of One (1) Storey Two (2) Classroom School Building
17AI0531 (with Toilet Attached) at Luna Este Elementary School, Umingan, 1 2 3,050,011.00 0.03 0.00 1 100.00% 100.00% 0.00% 3,050,011.00 3,050,011.00 90 150 MCB CS MENIO Alfredo Acosta 12/20/2017 3/19/2018 5/18/2018 Completed UMINGAN
272
Pangasinan 3,050,011.00 3,050,011.00

Construction of One (1) Storey Three (3) Classroom School Building UMINGAN
17AI0540 with Toilet Luna West Elementary School at Umingan, Pangasinan 1 3 3,938,858.83 0.14 0.00 1 100.00% 100.00% 0.00% 3,938,858.83 3,938,858.83 - 95 140 MCB CS MENIO Alfredo Acosta 12/21/2017 3/25/2018 5/9/2018 Completed
273 3,938,858.83 3,938,858.83
Construction of Two (2) Storey Six (6) Classroom School Building at UMINGAN
17AI0645 Maseil-Seil Alo-O Elementary School, Umingan, Pangasinan 1 6 12,817,375.11 0.80 0.00 1 100.00% 100.00% 0.00% 12,817,375.11 9,077,900.43 3,739,474.68 180 240 Alcel Const MENIO Alfredo Acosta 12/28/2017 6/25/2018 8/24/2018 Completed
274 12,817,375.11 12,817,375.11

