Você está na página 1de 9

MRS.

LOURDES ALZONA
SCHEDULE OF DRAWINGS
OWNER
SHEET NO. SHEET NAME
A-01 TITLE PAGE
A-02 FLOOR PLANS & ELEVATIONS
A-03 ELEVATIONS & SECTIONS
ARCHITECT / ENGINEER
S-01 STRUCTURAL PLAN AND DETAILS REG. NO. PTR NO.

S-02 ROOF FRAMING PLAN & STRUCTURAL DETAILS DATE: PLACE:

REPUBLIC OF THE PHILIPPINES


P-01 PLUMBING LAYOUT & DETAILS DEPT. OF PUBLIC WORKS & HIGHWAYS
P-02 PLUMBING ISOMETRIC PLAN & VIEW
E-01 LIGHTING LAYOUT
OFFICE OF THE BLDG. OFFICIAL
E-02 POWER & AUXILIARY LAYOUT

LAND USE & ZONING


1
A

361 2

20
0

19
B
LINE & GRADE
S 116
62°
30' 3800 60 3
00"
E

40
35
11.
66
m
C 395
0 4 ARCHITECTURAL

PERSPECTIVE VIEW

30
30
D

m
.80

0
200
21
STRUCTURAL


E
0"
6' 0
43 0
80
50
°5
21

35
N
SITE E SANITARY
NA
GA
RO

0
A

650
D

40
20
F

m
00
16.
60
ELECTRICAL
G

13

00
W

160
00"

20
17
H

30'
27°
430 S
ACACIA
MECHANICAL
IVE

0
DR

60
LL A

AC
37

AC
ME

ALZONA
IA
CA

NAG
A ROA
D
YAK
AL
AC
AC
12060
RESIDENCE

0
IA N 90° 00' 00" W 12.06 m

200
N
YA
KA
62°
30'
LOT 6-9-A, ACACIA ROAD
L 372 00"
0 W LAS PIÑAS CITY
416

0
120
0 4.1
KA
6m
MA
GO N TITLE PAGE
L

NG 324
KA

0
YA

NA
RR 5
NG

A KA Date OCTOBER 2018


ITO

MA IPI
GO 148
AP

L 60
NG
420
0
6
SITE DEVELOPMENT PLAN
Drawn by CHRISTEL JUAÑO
1 1 : 75 Checked by EJ
SITE VICINITY MAP

2/11/2019 3:36:07 PM
370
0
7
A-01
Scale 1 : 75

THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545
A-03 7
A-03 1 2 7
3 4
1 2 3 4 A-03

4 11660
11660
3760 3800 3800 300
100 3660 3800 3800 300
200 1660 1800 1800 2000 2050 1750 1620 1000 1140 1150 1000 1650 1700 1000 1100

200
A A
2000

2000
1 2 3 4
1800

1800
BALCONY BALCONY BALCONY 7
2400

LAUNDRY UTILITY RM UTILITY RM LAUNDRY LAUNDRY UTILITY RM A-03

11660
B B 3760 3800 3800 300

1180
TOI. TOI. TOI. 300 1240 1080 1150 1160 880 1770 1800 1000 1300
1 2 3 4 5 5 4 3 2 1 1 2 3 4 5 UP UP
UP UP UP UP
1 1 1

1020
3500

3500
2 2 2
6 6 6
3000

3 3 3
8500

8500
7 7 7
4 4 4

2000
8 8 8
5 5 5

1000
9 9 9
SHO. 6 6
SHO. SHO. 6
10 10 10
7 7 7
11 11 11
8 8 8 ACU ACU ACU

C
12 12 12

C B

4840
9 9 9
13 13 13
7850

10 10 10
14 14 14

CAR GARAGE 15 15 CAR GARAGE CAR GARAGE 15


11

12
11

12
11

12
16 16 16

3300
13 13 13
3000

3000

3000
17 17 17

3400
14 14 14

3500
4100
18 18 18
6 6 15 15 15 MSTR BDRM MSTR BDRM MSTR BDRM

8500
A-03 A-03
UNIT 1 UNIT 2 UNIT 3 5 5 5

6 6 6

D D 7 7 7

800
8 8 8

C
1350

9 9 9

10 10 10

550
5 11 11 11

12 12 12

5 3
6 7 13 13 13

3100
3000
A-03

4430
1 A-02 A-03 A-03 14 14 14
4300

4300
BDRM 1 BDRM 1 BDRM 1
3 9600 6 15
DN
15
DN
15
DN
A-03
5 A-03 6 2 7 2160 2200 1040 1100 3100

700
9600 5 A-03 ACU
1700

1000
2160 3240 4200

550 800
1350
1700
UTILITY ROOM SHO.
ACU
E E MSTR BDRM
ACU ACU ACU
610

3000
1510

1650
2000

2000
800
LIVING SPACE

1560
18 18 DN UNIT 4
F 17
F 17
TOI.
1450

16 16
5050

5050
THIRD FLOOR PLAN
1350

1350
15 15

14

13
0
14

13 3 1 : 75
G 12
552 G 12

2780
STO.
11 11 BDRM
2090

10 10
1700

1700
9 9

8 8

1300
H 7 H 7 ACU

770
6 6

5 4 5
1700 990 2250 1560 2640
4 4

3 3

2 A-02 2

1 1

UP
N
N GROUND FLOOR PLAN SECOND FLOOR PLAN MRS. LOURDES ALZONA
1 1 : 75
2 1 : 75 OWNER

1 2 3 4 1 2 3 4
12810 12820
5070 3800 3940 BLDG B BLDG B 5070 3800 3940 ARCHITECT / ENGINEER
ROOF APEX ROOF APEX
REG. NO.
800

800
3RD FLR CL 3RD FLR CL
9400 1 5 6 7 9400 DATE:

1890
2230
10570

300
3130 3240 4200 PTR NO.

3090
2800

2800
BLDG A

50
ROOF APEX
PLACE:

50
1400

970
970

800

800

800
700

300

300

300
3RD FLR FFL 3RD FLR FFL

50 50
2050

2730

580
6600 6600
ALZONA
BLDG B HEIGHT

BLDG B HEIGHT

300

1260
50 50
RESIDENCE
10200

10200
3000

3000

3000

650

50

50
560 890
BLDG A HEIGHT

LOT 6-9-A, ACACIA ROAD

1140

1140
50
800

800

800

800

800

800
7570

2ND FLR FFL 2ND FLR FFL LAS PIÑAS CITY


500

3600 3600

FLOOR PLANS & ELEVATIONS


3600

3600

3600

3100

Project number 01
GRND FLR FFL GRND FLR FFL Date OCTOBER 2018

2/11/2019 3:36:09 PM
0 0

4
BLDG A FRONT ELEVATION
5
BLDG B FRONT ELEVATION A-02
1 : 75 1 : 75
Scale 1 : 75
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545
9960
BLDG B
ROOF APEX

