Você está na página 1de 20

OWNER GLTK Asia Limited

SHIP NUMBER SC292 CLASS NIPPON KAIJI KYOKAI


SHIP NAME POLA ARIAKE FLAG PANAMANIAN
SHIP TYPE 38BC
MAIN ENGINE MITSUI - M.A.N. B&W 6S50ME-B8.5

PRELIMINARY 1ST DAY OFFICIAL 2ND DAY OFFICIAL


SEA TRIAL DATE Aug., 22, 2019 Aug., 23, 2019 Aug., 24, 2019
DRAFT MEASUREMENT DRAFT MEASUREMENT ANCHOR LOWERING AND
TEST ITEMS (PRELIM.) (OFFICIAL) HOISTING TEST
SPEED TRIAL STEERING GEAR TEST

CRASH STOP ASTERN TEST


(C.S.O.)

SPEED TRIAL 65%


73.5 % C.S.O.
M.C.O.

GUARANTEED SPEED 14.8 kts (C.S.O.)


GUARANTEED DISPLACEMENT 19,800 mt

PARTICULARS:
WINDLASS 220 kN (22.4 mt) x 9 m/min
24.5 MPa MAX. PRESSURE
88 A MAX. AMPERAGE
STEERING GEAR KAWASAKI
21.1 MPa MAX. PRESSURE
31 A MAX. AMPERAGE
SC292
M.V. POLA ARIAKE
LBP (m) B (m) D (m)
176.80 30.00 15.00
MAIN ENGINE
MITSUI - M.A.N. B&W 6S50ME-B8.5

TRIAL CONDITION

FORE m
DRAFT

MID m

AFT m

TRIM m

DISPLACEMENT* mt
* GUARANTEED DISPLACEMENT = 19,800 mt
SC292 M.V. POLA ARIAKE
STEERING GEAR TEST :
TEST NO. PORT  STBD TIME (sec.)
No.1 CONT. SYS. 35° → 30° (<28.0)
1
No.1 PUMP UNIT 30° ← 35° (<28.0)

No.2 CONT. SYS. 30° ← 35° (<28.0)


2
No.2 PUMP UNIT 35° → 30° (<28.0)
No.2 CONT. SYS. 15° → 15° (<60.0)
3 No.2 PUMP UNIT
(Emerg. Gen.) 15° ← 15° (<60.0)

Change time : Main Gen. to Em.Gen. IN _________________ (<45.0 sec.)


Remark: time in bracket() shows SOLAS requirement.

ANCHOR LOWERING AND HOISTING TEST :


TEST NO. SPEED (m/min.)

PORT (3→1) (>9.0)


STBD (3→1) (>9.0)
Remark: Speed in bracket() shows CLASS requirement.

CRASH STOP ASTERN TEST :


TEST ITEMS TRACK REACH

CRASH STOP ASTERN TEST C.S.O. (<15.0 Lbp)


Remark: Figure in bracket() shows IMO standard.
DRAFT MEASUREMENT
SC292 M.V.POLA ARIAKE
Date : Aug., 22, 2019
at : Tañon Strait
1) General
Dimension : (Lbp) 176.80 x (B) 30.00 x (D) 15.00 (d) 12.80
Note (Wt. Condition etc.) :

2) Draft and Trim


Measured Draft (M) Correction to p.p.
P S mean correct. draft at p.p.
fore
mid. (dO) -
aft.
mean (dm ) - - - -
trim - - -
(for p.p. correct.)

3) Displacement
Deflection (dm - dO) -sagg., +hogg. m
Corrected draft for deflection (dm - 3/4def.) m
Displacement for above mt
Correction of dispt. due to trim at:d=(dm+def.) mt
Displacement as S.G. of water 1.0250 mt
(Actual displacement at S.G. ) ( mt)

Displacement total mt
(estimated = mt)
SC292 M.V. POLA ARIAKE
PROGRESSIVE SPEED TRIAL DATE : Aug., 23, 2019
Measured by the "Differential Global Positioning System (D.G.P.S.)" SEA DEPTH : over 450 m
Course R.P.M. Entered Meas. M/E Air Wind
Direction Time Speed B.H.P. Barometer Sea Wave Height
Load No. Steady Time Steady Time Time Distance Rev. Temp. Dir. & Speed Weather
(deg.) (sec.) (knots) (kW) (HPa) Condition & Direction
(hour:min.) (hour:min.) (hour:min.) (m) (rpm) (℃) (P/S) ;(m/sec.)

