1 Mobilization - 4
2 Clearing Lot 1 1
3 Excavate for foundation 2 24
4 Layout Footings 3 28
5 Dig Footings 3 20
6 Install Formworks for Footing 5 5
7 Install Reinforcing Bars for Footing 5 3
8 Pour Footings 7 6
9 Install Formworks for Column and Beam 8 4
10 Install Reinforcing Bars for Column and Beam 10 5
11 Pour Column and Beam 11 28
12 1st Floor Deck Framing 12 10
13 1st Floor Wall Framing 12 3
14 Install Formworks for Slab (1st Floor) 14 7
15 Install Reinforcing Bars for Slab (1st Floor) 15 3
16 Termite Treatment for Slab 16 3
17 Slab Inspection 16 1
18 Pour 1st Floor Slab 18 28
19 2nd Floor Deck Framing 19 10
20 2nd Floor Wall Framing 19 3
21 Install Formworks for Slab (2nd Floor) 21 3
22 Install Reinforcing Bars for Slab (2nd Floor) 22 5
23 Termite Treatment for Slab 23 3
24 Slab Inspection 23 1
25 Pour 2nd Floor Slab 25 28
26 Install Formworks for Stairs 26 5
27 Install Reinforcing Bars for Stairs 26 8
28 Pour Stairs 28 28
29 Set Roof Trusses 29 3
30 Frame Roof 29 3
31 Install Roof Plywood 29 2
32 Install Windows and Doors 32 28
33 Caulk and Air Seal 33 1
34 Draft and Fire Stop 33 30
35 Batt Insulation 35 4
36 Stock Drywall 36 1
37 Hang Drywall 37 2
38 Remove Scrap Drywall 38 1
39 Tape and Finish Drywall 39 4
40 Ceramic Tile 40 5
41 Install Hardwood Floor 41 7
42 Sand, Stain, Seal Hardwood 42 3
43 Final Coat Hardwood 43 1
44 Installation of roofing 44 7
45 Plastering of wall 45 3
46 Prime Paint Drywall 46 7
47 Prime Trim 47 7
48 Finish Coat Trim 48 7
49 Finish Coat Drywall 49 1
Plumbing
Electrical
Mechanical
E
E
E

E
M
M
OR

M
TI
TI
TI

TI

E
LY
C

NC
C

ED
TI
TI

KE

IA
IS

CT
IS

R
LI
IM
M

VA
PE
T
TI

SS

OS

EX
OP

PE

6 5M 5.000 0.111 1
3 1 1.333 0.111 2
36 30 30.000 4.000 3
42 28 30.333 5.444 4
30 25 25.000 2.778 5
10 7 7.167 0.694 6
10 5 5.500 1.361 7
2 3 3.333 0.444 8
5 5 4.833 0.028 9
9 7 7.000 0.444 10
35 28 29.167 1.361 11
15 12 12.167 0.694 12
5 4 4.000 0.111 13
11 8 8.333 0.444 14
8 5 5.167 0.694 15
7 5 5.000 0.444 16
3 2 2.000 0.111 17
35 28 29.167 1.361 18
15 12 12.167 0.694 19
3 3 3.000 0.000 20
5 4 4.000 0.111 21
9 7 7.000 0.444 22
7 5 5.000 0.444 23
3 2 2.000 0.111 24
35 28 29.167 1.361 25
12 10 9.500 1.361 26
10 8 8.333 0.111 27
35 28 29.167 1.361 28
7 5 5.000 0.444 29
7 5 5.000 0.444 30
14 7 7.333 4.000 31
48 30 32.667 11.111 32
3 2 2.000 0.111 33
40 30 31.667 2.778 34
7 5 5.167 0.250 35
3 2 2.000 0.111 36
4 2 2.333 0.111 37
3 2 2.000 0.111 38
9 7 6.833 0.694 39
10 11 9.833 0.694 40
12 10 9.833 0.694 41
7 5 5.000 0.444 42
2 3 2.500 0.028 43
21 14 14.000 5.444 44
10 8 7.500 1.361 45
35 30 27.000 21.778 46
20 14 13.833 4.694 47
10 7 7.500 0.250 48
2 1 1.167 0.028 49

ES Activity # EF
S Description
LS D LF

ES = Early start
EF = Early finish
LS = Late start
LF = Late finish
D = Duration
S = Slack time
0 1 5.000
0.000 Mobilization
0.000 5.000 5.000

11.833 11 41.000
0.000 Pour Column and Beam
11.833 29.167 41.000

41.000 12 53.167
0.000 1st Floor Deck Framing
41.000 12.167 53.167

103.667 24 105.667
0.000 Slab Inspection
103.667 2.000 105.667
217.167 36 219.167
0.000 Stock Drywall
217.167 2.000 219.167

