Você está na página 1de 4

OBP005893

From: HOATS, ROY A


To: (b) (6) ; HOATS, ROY A (b) (6) ADAMS, ROWDY D; MANJARREZ,
VICTOR M; (b) (6)

Subject: RE: EL PASO PF-70 Daily REPORT 9-06-2007


Date: Friday, September 07, 2007 5:11:29 PM
Importance: High

Thank you (b) (6) Please keep us informed.

Regards,
Roy

-----Original Message-----
From: (b) (6)
Sent: Friday, September 07, 2007 3:09 PM
To: HOATS, ROY A; (b) (6) ; ADAMS, ROWDY D;
MANJARREZ, VICTOR M; (b) (6)

Subject: RE: EL PASO PF-70 Daily REPORT 9-06-2007

I have made contact with the vendor that holds the Rental Equipment BPA
for El Paso Sector and he is looking at what it would take to get a
concrete pump truck to Columbus ASAP. I have asked him to provide me
with information on any premium we may need to pay to get the truck to
Columbus faster, quicker, etc. He is going to work on this over the
weekend. As soon as I get the information I will forward.

(b) (6)

-----Original Message-----
From: HOATS, ROY A [mailto:roy.hoats@dhs.gov]
Sent: Friday, September 07, 2007 3:53 PM
To: (b) (6) ADAMS, ROWDY D; MANJARREZ, VICTOR
M; (b) (6)
Cc: (b) (6)
Subject: RE: EL PASO PF-70 Daily REPORT 9-06-2007
Importance: High

Gentlemen,

I have contacted (b) (6) of the PDT. (b) (6) has confirmed there are
available funds. She is diligently working on securing and coordinating
the site placement of the cement pumping truck.
(b) (6) will advise all addressees of progress.

Regards,
Roy

-----Original Message-----
From: (b) (6)
Sent: Friday, September 07, 2007 2:24 PM
To: (b) (6) ADAMS, ROWDY D
Cc: HOATS, ROY A
Subject: RE: EL PASO PF-70 Daily REPORT 9-06-2007

Rowdy,

I just received a call from ACPA Roy Hoats regarding this issue. Have
OBP005894

we made any progress?

(b)
(6)
-----Original Message-----
From: (b) (6)
Sent: Friday, September 07, 2007 10:35 AM
To: ADAMS, ROWDY D
Cc: HOATS, ROY A; (b) (6)
Subject: FW: EL PASO PF-70 Daily REPORT 9-06-2007
Importance: High

Rowdy,
EPT needs a pump truck to finish project. Can they rent one for use by
Seabees? They need to know pretty quick. Unknown costs but needed.
Please advise.
(b)
(6)
(b) (6)
Assistant Chief
OPA Division
Office of Border Patrol
1300 Pennsylvania Ave., NW Suite 6.5E
Washington, D.C. 20229
(b) (6)

-----Original Message-----
From: HOATS, ROY A
Sent: Friday, September 07, 2007 10:18 AM
To: (b) (6)
Cc: (b) (6)

Subject: Fw: EL PASO PF-70 Daily REPORT 9-06-2007

Gentlemen,

Please review the attached correspondence. EPT is requesting


assistance.

We need the cement pump truck. What can you do to assist?

Please forward you responses to all addressees.

Regards,
Roy

----- Original Message -----


From: MANJARREZ, VICTOR M
To: HOATS, ROY A; (b) (6)
Sent: Fri Sep 07 07:23:47 2007
Subject: Fw: EL PASO PF-70 Daily REPORT 9-06-2007

Roy

Please find out what we need to do to get a pump truck. The project is
not complete until the concrete is in. Please make these inquiries
yourself with either the PDT or SBI at HQOBP.

Thanks
OBP005895

Vic

----- Original Message -----


From: (b) (6)
To: (b) (6)
HOATS,
ROY A; (b) (6)
MANJARREZ, VICTOR M;
(b) (6)

Cc: (b) (6) ; ADAMS, ROWDY D; (b) (6)

Sent: Fri Sep 07 02:55:28 2007


Subject: EL PASO PF-70 Daily REPORT 9-06-2007

Daily El Paso PF-70 Columbus Fence report attached for review.

Snapshot for 09/06/2007

All,

09/5/2007 Evening shift OBP Agents fabricated 5 panels and conducted


site clean up and equipment inventory.

Today: 0 Seabees on dayshift. 18 OBP Agents on evening shift.

Seabees poured 7 yards of concrete prior to standing down for the


weather.

Evening shift OBP Agents were unable to reach the fence due to wet
unstable roadways. The weather hampered efforts today. Agents
consolidated materials and graded the fabrication yard area. 30% chance
of rain predicted through the weekend.

Two panels and the gate remain to be installed south of the corrals
area.

Seabees plan on utilizing a "ground hog" for grouting the bollards.


They anticipate this process to last several weeks. Chief (b) (6)
believes this time would be cut by two thirds using a pump truck. At
OBP005896

this time he does not expect approval to procure one.

Below I have amended the total remaining to complete the "1/2 mile
option" as reported by the Seabees and DHS QC Crandall.

Total PPB installed today - 0 Lin. Ft.

Cumulative PPB installed to date - 15,853 Lin. Ft.

Total 3 mile PPB remaining to be installed - 0 Lin. Ft.


Total "Half mile option" remaining to be installed - 1580 Lin. Ft.

55 panels of fence are staged near the install site.

An additional 1600 pieces of steel remain to be delivered. This


additional steel will be used to complete the additional .3 mile.
Seabees report they do not have a date for delivery.

PF-70 Columbus Fence Project maintains 18 detailed OBP Agents. 2 DNM


detailers departed for OBP training.

Thank you

(b) (6)
Supervisory Border Patrol Agent