1
5,556 ;

65% 2
5,556 ;

Mean
1
5,556 ;
73.5 %
2
C.S.O. 5,556 ;

Mean
1
5,556 ;

M.C.O. 2
5,556 ;

Mean
1
5,556 ;

2
5,556 ;

Mean
1
5,556 ;

2
5,556 ;

Mean
SC292 M.V. POLA ARIAKE PROGRESSIVE SPEED TRIAL
Measured by the "Differential Global Positioning System (D.G.P.S.)"
COURSE REACH TIME SPEED M/E REV.
LOAD
(deg.) (m) (sec.) (knots) (rpm)
5,556
65% 5,556
MEAN
5,556
73.5 %
5,556
C.S.O. MEAN
5,556
M.C.O. 5,556
MEAN
5,556
5,556

* GUARANTEED SPEED (C.S.O.) > 14.8 kts


EEDI SPEED TRIAL DATA SHEET

HULL NO. SC292 OWNER GLTK Asia Limited


SHIP'S NAME POLA ARIAKE CLASS / CLASS NO. NIPPON KAIJI KYOKAI
TRIAL DATE Aug., 23, 2019 FLAG PANAMANIAN

SPEED TRIAL RECORD

PRINCIPAL DIM. LOCATION (around) PLACE OF


176.8m x 30 m x 15 m N: 10° 34' ; E: 123° 36' TANON STRAIT
(LBP x Bmld x Dmld) (Longitude, Latitude) TRIAL
SHIP CONDITION ENVIRONMENTAL CONDITIONS MAIN ENGINE
DRAFT (EXT.) REQUIREMENT WEATHER SEA TYPE MITSUI - M.A.N. B&W 6S50ME-B8.5
CLOUDY SMOOTH
dF m ± 0.1 m of 3.54 m CONDITION CONDITION M.C.O. 6,780 kW X 108.0 rpm
dM m SEA S.G. 1.0215 C.S.O. 4,980 kW x 97.5 rpm
ABS. WIND 3 m/s; 173.2°S
dA m WATER TEMP. 29.0 PROPELLER
SPEED & DIR.
TRIM m PRESS. 1001.0 B.F. No. 2 DIAMETER 6,000 mm
ATMOS.
DISPLACEMENT TEMP. 27.0 SEA DEPTH 450 m PITCH 4,386.6 mm
mt < 2% of 19,800 mt ANEMOMETER POSITION (ABOVE W.L.) 39.3 m NO. OF BLADES 4

TIME IN DURATION SPEED M/E REV. B.H.P. RELATIVE WIND WAVE SWELL WEATHER SEA
LOAD RUN DIR.
(HR:MIN) (MINS.) (KNOTS) (RPM) (kW) SPEED DIR. HEIGHT DIR. PERIOD HEIGHT DIR. PERIOD CONDITION CONDITION

1
65%
2
73.5 % 1
C.S.O. 2
1
M.C.O.
2

OWNER : CLASS : BUILDER :

SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE


SC292 M.V. POLA ARIAKE WIND VEL.& DIRECTION
( at SPEED TRIAL )

LOAD 65% 73.5 % C.S.O. M.C.O. 0%


1ST 2ND 1ST 2ND 1ST 2ND 1ST 2ND

TIME
DIR. VEL. DIR. VEL. DIR. VEL. DIR. VEL. DIR. VEL. DIR. VEL. DIR. VEL. DIR. VEL.
1 0 m/s m/s m/s m/s m/s m/s m/s m/s