800
3RD FLR CL 7 6 5 1 H G F E
9400
9460 6140
1260 7600 4200 3240 2020 1700 1350 2000 1100
2800

BLDG A
ROOF APEX

1400
970
970

970

970
3RD FLR FFL 3RD FLR FFL 3RD FLR FFL
6600 6600 6600

200
10360
10200

6" THK CHB FIREWALL 6" THK CHB FIREWALL


3000

3000

3000

3000
WITH PLAIN CEMENT PAINTED FINISH WITH PLAIN CEMENT PAINTED FINISH UNIT 4

BLDG A HEIGHT

BLDG A HEIGHT
1520

1530
920

7790
7570

7570

7570
2ND FLR FFL 2ND FLR FFL 2ND FLR FFL
3600 3600 3600

200
3600

3600

3600

3600
3300
LIVING SPACE

1520
990
GRND FLR FFL GRND FLR FFL GRND FLR FFL
0 0 0

LEFT SIDE ELEVATION BLDG A REAR ELEVATION CROSS SECTION B


1 1 : 75
2 1 : 75
3 1 : 75
4 3 2 1 D C B A
11370 9800
BLDG B 3950 3800 3610 BLDG B 1400 3250 3250 1900
ROOF APEX ROOF APEX
800

800
3RD FLR CL H G F E 3RD FLR CL
9400 9400
200

200

200
7560
810 1700 1350 1990 1700
2800

2800
BLDG A
ROOF APEX
1520

1520

1520

1000

1000
920

920

920

3RD FLR FFL 3RD FLR FFL


6600 6600
BLDG B HEIGHT

BLDG B HEIGHT
6" THK CHB FIREWALL
10200

10200
WITH PLAIN CEMENT PAINTED FINISH
3000

3000

3000
BLDG A HEIGHT
1700

6" THK CHB FIREWALL


WITH PLAIN CEMENT PAINTED FINISH

7600

7600
2ND FLR FFL 2ND FLR FFL
3600 3600
5300
3600

3600

3600

3600
MRS. LOURDES ALZONA
GRND FLR FFL GRND FLR FFL
0 0
OWNER

BLDG B REAR ELEVATION RIGHT SIDE ELEVATION


4 1 : 75
5 1 : 75

1 2 3 4 D C B A ARCHITECT / ENGINEER
12450 9790
BLDG B ROOF REG. NO.
1390 3250 3250 1900
BLDG B ROOF 4700 3800 3950 APEX @ SECTION
APEX @ SECTION DATE:

800
560

3RD FLR CL H G F E 3RD FLR CL


9400 9400 PTR NO.
7520 PLACE:
810 1700 1350 2000 1660
2800
2800

2800
2800
BDRM 1 BDRM 1 BDRM 1 BLDG A BDRM 1 MSTR BDRM
ROOF APEX
1400

ALZONA
970

970

3RD FLR FFL 3RD FLR FFL


100

100
6600 6600

RESIDENCE

BLDG B HEIGHT
10200
3000

3000

3000
BALCONY
2900

2900
MSTR BDRM
9960

UNIT 1 UNIT 2 UNIT 2 SHO. TOI. LOT 6-9-A, ACACIA ROAD


BLDG A HEIGHT

LAS PIÑAS CITY


7570

2ND FLR FFL 2ND FLR FFL


100

3600 3600
ELEVATIONS & SECTIONS
3600

3600

3600
3600
CAR GARAGE CAR GARAGE CAR GARAGE
3500

Project number 01
LAUNDRY
CAR GARAGE Date OCTOBER 2018

2/11/2019 3:36:11 PM
FREE FREE FREE
DOWNLOAD @ DOWNLOAD @ DOWNLOAD @
REVITCARS.COM REVITCARS.COM REVITCARS.COM

GRND FLR FFL GRND FLR FFL


0 0

CROSS SECTION A LONGITUDINAL SECTION A-03


6 1 : 75
7 1 : 75 Scale 1 : 75
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545
1 2 3 4
1 2 3 4
11660 1 2 3 4
3610 3800 3950 11660
270 1710 3580 4050 1750 300 3610 3800 3950 11660
270 1350 1000 1140 1150 1650 1700 1000 1100 300 3610 3800 3950
200
A A A

2000
2000
1900

1900
1800

CKT-5 CKT-6 CKT-7


k k k
d d
c d c c
d d d

f f f
B c c c
B j,k j,k
B f f

1180
j,k f
2wb 2wb 2wb i i i
i j j i i j
b b b

1030
3500

3500
3500
e e
f f h h f d
h h h
h

8500
g g g
a a a

1050
9850

9850
g g
g
a a a d,e d,e

C C e,f e,f e,f C d


7850

MPB-1

MPB-2

MPB-3
e e

CKT-10

CKT-11
CKT-9
3000

3000
c,l 2wb,a 2wb,a c,l c,l 2wb,a
CKT-1

CKT-2

CKT-3

4140
c c

3900
c a a a
a a a c c

c 2wj,a,b 2wj,a,b 2wj,a,b


c c
c

D D D

450
450
l l l b
b b
4300

4300
1250
5 6 7
5 6 7

600
THIRD FLOOR LIGHTING LAYOUT
1700

5340
MPB-5 k
3 1 : 75

1800
e e
j
E a,e
CKT-4
E f
j k
l
e
ELECTRICAL SYMBOLS & LEGENDS
1510

d
1810

MPB-4 CKT-8 l
d a,b,c
PINLIGHT DUPLEX CONVENIENCE OUTLET
f,g,h
7520

SINGLE POLE TWO-GANG SWITCH


a
GENERAL NOTES: a,b wp
3350

3350
b WATERPROOF
a n i a,b,c SINGLE POLE THREE-GANG SWITCH CONVENIENCE OUTLET
c
F F 1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PERTINENT PROVISIONS
1450

2w TWO-WAY SWITCH OVER-THE-COUNTER OUTLET


n
c h i OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE. SINGLE POLE SWITCH

7520
a
c,d A.C.U. OUTLET

4440
c 40W FLUORESCENT LAMP acu
i 2. LOCATION OF LIGHTING FIXTURES ARE APRROXIMATE ONLY. FINAL PROVISIONS SHALL BE
DETERMINED ON SITE TO AVOID INTERFERENCE WITH OTHER SYSTEM AND/OR EQUIPMENTS. PANEL BOARD REFRIGERATOR OUTLET
G G ref
1250

0
b 561 BRANCH CIRCUIT HOMERUN
POWER SERVICE ENTRANCE
3. METALLIC FRAMES OF EQUIPMENTS SHALL BE EFFECTIVELY GROUNDED.
1700

1700
b
CHANDELIER LIGHT WALL LAMP
4. MINIMUM SIZE OF WIRE SHALL BE 3.5 SQ. MM. THW IN 20 MM PVC CONDUIT OR 15 MM DIA RSC
1300
1610

UNLESS OTHERWISE SPECIFIED IN THE PLANS.


