Você está na página 1de 7

SQUARE 7 CONSTRUCTION'S

QUANTITY-CHART

Controlled by :- Square 7 Constructions, NSK

Released on :- Gupta Power Industries Ltd. Odisha Wind Zone- Light Zone

Tower Quantities Sub Assembly Requirement as per Approved Check Survey Report

As per Profile Received As Per Check Survey Tower Type P Q R S


from MSETCL Report

Type of Tower Qtys Type of Qtys Total Stubs


Tower

P 14 P 14 22 Normal tower 14 2

P+3 7 P+3 7 3mtr extn


4 8
P+6 1 P+6 1 6mtr extn 8 2

Q+0 2 Q+0 2 4 9 mtr extn

Q+3 1 Q+3 1

Q+6 1 Q+6 1 Templates 2 1 1 2

R 1 R 1 4 Towers

R+3 2 R+3 2 Normal Towers 0 0 0 0

R+6 1 R+6 1

S 3 S 4 8 3 Mtr Extn 0 0 0 0

S+3 3 S+3 3

S+6 1 S+6 1 6 Mtr Extn 0 0 0 0

S+9 0 S+9 0

37 38 9 Mtr Extns 0 0 0 0
TOTAL QTY.

Counter Poise 23
Earthing

Pipe type 15
Earthing
Maharashtra State Electricity Transm
TOWER SCHEDULE-132 KV DCDC Line from 220 KV Taloda Substation to 13

As per Approved Detail Survey letter No 2021 dated 13-12-2018

LOC. Deviation Angle Section Length Ground


Tower Type Span (M) Remarks
No. (DMS) (M) Clerance

74 R+0 16°27'38"L Ap-36 (Old Loc no 74)


305 14.20m River
75 S+0 29°35'31"R 305 Ap-37
290 10.00m RF Boundry
76 R+0 18°18'27"R 290 Ap-38
332 13.80m LT Line/Road/11kv Line
77 S+6 47°20'07"L 332 Ap-39
272 11.50m 11kv Line
78 S+9 13°50'15"L 272 Ap-40
324 23.40m LT Line,Nala, 11kv Line
79 S+3
129 15.5m
80 Q+6
404 8.80m LT Line
81 S+6 37°22'41"L 857 Ap-41
226 10.30m
82 S+0 50°25'40"R 226 Ap-42
224 10.40m
83 S+0 47°25'46"L 224 Ap-43
260 16.1m
84 R+0 17°59'06"R 260 Ap-44
339 10.80m Cart Track
85 S+0 4°07'19"L 339 Ap-45
363 11.50m Road
86 S+0 56°27'53"R 363 Ap-46
301 13.90m Nala
87 S+0
203 9.90m
88 R+0 22°37'42"L 504 Ap-47
260 7.90m Cart Track, LT Line
89 P+0
169 14.00m LT Line
90 Q+0 13°23'34"L 429 Ap-48
221 11.30m LT Line
91 Q+0 14°05'44"R 221 Ap-49
282 6.50m Nala, Road, Wells
92 Q+0 14°19'10"L 282 Ap-50
220 12.20m Nala, 11kv HT Line, LT Line
93 P+0
286 8.80m
94 Q+0 10°28'51"R 506 Ap-51
TOTAL 5410 5410
OLD ABSTRACT -Loc No 74 to 94 New
TOWER
NORMAL 3 M EXTN 6 M EXTN 9 M EXTN Total TOWER TYPE
TYPE
P 2 0 0 0 2 P
Q 4 0 1 0 5 Q
R 4 0 0 0 4 R
S 6 1 2 1 10 S
TOTAL 21 TOTAL
Length of line:- 5.410Kms. Le

Submitted by Recommended
GPIL MSETCL
lectricity Transmission Company Limited
Substation to 132 KV Dhadgaon substation.Check Survey Report from loc no. 74 to 94.

As per Check Survey Profile

Deviation Angle Section Length


LOC. No. Tower Type Span (M) Ground Clerance Remarks
(DMS) (M)

Ap-36 (Old Loc no 74) Due to


74 S+0 16°27'38"L
height of location
305 14.20m River
75 S+0 29°35'31"R 305 Ap-37
290 10.00m RF Boundry
76 R+0 18°18'27"R 290 Ap-38
332 13.80m LT Line/Road/11kv Line
77 S+6 47°20'07"L 332 Ap-39
272 11.50m 11kv Line
78 S+9 13°50'15"L 272 Ap-40
324 23.40m LT Line,Nala, 11kv Line
79 S+3
129 15.5m
80 Q+6
404 8.80m LT Line
81 S+6 37°22'41"L 857 Ap-41
226 10.30m
82 S+0 50°25'40"R 226 Ap-42
224 10.40m
83 S+0 47°25'46"L 224 Ap-43
260 16.1m
84 R+0 17°59'06"R 260 Ap-44
339 10.80m Cart Track
85 S+0 4°07'19"L 339 Ap-45
363 11.50m Road
86 S+0 56°27'53"R 363 Ap-46
301 13.90m Nala
87 S+0
203 9.90m
88 R+3 22°37'42"L 504 Ap-47 ( For gr Clearence)
260 10.20 Cart Track, LT Line
89 P+0
169 14.00m LT Line
90 Q+0 13°23'34"L 429 Ap-48
221 11.30m LT Line
91 Q+3 14°05'44"R 221 Ap-49 ( For Gr Clearence)
282 9.00 Nala, Road, Wells
92 Q+3 14°19'10"L 282 Ap-50 ( For Gr Clearence))
220 12.20m Nala, 11kv HT Line, LT Line
93 P+0
286 8.80m
94 Q+0 10°28'51"R 506 Ap-51
5410 5410
New Abstract Loc No 74 to 94

NORMAL 3 M EXTN 6 M EXTN 9 M EXTN Total

2 0 0 0 2
2 2 1 0 5
2 1 0 0 3
7 1 2 1 11
21
Length of line:- 5.410 Kms.

Recommended by Approved by
MSETCL MSETCL
Stubs requirement for location no 94 to 74

Stubs Requiremnt 21 Sets


Adjusted agaisnt earler surplus supply -- 5 sets
Balance to procure 16 sets as follows
TOWER TYPE NORMAL 3 M EXTN 6 M EXTN 9 M EXTN
P 1 0 0 0
Q 0 2 1 0
R 1 0 0 0
S 7 1 2 1
TOTAL

Note - Towers will be relased on the approval for check survey profile

Note - 1)2 Sets of Q normal to be taken from supply of stubs for 118-95 bat
2)2 sets of R type to be taken from 1-37 stubs supply batch
3)1 set of P normal to be taken from 1-37 stubs supply batch
to 74

Total
1
3
1
11
16

for check survey profile

supply of stubs for 118-95 batch


37 stubs supply batch
-37 stubs supply batch