2 30" m/s m/s m/s m/s m/s m/s m/s m/s

3 1' m/s m/s m/s m/s m/s m/s m/s m/s

4 30" m/s m/s m/s m/s m/s m/s m/s m/s

5 2' m/s m/s m/s m/s m/s m/s m/s m/s

6 30" m/s m/s m/s m/s m/s m/s m/s m/s

7 3' m/s m/s m/s m/s m/s m/s m/s m/s

8 30" m/s m/s m/s m/s m/s m/s m/s m/s

9 4' m/s m/s m/s m/s m/s m/s m/s m/s

10 30" m/s m/s m/s m/s m/s m/s m/s m/s

11 5' m/s m/s m/s m/s m/s m/s m/s m/s

12 30" m/s m/s m/s m/s m/s m/s m/s m/s

13 6' m/s m/s m/s m/s m/s m/s m/s m/s

14 30" m/s m/s m/s m/s m/s m/s m/s m/s

15 7' m/s m/s m/s m/s m/s m/s m/s m/s

16 30" m/s m/s m/s m/s m/s m/s m/s m/s

17 8' m/s m/s m/s m/s m/s m/s m/s m/s

18 30" m/s m/s m/s m/s m/s m/s m/s m/s

19 9' m/s m/s m/s m/s m/s m/s m/s m/s

20 30" m/s m/s m/s m/s m/s m/s m/s m/s

21 10' m/s m/s m/s m/s m/s m/s m/s m/s

22 30" m/s m/s m/s m/s m/s m/s m/s m/s

23 11' m/s m/s m/s m/s m/s m/s m/s m/s

24 30" m/s m/s m/s m/s m/s m/s m/s m/s

25 12' m/s m/s m/s m/s m/s m/s m/s m/s

26 30" m/s m/s m/s m/s m/s m/s m/s m/s

27 13' m/s m/s m/s m/s m/s m/s m/s m/s

28 30" m/s m/s m/s m/s m/s m/s m/s m/s

29 14' m/s m/s m/s m/s m/s m/s m/s m/s

30 30" m/s m/s m/s m/s m/s m/s m/s m/s

31 15' m/s m/s m/s m/s m/s m/s m/s m/s

32 30" m/s m/s m/s m/s m/s m/s m/s m/s

AVE. m/s m/s m/s m/s m/s m/s m/s m/s


SC292 M.V. POLA ARIAKE

ANCHOR LOWERING AND HOISTING TEST


SEA DEPTH m
DESIGNED LOAD 220 kN (22.4 mt) x 9 m/min
TEST SIDE SHACKLE TIME SPEED
( min - sec. ) ( m/min )

PORT 3 → 1

STBD 3 → 1
SC292 M.V. POLA ARIAKE
ANCHOR LOWERING AND HOISTING TEST
P/S ELEC. MOTOR (AMPERAGE)
MAX. AMPERE 88 A
PORT SIDE STBD SIDE
2-LENGTH HOISTING 2-LENGTH HOISTING
MOTOR 1 MOTOR 2 MOTOR 1 MOTOR 2

MAX. A MAX. A MAX. A MAX. A


SC292 M.V. POLA ARIAKE
ANCHOR LOWERING AND HOISTING TEST
NO. 1&2 PUMP UNIT (OIL PRESSURE)
MAX. PRESSURE 24.5 MPa
PORT SIDE STBD SIDE
2-LENGTH HOISTING 2-LENGTH HOISTING
NO.1 PUMP NO.2 PUMP NO.1 PUMP NO.2 PUMP

MAX. MPa MAX. MPa MAX. MPa MAX. MPa


SC292 M.V. POLA ARIAKE
ANCHOR LOWERING AND HOISTING TEST
WINDLASS BEARING TEMP.

PORT SIDE STBD SIDE


SC292 M.V. POLA ARIAKE
STEERING GEAR TEST NO.1
STEERING OPERATION
SHIP'S SPEED M.C.O.
CONTROL SYSTEM NO.1
PUMP UNIT NO.1

P35° S35°

(<28sec
.)

28 se c. )
(<

INITIAL SPEED:
KTS.