H H

670
5. ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED
ELECTRICAL ENGINEER.

6. ALL MATERIALS TO BE USED IN THE INSTALLATION SHALL BE NEW, STANDARD AND APPROVED
TYPE AS TO LOCATION, TYPE AND USE.
GROUND FLOOR LIGHTING LAYOUT SECOND FLOOR LIGHTING LAYOUT
2950

2950
1 1 : 75
2 1 : 75
7. METHOD OF WIRING SHALL BE UNPLASTICIZED POLYVINYL CHLORIDE (uPVC) WITH PROPER
FITTINGS, DEVICES, BOXES AND SUPPORTS. WORK SHALL BE AS PER PLAN AND SPECIFICATIONS
AS TO LOCATION, TYPE AND USE.

8. ALL SWITCHES AND CONVENIENCE OUTLETS (EXCEPT FLOOR MOUNTED) SHALL BE FLUSH
MOUNTED, 1.40 METERS AND 0.30 METER, RESPECTIVELY, ABOVE FINISHED FLOOR. MRS. LOURDES ALZONA
9. CONDUIT RUNS ARE SCHEMATIC. ACTUAL RUNS SHALL BE DETERMINED IN THE FIELD TO SUIT
ACTUAL FIELD CONDITION.
OWNER

MAIN PANEL BOARD (MPB) - 1 PANEL


BOARD MPB 2 RISER DIAGRAM
10. WIRES, BOXES, ELECTRICAL AS WELL AS NON-ELECTRICAL MATERIALS NOT INCLUDED IN THE
PLANS AND SPECIFICATIONS BUT NECESSARY TO COMPLETE THE JOB SHALL BE FURNISHED
AND INSTALLED BY THE CONTRACTOR.
SERVICE 75 A
SCHEDULE OF LOADS ENTRANCE 230 V METER

PROTECTION
CKT NO. L.O. C.O. SPECIAL OUTLET WATTAGE VOLTAGE AMPERAGE WIRE SIZE CONDUIT SIZE LOAD COMPUTATIONS SERVICE ENTRANCE ARCHITECT / ENGINEER
AT AF
1 4 400 230 1.74 20 50 2 - 3.5 mm² THW 20mm Ø PVC I=
12,380 W + (25% of 1840W)
x 80% = 44.66 A METER MAIN FEEDER: 75 A
VOLTAGE DROP COMPUTATION REG. NO.
230 V 0.3 x 0.3M CONC 2 - 22.0 mm² THW COPPER WIRE
5 10 1000 230 4.35 20 50 2 - 3.5 mm² THW 20mm Ø PVC 1 - 8.0 mm² THW COPPER WIRE
POST W/ 4-12MM Ø FORMULA DATE:
9 5 500 230 2.17 20 50 2 - 3.5 mm² THW 20mm Ø PVC FOR MAIN CIRCUIT 32mm Ø CONDUIT PIPE 20 AT 20 AT
REBAR & 10MM Ø
12 3 600 230 2.61 20 50 2 - 3.5 mm² THW
20mm Ø PVC BREAKER USE: CKT-2 CKT-6 Vd = 2 x R x I x L
1 - 2.0 mm² THW TIES @ 0.20M O.C.
2 - 3.5 mm² THW 60 AT, 2 POLE, 240 VOLTS, 20 AT 20 AT 1000 L PTR NO.
16 6 1200 230 5.22 20 50 1 - 2.0 mm² THW 20mm Ø PVC MAIN FEEDER: CKT-10 CKT-13
2 - 3.5 mm² THW
60 HERTZ
20 REF 800 230 3.48 20 50 20mm Ø PVC 2 - 22.0 mm² THW COPPER WIRE 20 AT 20 AT
1 - 2.0 mm² THW
FOR MAIN FEEDER USE: Voltage drop from watt hour meter to panelboard. PLACE:
26 1200 230 5.22 20 50 2 - 3.5 mm² THW
20mm Ø PVC 1 - 8.0 mm² THW COPPER WIRE CKT-17 CKT-21
6 1 - 2.0 mm² THW
2 - 14.0 mm² THW 32mm Ø CONDUIT PIPE 20 AT 30 AT
29 ACU 1840 230 8.00 30 50 2 - 5.5 mm² THW
20mm Ø PVC 1 - 5.5 mm² THW Data: X1
1 - 2.0 mm² THW CKT-27 CKT-31
2 - 5.5 mm² THW
IN 25MM Ø RSC PIPE 2 x 14.0 mm² THHN
30 ACU 1840 230 8.00 30 50 1 - 2.0 mm² THW 20mm Ø PVC 30 AT 20 AT
CKT-32 CKT-37
L = 20 ft
35
36
SPARE
SPARE
1500
1500
230
230
6.52
6.52
20
20
50
50
GROUND
CKT-38
20 AT
I = 50
R = 0.78 ALZONA
TOTAL: 12,380 W 230 53.83 A
ONE RISER DIAGRAM where:
Vd = Voltage drop
R = resistance of conductor (Q/ft)
RESIDENCE
MAIN PANEL BOARD (MPB) - 2 MPB 1 RISER DIAGRAM MPB 3 RISER DIAGRAM I = full load current in Amperes
L = length of conductor in ft LOT 6-9-A, ACACIA ROAD
METER Vd = 2 x 20 x 50 x 0.78 LAS PIÑAS CITY
SCHEDULE OF LOADS METER
1000
SERVICE ENTRANCE SERVICE ENTRANCE
PROTECTION
CKT NO. L.O. C.O. SPECIAL OUTLET WATTAGE VOLTAGE AMPERAGE WIRE SIZE CONDUIT SIZE LOAD COMPUTATIONS Vd = 1.56 V
AT AF
2 4 400 230 1.74 20 50 2 - 3.5 mm² THW 20mm Ø PVC I=
12,380 W + (25% of 1840W)
x 80% = 44.66 A
MAIN FEEDER:
2 - 22.0 mm² THW COPPER WIRE
75 A
MAIN FEEDER:
2 - 22.0 mm² THW COPPER WIRE
75 A
%Vd = 1.56 V / 230 V x 100% = 0.67 ( ALLOWABLE )
LIGHTING LAYOUT
230 V 1 - 8.0 mm² THW COPPER WIRE 1 - 8.0 mm² THW COPPER WIRE
6 10 1000 230 4.35 20 50 2 - 3.5 mm² THW 20mm Ø PVC 32mm Ø CONDUIT PIPE
32mm Ø CONDUIT PIPE 20 AT 20 AT 20 AT 20 AT
10 5 500 230 2.17 20 50 2 - 3.5 mm² THW 20mm Ø PVC FOR MAIN CIRCUIT CKT-3 CKT-7
Operating Voltage at Main Circuit Breaker.
CKT-1 CKT-5
13 3 600 230 2.61 20 50 2 - 3.5 mm² THW
1 - 2.0 mm² THW 20mm Ø PVC BREAKER USE: 20 AT 20 AT 20 AT 20 AT
OV = 230 V - 1.56 V = 227.75 Volts Project number 01
2 - 3.5 mm² THW 60 AT, 2 POLE, 240 VOLTS, CKT-9 CKT-12 CKT-11 CKT-14
17 6 1200 230 5.22 20 50 1 - 2.0 mm² THW 20mm Ø PVC %Vd = 2 x 20 x 50 x 0.78
60 HERTZ 20 AT 20 AT 20 AT 20 AT
21 REF 800 230 3.48 20 50 2 - 3.5 mm² THW
20mm Ø PVC 1000 Date OCTOBER 2018