Construction of Two (2) Storey Four (4) Classroom School Building at


17AI0579 1 4 9,776,362.64 1.84 0.00 1 100.00% 100.00% 0.00% 9,776,362.64 9,287,544.46 488,818.18 160 220 MCB CS MENIO Alfredo Acosta 12/27/2017 6/4/2018 8/3/2018 Completed UMINGAN
Nampalcan - Molina Elementary School, Umingan, Pangasinan
275 9,776,362.64 9,776,362.64
Construction of Two (2) Storey Four (4) Classroom School Building STA. MARIA
17AI0597 Pilar Cauplasan Elementary School, Sta. Maria, Pangasinan 1 4 9,580,172.50 255,891.98 2.60 1 100.00% 100.00% 0.00% 9,580,172.50 9,580,172.50 - 160 280 JHI CS JONG MIKE 12/27/2017 6/4/2018 10/2/2018 Completed
276 9,580,172.50 9,580,172.50
Construction of Two (2) Storey Four (4) Classroom School Building at RG Diaz Builders NATIVIDAD
17AI0622 San Maximo Elementary School, Natividad, Pangasinan 1 4 9,776,364.20 0.28 0.00 1 100.00% 100.00% 0.00% 9,776,364.20 9,776,364.20 - 160 220
& Trading
JONG Silver 12/27/2017 6/4/2018 8/3/2018 Completed
277 9,776,364.20 9,776,364.20
Construction of One (1) Storey Two (2) Classroom School Building
17AI0527 (with Toilet Attached) at San Vicente West Elementary School, San 1 2 2,789,942.54 0.77 0.00 1 100.00% 100.00% 0.00% 2,789,942.54 2,789,942.54 - 85 105 RA Matias CD ZALDY Alfredo 12/20/2017 3/14/2018 4/3/2018 Completed SAN MANUEL
278 Manuel, Pangasinan 2,789,942.54 2,789,942.54
Construction of Four (4) Storey Sixteen (16) Classroom School
Building (with Micropile) (4 Regular Workshop, 2 Science Laboratory ASINGAN
17AI0649 and 2 Computer Laboratory) Angela Valdez Ramos National High 1 1 43,875,563.17 0.71 0.00 1 100.00% 100.00% 0.00% 43,875,563.17 41,681,785.01 2,193,778.16 280 370 AMP Const. FELIPA KING 12/22/2017 9/27/2018 12/26/2018 Completed
School at Asingan, Pangasinan
279 43,875,563.17 43,875,563.17
Construction of Four (4) Storey Sixteen (16) Classroom School
Aquino delaCruz
Building (4 Regular Workshop, 2 Science Laboratory, and Computer
17AI0638 1 1 40,518,201.16 1.54 0.00 1 100.00% 100.00% 0.00% 40,518,201.16 36,654,723.51 3,863,477.65 254 349 EC/RT Macanlalay JONG Rodolfo Raquedan 12/28/2017 9/7/2018 12/11/2018 Completed BALUNGAO
Laboratory) at Balunagao National High School, Balungao,
Pangasinan Const. (JV)
280 40,518,201.16 40,518,201.16
Construction of Two (2) Storey Four (4) Classroom School Building at Rogenox CS
17AI0543 1 4 9,580,004.09 256,060.39 2.60 1 100.00% 100.00% 0.00% 9,580,004.09 9,101,003.89 479,000.20 160 190 JONG Melchor Pacos 12/21/2017 5/29/2018 6/28/2018 Completed SAN NICOLAS
281 Cacabugaoan National High School, San Nicolas, Pangasinan Corp. 9,580,004.09 9,580,004.09
Construction of Two (2) Storey Four (4) Classroom School Building
17AI0586 (with Micropile) at Carosucan Norte National High School, Asingan, 1 4 11,842,586.14 286,279.21 2.36 1 100.00% 100.00% 0.00% 11,842,586.14 11,250,456.83 592,129.31 185 305 RG Tabin CS FELIPA KING 12/27/2017 6/29/2018 10/27/2018 Completed ASINGAN
282 Pangasinan 11,842,586.14 11,842,586.14
Construction of Three (3) Storey Six (6) Classroom School Building
(with Micropile) at Lagasit National High School, San Quintin, Rogenox CS SAN QUINTIN
17AI0639 1 6 17,618,572.11 0.32 0.00 1 100.00% 100.00% 0.00% 17,618,572.11 14,966,657.08 2,651,915.03 190 310 VICKY Silver 12/28/2017 7/5/2018 11/2/2018 Completed
Pangasinan Corp.
283 17,618,572.11 17,618,572.11
Construction of Four (4) Storey Eight (8) Classroom School Building
(with Micropile) (1 Regular Workshop, 1 Science Laboratory, 1 Aquino delaCruz
17AI0652 Computer Laboratory and 2 Classrooms) Dalumpinas National High 1 1 21,792,854.05 0.99 0.00 1 100.00% 100.00% 0.00% 21,792,854.05 18,510,571.23 3,282,282.82 225 345 JONG Melchor Pacos 12/28/2017 8/9/2018 12/7/2018 Completed SAN NICOLAS
EC
School at San Nicolas, Pangasinan
284 21,792,854.05 21,792,854.05
Construction of Two (2) Storey Eight (8) Classroom School Building at Rogenox CS
17AI0643 Eastern Pangasinan Agricultural College, Sta. Maria, Pangasinan 1 8 18,668,457.31 0.63 0.00 1 100.00% 100.00% 0.00% 18,668,457.31 15,916,960.09 2,751,497.22 195 255 JONG MIKE 12/28/2017 7/10/2018 9/8/2018 Completed STA. MARIA
285 Corp. 18,668,457.31 18,668,457.31
Construction of Four (4) Storey Eight (8) Classroom School Building
17AI0654 (with Micropile) (2 Science Laboratory) Flores National High School 1 1 20,784,564.02 441,141.02 2.08 1 100.00% 100.00% 0.00% 20,784,564.02 17,801,979.08 2,982,584.94 215 335 AMP Const. JONG Alfredo Acosta 12/28/2017 7/30/2018 11/27/2018 Completed UMINGAN
286 at Umingan, Pangasinan 20,784,564.02 20,784,564.02
Construction of Four (4) Storey; Twenty (20) Classroom School
Building (2 Computer Laboratory and 16 Classrooms) Tayug National Rogenox CS TAYUG
17AI0659 1 1 44,273,409.51 12,819,368.89 22.45 1 97.90% 98.02% 0.12% 44,273,409.51 32,750,179.73 11,523,229.78 265 540 JONG Jomille Mingrajal 12/28/2017 9/18/2018 6/20/2019 On-going
High School, at Tayug, Pangasinan Corp.
320 43,343,667.91 43,396,796.00
Construction of Two (2) Storey Four (4) Classroom School Building at Aquino delaCruz
17AI0658 1 4 9,836,063.00 1.48 0.00 1 100.00% 100.00% 0.00% 9,836,063.00 5,209,814.16 4,626,248.84 160 280 JONG Melchor Pacos 12/28/2017 6/5/2018 10/3/2018 Completed SAN NICOLAS
287 Malico National High School, San Nicolas, Pangasinan EC 9,836,063.00 9,836,063.00
Construction of Four (4) Storey Sixteen (16) Classroom School Alcel Const./ UMINGAN
17AI0635 Building at Prado National High School, Umingan, Pangasinan 1 16 40,398,799.72 2.98 0.00 1 100.00% 100.00% 0.00% 40,398,799.72 33,934,991.76 6,463,807.96 240 360 EUGENE Alfredo Acosta 12/28/2017 8/24/2018 12/22/2018 Completed
288 Vyragus C (JV) 40,398,799.72 40,398,799.72