Time in bracket () shows SOLAS requirement.


SC292 M.V. POLA ARIAKE
STEERING GEAR TEST NO.2
STEERING OPERATION
SHIP'S SPEED M.C.O.
CONTROL SYSTEM NO.2
PUMP UNIT NO.2

P35° S35°

<28 se c. )
(

(<28sec
.)

INITIAL SPEED:
KTS.

Time in bracket () shows SOLAS requirement.


SC292 M.V. POLA ARIAKE
STEERING GEAR TEST NO.3
STEERING OPERATION
over 1/2 M.C.O. speed or 7 knots,
SHIP'S SPEED whichever is greater
CONTROL SYSTEM NO.2
PUMP UNIT NO.2

P15° S15°

(<60sec
.)

60 se c. )
(<

EMERG.GEN.
INITIAL SPEED:
TIME IN:
KTS. (<45sec.)

(over 1/2 M.C.O. speed)

Time in bracket () shows SOLAS requirement.


SC292 M.V. POLA ARIAKE
STEERING GEAR TEST NO.4
STEERING OPERATION
over 1/2 M.C.O. speed or 7 knots,
SHIP'S SPEED whichever is greater
CONTROL SYSTEM TORQUE MOTOR
PUMP UNIT NO.2

P15° S15°

INITIAL SPEED:
KTS.
(over 1/2 M.C.O. speed)
SC292 M.V. POLA ARIAKE PUMP UNIT NO.1
(PRESSURE) Working Pressure 21.1 Mpa

No.1 STEERING GEAR TEST No.2  STEERING GEAR TEST No.3  STEERING GEAR TEST No.4 STEERING GEAR TEST
RUDDER ANGLE MPa MAX RUDDER ANGLE MPa MAX RUDDER ANGLE MPa MAX RUDDER ANGLE MPa MAX
1 0 1 0 1 0 1 0
2 5 2 5 2 5 2 5

3 10 3 10 3 10 3 10
4 15 4 15 4 15 4 15
① ① ①
5 20 5 20 5 15
6 25 6 25 6 10
7 30 7 30 7 5
8 35 8 35 ② 8 0
9 35 9 35 9 5
10 30 10 30 10 10
11 25 11 25 11 15
12 20 12 20 5 15 12 15
13 15 13 15 6 10 13 10
14 10 14 10 7 5 14 5
15 5 15 5 8 0 ③ 15 0
② ② ②
16 0 16 0 9 5 16 5
17 5 17 5 10 10 17 10
18 10 18 10 11 15 18 15
19 15 19 15 19 15
20 20 20 20 20 10

21 25 21 25 21 5
22 30 22 30 22 0
23 35 23 35
24 30 24 30
25 25 25 25 0° 0°
26 20 26 20 12 15
27 15 27 15 13 10 ④ ④
28 10 28 10 14 5
29 5 29 5 15 0
③ ③ ③
30 0 30 0 16 5
31 5 31 5 17 10 ③ ③
32 10 32 10 18 15
33 15 33 15
34 20 34 20
35 25 35 25
② ②
36 30 36 30
37 35 37 35
38 30 38 30
39 25 39 25
① ①
40 20 40 20
④ ④ ④
41 15 41 15 19 15
42 10 42 10 20 10
43 5 43 5 21 5 MAIN MAIN
44 0 44 0 22 0 STEERING STEERING
SC292 M.V. POLA ARIAKE PUMP UNIT NO.2
(PRESSURE) Working Pressure 21.1 Mpa

No.1 STEERING GEAR TEST No.2  STEERING GEAR TEST No.3  STEERING GEAR TEST No.4 STEERING GEAR TEST
RUDDER ANGLE MPa MAX RUDDER ANGLE MPa MAX RUDDER ANGLE MPa MAX RUDDER ANGLE MPa MAX
1 0 1 0 1 0 1 0
2 5 2 5 2 5 2 5