2/11/2019 3:36:14 PM
1 - 2.0 mm² THW CKT-16 CKT-20 CKT-18 CKT-22
2 - 3.5 mm² THW FOR MAIN FEEDER USE:
27 6 1200 230 5.22 20 50 1 - 2.0 mm² THW 20mm Ø PVC 20 AT 30 AT 20 AT 30 AT
2 - 14.0 mm² THW CKT-28 CKT-33 Vd = 1.56 V + Vd
2 - 5.5 mm² THW CKT-26 CKT-29
31 ACU 1840 230 8.00 30 50 1 - 2.0 mm² THW 20mm Ø PVC 1 - 5.5 mm² THW Vd = 1.56 V + 0.67 V = 2.23 Volts
30 AT 20 AT 30 AT 20 AT

E-01
2 - 5.5 mm² THW
32 ACU 1840 230 8.00 30 50 1 - 2.0 mm² THW 20mm Ø PVC IN 25MM Ø RSC PIPE CKT-30 CKT-35 CKT-34 CKT-39 %Vd = 2.23 V / 230 V x 100% = 0.96 ( ALLOWABLE )
37 SPARE 1500 230 6.52 20 50 20 AT 20 AT Operating Voltage at LP ( farthest panelboard );
CKT-36 CKT-40 Ov = 230 V - 0.96 V = 229.04 Volts
38 SPARE 1500 230 6.52 20 50
TOTAL: 12,380 W 230 53.83 A
Scale As indicated
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545
1 2 3 4
1 2 3 4 1 2 3 4
11660 11660
3610 3800 3950 3610 3800 3950 11660
270 1700 1780 1800 2000 2050 1750 300 1520 2090 2100 1700 1780 2170 3610 3800 3950

200
A A A

2000
1900

1900
1900
2100
1800
CKT-16 CKT-17 CKT-18

wp wp wp

B wp wp wp
B B

1080

acu
acu

acu
CKT-30
2870

CKT-32

CKT-34
1020
3500

3500
3500
1050

9850
C C C
7850

MPB-1

MPB-2

MPB-3
CKT-21 CKT-22
CKT-20
3000

3000
3000

4520
ref ref ref

4140
wp

wp
wp

CKT-26

CKT-27

CKT-28
CKT-12 CKT-13 CKT-14
CKT-29

D D D CKT-31 CKT-33

acu
acu

acu
1350
450
450
1250
5 6 7
4300

4300
21560

21560
5 6 7
THIRD FLOOR POWER LAYOUT

700
3
1700

1 : 75

acu
MPB-5

1700
E E CKT-23

CKT-25
wp
ref
acu
1510

MPB-4
CKT-41 CKT-19 ELECTRICAL SYMBOLS & LEGENDS
PINLIGHT DUPLEX CONVENIENCE OUTLET

1560
3350

3350
a,b SINGLE POLE TWO-GANG SWITCH wp
WATERPROOF
SINGLE POLE THREE-GANG SWITCH CONVENIENCE OUTLET
F F a,b,c
1450

2w TWO-WAY SWITCH OVER-THE-COUNTER OUTLET


a SINGLE POLE SWITCH
A.C.U. OUTLET
CKT-15

40W FLUORESCENT LAMP acu

G G PANEL BOARD
ref
REFRIGERATOR OUTLET
BRANCH CIRCUIT HOMERUN

3550
POWER SERVICE ENTRANCE
1700

1700
2860

CKT-24 CHANDELIER LIGHT WALL LAMP


DESIGN LOAD ANALYSIS

acu
90sqm. floor area 1Ø, 230V
H H 1. Lighting and Convenience Receptacle
90 sq mts. X 24VA/sqm. = 2160 VA
2. Small Appliance Circuit
Three 20 ampere @ 1500VA = 4500 VA
3. Laundry Circuit
One 20 ampere @ 1500VA = 1500 VA
GROUND FLOOR POWER LAYOUT SECOND FLOOR POWER LAYOUT
2950

2950
Sub - Total = 8160 VA

M 1 1 : 75
M 2 1 : 75
Application of Demand Factor
First 3000 VA @ 100% D.F. = 3000 VA
Remainder @ 35% D.F. (5160 X 0.35) = 1806 VA
Sub - Total = 4806 VA
Other Loads MRS. LOURDES ALZONA
1. 2 Air Conditioning Load
2-1 hp units @ 8.0Amp X 230V @ 100% D.F. = 3680 VA
SHORT CIRCUIT ANALYSIS 2. Refrigerator OWNER
3.47 Amps @ 100% D.F. = 800 VA

MAIN PANEL BOARD (MPB) - 5 Faults are line to line single


Total Computed Load
Total Full Load Current
[9286+ 0.25(1840)] / 230V
= 9286 VA

= 42.37 Amps
phase fault
MAIN PANEL BOARD (MPB) - 3 SCHEDULE OF LOADS
PROTECTION
Fault #1
USE:
2-8.0mm + 3.5mm THHN IN #20mmØ PVC

CKT NO. L.O. C.O. SPECIAL OUTLET WATTAGE VOLTAGE AMPERAGE WIRE SIZE CONDUIT SIZE ARCHITECT / ENGINEER
SCHEDULE OF LOADS AT AF MAIN SERVICE