Construction of Four (4) Storey Twenty (20) Classroom School


Building (7 Regular Workshop, 2 Science Laboratory and 1 Computer Rogenox CS ROSALES
17AI0671 1 1 44,642,965.57 678,538.89 1.50 1 100.00% 100.00% 0.00% 44,642,965.57 37,933,324.27 6,709,641.30 250 355 REYNALD Rodolfo Raquedan 12/28/2017 9/3/2018 12/17/2018 Completed
Laboratory) Rosales National High School, Rosales, Pangasinan Corp.
289 44,642,965.57 44,642,965.57
Construction of Three (3) Storey Twelve (12) Classroom School
RT Macanlalay
Building (2 Regular Workshop, 2 Science Laboratory and 2 Computer BALUNGAO
17AI0670 Laboratory) San Aurelio National High School at Balungao, 1 1 31,213,550.81 335,917.79 1.06 1 100.00% 100.00% 0.00% 31,213,550.81 28,282,458.50 2,931,092.31 210 335 Const/Aquino CYL Rodolfo Raquedan 12/28/2017 7/25/2018 11/27/2018 Completed
Pangasinan delaCruz EC (JV)
290 31,213,550.81 31,213,550.81
Construction of Four (4) Storey Eight (8) Classroom School Building
(1 Regular Workshop, 1 Science Laboratory, 1 Computer Laboratory Aquino delaCruz
SAN NICOLAS
17AI0650 and 2 Classrooms) San Isidro National High School at San Nicolas, 1 1 18,641,667.39 395,589.30 2.08 1 100.00% 100.00% 0.00% 18,641,667.39 17,709,584.02 932,083.37 190 310 JONG Melchor Pacos 12/28/2017 7/5/2018 11/2/2018 Completed
EC
Pangasinan
291 18,641,667.39 18,641,667.39
Construction of Four(4) Storey Eight(8) Classroom School Building
with Micropile at San Juan National High School, San Manuel, Aquino dela Cruz SAN MANUEL
17AI0618 1 4 18,840,847.98 2.12 0.00 1 100.00% 100.00% 0.00% 18,840,847.98 17,898,805.58 942,042.40 215 305 ZALDY Alfredo 12/27/2017 7/29/2018 10/27/2018 Completed
Pangasinan EC
292 18,840,847.98 18,840,847.98
Construction of Four (4) Storey Eight (8) Classroom School Building
(1 Regular Workshop, 1 Science Laboratory, 1 Computer Laboratory
17AI0651 and 2 Classrooms) Robert B. Estrella Memorial National High School 1 1 18,796,016.10 59.00 0.00 1 70.00% 72.00% 2.00% 18,796,016.10 2,748,902.42 16,047,113.68 190 535 Alcel Const REYNALD Rodolfo Raquedan 12/28/2017 7/5/2018 6/15/2019 On-going ROSALES
at Rosales, Pangasinan
327 13,157,211.27 13,533,131.59

Construction of Three (3) Storey Twelve (12) Classroom School


17AI0667 Building (2 Regular Workshop, 2 Science Laboratory and 2 Computer 1 1 31,330,719.00 802,999.01 2.50 1 100.00% 100.00% 0.00% 31,330,719.00 26,317,803.96 5,012,915.04 210 270 AMP Const. JONG Alfredo Acosta 12/28/2017 7/25/2018 9/23/2018 Completed UMINGAN
Laboratory) La Paz National High School at Umingan, Pangasinan
293 31,330,719.00 31,330,719.00