3 10 3 10 3 10 3 10
4 15 4 15 4 15 4 15
① ① ①
5 20 5 20 5 15
6 25 6 25 6 10
7 30 7 30 7 5
8 35 8 35 ② 8 0
9 35 9 35 9 5
10 30 10 30 10 10
11 25 11 25 11 15
12 20 12 20 5 15 12 15
13 15 13 15 6 10 13 10
14 10 14 10 7 5 14 5
15 5 15 5 8 0 ③ 15 0
② ② ②
16 0 16 0 9 5 16 5
17 5 17 5 10 10 17 10
18 10 18 10 11 15 18 15
19 15 19 15 19 15
20 20 20 20 20 10

21 25 21 25 21 5
22 30 22 30 22 0
23 35 23 35
24 30 24 30
25 25 25 25 0° 0°
26 20 26 20 12 15
27 15 27 15 13 10 ④ ④
28 10 28 10 14 5
29 5 29 5 15 0
③ ③ ③
30 0 30 0 16 5
31 5 31 5 17 10 ③ ③
32 10 32 10 18 15
33 15 33 15
34 20 34 20
35 25 35 25
② ②
36 30 36 30
37 35 37 35
38 30 38 30
39 25 39 25
① ①
40 20 40 20
④ ④ ④
41 15 41 15 19 15
42 10 42 10 20 10
43 5 43 5 21 5 MAIN MAIN
44 0 44 0 22 0 STEERING STEERING
SC292 M.V. POLA ARIAKE CONTROL SYSTEM NO.1 & NO.2
( AMPERE) Max 31 A

No.1 STEERING GEAR TEST No.2  STEERING GEAR TEST No.3  STEERING GEAR TEST No.4 STEERING GEAR TEST
RUDDER ANGLE A MAX RUDDER ANGLE A MAX RUDDER ANGLE A MAX RUDDER ANGLE A MAX
1 0 1 0 1 0 1 0
2 5 2 5 2 5 2 5

3 10 3 10 3 10 3 10
4 15 4 15 4 15 4 15
① ① ①
5 20 5 20 5 15
6 25 6 25 6 10
7 30 7 30 7 5
8 35 8 35 ② 8 0
9 35 9 35 9 5
10 30 10 30 10 10
11 25 11 25 11 15
12 20 12 20 5 15 12 15
13 15 13 15 6 10 13 10
14 10 14 10 7 5 14 5
15 5 15 5 8 0 ③ 15 0
② ② ②
16 0 16 0 9 5 16 5
17 5 17 5 10 10 17 10
18 10 18 10 11 15 18 15
19 15 19 15 19 15
20 20 20 20 20 10

21 25 21 25 21 5
22 30 22 30 22 0
23 35 23 35
24 30 24 30
25 25 25 25 0° 0°
26 20 26 20 12 15
27 15 27 15 13 10 ④ ④
28 10 28 10 14 5
29 5 29 5 15 0
③ ③ ③
30 0 30 0 16 5
31 5 31 5 17 10 ③ ③
32 10 32 10 18 15
33 15 33 15
34 20 34 20
35 25 35 25
② ②
36 30 36 30
37 35 37 35
38 30 38 30
39 25 39 25
① ①
40 20 40 20
④ ④ ④
41 15 41 15 19 15
42 10 42 10 20 10
43 5 43 5 21 5 MAIN MAIN
44 0 44 0 22 0 STEERING STEERING
SC292 M.V. POLA ARIAKE
TIME TIME SEA WIND SEA DEPTH HEADING M/E REV. INITIAL
TEST ITEM START FINISHED
WEATHER
CONDITION DIRECTION ; SPEED (m) (deg) (rpm) SPEED
PRELIMINARY
Aug., 22, 2019
DRAFT MEASUREMENT (PRELIM.) ; - -

1ST DAY OFFICIAL


Aug., 23, 2019
DRAFT MEASUREMENT (OFFICIAL) ; - -
SPEED TRIAL ;
CRASH STOP ASTERN TEST (C.S.O.) ;

2ND DAY OFFICIAL


Aug., 24, 2019
ANCHOR LOWERING AND HOISTING TEST ; - -
STEERING GEAR TEST ;