219.167 37 221.500
0.000 Hang Drywall
219.167 2.333 221.500

221.500 38 223.500
0.000 Remove Scrap Drywall
221.500 2.000 223.500

223.500 39 230.333
0.000 Tape and Finish Drywall
223.500 6.833 230.333

POSSIBLE PATHS:
1. 1-2-3-4
2. 1-2-3-5-6
3. 1-2-3-5-7-8
4. 1-2-3-5-7-9-10-11-12
5. 1-2-3-5-7-9-10-11-12-14-15-16
6. 1-2-3-5-7-9-10-11-12-14-15-16-18-19
7. 1-2-3-5-7-9-10-11-12-14-15-16-18-19-21-22-23-24-25-26
8. 1-2-3-5-7-9-10-11-12-14-15-16-18-19-21-22-23-24-25-27-28-29-30-31
9. 1-2-3-5-7-9-10-11-12-14-15-16-18-19-21-22-23-24-26-28-29-32-33-34
10. 1-2-3-5-7-9-10-11-12-14-15-16-18-19-21-22-23-25-26-28-29-32-33-35-36-37-38-39-40-41-42-43-44-45-46-47-48-49

Project Variance = σp²


where σp² is the sum of the variances along the critical path
σp2 =I9+I10+I11+I13+I15+I17+I18+I19+I20+I22+I23+I24+I26+I27+I29+I30+I31+I33+I34+I36+I37+I40+I41+I43+I44+I45+I46+I4
σp2 = 65

Standard Deviation = σp
σp = 8.1 days

Therefore, the project standard deviation is = ± 8


Due date:
Project duration:

Z-score = (due date - expected date)/σp


Z-score = (411-395)/8.1
Z-score = 1.9753
5.000 2 6.333
0.000 Clearing Lot
5.000 1.333 6.333

4.833 10 11.833
0.000 Install Reinforcing Bars for Column and Beam
4.833 7.000 11.833

41.000 13 45.000
0.000 1st Floor Wall Framing
41.000 4.000 45.000

103.667 23 108.667
0.000 Termite Treatment for Slab
103.667 5.000 108.667

96.667 22 103.667
0.000 Install Reinforcing Bars for Slab (2nd Floor)
96.667 7.000 103.667

105.667 25 134.833
0.000 Pour 2nd Floor Slab
105.667 29.167 134.833

134.833 26 144.333
0.000 Install Formworks for Stairs
134.833 9.500 144.333
212.000 35 217.167
0.000 Batt Insulation
212.000 5.167 217.167

230.333 40 240.167
0.000 Ceramic Tile
230.333 9.833 240.167

327.333 49 328.500
0.000 Finish Coat Drywall
327.333 1.167 328.500

64
68.000
69
118
136
176
232
275
299
41-42-43-44-45-46-47-48-49 416
37+I40+I41+I43+I44+I45+I46+I47+I48+I49+I50+I51+I52+I53+I54+I55+I56+I57

days
96.11%
411 days Chance of completion by due date
395 days

3.89%
Chance of failing to meet the due date
36.333 4 66.667
0.000 Layout Footings
36.333 30.333 66.667

6.333 3 36.333
0.000 Excavate for foundation
6.333 30.000 36.333

0.000 9 4.833
0.000 Install Formworks for Column and Beam
0.000 4.833 4.833

45.000 14 53.333
0.000 Install Formworks for Slab (1st Floor)
45.000 8.333 53.333

92.667 21 96.667
0.000 Install Formworks for Slab (2nd Floor)
92.667 4.000 96.667

134.833 27 143.167
0.000 Install Reinforcing Bars for Stairs
134.833 8.333 143.167
210.000 33 212.000
0.000 Caulk and Air Seal
210.000 2.000 212.000

212.000 34 243.667
0.000 Draft and Fire Stop
212.000 31.667 243.667

240.167 41 250.000
0.000 Install Hardwood Floor
240.167 9.833 250.000

319.833 48 327.333
0.000 Finish Coat Trim
319.833 7.500 327.333
etion by due date

to meet the due date


61.333 6 68.500
0.000 Install Formworks for Footing
61.333 7.167 68.500

36.333 5 61.333
0.000 Dig Footings
36.333 25.000 61.333

53.333 15 58.500
0.000 Install Reinforcing Bars for Slab (1st Floor)
53.333 5.167 58.500

