Unit Testing – PP-01-01- Master Data-Bill of Material

- Change
Project ID: 4136-02
Project Name: ICF S/4 HANA Turnkey Implementation

Document Version / Details: 1.0/ 14.04.2019


Unit Testing – Material Management

Record of Release

Version Modified By Reviewed By Authorized By Release Date Modifications Done


No.
1.0 Manikandan R Ganesh Vijayakumar 14-May-2019 Initial
Swaminathan TVN

2
LTI & ICF Confidential SAP-E2E-408 (Ver. 1.13/15-Jun-2017)
Unit Testing – Material Management

1 Change BOM

Project id: 4136-02 Modules: PP Page


Scenario: Unit Testing –Master Data- Bill of Material Case: Bill of Material - Change
Description: Unit Test plan for Change Bill of Material
Prep. By Manikandan R Run# 1 Revision: 1.0
Geography: LTI (ICF) Run date: 14-05-2019 Status: Completed

Set-up data
Data Object Value/Code Description Comments & Notes
Material
1. 3000000035
Plant
2. FURN
BOM
3. Usage 1
Alternative
4. BOM 1
Component
5. Required Quantity 1000000035 - 2

Sr. Business Transaction Expected Actual results Tester Iteration - 1 Iteration- 2 Status Cause Defect Remarks
no. process steps code/ Fiori results of Severity
App Failure
1. Change Change material Manik Passed Complete
material BOM: BOM: Initial andan d
Change
CS02 Initial screen screen was
material BOM
should be displayed
displayed
2. Enter Material, Manik Passed Complete
Plant, BOM andan d
usage and
Select the new CS02
revision
level(B) and it
will copy the

3
LTI & ICF Confidential SAP-E2E-408 (Ver. 1.13/15-Jun-2017)
Unit Testing – Material Management

Sr. Business Transaction Expected Actual results Tester Iteration - 1 Iteration- 2 Status Cause Defect Remarks
no. process steps code/ Fiori results of Severity
App Failure
new change
number.
3. Go to the User able to Manik Passed Complete
User was able to
change change the andan d
change the
material BOM: CS02 component
component code
General Item code or
or quantity
Overview quantity
4. After finishing Manik Passed Complete
BOM for
all BOM of andan d
material
modifications, CS02 material should
3000000035
click "SAVE" be changed.
changed
Button.
Test Completion Results: Passed: YES Failed: Corrected, re-tested, and passed

Comments:

4
LTI & ICF Confidential SAP-E2E-408 (Ver. 1.13/15-Jun-2017)
Unit Testing – Material Management

Approval: _________________________ Date: ____/____/____

5
LTI & ICF Confidential SAP-E2E-408 (Ver. 1.13/15-Jun-2017)
Unit Testing – Material Management

LTI Project Manager: _________________

Client Project Manager: _________________

Annexure
Field Description
Project Id. Project identification number
Scenario Test Scenario from the Business Process Master List
Modules Name of the module and/or function being tested.
Case The particular situation or case that is being tested within the scenario
Description An explanation of the Scenario/Case
Geography The location, company, plant or other relative organisational unit
Run The actual test iteration
Run Date Date that the test took place for the applicable run
Revision Revision of the Unit Test
Status Status of the Unit Test
Data Object Data element that needs to be entered prior to the test
Value/Code Specific value which the data object must be entered as
Description A short description of what the data object is
Prep. By Name of the person preparing the test case
Comments and Notes Any relevant information as it pertains to the data object
Business Process Steps The business processes and transactions that comprise the Unit test. Normally these steps are formatted in the same way that they
are found on the Business Process Master List
Transaction Code The R/3 transaction that applies to each transaction
Expected Results The results or outcome that is expected from the test
Actual Results The actual results or outcome that was realised
Tester The person who will be performing the test
OK Status of the step ( OK/Failed/Not tested)
Comments Explanatory text, if required, for the entry