Você está na página 1de 9

Name: Aljhon C.

Compuesto
Permanent Address: Archbishop Reyes Street Zapatera Barrio Luz, Cebu City Philippines.
Mobile Numbers: +639560293544 and +639958676817 (Globe)
Email Add: aljz_2000@yahoo.com.ph and aljhoncompuesto35@gmail.com
Skype Id: live:b4a0ab0a6baba305

CAREER OVERVIEW:

To apply what I learned from my education and experience as well as to improve my knowledge, to join a team of
creative and innovative individuals in a challenging and rewarding environment and to boost up the awareness in
terms of professionalism and gain for living, and I am a Land/Mechanical Surveyor for more than Ten (14) years of
field experience for horizontal and vertical projects assigned as Site Surveyor and Site Engineer Assistant. This covers
earthwork, excavation for foundation works, roads, & highways (inclusive of bridges), land areas, buildings, airports,
oil and gas power plant civil works and Mechanical Survey works in Coal and Power Energy Plantation,
knowledgeable in any Main Potentials survey works and supervision under Saudi Aramco .
Have background in office works, electrical works installations, and electronic repair works, Computer Literate
particularly on Microsoft Office Tools and knowledgeable at Computer Aided Design System.
Added to my personal capabilities, I have the ability to operate heavy equipment like Road Roller, Dump Track, and
Backhoe.

CAREER HISTORY:
KEY STRENGHTHS:

Company : Al Robaya Holding Company


Location : P.O. Box 66, Abqaiq 31992, Kingdom of Saudi Arabia.
Position : Senior Surveyor
Duration : March 20, 2018 to February 28, 2019
Project : Saudi Aramco Main Potential Project for OIL, GAS and Over Head Power Lines (OHPL).

Special Task: Site Supervision and Site Implementation of Survey.

Machine Issued: Topcon SDR Basic-GM-55 Series, Total Station and Topcon Automatic Level
A Multi Trillion USD Project of SAUDI ARAMCO @ Bahrain, HAWIYAH, & HARADH Projects K.S.A.

Duties and responsibilities:

• Site Supervision to all Surveyors on Horizontal Survey for Pipe Flow Lines from Well head to Tie-In Area.
• Inspection and monitoring for establishing Site Controls and Tracks unknown bench marks as per IFC
drawing.
• Collecting survey data for daily, weekly, and monthly reports.
• Drawing finalizing on Auto-Cad software operation and Microsoft Office Tools.

Company : M. Al Barghash Al Mansori Trading & Construction Company


Location : P.O. Box 31996, Al-Khobar 31952, Kingdom of Saudi Arabia.
Position : Mechanical Surveyor
Duration : April 20, 2017 – March 5, 2018
Project : Saudi Aramco Well Packages Project for OIL, GAS, OHPL Transmission Power Lines and Water
injection Wells.

Special Task: Site Surveyor.

Machine Issued: SOKKIA CX-105, Total Station and Topcon Automatic Level
A Multi Billion Pesos Project of SAUDI ARAMCO @ SHEDGUM, HAWIYAH, & HARADH Projects K.S.A.

Duties and responsibilities:

 Horizontal Survey for Pipe Flow Lines from Well head to Tie-In Area.
 Establishing Site Controls and Tracks unknown bench marks as per IFC Drawings.
 As-built and Topo Survey in preparation of survey reports.
 Knowledgeable for Auto-Cad software operation and Microsoft Office Tools.

Company: Galing Power Energy Construction Co.,Inc./ HYUNDAI E&C.


Location : Sitio Looc II, Bato Toledo City
Position : Mechanical Surveyor
Duration : April 11, 2015 – April 11, 2016
Project : THERMA VISAYAS ENERGY PROJECT

Special Task: Site Head Surveyor and Permit to Work (PTW)-Holder.

Machine Issued: Nikkon and Leica Total Station and Topcon Automatic Level
A Multi Billion Pesos Project of Toledo City, Cebu, COAL ENERGY POWER PLANT.

