SHOP DRAWINGS
1ST SUBMISSION
DURATION REMARKS
ITEM PERCENT
SHEET NO. DESCRIPTION RESPONSIBLE (i.e. Ref. Docs., CB, SI,
NO. NO. OF AGE
PERSON START END Design Changes from
DAYS (%)
Workshop, Reasons for
PLANNED SCHEDULE
SHOP DRAWING 100.0%
1 of 4
1ST SUBMISSION
DURATION REMARKS
ITEM PERCENT
SHEET NO. DESCRIPTION RESPONSIBLE (i.e. Ref. Docs., CB, SI,
NO. NO. OF AGE
PERSON START END Design Changes from
DAYS (%)
Workshop, Reasons for
PLANNED SCHEDULE
SHOP DRAWING 100.0%
2 of 4
1ST SUBMISSION
DURATION REMARKS
ITEM PERCENT
SHEET NO. DESCRIPTION RESPONSIBLE (i.e. Ref. Docs., CB, SI,
NO. NO. OF AGE
PERSON START END Design Changes from
DAYS (%)
Workshop, Reasons for
PLANNED SCHEDULE
SHOP DRAWING 100.0%
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
101 DT 129 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 6‐36) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
102 DT 129.1 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 6‐36) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
103 DT 130 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 5‐29) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
104 DT 130.1 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 5‐29) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
105 DT 130.2 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 5‐29) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
106 DT 131 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 30‐36) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
107 DT 131.1 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 30‐36) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
108 DT 131.2 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 30‐36) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
109 DT 132 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 4 @ Slab Connection) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
110 DT 132.1 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 4 @ Slab Connection) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
111 DT 132.2 JSB 25‐May‐19 25‐May‐19 100.0%
Bracket Area (Level 4 @ Slab Connection) 1.5
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
112 DT 133 JSB 27‐May‐19 27‐May‐19 100.0%
Bracket Area (Level 4 Lower Support) 2
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
113 DT 133.1 JSB 27‐May‐19 27‐May‐19 100.0%
Bracket Area (Level 4 Lower Support) 2
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
114 DT 134 JSB 27‐May‐19 27‐May‐19 100.0%
Bracket Area (Level 4 Slab Connection) 2
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
115 DT 134.1 JSB 27‐May‐19 27‐May‐19 100.0%
Bracket Area (Level 4 Slab Connection) 2
Plan Detail of Intermediate Mullion w/ Bullnose (Spandrel‐Spandrel) at
116 DT 134.2 JSB 27‐May‐19 27‐May‐19 100.0%
Bracket Area (Level 4 Slab Connection) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
117 DT 135 JSB 28‐May‐19 28‐May‐19 100.0%
Area (Level 5 to 36) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
118 DT 135.1 JSB 28‐May‐19 28‐May‐19 100.0%
Area (Level 5 to 36) 2
Plan Detail of 90˚ Inside Corner Mullion @ Slab (Spandrel‐SPandrel) at
119 DT 136 JSB 28‐May‐19 28‐May‐19 100.0%
Bracket Area (Level 5 to 36) 2
Plan Detail of 90˚ Inside Corner Mullion @ Slab (Spandrel‐SPandrel) at
120 DT 136.1 JSB 28‐May‐19 28‐May‐19 100.0%
Bracket Area (Level 5 to 36) 2
Plan Detail of 90˚ Inside Corner Mullion @ Beam (Spandrel‐SPandrel) at