Construction of Four (4) Storey Eight (8) Classroom School Building


17AI0653 (with Micropile) (2 Science Laboratory and 2 Computer Laboratory) 1 1 22,294,923.53 682,933.79 2.97 1 100.00% 100.00% 0.00% 22,294,923.53 21,180,177.35 1,114,746.18 230 290 Phesco Inc. JONG Silver 12/28/2017 8/14/2018 10/13/2018 Completed NATIVIDAD
San Macario National High School at Natividad, Pangasinan
294 22,294,923.53 22,294,923.53
Construction of Two (2) Storey Ten (10) Classroom School Building
17AI0662 San Rafael National High School, San Nicolas, Pangasinan 1 10 20,877,558.85 300,825.24 1.42 1 100.00% 100.00% 0.00% 20,877,558.85 19,833,680.91 1,043,877.94 200 290 AMP Const. JONG Melchor Pacos 12/28/2017 7/15/2018 10/13/2018 Completed SAN NICOLAS
295 20,877,558.85 20,877,558.85
Construction of Three (3) Storey Six (6) Classroom School Building at TAYUG
17AI0634 Panganiban National High School, Tayug, Pangasinan 1 6 14,366,897.18 3.04 0.00 1 100.00% 100.00% 0.00% 14,366,897.18 6,892,583.04 7,474,314.14 155 410 Alcel Const JONG Jomille Mingrajal 12/28/2017 5/31/2018 2/10/2019 Completed
296 14,366,897.18 14,366,897.18
Construction of Three (3) Storey Nine (9) Classroom School Building
(with Micropile) Carosucan Sur National High School at Asingan, Aquino delaCruz ASINGAN
17AI0655 1 9 26,293,363.57 0.52 0.00 1 100.00% 100.00% 0.00% 26,293,363.57 24,978,695.39 1,314,668.18 230 350 FELIPA KING 12/28/2017 8/14/2018 12/12/2018 Completed
Pangasinan EC
297 26,293,363.57 26,293,363.57

Construction of Four (4) Storey Sixteen (16) Classroom School


Building (4 Regular Workshop, 2 Science Laboratory and 2 Computer Aquino delaCruz ASINGAN
17AI0648 1 1 38,929,752.84 2.49 0.00 1 100.00% 100.00% 0.00% 38,929,752.84 36,983,265.20 1,946,487.64 225 345 FELIPA KING 12/28/2017 8/9/2018 12/7/2018 Completed
Laboratory) Toboy National High School at Asingan, Pangasinan EC
298 38,929,752.84 38,929,752.84
Construction of Two (2) Storey Four (4) Classroom School Building
Ucore Const. & SAN QUINTIN
17AI0664 (with Micropile) Lumayao Integrated School, San Quintin, 1 4 11,866,323.52 307,316.83 2.52 1 100.00% 100.00% 0.00% 11,866,323.52 11,866,323.52 - 185 VICKY Silver 12/28/2017 6/30/2018 - Completed
Pangasinan Dev. Corp.
299 11,866,323.52 11,866,323.52

Construction of Four (4) Storey Sixteen (16) Classroom School Aquino delaCruz
17AI0637 1 16 39,122,721.61 541,557.41 1.37 1 100.00% 100.00% 0.00% 39,122,721.61 37,166,585.53 1,956,136.08 230 350 FELIPA KING 12/28/2017 8/14/2018 12/12/2018 Completed ASINGAN
Building at Ariston - Bantog Elementary School, Asingan, Pangasinan EC
300 39,122,721.61 39,122,721.61
Construction of Two (2) Storey Eight (8) Classroom School Building (2
Science Laboratory and 2 Computer Laboratory) Sta. Cruz Integrated RG Diaz Builders STA. MARIA
17AI0669 1 1 18,578,906.34 1.68 0.00 1 100.00% 100.00% 0.00% 18,578,906.34 17,649,961.02 928,945.32 175 235 JONG MIKE 12/28/2017 6/20/2018 8/19/2018 Completed
School, Sta. Maria, Pangasinan & Trading
301 18,578,906.34 18,578,906.34
Construction of One (1) Storey Two (2) Classroom School Building
17AI0529 (with Toilet Attached) at Bangar Elementary School, San Nicolas, 1 2 2,949,640.23 0.58 0.00 1 100.00% 100.00% 0.00% 2,949,640.23 2,949,640.23 - 85 175 RA Matias CD JONG Melchor Pacos 12/20/2017 3/14/2018 6/12/2018 Completed SAN NICOLAS
302 Pangasinan 2,949,640.23 2,949,640.23
TOTAL 326.00 1073 68 4,263,758,738.19 98,880,846.38 310.00 21.00 - 98.40% 98.77% 0.37% 4,195,512,332.56 4,211,136,178.62