Duties and responsibilities:


 Establish Bench Mark references at site for elevation and coordinates.
 Run traverse in any control around the project site for closure purpose of all Bench Marks use at the area of
responsibility.
 Checking sub-contractors’ controls use for any Mechanical activities for the initials and final inspection.
 Monitoring all of Mechanical works @ Electro Static Precipitator foundation, anchor bolts, plates and
structures with regards of elevation monitoring and location monitoring uses with coordination survey.
 Conduct random survey checking during the initials of sub-contractors to minimize errors during final
inspection with the Q.C and Owner side Inspector.
 Conduct Plumpness checking during the erecting of structure columns of Boilers and Steam Turbine
structure.
 Control and monitoring of pipes elevation and its location during pipe laying at GRP (Glass Reinforcement
Pipe) and HDPE (High Density Poly Ethylene).
 Establish advance survey monitoring for elevation of installed trestle for base plate and plumpness.
Prepare work report in every accomplishments and inspections conducted of survey in all mechanical matters.

Company : WTG CONSTRUCTION


Location : Cogon Pardo, Cebu City
Position: Site Assistant/ Land Surveyor
Duration : December 02, 2015 – April 01, 2015
Project : MJ Cuenco Avenue, Cebu City Rehabilitation and Road Widening.

 Machine Issued: Topcon Total Station and Topcon Automatic Level


 A Multi Million Peso Government Project.
Company : HDEC-Gusan Company. LTD. KR
Location : Barrakah Nuclear Power Plant Project, Abu Dhabi UAE
Position : Surveyor
Duration : October 28, 2014 – September 23, 2015
Project : BNPP- Barrakah Nuclear Power Plant
Special Task: Site Head Surveyor and Permit To Work (PTW)-Holder.

Machine Issued: Sokia Total Station and Sokia Automatic Level


A Multi-Billion Dollar Project of Abu Dhabi UAE, ENERGY NUCLEAR POWER PLANT.

Duties and responsibilities:

Establish location controls for vertical and horizontal BM.


Establish location Perform all the relative computations and prepare all the survey data and survey plan
Distribute all the survey plans on the site supervisor.
Coordinate with the field engineer and other field supervisor to assure the implementation of the detailed plan on
the site.
Assure horizontal and vertical alignments coordinated points of columns, walls, and elevator pits of the the power
block building unit designated, and checked as per plan and the noted revised elevation drawings for avoid mistakes
in the project.

Company: Makati Development Corporation (MDC)


Location : Corner Paknaan Road, Mandaue City
Position : Surveyor
Duration : August 04, 2014 TO October 20 (Resignation in reason of going abroad)
Project : AMAIA STEPS PROJECT

Duties and responsibilities:


Establish location controls for vertical and horizontal BM.
Establish location Perform all the relative computations and prepare all the survey data and survey plan
Distribute all the survey plans on the site supervisor.
Coordinate with the field engineer and other field supervisor to assure the implementation of the detailed plan on
the site.
Assure horizontal and vertical alignments coordinated points of columns, walls, and elevator pits of the building
designated, and checked as per plan and the noted revised elevation drawings for avoid mistakes in the project.

Machine Issued: Nikkon Total Station and Topcon Automatic Level


A Multi Billion Peso project with 2 High rise buildings, world class hotel and amenities.

Company: Saudi Technical Limited KSA (STL)


Location : Al Hassah Road Malas, Riyadh KSA, Saudi Technical Building.
Position : Surveyor
Duration : May 01, 2013 up to May 01, 2014- END OF 1 YEAR
Project : Hail City Ministry Building Projects

Duties and responsibilities:


Supervise all the site survey to assure accuracy of the layout of all structures.
Attend technical and project meetings to coordinate with other member of the project team.
Keep and control all the survey data and detailed plan including revised drawing plans.
Establish location controls for vertical and horizontal BM.
Establish location Perform all the relative computations and prepare all the survey data and survey plan
Distribute all the survey plans on the site supervisor.
Coordinate with the field engineer and other field supervisor to assure the implementation of the detailed plan on
the site.
Supervise of excavation for ground level design with sloping elevation and monitor vertical and horizontal in the
building projects.
Perform profile leveling and design elevation for area of the building location.