PROTECTION 8 13 1300 230 5.65 30 50 2 - 5.5 mm² THW 20mm Ø PVC 50 KVA, 2%Z PANEL GENERAL NOTES: REG. NO.
CKT NO. L.O. C.O. SPECIAL OUTLET WATTAGE VOLTAGE AMPERAGE WIRE SIZE CONDUIT SIZE LOAD COMPUTATIONS 19 12 1200 230 5.22 30 50 2 - 5.5 mm² THW 20mm Ø PVC
230V, 1 Ø Fault #2
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE
AT AF
12,380 W + (25% of 1840W) 23 REF 800 230 3.48 20 50 2 - 3.5 mm² THW
20mm Ø PVC WITH THE PERTINENT PROVISIONS OF THE LATEST EDITION OF DATE:
3 4 400 230 1.74 20 50 2 - 3.5 mm² THW 20mm Ø PVC I= x 80% = 44.66 A 1 - 2.0 mm² THW
230 V 24 ACU 1840 230 8.00 30 50 2 - 5.5 mm² THW
20mm Ø PVC Infinite THE PHILIPPINE ELECTRICAL CODE.
7 10 1000 230 4.35 20 50 2 - 3.5 mm² THW 20mm Ø PVC 1 - 2.0 mm² THW
Primary
25 ACU 1840 230 8.00 30 50 2 - 5.5 mm² THW
20mm Ø PVC PTR NO.
11 5 500 230 2.17 20 50 2 - 3.5 mm² THW 20mm Ø PVC FOR MAIN CIRCUIT 1 - 2.0 mm² THW
Available 2. LOCATION OF LIGHTING FIXTURES ARE APRROXIMATE ONLY.
14 600 230 2.61 20 50 2 - 3.5 mm² THW
20mm Ø PVC BREAKER USE: 43 SPARE 1500 230 6.52 20 50 FINAL PROVISIONS SHALL BE DETERMINED ON SITE TO AVOID
3 1 - 2.0 mm² THW 20'. 500 MCM CU PLACE:
2 - 3.5 mm² THW 60 AT, 2 POLE, 240 VOLTS, 44 SPARE 1500 230 6.52 20 50 Steel Conduit INTERFERENCE WITH OTHER SYSTEM AND/OR EQUIPMENTS.
18 6 1200 230 5.22 20 50 1 - 2.0 mm² THW 20mm Ø PVC 20', # 2 CU
60 HERTZ TOTAL: 9,980 W 230 43.39 A
22 REF 800 230 3.48 20 50 2 - 3.5 mm² THW
20mm Ø PVC Steel Conduit 3. METALLIC FRAMES OF EQUIPMENTS SHALL BE EFFECTIVELY
1 - 2.0 mm² THW
2 - 3.5 mm² THW FOR MAIN FEEDER USE: GROUNDED.
28 6 1200 230 5.22 20 50 20mm Ø PVC
1 - 2.0 mm² THW
2 - 14.0 mm² THW LOAD COMPUTATIONS FAULT # 1

ALZONA
2 - 5.5 mm² THW
33 ACU 1840 230 8.00 30 50 1 - 2.0 mm² THW 20mm Ø PVC 1 - 5.5 mm² THW STEP 5:
9,980 W + (25% of 1840W) 4. MINIMUM SIZE OF WIRE SHALL BE 3.5 SQ. MM. THW IN 20 MM
34 ACU 1840 230 8.00 30 50 2 - 5.5 mm² THW
1 - 2.0 mm² THW 20mm Ø PVC IN 25MM Ø RSC PIPE I= x 80% = 36.31 A MPB 5 RISER DIAGRAM STEP 1:
M=
1
= 0.958 PVC CONDUIT OR 15 MM DIA RSC UNLESS OTHERWISE SPECIFIED
230 V 50 x 1000 1 +0.043
39 SPARE 1500 230 6.52 20 50 IN THE PLANS.
40
TOTAL:
SPARE 1500
12,380 W
230
230
6.52
53.83 A
20 50 FOR MAIN CIRCUIT
BREAKER USE: SERVICE ENTRANCE
METER
IFLA =

STEP 2:
240 = 208.33 A
STEP 6:
5. ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT
SUPERVISION OF A DULY LICENSED ELECTRICAL ENGINEER.
RESIDENCE
50 AT, 2 POLE, 240 VOLTS, ISCA = 11572.92 x 0.958 = 11090.7863 A
60 HERTZ
MAIN FEEDER:
Multiplier = .9(2)
100
= 55.55 Fault #2 (Use ISCA at Fault #1 to calculate)
6. ALL MATERIALS TO BE USED IN THE INSTALLATION SHALL BE
LOT 6-9-A, ACACIA ROAD
75 A
FOR MAIN FEEDER USE:
2 - 8.0 mm² THW
2 - 22.0 mm² THW COPPER WIRE
1 - 8.0 mm² THW COPPER WIRE STEP 3: STEP 4: NEW, STANDARD AND APPROVED TYPE AS TO LOCATION, TYPE LAS PIÑAS CITY
MAIN PANEL BOARD (MPB) - 4 LOAD COMPUTATIONS
1 - 3.5 mm² THW
IN 32MM Ø RSC PIPE
32mm Ø CONDUIT PIPE
CKT-8
30 AT 30 AT
CKT-19
IL-L = 208.33 x 55.55 = 11572.92 A
Single phase short circuit current at
Transformer Secondary
f=
2 x 20 x 11090.7863
5907 x 2 x 240
= 0.156
AND USE.

7. METHOD OF WIRING SHALL BE UNPLASTICIZED POLYVINYL


20 AT 30 AT
4,240 W + (25% of 1840W) CHLORIDE (uPVC) WITH PROPER FITTINGS, DEVICES, BOXES AND
SCHEDULE OF LOADS I= x 80% = 16.35 A
CKT-23 CKT-24 STEP 5:
SUPPORTS. WORK SHALL BE AS PER PLAN AND SPECIFICATIONS POWER & AUXILIARY LAYOUT
230 V MPB 4 RISER DIAGRAM 30 AT 20 AT STEP 4:
1 AS TO LOCATION, TYPE AND USE.
PROTECTION CKT-25 CKT-43 M= = 0.864
CKT NO. L.O. C.O. SPECIAL OUTLET WATTAGE VOLTAGE AMPERAGE WIRE SIZE CONDUIT SIZE 2 x 20 x 11572.92 1 +0.156
AT AF FOR MAIN CIRCUIT 20 AT f=
METER 22185 x 2 x 240 8. ALL SWITCHES AND CONVENIENCE OUTLETS (EXCEPT FLOOR
4 5 500 230 2.17 20 50 2 - 3.5 mm² THW 20mm Ø PVC
BREAKER USE:
50 AT, 2 POLE, 240 VOLTS, SERVICE ENTRANCE
CKT-44
30 AT = 0.04347125185
STEP 6:
MOUNTED) SHALL BE FLUSH MOUNTED, 1.40 METERS AND 0.30 Project number 01
15 2 400 230 1.74 20 50 2 - 3.5 mm² THW 20mm Ø PVC 60 HERTZ ISCA = 11090.7863 x 0.864 = 9590 METER, RESPECTIVELY, ABOVE FINISHED FLOOR.
2 - 5.5 mm² THW
41 ACU 1840 230 8.00 30 50 20mm Ø PVC Date OCTOBER 2018

2/11/2019 3:36:17 PM
1 - 2.0 mm² THW MAIN FEEDER:
FOR MAIN FEEDER USE: 75 A 9. CONDUIT RUNS ARE SCHEMATIC. ACTUAL RUNS SHALL BE
42 SPARE 1500 230 6.52 20 50 2 - 8.0 mm² THW 2 - 22.0 mm² THW COPPER WIRE
DETERMINED IN THE FIELD TO SUIT ACTUAL FIELD CONDITION.
1 - 8.0 mm² THW COPPER WIRE
TOTAL: 4,240 W 230 18.43 A 1 - 3.5 mm² THW 32mm Ø CONDUIT PIPE 20 AT 20 AT
IN 32MM Ø RSC PIPE 10. WIRES, BOXES, ELECTRICAL AS WELL AS NON-ELECTRICAL
CKT-4

CKT-41
30 AT 20 AT
CKT-15

CKT-42
MATERIALS NOT INCLUDED IN THE PLANS AND SPECIFICATIONS
BUT NECESSARY TO COMPLETE THE JOB SHALL BE FURNISHED
E-02
20 AT AND INSTALLED BY THE CONTRACTOR.

