Introduction Of The Project

 Project Title :Project Proposed Condominium Apartment Complex


 Client :Barrington Global (Pvt) Ltd
 Main Contractor :N & A Engineering (Pvt) Ltd
 Conditions of Contract :ICTAD/SBD/02/2007
 Contract Type :Measure and Pay
 Project duration :24 Months
 Total Contract Sum :Rs.604,505,600.00
(Including VAT)
Site Condition

 Land Size : 57 perches


 Soil Type : soils that are compressive with heavy loads
 Foundation Type : Pile Foundation
Pile Details
 P1(600mm) - 7
 P2 (750mm)- 6
 P3 (900mm)- 38
 P4 (1000mm)- 26
 P5 (750mm)-1
Details of Pile Caps
 PC1 (4’ x 4’ x 4’ size) – 7
 PC2 (4’ 9” x 4’ x 10’ 9” size) – 3
 PC3 (5’ 8” x 5’ x 12’ 6” size) – 19
 PC4 (6’ x 5’ 4” x 13’ 8” size) – 13
 PC5 (4’ 6” x 4’ 6” x 4’ size) – 7
Slab & Beams F/W and R/F

 In this project slab works going as 3 unit


Site Surveying

 Type of equipped used


1. Total Station
2. Level Machine
Total Station

Advantages
 Relatively quick collection of information
 Multiple surveys can be performed at one set-up location.
 Easy to perform distance and horizontal measurements with simultaneous
calculation of project coordinates (Northings, Eastings, and Elevations).
 Layout of construction site quickly and efficiently.
 Digital design data from CAD programs can be uploaded to data collector.
 Daily survey information can also be quickly downloaded into CAD which
eliminates data manipulation time required using conventional survey
techniques.
Total Station

 Resection method
Level Machine

 Using level machine


Prepared Bills

 Labor Supply Bills


 Sub Contractor Reinforcement Bill
 Sub Contractor Form Work Bill
 Work Done estimations
Rates of Bills

 Rates taken by the agreements


 Skilled Labor = 1,275.00
 Unskilled Labor = 1,000.00
 Rigger = 1,100.00
 Formwork = 450.00 per 1 sq. meter
 Reinforcement = 12.00 per 1 kg
Variations

 Additional T25, 4 Bars for PC4 Pile cap


 Height of the PC2 pile cap changed 4’ 6” to 4’ 9”
 Some Plinth Beams changed accordingly to the structural engineer
 C22 & C 21 columns of the car lift changed to 9” x 36”
Barrington Tower

 Its started on 2016/09/28


 80 Semi Luxury Apartments
 115,000 sq. feet Gross floor
Area
 8 Residences per floor
 3 Car parking floors
Typical Floor Plan