 Machine Issued: Leica Total Station 1203 Model and Topcon Automatic Level
 A Multi-Million Dollar project with government High rise building

Company : Gusan Construction (Korean Firms).


Location : Mussafa Industrial Abu Dhabi, Abu Dhabi City UAE.
Position : Surveyor
Duration : May 21, 2012 – December 23, 2012 (Finished Project)
Project : IRP-II Oil and Gas Plant, International Refinery Pipe lines Project

Duties and responsibilities:


Establish location Perform all the relative computations and prepare all the survey data and survey plan
Distribute all the survey plans on the site supervisor.
Coordinate with the field engineer and other field supervisor to assure the implementation of the detailed plan on
the site
Supervise all the site survey to assure accuracy of the layout of all structures. Attend technical and project meeting to
coordinate with other member of the project team.
Keep and control all the survey data and detailed plan including revised drawing plans.
Establish location of Drainage manhole
Establish elevation and control points,
Supervise of excavation for RCP and GRE pipe with sloping elevation
Perform profile levelling and design elevation for area and sewer manhole.
Establish reference elevation for levelling
Establish reference line and control point for lay out
Stake out storm water manhole location for excavation, & lay out center line U Ditch
Establish all location of Electric cable duct bank
Supervise and prepare slope elevation for drainage RCP pipe and GRE pipe
Establish location of Bund wall, Dyke wall and crossover lay out
Establish elevation and control points
Stake out and relocate bench mark and reference control
Lay out pipe way culvert location & establish blinding elevation.
Lay out excavation line VMH pipeline & monitoring elevation
Lay out structural works location FIRE WATER TANK. GAS TANK
Perform profile levelling
Lay out two way valve pit & collection pit
Stake out location AYMH. (Accidentally oily sewer manhole), for excavation
Lay out structural AYMH VMH MH MANHOLE. CULVERT. PIPE SLEEPER PIPE
Establish elevation and location manhole
Lay out curve structural radius
Establish horizontal control for setting out instrument and G/S for lay out reference
Lay out center line Cable trench for Electrical Instrumental route lay out
Lay out location Catch basin valve manifold
Stake out Pipe Sleeper location for excavation
Establish location Fresh Water Storage Tank and monitoring elevation
Establish elevation for design, fresh water tank
Supervise carpentry, masonry steel men works especially in the construction structure
Establish all location of all control base on coordinate’s future lay out
Topographic levelling of sub grade, PCC Road way site.
Supervise field operation to ensure the accurateness of center dowel bar, based on station at every 10 meter for
excavation references
Establish horizontal control for future, layout reference.
Topographic levelling for backfilling and fill, based on design elevation
Establish center line of U-(DTH) open canal.
Locate properly side and all property line bases on coordinates a data and Boundary wall lay out.

 Machine Issued: Leica Total Station and Topcon Automatic Level


 A Multi-Billion Dollar project of Oil and Gas Power Plant of TAKREER Refineries U.A.E.

Company : SAUDI BINLADIN GROUP (PBAD) PUBLIC BUILDINGS AND AIRPORTS.


Location : Riyadh, Saudi Arabia
Position : Surveyor
Duration : March 14, 2010 up to March 14, 2012 (End of Contract).
Project : KING ABDULLAH FINACIAL DISTRICT PROJECT Marcos Malleh Street.
Saudi Riyadh. Survey Department, ZONE 4 KAFD Project, Kingdom of Saudi Arabia.

Duties and responsibilities:


Establish location controls for vertical and horizontal BM.
Establish location Perform all the relative computations and prepare all the survey data and survey plan
Distribute all the survey plans on the site supervisor.
Coordinate with the field engineer and other field supervisor to assure the implementation of the detailed plan on
the site.
Assure horizontal and vertical alignments coordinated points of columns, walls, and elevator pits of the building
designated, and checked as per plan and the noted revised elevation drawings for avoid mistakes in the project.