Scale As indicated
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545
PLUMBING LEGEND PLUMBING LEGEND
SEWER LINE SEWER LINE
1 2 3 4 1 2 3 4
STORM LINE STORM LINE
WATER SUPPLY LINE 11660 WATER SUPPLY LINE 11660
3760 3800 4100 3760 3800 4100

100
200
A cb cb
A
cb
cb

1900

1900
ds

1800
ds cb ds
ds ds cb ds
fau ds fau fau ds
uf uf uf uf uf uf
B df df
B df df df
df fau fau fau
wc wc wc
fd fd fd

3500
lav lav lav

8500
sho sho sho
fau fau
9850

fau
6500
6500

fd fd fd
C C
ksink ksink ksink
fau fau fau

3000
D D
1350

SEPTIC
TANK
1250
4300

4300
5 SEPTIC
7 5 6 7
TANK 6
ds ds
1700

ds fd
ds ds fd
cb df cb ds cb cb ksink sho lav
E df
E fau fau
1510

lav uf
2000

2000
7520

fd fd
fau
F F
1450

wc

5050
wc
1350

1350
fau
TAP TO
G G
1250

NEAREST
MAIN STORM
1700

1700
DRAIN LINE
TAP TO TAP TO
NEAREST NEAREST
1610

MAIN STREET MAIN WATER


H TAP TO TAP TO SEWER LINE SUPPLY LINE H
NEAREST NEAREST
MAIN STORM MAIN STREET
DRAIN LINE SEWER LINE
3720

SECOND FLOOR PLUMBING LAYOUT


2950

GROUND FLOOR PLUMBING LAYOUT 2 1 : 75 MRS. LOURDES ALZONA


1 1 : 75 OWNER

ARCHITECT / ENGINEER
3200 REG. NO.
150 1800 150 950 150
500 500 DATE:
MANHOLE MANHOLE
0.10M THK CONC. SLAB PTR NO.
3200 W/ 10MM DIA RSB SPACED
100

150 1800 150 950 150 0.10M THK CONC. SLAB AT EVERY 0.125M O.C.
BOTHWAYS
PLACE:
W/ 10MM DIA RSB SPACED
300

AT EVERY 0.125M O.C.


150

BOTHWAYS

MANHOLE MANHOLE
6" CHB WALL W/ 10MM DIA
RSB SPACED AT EVERY
0.40M O.C. VERTICAL AND
3" DIA PVC BLACK
SEWER PIPE ALZONA
EVERY 2 LAYERS
DIGESTION LEACHING 6" CHB WALL W/ 10MM DIA
RESIDENCE
1750

HORIZONTAL RSB SPACED AT EVERY


CHAMBER WELL
1500
1200

1200

0.150M THK CONC. SLAB 0.40M O.C. VERTICAL AND


EVERY 2 LAYERS
W/ 10MM DIA RSB SPACED
AT EVERY 0.150M O.C. HORIZONTAL LOT 6-9-A, ACACIA ROAD
BOTHWAYS LAS PIÑAS CITY
DIGESTION LEACHING 0.150M THK CONC. SLAB
CHAMBER WELL slope slope W/ 10MM DIA RSB SPACED
3" DIA PVC BLACK AT EVERY 0.150M O.C.
PLUMBING LAYOUT & DETAILS
150

150

SEWER PIPE BOTHWAYS

Project number 01
SEPTIC TANK DETAILS SEPTIC TANK SECTION Date OCTOBER 2018
3 4

2/11/2019 3:36:18 PM
1 : 20 1 : 20

P-01
Scale As indicated
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545
1 2 3 4
11660
3760 3800 4100

100
A
1900
ds ds
ds ds
B
3500
8500

DOWNSPOUT
3000

GU
TTE
R
D

DOWNSPOUT
fau

DOWNSPOUT
sho lav wc
ksink
fau
fau cb

GU
TTE
fd
THIRD FLOOR PLUMBING LAYOUT fd

R
PLUMBING LEGEND 1 1 : 75

DOWNSPOUT
fd fau

DOWNSPOUT

DOWNSPOUT
SEWER LINE

upflow
ksink
STORM LINE sho
WATER SUPPLY LINE
1 2 3 4

DOWNSPOUT

DOWNSPOUT

downflow
downflow
11380
fau
cb
3620 3800 3950 sho
fau
100

lav
A fd
sho lav fau

DOWNSPOUT
lav ksink cb
1900

wc cb fau lav
fau
ds ds fd
ds ds fau fd fau fau

DOWNSPOUT
fau wc
B ksink
fau fd
fd fd

downflow
DOWNSPOUT
upflow
fau

upflow
3500

cb
8500

SEPTIC

upflow
TANK
cb
cb cb

downflow
C

DOWNSPOUT

MRS. LOURDES ALZONA

DOWNSPOUT
3000

fau
DN OWNER
TAP TO NEAREST
MAIN STORM
DRAIN LINE
D cb
TAP TO NEAREST
MAIN STREET
SEPTIC ARCHITECT / ENGINEER
SEWER LINE
TANK
REG. NO.
4300

TAP TO NEAREST cb PLUMBING LEGEND


MAIN STORM SEWER LINE DATE:
ds ds ds DRAIN LINE
STORM LINE
PTR NO.
TAP TO NEAREST WATER SUPPLY LINE
MAIN STREET
PLACE:
SEWER LINE TAP TO NEAREST
E MAIN WATER
SUPPLY LINE
2000

ALZONA
F PLUMBING ISOMETRIC VIEW
3 RESIDENCE
5050
1350

N LOT 6-9-A, ACACIA ROAD


G
LAS PIÑAS CITY
1700

H PLUMBING ISOMETRIC PLAN &


VIEW
3010 3240 4200
10450
Project number 01
Date OCTOBER 2018

2/11/2019 3:36:20 PM
5 6 7

P-02
ROOF PLUMBING LAYOUT
2 1 : 75 Scale 1 : 75
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545
1 2 3 4 1 2 3 4 1 2 3 4
11660 11460 11410
3760 3800 4100 3660 3800 4100 3660 3800 3950
F2/C3 WF1 WF1 F2/C3 WF1 F2/C3 B3 B3 B3
A A C3 C3 C3 C3
A
F2/C3 F2/C3 F2/C3 F2/C3
2000