58.500 16 63.500
0.000 Termite Treatment for Slab
58.500 5.000 63.500

89.667 20 92.667
0.000 2nd Floor Wall Framing
89.667 3.000 92.667

143.167 28 172.333
0.000 Pour Stairs
143.167 29.167 172.333

177.333 32 210.000
0.000 Install Windows and Doors
177.333 32.667 210.000

250.000 42 255.000
0.000 Sand, Stain, Seal Hardwood
250.000 5.000 255.000

306.000 47 319.833
0.000 Prime Trim
306.000 13.833 319.833

64
68.000
69
118
136
176
232
275
299
416 CRITICAL PATH
66.833 8 70.167
0.000 Pour Footings
66.833 3.333 70.167

61.333 7 66.833
0.000 Install Reinforcing Bars for Footing
61.333 5.500 66.833

58.500 17 60.500
0.000 Slab Inspection
58.500 2.000 60.500

60.500 18 89.667 89.667


0.000 Pour 1st Floor Slab 0.000
60.500 29.167 89.667 89.667

177.333
0.000
177.333
172.333 29 177.333
0.000 Set Roof Trusses
172.333 5.000 177.333 177.333
0.000
177.333
255.000 43 257.500
0.000 Final Coat Hardwood
255.000 2.500 257.500

257.500 44 271.500
0.000 Installation of roofing
257.500 14.000 271.500

271.500 45 279.000
0.000 Plastering of wall
271.500 7.500 279.000

279.000 46 306.000
0.000 Prime Paint Drywall
279.000 27.000 306.000
19 101.833
2nd Floor Deck Framing
12.167 101.833

30 182.333
Frame Roof
5.000 182.333

31 184.667
Install Roof Plywood
7.333 184.667
Workers
4

N
IO
TY

PT
VI 4

RI
TI

SC
AC

DE
Foreman Engineer
1 Mobilization 1 1
2 Clearing Lot 1 1
3 Excavate for foundation 1 1
4 Layout Footings 1 1
5 Dig Footings 1 1
6 Install Formworks for Footing 1 1
7 Install Reinforcing Bars for Footing 1 1
8 Pour Footings 1 1
9 Install Formworks for Column and Beam 1 1
10 Install Reinforcing Bars for Column and Beam 1 1
11 Pour Column and Beam 1 1
12 1st Floor Deck Framing 1 1
13 1st Floor Wall Framing 1 1
14 Install Formworks for Slab (1st Floor) 1 1
15 Install Reinforcing Bars for Slab (1st Floor) 1 1
16 Termite Treatment for Slab 1 1
17 Slab Inspection 1 1
18 Pour 1st Floor Slab 1 1
19 2nd Floor Deck Framing 1 1
20 2nd Floor Wall Framing 1 1
21 Install Formworks for Slab (2nd Floor) 1 1
22 Install Reinforcing Bars for Slab (2nd Floor) 1 1
23 Termite Treatment for Slab 1 1
24 Slab Inspection 1 1
25 Pour 2nd Floor Slab 1 1
26 Install Formworks for Stairs 1 1
27 Install Reinforcing Bars for Stairs 1 1
28 Pour Stairs 1 1
29 Set Roof Trusses 1 1
30 Frame Roof 1 1
31 Install Roof Plywood 1 1
32 Install Windows and Doors 1 1
33 Caulk and Air Seal 1 1
34 Draft and Fire Stop 1 1
35 Batt Insulation 1 1
36 Stock Drywall 1 1
37 Hang Drywall 1 1
38 Remove Scrap Drywall 1 1
39 Tape and Finish Drywall 1 1
40 Ceramic Tile 1 1
41 Install Hardwood Floor 1 1
42 Sand, Stain, Seal Hardwood 1 1
43 Final Coat Hardwood 1 1
44 Installation of roofing 1 1
45 Plastering of wall 1 1
46 Prime Paint Drywall 1 1
47 Prime Trim 1 1
48 Finish Coat Trim 1 1
49 Finish Coat Drywall 1 1
Plumbing 1 1
Electrical 1 1
Mechanical 1 1
CHB per sqrt meter Area Days Workers Column/ Cu.m
8 180 23 2 7
Cubic Meter/ Day / Person EXCAVATION Foundation/ Cu.m
2 200 25 2 7

Carpenter Mason Labor Plumber Welder


1 2
3
5
5

2 2
Total Column/ Cu.m Days Workers Beam/ Cu.m Total Beam/ Cu.m
16.875 3 2 7 25
Total Foundation / Cu.m
10.29 2

Electrician Steelman Days Workers


7 2
3 Painter
3 1
2 Workers
3
Steelman
3
Carpenter
2

24
Days
4

Plaster sqrt meter / day Cubic meter Days


50 360 8
1 coat sqrt meter / person/day
120 560 5
Tile / square meter
18 200 11
Rebar Form/pc/day Total Column
4 15 4
Formworks/pc/day
4 15 4

Você também pode gostar