 Machine Issued: Leica Total Station 1203 Model and Topcon Automatic Level
 A Multi-Billion Dollar project with 30 High rise buildings, world class hotel and amenities.

Company : WTG CONSTRUCTION


Location : Sergio Osmeña
Position: Surveyor
Duration : July 12, 2009 – March 9, 2010
Project : Dipolog, Punta, Dansulan, Sergio Osmeña Rehabilitation and Road Widening.

 Machine Issued: Topcon Total Station and Topcon Automatic Level


 A Multi Million Peso Government Project.

Company : Malaysia Thailand Development Corporation INC. (MTD)


Location : Pulong Sta. Cruz Sta. Rosa Laguna Exit.
Position : Survey Assistant
Duration : July 12, 2006 ~ July 25, 2008 (End of Contract)
Project : South Luzon Expressway Rehabilitation and Road Widening Project.
 Machine Issued: Horizon Total Station and Topcon Automatic Level
 A Multi Billion Peso Government Project, Finance By Malaysia and Thailand Construction

Company : TOA CORPORATION (Japanese Firm)


Location : Pilli Drive Butuan City Agusan Del Norte
Position : Survey Assistant/ Laboratory Assistant
Duration : April 20, 2004 ~ April 26, 2006 (End of Contract)
Project : Second Magsaysay Bridge & Butuan City, Bypass Road Project
Butuan City, Agusan Del Norte.

 Machine Issued: Sokia Total Station and Topcon Automatic Level


 A Multi Billion Peso Government Project, Finance by Japan Construction Firm

Company : MAKATI DEVELOPMENT CORPORATION (MDC)


Location : Makati City Philippines
Position : Office Assistant/Property Custodian
Duration : June 2000 ~ May 2002 (Finished Project)
Project : Globe Isla Plaza Abacus Building, Ayala Project Cebu City Philippines.

 A Multi Million Peso Project of High Rise Building.

EDUCATION AND TRAINING


College / Degree: Jose Rizal Memorial State College, Dapitan City,
Bachelor of Science Industrial Technology (BSIT)
Completed Course of (AIT), Associate Industrial Tech.
Major in Electronics Graduated (2004)

Hyundai-Samsung Join Venture Safety Training for BNPP


Barrakah Nuclear Power Plant Safety Trainings
 Induction training
 Indoctrination Training
 PPE and Hazard Trainings
 Hot works and Cold Works Training
 Confine Space Training
 Working at Height Training
 (PTW) Permit To Work Training for Site Permit Holder

MTD Group Induction Training


Malaysia Thailand Development Group of Companies (MTD) Inc.
MTD Construction Philippines Inc.
Makati City Philippines

Auto CAD Training of TESDA-VII


Computer Aided Design (L-1)
(UTPRAS NTR No. 0407022023)
TESDA 7- CEBU MIAP FOUNDATION INC. TRAINING CENTER
Cebu City Philippines

USAID’s Growth with Equity in Mindanao (GEM) Program


Training on Troubleshooting and Maintenance of Internet Connection
IPSTAR Basic Troubleshooting and Maintenance
We Are I.T Phil., Inc.
Norberta Guillar Memorial High School, Pagadian City
Certificate of Training Surveying Course No. 07-01020 Conducted by AMDC-SRMTC
DMECQ BUILDING CONTRACTOR Cooperating Agency
Republic of the Philippines Department of Labor and Employment
National Manpower and Youth Council Region – IV

ORGANIZATIONS: Philippine Martial Arts Combat Aikido (PHIMACA)


S.E.C Reg. No. A20000927513
Titled : INSTRUCTOR (1st DEGREE BLACK BELT)
ID No. : 1210764513

Certified 1st Degree Black Belt member of PHIMACA Techniques Al-Urrobah Chapter
City of Riyadh, Kingdom of Saudi Arabia.