121 DT 137 JSB 29‐May‐19 29‐May‐19 100.0%
Bracket Area (Level 5 to 36) 2
Plan Detail of 90˚ Inside Corner Mullion @ Beam (Spandrel‐SPandrel) at
122 DT 137.1 JSB 29‐May‐19 29‐May‐19 100.0%
Bracket Area (Level 5 to 36) 2
Plan Detail of 90˚ Outside Corner Mullion @ Slab (Spandrel‐SPandrel) at
123 DT 138 JSB 29‐May‐19 29‐May‐19 100.0%
Bracket Area (Level 5 to 23 & Level 26 to 36) 2
Plan Detail of 90˚ Outside Corner Mullion @ Slab (Spandrel‐SPandrel) at
124 DT 138.1 JSB 29‐May‐19 29‐May‐19 100.0%
Bracket Area (Level 5 to 23 & Level 26 to 36) 2
Plan Detail of 90˚ Outside Corner Mullion @ Slab (Spandrel‐SPandrel) at
125 DT 139 JSB 30‐May‐19 30‐May‐19 100.0%
Bracket Area (Level 24 & 25) 2
Plan Detail of 90˚ Outside Corner Mullion @ Slab (Spandrel‐SPandrel) at
126 DT 139.1 JSB 30‐May‐19 30‐May‐19 100.0%
Bracket Area (Level 24 & 25) 2
Plan Detail of 90˚ Outside Corner Mullion @ Slab (Spandrel‐SPandrel) at
127 DT 139.2 JSB 30‐May‐19 30‐May‐19 100.0%
Bracket Area (Level 24 & 25) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
128 DT 140 JSB 30‐May‐19 30‐May‐19 100.0%
Area (Level 4&5 Upper Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
129 DT 140.1 JSB 30‐May‐19 30‐May‐19 100.0%
Area (Level 4&5 Upper Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
130 DT 141 JSB 30‐May‐19 30‐May‐19 100.0%
Area (Level 4 Lower Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
131 DT 141.1 JSB 30‐May‐19 30‐May‐19 100.0%
Area (Level 4 Lower Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
132 DT 142 JSB 30‐May‐19 30‐May‐19 100.0%
Area (Level 4 Upper Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
133 DT 142.1 JSB 30‐May‐19 30‐May‐19 100.0%
Area (Level 4 Upper Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
134 142.1 JSB 30‐May‐19 30‐May‐19 100.0%
Area (Level 4 Upper Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
135 DT 143 JSB 31‐May‐19 31‐May‐19 100.0%
Area (Level 4 Lower Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
136 DT 143.1 JSB 31‐May‐19 31‐May‐19 100.0%
Area (Level 4 Lower Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
137 DT 143.2 JSB 31‐May‐19 31‐May‐19 100.0%
Area (Level 4 Lower Support) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
138 DT 144 JSB 31‐May‐19 31‐May‐19 100.0%
Area (Level 4 ) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
139 DT 144.1 JSB 01‐Jun‐19 01‐Jun‐19 100.0%
Area (Level 4 ) 2
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
140 DT 144.2 JSB 01‐Jun‐19 01‐Jun‐19 100.0%
Area (Level 4 ) 2
3 of 4
1ST SUBMISSION
DURATION REMARKS
ITEM PERCENT
SHEET NO. DESCRIPTION RESPONSIBLE (i.e. Ref. Docs., CB, SI,
NO. NO. OF AGE
PERSON START END Design Changes from
DAYS (%)
Workshop, Reasons for
PLANNED SCHEDULE
SHOP DRAWING 100.0%
Plan Detail of 90˚ Outside Corner Mullion (Spandrel‐SPandrel) at Bracket
141 DT 144.3 JSB 03‐Jun‐19 03‐Jun‐19 100.0%
Area (Level 4 ) 2
SECTION DETAIL
142 DT 201 Section Detail of Intermediate Transom (Vision‐Vision) ANTHONY 2 18‐Jun‐19 18‐Jun‐19
143 DT 202 Section Detail of Intermediate Transom (Spandrel‐Vision) ANTHONY 2 18‐Jun‐19 18‐Jun‐19
144 DT 203 Section Detail of Intermediate Transom (Operable‐Vision) ANTHONY 2 18‐Jun‐19 18‐Jun‐19
145 DT 204 Section Detail of Intermediate Transom (Spandrel ‐ Operable) ANTHONY 2 18‐Jun‐19 18‐Jun‐19
146 DT 205 Section Detail of Starter Sill Transom (Vision) at Bracket Area ANTHONY 2 19‐Jun‐19 19‐Jun‐19
306.5 HOURS