PROJECT TITLE : FACADE DESIGN OF S

LOCATION : STO ROSARIO, STA ROSA,


OWNER : CATHOLIC CHURCH

SUBJECT : BILL OF MATERIALS


DATE : JULY 21, 2019

MATERIAL COS
DESCRIPTION OF WORKS QTY-UNIT
ITEM UNIT COST
A. GENERAL REQUIREMENTS

Mobilization / Demobilization _
A.1
Temporary facilities
A.2
Clearing and Hauling 1 lot ₱ 5,000.00
A.3
Project Overhead 1 lot ₱ 5,000.00
A.4
B. EARTHWORKS

Excavation 1 lot ₱ 3,000.00


B.1
Backfill ₱ -
B.2

C. COLUMNS / FOOTINGS

C.1) Formworks

2'' x 3'' x 12' Good lumber 1 lot ₱ 8,000.00


C.1.1
2'' x 2'' x 12' Good lumber 1 lot ###
C.1.2
Ordinary Plywood 4' x 8' x 1/2'' 1 lot ₱ 3,500.00
C.1.3
C.2) Reinforce Steel Bars

C.2.1 16mm dia. db 8.00 ₱ 190.00

C.2.2 10mm dia. Db Lateral ties / Temp. bar 26.00 ₱ 155.00

C.2.3 Tirewire #16 1.00 ₱ 1,500.00

C.4) Structural Concrete

C.4.1 Portland cement 40kg 15 ₱ 250.00

C.4.2 Riversand S1 1 lot ₱ 9,000.00

C.4.3 Gravel 3/4 1 lot ₱ 6,000.00

Proposed Facade of Sto Rosario Chapel, 2019


C.4.4 Shovel 2 ₱ 600.00

D. GROUND AND SUSPENDED SLAB

D.1 12mm dia. Temp. ₱ -


D.2 10mm dia. db 10 ₱ 150.00
D.3 Tie wire #16 1 ₱ 1,500.00
D.4 Portland cement 40kg 13 ₱ 250.00
D.5 Riversand S1 1 lot ₱ 2,200.00
D.6 Gravel 3/4 1 lot ₱ 1,500.00
D.7 H-Frame, braces and support 1 lot ###
D.8 Misc. Hardwares 1 lot ₱ 1,500.00

E.) MASONRY WORKS

E.1 CHB #4 160 ₱ 10.00


E.2 10mm dia. Db 12 ₱ 150.00
E.3 Tie wire #16 1 ₱ 1,500.00
E.4 Portland cement 40kg 48 ₱ 250.00
E.5 Riversand S1 2 ₱ 1,800.00
E.6 Misc. Hardwares 1 lot ₱ 1,500.00

Proposed Facade of Sto Rosario Chapel, 2019


F.)PLASTERING WORKS

F.1 Portland cement 40kg 20 ₱ 250.00


F.2 Riversand S1 2 ₱ 1,800.00
F.3 Misc. Hardwares 1 lot ₱ 1,000.00
F.4 H-Frame, braces and support 1 lot ###

G.) WALL FINISHES

G.1 Ez Rock 150 x 600mm (Accent Wall) 257.00 ₱ 275.00


G.2 Portland Cement 40 kg ₱ -
G.3 Riversand S1 1 lot ₱ 9,000.00
G.4 Tile grout 1 lot ₱ 1,500.00
G.5 Tile Adhesive (ABC) 6.00 ₱ 450.00

H.) PAINTING WORKS

H.1 Ceiling (flat latex boysen) (Exterior) 1 lot ₱ 5,000.00


H.2 Exterior walls (elastomeric boysen) 1 lot ###
0 Interior walls (semi gloss latex) ₱ -
H.4 Doors 1 lot ₱ 8,000.00

I.) DOORS AND WINDOWS

I.1 Doors 2 ###


I.2 Windows 13.95 ₱ 5,000.00

J.) STEP WORKS & OTHER EXPENSES

J.1 STEPS 1 lot ###


J.2 Miscellaneous 1 lot ₱ 3,000.00

K.) STEEL WORKS

K.1 SQUARE TUBE 40 ₱ 450.00

A GENERAL REQUIREMENTS

B EARTHWORKS

C COLUMN & FOOTING

D GROUND & SUSP. SLAB

E MASONRY WORKS

Proposed Facade of Sto Rosario Chapel, 2019


F PLASTERING

G FLOOR & WALL FINISHES

H PAINTING WORKS

I DOORS AND WINDOWS

J STEP WORKS & OTHER EXPENSES

K STEEL WORKS

Prepared by: Ar. Angelique Aguilar-Dedoza

Proposed Facade of Sto Rosario Chapel, 2019


OJECT TITLE : FACADE DESIGN OF STO ROSARIO CHAPEL
CATION : STO ROSARIO, STA ROSA, NUEVA EIJA
WNER : CATHOLIC CHURCH

BJECT : BILL OF MATERIALS

Sheet no. 1-2


MATERIAL COST
LABOR TOTAL AMOUNT
TOTAL COST

0 _ Subtotal 1

0 _

5,000 _ ₱ 10,000.00

5,000 _

3,000 1,200 Subtotal 2

0 0 ₱ 3,000.00

8,000 Subtotal 3

15,000 Labor x 40%


₱ 24,400.00
3,500

1,520 Subtotal 4

4,030 Labor x 40%


₱ 6,150.00
1,500

3,750 Subtotal 6

9,000
Labor x 40%
6,000 ₱ 19,950.00

Proposed Facade of Sto Rosario Chapel, 2019


Labor x 40%
₱ 19,950.00

1,200

0 Subtotal 10
1,500
1,500
3,250
Labor x 40%
2,200 ₱ 25,550.00
1,500
15,000
1,500

1,600
1,800
1,500
₱ 21,100.00
12,000
3,600
1,500

Proposed Facade of Sto Rosario Chapel, 2019


5,000 Subtotal 12
3,600
Labor x 40%
1,000 ₱ 19,600.00
25,000

70,675 Subtotal 16
0
9,000 Labor x 40%
₱ 82,255.00
1,500
2,700

5,000 Subtotal 17
35,000
Labor x 40%
0 ₱ 43,200.00
8,000

40,000 Subtotal 19
_
69,750 ₱ 109,750.00

12,000 Subtotal 24
3,000 ₱ 15,000.00

18,000 ₱ 18,000.00

TOTAL

₱ 10,000

₱ 3,000

₱ 50,500

₱ 25,550

₱ 21,100

Proposed Facade of Sto Rosario Chapel, 2019


₱ 19,600

₱ 82,255

₱ 43,200

₱ 109,750

₱ 15,000

₱ 18,000

Grand Total : ₱ 364,955