2000

2000
WF1 WF2 WF2 WF1

B3
B3
B3

B3
S1 S1 S1
TB TB TB C2 C2
B B C2 B1 C2 B1 C2 B1 C2 B C2 B2 B2 B2 B2 C2 B2 B2
F1/C1 F1/C1
F1/C1 F1/C1 UP UP UP UP UP UP
1 2 3 4 5 5 4 3 2 1 1 2 3 4 5
1 1 1

B3

B2
3500

3500

3500

B3

B2
B2
2 2 2

B3

B2
TB

6 6 6

TB

TB

TB
3 3 3
8500

8500

8500
7 7 7
4 4 4
8 8 8
5 5 5
9 9 9

B1
S1 S1 S1

B1
6 6 6
10 10 10

B1
B3

B1

B3

B3
TB TB TB S1 11 11 S1 S1 11
7 7 7

12 12 12
C2 8 8 8
C2
C C 13 13 13 C 9

10 C2
9

10 C2
9

10
14 14 14
F1/C2 15 15 15
11 11 11
TB

F1/C2 F1/C2 F1/C2 16 16 16


12 12 12

B2 B2 B2 B2 13
B2 B2
13
B2 B2 13
B2
TB

TB

TB
3000

3000

3000
17 17 17
14 14 14
18 18 18
15 15 15

B2
B2
S1 S1 S1

B2
B1
B1

B2
S1 S1

B1

B1
S1

16000
TB TB TB B2 B2 B2 C2 B2 B2 B2 B2 C2 B2 C2
D D C2 C2 C2 C2 D C2

800

800
B2
B1

B1

B1

B2

B2

B2
B1
S1 S1 S1

F1/C1 F1/C1 F1/C1 F1/C1 C4 B2 C4 B2 C4 B2 C4 C4 B2 C4 B2 C4 B2 C4

5 6 7
4300

4300
9540
5 6 7 2100 3240 4200
2160 3240 4200 B3 B3 B3 THIRD FLOOR FRAMING PLAN
C4 C4 C4 C4 3 1 : 75

1000

B3

B3
B3
B3
F1/C2 F1/C2 S1 S1 S1
TB1 TB1 TB1
E E C2 B3 C2 B3 C2 B3 C2
F1/C2

B3
2000

2000
F1/C2
TB1

S1 FFL FFL
TB1

100
B3
18 S1
F F B3
TB1

17

TB1
TB1

TB1 B3 C2

B3
5050

5050
16
S1 BACK BACK TIEBEAM BACK BACK

B3

400
1350

1350
F1/C2 15
FILL FILL FILL FILL
WF2 14 6"CHB WALL PLASTERED TIEBEAM

900
13
AND GROUTED W/ 10MM
G G 12
C2 DIA RSB SPACED AT EVERY 6"CHB WALL PLASTERED
11
0.60M O.C. FOR VERTICAL AND GROUTED W/ 10MM
TB1 F1/C2

400
B3
1700

1700
10
AND EVERY 3 LAYERS DIA RSB SPACED AT EVERY
9

8 HORIZONTAL REINFORCEMENT 0.60M O.C. FOR VERTICAL


NGL NGL AND EVERY 3 LAYERS
TB1 B3 10MM DIA. RSB
HORIZONTAL REINFORCEMENT
H H C2 7 C2 AT EVERY 0.30M O.C.
F1/C2 3PCS-10MM DIA 10MM DIA. RSB

VERIFY
6
F1/C2 5 RSB AT EVERY 0.30M O.C.
4

3 GRAVEL FILL 3PCS-10MM DIA


2 RSB
1

FOUNDATION PLAN UP SECOND FLOOR FRAMING PLAN GRAVEL FILL

50 200
1 1 : 75
2 1 : 75
400
WF1 400
WF2 MRS. LOURDES ALZONA

OWNER

SCHEDULE OF BEAMS WALL FOOTING DETAILS


4 1 : 20
B1 B2 B3
AT FACE OF SUPPORT AT MIDSPAN AT FACE OF SUPPORT AT MIDSPAN AT FACE OF SUPPORT AT MIDSPAN
ARCHITECT / ENGINEER
200 200 200 200 200 TENSION BARS 200
TENSION BARS TENSION BARS 3PCS - 16MM DIA REG. NO.
COMPRESSION COMPRESSION COMPRESSION
3PCS-16MM DIA 4PCS - 16MM DIA RSB
BARS
RSB BARS RSB
3PCS - 16MM DIA
BARS
3PCS - 16MM DIA
SCHEDULE OF COLUMNS DATE:
3PCS - 16MM STIRRUPS
RSB RSB
STIRRUPS DIA RSB STIRRUPS 10MM DIA RSB C1 C2 PTR NO.
400

400

10MM DIA RSB 10MM DIA RSB 1PC AT 0.05M O.C.


400

400

400

400

1PC AT 0.05M O.C. 1PC AT 0.05M O.C. 6PCS AT 0.10M O.C. 200 200
6PCS AT 0.10M O.C. 6PCS AT 0.10M O.C. REST AT 0.20M O.C. PLACE:
REST AT 0.20M O.C. TENSION BARS REST AT 0.20M O.C. TENSION BARS REBAR REBAR
5PCS - 16MM TENSION BARS 4PCS - 16MM DIA 8PCS - 20MM DIA 6PCS - 16MM DIA
6PCS - 16MM DIA COMPRESSION
COMPRESSION BARS DIA RSB COMPRESSION BARS BARS RSB RSB RSB
1" GAP RSB
3PCS - 16MM DIA RSB 1" GAP 3PCS - 16MM DIA RSB 3PCS - 16MM DIA
1" GAP 1" GAP 1" GAP 1" GAP
ALZONA

400

400
RSB TIES TIES
1SET-10MM DIA RSB 1SET-10MM DIA RSB
1PC AT 0.05M O.C. 1PC AT 0.05M O.C.

AT FACE OF SUPPORT
TB
AT MIDSPAN AT FACE OF SUPPORT
TB1
AT MIDSPAN AT FACE OF SUPPORT
RB
AT MIDSPAN
6PCS AT 0.10M O.C.
REST AT 0.20M O.C.
6PCS AT 0.10M O.C.
REST AT 0.20M O.C. RESIDENCE
LOT 6-9-A, ACACIA ROAD
200 200 200 TENSION BARS 200 200 200 C3 C4
TENSION BARS 3PCS - 16MM DIA TENSION BARS LAS PIÑAS CITY
3PCS - 16MM DIA COMPRESSION RSB COMPRESSION 3PCS - 16MM DIA COMPRESSION
RSB BARS BARS RSB BARS 250 REBAR
200 REBAR
3PCS - 16MM DIA STIRRUPS 3PCS - 16MM DIA 2PCS - 16MM DIA
STIRRUPS RSB 10MM DIA RSB RSB RSB 4PCS-16MM DIA 4PCS-16MM DIA STRUCTURAL PLAN AND
300

STIRRUPS
RSB RSB
350

1PC AT 0.05M O.C.


