Commissioning Procedure

Caustic Mixer Unit

RIG/PLANT REFERENCE REFERENCE DESCRIPTION


PPL 2036 F1624 Mud Additive System
ADDITIONAL CODE SDRL CODE TOTAL PGS
5 This document contains proprietary and confidential National Oilwell Varco Norway AS
information which belongs to National Oilwell Varco; it is P.O. Box 168, Drengsrudhagen 4
REMARKS loaned for limited purposes only and remains the property
of National Oilwell Varco. Reproduction, in whole or in N-1371 ASKER
MAIN TAG NUMBER DISCIPLINE part; or use of this design or distribution of this information Norway
to others is not permitted without the express written
consent of National Oilwell Varco. This document is to be
CLIENT PO NUMBER returned to National Oilwell Varco upon request and in Phone +47 64 00 50 00
any event upon completion of the use for which it was Fax +47 38 19 48 12
loaned.
© Copyright National Oilwell Varco - 2013

CLIENT DOCUMENT NUMBER DOCUMENT NUMBER REV

F1624-Z-KA-005 0

www.nov.com
Document number F1624-Z-KA-005
Revision 0
Page 3 of 5

TABLE OF CONTENTS

1 GENERAL ......................................................................................................................... 4
1.1 Objective ................................................................................................................. 4
1.2 Prior to start of commissioning ................................................................................ 4
1.3 Reference documentation ....................................................................................... 4
1.4 Safety Requirements .............................................................................................. 4
2 CAUSTIC MIXER UNIT ..................................................................................................... 5
2.1 General description ................................................................................................. 5
2.2 Preparations............................................................................................................ 5
2.3 Testing sequence .................................................................................................... 5
2.4 Customer acceptance ............................................................................................. 5

www.nov.com
Document number F1624-Z-KA-005
Revision 0
Page 4 of 5

1 GENERAL

1.1 Objective
The objective of this procedure is to describe the necessary activities that need to be
performed during the commissioning period, ensuring that all equipment part of the package
functions as expected.

1.2 Prior to start of commissioning


The following must be performed before start of any of the commissioning tests described
in this document:

Installation must be completed


No outstanding punches on the equipment
Bulk / instrument air systems tested and available.
All necessary “permits to work” must be acquired.

1.3 Reference documentation


Doc. No Description
DP25-Z-MA-023 Installation, Operation and Maintenance Manual
F1624-DP25-G0003 GA Drawing - Caustic Mixer Self Equipped Transfer
F1624-DP25-H0001 Pipe & Instrument Diagrams

1.4 Safety Requirements

Remember: Safety is the responsibility of everyone.


IF IN DOUBT, ASK!

The procedures and systems already established for the project activities shall be
adhered to during the commissioning activities.

Prior to starting any activities that involve energizing, starting up and running equipment
or pressurizing systems, the applicable Livening-Up Notices and Work Permit
Procedures, shall be adhered to.

www.nov.com
Document number F1624-Z-KA-005
Revision 0
Page 5 of 5

2 CAUSTIC MIXER UNIT

2.1 General description


The caustic mixer unit consist off 1 air driven pump. By means of a hand
operated valve the pump can be use to mix the chemicals & to feed the mixing
lines. The pump speed is adjusted with needle valve that regulates the airflow to
the pump.

2.2 Preparations
• A selection of caustic chemical sacks must be available. If operations do not allow
mixing of caustic chemicals the test could be performed with use of water.
• Circulation thru applicable mix line must be initiated before start of test.

2.3 Testing sequence

Comments
1 Visual inspection.
Verify correct air inlet pressure: 6 bar (87 PSI).
Adjust if necessary on the plants filter regulator.

2 Pump stroke
Close needle valve. Line up 3-way valve for mixing.
Fill the tank with water.
Open needle valve slowly, and verify pump speed
will increase.

3 Flow rate
Line up 3-way valve to feed mixing line.
Fully open the needle valve. Check that the rate is
satisfactory.

2.4 Customer acceptance


Acceptance criteria:
Control functions OK (signed out table above)

Comments / Punch List items:

Accepted:
Representatives from: Date Sign
Client (Optional):
Supplier: NOV