1,899,317,833.910 159 4 0 99.41% 99.62% 0.21% -99.41% 1,888,081,309.52 1,892,017,761.21

Prepared By: Checked


By Submitted By:
REYNALD N. BARRERA
Engineer II JONATHAN B. RAMOS GERARDO T. DE GUZMAN
IMELDA Engineer II
Monitoring Engineer S. District Engineer
OIC-Chief Planning &Ddesign section
TANDOC
Engineer
III
Chief
Construc
tion
Section
1515836
Programmed
DISTRICT Amount
(P'000)

Contract ID
PANG 3RD
Concreting of Brgy. Asan Norte-Innalog
17AI0190 1 Sur FMR, Bgrys. Asan Norte & Innalog 4,000.00
Sur

Concreting of Brgy. Tara tara FMR, Brgy.


17AI0187 2 4,000.00
Tara tara

Concreting of Brgy. Artacho-Villanueva


17AI0189 3 10,000.00
FMR, Brgys. Artacho & Villanueva

Concreting of Brgy. Primicias FMR, Brgy.


17AI0186 4 11,000.00
Primicias

Concreting of Brgy. Pogo-Diaz FMR,


17AI0188 5 8,000.00
Brgys. Pogo & Diaz
Concreting of Kawakan Road, Brgy.
17AI0197 6 2,000.00
Ariston FMR, Brgy. Ariston
Concreting of Brgy. Sobol FMR, Brgy.
17AI0196 7 2,000.00
Sobol

Concreting of Brgy. San Joaquin-San Leon


17AI0202 8 2,000.00
FMR, Brgys. San Joaquin & San Leon

Concreting of Brgy. Capulaan-San Miguel


17AI0201 9 2,000.00
FMR, Brgys. Capulaan & San Miguel

Concreting of Brgy. Narra-San Roque


IN PDE 10 2,000.00
FMR, Brgys. Narra & San Roque
Concreting of Agno-Poblacion C FMR,
17AI0206 11 2,000.00
Brgys. Agno & Poblacion C
Concreting of Pataquid-Cabuloan FMR,
17AI0195 12 2,000.00
Brgys. Pataquid & Cabulaon
Concreting of Brgy. Namagbagan FMR,
17AI0200 13 2,000.00
Brgy. Namagbagan
17AI0204 14 Concreting of Brgy. Pilar FMR, Brgy. Pilar 2,000.00

Concreting of Brgy. Amaronan FMR, Brgy.


17AI0198 15 2,000.00
Amaronan
Concreting of Brgy. Cabangaran FMR,
17AI0194 16 2,000.00
Brgy. Cabangaran

Concreting of Brgy. Carayungan Sur FMR,


17AI0193 17 2,000.00
Brgy. Carayungan Sur

Concreting of Sitio Taradio, Brgy.


17AI0199 18
Cabatuan FMR, Brgy. Cabatuan
2,000.00

Concreting of Brgy. Evangelista FMR,


17AI0177 19
Brgy. Evangelista
2,000.00

Concreting of Brgy. Baracbac FMR, Brgy.


17AI0178 20
Baracbac
2,000.00

Concreting of Brgy. San Maximo-Burgos


17AI0205 21 FMR, Brgys. San Maximo & Burgos 3,000.00

Concreting of Brgy. Camangaan-


17AI0207 22 Calapugan FMR, Brgys. Camangaan & 4,000.00
Calapugan
Concreting of Brgy. Calapugan-
17AI0208 23 Cacandungan FMR, Brgys. Calapugan & 3,000.00
Cacandungan
77,000.00
DEPAR

PDE PRE-CONSTRUCTION

Total Number of Projects Number of Projects


No. of
Active
Completed

Completed

Advertised
On-going

On-going

Bidding
Pre-Bid
Proj

Date

Date
NYS

NYS

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1
1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