References:

Isagani B. Cabahug Sr. School Governance Operation Division, SGOD


DepEd Pagadian City, Zamboanga Del Sur
Mobile: 09053262726

Engr. Kim Song Wook Mechanical Construction Manager


Galing Power and Energy Construction Co.Inc. (Korean Firm)
Sitio Looc-II Brgy. Bato Toledo City, Cebu Philippines
Therma Visayas Energy Project 300/MW
Mobile: +639778269005

Engr. Kim Youngmin Mechanical Site Engineer


Galing Power and Energy Construction Co.Inc. (Korean Firm)
Sitio Looc-II Brgy. Bato Toledo City, Cebu Philippines
Therma Visayas Energy Project 300/MW
Mobile: +639778349019

Engr. In Kyu Jun Site Manager


Gusan Construction Co.Ltd (Korean Firm)
Barrakah Nuclear Power Plant Unit-3 Auxiliary Building A/B Project
Barrakah South East Province of, Abu Dhabi U.A.E.
Mobile: +971564402992

Engr. Jung Wook Park Admin Manager


Gusan Construction Co.Ltd (Korean Firm)
Barrakah Nuclear Power Plant Unit-3 Auxiliary Building A/B Project
Mobile: +971561565187

Engr. Hyosang Lee Project Engineer


Gusan Construction Co.Ltd (Korean Firm)
Barrakah Nuclear Power Plant Unit-3 Auxiliary Building A/B Project
Barrakah South East Province of, Abu Dhabi U.A.E.

Engr. Il Oh Kim Concrete Foreman


Gusan Construction Co.Ltd (Korean Firm)
Barrakah Nuclear Power Plant Unit-3 Auxiliary Building A/B Project
Barrakah South East Province of, Abu Dhabi U.A.E.

Engr. Jang JinHo Construction Manager


Gusan Construction Co.Ltd (Korean Firm)
Inter Refineries Pipe line (IRP-II) Project
Mussaffah Industrial City, Abu Dhabi – U.A.E.
Mobile: +82-010-3805-4279 (KR)

Engr. Oh Ki Eun Planning Manager


Gusan Construction Co.Ltd (Korean Firm)
Inter Refineries Pipe line (IRP-II) Project
Mussaffah Industrial City, Abu Dhabi U.A.E.
Mobile: +971501654137 (UAE)

Engr. Kim Jung Won Admin Manager


Gusan Construction Co.Ltd (Korean Firm)
Inter Refineries Pipe line (IRP-II) Project
Mussaffah Industrial City, Abu Dhabi U.A.E.
Mobile: +971508364104 (UAE)

Engr. Ha YunSung Site Supervisor


Gusan Construction Co.Ltd (Korean Firm)
Inter Refineries Pipe line (IRP-II) Project
MussIaffah Industrial City, Abu Dhabi U.A.E.
Mobile: +82-010-8646-3987 (KR)

Engr. Ha TaeHun Manager (Civil Team)


DAEWOO E&C (Korean Firm)
Inter Refineries Pipe line (IRP-II) Project
Mussaffah Industrial City, Abu Dhabi U.A.E.
Mobile: +971505814736 (UAE)
Engr. Adil Taha Parcel Manager
Zone-4 Parcel 4.10
King Abdullah Financial District Project
Marcos Malleh Street Exit-4 Riyadh KSA
Mobile: +966593835239

Engr. Luiesito Consolacion Site Manager


Zone-4 Parcel 4.10
King Abdullah Financial District Project
Marcos Malleh Street Exit-4 Riyadh KSA
Mobile: +96656556827

Engr. Rashad KH. Hammad Chief Surveyor Zone-4


King Abdullah Financial District Project
Marcos Malleh Street Exit-4 Riyadh KSA
Mobile: +966593832629

Engr. Peewe Julario Civil Engineer / Logistics


Zone-4 Tower Cranes
King Abdullah Finacial District Project
Marcos Malleh Street Exit-4 Riyadh KSA
Mobile: +966542819168

I hereby certify that the above statement are true and correct to the best of my knowledge and belief.

ALJHON C. COMPUESTO

(Applicant)

Você também pode gostar