10MM DIA RSB 10MM DIA RSB
DETAILS
400

400

400

400

6PCS AT 0.10M O.C.

200
1PC AT 0.05M O.C. 1PC AT 0.05M O.C.
250
REST AT 0.20M O.C. TIES TIES
6PCS AT 0.10M O.C. 6PCS AT 0.10M O.C.
1SET-10MM DIA RSB 1SET-10MM DIA RSB
REST AT 0.20M O.C. TENSION BARS
3PCS - 16MM DIA COMPRESSION
TENSION BARS
3PCS - 16MM DIA 1" GAP
REST AT 0.20M O.C. TENSION BARS
4PCS - 16MM DIA 1PC AT 0.05M O.C. 1PC AT 0.05M O.C. Project number 01
RSB BARS RSB RSB 6PCS AT 0.10M O.C. 6PCS AT 0.10M O.C.
COMPRESSION BARS COMPRESSION BARS 1" GAP
3PCS - 16MM DIA REST AT 0.20M O.C. REST AT 0.20M O.C.
3PCS - 16MM DIA RSB 2PCS - 16MM DIA RSB
1" GAP 1" GAP Date OCTOBER 2018

2/11/2019 3:36:20 PM
1" GAP RSB 1" GAP

BEAM SCHEDULE 6
COLUMN SCHEDULE S-01
5 1 : 10 1 : 10
Scale As indicated
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545
9150 6140
T1 T4

820
800
1 2 3 4
9110 6090
11230
1800 1800 1950 1950 1850 1850

7660
5400
A T2 T5

960

750
1100

7610 5350
600
800

B
600

6240
T3 4660
T6

740

690
600

6200 4610
600
3500
600

ROOF FRAMING NOTES:


1. USE 2PCS-1/4"x2"x2" ANGULAR BAR FOR TOP & BOTTOM MEMBERS OF TRUSSES.
600

2. USE 2PCS-3/16"x1-1/2"x1-1/2" ANGULAR BAR FOR DIAGONAL AND VERTICAL MEMBERS OF TRUSSES.
ROOF TRUSS SCHEDULE 3. USE G16x2"x4" STEEL C-PURLINS FOR PURLINS SPACED AT EVERY 0.60M O.C. (VERIFY ROOF SPACING REQUIREMENTS).
4. USE 10MM DIA ROUND BAR FOR SAG RODS
2
600

5. USE 1/2"DIA x2-1/2" EXPANSION BOLT SPACED AT EVERY 0.60M O.C. AND OR PROTRUDE REINFORCEMENT OF CONCRETE MEMBERS FOR ANCHORAGE.
1 : 50
C
9000

600

T1 T1 T1 T1 T1 T1 S
S/4 S/2 S/4 0.10M THK CONC. SLAB-
600

STBCSD SBBCS STBCSC


ON-GRADE WITH 10MM
SCHEDULE OF SLABS DIA RSB REBAR AT EVERY
600

DISCONTINUOUS
3000

LTBCSD LTBCSD
S1 0.40M O.C. B.W. ON

L/4
600

THK BAR DIAMETER SPACING 50MM THK GRAVEL FILL


LTBMSD THICKNESS (MM) 100 (4")
SBBMS 10MM DIA. RSB 150MM O.C.
600

SBBCS 10MM DIA. RSB 200MM O.C.


LBBCS LBBCS
STBMSD 10MM DIA. RSB 200MM O.C.

DISCONTINUOUS

CONTINUOUS
D STBMSC 10MM DIA. RSB 200MM O.C.

L/2
600

L
STBCSD 10MM DIA. RSB 200MM O.C.
STBCSC 10MM DIA. RSB 200MM O.C.
1350

LBBMS
LBBMS 10MM DIA. RSB 150MM O.C.
CONCRETE SLAB-ON-GRADE DETAILS
600

LBBCS 10MM DIA. RSB 200MM O.C.


LTBMSC
LTBMSD
LTBMSC
10MM DIA. RSB
10MM DIA. RSB
200MM O.C.
200MM O.C.
4 1 : 20
600

L/4
12630 LTBCSD 10MM DIA. RSB 200MM O.C.
LTBCSC LTBCSC
LTBCSC 10MM DIA. RSB 200MM O.C.
CONTINUOUS
SBBCS
600 400

SCHEDULE OF SLABS
3
1900

1 : 20
600
600

E FFL FFL MRS. LOURDES ALZONA

400 100

400 100
600

T2 T2 T3 T4 T5 T6 T6 T6 BACK BACK BACK BACK OWNER


2000

FILL FILL FILL FILL

900

900
600

400

400
12MM DIA RSB ELEV FFL
600
7610

SPACED AT EVERY NGL NGL


F

15
0.20M O.C.

0
ARCHITECT / ENGINEER
600

16MM DIA RSB TIEBEAM


1350

SPACED AT EVERY TIEBEAM

VERIFY

VERIFY
0.10M O.C. BEAM 5PCS-16MM DIA REG. NO.
12MM DIA RSB
600

SPACED AT EVERY RSB BOTHWAYS


0.20M O.C. 9PCS - 16MM DIA DATE:
G RSB BOTHWAYS
600

16MM DIA RSB


SPACED AT EVERY PTR NO.
0.10M O.C.
1700

100 250
600

100 300
PLACE:
LANDING
150
600

12MM DIA RSB


H SPACED AT EVERY 1500
0.20M O.C.
ALZONA
660
600

LINTEL BEAM
16MM DIA RSB
SPACED AT EVERY
RESIDENCE
LINTEL COLUMN

1160 1930 1510 1510 1420 1420 1100 1100 0.10M O.C. 9PCS - 16MM DIA 800
RSB BOTHWAYS
3090 3020 2840 2200
11150 5PCS - 16MM DIA
RSB BOTHWAYS
LOT 6-9-A, ACACIA ROAD

1500
GRND FFL LAS PIÑAS CITY

800
0
15
5 6 7
ROOF FRAMING PLAN &
WALL FTG STRUCTURAL DETAILS
Project number 01
1
ROOF FRAMING PLAN
1 : 50
F1 F2 Date OCTOBER 2018

2/11/2019 3:36:21 PM
TYP. CONCRETE STAIR DETAIL
5 1 : 25 FOOTING DETAILS
6 1 : 25
S-02
Scale As indicated
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT / ENGINEER AND SHOULD NOT BE REPRODUCED OR COPIED
IN PART OR IN WHOLE WITHOUT THEIR PERMISSION. ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. - REPUBLIC ACT 545

Você também pode gostar