23 23 0 0 22 1 0 22 22 22
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Project Monitoring Division
Region/District Implemented Projects
DPWH CY 2017 Infrastructure Program
As of March 15, 2018

ONSTRUCTION RESULT OF BID

er of Projects Approved APPROPRIATION ABC

Date NTP
Awarded

Contract

Amount Amount
Date

Date

(P'000) (P'000)

1 8/11/2017 1 8/18/2017 1 8/22/2017 4,000.00 3,960.00

1 7/31/2017 1 8/10/2017 1 8/11/2017 4,000.00 3,960.00

1 7/31/2017 1 8/10/2017 1 8/11/2017 10,000.00 9,900.00

1 7/31/2017 1 8/10/2017 1 8/11/2017 11,000.00 10,890.00

1 7/31/2017 1 8/10/2017 1 8/10/2017 8,000.00 7,920.00

1 8/18/2017 1 8/25/2017 1 8/29/2017 2,000.00 1,980.00

1 1 1 9/22/2017

1 8/15/2017 1 8/25/2017 1 8/29/2017 2,000.00 1,980.00

1 1 1

1 1 1

1 8/17/2017 1 8/25/2017 1 8/29/2017 2,000.00 1,980.00


1 8/17/2017 1 8/25/2017 1 8/29/2017 2,000.00 1,980.00

1 8/18/2017 1 8/25/2017 1 8/29/2017 2,000.00 1,980.00

1 8/17/2017 1 8/25/2017 1 8/29/2017 2,000.00 1,980.00

1 8/17/2017 1 8/25/2017 1 8/29/2017 2,000.00 1,980.00

1 8/11/2017 1 8/18/2017 1 8/22/2017 2,000.00 1,980.00

1 1 1 7/17/2017 2,000.00 1,980.00

1 1 1 7/17/2017 2,000.00 1,980.00

1 8/17/2017 1 8/25/2017 1 8/29/2017 3,000.00 2,970.00

1 8/17/2017 1 8/25/2017 1 8/29/2017 4,000.00 3,960.00

1 8/17/2017 1 8/25/2017 1 8/29/2017 3,000.00 2,970.00

22 21 21 67,000.00 66,330.00
RESULT OF BIDDING CONSTRUCTION

Awarded Contract
VARIANCE No. of Projects
Amount Amount

Completed

On-going
Amount Amount Amount

NYS
(%)
(P'000) (P'000) (P'000)

3,757.64 3,757.64 202.356 1 0 0

3,760.15 3,760.15 199.849 1 0 0

9,401.74 9,401.74 498.256 1 0 0

10,335.90 10,335.90 554.102 1 0 0

7,519.99 7,519.99 400.011 1 0 0

- - 1 0 0

1,920.53 1,920.53 59.467 1 0 0

- - 1 0 0

1,884.21 1,884.21 95.786 1 0 0

- - 1 0 0

- - 1 0 0

- - 1 0 0

1,920.87 1,920.87 59.133 1 0 0


1,880.98 1,880.98 99.019 1 0 0

1,880.91 1,880.91 99.089 1 0 0

1,880.76 1,880.76 99.243 1 0 0

1,880.76 1,880.76 99.243 1 0 0

1,880.89 1,880.89 99.110 1 0 0

1,895.99 1,895.99 84.005 1 0 0

1,890.33 1,890.33 89.667 1 0 0

2,821.45 2,821.45 148.550 1 0 0

3,761.90 3,761.90 198.100 1 0 0

2,821.34 2,821.34 148.664 1 0 0

63,096.35 63,096.35 3,233.65 4.88% 23.00 - -


CONSTRUCTION

STATUS
Slippage

Sched Actual
Accomp Accomp
(%) (%)

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%


100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00% 100.00% 0.00%

100.00 100.00 -
DPWH CY 2016 PROJECTS
as of January 15, 2018

DISTRICT: Pangasinan 3rd District Engineering Office


REGION: Region 1

CONSTRUCTION
STATUS
PROGRAMMED
IMPLEMENTING OFFICE
AMOUNT (P'000)
Sched Actual
Slippage
Accomp (%) Accomp. (%)

343 Urdaneta District Hospital 10,000.00 100.00% 100.00% 0.00%


344 Umingan Community Hospital 1,105.00 100.00% 100.00% 0.00%